Professional Documents
Culture Documents
Nammiaca 000024
Nammiaca 000024
HIGHLIGHTS
Pages which have been revised are outlined below, together with the Highlights of the
Revision
--------------------------------------------------------------------------------------
CH/SE/SU C REASON FOR CHANGE EFFECTIVITY
PAGES
--------------------------------------------------------------------------------------
CHAPTER 33
__________
33-HIGHLIGHTS Page 1 of 1
REVISION NO. 57 May 01/08
IAC
CHAPTER 33
__________
LIGHTS
33-L.E.P. Page 1
May 01/08
IAC
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
33-L.E.P. Page 2
May 01/08
IAC
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
33-L.E.P. Page 3
May 01/08
IAC
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
33-L.E.P. Page 4
May 01/08
IAC
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
33-L.E.P. Page 5
May 01/08
IAC
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
33-L.E.P. Page 6
May 01/08
IAC
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
33-L.E.P. Page 7
May 01/08
IAC
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
33-L.E.P. Page 8
May 01/08
IAC
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
33-L.E.P. Page 9
May 01/08
IAC
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
33-L.E.P. Page 10
May 01/08
IAC
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
33-L.E.P. Page 11
May 01/08
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
LIGHTS - GENERAL
________________ 33-00-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Cockpit Lights 1 ALL
Cabin Lights 1 ALL
Cargo and Service Compartment 1 ALL
Lights
External Lights 1 ALL
Cabin Emergency Lighting 2 ALL
_______
COCKPIT 33-10-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Power Supply 1 ALL
33-CONTENTS Page 1
May 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ _
C ____ EFFECTIVITY
PAGE ___________
REMOVAL/INSTALLATION 2 401 028-099, 101-199
901-999,
Removal of the Map Table Lights 401 028-099, 101-199
(41LE, 42LE) 901-999,
Installation of the Map Table 404 028-099, 101-199
lights (41LE, 42LE) 901-999,
LIGHT - MAIN AND CENTER INSTRUMENT 33-12-13
PANEL
REMOVAL/INSTALLATION 401 ALL
Removal of the Main 401 ALL
Instrument-Panel Lights (36LE,
37LE)
Installation of the Main 406 ALL
Instrument-Panel Light (36LE,
37LE)
Removal of the Main 410 ALL
Instrument-Panel Center-Light
(38LE)
Installation of the Main 413 ALL
Instrument-Panel Center-Light
(38LE)
LIGHT - CENTER PEDESTAL 33-12-14
REMOVAL/INSTALLATION 401 ALL
Removal of the Center Pedestal 401 ALL
Light (27LE)
Installation of the Center 406 ALL
Pedestal Light (27LE)
LIGHT - CONSOLE AND BRIEFCASE 33-12-15
REMOVAL/INSTALLATION 401 ALL
Removal of the Console and 401 ALL
Briefcase Light (17LE, 18LE, 19LE,
20LE, 21LE, 22LE, 23LE, 24LE)
Installation of the Console and 404 ALL
Briefcase Light (17LE, 18LE, 19LE,
20LE, 21LE, 22LE, 23LE, 24LE)
RHEOSTAT - FLOODLIGHT 33-12-17
REMOVAL/INSTALLATION 401 ALL
Removal of the Rheostat - Flood 401 ALL
Light (28LE, 35LE)
Installation of the Rheostat - 405 ALL
Flood Light (28LE, 35LE)
RHEOSTAT - MAP TABLE LIGHT 33-12-18
REMOVAL/INSTALLATION 401 028-099, 101-199
901-999,
Removal of the Map Table Light 401 028-099, 101-199
Rheostats (39LE, 40LE) 901-999,
33-CONTENTS Page 2
Feb 01/07
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ EFFECTIVITY
PAGE ___________
Installation of the Map Table 406 028-099, 101-199
Light Rheostats (39LE, 40LE) 901-999,
33-CONTENTS Page 3
Feb 01/07
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Fourteen Annunciator Light Test 8 ALL
and Interface Boards
Four-Stage Relays 9 ALL
Operational/Control and Indicating 9 ALL
Annunciator Light Test for the 9 ALL
External Power Panel 108VU
_____
CABIN 33-20-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Description 1 ALL
General Illumination 1 ALL
Lavatory Lighting 1 ALL
Passenger Reading Lights 4 ALL
Lavatory Lighted Signs 4 ALL
Cabin Attendant Work-Lights 4 ALL
33-CONTENTS Page 4
Aug 01/07
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
______
CABIN 33-20-00
DEACTIVATION/REACTIVATION 401 ALL
Deactivation of the Cabin NO 401 ALL
SMOKING / FASTEN SEAT BELTS /
RETURN TO SEAT (NS/FSB/RTS) Signs
Refer to the MMEL TASK: 33-20-02 401 ALL
b)
Reactivation of the Cabin NO 403 ALL
SMOKING / FASTEN SEAT BELTS /
RETURN TO SEAT (NS/FSB/RTS) Signs
Refer to the MMEL TASK: 33-20-02 403 ALL
b)
33-CONTENTS Page 5
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Illumination
Bite Test of the General 522 101-199, 901-999
Illumination with the MCDU
BALLAST UNIT WITH LAMPHOLDER 33-21-11
REMOVAL/INSTALLATION 401 ALL
Removal of the Ballast Unit and 401 ALL
Lampholder 1LG1 (3LG1)
Installation of the Ballast Unit 408 ALL
and Lampholder 1LG1
SWITCH - CABIN ENTRANCE LIGHT DIMMING 33-21-12
REMOVAL/INSTALLATION 401 ALL
Removal of the Cabin Entrance 401 ALL
Light Dimming Switch (310LG)
Installation of the Cabin Entrance 404 ALL
Light Dimming Switch (310LG)
33-CONTENTS Page 6
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
and Lampholder 3LQ
Removal of the Ballast Unit and 407 001-012, 014-099
Lampholder 4LQ
Installation of the Ballast Unit 410 001-012, 014-099
and Lampholder 4LQ
Removal of the Ballast Unit and 413 001-012, 014-099
Lampholder 6LQ
Installation of the Ballast Unit 416 001-012, 014-099
and Lampholder 6LQ
Removal of the Ballast Unit and 419 101-199, 901-999
Lampholder
Installation of the Ballast Unit 424 101-199, 901-999
and Lampholder
HALOGEN LAMP WITH LAMPHOLDER 33-24-12
REMOVAL/INSTALLATION 401 101-199, 901-999
Removal of the Mirror Lavatory 401 101-199, 901-999
Light
Installation of the Mirror 402 101-199, 901-999
Lavatory Light
33-CONTENTS Page 7
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Rear Lavatory Occupied-Signs 15 101-199,
Rear Lavatory Occupied-Signs 16 901-999,
33-CONTENTS Page 8
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Work-Lights
Installation of the Cabin 408 ALL
Attendant Work-Lights
POWER UNIT - CABIN ATTENDANT WORK 33-27-38
LIGHT
REMOVAL/INSTALLATION 401 001-012, 014-099
Removal of the Power Unit for the 401 001-012, 014-099
Cabin Attendant Work-Light
Installation of the Power Unit for 404 001-012, 014-099
the Cabin Attendant Work-Light
PISA (PASSENGER INTERFACE AND SUPPLY 33-27-41
ADAPTER) - STAND ALONE
REMOVAL/INSTALLATION 401 101-199, 901-999
Removal of the Stand-Alone 401 101-199, 901-999
Passenger Interface and Supply
Adapter (StA-PISA)
Installation of the Stand-Alone 407 101-199, 901-999
Passenger Interface and Supply
Adapter (StA-PISA)
______________________________
CARGO AND SERVICE COMPARTMENTS 33-30-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
System Description 1 ALL
Service Area Lighting 1 ALL
Air Conditioning Duct and 1 ALL
Accessory Compartment
Forward and Aft 4 ALL
Cargo-Compartment Lighting
Avionics Compartment Lighting 4 ALL
Wheel Well Lighting 4 ALL
33-CONTENTS Page 9
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
REMOVAL/INSTALLATION 401 ALL
Removal of the Service Area Light 401 ALL
6LJ
Installation of the Service Area 407 ALL
Light 6LJ
Removal of the Service Area Light 413 ALL
4LJ (5LJ)
Installation of the Service Area 419 ALL
Light 4LJ (5LJ)
Removal of the Lamp of the Service 424 101-199, 901-999
Area Light 6LJ
Installation of the Lamp of the 427 101-199, 901-999
Service Area Light 6LJ
Removal of the Lamp of the Service 430 101-199, 901-999
Area Light 4LJ (5LJ)
Installation of the Lamp of the 433 101-199, 901-999
Service Area Light 4LJ (5LJ)
33-CONTENTS Page 10
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
SERVICING 301 ALL
Servicing of the Ballast Units 301 ALL
with Lampholders
BALLAST UNIT WITH LAMPHOLDER 33-34-11
REMOVAL/INSTALLATION 401 ALL
Removal of the Ballast Unit and 401 ALL
Lampholder
Installation of the Ballast Unit 410 ALL
and Lampholder
LIGHT - LOADING AREA 33-34-12
REMOVAL/INSTALLATION 401 ALL
Removal of the Loading-Area Light 401 ALL
(11LU, 12LU)
Installation of the Loading-Area 408 ALL
Light (11LU, 12LU)
33-CONTENTS Page 11
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
WHEEL WELL LIGHTING 33-37-00
ADJUSTMENT/TEST 501 ALL
Operational Test of the Wheel Well 501 ALL
Lighting
Functional Test of the Maintenance 506 ALL
Sockets
LIGHT - DOME, MLG L AND R WELL 33-37-11
REMOVAL/INSTALLATION 401 ALL
Removal of the MLG Dome Light 401 001-012, 014-099
(HELLA)
Installation of the MLG Dome Light 407 001-012, 014-099
(HELLA)
Removal of the Lamp(s) of the MLG 411 ALL
Dome Light (AIRSIGNA)
Installation of the Lamp(s) of the 417 ALL
MLG Dome Light (AIRSIGNA)
Removal of the MLG Dome Light 423 ALL
(AIRSIGNA)
Installation of the MLG Dome Light 429 ALL
(AIRSIGNA)
________
EXTERIOR 33-40-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
System Description 1 ALL
Taxi and Takeoff Lights 1 ALL
Runway Turnoff Lights 1 ALL
Wing and Engine Scan Lights 1 ALL
Navigation Light 1 ALL
Landing Lights 8 ALL
Anticollision/Beacon Lights 8 ALL
Logo Lights 8 ALL
33-CONTENTS Page 12
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
33-CONTENTS Page 13
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Installation of the Tail 404 ALL
Navigation-Light Transformer 13LA
33-CONTENTS Page 14
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 1 ALL
Description 1 ALL
Operation 1 ALL
33-CONTENTS Page 15
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Component Location 1 ALL
System Description 1 ALL
Operation/Control and Indicating 1 ALL
33-CONTENTS Page 16
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Removal of the Taxi Light (8LR) 401 ALL
Installation of the Taxi Light 407 ALL
(8LR)
Replacement of the Lamp in the 412 ALL
Taxi Light (8LR)
Replacement of the Halogen Bulb of 418 ALL
the Taxi Light (8LR)
Replacement of the Lens and the 423 ALL
Mirror of the Taxi Light (8LR)
LIGHT - TAXI 33-46-12
ADJUSTMENT/TEST 501 001-012, 014-099
Adjustment of the Taxi Light (8LR) 501 001-012, 014-099
Adjustment of the Taxi Light (8LR) 505 001-012, 014-099
- Alternative Procedure
33-CONTENTS Page 17
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Replacement of the Lamp of the 201 ALL
Logo Light 3LY (4LY)
LIGHT - LOGO 33-47-11
REMOVAL/INSTALLATION 401 ALL
Removal of the Logo Light 3LY 401 ALL
(4LY)
Installation of the Logo Light 3LY 405 ALL
(4LY)
33-CONTENTS Page 18
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Operational Test of the 501 ALL
Anti-Collision/Strobe Lighting
Operational Test of the 504 ALL
Anti-Collision/Strobe Lighting
LIGHT - BEACON, UPPER 33-48-11
REMOVAL/INSTALLATION 401 ALL
Removal of the Upper Beacon/Strobe 401 ALL
Light 7LV from the Outside of the
Fuselage
Installation of the Upper 406 ALL
Beacon/Strobe Light 7LV from the
Outside of the Fuselage
Removal of the Upper Beacon/Strobe 413 ALL
Light 7LV from the Inside of the
Fuselage
Installation of the Upper 416 ALL
Beacon/Strobe Light 7LV from the
Inside of the Fuselage
Removal of the Flash Tube Assembly 423 ALL
of the Upper Beacon Light
Installation of the Flash Tube 426 ALL
Assembly of the Upper Beacon Light
LIGHT - BEACON, LOWER 33-48-12
REMOVAL/INSTALLATION 401 ALL
Removal of the Lower Beacon/Strobe 401 ALL
Light 6LV from the Fuselage
Outside
Installation of the Lower 406 ALL
Beacon/Strobe Light 6LV from the
Fuselage Outside
Test of the Lower Beacon/Strobe 411 ALL
Light 6LV
Removal of the Flash Tube Assembly 414 ALL
of the Lower Beacon Light
Installation of the Flash Tube 417 ALL
Assembly of the Lower Beacon Light
LIGHT - STROBE, TAIL CONE 33-48-13
REMOVAL/INSTALLATION 401 ALL
Removal of the Tail Cone 401 ALL
Strobe-Light (19LV)
Installation of the Tail Cone 406 ALL
Strobe-Light (19LV)
Replacement of the Strobe-Light 410 ALL
Flash-Tube Assembly
LIGHT - STROBE, WING TIP 33-48-14
REMOVAL/INSTALLATION 401 ALL
33-CONTENTS Page 19
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Removal of the Strobe Light 401 ALL
Installation of the Strobe Light 405 ALL
Removal of the Strobe Light 411 ALL
Flash-Tube Assembly
Installation of the Strobe Light 415 ALL
Flash-Tube Assembly
POWER SUPPLY UNIT - UPPER BEACON LIGHT 33-48-36
REMOVAL/INSTALLATION 401 ALL
Removal of the Power Supply Unit 401 ALL
3LV
Installation of the Power Supply 404 ALL
Unit 3LV
POWER SUPPLY UNIT - LOWER BEACON LIGHT 33-48-37
REMOVAL/INSTALLATION 401 ALL
Removal of the Power Supply Unit 401 ALL
4LV
Installation of the Power Supply 404 ALL
Unit 4LV
POWER SUPPLY UNIT - WING TIP STROBE 33-48-38
LIGHT
REMOVAL/INSTALLATION 401 ALL
Removal of the Power Supply Unit 401 ALL
Installation of the Power Supply 405 ALL
Unit
POWER SUPPLY UNIT - TAIL CONE STROBE 33-48-39
LIGHT
REMOVAL/INSTALLATION 401 ALL
Removal of the Power Supply Unit 401 ALL
(18LV) of the Tail Cone
Strobe-Light
Installation of the Power Supply 404 ALL
Unit (18LV) of the Tail Cone
Strobe-Light
33-CONTENTS Page 20
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Refer to the CDL TASK: 33-1 401 ALL
Reactivation of the Wing and 404 ALL
Engine Scan Light (3LX, 4LX)
Refer to the CDL TASK: 33-1 404 ALL
__________________
EMERGENCY LIGHTING 33-50-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 1 ALL
Emergency Power Supply Units 1 001-012, 014-099
(EPSU)
Cabin Emergency Lights 1 001-012, 014-099
FPEEPMS 2 001-012, 014-099
Integrated Escape Slide Lights 2 001-012, 014-099
Emergency Power Supply Units 2 101-199, 901-999
(EPSU)
Cabin Emergency Lights 2 101-199, 901-999
Photoluminescent Marking System 2 101-199, 901-999
Integrated Escape Slide Lights 2 101-199, 901-999
System Description 3 ALL
General 3 ALL
Power Supply 3 ALL
BITE Test 3 ALL
General 4 001-012, 014-099
General 4 101-199, 901-999
33-CONTENTS Page 21
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
SUBJECT
_______ CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
system supplies power for:
Component Location 2 ALL
System Description 29 ALL
Emergency Lighting System 30 001-012, 014-099
Emergency Lighting System 30 101-199,
Emergency Lighting System 47 901-999,
Power Supply 47 ALL
Component Description 53 ALL
Emergency Power-Supply Unit 53 001-012, 014-099
Emergency Power-Supply Unit 55 101-199,
Emergency Power-Supply Units 57 901-999,
Exit Lights 59 001-012, 014-099
Cabin Emergency Light 59 001-012, 014-099
External Lights 59 001-012, 014-099
Floor Proximity Lights 59 001-012, 014-099
System Control 60 001-012, 014-099
Cabin Emergency Lights 60 101-199,
Exit Signs 60 101-199,
External Lights 60 101-199,
Floor Proximity Lights 61 101-199,
System Control 61 101-199,
Cabin Emergency Lights 61 901-901,
Exit Signs 61 901-901,
External Lights 62 901-901,
Floor Proximity Lights 62 901-901,
System Control 62 901-901,
Exit Lights 63 902-999,
Cabin Emergency Lights 63 902-999,
External Lights 63 902-999,
Floor Proximity Lights 63 902-999,
System Control 63 902-999,
Photoluminescent Floor 64 101-199, 901-999
Path-Marking-System
Operation 64 ALL
Operation of the Emergency 64 001-012, 014-099
Lighting System
Operation of the Emergency 66 101-199, 901-999
Lighting System
BITE TEST 70 ALL
Emergency Lighting System 70 001-012, 014-099
General 71 101-199, 901-999
Emergency Lighting Batteries 74 001-012, 014-099
Description 74 101-199, 901-999
Operation 81 101-199, 901-999
33-CONTENTS Page 22
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
CABIN EMERGENCY LIGHTING 33-51-00
DEACTIVATION/REACTIVATION 401 ALL
Deactivation of the EMER SYSTEM 401 001-012, 014-099
TEST of the Cabin Emergency
Lighting System
Refer to the MMEL TASK: 401 001-012, 014-099
33-50-07-B)
Deactivation of the EMER EXIT LT 404 ALL
OFF Annunciator Light 5WL
Refer to the MMEL TASK: 33-50-08 404 ALL
Reactivation of the EMER EXIT LT 410 ALL
OFF Annunciator Light 5WL
Refer to the MMEL TASK: 33-50-08 410 ALL
33-CONTENTS Page 23
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
SIGN - EXIT MARKING, WALL MOUNTED 33-51-13
REMOVAL/INSTALLATION 401 ALL
Removal of the Cabin Wall-Mounted 401 ALL
Emergency-Exit-Markers
Installation of the Cabin 409 ALL
Wall-Mounted
Emergency-Exit-Markers
LIGHT - AUXILIARY, LAVATORY 33-51-14
REMOVAL/INSTALLATION 401 ALL
Removal of the Auxiliary Lavatory 401 001-012, 014-099
Light 80WL
Installation of the Auxiliary 406 001-012, 014-099
Lavatory Light 80WL
Removal of the Auxiliary Lavatory 410 001-012, 014-099
Light 81WL
Installation of the Auxiliary 415 001-012, 014-099
Lavatory Light 81WL
Removal of the Auxiliary Lavatory 420 001-012, 014-099
Light 83WL
Installation of the Auxiliary 425 001-012, 014-099
Lavatory Light 83WL
Removal of the Auxiliary/Mirror 429 101-199, 901-999
Lavatory Light
Installation of the 434 101-199, 901-999
Auxiliary/Mirror Lavatory Light
LIGHT - EMERGENCY, OVERWING 33-51-15
REMOVAL/INSTALLATION 401 001-012, 014-099
901-999,
Removal of the Emergency Overwing 401 001-012, 014-099
Lights 60WL (61WL, 62WL, 63WL) 901-999,
Installation of the Emergency 406 001-012, 014-099
Overwing Lights 60WL (61WL, 62WL, 901-999,
63WL)
SIGN - EMERGENCY EXIT 33-51-16
REMOVAL/INSTALLATION 401 ALL
Removal of the Emergency Exit Sign 401 ALL
Installation of the Emergency Exit 408 ALL
Sign
SIGN - EMERGENCY EXIT LOCATION 33-51-17
REMOVAL/INSTALLATION 401 ALL
Removal of the Emergency Exit 401 ALL
Location-Sign
Installation of the Emergency Exit 408 ALL
Location-Sign
LIGHT - EMERGENCY EXIT LOCATION, 33-51-18
SEAT/WALL MOUNTED
33-CONTENTS Page 24
Feb 01/08
R
IAC
CHAPTER 33
__________
LIGHTS
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
REMOVAL/INSTALLATION 401 001-012, 014-099
Removal of the Seat/Wall-Mounted 401 001-012, 014-099
Emergency-Exit Location-Light
Installation of the 404 001-012, 014-099
Seat/Wall-Mounted Emergency-Exit
Location-Light
LIGHT - EMERGENCY, SEAT/WALL MOUNTED 33-51-19
REMOVAL/INSTALLATION 401 001-012, 014-099
Removal of the Seat/Wall-Mounted 401 001-012, 014-099
Emergency Light
Installation of the 404 001-012, 014-099
Seat/Wall-Mounted Emergency Light
PHOTOLUMINESCENT STRIP - FLOOR 33-51-21
PROXIMITY EMERGENCY ESCAPE PATH
MARKING
REMOVAL/INSTALLATION 401 101-199, 901-999
Removal of the Photoluminescent 401 101-199, 901-999
Strip of the Floor-Proximity
Emergency-Escape Path-Marking
Installation of the 410 101-199, 901-999
Photoluminescent Strip of the
Floor-Proximity Emergency-Escape
Path-Marking
Discard Photoluminescent Floor 414 101-199, 901-999
Path Marking System
PHOTOLUMINESCENT STRIP - FLOOR 33-51-21
PROXIMITY EMERGENCY ESCAPE PATH
MARKING
CLEANING/PAINTING 701 101-199, 901-999
Cleaning of the Photoluminescent 701 101-199, 901-999
Strips of the Floor-Proximity
Emergency-Escape Path-Marking
POWER SUPPLY UNIT - EMERGENCY 33-51-38
REMOVAL/INSTALLATION 401 ALL
Removal of the Emergency 401 ALL
Power-Supply Unit (EPSU)
Installation of the Emergency 411 ALL
Power-Supply Unit (EPSU)
Removal of the Battery of the 422 ALL
Emergency Power-Supply Unit
Installation of the Battery of the 428 ALL
Emergency Power-Supply Unit
33-CONTENTS Page 25
Feb 01/08
R
IAC
LIGHTS - GENERAL - DESCRIPTION AND OPERATION
____________________________________________
1. _______
General
The aircraft lighting system provides illumination inside and outside of the
aircraft. The system comprises:
A. Cockpit Lights
The cockpit lighting consists of the following sub-systems:
- general illumination of cockpit panels, instruments and work surfaces,
- integral lighting of panels and instruments,
- test system for annunciator lights,
- dimming system for annunciator lights.
B. Cabin Lights
The cabin lighting consists of the following sub-systems:
- general illumination of cabin, galley areas and entrances,
- illumination of the lavatories,
- passenger reading lights (customer option),
- cabin lighted signs,
- work lights for the cabin attendants.
R D. External Lights
R The external lights illuminate the runways and/or taxiway, some aircraft
R surfaces and give an indication of the aircrafts position.
R The system has:
R - three navigation lights, colored red, green and white, one is installed
R at the tip of each wing and one at the aft of the fuselage,
R - landing lights, which have two high-power lights that retract and are
R installed one under each wing,
R - runway turnoff lights, which have two lights and are installed on the
R nose landing gear,
R - one takeoff light and one taxi light are installed on the nose landing
R gear,
R - two anticollision beacon lights, which flash red, are installed one at
R the top and one at the bottom of the fuselage,
R - three strobe lights, which flash white, are installed one on each wing
R tip leading-edge and one on the tailcone below the exhaust of the
R Auxiliary Power Unit (APU),
EFF :
ALL 33-00-00
Page 1
May 01/07
IAC
R - wing and engine scan lights are installed one at each side of the
R fuselage to illuminate the wing surface areas and engine intakes.
EFF :
ALL 33-00-00
Page 2
May 01/07
IAC
COCKPIT - DESCRIPTION AND OPERATION
___________________________________
1. _______
General
The cockpit lighting system allows the flight crew to see:
- all the equipment details in the cockpit,
- all the inscriptions and necessary indications whatever the level of
light.
The various lighting sources are:
- cockpit lighting: dome lights,
- panels and instruments lighting: flood lights or lamps,
- map table lighting: reading lights,
- console lighting: lamps,
- integral lighting of VU panels and instruments,
- lighting of annunciators and pushbutton switches.
A spare lamps box is provided in the cockpit. It is located on the left side
panel.
(Ref. Fig. 001)
For contents of the spare lamps box refer to IPC 33-12-01.
2. Power
____________
Supply
This figure shows the general power supply of busbars used for cockpit
lighting
EFF :
ALL 33-10-00
Page 1
Feb 01/07
IAC
Spare Lamp Box-Component location
Figure 001
EFF :
ALL 33-10-00
Page 2
Feb 01/96
IAC
Electrical Power-General Schematic
Figure 002
R
EFF :
001-012, 014-099, 33-10-00
Page 3/4
May 01/06
IAC
Electrical Power-General Schematic
Figure 002A
R
EFF :
101-199, 901-999, 33-10-00
Page 5/6
Feb 01/07
IAC
GENERAL ILLUMINATION - DESCRIPTION AND OPERATION
________________________________________________
1. _______
General
The cockpit lighting system has 5 functions:
- dome lights,
- side consoles,
- instrument panels,
- reading lights,
- service outlets.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
14LE SW-INT LT/DOME 25VU 210
15LE SW-CONSOLE/FLOOR 301VU 211
16LE SW-CONSOLE/FLOOR 500VU 212
17LE LT-CONSOLE, CAPT 211 33-12-15
18LE LT-CONSOLE, F/O 212 33-12-15
19LE LT-CONSOLE, CAPT 211 33-12-15
20LE LT-CONSOLE, F/O 212 33-12-15
21LE LT-CONSOLE, CAPT 211 33-12-15
22LE LT-CONSOLE, F/O 212 33-12-15
23LE LT-BRIEFCASE 1VU 211 33-12-15
24LE LT-BRIEFCASE 7VU 212 33-12-15
25LE LT-READING, CAPT 211 33-12-12
EFF :
ALL 33-12-00
Page 1
Feb 01/07
IAC
R General Illumination - Component Location
R Figure 001
EFF :
ALL 33-12-00
Page 2
Aug 01/96
IAC
R General Illumination - Component Location
R Figure 002
R
EFF :
001-012, 014-027, 33-12-00
Page 3
Aug 01/96
IAC
R General Illumination - Component Location
R Figure 002A
R
EFF :
028-099, 33-12-00
Page 4
Aug 01/96
IAC
General Illumination - Component Location
Figure 002B
R
EFF :
101-199, 901-999, 33-12-00
Page 5
Feb 01/07
IAC
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
26LE LT-READING, F/O 212 33-12-12
27LE LT-CENTER PEDESTAL 48VU 210 33-12-14
28LE RHEOSTAT-FLOOD LT/PED 112VU 212
29LE LT-READING-SUPPLEMENTARY 54VU 212 33-12-12
30LE RHEOSTAT-READING LT 54VU 212
EFF :
ALL 33-12-00
Page 6
Feb 01/07
IAC
**ON A/C 001-012, 014-027,
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
3. __________________
System Description
EFF :
ALL 33-12-00
Page 7
Feb 01/07
IAC
General Illumination - Dome Light
Figure 003
EFF :
ALL 33-12-00
Page 8
May 01/06
R
IAC
(1) Normal operation
When the INT LT/DOME switch 14LE is in the BRT position:
- the dome light in 453VU is supplied with 28VDC from busbar 601PP
through circuit breaker 3LE on the rear C/B panel 122VU.
- the dome light in 452VU is supplied with 28VDC from essential
busbar 401PP through circuit breaker 1LE on the overhead C/B panel
49VU.
When the switch is in the DIM position the light intensity decreases.
In the BRT position, the lights are supplied in parallel and in the
DIM position they are supplied in series by groups of two.
B. Console Lighting
(Ref. Fig. 004)
Four lights are used for the lighting of each console (3 for the console
itself and 1 for the briefcase).
The associated floor lighting consists of four lights fitted at the base
of the Captain and First Officer seats.
EFF :
ALL 33-12-00
Page 9
May 01/06
R
IAC
General Illumination - Side Console Lighting and Cockpit Outlets
Figure 004
R
EFF :
ALL 33-12-00
Page 10
May 01/06
IAC
General Illumination - Instrument Panel Lighting and Reading Lights
Figure 005
R
EFF :
001-012, 014-027, 33-12-00
Page 11
May 01/06
IAC
**ON A/C 028-099,
Three lights 36LE (First Officer), 37LE (Captain) and 38LE (center)
provide the ambient lighting of the Captain, First Officer and center
main instrument panels.
They are installed under the glareshield and illuminate only the
instruments and the placards located on four zones of the main instrument
panels:
- 2 zones at the ends of the main instrument panels, 301VU and 500VU,
- 2 zones on the center instrument panel:
One on the left side which has the emergency equipments, one on the
right side which has items of equipment such as the landing gear
control lever, clock, the landing gear control and indicating panel
402VU etc.
The single control dual rheostat 35LE located on the center pedestal on
the FLOOD LT/INTEG LT panel 111VU controls these lights:
- The first rheostat controls:
EFF :
ALL 33-12-00
Page 12
May 01/08
IAC
General Illumination - Instrument Panel Lighting and Reading Lights
Figure 005A
R
EFF :
028-099, 33-12-00
Page 13
May 01/06
IAC
General Illumination - Instrument Panel Lighting and Reading Lights
Figure 005B
R
EFF :
101-199, 901-999, 33-12-00
Page 14
Feb 01/07
IAC
R General Illumination - Instrument Panel Lighting and Reading Lights
R Figure 005C
R
EFF :
001-012, 014-027, 33-12-00
Page 15
May 01/08
IAC
General Illumination - Instrument Panel Lighting and Reading Lights
R Figure 005D
R
EFF :
028-099, 33-12-00
Page 16
May 01/08
IAC
R General Illumination - Instrument Panel Lighting and Reading Lights
R Figure 005E
R
EFF :
901-901, 33-12-00
Page 17
May 01/08
IAC
The brightness of the 11.5W halogen lamps of the First Officer light
36LE:
- the section of the center instrument panel light 38LE which illuminates
the right zone. The normal busbar 103PP supplies the lamps with 28VDC
through circuit breaker 2LE located on rear circuit breaker panel
122VU.
- The second rheostat controls:
The brightness of the 11.5W halogen lamps of the Captain light 37LE and
the section of the center instrument panel light 38LE which illuminates
the left zone (standby equipment).
Three lights 36LE (First Officer), 37LE (Captain) and 38LE (center)
provide the ambient lighting of the Captain, First Officer and center
main instrument panels.
They are installed under the glareshield and illuminate only the
instruments and the placards located on four zones of the main instrument
panels:
- 2 zones at the ends of the main instrument panels, 301VU and 500VU,
- 2 zones on the center instrument panel:
One on the left side which has the emergency items of equipment, one on
the right side which has equipments such as the landing gear control
lever, clock, the landing gear control and indicating panel 402VU etc.
The single control dual rheostat 35LE located on the center pedestal on
the FLOOD LT/INTEG LT panel 111VU controls these lights:
- The first rheostat controls:
The brightness of the halogen lamps of the F/O main instrument-panel
light 36LE:
- the section of the center instrument panel light 38LE which illuminates
the right zone. The normal busbar 103PP supplies the lamps with 28VDC
through circuit breaker 2LE located on rear circuit breaker panel
122VU.
- The second rheostat controls:
The brightness of the halogen lamps of the Captain main instrument
panel light 37LE and the section of the center instrument panel light
38LE which illuminates the left zone (standby equipment).
The rheostat of the F/O main instrument-panel light controls the
intensity of the six halogen lamps of the F/O main instrument-panel.
The rheostat of the Captain main instrument-panel light controls the
intensity of the six halogen lamps of the Captain main instrument-panel.
EFF :
ALL 33-12-00
Page 18
May 01/08
R
IAC
**ON A/C ALL
D. Reading Lights
(1) Captain and First Officer reading lights (25LE and 26LE)
The two reading lights are fitted on the upright of the side windows
of the cockpit. They swivel and illuminate the sliding tables of the
Captain and First Officer, the consoles and the ceiling if necessary.
Each reading light has:
- a 11.5W, 28V halogen bulb of the long lasting type (2000 hours),
EFF :
ALL 33-12-00
Page 19
May 01/08
IAC
- a rheostat which provides the three functions OFF - DIM - BRIGHT,
- a variable diameter diaphragm to reduce or increase the lighted
surface (the diameter varies from 100 mm to 350 mm).
(1) Captain and First Officer map table lights (41LE and 42LE)
The two map table lights are fitted on the upright of the side
windows of the cockpit. They swivel and illuminate the sliding tables
of the Captain and First Officer and the map tables located on the
sliding windows.
Each map table light has a 4.8W, 28V incandescent light.
The rheostats (39LE and 40LE) control these lights.
Each map table light has a rheostat which controls the light.
EFF :
ALL 33-12-00
Page 20
May 01/08
IAC
**ON A/C ALL
E. Cockpit Outlets
(Ref. Fig. 004)
EFF :
ALL 33-12-00
Page 21
May 01/08
IAC
GENERAL ILLUMINATION - ADJUSTMENT/TEST
______________________________________
TASK 33-12-00-710-001
1. __________________
Reason for the Job
Make sure that the general illumination of the cockpit operates correctly.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-00-861-051
Subtask 33-12-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
122VU LIGHTING/CKPT/DOME 3LE Y06
122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
EFF :
ALL 33-12-00
Page 501
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-12-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- put the DOME switch in the BRT - the four lights get brighter,
position,
Subtask 33-12-00-710-053
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 33-12-00
Page 502
Aug 01/06
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- put the switch in the BRT - the lights get brighter,
position,
R Subtask 33-12-00-710-051-C
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - turn the rheostat from the BRT - the lights get dimmer and then go
R to the OFF position. off.
R 2. On the Captain and the First On the Captain and the First officer
R Officer sides: sides:
R - pull the reading lights - the reading lights come on with a dim
R intensity
R - turn the READING LT rheostats - the reading lights get brighter until
R clockwise they are fully bright
EFF :
ALL 33-12-00
Page 503
Feb 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - turn the rheostat from the BRT - the reading light gets dimmer and
R to the OFF position. then goes off.
R - turn the rheostat from the BRT - the center pedestal light gets dimmer
R to the OFF position and then goes off.
Subtask 33-12-00-710-051-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- turn the rheostat from the BRT - the flood lights get dimmer and then
to the OFF position. go off.
- turn the rheostat in the - the reading light gets dimmer and
opposite direction. then goes off.
R
EFF :
001-012, 014-099, 33-12-00
Page 504
Feb 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
3. On the panel 131VU: On the Captain main instrument-panel:
- turn the rheostat of the - the flood lights get brighter until
Captain main they are fully bright,
instrument panel light from the
OFF to the BRT position,
- turn the rheostast from the BRT - the flood lights get dimmer and then
to the OFF position. go off.
- turn the rheostat from the BRT - the flood lights get dimmer and then
to the OFF position. go off.
5. On the Captain and the On the Captain and First Officer sides:
First-Officer sides:
- turn the rheostats of the map
table lights,
- turn the rheostats in the - the map table lights get dimmer,
opposite direction,
- set the switch to OFF. - the map table light goes off.
- turn the rheostat in the - the center pedestal light gets dimmer
opposite direction. and then goes off.
EFF :
028-099, 33-12-00
Page 505
Feb 01/07
R
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-12-00-710-051-B
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- turn the rheostat from the BRT - the lights get dimmer and then go
to the OFF position. off.
- turn the rheostat from the BRT - the lights get dimmer and then go
to the OFF position. off.
R
EFF :
101-199, 901-999, 33-12-00
Page 506
Feb 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
4. On the panel 130VU: On the F/O main instrument-panel:
- turn the rheostat of the F/O - the lights get brighter until they
main instrument-panel light are fully bright,
from the OFF to the BRT
position,
- turn the rheostat from the BRT - the lights get dimmer and then go
to the OFF position. off.
5. On the Captain and the On the Captain and First Officer sides:
First-Officer sides:
- turn the rheostats of the map
table lights,
- set the switches to ON, - the map table lights come on with a
dim intensity,
- turn the rheostats in the - the map table lights get dimmer,
opposite direction,
- set the switch to OFF. - the map table light goes off.
- turn the rheostat in the - the center pedestal light gets dimmer
opposite direction, and then goes off.
5. Close-up
________
Subtask 33-12-00-862-051
R
EFF :
ALL 33-12-00
Page 507
Feb 01/07
IAC
_______________________________________________________________________
LIGHT - DOME, COCKPIT (161LE,162LE,163LE,164LE,165LE,166LE,167LE,168LE)
____________________
REMOVAL/INSTALLATION
TASK 33-12-11-000-002
Removal of the Cockpit Dome Light (161LE, 162LE, 163LE, 164LE, 165LE, 166LE,
167LE, 168LE)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-12-11
Page 401
Feb 01/96
IAC
3. __________
Job Set-up
Subtask 33-12-11-865-054
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
122VU LIGHTING/CKPT/DOME 3LE Y06
Subtask 33-12-11-010-050
B. Remove the ceiling panel (211CC for the Captain Dome Lights and 212CC for
the F/O Dome Lights) with an ALLEN wrench.
4. Procedure
_________
Subtask 33-12-11-020-053
Subtask 33-12-11-020-054
(1) Disconnect the electrical connector (1) from the socket (2).
(2) Remove the four screws (4) and washers (3) that attach the dome light
box.
(3) Put a blanking caps on the disconnected electrical connector (1) and
the socket (2).
EFF :
ALL 33-12-11
Page 402
Aug 01/06
IAC
Dome Light
Figure 401/TASK 33-12-11-991-001
EFF :
ALL 33-12-11
Page 403
Feb 01/96
IAC
Subtask 33-12-11-020-055
(2) Remove the two screws (14) and the two screws (5) with their nuts
(15) that attach the plate (6) to the defective socket (9). Hold the
plate during the removal.
(4) Remove the screw (12), the washer (13) and the power supply cable
(11).
EFF :
ALL 33-12-11
Page 404
Feb 01/96
IAC
TASK 33-12-11-400-002
Installation of the Cockpit Dome Light (161LE, 162LE, 163LE, 164LE, 165LE,
166LE, 167LE, 168LE)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
R
10 bulb 33-12-08 01A-090
10 bulb 33-12-08 01B-090
10 bulb 33-12-08 01C-090
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-12-11
Page 405
Aug 01/07
IAC
3. __________
Job Set-up
Subtask 33-12-11-865-056
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
122VU LIGHTING/CKPT/DOME 3LE Y06
4. Procedure
_________
Subtask 33-12-11-160-051
Subtask 33-12-11-420-053
(2) Install the ceiling panel (211CC for the Captain Dome Lights and
212CC for the F/O Dome Lights) with an ALLEN wrench.
Subtask 33-12-11-420-054
(1) Remove the blanking caps of the disconnected electrical connector (1)
and the socket (2).
EFF :
ALL 33-12-11
Page 406
Nov 01/06
R
IAC
(3) Tighten the four screws (4) and washers (3) that attach the dome
light box.
(5) Install the ceiling panel (211CC for the Captain Dome Lights and
212CC for the F/O Dome Lights) with an ALLEN wrench.
Subtask 33-12-11-420-055
(2) Attach the socket (9) with the washer (8) and the nut (7).
(3) Connect the power supply cable (11) and attach it with the screw (12)
and the washer (13).
(5) Tighten the two screws (14) and the two screws (5) with their nuts
(15) that attach the plate (6).
(7) Install the ceiling panel (211CC for the Captain Dome Lights and
212CC for the F/O Dome Lights) with an ALLEN wrench.
Subtask 33-12-11-865-057
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
R 122VU LIGHTING/CKPT/DOME 3LE Y06
Subtask 33-12-11-710-052
F. Do the operational test of the cockpit dome light (Ref. TASK 33-12-00-
710-001).
EFF :
ALL 33-12-11
Page 407
Nov 01/07
IAC
5. Close-up
________
Subtask 33-12-11-942-051
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-12-11
Page 408
Nov 01/07
IAC
LIGHT - READING (25LE,26LE,29LE) - REMOVAL/INSTALLATION
_______________________________________________________
TASK 33-12-12-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
001-012, 014-027, 33-12-12
Page 401
Config-1 Feb 01/96
IAC
3. __________
Job Set-up
Subtask 33-12-12-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 25LE
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05
FOR 26LE
122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
FOR 29LE
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
4. Procedure
_________
Subtask 33-12-12-020-050
(a) Lift the reading light (2) out of its housing (1) and put it
against its stop.
(b) Push the button under the reading light (2) and remove the light
unit (4).
(c) Release the two catches that attach the socket (5) in the light
unit (4) and remove the socket (5).
(a) Remove the cap (4) from the reading light body (2) with a
screwdriver.
EFF :
001-012, 014-027, 33-12-12
Page 402
Config-1 May 01/98
IAC
Subtask 33-12-12-020-051
(a) Pull and turn the reading light (12) to get access to its holder
(10).
(b) Remove the four attaching screws (11) and the four washers (7).
(c) Pull the reading light holder (10) out of its housing.
(d) Disconnect the female terminal lugs (8) from the male terminal
lugs (9).
(a) Remove the QAD fasteners (5) from the panel (9).
(b) Disconnect the female terminal lugs (6) from the male terminal
lugs (7).
(c) Remove the circlip (10) from the reading light (8).
EFF :
001-012, 014-027, 33-12-12
Page 403
Config-1 Feb 01/96
IAC
Captain / First Officer Reading Lights
Figure 401/TASK 33-12-12-991-001- 12 (SHEET 1)
EFF :
001-012, 014-027, 33-12-12
Page 404
Config-1 Feb 01/96
IAC
Captain / First Officer Reading Lights
Figure 401/TASK 33-12-12-991-001- 22 (SHEET 2)
EFF :
001-012, 014-027, 33-12-12
Page 405
Config-1 Feb 01/96
IAC
Supplementary Reading Light
Figure 402/TASK 33-12-12-991-002- 12 (SHEET 1)
EFF :
001-012, 014-027, 33-12-12
Page 406
Config-1 Feb 01/96
IAC
Supplementary Reading Light
Figure 402/TASK 33-12-12-991-002- 22 (SHEET 2)
EFF :
001-012, 014-027, 33-12-12
Page 407
Config-1 Feb 01/96
IAC
TASK 33-12-12-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
001-012, 014-027, 33-12-12
Page 408
Config-1 Feb 01/96
IAC
3. __________
Job Set-up
Subtask 33-12-12-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 25LE
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05
FOR 26LE
122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
FOR 29LE
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
4. Procedure
_________
Subtask 33-12-12-560-050
Subtask 33-12-12-420-050
(b) Install the socket (5) in the light unit (4) with the help of the
two catches.
(c) Install the light unit (4) in the reading light (2).
(d) Put back the reading light (2) in its housing (1).
EFF :
001-012, 014-027, 33-12-12
Page 409
Config-1 Feb 01/96
IAC
(b) Install the cap (4) on the reading light body (2).
Subtask 33-12-12-420-051
(a) Connect the female terminal lugs (8) to the male terminal lugs
(9).
(d) Tighten the reading light holder (10) with the four attaching
screws (11) and washers (7).
(c) Connect the female terminal lugs (6) to the male terminal lugs
(7).
Subtask 33-12-12-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 25LE
5LE
FOR 26LE
4LE
FOR 29LE
2LE
EFF :
001-012, 014-027, 33-12-12
Page 410
Config-1 Feb 01/96
IAC
Subtask 33-12-12-710-050
5. Close-up
________
Subtask 33-12-12-942-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
001-012, 014-027, 33-12-12
Page 411
Config-1 Feb 01/96
IAC
LIGHT - MAP TABLE (41LE,42LE) - REMOVAL/INSTALLATION
____________________________________________________
TASK 33-12-12-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-12-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 41LE
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05
FOR 42LE
122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
R
EFF :
028-099, 101-199, 901-999, 33-12-12
Page 401
Config-2 Feb 01/07
IAC
4. Procedure
_________
Subtask 33-12-12-020-054
R
EFF :
028-099, 101-199, 901-999, 33-12-12
Page 402
Config-2 Feb 01/07
IAC
Captain/First-Officer Map-Table Lights
Figure 401/TASK 33-12-12-991-006
R
EFF :
028-099, 101-199, 901-999, 33-12-12
Page 403
Config-2 Feb 01/07
IAC
TASK 33-12-12-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-12-865-054
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 41LE
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05
FOR 42LE
122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
R
EFF :
028-099, 101-199, 901-999, 33-12-12
Page 404
Config-2 Feb 01/07
IAC
4. Procedure
_________
Subtask 33-12-12-420-055
Subtask 33-12-12-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 41LE
5LE
FOR 42LE
4LE
Subtask 33-12-12-710-051
5. Close-up
________
Subtask 33-12-12-942-051
A. Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
028-099, 101-199, 901-999, 33-12-12
Page 405
Config-2 Feb 01/07
IAC
_________________________________________________________
LIGHT - MAIN AND CENTER INSTRUMENT PANEL (36LE,37LE,38LE)
____________________
REMOVAL/INSTALLATION
TASK 33-12-13-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-12-13
Page 401
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-12-13-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
4. Procedure
_________
Subtask 33-12-13-020-050
(1) Loosen the four fasteners (1). During this operation, hold the
blanking plate (3).
(3) Before you remove the bulb (2) it is necessary that you move back the
bulb holder (4).
EFF :
ALL 33-12-13
Page 402
Feb 01/07
IAC
Main Instrument-Panel Light
Figure 401/TASK 33-12-13-991-001
EFF :
001-012, 014-027, 33-12-13
Page 403
Feb 01/96
IAC
Main Instrument-Panel Light
Figure 401A/TASK 33-12-13-991-001-A
R
EFF :
028-099, 101-199, 901-999, 33-12-13
Page 404
Feb 01/07
IAC
R **ON A/C 028-099, 101-199, 901-999,
Subtask 33-12-13-020-050-A
(1) Loosen the four fasteners (1). During this operation, hold the
blanking plate (3).
(3) Before you remove the bulb (2) it is necessary that you move back the
bulb holder (4).
(5) Remove the transparent cover (6) from the seal (8).
R
EFF :
028-099, 101-199, 901-999, 33-12-13
Page 405
Feb 01/07
IAC
**ON A/C ALL
TASK 33-12-13-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-12-13
Page 406
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-12-13-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
4. Procedure
_________
Subtask 33-12-13-560-052
EFF :
ALL 33-12-13
Page 407
Feb 01/07
IAC
**ON A/C 001-012, 014-027,
Subtask 33-12-13-420-050
(1) Move back the bulb holder (4) and hold it in its position.
(2) Install a new bulb (2) on the Captain and F/O sides.
(3) Put the blanking plate (3) in position opposite its housing. Hold it
in this position.
(4) Attach the blanking plate (3) with the four fasteners (1).
Subtask 33-12-13-420-050-A
(1) Move back the bulb holder (4) and hold it in its position.
(2) Install a new bulb (2) on the Captain and F/O sides.
(4) Install the transparent cover (6) in position on the seal (8).
(6) Put the blanking plate (3) in position opposite its housing. Hold it
in this position.
(7) Attach the blanking plate (3) with the four fasteners (1).
Subtask 33-12-13-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LE, 2LE
EFF :
ALL 33-12-13
Page 408
Feb 01/07
IAC
Subtask 33-12-13-710-050
5. Close-up
________
Subtask 33-12-13-942-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-12-13
Page 409
Feb 01/96
IAC
TASK 33-12-13-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-13-865-056
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
EFF :
ALL 33-12-13
Page 410
Aug 01/06
IAC
R **ON A/C ALL
4. Procedure
_________
Subtask 33-12-13-020-053
(1) Loosen the three fasteners (1). During this operation, hold the
blanking plate (2).
(3) Remove the two fasteners (3) that attach the optical body (4) with
the defective bulb (6).
(5) Laterally push the contact spring (5) and remove the socket (7).
EFF :
ALL 33-12-13
Page 411
May 01/06
IAC
Main Instrument-Panel Center-Light
Figure 402/TASK 33-12-13-991-002
EFF :
ALL 33-12-13
Page 412
Feb 01/96
IAC
TASK 33-12-13-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-13-865-057
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
EFF :
ALL 33-12-13
Page 413
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-12-13-560-051
Subtask 33-12-13-420-053
(2) Laterally push the contact spring (5) and install the socket (7).
(3) Install the optical body (4) on its blanking plate (2).
(4) Attach the optical body (4) with the two fasteners (3).
(6) Attach the blanking plate (2) with the three fasteners (1).
Subtask 33-12-13-865-058
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LE, 2LE
Subtask 33-12-13-710-052
5. Close-up
________
Subtask 33-12-13-942-052
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-12-13
Page 414
Aug 01/06
IAC
LIGHT - CENTER PEDESTAL (27LE) - REMOVAL/INSTALLATION
_____________________________________________________
TASK 33-12-14-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-14-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
EFF :
ALL 33-12-14
Page 401
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-12-14-020-052
(1) Remove the lens (1) from the body of the light (3) with a
screwdriver.
(2) Remove the bulb (2) from the socket inside the body of the light (3).
Subtask 33-12-14-020-053
(1) Loosen the quick-disconnect fasteners (5) from the panel (7).
(2) Disconnect the female electrical connectors (9) from the male
electrical connectors (8) of the center pedestal light (6).
EFF :
ALL 33-12-14
Page 402
Aug 01/06
IAC
INTENTIONALLY BLANK
33-12-14
Page 403
Feb 01/96
IAC
Center Pedestal Light
Figure 401/TASK 33-12-14-991-001- 12 (SHEET 1)
EFF :
ALL 33-12-14
Page 404
Feb 01/96
IAC
Center Pedestal Light
Figure 401/TASK 33-12-14-991-001- 22 (SHEET 2)
EFF :
ALL 33-12-14
Page 405
Feb 01/96
IAC
TASK 33-12-14-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-14-865-054
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
EFF :
ALL 33-12-14
Page 406
Aug 01/06
IAC
R
Subtask 33-12-14-941-050
4. Procedure
_________
Subtask 33-12-14-420-052
(2) Install the lens (1) on the body of the light (3).
Subtask 33-12-14-420-053
(3) Connect the female electrical connectors (9) to the male electrical
connectors (8).
Subtask 33-12-14-865-055
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2LE
Subtask 33-12-14-710-051
D. Do the operational test of the Center Pedestal Light (Ref. TASK 33-12-00-
710-001).
EFF :
ALL 33-12-14
Page 407
Aug 01/06
IAC
5. Close-up
________
Subtask 33-12-14-942-051
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-12-14
Page 408
Feb 01/96
IAC
_______________________________________________________________________
LIGHT - CONSOLE AND BRIEFCASE (17LE,18LE,19LE,20LE,21LE,22LE,23LE,24LE)
____________________
REMOVAL/INSTALLATION
TASK 33-12-15-000-001
Removal of the Console and Briefcase Light (17LE, 18LE, 19LE, 20LE, 21LE, 22LE,
23LE, 24LE)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-15-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05
EFF :
ALL 33-12-15
Page 401
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-12-15-020-050
(1) Remove the cover (3) from its housing (1). To do this, put two
fingers in the covers notches.
(2) Remove the bulb (2) from the cover (3). To do this, pull the bulb.
EFF :
ALL 33-12-15
Page 402
Aug 01/06
IAC
Console and Briefcase Light
Figure 401/TASK 33-12-15-991-001
EFF :
ALL 33-12-15
Page 403
Feb 01/96
IAC
TASK 33-12-15-400-001
Installation of the Console and Briefcase Light (17LE, 18LE, 19LE, 20LE, 21LE,
22LE, 23LE, 24LE)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-12-15
Page 404
May 01/06
R
IAC
3. __________
Job Set-up
Subtask 33-12-15-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05
Subtask 33-12-15-941-050
4. Procedure
_________
Subtask 33-12-15-420-050
NOTE : Make sure that the bulb (2) is in the correct position in the
____
cover (3).
Subtask 33-12-15-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5LE, 4LE
EFF :
ALL 33-12-15
Page 405
Aug 01/06
IAC
Subtask 33-12-15-710-050
C. Test
5. Close-up
________
Subtask 33-12-15-942-050
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-12-15
Page 406
Aug 01/06
R
IAC
RHEOSTAT - FLOODLIGHT (28LE,35LE) - REMOVAL/INSTALLATION
________________________________________________________
TASK 33-12-17-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-17-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
EFF :
ALL 33-12-17
Page 401
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-12-17-020-050
(3) Remove the two screws (11) and disconnect the electrical connector
(10).
(5) Loosen the two screws (6) located on the knob (5), do not remove
them.
(7) Remove the two screws (4) and the placard (3).
Subtask 33-12-17-020-051
(3) Remove the two screws (22) and disconnect the electrical connector
(21).
(5) Loosen the two screws (17) located on the knob (16), do not remove
them.
(7) Remove the two screws (15) and the placard (14).
EFF :
ALL 33-12-17
Page 402
Aug 01/06
IAC
Main Panel and Pedestal Flood Light Rheostats
Figure 401/TASK 33-12-17-991-001
EFF :
ALL 33-12-17
Page 403
Feb 01/96
IAC
(8) Remove the nut (18) and the washer (19).
EFF :
ALL 33-12-17
Page 404
Feb 01/96
IAC
TASK 33-12-17-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-17-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08
122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04
EFF :
ALL 33-12-17
Page 405
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-12-17-420-050
(2) Install a new rheostat (9) through the hole of the panel 112VU (9).
(3) Install the washer (8) and tighten the nut (7).
(4) Put the placard (3) in position on the panel 112VU (1) and hold it in
this position.
(5) Attach the placard (3) with the two screws (4).
(6) Install the knob (5). Be careful not to damage the flat of the axle
of the rheostat (9).
(9) Make sure that the electrical connectors are clean and in the correct
condition.
(10) Install the connector (10) and attach it with the two screws (11) on
the back of the rheostat (9).
(11) Install the panel 112VU (1) with the two fasteners (2).
Subtask 33-12-17-420-051
(2) Install a new rheostat (20) through the hole of the panel 111VU (12).
(3) Install the washer (19) and tighten the nut (18).
(4) Put the placard (14) in position on the panel 111VU (12) and hold it
in this position.
EFF :
ALL 33-12-17
Page 406
Aug 01/06
IAC
(5) Attach the placard (14) with the two screws (15).
(6) Install the knob (16). Be careful not to damage the flat of the axle
of the rheostat (20).
(9) Make sure that the electrical connectors are clean and in the correct
condition.
(10) Install the connector (21) and attach it with the two screws (22) on
the back of the rheostat (20).
(11) Install the panel 111VU (12) with the two fasteners (13).
Subtask 33-12-17-865-052
Subtask 33-12-17-710-050
D. Test
Do the operational test of the general illumination (Ref. TASK 33-12-00-
710-001).
5. Close-up
________
Subtask 33-12-17-942-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-12-17
Page 407
Feb 01/96
IAC
RHEOSTAT - MAP TABLE LIGHT (39LE,40LE) - REMOVAL/INSTALLATION
_____________________________________________________________
TASK 33-12-18-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-18-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 41LE
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05
FOR 42LE
122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
R
EFF :
028-099, 101-199, 901-999, 33-12-18
Page 401
Feb 01/07
IAC
4. Procedure
_________
Subtask 33-12-18-020-050
(d) Remove the four attaching screws (14) and the four washers (13).
(e) Pull the control box holder (12) out of its housing.
(f) Disconnect the female terminal lugs (16) from the male terminal
lugs (15).
(d) Remove the support (11) of the reading light with the cable (2).
R
EFF :
028-099, 101-199, 901-999, 33-12-18
Page 402
Feb 01/07
IAC
INTENTIONALLY BLANK
R
33-12-18
Page 403
Feb 01/07
IAC
Captain/First Officer Contol Box of the Reading Lights
Figure 401/TASK 33-12-18-991-001- 12 (SHEET 1)
R
EFF :
028-099, 101-199, 901-999, 33-12-18
Page 404
Feb 01/07
IAC
Captain/First Officer Contol Box of the Reading Lights
Figure 401/TASK 33-12-18-991-001- 22 (SHEET 2)
R
EFF :
028-099, 101-199, 901-999, 33-12-18
Page 405
Feb 01/07
IAC
TASK 33-12-18-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-12-18-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 41LE
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05
FOR 42LE
122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
R
EFF :
028-099, 101-199, 901-999, 33-12-18
Page 406
Feb 01/07
IAC
4. Procedure
_________
Subtask 33-12-18-420-050
(a) Install the cable (2) through the hole of the support (1) and put
the support (11) in position.
(a) Connect the female terminal lugs (16) to the male terminal lugs
(15).
(b) Install the cable (2) through the hole of the control box holder
(12).
(d) Tighten the control box holder (12) with the four attaching
screws (14) and washers (13).
R
EFF :
028-099, 101-199, 901-999, 33-12-18
Page 407
Feb 01/07
IAC
Subtask 33-12-18-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 41LE
5LE
FOR 42LE
4LE
Subtask 33-12-18-710-050
5. Close-up
________
Subtask 33-12-18-942-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
028-099, 101-199, 901-999, 33-12-18
Page 408
Feb 01/07
IAC
INSTRUMENT AND PANEL INTEGRAL LIGHTING - DESCRIPTION AND OPERATION
__________________________________________________________________
1. _______
General
The instrument and panel integral lighting permit the crew to read the
indications on these panels and instruments during night flights or flights
in stormy conditions.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
2LF SW-INT LT, STBY COMPASS 25VU 210
6LF CONTROLLER-LIGHTING 210 33-13-51
7LF POT-INT LT/OVHD INTEG LT 25VU 210
16LF CONTROLLER-LIGHTING 212 811 33-13-51
17LF POT-INTEG LT/MAIN PNL & PED 111VU 211
30LF CONTROLLER-LIGHTING 212 811 33-13-51
2FN COMPASS STANDBY 210
EFF :
ALL 33-13-00
Page 1
Feb 01/96
IAC
R Instrument and Panel Integral Lighting - Component Location
R Figure 001
EFF :
ALL 33-13-00
Page 2
Aug 01/96
IAC
3. System
__________________
Description
The integral lighting installed on the panels and the instruments has
miniature lamps. These lamps are supplied by an alternating current with
variable voltage from 0 to 5 volts.
Lighting controllers deliver this alternating current.
These lighting controllers generate a low voltage current source with high
intensity from the 115V - 400Hz voltage.
A 470 ohms potentiometer provides the continuous adjustment of the output
voltage between 0 and 5 efficient volts.
This output voltage is independent from the load.
The table below shows the main characteristics and the function of each
lighting controller.
-------------------------------------------------------------------------------
| | Lighting | Supply | Adjustment |
| Instrument | Controller | | Potentiometer|
| and Panel |-------------------------------|------------|--------------|
| Integral | Lighting | Maximum | Number | Circuit | Electrical |
| Lighting | Controller | Output | of | Breaker | Identifier |
| | Identifier | Power | Fuses | Identifier | |
|-----------------|------------|---------|--------|------------|--------------|
| Overhead Panel | 6LF | 180VA | 6 | 3LF | 7LF |
|-----------------|------------|---------|--------|------------|--------------|
| Captain, First | | | | | |
| Officer Main | | | | | |
| Instrument | | | | | |
| Panels | 16LF | 180VA | 6 | 4LF | 17LF |
| Center | | | | | |
| Instrument Panel| | | | | |
| Center Pedestal | | | | | |
| Side Consoles | | | | | |
|-----------------|------------|---------|--------|------------|--------------|
| Glareshields | 30LF | 25VA | 3 | 5LF | 38LE |
| | | + 45VA | | | |
-------------------------------------------------------------------------------
EFF :
ALL 33-13-00
Page 3
Aug 01/96
IAC
R Instrument and Panel Integral Lighting - Schematic
R Figure 002
EFF :
ALL 33-13-00
Page 4
Aug 01/96
IAC
R - a lighting controller 6LF. Its 6 outputs provide the integral
R lighting of the placards and the instruments on the overhead panel.
EFF :
ALL 33-13-00
Page 5
Aug 01/96
IAC
INSTRUMENT AND PANEL INTEGRAL LIGHTING - ADJUSTMENT/TEST
________________________________________________________
TASK 33-13-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-13-00-860-051
EFF :
ALL 33-13-00
Page 501
Aug 01/06
R
IAC
Subtask 33-13-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 33-13-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the selector switch to OFF. - the integral lighting of the standby
compass goes off.
EFF :
ALL 33-13-00
Page 502
Feb 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
2. On the panel 111VU: On the main instrument panels (Captain
- turn the INTEG LT/MAIN PNL & and F/O), the center instrument panel,
PED rheostat from OFF to BRT. the center pedestal and the side
consoles:
- the instrument and panel
integral-lighting gets brighter when
you turn the rheostat to BRT.
- turn the rheostat from BRT to - the brightness of the instrument and
OFF. panel integral-lighting gets dimmer
step by step.
5. Close-up
________
Subtask 33-13-00-860-050
EFF :
ALL 33-13-00
Page 503
Aug 01/06
R
IAC
______________________________________________________________________________
PLATE - INT LIGHTED IDENT, 11VU (18LF,19LF,20LF,21LF,22LF,23LF,24LF,26LF,35LF,
36LF) - REMOVAL/INSTALLATION
____________________________
TASK 33-13-41-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-13-41-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED 4LF Y04
EFF :
ALL 33-13-41
Page 401
May 01/07
IAC
4. Procedure
_________
Subtask 33-13-41-020-050
(1) Remove the wheels (1) and the indicators (2) (Ref. TASK 27-41-41-000-
001).
Subtask 33-13-41-020-054
Subtask 33-13-41-020-054-A
Subtask 33-13-41-020-055
EFF :
ALL 33-13-41
Page 402
Feb 01/07
IAC
(4) Remove the integrally-lighted identification plate (7).
Subtask 33-13-41-020-056
(2) Pull the FLOOD LT panel 112VU (12) and the FLOOD LT/INTEG LT panel
111VU (17).
Subtask 33-13-41-020-057
R (1) Disassemble the knobs, the nuts and the washers of the ENG/MASTER 1
R and 2 control switches (2KC and 3KC) (Ref. IPC 761208) (Ref. ESPM
R 204521).
Subtask 33-13-41-020-058
Subtask 33-13-41-020-059
EFF :
ALL 33-13-41
Page 403
May 01/07
IAC
R Integrally Lighted Identification Plate
R Figure 401/TASK 33-13-41-991-001- 12 (SHEET 1)
EFF :
ALL 33-13-41
Page 404
Nov 01/04
IAC
R Integrally Lighted Identification Plate
R Figure 401/TASK 33-13-41-991-001- 22 (SHEET 2)
EFF :
ALL 33-13-41
Page 405
Nov 01/04
IAC
(3) Remove the four screws (30).
EFF :
ALL 33-13-41
Page 406
Feb 01/07
R
IAC
TASK 33-13-41-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-13-41-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED 4LF Y04
EFF :
ALL 33-13-41
Page 407
May 01/07
IAC
4. Procedure
_________
Subtask 33-13-41-420-054
Subtask 33-13-41-420-054-A
Subtask 33-13-41-420-050
(3) Install the indicator (2) and the wheel (1) (Ref. TASK 27-41-41-400-
001).
Subtask 33-13-41-420-055
EFF :
ALL 33-13-41
Page 408
Feb 01/07
IAC
(3) Tighten the four quarter-turn fasteners (9).
Subtask 33-13-41-420-056
(2) Install and tighten the two screws (10) and (14).
Subtask 33-13-41-420-057
R (1) Pull the disassembled ENG/MASTER 1 and 2 control switches (2KC and
R 3KC) through the integrally-lighted indentification plate (20).
R (5) Install the washers, the nuts and the knobs of the ENG/MASTER 1 and 2
R control switches (2KC and 3KC) (Ref. IPC 761208) (Ref. ESPM 204521).
Subtask 33-13-41-420-058
EFF :
ALL 33-13-41
Page 409
May 01/07
IAC
Subtask 33-13-41-420-059
Subtask 33-13-41-865-052
H. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
4LF
Subtask 33-13-41-710-050
5. Close-up
________
Subtask 33-13-41-942-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-13-41
Page 410
May 01/07
R
IAC
PLATE - INT LIGHTED IDENT, 20VU - REMOVAL/INSTALLATION
______________________________________________________
TASK 33-13-42-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-13-42-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/INSTL LT/OVHD/PNL 3LF Y03
EFF :
ALL 33-13-42
Page 401
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-13-42-020-050
(2) Pull the overhead control and indicating panel 21VU (2).
Subtask 33-13-42-020-051
(2) Pull the overhead control and indicating panel 22VU (6).
Subtask 33-13-42-020-052
(2) Pull the FLT CTL panel 24VU (10) or 23VU (14).
EFF :
ALL 33-13-42
Page 402
Aug 01/06
IAC
Integrally-Lighted Identification Plate
Figure 401/TASK 33-13-42-991-001
EFF :
ALL 33-13-42
Page 403
Nov 01/05
IAC
Subtask 33-13-42-020-053
(1) Loosen the four quarter-turn fasteners (17), (21), (25) or (29).
(2) Pull the overhead control and indicating panel 25VU (18), the AIR
COND panel 30VU (22), the ELEC control panel 35VU (26) or the
HYD/FUEL panel 40VU (30).
EFF :
ALL 33-13-42
Page 404
Nov 01/05
IAC
TASK 33-13-42-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-13-42-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/INSTL LT/OVHD/PNL 3LF Y03
4. Procedure
_________
Subtask 33-13-42-420-050
(3) Push the overhead control and indicating panel 21VU (2) and tighten
the six quarter-turn fasteners (1).
EFF :
ALL 33-13-42
Page 405
Aug 01/06
IAC
Subtask 33-13-42-420-051
(3) Push the overhead control and indicating panel 22VU (6) and tighten
the four quarter-turn fasteners (5).
Subtask 33-13-42-420-052
(3) Push the FLT CTL panel 24VU (10) or 23VU (14) and tighten the two
quarter-turn fasteners (9) or (13).
Subtask 33-13-42-420-053
(2) Install and tighten the five screws (19), (23), (27) or (31).
(3) Push the overhead control and indicating panel 25VU (18), the AIR
COND panel 30VU (22), the ELEC control panel 35VU (26) or the
HYD/FUEL panel 40VU (30) and tighten the four quarter-turn fasteners
(17), (21), (25) or (29).
Subtask 33-13-42-865-052
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3LF
EFF :
ALL 33-13-42
Page 406
Aug 01/06
R
IAC
Subtask 33-13-42-710-050
5. Close-up
________
Subtask 33-13-42-942-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-13-42
Page 407
Nov 01/05
IAC
CONTROLLER - LIGHTING (6LF,16LF,30LF) - REMOVAL/INSTALLATION
____________________________________________________________
TASK 33-13-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-13-51
Page 401
Feb 01/96
IAC
3. __________
Job Set-up
Subtask 33-13-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 6LF
R
122VU LIGHTING/INSTL LT/OVHD/PNL 3LF Y03
R
FOR 16LF
R
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED 4LF Y04
R
FOR 30LF
R
122VU LIGHTING/INSTL LT/GLARE/SHLD 5LF Y05
Subtask 33-13-51-010-050
B. Get Access
EFF :
ALL 33-13-51
Page 402
Aug 01/06
IAC
4. Procedure
_________
Subtask 33-13-51-020-050
(2) Remove the four screws (3) and the lockwashers (2). During this
operation, hold the lighting controller (1).
EFF :
ALL 33-13-51
Page 403
Aug 01/06
R
IAC
Lighting Controller
Figure 401/TASK 33-13-51-991-001
EFF :
ALL 33-13-51
Page 404
May 01/06
R
IAC
TASK 33-13-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-13-51
Page 405
May 01/06
R
IAC
3. __________
Job Set-up
Subtask 33-13-51-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 6LF
R
122VU LIGHTING/INSTL LT/OVHD/PNL 3LF Y03
R
FOR 16LF
R
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED 4LF Y04
R
FOR 30LF
R
122VU LIGHTING/INSTL LT/GLARE/SHLD 5LF Y05
Subtask 33-13-51-010-051
B. Get Access
4. Procedure
_________
Subtask 33-13-51-420-050
EFF :
ALL 33-13-51
Page 406
Aug 01/06
IAC
(3) Remove the blanking caps from the electrical connectors (4) and (5).
(4) Put the lighting controller (1) in position opposite its housing (6).
Hold it in this position.
(5) Install the lighting controller (1) with the lockwashers (2) and the
four screws(3).
Subtask 33-13-51-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 6LF
3LF
FOR 16LF
4LF
FOR 30LF
5LF
Subtask 33-13-51-710-050
5. Close-up
________
Subtask 33-13-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-13-51
Page 407
Aug 01/06
R
IAC
ANNUNCIATOR LIGHT TEST AND DIMMING - DESCRIPTION AND OPERATION
______________________________________________________________
1. _______
General
Bulbs supplied with 5VAC-400Hz are used for the lighting of the sun readable
lights in the cockpit. The current is delivered by the 115V/5V transformers.
Each light is parted in two sections ; each one has two 5V bulbs.
An annunciator light test switch permits illumination of all annunciators
and therefore check of all lights.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
1LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
2LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
3LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
4LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
5LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
6LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
7LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
8LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
9LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
10LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
11LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
18LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
19LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
20LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
31LP XFMR-ESS 211 33-14-51
33LP SW-INT LT/ANN LT 25VU 210
34LP P/BSW-LIGHT TEST 108VU 120
35LP XFMR-ESS 211 33-14-51
36LP XFMR-SYS 2 120VU 212 33-14-51
37LP XFRM-SYS 1 120VU 212 33-14-51
EFF :
ALL 33-14-00
Page 1
May 01/06
IAC
Annunciator Light Test and Dimming - Component Location
Figure 001
R
EFF :
001-012, 014-099, 33-14-00
Page 2
May 01/06
IAC
R Annunciator Light Test and Dimming - Component Location
R Figure 001A
EFF :
ALL 33-14-00
Page 3
May 01/05
IAC
Annunciator Light Test and Dimming - Component Location
Figure 002
EFF :
ALL 33-14-00
Page 4
May 01/05
R
IAC
**ON A/C ALL
-------------------------------------------------------------------------------
FIN I FUNCTIONAL DESIGNATION I PANELIZONEIACCESS I ATA
I I I I DOOR I REF.
-------------------------------------------------------------------------------
1LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
2LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
3LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
4LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
5LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
6LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
7LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
8LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
9LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
10LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
11LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
12LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
18LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
19LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
20LP BOARD-ANN LT TEST & INTFC 70VU 126 822 33-14-33
31LP XFMR-ESS 211 33-14-51
33LP SW-INT LT/ANN LT 25VU 210
34LP P/BSW-LIGHT TEST 108VU 120
35LP XFMR-ESS 211 33-14-51
36LP XFMR-SYS 2 120VU 212 33-14-51
37LP XFRM-SYS 1 120VU 212 33-14-51
3. System
__________________
Description
(Ref. Fig. 003)
Miniature lamps (115 mA, 5VAC) are used for the lighting of the annunciator
lights mounted on the panels and instruments in the cockpit.
A relay (system) or internal contacts (case of ON-OFF position indication
pushbutton switches) control illumination of each annunciator light. Four
different busbars:
- AC1 supply: 103XP
- AC2 supply: 202XP
- 115VAC STAT INV BUS: 901XP
- Essential supply: 801XP
EFF :
ALL 33-14-00
Page 5
May 01/06
IAC
Annunciator Light Test and Dimming - Principle Diagram
Figure 003 (SHEET 1)
EFF :
ALL 33-14-00
Page 6
May 01/05
R
IAC
Annunciator Light Test and Dimming - Principle Diagram
Figure 003 (SHEET 2)
EFF :
ALL 33-14-00
Page 7
May 01/05
R
IAC
R supply the annunciator lights with 5VAC-400Hz through the transformers. In
R the case of emergency supply only busbar 901XP is serviceable.
R The system comprises:
C. Switch 33LP
A switch with 3 positions: DIM, BRT, TEST is located on the overhead
control and indicating panel 25VU.
EFF :
ALL 33-14-00
Page 8
May 01/05
IAC
- seven are associated with the annunciator lights supplied by the
essential generation. They are identified by FINs 5LP to 11LP.
Three are associated with the annunciator lights supplied by the AC2
generation.
They are identified by FINs 18LP to 20LP.
Each board comprises:
- 2 relays supplied by busbar 206PP with 28VDC through circuit breaker
30LP located on the rear circuit breaker panel 122VU.
These 2 relays serve for the annunciator light tests when the switch
33LP is in the TEST position.
- 10 relays supplied by the various A/C systems with 28VDC. They supply
the annunciator light with 5VAC whereas the system data are supplied
with 28VDC.
E. Four-Stage Relays
They are located in the relay box 103VU. They all are identified with a
TEST placard. They serve for the test of the equipment annunciator lights
(high intensity) or of other annunciator lights (ON - OFF).
The busbar 206PP supplies 28VDC to the coil of these relays through the
circuit breaker 30LP located on the rear circuit breaker panel 122VU.
4. __________________________________
Operational/Control and Indicating
R
R (Ref. Fig. 004)
EFF :
ALL 33-14-00
Page 9
May 01/05
IAC
Control and Indicating-Panel 108VU
Figure 004
EFF :
ALL 33-14-00
Page 10
May 01/05
IAC
ANNUNCIATOR LIGHT TEST AND DIMMING - ADJUSTMENT/TEST
____________________________________________________
TASK 33-14-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-14-00-860-050
(2) On the Captain and F/O instrument panels, the overhead panel, the
glareshield set some annunciator lights (warning or indicator lights)
to the operative position.
(3) On the center pedestal 11VU and overhead panel 20VU, on all the Radio
Management Panels (RMPs), set the ON/OFF switch to the ON position.
EFF :
ALL 33-14-00
Page 501
Aug 01/07
IAC
Subtask 33-14-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/XFMR/115V.5V/ESS BUS 29LP H03
105VU ADIRS/ADIRU1/28VDC 6FP1 C02
122VU ELEC/EXT PWR/LT CLT/AVAIL 4XG X31
122VU LIGHTING/TST/BOARD/SPLY 30LP X06
122VU LIGHTING/ANN LT SPLY/XFMR/BUS 2 27LP X05
122VU LIGHTING/ANN LT SPLY/XFMR/BUS 1 26LP X04
122VU LIGHTING/ANN LT SPLY/XFMR/STAT INV 28LP X03
4. Procedure
_________
Subtask 33-14-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- put the ANN LT switch in the - all the annunciator lights go off.
BRT position. This does not include the annunciator
lights that come on during the job
set-up.
- put the ANN LT switch in the - the annunciator lights that come on
DIM position. during the job set-up get dimmer.
- put the ANN LT switch in the - the annunciator lights that come on
BRT position during the job set-up get brighter.
EFF :
ALL 33-14-00
Page 502
May 01/08
IAC
R Subtask 33-14-00-710-054
R B. Do the annunciator light test for the EXT PWR panel 108VU with the
R external power
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - release the LIGHT TEST pushbutton - the EXT PWR/NOT IN USE indicator
R switch. light goes off
R - the COCKPIT CALL indicator light goes
R off
R - the APU FIRE indicator light goes off
R - the ADIRU & AVNCS VENT caution light
R goes off.
R Subtask 33-14-00-710-055
R C. Do the annunciator light test for the EXT PWR panel 108VU with the APU
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - release the LIGHT TEST pushbutton - the EXT PWR/NOT IN USE indicator
R switch. light stays off
EFF :
ALL 33-14-00
Page 503
Nov 01/06
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - the COCKPIT CALL indicator light
R stays off
R - the APU FIRE indicator light stays
R off
R - the ADIRU & AVNCS VENT caution light
R goes off.
5. Close-up
________
Subtask 33-14-00-860-051
(1) On the center pedestal 11VU and overhead panel 20VU, on all the RMPs,
set the ON/OFF switch to the OFF position.
(2) On the Captain and F/O instrument panels, the overhead panel, the
glareshield, make sure that the annunciator lights that came on
during the job set-up go off.
EFF :
ALL 33-14-00
Page 504
Nov 01/06
IAC
______________________________________________________________________________
BOARD - ANNUNCIATOR LIGHT TEST AND INTERFACE (1LP,2LP,3LP,4LP,5LP,6LP,7LP,8LP,
9LP,10LP,11LP,12LP,18LP,19LP,20LP) - REMOVAL/INSTALLATION
_________________________________________________________
TASK 33-14-33-000-001
Removal of the Annunciator-Light Test and Interface-Board (1LP, 2LP, 3LP, 4LP,
5LP, 6LP, 7LP, 8LP, 9LP, 10LP, 11LP, 12LP, 18LP, 19LP, 20LP)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-14-33
Page 401
May 01/06
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-14-33-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/TST/BOARD/SPLY 30LP X06
Subtask 33-14-33-010-050
B. Get Access
(1) Put the access platform in position under the access door 822.
4. Procedure
_________
EFF :
ALL 33-14-33
Page 402
Aug 01/06
IAC
Annunciator-Light Test and Interface-Board
Figure 401/TASK 33-14-33-991-001
R
EFF :
001-012, 014-099, 33-14-33
Page 403
May 01/06
IAC
R Annunciator-Light Test and Interface-Board
R Figure 401A/TASK 33-14-33-991-001-A
EFF :
ALL 33-14-33
Page 404
May 01/05
IAC
**ON A/C ALL
Subtask 33-14-33-020-050
(1) Fully loosen the two screws (2) that attach the defective
annunciator-light test and interface-board (1) to its support (3).
EFF :
ALL 33-14-33
Page 405
May 01/06
R
IAC
TASK 33-14-33-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-14-33
Page 406
May 01/06
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-14-33-010-051
A. Get Access
(1) Make sure that the access platform is in position under the access
door 822.
Subtask 33-14-33-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/TST/BOARD/SPLY 30LP X06
4. Procedure
_________
EFF :
ALL 33-14-33
Page 407
Aug 01/06
IAC
**ON A/C ALL
Subtask 33-14-33-420-050
(2) Tighten the two screws (2) that attach the annunciator light test and
interface-board to its support (3).
Subtask 33-14-33-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
30LP
Subtask 33-14-33-710-050
5. Close-up
________
Subtask 33-14-33-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-14-33
Page 408
May 01/06
IAC
__________________________________________________________
TRANSFORMER - ANNUNCIATOR LIGHT TEST (31LP,35LP,36LP,37LP)
____________________
REMOVAL/INSTALLATION
TASK 33-14-51-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-14-51
Page 401
May 01/06
R
IAC
3. __________
Job Set-up
Subtask 33-14-51-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/TST/BOARD/SPLY 30LP X06
R
FOR 31LP
R
49VU LIGHTING/XFMR/115V.5V/ESS BUS 29LP H03
R
FOR 35LP
R
122VU LIGHTING/ANN LT SPLY/XFMR/STAT INV 28LP X03
Subtask 33-14-51-010-050
B. Get Access
4. Procedure
_________
Subtask 33-14-51-020-050
(1) Disconnect the movable connector (4) from the defective transformer
(1). Put a blanking cap on the disconnected connector.
(2) Loosen the four screws (3) and the washers (2) that attach the
defective transformer (1) to the structure.
EFF :
ALL 33-14-51
Page 402
Aug 01/06
IAC
Essential Transformer
Figure 401/TASK 33-14-51-991-001
EFF :
ALL 33-14-51
Page 403
Aug 01/06
R
IAC
TASK 33-14-51-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-14-51-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/TST/BOARD/SPLY 30LP X06
R
FOR 36LP
R
122VU LIGHTING/ANN LT SPLY/XFMR/BUS 2 27LP X05
R
FOR 37LP
R
122VU LIGHTING/ANN LT SPLY/XFMR/BUS 1 26LP X04
EFF :
ALL 33-14-51
Page 404
Aug 01/06
IAC
R
Subtask 33-14-51-010-051
B. Get Access
(1) In the cockpit, remove the panels 121VU and/or 122VU which give
access to the panel 120VU.
4. Procedure
_________
Subtask 33-14-51-020-051
(2) Loosen the four screws (3) and the washers (2) that attach the
defective transformer (1) to the structure.
EFF :
ALL 33-14-51
Page 405
Aug 01/06
IAC
System 1 (2) Transformer
Figure 402/TASK 33-14-51-991-002
EFF :
ALL 33-14-51
Page 406
Aug 01/06
R
IAC
TASK 33-14-51-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-14-51
Page 407
Aug 01/06
R
IAC
3. __________
Job Set-up
Subtask 33-14-51-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/TST/BOARD/SPLY 30LP X06
R
FOR 31LP
R
49VU LIGHTING/XFMR/115V.5V/ESS BUS 29LP H03
R
FOR 35LP
R
122VU LIGHTING/ANN LT SPLY/XFMR/STAT INV 28LP X03
Subtask 33-14-51-010-052
B. Get Access
4. Procedure
_________
Subtask 33-14-51-420-050
(4) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
ALL 33-14-51
Page 408
Aug 01/06
IAC
(6) Tighten the four screws (3) and the washers (2) that attach the
transformer (1) to the structure.
Subtask 33-14-51-865-053
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
30LP
FOR 31LP
29LP
FOR 35LP
28LP
Subtask 33-14-51-710-050
5. Close-up
________
Subtask 33-14-51-410-051
A. Close Access
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-14-51
Page 409
Aug 01/06
R
IAC
TASK 33-14-51-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-14-51
Page 410
Aug 01/06
R
IAC
3. __________
Job Set-up
Subtask 33-14-51-865-055
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/TST/BOARD/SPLY 30LP X06
R
FOR 36LP
R
122VU LIGHTING/ANN LT SPLY/XFMR/BUS 2 27LP X05
R
FOR 37LP
R
122VU LIGHTING/ANN LT SPLY/XFMR/BUS 1 26LP X04
Subtask 33-14-51-010-053
B. Get Access
(1) Make sure that the panel(s) 121VU and/or 122VU is (are) removed.
(2) Make sure that the quick-disconnect fasteners are loosened for these
panels:
FOR 37LP
112VU
FOR 36LP
122VU, 121VU
(3) Make sure that these panels are pulled to the front.
EFF :
ALL 33-14-51
Page 411
Aug 01/06
IAC
4. Procedure
_________
Subtask 33-14-51-420-051
(4) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Install the four screws (3) and the washers (2) that attach the
transformer (1) to the structure.
Subtask 33-14-51-410-050
Subtask 33-14-51-865-054
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
30LP
FOR 36LP
27LP
FOR 37LP
26LP
Subtask 33-14-51-710-051
EFF :
ALL 33-14-51
Page 412
Aug 01/06
R
IAC
5. Close-up
________
Subtask 33-14-51-942-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-14-51
Page 413
Aug 01/06
R
IAC
CABIN - DESCRIPTION AND OPERATION
_________________________________
1. General
_______
R
R The cabin lighting system illuminates the cabin, the entrances, the
R lavatories, the galley and the attendant work areas.
R The system has these sub-systems:
R
R - General Illumination (Ref. 33-21-00)
R - Call System (Ref. 33-23-00)
R - Lavatory Lighting (Ref. 33-24-00)
R - Passenger Reading Lights (Ref. 33-25-00)
R - Lavatory Lighted Signs (Ref. 33-26-00)
R - Cabin Attendant Work-Lights (Ref. 33-27-00).
R
R NOTE : The Call System and the lighted signs NO SMOKING, FASTEN SEAT BELT
____
R and RETURN TO SEAT (NS/FSB/RTS) are part of the Cabin
R Intercommunication Data System (CIDS) (Ref. 23-73-00).
2. Description
___________
A. General Illumination
(Ref. Fig. 001)
(Ref. 33-21-00)
The general illumination system has fluorescent tubes which are installed
in the ceiling panels along the center aisle (CEILING lights), above the
windows (WINDOW lights) and at each entrance.
They illuminate the cabin and the entrance areas.
The cabin attendants control the general illumination through the Forward
Attendant Panel (FAP) and the Additional Attendant Panel(s) (AAP), which
are part of the Cabin Intercommunication Data System (CIDS) (Ref.
23-73-00).
B. Lavatory Lighting
(Ref. Fig. 002)
(Ref. 33-24-00)
The lavatory lighting system gives illumination inside the lavatories.
Each lavatory has a fluorescent tube and additional halogen light(s).
A microswitch in the lavatory door frame controls the brightness level of
the fluorescent tube and the halogen light(s).
The cabin attendants control the power of the lavatory lighting system
through a membrane switch (POWER LAV) on the Forward Attendant Panel
(FAP).
EFF :
ALL 33-20-00
Page 1
Nov 01/07
IAC
R General Illumination - Schematic
R Figure 001
EFF :
ALL 33-20-00
Page 2
May 01/00
IAC
Lavatory Lighting - Schematic (Example)
Figure 002
EFF :
ALL 33-20-00
Page 3
Nov 01/04
R
IAC
NOTE : The installation of the additional halogen light(s) is a customer
____
option.
EFF :
ALL 33-20-00
Page 4
Nov 01/04
R
IAC
R CABIN - DEACTIVATION/REACTIVATION
_________________________________
TASK 33-20-00-040-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-20-00-861-051
EFF :
ALL 33-20-00
Page 401
Nov 01/05
IAC
4. Procedure
_________
Subtask 33-20-00-040-051
(1) Do the operational test of the cabin signs (Ref. TASK 23-73-00-710-
017) and find the defective NS/FSB/RTS sign(s).
(2) Find the passenger seats from which you cannot see the serviceable
NS/FSB/RTS sign.
(3) Put warning notices in position on these seats to tell the passengers
not to use them.
5. Close-up
________
Subtask 33-20-00-860-051
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-20-00
Page 402
May 01/05
IAC
TASK 33-20-00-440-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-20-00-861-052
EFF :
ALL 33-20-00
Page 403
Nov 01/05
IAC
4. Procedure
_________
Subtask 33-20-00-440-050
(1) Remove the warning notices from the applicable passenger seats.
(2) Do the trouble shooting of the cabin NS/FSB/RTS signs (Ref. TSM 23)
and make the applicable correction.
5. Close-up
________
Subtask 33-20-00-860-052
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-20-00
Page 404
May 01/05
IAC
GENERAL ILLUMINATION - DESCRIPTION AND OPERATION
________________________________________________
1. General
_______
Fluorescent lamps illuminate the passenger cabin and the entrance areas as
listed below:
Fluorescent lamps give lighting to the passenger cabin and the entrance
areas.
EFF :
ALL 33-21-00
Page 1
Feb 01/08
IAC
**ON A/C 901-999,
EFF :
101-199, 901-999, 33-21-00
Page 2
Feb 01/08
IAC
Ceiling and Window Lights (Right-Hand) - Schematic
Figure 001
R
EFF :
001-012, 014-099, 33-21-00
Page 3/4
Aug 01/07
IAC
INTENTIONALLY BLANK
R
33-21-00
Page 5
Nov 01/06
IAC
R Ceiling and Window Lights (Right-Hand) - Schematic
Figure 001A (SHEET 1)
EFF :
101-199, 33-21-00
Page 6
Feb 01/08
IAC
R Ceiling and Window Lights (Right-Hand) - Schematic
Figure 001A (SHEET 2)
EFF :
101-199, 33-21-00
Page 7
Feb 01/08
IAC
R Ceiling and Window Lights (Right-Hand) - Schematic
Figure 001B (SHEET 1)
EFF :
901-999, 33-21-00
Page 8
Feb 01/08
IAC
R Ceiling and Window Lights (Right-Hand) - Schematic
Figure 001B (SHEET 2)
EFF :
901-999, 33-21-00
Page 9
Feb 01/08
IAC
INTENTIONALLY BLANK
33-21-00
Page 10
May 01/07
R
IAC
Ceiling and Window Lights (Left-Hand) - Schematic
Figure 002
R
EFF :
001-012, 014-099, 33-21-00
Page 11/12
Aug 01/07
IAC
INTENTIONALLY BLANK
R
33-21-00
Page 13
May 01/07
IAC
R Ceiling and Window Lights (Left-Hand) - Schematic
R Figure 002A (SHEET 1)
R
EFF :
101-199, 33-21-00
Page 14
May 01/07
IAC
R Ceiling and Window Lights (Left-Hand) - Schematic
R Figure 002A (SHEET 2)
EFF :
101-199, 33-21-00
Page 15
May 01/07
IAC
R Ceiling and Window Lights (Left-Hand) - Schematic
Figure 002B (SHEET 1)
EFF :
901-999, 33-21-00
Page 16
Feb 01/08
IAC
R Ceiling and Window Lights (Left-Hand) - Schematic
Figure 002B (SHEET 2)
EFF :
901-999, 33-21-00
Page 17
Feb 01/08
IAC
Entrance Lighting - Schematic
Figure 003
R
EFF :
001-012, 014-099, 33-21-00
Page 18
May 01/07
IAC
R Entrance Lighting - Schematic
Figure 003A
EFF :
101-199, 901-999, 33-21-00
Page 19
May 01/08
IAC
When the cockpit door is opened and the engines are in operation, the
lighting of the forward entrance LH is dimmed automatically to 10% of
full brightness (DIM2).
If a full failure of the FAP and/or the CIDS occurs, the lighting of the
forward entrance comes on automatically to 100% intensity level. A cabin
decompression also occurs and the pre-set mode is then cancelled.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS ATA
DOOR REF.
-------------------------------------------------------------------------------
1LG1 LAMP AND BALLAST UNIT (RIGHT-HAND) 200 33-21-11
THRU WINDOW
1LG10
2LG1 LAMP AND BALLAST UNIT (RIGHT-HAND) 200 33-21-11
THRU WINDOW
2LG10
3LG1 LAMP AND BALLAST UNIT (LEFT-HAND) 200 33-21-11
THRU CEILING
3LG10
4LG1 LAMP AND BALLAST UNIT (RIGHT-HAND) 200 33-21-11
THRU CEILING
4LG10
11LG1 LAMP AND BALLAST UNIT (LEFT-HAND) 200 33-21-11
THRU WINDOW
11LG10
12LG1 LAMP AND BALLAST UNIT (RIGHT-HAND) 200 33-21-11
THRU WINDOW
12LG10
13LG1 LAMP AND BALLAST UNIT (LEFT-HAND) 200 33-21-11
THRU CEILING
13LG10
14LG1 LAMP AND BALLAST UNIT (RIGHT-HAND) 200 33-21-11
THRU CEILING
14LG10
20LG LAMP AND BALLAST UNIT 1 (RIGHT-HAND) 200 33-21-11
ENTRANCE
EFF :
ALL 33-21-00
Page 20
Feb 01/08
R
IAC
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS ATA
DOOR REF.
-------------------------------------------------------------------------------
21LG LAMP AND BALLAST UNIT 1 (LEFT-HAND) 200 33-21-11
ENTRANCE
23LG LAMP AND BALLAST UNIT 2 (LEFT-HAND) 200 33-21-11
ENTRANCE
24LG LAMP AND BALLAST UNIT 2 (RIGHT-HAND) 200 33-21-11
ENTRANCE
30LG LAMP AND BALLAST UNIT (RIGHT-HAND) 200 33-21-11
WINDOW
31LG LAMP AND BALLAST UNIT (LEFT-HAND) 200 33-21-11
CEILING
34LG LAMP AND BALLAST UNIT (RIGHT-HAND) 200 33-21-11
Window
37LG LAMP AND BALLAST UNIT (LEFT-HAND) 200 33-21-11
WINDOW
38LG LAMP AND BALLAST UNIT (RIGHT-HAND) 200 33-21-11
CEILING
120RH PANEL - FORWARD ATTENDANT 221 23-73-12
126RH PANEL - AFT ATTENDANT 261 23-73-13
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS ATA
DOOR REF.
-------------------------------------------------------------------------------
BALLAST UNITS WITH FLUORESCENT LAMPS 200 33-21-11
EFF :
ALL 33-21-00
Page 21
Feb 01/08
R
IAC
General Illumination - Component Location
Figure 004 (SHEET 1)
R
EFF :
001-012, 014-099, 33-21-00
Page 22
Aug 01/07
IAC
General Illumination - Component Location
Figure 004 (SHEET 2)
R
EFF :
001-012, 014-099, 33-21-00
Page 23
Aug 01/07
IAC
General Illumination - Component Location
Figure 004 (SHEET 3)
R
EFF :
001-012, 014-099, 33-21-00
Page 24
Aug 01/07
IAC
General Illumination - Component Location
Figure 004 (SHEET 4)
R
EFF :
001-012, 014-099, 33-21-00
Page 25
Aug 01/07
IAC
Attendant Panels - Component Location
Figure 005
R
EFF :
101-199, 901-999, 33-21-00
Page 26
Aug 01/07
IAC
Ceiling & Window Lighting Strips
Figure 006
R
EFF :
101-199, 33-21-00
Page 27
Aug 01/07
IAC
R Ceiling and Window Lighting Strips
Figure 006A
EFF :
901-999, 33-21-00
Page 28
Feb 01/08
IAC
**ON A/C ALL
3. __________________
System Description
A. Cabin Illumination
The cabin lamps are distributed in four strips throughout the cabin.
The four strips are divided into two pairs for control purposes. The two
outboard strips are designated as WINDOW (WDO) lights and the two center
strips as CEILING (CLG) lights. The system is designed so that the window
and ceiling lights can be on together or separately. When on, the
fluorescent lamps can be selected to 100 % (BRT), 50 % (DIM 1) or 10 %
(DIM 2) intensity. Each fluorescent lamp is installed in a holder which
contains an integral ballast unit. The units are supplied with 115VAC
from busbars 212XP and 214XP through circuit breakers 300LG thru 307LG
(cabin lighting) and 308LG (entrance lighting). The lighting system is
controlled from the forward attendant panel 120RH, which contains the
following membrane switches:
(1) MAIN ON - when pushed, switches on the cabin zones and entrance areas
lighting with 100 % intensity. It also causes the integral light in
all BRT, WDO and CLG membrane switches to come on.
(2) MAIN OFF - when pushed, the cabin zones and entrance area lights goes
off. Also any light of the general illumination switch goes off.
This function is disabled in flight.
(3) ENTRY BRT - when initially pushed, causes the related entrance area
lighting to come on with 100 % intensity. It also causes the integral
light under the membrane switch foil to come on. The lights may be
switched off by pushing the membrane switch twice in succession.
(4) ENTRY DIM1 - when initially pushed, causes the related entrance area
lighting to come on with 50 % intensity. It also causes the integral
light under the membrane switch foil to come on. The lights may be
switched off by pushing the membrane switch twice in succession.
(5) ENTRY DIM2 - when initially pushed, causes the related entrance area
lighting to come on with 10 % intensity. It also causes the integral
light under the membrane switch foil to come on. The lights may be
switched off by pushing the membrane switch twice in succession.
EFF :
ALL 33-21-00
Page 29
Feb 01/08
IAC
(6) BRT - when initially pushed, causes the related cabin zone lighting
to come on with 100 % intensity. It also causes the integral lights
in the related BRT, cabin WDO and cabin CLG membrane switch to come
on. The lights may be switched off by pushing the membrane switch
twice in succession.
(7) DIM1 - when initially pushed, causes the related cabin zone lighting
to come on with 50 % intensity. It also causes the integral light in
the related DIM 1, cabin WDO and cabin CLG membrane switch to come
on. The lights may be switched off by pushing the membrane switch
twice in succession.
(8) DIM2 - when initially pushed, causes the related cabin zone lighting
to come on with 10 % intensity. It also causes the integral light in
the related DIM 2, cabin WDO and cabin CLG membrane switch to come
on. The lights may be switched off by pushing the membrane switch
twice in succession.
(9) WDO - With the cabin lighting set on at any intensity. On pushing
this membrane switch, the window lights in each cabin zone and the
light under the membrane switch foil go off. Pushing the membrane
switch again will cause the lights to come on.
(10) CLG - With the cabin lighting set on at any intensity. On pushing
this membrane switch, the ceiling lights in each cabin zone and the
light under the membrane switch foil go off. Pushing the membrane
switch again will cause the lights to come on.
A. Cabin Illumination
The cabin lamps are divided in four lighting strips throughout the cabin
zones. The four lighting strips in each cabin zone are divided into two
pairs for control purposes. The two outboard strips are designated as
WINDOW (WDO) lights and the two center strips as CEILING (AISLE) lights.
The system is designed so that the window and ceiling lights in the cabin
zone can be on together or separately. When on, the fluorescent lamps can
be set to 100% (BRT), 50% (DIM1) or 10% (DIM2) intensity. Each
fluorescent lamp is installed in a holder which contains an ballast unit.
The units are supplied with 115VAC from busbars 212XP and 214XP through
circuit breakers 300LG thru 307LG (cabin lighting) and 308LG (entrance
lighting). The lighting system is controlled from the FAP 120RH and the
AAP 126RH.
EFF :
ALL 33-21-00
Page 30
Feb 01/08
R
IAC
B. Flight Attendant Panel (FAP) 120RH
(1) When the button MAIN ON is pushed, all fluorescent lamps come on
with 100% intensity. Also the button indicator light comes on.
(2) When the button MAIN OFF is pushed, all fluorescent lamps go off.
Also the button indicator light goes off.
In flight this function is not available.
(3) When the button ENTRY BRT is pushed initially, the related entrance
area lighting comes on with 100% intensity. Also the button indicator
light comes on.
(4) When the button ENTRY DIM1 is pushed initially, the related
entrance area lighting comes on with 50% intensity. Also the button
indicator light comes on.
(5) When the button ENTRY DIM2 is pushed initially, the related
entrance area lighting comes on with 10% intensity. Also the button
indicator light comes on.
(6) When the button BRT is pushed initially, the related cabin zone
lighting comes on with 100% intensity. Also the button indicator
light comes on.
(7) When the button DIM1 is pushed initially, the related cabin zone
lighting comes on with 50% intensity. Also the button indicator light
comes on.
(8) When the button DIM2 is pushed initially, the related cabin zone
lighting comes on with 10% intensity. Also the button indicator light
comes on.
(9) When the button WDO is pushed, all window lights in each cabin zone
come on. Also the button indicator light comes on. When the button
WDO is pushed again, all window lights in each cabin zone go off.
The button indicator light also goes off.
(10) When the button AISLE is pushed, all ceiling lights in each cabin
zone come on. Also the button indicator light comes on. When the
button AISLE is pushed again, all ceiling lights in each cabin zone
go off. The button indicator light also goes off.
EFF :
101-199, 901-999, 33-21-00
Page 31
Feb 01/08
R
IAC
C. Additional Attendant Panel (AAP)
NOTE : The AAP has no buttons MAIN ON and MAIN OFF.
____
(1) When the button ENTRY BRT is pushed initially, the related entrance
area lighting comes on with 100% intensity. Also the button indicator
light comes on.
(2) When the button ENTRY DIM1 is pushed initially, the related
entrance area lighting comes on with 50% intensity. Also the button
indicator light comes on.
(3) When the button ENTRY DIM2 is pushed initially, the related
entrance area lighting comes on with 10% intensity. Also the button
indicator light comes on.
(4) When the button CABIN BRT is pushed initially, the related cabin
zone lighting comes on with 100% intensity. Also the button indicator
light comes on.
(5) When the button CABIN DIM1 is pushed initially, the related cabin
zone lighting comes on with 50% intensity. Also the button indicator
light comes on.
(6) When the button CABIN DIM2 is pushed initially, the related cabin
zone lighting comes on with 10% intensity. Also the button indicator
light comes on.
4. _____________________
Component Description
EFF :
ALL 33-21-00
Page 32
Feb 01/08
R
IAC
Fluorescent Lamp with Ballast Unit - Schematic
Figure 007
R
EFF :
001-012, 014-099, 33-21-00
Page 33
Feb 01/08
IAC
**ON A/C 101-199, 901-999,
5. ________________________________
Operation/Control and Indication
The forward attendant panel 120RH is connected to the Directors 101RH and
102RH of the Cabin Intercommunication Data System (CIDS).
The input signals from the forward attendant panel 120RH are processed by
the director and transmitted to the Decoder/Encoder Units (DEUs). The DEUs
accept the input data and activate the output to the fluorescent lamps with
ballast units in accordance with the code presented at the input. The DEU is
capable of handling up to four fluorescent lamps with ballast units. Three
signal lines connect each fluorescsent lamp with ballast unit to the related
DEU.
The truth table below shows the state of the fluorescent lamps when
activated by the DEU output signal. The DEU output signal has two levels 0
(0VDC) and 1 (28VDC).
As can be seen in the truth table with no output signal from the associated
DEU the fluorescent lamps will illuminate at full brightness.
Truth Table
EFF :
ALL 33-21-00
Page 34
Feb 01/08
IAC
R Fluorescent Lamp with Advanced Integrated Ballast-Unit (AIBU) - Block Diagram
R Figure 007A
R
EFF :
101-199, 901-999, 33-21-00
Page 35
Feb 01/08
IAC
--------------------------------------------------------------------------
| | BALLAST UNIT INPUT PIN. |
| LAMP STATE | SIGNAL |
| |--------------------------------------------|
| | F | D | E |
|-----------------------------|---------------|---------------|------------|
| BRT | 0 | 0 | 0 |
|-----------------------------|---------------|---------------|------------|
| DIM 1 (50 %) | 0 | 1 | 0 |
|-----------------------------|---------------|---------------|------------|
| DIM 2 (10 %) | 0 | 0 | 1 |
|-----------------------------|---------------|---------------|------------|
| OFF | 1 | 0 | 0 |
--------------------------------------------------------------------------
The assignment of the fluorescent lamps with ballast units to cabin zones is
programmed into the Cabin Assignment Module (CAM). The CAM is fitted in the
programming and test panel 110RH and preprogrammed for particular lighting
requirements. Any new requirements can be programmed into the CAM.
The FAP 120RH and the AAP 126RH are connected to the Directors 101RH and
102RH of the CIDS.
The input signals from the FAP 120RH and the AAP 126RH are processed by the
R director and transmitted to the DEUs. The DEU can control up to eight
R fluorescent lamps with ballast units. Two signal lines connect each
R fluorescent lamp with ballast unit to the related DEU. The DEUs receive the
R input data and give output through the two signal lines to the fluorescent
R lamps with ballast units.
R The control of the fluorescent lamps with ballast units to the cabin zones
R is given in the Cabin Assignment Module (CAM). The CAM is installed in the
R FAP 120RH and pre-set for the applicable lighting. All changes can be made
R in the CAM.
A. Entrance Lighting
R
EFF :
ALL 33-21-00
Page 36
Feb 01/08
IAC
**ON A/C 101-199, 901-999,
The entrance lighting has fluorescent lamps with ballast units installed
in the ceiling panels at the forward and aft entrances. Two fluorescent
lamps are installed in the LH and RH ceiling panels at each entrance. The
operation is the same as the cabin lighting.
(2) The CIDS directors 101RH and 102RH receive one signal from the engine
oil-pressure system and another signal from the cockpit door
microswitch.
The directors 101RH and 102RH transmit their output signal to the DEU
which controls the entrance 1 LH fluorescent lamp with ballast unit.
The DEU provides a DIM2 signal and the light dims to 10% intensity.
EFF :
ALL 33-21-00
Page 37
Feb 01/08
R
IAC
GENERAL ILLUMINATION - ADJUSTMENT/TEST
______________________________________
TASK 33-21-00-710-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-21-00-861-050
EFF :
ALL 33-21-00
Page 501
Feb 01/96
IAC
Subtask 33-21-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
EFF :
ALL 33-21-00
Page 502
Feb 01/07
IAC
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39
121VU ENGINE/ENG2/FADEC B 4KS2 Q40
121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41
EFF :
ALL 33-21-00
Page 503
May 01/07
IAC
**ON A/C ALL
Subtask 33-21-00-860-050
R (2) Make sure that the cockpit door is closed and the engines do not
R operate.
(3) Push the MAIN OFF membrane switch on the FAP 120RH to make sure that
all the entrance and cabin lights are off.
4. Procedure
_________
Subtask 33-21-00-710-050
A. Test of all the Cabin Lighting from the Forward Attendant Panel (FAP).
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. On the Forward Attendant Panel At the forward and aft entrance and in
120RH: the cabin.
- push the MAIN ON membrane - all the entrance and cabin lights
switch. come on.
- push the MAIN OFF membrane - all the entrance and cabin lights go
switch. off.
EFF :
ALL 33-21-00
Page 504
Feb 01/08
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-21-00-710-050-A
A. Test of all the Cabin Lighting from the Flight Attendant Panel (FAP)
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. On the Flight Attendant Panel In the forward and aft entry area and
(FAP) 120RH: in the cabin:
- Push the LIGHT MAIN ON/OFF - All the entry and cabin lights come
key. on.
- Push the LIGHT MAIN ON/OFF - All the entry and cabin lights go
key again. off.
R Subtask 33-21-00-710-051
R B. Test of the forward and aft Entrance Lighting from the Forward Attendant
R Panel (FAP).
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - push the ENTRY BRT membrane - the forward and aft entrance lights
R switch. come on.
R
EFF :
ALL 33-21-00
Page 505
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - push the ENTRY DIM1 membrane - the forward and aft entrance lights
R switch. become dim.
R - push the ENTRY DIM2 membrane - the forward and aft entrance lights
R switch. dim again.
R - push the ENTRY BRT membrane - the forward and aft entrance lights
R switch. become bright.
R - push the ENTRY BRT membrane - the forward and aft entrance lights
R switch. go off.
R
EFF :
001-012, 014-099, 33-21-00
Page 506
Nov 01/07
IAC
**ON A/C 101-199, 901-901,
Subtask 33-21-00-710-051-A
B. Test of the Forward and Aft Entrance Lighting from the Flight Attendant
Panel (FAP) 120RH
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Set the LIGHT page. - All possible cabin lighting zones are
shown.
- Push the ENTRY FWD/BRT key. - The ENTRY FWD/BRT indication comes
on.
In the cabin:
- The fluorescent tubes in the forward
entry area come on with 100%
intensity.
- Push the ENTRY FWD/DIM1 key. - The ENTRY FWD/BRT indication goes
off.
- The ENTRY FWD/DIM1 indication comes
on.
In the cabin:
- The fluorescent tubes in the forward
entry area come on with 50%
intensity.
- Push the ENTRY FWD/DIM2 key. - The ENTRY FWD/DIM1 indication goes
off.
- The ENTRY FWD/DIM2 indication comes
on.
In the cabin:
EFF :
101-199, 901-901, 33-21-00
Page 507
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- The fluorescent tubes in the forward
entry area come on with 10%
intensity.
- Push the ENTRY FWD/DIM2 key - The ENTRY FWD/DIM2 indication goes
again. off.
In the cabin:
- The fluorescent tubes in the forward
entry area go off.
- Push the ENTRY FWD/BRT key. - The ENTRY FWD/BRT indication comes
on.
In the cabin:
- The fluorescent tubes in the forward
entry area come on with 100%
intensity.
- Push the ENTRY AFT/BRT key. - The ENTRY AFT/BRT indication comes
on.
In the cabin:
- The fluorescent tubes in the aft
entry area come on with 100%
intensity.
- Push the ENTRY AFT/DIM1 key. - The ENTRY AFT/BRT indication goes
off.
- The ENTRY AFT/DIM1 indication comes
on.
In the cabin:
- The fluorescent tubes in the aft
entry area come on with 50%
intensity.
R
EFF :
101-199, 901-901, 33-21-00
Page 508
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
On the FAP 120RH:
- Push the ENTRY AFT/DIM2 key. - The ENTRY AFT/DIM1 indication goes
off.
- The ENTRY AFT/DIM2 indication comes
on.
In the cabin:
- The fluorescent tubes in the aft
entry area come on with 10%
intensity.
- Push the ENTRY AFT/DIM2 key - The ENTRY AFT/DIM2 indication goes
again. off.
In the cabin:
- The fluorescent tubes in the aft
entry area go off.
R Subtask 33-21-00-710-051-B
R B. Test of the Forward and Aft Entrance Lighting from the Flight Attendant
R Panel (FAP) 120RH
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - Set the LIGHT page. - All possible cabin lighting zones are
R shown.
R - Push the FWD ENTRY/BRT key. - The FWD ENTRY/BRT indication comes
R on.
R In the cabin:
R
EFF :
101-199, 901-999, 33-21-00
Page 509
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - The fluorescent tubes in the forward
R entry area come on with 100%
R intensity.
R - Push the FWD ENTRY/DIM1 key. - The FWD ENTRY/BRT indication goes
R off.
R - The FWD ENTRY/DIM1 indication comes
R on.
R In the cabin:
R - The fluorescent tubes in the forward
R entry area come on with 50%
R intensity.
R - Push the FWD ENTRY/DIM2 key. - The FWD ENTRY/DIM1 indication goes
R off.
R - The FWD ENTRY/DIM2 indication comes
R on.
R In the cabin:
R - The fluorescent tubes in the forward
R entry area come on with 10%
R intensity.
R - Push the FWD ENTRY/DIM2 key - The FWD ENTRY/DIM2 indication goes
R again. off.
R In the cabin:
R - The fluorescent tubes in the forward
R entry area go off.
R - Push the FWD ENTRY/BRT key. - The FWD ENTRY/BRT indication comes
R on.
R In the cabin:
R
EFF :
902-999, 33-21-00
Page 510
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - The fluorescent tubes in the forward
R entry area come on with 100%
R intensity.
R - Push the AFT ENTRY/BRT key. - The AFT ENTRY/BRT indication comes
R on.
R In the cabin:
R - The fluorescent tubes in the aft
R entry area come on with 100%
R intensity.
R - Push the AFT ENTRY/DIM1 key. - The AFT ENTRY/BRT indication goes
R off.
R - The AFT ENTRY/DIM1 indication comes
R on.
R In the cabin:
R - The fluorescent tubes in the aft
R entry area come on with 50%
R intensity.
R - Push the AFT ENTRY/DIM2 key. - The AFT ENTRY/DIM1 indication goes
R off.
R - The AFT ENTRY/DIM2 indication comes
R on.
R In the cabin:
R - The fluorescent tubes in the aft
R entry area come on with 10%
R intensity.
R - Push the AFT ENTRY/DIM2 key - The AFT ENTRY/DIM2 indication goes
R again. off.
R In the cabin:
R
EFF :
902-999, 33-21-00
Page 511
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - The fluorescent tubes in the aft
R entry area go off.
R Subtask 33-21-00-710-052
R C. Test of the Cabin Window and Ceiling Lighting from the Forward Attendant
R Panel (FAP).
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - push the CABIN LIGHTING BRT - the window and ceiling lights come
R membrane switch. on.
R In the cabin:
R - push the CABIN LIGHTING DIM1 - the window and ceiling lights become
R membrane switch. dim.
R In the cabin:
R
EFF :
001-012, 014-099, 902-999, 33-21-00
Page 512
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - push the CABIN LIGHTING DIM2 - the window and ceiling lights dim
R membrane switch. again.
R In the cabin:
R - push the CABIN LIGHTING BRT - the window and ceiling lights become
R membrane switch. bright.
R In the cabin:
R In the cabin:
R In the cabin:
R - push the CABIN LIGHTING BRT - the window and ceiling lights come
R membrane switch. on.
R
EFF :
001-012, 014-099, 33-21-00
Page 513
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
On the FAP 120RH:
- the CABIN LIGHTING BRT, WDO and CLG
internal lights on the membrane
switches come on.
In the cabin:
- push the CABIN LIGHTING BRT - the window and ceiling lights go off.
membrane switch.
Subtask 33-21-00-710-052-A
C. Test of the Cabin Window and Ceiling Lighting from the Flight Attendant
Panel (FAP) 120RH
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Set the LIGHT page. - All possible cabin lighting zones are
shown.
In the cabin:
- The fluorescent tubes come on with
100% intensity.
EFF :
ALL 33-21-00
Page 514
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the cabin:
- The fluorescent tubes of the window
lights go off.
- Push the WDO key again. - The WDO indication comes on.
In the cabin:
- The fluorescent tubes of the window
lights come on again with 100%
intensity.
In the cabin:
- The fluorescent tubes of the ceiling
lights go off.
- Push the AISLE key again. - The AISLE indication comes on.
In the cabin:
- The fluorescent tubes come on with
50% intensity.
In the cabin:
R
EFF :
101-199, 901-999, 33-21-00
Page 515
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- The fluorescent tubes come on with
10% intensity.
- Push the DIM2 key again. - The DIM2 indication goes off.
In the cabin:
- The fluorescent tubes go off.
Subtask 33-21-00-710-054
D. Test of the aft Entrance Lighting from the Additional Attendant Panel
(AAP)
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the ENTRY BRT membrane - The ENTRY BRT indication comes on.
switch.
- Push the ENTRY DIM1 membrane - The ENTRY BRT indication goes off.
switch. - The ENTRY DIM1 indication comes on.
- Push the ENTRY DIM2 membrane - The ENTRY DIM1 indication goes off.
switch. - The ENTRY DIM2 indication comes on.
EFF :
101-199, 901-999, 33-21-00
Page 516
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the aft entry area:
- The fluorescent tubes come on with
10% intensity.
- Push the ENTRY DIM2 membrane - The ENTRY DIM2 indication goes off.
switch again.
Subtask 33-21-00-710-055
E. Test of the Cabin Window and Ceiling Lighting from the Additional
Attendant Panel (AAP)
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the CABIN BRT membrane - The CABIN BRT light on the membrane
switch. switch comes on.
In the cabin:
- The fluorescent tubes come on with
100% intensity.
- Push the CABIN DIM1 membrane - The CABIN BRT light on the membrane
switch. switch goes off.
- The CABIN DIM1 light on the
membrane switch comes on.
In the cabin:
- The fluorescent tubes come on with
50% intensity.
EFF :
101-199, 901-999, 33-21-00
Page 517
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the CABIN DIM2 membrane - The CABIN DIM1 light on the
switch. membrane switch goes off.
- The CABIN DIM2 light on the
membrane switch comes on.
In the cabin:
- The fluorescent tubes come on with
10% intensity.
- Push the CABIN DIM2 membrane - The CABIN DIM2 light on the
switch again. membrane switch goes off.
In the cabin:
- The fluorescent tubes go off.
Subtask 33-21-00-710-060
WARNING : MAKE SURE THAT YOU OPEN THE CIRCUIT BREAKERS AS FOLLOWS:
_______
- 1JH, 2JH1 AND 3JH1 BEFORE 2KS1
- 1JH, 2JH2 AND 3JH2 BEFORE 2KS2.
IF YOU DO NOT OBEY THIS SEQUENCE, THERE IS A RISK OF
ELECTROCUTION. THIS IS BECAUSE YOU WILL START CONTINUOUS
IGNITION IF YOU OPEN CIRCUIT BREAKER 2KS1 OR 2KS2 FIRST.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the ENTRY FWD BRT - The forward entrance lights come on.
button.
EFF :
ALL 33-21-00
Page 518
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Open the cockpit door. - The cockpit door is open.
- Open the circuit breaker ENG2 - The circuit breaker ENG2 FADEC A EIU,
FADEC A EIU, 2KS2. 2KS2 is open.
EFF :
ALL 33-21-00
Page 519
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the ENTRY FWD BRT - The forward entrance lights go off.
button.
Subtask 33-21-00-710-062
R NOTE : The removal and installation procedure for the cabin pressure
____
R controller 11HL/12HL is given in (Ref. TASK 21-31-34-000-001) and
R (Ref. TASK 21-31-34-400-001).
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - Push the buttons that follow: - The fluorescent tubes come on with
DIM1 50% intensity.
ENTRY FWD/DIM1
ENTRY AFT/DIM1.
R - Ground the pin A11 of the - The fluorescent tubes come on with
R connector 11HL-AA. 100% intensity.
EFF :
ALL 33-21-00
Page 520
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - Install the CABIN PRESSURE 1 - The CABIN PRESSURE 1 controller
R controller 11HL in 95VU. 11HL in 95VU is installed.
R
R - Ground the pin A11 of the - The fluorescent tubes come on with
R connector 12HL-AA. 100% intensity.
5. Close-up
________
Subtask 33-21-00-862-050
EFF :
ALL 33-21-00
Page 521
Feb 01/08
IAC
**ON A/C 101-199, 901-999,
TASK 33-21-00-740-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-21-00-861-051
(3) Procedure to get access to the SYSTEM REPORT/TEST/COM Page (Ref. TASK
31-32-00-860-003).
EFF :
101-199, 901-999, 33-21-00
Page 522
Feb 01/08
IAC
Subtask 33-21-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU CAB LIGHT PWR-CEILING-AFT 307LG H08
2000VU CAB LIGHT PWR-CEILING-AFT 304LG H07
2000VU CAB LIGHT PWR-CEILING-FWD 306LG H06
2000VU CAB LIGHT PWR-CEILING-FWD 305LG H05
2000VU CAB LIGHT PWR-WINDOW-AFT 302LG H04
2000VU CAB LIGHT PWR-WINDOW-AFT 301LG H03
2000VU CAB LIGHT PWR-WINDOW-FWD 303LG H02
2000VU CAB LIGHT PWR-WINDOW-FWD 300LG H01
2000VU LIGHT-CABIN-ENTRY 308LG J02
4. Procedure
_________
Subtask 33-21-00-740-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - Push the line select key - The CIDS main menu page comes into
R adjacent to the CIDS 1 view.
indication.
R - Push the line select key - The SYSTEM/TESTS menu page comes into
R adjacent to the SYSTEM TESTS view.
indication.
R - Push the line select key - The ILLUMINATION TEST menu page comes
R adjacent to the ILLUMINATION into view.
TEST indication.
EFF :
101-199, 901-999, 33-21-00
Page 523
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the cabin:
- All the cabin lights come on for
approx. 5s.
R - Push the line select key - The CIDS main menu page comes into
R adjacent to the RETURN view.
indication.
5. Close-up
________
Subtask 33-21-00-862-051
(1) On the MCDU, set the BRT knob to the OFF position.
EFF :
101-199, 901-999, 33-21-00
Page 524
Feb 01/08
IAC
BALLAST UNIT WITH LAMPHOLDER - REMOVAL/INSTALLATION
___________________________________________________
TASK 33-21-11-000-001
NOTE : The procedure is the same for all the passenger cabin lighting in Zone
____
200.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-21-11
Page 401
Feb 01/08
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-21-11-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
EFF :
ALL 33-21-11
Page 402
Feb 01/08
IAC
**ON A/C ALL
Subtask 33-21-11-010-050
B. Get Access
4. Procedure
_________
Subtask 33-21-11-020-050
(a) Push the buttons (1) at each end of the lampholder (6) and remove
the fluorescent tube (2).
EFF :
ALL 33-21-11
Page 403
Feb 01/08
IAC
Ballast Unit and Lampholder
Figure 401/TASK 33-21-11-991-001- 12 (SHEET 1)
R
EFF :
001-012, 014-099, 33-21-11
Page 404
Feb 01/08
IAC
Ballast Unit and Lampholder
Figure 401/TASK 33-21-11-991-001- 22 (SHEET 2)
R
EFF :
001-012, 014-099, 33-21-11
Page 405
Feb 01/08
IAC
R Advanced Integrated Ballast-Unit (AIBU) with Lampholder
R Figure 401A/TASK 33-21-11-991-001-A
R
EFF :
101-199, 901-999, 33-21-11
Page 406
Feb 01/08
IAC
(c) Remove the screws (5) and the washers (4).
(d) Remove the ballast unit and lampholder (6) from the airframe
structure.
(3) Remove the ceiling and the entrance ballast unit and lampholder (6)
(d) Remove the ballast unit and lampholder (6) from the airframe
structure.
R Subtask 33-21-11-020-050-A
R (1) Identify all electrical connectors (1) before you disconnect them.
R (4) Hold the fluorescent tube (5) and push the buttons (2) at each end of
R the lampholder (7) to remove the fluorescent tube (5).
EFF :
ALL 33-21-11
Page 407
Feb 01/08
IAC
R **ON A/C ALL
TASK 33-21-11-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-21-11
Page 408
Feb 01/08
IAC
R **ON A/C ALL
3. __________
Job Set-up
Subtask 33-21-11-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
EFF :
ALL 33-21-11
Page 409
Feb 01/08
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-21-11-910-051
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
Subtask 33-21-11-420-050
(1) Installation of the ceiling and the entrance ballast unit and
lampholder
(a) Install the ceiling and the entrance ballast unit and lampholder
(6) to the fuselage structure with the washers (7) and the screws
(8).
(a) Install the window ballast unit and lampholder (6) to the
fuselage structure with the washers (4) and the screws (5).
R
EFF :
ALL 33-21-11
Page 410
Feb 01/08
IAC
(3) Installation of the tube
R Subtask 33-21-11-420-050-A
R (3) Put the AIBU with lampholder (7) in the correct position on the
R aircraft structure.
R (4) If removed, put the reflector (6) in the correct position on the AIBU
R with lampholder (7).
R (8) Make sure that the electrical connectors are clean and in the correct
R condition.
R (9) Connect the electrical connector (1) as identified during the removal
R procedure.
EFF :
ALL 33-21-11
Page 411
Feb 01/08
IAC
R **ON A/C ALL
Subtask 33-21-11-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R 300LG, 301LG, 302LG, 303LG, 304LG, 305LG, 306LG, 307LG, 308LG
Subtask 33-21-11-860-050
(2) Energize the Cabin Intercommunication Data System (CIDS) (Ref. TASK
23-73-00-861-001).
(3) Make sure that the cockpit door is closed and the engines are not
running.
(4) Push the MAIN OFF membrane switch on the forward attendant panel
120RH.
(5) Make sure that the integral lights on all BRT, DIM1, DIM2, WDO and
CLG membrane switches on the forward attendant panel 120RH are off.
R
EFF :
ALL 33-21-11
Page 412
Feb 01/08
IAC
Subtask 33-21-11-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- push the ENTRY BRT pushbutton - the related entrance light comes on.
switch. - the ENTRY BRT integral light on the
related pushbutton comes on.
- push the ENTRY DIM 1 pushbutton - the related entrance light intensity
switch. decreases.
- the ENTRY DIM 1 integral light on the
related pushbutton comes on.
- push the ENTRY DIM 2 pushbutton - the related entrance light intensity
switch. decreases again.
- the ENTRY DIM 2 integral light on the
related pushbutton comes on.
- push the ENTRY DIM 2 pushbutton - the related entrance light goes off.
switch. - the ENTRY DIM 2 integral light on the
related pushbutton goes off.
- push the BRT pushbutton switch. - the related window or ceiling light
comes on.
- the BRT integral light on the related
pushbutton comes on.
R
EFF :
001-012, 014-099, 33-21-11
Page 413
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- the DIM 2 integral light on the
related pushbutton comes on.
Subtask 33-21-11-860-050-A
(2) Energize the Cabin Intercommunication Data System (CIDS) (Ref. TASK
23-73-00-861-001).
(3) Make sure that the cockpit door is closed and the engines are not
running.
(4) Push the LIGHT MAIN ON/OFF membrane switch on the Flight Attendant
Panel (FAP) 120RH.
(5) Make sure that the indication on all of the BRT, DIM1, DIM2, WDO and
CLG buttons on the FAP 120RH are off.
EFF :
ALL 33-21-11
Page 414
Feb 01/08
IAC
Subtask 33-21-11-710-050-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Set the LIGHT page. - All possible cabin lighting zones are
shown.
In the cabin:
- The related entrance light comes on.
In the cabin:
- The related entrance light intensity
decreases.
In the cabin:
- The related entrance light intensity
decreases again.
EFF :
101-199, 901-999, 33-21-11
Page 415
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the cabin:
- The related entrance light goes off.
In the cabin:
- The related window or ceiling light
comes on.
In the cabin:
- The related window or ceiling light
intensity decreases.
In the cabin:
- The related window or ceiling light
intensity decreases again.
- Push the DIM2 button again. - The DIM2 indication on the related
button goes off.
In the cabin:
- The related window or ceiling light
goes off.
EFF :
101-199, 901-999, 33-21-11
Page 416
Feb 01/08
IAC
**ON A/C ALL
5. Close-up
________
Subtask 33-21-11-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-21-11-862-050
EFF :
ALL 33-21-11
Page 417
Feb 01/08
IAC
SWITCH - CABIN ENTRANCE LIGHT DIMMING (310LG) - REMOVAL/INSTALLATION
____________________________________________________________________
TASK 33-21-12-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-21-12-010-050
A. Get Access
EFF :
ALL 33-21-12
Page 401
May 01/07
R
IAC
Subtask 33-21-12-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 33-21-12-020-050
(1) Remove the screws (11) and the bracket (12) from the cockpit wall
(1).
(2) Carefully remove the switch bracket (8) together with the limit
switch (3) from the insert of the cockpit wall (1).
(3) Cut and remove the lockwire from the adjustment nut (6) and the lock
nut (10).
(4) Remove the lock nut (10) and the serrated washer (9) from the limit
switch (3).
(5) Remove the limit switch (3) together with the adjustment nut (6) and
the lock washer (7) from the swtich bracket (3).
(6) Disconnect the wires of the cable harness (2) from the limit switch
(3). Tag and identify each wire as it is disconnected.
EFF :
ALL 33-21-12
Page 402
May 01/07
IAC
R Cabin Entrance Light Dimming Switch
Figure 401/TASK 33-21-12-991-001
EFF :
ALL 33-21-12
Page 403
Nov 01/05
IAC
TASK 33-21-12-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-21-12-860-050
EFF :
ALL 33-21-12
Page 404
May 01/06
R
IAC
Subtask 33-21-12-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
4. Procedure
_________
Subtask 33-21-12-210-050
A. Visual Inspection
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Make sure that the wires of the cable harness (2) are in a good
condition.
EFF :
ALL 33-21-12
Page 405
May 01/07
IAC
Subtask 33-21-12-560-050
(1) Make sure that the roller (5) of the replaced limit switch (3) is
turned 90 degrees to the groove.
(2) If not, put the roller (5) in the correct position as follows:
(a) Remove the nut (14) and the bolt (4) from the fork end (13).
(b) Disengage the roller (5) from the fork end (14).
(c) Push the fork end (13) carefully into the switch housing with a
suitable tool until you feel resistance and hold.
(d) Turn the fork end (13) to 90 degrees and release it.
(e) Put the roller (5) in the fork end (13) and install the bolt (4)
and the nut (14).
Subtask 33-21-12-420-050
(1) Put the limit switch (3) together with the related adjustment nut (6)
and the lock washer (7) in position on the switch bracket (8).
NOTE : Make sure that the outer tab of the lock washer (7) engages in
____
the attachment hole of the switch bracket (8).
(2) Make sure that the roller (5) of the limit switch (3) is in the
longitudial direction.
(3) Attach the limit switch (3) on the switch bracket (8) with the
serrated washer (9) and the lock nut (10).
(4) Connect the wires of the cable harness (2) to the terminals of the
limit switch (3).
NOTE : For the correct connection refer to the table Wire Connection
____
to Connector Contacts of the illustration.
(5) Make sure that the contacts, which are not used, are covered with red
blanking plugs.
EFF :
ALL 33-21-12
Page 406
May 01/07
R
IAC
(6) Put the switch bracket (8) and the bracket (12) into the slot of the
cockpit wall (1) and attach them with the screws (11).
Subtask 33-21-12-820-050
(1) Measure the distance which must be in a range of 7.5 mm (0.2952 in.)
between the lower edge cockpit wall (1) and the end of the roller
(5).
(2) Close the cockpit door and make sure that the limit switch 310LG
operates correctly. If not, loosen the lock nut (10) and turn the
adjustment nut (6) as required.
Subtask 33-21-12-865-052
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
308LG
Subtask 33-21-12-710-050
F. Do the opertional test for the dimming of the forward entrance lighting
(Ref. TASK 33-21-00-710-001).
5. Close-up
________
Subtask 33-21-12-410-050
A. Close Access
EFF :
ALL 33-21-12
Page 407
May 01/07
R
IAC
CALL SYSTEM (SEE ALSO 23-73-00) - DESCRIPTION AND OPERATION
___________________________________________________________
1. _______
General
The Call System Circuit RH is described in the Cabin Intercommunication Data
System (CIDS) (Ref. 23-73-00).
EFF :
ALL 33-23-00
Page 1
Feb 01/96
IAC
LAVATORY LIGHTING - DESCRIPTION AND OPERATION
_____________________________________________
1. General
_______
A. Description
The lavatory lighting system consists of a fluorescent lamp and an
integrated ballast unit installed in each lavatory. A membrane switch
POWER LAV on the forward attendant panel 120RH controls the power for the
lavatory lighting system.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS ATA
DOOR REF.
-------------------------------------------------------------------------------
3LQ BALLAST UNIT 221 33-24-11
3LQ-1 FLUORESCENT LAMP 221 33-24-11
4LQ BALLAST UNIT 261 33-24-11
4LQ-1 FLUORESCENT LAMP 261 33-24-11
5LQ BALLAST UNIT 261 33-24-11
5LQ-1 FLUORESCENT LAMP 261 33-24-11
EFF :
ALL 33-24-00
Page 1
Feb 01/07
IAC
Lavatory Lighting - Component Location
Figure 001
R
EFF :
001-012, 014-099, 33-24-00
Page 2
Aug 01/07
IAC
**ON A/C 101-199, 901-999,
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS ATA
DOOR REF.
-------------------------------------------------------------------------------
BALLAST UNIT 200 33-24-11
FLUORESCENT LAMP 200 33-24-11
HALOGEN LAMP 200 33-24-12
3. __________________
System Description
EFF :
ALL 33-24-00
Page 3
Aug 01/07
IAC
R Lavatory Lighting - Component Location
R Figure 001A
R
EFF :
101-199, 33-24-00
Page 4
May 01/07
IAC
Lavatory Lighting - Component Location
Figure 001B
R
EFF :
901-999, 33-24-00
Page 5
Aug 01/07
IAC
**ON A/C 101-199, 901-999,
4. ____________
Power Supply
The 115VAC from the busbar 214XP supplies the fluorescent lamps 10LQ with
the integrated ballast units and the mirror light 22LQ through the circuit
breaker 1LQ and the power control relay 21LQ. The MAIN LIGHT ON/OFF button
on the Flight Attendant Panel (FAP) 120RH controls the power supply for the
fluorescent lamps and the mirror light.
EFF :
ALL 33-24-00
Page 6
Aug 01/07
IAC
Lavatory Lighting - Schematic
Figure 002
R
EFF :
001-012, 014-099, 33-24-00
Page 7/8
Aug 01/07
IAC
R Lavatory Lighting - Schematic
R Figure 002A
R
EFF :
101-199, 33-24-00
Page 9
May 01/07
IAC
Lavatory Lighting - Schematic
Figure 002B
R
EFF :
901-999, 33-24-00
Page 10
Aug 01/07
IAC
The 28VDC from the busbar 208PP supplies the halogen lamps through the
circuit breakers 1WJ, 11WJ and the door microswitches (Ref. 33-26-00).
5. Operation
_________
A. Component Operation
The system is supplied with power when the busbars are energized and the
circuit breakers 1LQ, 1WJ and 11WJ are closed. With the door microswitch
in FREE position, 28VDC is supplied to the DIM 1 (50 %) input of the
ballast unit.
(1) When the switch POWER LAV on the forward attendant panel 120RH is
pushed relay 2LQ energizes. Each lavatory ballast unit is supplied
with 115VAC and the fluorescent lamp comes on with 50 % intensity.
(2) When the lavatory door is locked, the respective door microswitch
changes over to the ENGAGED position. The 28VDC to the DIM 1 input of
the ballast unit is disconnected and the fluorescent lamp illuminates
with 100 % intensity.
(3) The integral light under the POWER LAV membrane switch foil (on the
forward attendant panel 120RH) comes on when the membrane switch is
initially pushed.
When the membrane switch is pushed again, the fluorescent lamps in
the lavatory go off. Also the integral light under the POWER LAV
membrane switch foil goes off.
(4) All lavatory lights go off when the membrane switch LIGHT MAIN OFF on
the attendant panel 120RH is pushed. Other systems are also switched
off with this membrane switch at the same time.
A. Component Operation
The system is supplied with power when the busbars are energized and the
circuit breakers 1LQ, 1WJ and 11WJ are closed.
With the door microswitch in the FREE position the halogen lamp is
disconnected from the 28VDC. The DIM 1 (50 %) input of the ballast unit
is supplied with 28VDC.
EFF :
ALL 33-24-00
Page 11
Aug 01/07
R
IAC
(1) When the MAIN LIGHT ON/OFF button on the FAP 120RH is set to ON, the
relay 2LQ energizes. Each lavatory ballast unit is supplied with
115VAC and the fluorescent lamp comes on with 50 % intensity.
With the LAV MAINT button on the FAP 120RH the light in the
lavatories can be controlled. The fluorescent lamps in the lavatories
switches to 100% intensity (bright), when the LAV MAINT button is
pushed.
(2) When the lavatory door is locked, the related door microswitch
changes over to the ENGAGED position and the halogen lamp is supplied
with 28VDC. The 28VDC is disconnected from the DIM 1 input of the
ballast unit and the fluorescent lamp illuminates with 100 %
intensity.
(3) The lights in the lavatories is on when the LIGHTS MAIN ON/OFF button
on the Flight Attendant Panel(FAP) 120RH is pushed to ON.
When the button is pushed to OFF, the lights in the lavatories are
off.
Through the LAV MAINT button on the FAP the light in the lavatories
can be controlled. As long as the LAV MAINT button is not activated,
the light in the lavatories is dimmed. The light switches to bright,
when the LAV MAINT button is pushed.
(4) All fluorescent tubes go off when the MAIN LIGHT ON/OFF button on the
Flight Attendant Panel (FAP) 120RH is pushed. Other systems are also
go off at the same time.
EFF :
101-199, 901-999, 33-24-00
Page 12
Aug 01/07
R
IAC
LAVATORY LIGHTING - ADJUSTMENT/TEST
___________________________________
TASK 33-24-00-710-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-24-00-861-050
EFF :
ALL 33-24-00
Page 501
Feb 01/96
IAC
**ON A/C 001-012, 014-019,
Subtask 33-24-00-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
2000VU LAVATORY FORWARD - OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
Subtask 33-24-00-865-050-B
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
2000VU LAVATORY FWD & MID OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ C07
R Subtask 33-24-00-865-050-D
R -------------------------------------------------------------------------------
R PANEL SERVICE IDENT. LOCATION
R -------------------------------------------------------------------------------
R 2000VU LIGHT - LAV 1LQ J01
R 2000VU LAV FWD & MID - OCCUPIED 1WJ F01
R 2001VU LAVATORY AFT OCCUPIED 11WJ B04
R
EFF :
001-012, 014-099, 101-199, 33-24-00
Page 502
Feb 01/07
IAC
R **ON A/C 901-999,
Subtask 33-24-00-865-050-C
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
2000VU LAVATORY FWD & MID OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
Subtask 33-24-00-869-051
C. Energize the Cabin Intercommunication Data System (CIDS) (Ref. TASK 23-
73-00-861-001).
4. Procedure
_________
Subtask 33-24-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the lavatory:
2. In the lavatory:
EFF :
ALL 33-24-00
Page 503
Feb 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- close and lock the lavatory - the lavatory lighting becomes bright.
door.
Subtask 33-24-00-710-050-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- push the LIGHTS MAIN ON/OFF - the integral light in the LIGHTS MAIN
membrane switch on the hardkey ON/OFF membrane switch comes on.
panel.
In the cabin:
R
EFF :
ALL 33-24-00
Page 504
Feb 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- lock the lavatory door. - the fluorescent light increases to
full intensity (bright mode).
- the mirror light comes on.
- push the LAV MAINT membrane - the integral light in the LAV MAINT
switch on the hardkey panel. membrane switch comes on.
- push the LAV MAINT membrane - the integral light in the LAV MAINT
switch on the hardkey panel. membrane switch goes off.
- push the LIGHTS MAIN ON/OFF - the integral light in the LIGHTS MAIN
membrane switch on the hardkey ON/OFF membrane switch goes off.
panel.
In the cabin:
R
EFF :
101-199, 901-999, 33-24-00
Page 505
Feb 01/07
IAC
**ON A/C ALL
5. Close-up
________
Subtask 33-24-00-860-050
EFF :
ALL 33-24-00
Page 506
Feb 01/07
IAC
BALLAST UNIT WITH LAMPHOLDER - REMOVAL/INSTALLATION
___________________________________________________
TASK 33-24-11-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-24-11
Page 401
May 01/06
IAC
3. __________
Job Set-up
Subtask 33-24-11-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
Subtask 33-24-11-010-050
4. Procedure
_________
Subtask 33-24-11-020-051
(c) Remove the screws (9), the washers (10) and the upper service
cabinet door (11).
(d) Push the slidebuttons (1) at each end of the lampholder (6) and
remove the fluorescent tube (5).
(d) Remove the screws (3), the washers (2) and the ballast unit and
lampholder (6) from the mounting.
R
EFF :
001-012, 014-099, 33-24-11
Page 402
May 01/06
IAC
Ballast Unit and Lampholder 3LQ
Figure 401/TASK 33-24-11-991-001
R
EFF :
001-012, 014-099, 33-24-11
Page 403
May 01/06
IAC
TASK 33-24-11-400-001
WARNING : MAKE SURE THAT YOU INSTALL THE BALLAST UNIT AND THE WIRING CORRECTLY.
_______
THIS WILL PREVENT DAMAGE TO THE WIRING AND ALL DANGER OF ELECTRICAL
SHOCK.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-24-11-865-064
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
R
EFF :
001-012, 014-099, 33-24-11
Page 404
May 01/06
IAC
4. Procedure
_________
Subtask 33-24-11-420-050
WARNING : MAKE SURE THAT YOU INSTALL THE BALLAST UNIT AND THE WIRING
_______
CORRECTLY. THIS WILL PREVENT DAMAGE TO THE WIRING AND ALL
DANGER OF ELECTRICAL SHOCK.
(c) Install the ballast unit and lampholder (6) to the mounting with
the washers (2) and the screws (3).
(b) Install the upper service cabinet door (11) with the washers (10)
and the screws (9).
Subtask 33-24-11-861-050
Subtask 33-24-11-865-052
C. Remove the safty clip(s) and the tag(s) and close this(these) circuit
breakers(s):
1LQ.
R
EFF :
001-012, 014-099, 33-24-11
Page 405
May 01/06
IAC
Subtask 33-24-11-710-051
(1) On the Forward Attendant Panel (FAP) 120RH push the membrane switch
MAIN ON.
(2) On the FAP 120RH push the POWER LAV membrane switch to on.
(3) Make sure that the lavatory light 3LQ comes on.
5. Close-up
________
Subtask 33-24-11-860-050
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) On the FAP 120RH push the membrane switch MAIN OFF.
Subtask 33-24-11-862-054
R
EFF :
001-012, 014-099, 33-24-11
Page 406
May 01/06
IAC
TASK 33-24-11-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-24-11-865-054
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
Subtask 33-24-11-010-067
R
EFF :
001-012, 014-099, 33-24-11
Page 407
May 01/06
IAC
4. Procedure
_________
Subtask 33-24-11-020-053
(c) Push the slidebuttons (1) at each end of the lampholder (6) and
remove the fluorescent tube (5).
(d) Remove the screws (3), the washers (2) and the ballast unit and
lampholder (6) from the mounting.
R
EFF :
001-012, 014-099, 33-24-11
Page 408
May 01/06
IAC
Ballast Unit and Lampholder 4LQ
Figure 402/TASK 33-24-11-991-002
R
EFF :
001-012, 014-099, 33-24-11
Page 409
May 01/06
IAC
TASK 33-24-11-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-24-11-865-065
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
R
EFF :
001-012, 014-099, 33-24-11
Page 410
May 01/06
IAC
4. Procedure
_________
Subtask 33-24-11-420-054
(c) Install the ballast unit and lampholder (6) to the mounting with
the washers (2) and the screws (3).
Subtask 33-24-11-861-051
Subtask 33-24-11-865-058
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LQ.
Subtask 33-24-11-710-052
(1) On the Forward Attendant Panel (FAP) 120RH push the membrane switch
MAIN ON.
(2) On the FAP 120RH push the membrane switch POWER LAV to on.
R
EFF :
001-012, 014-099, 33-24-11
Page 411
May 01/06
IAC
(3) Make sure that the lavatory light 4LQ comes on .
5. Close-up
________
Subtask 33-24-11-860-051
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) On the FAP 120RH push the membrane switch MAIN OFF.
Subtask 33-24-11-862-050
R
EFF :
001-012, 014-099, 33-24-11
Page 412
May 01/06
IAC
TASK 33-24-11-000-004
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-24-11-865-056
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
Subtask 33-24-11-010-068
R
EFF :
001-012, 014-099, 33-24-11
Page 413
May 01/06
IAC
4. Procedure
_________
Subtask 33-24-11-020-055
(c) Push the slidebuttons (1) at each end of the lampholder (6) and
remove the flourescent tube (5).
(d) Remove the screws (3), the washers (2) and the ballast unit and
lampholder (6) from the mounting.
R
EFF :
001-012, 014-099, 33-24-11
Page 414
May 01/06
IAC
Ballast Unit and Lampholder 6LQ
Figure 403/TASK 33-24-11-991-004
R
EFF :
001-012, 014-099, 33-24-11
Page 415
May 01/06
IAC
TASK 33-24-11-400-004
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-24-11-865-067
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
R
EFF :
001-012, 014-099, 33-24-11
Page 416
May 01/06
IAC
4. Procedure
_________
Subtask 33-24-11-420-056
(c) Install the ballast unit and lampholder (6) to the mounting with
the washers (2) and the screws (3).
Subtask 33-24-11-861-053
Subtask 33-24-11-865-060
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LQ.
Subtask 33-24-11-710-054
(1) On the Forward Attendant Panel (FAP) 120RH push the membrane switch
MAIN ON.
(2) On the FAP 120RH push the membrane switch POWER LAV to on.
R
EFF :
001-012, 014-099, 33-24-11
Page 417
May 01/06
IAC
(3) Make sure that the lavatory light 6LQ comes on.
5. Close-up
________
Subtask 33-24-11-860-053
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) On the FAP 120RH push the membrane switch MAIN OFF.
Subtask 33-24-11-862-052
R
EFF :
001-012, 014-099, 33-24-11
Page 418
May 01/06
IAC
**ON A/C 101-199, 901-999,
TASK 33-24-11-000-006
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
101-199, 901-999, 33-24-11
Page 419
Aug 01/07
IAC
**ON A/C 101-199, 901-999,
3. __________
Job Set-up
Subtask 33-24-11-865-062
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - LAV 1LQ J01
Subtask 33-24-11-010-065
4. Procedure
_________
Subtask 33-24-11-020-057
A. Removal of the Ballast Unit with Lampholder and the Fluorescent Tube
R (c) Push the slidebuttons (6) at each end of the ballast unit and
R lampholder (5) and remove the fluorescent tube (7).
EFF :
101-199, 901-999, 33-24-11
Page 420
Aug 01/07
IAC
R Ballast Unit and Lampholder
R Figure 404/TASK 33-24-11-991-006-A
R
EFF :
101-199, 33-24-11
Page 421
May 01/07
IAC
Ballast Unit and Lampholder
Figure 404A/TASK 33-24-11-991-006
R
EFF :
901-999, 33-24-11
Page 422
Aug 01/07
IAC
(2) Removal of the ballast unit and lampholder:
(a) Remove the screws (1), the washers (2) and the cover (3).
(b) Release the quick release fasteners (9) and remove the
fluorescent lamp cover (8).
(e) Remove the screws (11), the washers (10) and the ballast unit and
the lampholder (5) from the lavatory structure.
EFF :
101-199, 901-999, 33-24-11
Page 423
May 01/07
R
IAC
TASK 33-24-11-400-006
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
101-199, 901-999, 33-24-11
Page 424
Aug 01/07
IAC
**ON A/C 101-199, 901-999,
3. __________
Job Set-up
Subtask 33-24-11-865-069
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - LAV 1LQ J01
4. Procedure
_________
WARNING : MAKE SURE THAT YOU INSTALL THE BALLAST UNIT AND THE WIRING
_______
CORRECTLY. THIS WILL PREVENT DAMAGE TO THE WIRING AND ALL DANGER
OF ELECTRICAL SHOCK.
Subtask 33-24-11-420-059
A. Installation of the Ballast Unit with Lampholder and the Fluorescent Tube
(c) Install the ballast unit and lampholder (5) on the lavatory
structure with the washers (10) and the screws (11).
EFF :
101-199, 901-999, 33-24-11
Page 425
Aug 01/07
IAC
(d) Remove the blanking caps.
(f) Install the fluorescent lamp cover (8) with the quick release
fasteners (9).
(g) Install the cover (3) with the screws (1) and the washers (2).
(a) Insert fluorescent tube (7) between the slidebuttons (6) at each
R end of the ballast unit and lampholder (5).
(b) Close the service cabinet door (13) and make sure the handle (12)
engages.
Subtask 33-24-11-861-055
Subtask 33-24-11-865-063
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breakers:
1LQ.
R
Subtask 33-24-11-710-056-A
(1) On the Flight Attendant Panel (FAP) 120RH push the LIGHT MAIN ON/OFF
pushbutton.
EFF :
101-199, 901-999, 33-24-11
Page 426
Aug 01/07
IAC
5. Close-up
________
Subtask 33-24-11-860-055
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) On the FAP 120RH push the membrane switch MAIN OFF.
Subtask 33-24-11-862-055
EFF :
101-199, 901-999, 33-24-11
Page 427
Aug 01/07
R
IAC
HALOGEN LAMP WITH LAMPHOLDER - REMOVAL/INSTALLATION
___________________________________________________
TASK 33-24-12-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-24-12-860-050
4. Procedure
_________
Subtask 33-24-12-020-051
R
EFF :
101-199, 901-999, 33-24-12
Page 401
Feb 01/07
IAC
TASK 33-24-12-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-24-12-860-051
4. Procedure
_________
Subtask 33-24-12-420-051
R
EFF :
101-199, 901-999, 33-24-12
Page 402
Feb 01/07
IAC
PASSENGER READING LIGHTS - DESCRIPTION AND OPERATION
____________________________________________________
1. _______
General
Passenger reading lights supply high intensity light to each passenger seat.
Each light has an ON/OFF switch.
2. __________________
Component Location
R
R (Ref. Fig. 001, 002)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
7LW RELAY 2000VU 223 33-25-00
8LW RELAY 2000VU 223 33-25-00
120RH ATTENDANT PANEL-FORWARD 221 831 23-73-00
501RH MEMBRANE SWITCH 200 23-73-00
502RH MEMBRANE SWITCH 200 23-73-00
503RH MEMBRANE SWITCH 200 23-73-00
511RH POWER UNIT 200 23-73-00
512RH POWER UNIT 200 23-73-00
513RH POWER UNIT 200 23-73-00
514RH POWER UNIT 200 23-73-00
521RH READING LIGHT 200 23-73-64
522RH READING LIGHT 200 23-73-64
523RH READING LIGHT 200 23-73-64
524RH READING LIGHT 200 23-73-64
525RH READING LIGHT 200 23-73-64
526RH READING LIGHT 200 23-73-64
2040VUJ COMBI PANEL 200 25-25-11
2041VUJ COMBI PANEL 200 25-25-11
2040VUK COMBI PANEL 200 25-25-11
2041VUK COMBI PANEL 200 25-25-11
2040VUE COMBI PANEL 200 25-25-11
2041VUE COMBI PANEL 200 25-25-11
2040VUF COMBI PANEL 200 25-25-11
2041VUF COMBI PANEL 200 25-25-11
2040VUG COMBI PANEL 200 25-25-11
2041VUG COMBI PANEL 200 25-25-11
2040VUR COMBI PANEL 200 25-25-11
2041VUR COMBI PANEL 200 25-25-11
EFF :
ALL 33-25-00
Page 1
Aug 01/07
IAC
Passenger Reading Lights - Schematic
Figure 001 (SHEET 1)
R
EFF :
001-012, 014-099, 33-25-00
Page 2
May 01/06
IAC
Passenger Reading Lights - Schematic
Figure 001 (SHEET 2)
R
EFF :
001-012, 014-099, 33-25-00
Page 3
May 01/06
IAC
R Passenger Reading Lights - Schematic
R Figure 001A
R
EFF :
101-199, 33-25-00
Page 4
Aug 01/07
IAC
Passenger Reading Lights - Schematic
Figure 001B
R
EFF :
901-901, 33-25-00
Page 5
May 01/07
IAC
R Passenger Reading Lights - Schematic
R Figure 001C (SHEET 1)
R
EFF :
902-999, 33-25-00
Page 6
Aug 01/07
IAC
R Passenger Reading Lights - Schematic
R Figure 001C (SHEET 2)
R
EFF :
902-999, 33-25-00
Page 7
Aug 01/07
IAC
Passenger Reading Lights - Component Location
Figure 002 (SHEET 1)
R
EFF :
001-012, 014-099, 33-25-00
Page 8
Aug 01/07
IAC
Passenger Reading Lights - Component Location
Figure 002 (SHEET 2)
R
EFF :
001-012, 014-099, 33-25-00
Page 9
Aug 01/07
IAC
R **ON A/C 101-199,
R -------------------------------------------------------------------------------
R FIN | FUNCTIONAL DESIGNATION | PANEL | ZONE | ACCESS | ATA
R | | | | DOOR | REF.
R -------------------------------------------------------------------------------
R 120RH ATTENDANT PANEL-FLIGHT 221 831 23-73-00
R 651RH PSU LH/RH 200 25-25-11
R 652RH PSU LH/RH 200 25-25-11
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
120RH ATTENDANT PANEL-FLIGHT 221 831 23-73-00
602RH StA-PISA 200 23-73-00
603RH LED READING LIGHT 200 23-73-64
604RH LED READING LIGHT 200 23-73-64
605RH LED READING LIGHT 200 23-73-64
611RH PSU FWD EXIT 200 25-25-11
612RH PSU AFT EXIT 200 25-25-11
621RH PSU LH/RH 200 25-25-11
622RH PSU LH/RH 200 25-25-11
R -------------------------------------------------------------------------------
R FIN | FUNCTIONAL DESIGNATION | PANEL | ZONE | ACCESS | ATA
R | | | | DOOR | REF.
R -------------------------------------------------------------------------------
R 120RH ATTENDANT PANEL-FLIGHT 221 831 23-73-00
R 651RH PSU LH/RH 200 25-25-11
R 652RH PSU LH/RH 200 25-25-11
R 653RH PSU LH/RH 200 25-25-11
R
EFF :
101-199, 901-999, 33-25-00
Page 10
Aug 01/07
IAC
**ON A/C ALL
3. __________________
System Description
The reading lights are installed in the combi-panels. The combi-panels are
fitted in the Passenger Service Unit (PSU) channel above the passenger
seats. The combi-panel fitted must agree with the number of seats in a row.
The reading light configurations are listed below:
- two reading lights are installed in the combi-panels 2040/2041VUJ and
2040/2041VUK with the middle position blanked off,
- two reading lights are installed in the combi-panels 2040/2041VUE with the
inboard position blanked off,
- three reading lights are installed in the combi-panels 2040/2041VUF,
2040/2041VUG and 2040/2041VUR.
R The passenger reading lights are installed in the Passenger Service Units
R (PSUs). The PSUs are located in the PSU channel above the passenger seats.
R The number of PSUs on each side of the cabin must agree with the number of
R seat rows. There are:
R - Three reading lights in each of the PSUs 651RH
R - Two or three reading lights in each of the PSUs 652RH
R - One reading light and an attendant loudspeaker in each of the PSUs 652RH.
The reading lights are installed in the Passenger Service Units (PSUs). The
PSUs are installed in the PSU channel above the passenger seats. The number
of PSUs on each side of the cabin must agree with the number of seat rows.
Three reading lights are installed in each of the PSUs 621RH.
Two or three reading lights are installed in each of the PSUs 622RH.
R The passenger reading lights are installed in the Passenger Service Units
R (PSUs). The PSUs are located in the PSU channel above the passenger seats.
R The number of PSUs on each side of the cabin must agree with the number of
R seat rows. There are:
R - Three reading lights in each of the PSUs 651RH and 653RH
R
EFF :
ALL 33-25-00
Page 11
Aug 01/07
IAC
R Passenger Reading Lights - Component Location
R Figure 002A (SHEET 1)
R
EFF :
101-199, 33-25-00
Page 12
Aug 01/07
IAC
R Passenger Reading Lights - Component Location
R Figure 002A (SHEET 2)
R
EFF :
101-199, 33-25-00
Page 13
Aug 01/07
IAC
Passenger Reading Lights - Component Location
R Figure 002B (SHEET 1)
EFF :
901-901, 33-25-00
Page 14
Aug 01/07
IAC
Passenger Reading Lights - Component Location
R Figure 002B (SHEET 2)
EFF :
901-901, 33-25-00
Page 15
Aug 01/07
IAC
R Passenger Reading Lights - Component Location
R Figure 002C (SHEET 1)
EFF :
902-999, 33-25-00
Page 16
Aug 01/07
IAC
R Passenger Reading Lights - Component Location
R Figure 002C (SHEET 2)
EFF :
902-999, 33-25-00
Page 17
Aug 01/07
IAC
R - Two or three reading lights in each of the PSUs 652RH.
4. ____________
Power Supply
115VAC is supplied to the reading lights from the busbars 110XP and 210XP.
This is controlled through the circuit breakers 1LW thru 6LW and the relays
7LW and 8LW.
The power units 511RH thru 514RH change the 115VAC to 6VAC for the light
operation. A fuse in each line gives protection for the transformer and the
related Printed Circuit Board (PCB). A membrane switch POWER READ on the
Forward Attendant Panel (FAP) 120RH controls the power supply for the
reading lights.
R
115VAC is supplied to the reading lights from the busbars 110XP and 210XP.
This is controlled through the circuit breakers 1LW thru 6LW and the relays
7LW and 8LW.
The Stand Alone - Passenger Interface and Supply Adapter (StA-PISA) changes
the 115VAC to 28VDC for the operation of the light. A fuse in each line
gives protection for the transformer and the related Printed Circuit Board
(PCB). The Main ON/OFF touchbutton on the LIGHT page at the Flight
Attendant Panel (FAP) 120RH controls the power supply for the reading
lights.
5. Operation
_________
EFF :
ALL 33-25-00
Page 18
Aug 01/07
IAC
**ON A/C 001-012, 014-099,
A. Component Description
(1) When the POWER READ membrane switch on the FAP 120RH is pushed, the
power units 511RH thru 514RH are activated. The coils of the relays
7LW and 8LW in the panel 2000VU are energized. This closes the
contacts of the relays and 115VAC is supplied to the power units.
(2) When the reading-light membrane switches 501RH thru 503RH are pushed,
a ground pulse is supplied to the voltage control circuit. This
completes the primary circuit of the step-down transformer. The
transformer changes the 115VAC down to 6VAC which causes the lights
to come on.
(3) A test of the reading lights, the work lights and the PCB circuits is
made by the related BITE test on the Programming and Test Panel (PTP)
110RH. In this test all reading lights and work lights come on for
approximately 3 s and then go off. After the test the PTP 110RH shows
the status of the reading lights, the work lights and the PCBs.
R
EFF :
ALL 33-25-00
Page 19
Aug 01/07
IAC
R **ON A/C 101-199, 901-999,
A. Component Description
R (1) The cabin reading light-system gives lighting to each passenger seat.
R The passenger reading light can be controlled with a button on the
R Passenger Service Unit (PSU) or through the Passenger Service System
R (PSS)/Cabin Intercommunication Data-System (CIDS) from the Power
R Control Unit (PCU).
The passenger reading lights are supplied by Passenger Interface and
Supply Adapters (PISA). These units change the voltage from 115VAC to
the necessary reading light supply voltage of 28VDC.
The PISA gives the interface to CIDS for test, control functions and
internal tests to find reading light malfunctions (Ref. 23-73-00).
EFF :
101-199, 901-999, 33-25-00
Page 20
Aug 01/07
IAC
PASSENGER READING LIGHTS - ADJUSTMENT/TEST
__________________________________________
TASK 33-25-00-710-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-25-00-860-050
EFF :
ALL 33-25-00
Page 501
Feb 01/08
IAC
**ON A/C 001-012, 014-099,
Subtask 33-25-00-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU PASSENGER READING LIGHT 1LW G2
2000VU PASSENGER READING LIGHT 2LW G3
2000VU PASSENGER READING LIGHT 3LW G4
2000VU PASSENGER READING LIGHT 4LW G5
2000VU PASSENGER READING LIGHT 5LW G6
2000VU PASSENGER READING LIGHT 6LW G7
Subtask 33-25-00-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU PASSENGER READING LIGHT 1LW G1
2000VU PASSENGER READING LIGHT 2LW G2
2000VU PASSENGER READING LIGHT 3LW G3
2000VU PASSENGER READING LIGHT 4LW G4
2000VU PASSENGER READING LIGHT 5LW G5
2000VU PASSENGER READING LIGHT 6LW G6
EFF :
ALL 33-25-00
Page 502
Feb 01/07
IAC
R **ON A/C ALL
4. Procedure
_________
Subtask 33-25-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- in less than 10 s push the - the integral light of the POWER READ
POWER READ membrane switch membrane switch comes on.
again.
In the cabin:
- all the reading lights come on.
- push to reset the POWER READ - all the reading lights go off.
membrane switch.
On the FAP 120RH:
- the integral light of the POWER READ
membrane switch goes off.
EFF :
ALL 33-25-00
Page 503
May 01/06
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- after more than 10 s push the - the integral light of the POWER READ
POWER READ membrane switch membrane switch comes on.
again.
Subtask 33-25-00-740-050
(1) Do the BITE test of the passenger reading lights and the cabin
attendant work-lights on the programming and test panel 110RH
(Ref. TASK 33-27-00-710-001).
R
EFF :
001-012, 014-099, 33-25-00
Page 504
May 01/06
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-25-00-710-050-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the LIGHTS MAIN ON/OFF - The LIGHTS MAIN ON/OFF indication on
membrane switch. the membrane switch comes on.
- Set the LIGHT page. - All possible cabin lighting zones are
shown.
- Push all pushbuttons of the - All the reading lights come on.
reading lights.
- Push the R/L Reset pushbutton. - The R/L Reset indication shows as
long as the pushbutton is pushed.
In the cabin:
- All reading lights go off.
- Push the R/L Set pushbutton. - The R/L Set indication shows as long
as the pushbutton is pushed.
In the cabin:
- All reading lights come on.
- Push the LIGHTS MAIN ON/OFF - The LIGHTS MAIN ON/OFF indication
membrane switch. light goes off.
R
EFF :
101-199, 901-999, 33-25-00
Page 505
Feb 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the cabin:
- All reading lights go off.
- All cabin lighting go off.
Subtask 33-25-00-740-050-A
(1) Do the BITE test of the passenger reading lights and the cabin
attendant work-lights on the Multipurpose Control and Display Unit
(MCDU) 3CA (Ref. TASK 33-27-00-740-001).
5. Close-up
________
Subtask 33-25-00-862-050
EFF :
ALL 33-25-00
Page 506
Feb 01/08
IAC
TASK 33-25-00-820-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-25-00
Page 507
Feb 01/08
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-25-00-861-051
Subtask 33-25-00-865-051
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU PASSENGER READING LIGHT 1LW G2
2000VU PASSENGER READING LIGHT 2LW G3
2000VU PASSENGER READING LIGHT 3LW G4
2000VU PASSENGER READING LIGHT 4LW G5
2000VU PASSENGER READING LIGHT 5LW G6
2000VU PASSENGER READING LIGHT 6LW G7
Subtask 33-25-00-865-051-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU PASSENGER READING LIGHT 1LW G1
2000VU PASSENGER READING LIGHT 2LW G2
2000VU PASSENGER READING LIGHT 3LW G3
2000VU PASSENGER READING LIGHT 4LW G4
2000VU PASSENGER READING LIGHT 5LW G5
2000VU PASSENGER READING LIGHT 6LW G6
EFF :
ALL 33-25-00
Page 508
Feb 01/08
IAC
R **ON A/C 001-012, 014-099,
R Subtask 33-25-00-010-050
R C. Get Access
Subtask 33-25-00-010-050-A
C. Get Access
(1) Carefully remove the LED reading light lens (2) from the related
reading light.
Subtask 33-25-00-480-050
D. Install the ADJUSTING DEVICE in the housing of the reading light and turn
it clockwise to lock it.
R
EFF :
001-012, 014-099, 901-901, 33-25-00
Page 509
Feb 01/08
IAC
Subtask 33-25-00-860-051
(1) Make sure that the Cabin Intercommunication Data System (CIDS) is
energized (Ref. TASK 23-73-00-861-001).
(2) On the FWD Attendant Panel (FAP) 120RH, push the membrane switches
MAIN ON and POWER READ.
Subtask 33-25-00-860-051-A
(1) Make sure that the Cabin Intercommunication Data System (CIDS) is
energized (Ref. TASK 23-73-00-861-001).
(2) On the Light page of the Flight Attendant Panel (FAP) 120RH, push the
LIGHT MAIN ON/OFF button to ON.
4. Procedure
_________
Subtask 33-25-00-820-050
(3) Adjust the reading light beam to the center of the leading edge of
the related seat with the ADJUSTING DEVICE.
NOTE : Do not adjust the angle of the reading light beam more than 20
____
degrees in each direction.
EFF :
ALL 33-25-00
Page 510
Feb 01/08
R
IAC
(4) On the combi-panel 2040VU/2041VU, push the related membrane switch of
the reading light.
R Subtask 33-25-00-820-050-B
R NOTE : The procedure for all the reading lights is the same. Only one
____
R procedure is given.
R NOTE : The lens (7) stays on the TOOL - ADJUSTMENT, READING LIGHT (1)
____
R during the adjustment procedure.
R (1) Carefully push the suction end (6) of the TOOL - ADJUSTMENT, READING
R LIGHT (1) onto the lens (7) of the reading light (2).
R (2) Pull the TOOL - ADJUSTMENT, READING LIGHT (1) to remove the lens (7)
R from the reading light (2).
R (5) Make sure that the related seat is in the vertical position.
R (6) Connect the adjustment end (3) of the TOOL - ADJUSTMENT, READING
R LIGHT (1) to the reading light.
R (7) Lock the TOOL - ADJUSTMENT, READING LIGHT (1) with the small lever
R (4).
R (8) Swivel the TOOL - ADJUSTMENT, READING LIGHT (1) until the light beam
R through the TOOL - ADJUSTMENT, READING LIGHT (1) points to the
R correct direction.
R (9) Unlock the TOOL - ADJUSTMENT, READING LIGHT (1) and remove the TOOL -
R ADJUSTMENT, READING LIGHT (1) from the reading light (2).
R
EFF :
001-012, 014-099, 101-199, 902-999, 33-25-00
Page 511
Feb 01/08
IAC
R Adjustment of the Passenger LED Reading Light
R Figure 501/TASK 33-25-00-991-001-A
R
EFF :
101-199, 902-999, 33-25-00
Page 512
Feb 01/08
IAC
R (12) Put the suction end (6) of the TOOL - ADJUSTMENT, READING LIGHT (1)
R with the lens (7) to the reading light (2).
R (13) Push the lens (7) into the correct position until you hear a click.
Subtask 33-25-00-820-050-A
(1) On the Passenger Service Unit (PSU)(1), push the membrane switch of
the related reading light.
(3) Open and move the tray table (6) to the open position.
(4) Make sure that the seat (5) is in the vertical position.
(5) Put the TOOL-ADJUSTMENT, READING LIGHT (4) in position on the housing
(3) of the reading light.
(6) Use the TOOL-ADJUSTMENT, READING LIGHT (4) to adjust the reading
light beam (7).
NOTE : Do not adjust the angle of the reading light beam more than 20
____
degrees in each direction.
(8) On the PSU (1), push the membrane switch of the related reading
light.
EFF :
101-199, 901-999, 33-25-00
Page 513
Feb 01/08
IAC
Adjustment of the Passenger LED Reading Light
R Figure 501A/TASK 33-25-00-991-001
EFF :
901-901, 33-25-00
Page 514
Feb 01/08
IAC
**ON A/C ALL
5. Close-up
________
Subtask 33-25-00-080-050
Subtask 33-25-00-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-25-00-410-050-A
B. Close Access
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Push the LED reading light lens (2) with a slight pressure in the
housing (3) of the reading light.
EFF :
ALL 33-25-00
Page 515
Feb 01/08
IAC
R **ON A/C 001-012, 014-099,
R Subtask 33-25-00-860-052
R (1) On the FAP 120RH push the membrane switches MAIN OFF and POWER READ.
Subtask 33-25-00-860-052-A
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (2) Push the LIGHT MAIN ON/OFF button on the LIGHT page of the FAP 120RH
to OFF.
EFF :
ALL 33-25-00
Page 516
Feb 01/08
IAC
LAVATORY LIGHTED SIGNS - DESCRIPTION AND OPERATION
__________________________________________________
1. _______
General
The lavatory signs are installed near the forward and aft lavatories. They
show the position of the lavatories in the cabin and if the lavatories are
occupied or not.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS ATA
DOOR REF.
-------------------------------------------------------------------------------
2WJ MICROSWITCH 221
3WJ LAVATORY OCCUPIED SIGN 3700VU 220 33-26-23
6WJ ANNUNCIATOR-TOILET OCCUPD 48VU 210 33-26-23
9WJ MICROSWITCH 261
10WJ MICROSWITCH 262
13WJ LAVATORY OCCUPIED SIGN 3701VU 260 33-26-23
14WJ LAVATORY OCCUPIED SIGN 3701VU 260 33-26-23
R -------------------------------------------------------------------------------
R FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
R | | | | DOOR | REF.
R -------------------------------------------------------------------------------
R 3WJ SIGN-LAVATORY OCCUPIED 3700VU 220 831 33-26-23
R 6WJ ANNUNCIATOR-TOILET/OCCPD 48VU 210 831 33-26-00
R 13WJ SIGN-LAVATORY OCCUPIED 3701VU 260 832 33-26-23
R 14WJ SIGN-LAVATORY OCCUPIED 3701VU 260 832 33-26-23
R 2WJ1 MICROSWITCH 221 831 33-26-11
R 2WJ4 MICROSWITCH 261 832 33-26-11
R 2WJ9 MICROSWITCH 251 842 33-26-11
R 2WJ10 MICROSWITCH 252 832 33-26-11
R 5WJ9 RELAY 251 832 33-26-00
R 8WJ9 RELAY 251 832 33-26-00
EFF :
ALL 33-26-00
Page 1
May 01/07
IAC
Lavatory Lighted Signs - Component Location
Figure 001
R
EFF :
001-012, 014-099, 33-26-00
Page 2
May 01/06
IAC
R Lavatory Lighted Signs - Component Location
Figure 001A
EFF :
101-199, 33-26-00
Page 3
Feb 01/08
IAC
**ON A/C 901-999,
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
3WJ SIGN-LAVATORY OCCUPIED 3700VU 220 831 33-26-23
6WJ ANNUNCIATOR-TOILET/OCCPD 48VU 210 831 33-26-00
13WJ SIGN-LAVATORY OCCUPIED 3701VU 260 832 33-26-23
14WJ SIGN-LAVATORY OCCUPIED 3701VU 260 832 33-26-23
2WJ1 MICROSWITCH 221 831 33-26-11
2WJ4 MICROSWITCH 261 832 33-26-11
2WJ5 MICROSWITCH 262 842 33-26-11
3. __________________
System Description
EFF :
ALL 33-26-00
Page 4
Feb 01/08
IAC
Lavatory Lighted Signs - Component Location
Figure 001B
R
EFF :
901-999, 33-26-00
Page 5
Aug 01/07
IAC
INTENTIONALLY BLANK
R
33-26-00
Page 6
Aug 01/07
IAC
Lavatory Lighted Signs - Schematic
Figure 002
R
EFF :
001-012, 014-099, 33-26-00
Page 7/8
May 01/07
IAC
INTENTIONALLY BLANK
R
33-26-00
Page 9
May 01/07
IAC
R Lavatory Lighted Signs - Schematic
R Figure 002A (SHEET 1)
R
EFF :
101-199, 33-26-00
Page 10
May 01/07
IAC
R Lavatory Lighted Signs - Schematic
R Figure 002A (SHEET 2)
R
EFF :
101-199, 33-26-00
Page 11
May 01/07
IAC
Lavatory Lighted Signs - Schematic
Figure 002B (SHEET 1)
R
EFF :
901-999, 33-26-00
Page 12
Aug 01/07
IAC
Lavatory Lighted Signs - Schematic
Figure 002B (SHEET 2)
R
EFF :
901-999, 33-26-00
Page 13
Aug 01/07
IAC
**ON A/C ALL
(1) The 28VDC normal busbar 208PP energizes the sign through the circuit
breaker 1WJ and the microswitch of the related lavatory. The
R microswitch is installed in the door frame of the lavatory A.
R (2) If the door of the lavatory A unlocked, the electrical supply flows
R through the related microswitch to the FREE terminal of the sign. The
R sign pictogram/legend comes on with a green color to show that the
R lavatory A is not occupied.
(3) When the door is closed and locked, the contacts of the related
R microswitch change over. This moves the electrical supply from the
R FREE terminal to the ENGAGED terminal. Thus, the sign
R pictogram/legend comes on with a red color to show that the lavatory
R A is occupied. At the same time the relay 18LP energizes. The
R annunciator 6WJ in the cockpit comes on to show the flight crew that
R the forward lavatory A is occupied.
(1) The 28VDC busbar 208PP energizes the signs through the circuit
breaker 11WJ and the related microswitches of the lavatories. One
microswitch is installed in the door frame of each rear lavatory.
(2) With the lavatory doors unlocked, the electrical supply flows through
the lavatory microswitches to the FREE terminal of each sign. The
sign pictogram/legends come on green to show that the lavatories are
not occupied.
(3) When the lavatory doors are closed and locked, the contacts of the
microswitches change over and remove the electrical supply from the
FREE terminal to the ENGAGED terminal of the related sign. The sign
pictogram/legends change to red to show that the related lavatory is
occupied.
EFF :
ALL 33-26-00
Page 14
Feb 01/08
IAC
**ON A/C 101-199,
(1) The rear lavatory occupied-sign 13WJ shows the positions of the two
rear lavatories D and L on the left side. It also shows if the two
lavatories are occupied or not occupied. The sign is installed in a
position where it can be seen easily.
(a) The 28VDC normal busbar 208PP energizes the sign 13WJ through the
circuit breaker 11WJ and the relay 1. The door microswitches of
the lavatories D and L and the relay 2 energize the relay 1.
The two relays are installed in the lavatory L. One microswitch
is installed in the door frame of each of the lavatories D and L.
(b) With one or the two doors of these lavatories unlocked, the
relays cause the electrical supply to energize the FREE terminal
of the sign 13WJ. The sign pictogram/legend comes on green to
show that at least one of these lavatories is not occupied.
(c) When the door of each of the lavatories D and L is closed and
locked, the electrical supply energizes the two relays. The relay
1 removes the electrical supply from the FREE terminal of the
sign 13WJ and supplies it to the ENGAGED terminal. The sign
pictogram/legend changes to red and shows that the two lavatories
are occupied.
(2) The rear lavatory occupied-sign 14WJ shows the position of the rear
lavatory M on the right side. It also shows if this lavatory is
occupied or not occupied. The sign is installed in a position where
it can be seen easily.
(a) The 28VDC normal busbar 208PP energizes the sign 14WJ through the
circuit breaker 11WJ and the microswitch of the lavatory M.
The microswitch is installed in the door frame of this lavatory.
(b) With the door of the lavatory M unlocked, electrical supply flows
to the FREE terminal of the sign 14WJ. The sign pictogram/legend
comes on green to show that this lavatory is not occupied.
(c) When the door of the lavatory M is closed and locked, the
microswitch contacts change over. The microswitch removes the
electrical supply from the FREE terminal to the ENGAGED terminal
of the sign 14WJ. The sign pictogram/legend changes to red and
shows that this lavatory is occupied.
R
EFF :
101-199, 33-26-00
Page 15
Aug 01/07
IAC
(3) Not Applicable
(1) The 28VDC busbar 208PP energizes the signs through the circuit
breaker 11WJ and the related microswitches of the lavatories D and E.
The microswitch 2WJ4 is installed in the door frame of the lavatory D
and the microswitch 2WJ5 is installed in the door frame of the
lavatory E.
(2) With the lavatory doors unlocked, the electrical supply flows through
the lavatory microswitches to the FREE terminal of each sign. The
sign pictogram/legends come on green to show that the lavatories are
not occupied.
(3) When the lavatory doors are closed and locked, the contacts of the
microswitches change over and remove the electrical supply from the
FREE terminal to the ENGAGED terminal of the related sign. The sign
pictogram/legends change to red to show that the related lavatory is
occupied.
R
EFF :
101-199, 901-999, 33-26-00
Page 16
Aug 01/07
IAC
LAVATORY LIGHTED SIGNS - ADJUSTMENT/TEST
________________________________________
TASK 33-26-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-26-00-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAVATORY FORWARD OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
Subtask 33-26-00-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAVATORY FWD & MID OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ C07
EFF :
ALL 33-26-00
Page 501
Feb 01/07
R
IAC
R **ON A/C 101-199,
R Subtask 33-26-00-865-050-C
R -------------------------------------------------------------------------------
R PANEL SERVICE IDENT. LOCATION
R -------------------------------------------------------------------------------
R 2000VU LAV FWD & MID - OCCUPIED 1WJ F01
R 2001VU LAVATORY AFT OCCUPIED 11WJ B04
Subtask 33-26-00-865-050-B
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAVATORY FWD & MID OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
Subtask 33-26-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/ANN LT SPLY/XFMR/BUS 2 27LP X05
EFF :
ALL 33-26-00
Page 502
Feb 01/07
IAC
R **ON A/C ALL
4. Procedure
_________
Subtask 33-26-00-860-050
(2) Make sure that all lavatory doors are closed but not locked.
Subtask 33-26-00-710-050
(1) Do the test of the lavatory lighted signs 3WJ and 6WJ.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In Zone 220:
- the green unoccupied pictorial symbol
3WJ goes off.
- the red occupied pictorial symbol 3WJ
comes on.
- set the ANN LT switch 33LP to - the annunciator OCCPD 6WJ becomes
the BRT position. bright.
EFF :
ALL 33-26-00
Page 503
May 01/06
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
4. At the lavatory A: In the cockpit, on the overhead panel
48VU:
- lift the sign LAVATORY and - the annunciator OCCPD 6WJ goes off.
unlock the lavatory door.
In Zone 220:
- the red occupied pictorial symbol 3WJ
goes off.
- the green unoccupied pictorial symbol
3WJ comes on.
Subtask 33-26-00-710-051
(1) Do the test of the lavatory lighted signs 13WJ and 14WJ.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 33-26-00
Page 504
May 01/06
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- the green unoccupied pictorial symbol
13WJ comes on.
R Subtask 33-26-00-710-051-C
R (1) Do the test of the lavatory lighted signs 13WJ and 14WJ.
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - lift the sign LAVATORY and lock - the green unoccupied pictorial symbol
R the door of the lavatory L. 13WJ goes off.
R - the red occupied pictorial symbol
R 13WJ comes on.
R - lift the sign LAVATORY and - the red occupied pictorial symbol
R unlock the door of the lavatory 13WJ goes off.
R D. - the green unoccupied pictorial symbol
R 13WJ comes on.
R - lift the sign LAVATORY and - the green unoccupied pictorial symbol
R unlock the door of the lavatory 13WJ stays on.
R L.
EFF :
001-012, 014-099, 101-199, 33-26-00
Page 505
May 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
the lavatory door. - the red occupied pictorial symbol
14WJ comes on.
- lift the sign LAVATORY and - the red occupied pictorial symbol
unlock the lavatory door. 14WJ goes off.
- the green unoccupied pictorial symbol
14WJ comes on.
Subtask 33-26-00-710-051-B
(1) Do the test of the lavatory lighted signs 13WJ and 14WJ.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R
EFF :
101-199, 901-999, 33-26-00
Page 506
Aug 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- lift the sign LAVATORY and - the red occupied pictorial symbol
unlock the lavatory door. 14WJ goes off.
- the green unoccupied pictorial symbol
14WJ comes on.
5. Close-up
________
Subtask 33-26-00-862-050
EFF :
ALL 33-26-00
Page 507
Aug 01/07
IAC
MICRO SWITCH - LAVATORY OCCUPIED - REMOVAL/INSTALLATION
_______________________________________________________
TASK 33-26-11-000-001
NOTE : This procedure is the same for all lavatory door microswitches.
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-26-11
Page 401
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-26-11-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
2000VU LAVATORY FORWARD - OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
Subtask 33-26-11-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
2000VU LAVATORY FWD & MID - OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
EFF :
ALL 33-26-11
Page 402
Feb 01/07
IAC
Lavatory Door Microswitch
Figure 401/TASK 33-26-11-991-001
R
EFF :
001-012, 014-099, 33-26-11
Page 403
Aug 01/06
IAC
Lavatory Door Microswitch
Figure 401A/TASK 33-26-11-991-001-A
R
EFF :
101-199, 901-999, 33-26-11
Page 404
Feb 01/07
IAC
R **ON A/C 101-199,
R Subtask 33-26-11-865-050-B
R -------------------------------------------------------------------------------
R PANEL SERVICE IDENT. LOCATION
R -------------------------------------------------------------------------------
R 2000VU LIGHT - LAV 1LQ J01
R 2000VU LAV FWD & MID - OCCUPIED 1WJ F01
R 2001VU LAVATORY AFT OCCUPIED 11WJ B04
Subtask 33-26-11-010-050
4. Procedure
_________
Subtask 33-26-11-020-050
(1) Remove the recess-cover attachment screws (2) from the door frame
(9).
(3) Make a mark to show the position of the angle mount (4) in the door
frame (9).
EFF :
ALL 33-26-11
Page 405
Feb 01/07
IAC
(4) Remove the microswitch (5) with angle mount (4) from the door frame
(9).
(5) Disconnect the electrical connection (10) from the microswitch (5).
(7) Remove the screws (8), lockwashers (7) and bushes (6),that attach the
microswitch (5) to the angle mount (4).
(8) Remove the microswitch (5) from the angle mount (4).
Subtask 33-26-11-020-050-A
(1) Remove the screws (7) from the door frame (2).
(2) Remove the angle support (6) with the microswitch (4) from the door
frame (2).
(3) Remove the screws (3) which attach the microswitch (4) to the angle
support (6).
(4) Disconnect the electrical connectors (5) from the microswitch (4).
(6) Remove the microswitch (4) from the angle support (6).
R
EFF :
ALL 33-26-11
Page 406
Feb 01/07
IAC
R **ON A/C ALL
TASK 33-26-11-400-001
NOTE : This procedure is the same for all lavatory door microswitches.
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-26-11
Page 407
Aug 01/06
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-26-11-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
2000VU LAVATORY FORWARD - OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
EFF :
ALL 33-26-11
Page 408
Feb 01/07
IAC
R **ON A/C 020-099, 901-999,
Subtask 33-26-11-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAV LIGHT 1LQ C01
2000VU LAVATORY FWD & MID - OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
R Subtask 33-26-11-865-051-B
R A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
R tagged
R -------------------------------------------------------------------------------
R PANEL SERVICE IDENT. LOCATION
R -------------------------------------------------------------------------------
R 2000VU LIGHT - LAV 1LQ J01
R 2000VU LAV FWD & MID - OCCUPIED 1WJ F01
R 2001VU LAVATORY AFT OCCUPIED 11WJ B04
Subtask 33-26-11-410-050
EFF :
ALL 33-26-11
Page 409
Feb 01/07
IAC
4. Procedure
_________
Subtask 33-26-11-420-050
(1) Install the microswitch (5) on the angle mount (4) with the screws
(8), lockwashers (7) and bushes (6).
(2) Remove the blanking caps and connect the electrical connectors (10)
to the microswitch (5).
(3) Install the microswitch (5) and angle mount (4) into the door frame
(9).
(4) Set the angle mount (4) to the position noted during removal.
(5) Put the recess-cover (3) in the correct position and install the
screws (2) and tighten the screws.
Subtask 33-26-11-420-050-A
(1) Install the microswitch (4) on the angle support (6) with the screws
(3).
(2) Remove the blanking caps and connect the electrical connectors (5) to
the microswitch (4).
EFF :
ALL 33-26-11
Page 410
Feb 01/07
IAC
(3) Install the angle support (6) with the microswitch (4) into the door
frame (2).
Subtask 33-26-11-860-051
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
Subtask 33-26-11-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s): 1LQ, 1WJ, 11WJ.
Subtask 33-26-11-860-050
D. Energize the Cabin Intercommunication Data System (CIDS) (Ref. TASK 23-
73-00-861-001).
EFF :
ALL 33-26-11
Page 411
Feb 01/07
R
IAC
R **ON A/C 001-012, 014-099, 101-199,
Subtask 33-26-11-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the POWER LAV membrane - The green POWER LAV light in the
switch. membrane switch comes on.
In the lavatory:
- The lavatory lighting is dim.
2. In the lavatory:
- Close and lock the lavatory - The lavatory lighting becomes bright.
door.
- Push the POWER LAV membrane - The green POWER LAV light in the
switch. membrane switch goes off.
In all lavatories:
- The lighting in all the lavatories
goes off.
R
EFF :
001-012, 014-099, 101-199, 33-26-11
Page 412
Feb 01/07
IAC
R **ON A/C 901-999,
Subtask 33-26-11-710-050-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the LAV MAINT membrane - The LAV MAINT indication on the
switch. membrane switch comes on.
In the lavatory:
- The lavatory lighting is dim.
2. In the lavatory:
- Close and lock the lavatory - The lavatory lighting becomes bright.
door.
- Push the LAV MAINT membrane - The LAV MAINT indication on the
switch. membrane switch goes off.
In all lavatories:
- The lighting goes off.
R
EFF :
901-999, 33-26-11
Page 413
Feb 01/07
IAC
**ON A/C 001-012, 014-099,
Subtask 33-26-11-820-051
(1) If the lavatory light stays dim when the lavatory door is closed and
locked (door bolt is in position A):
(4) Install the microswitch (Ref. TASK 33-26-11-400-001) and make sure
that the microswitch is moved in the direction of spring strip.
5. Close-up
________
Subtask 33-26-11-860-052
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
ALL 33-26-11
Page 414
Feb 01/07
IAC
Lavatory Door Bolt - Adjustment
Figure 402/TASK 33-26-11-991-002
R
EFF :
001-012, 014-099, 33-26-11
Page 415
Feb 01/07
IAC
SIGN - LAVATORY OCCUPIED - REMOVAL/INSTALLATION
_______________________________________________
TASK 33-26-23-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
NOTE : The procedure is the same for all lavatory occupied signs.
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-26-23
Page 401
Aug 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-26-23-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAVATORY FORWARD - OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
Subtask 33-26-23-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAVATORY FWD & MID - OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
Subtask 33-26-23-941-050
B. Get Access
(2) Put the stepladder in position below the lavatory occupied sign.
EFF :
ALL 33-26-23
Page 402
Feb 01/07
IAC
4. Procedure
_________
Subtask 33-26-23-020-051
(c) Pull the sign housing (5) sufficiently forward to get access to
the electrical connectors (4).
(d) Support the sign housing (5) and identify all the electrical
wires before you disconnect them.
NOTE : If you have the lavatory occupied signs with LEDs installed,
____
the subsequent procedure is not applicable, you must remove
the complete sign housing (5) with the LEDs (see above).
EFF :
ALL 33-26-23
Page 403
Aug 01/07
IAC
Lavatory Occupied Sign
Figure 401/TASK 33-26-23-991-001
R
EFF :
001-012, 014-099, 33-26-23
Page 404
Aug 01/07
IAC
R Lavatory Occupied Sign
Figure 401A/TASK 33-26-23-991-001-B
EFF :
101-199, 33-26-23
Page 405
Feb 01/08
IAC
Lavatory Occupied Sign
Figure 401B/TASK 33-26-23-991-001-A
R
EFF :
901-999, 33-26-23
Page 406
Aug 01/07
IAC
(b) Remove the bulb(s) (6).
Subtask 33-26-23-020-051-A
(3) Pull the sign housing (5) sufficiently forward to get access to the
electrical connectors (4).
(4) Support the sign housing (5) and identify all the electrical wires
before you disconnect them.
EFF :
ALL 33-26-23
Page 407
May 01/07
R
IAC
**ON A/C ALL
TASK 33-26-23-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-26-23
Page 408
Aug 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-26-23-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAVATORY FORWARD - OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
Subtask 33-26-23-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LAVATORY FWD & MID - OCCUPIED 1WJ C06
2001VU LAVATORY AFT OCCUPIED 11WJ E07
Subtask 33-26-23-941-052
B. Make sure that the stepladder is in position below the lavatory occupied
sign.
4. Procedure
_________
EFF :
ALL 33-26-23
Page 409
Aug 01/07
IAC
**ON A/C 101-199,
Subtask 33-26-23-420-050
(c) Make sure that the electrical connectors are clean and in the
correct condition.
(e) Install the sign housing (5) with the washers (3) and the screws
(2).
NOTE : If you have the lavatory occupied signs with LEDs installed,
____
the subsequent procedure is not applicable, you must install
the complete sign housing (5) with the LEDs (see above).
R
EFF :
ALL 33-26-23
Page 410
Aug 01/07
IAC
(c) Install the bulb(s) (6) to the sign housing (5).
Subtask 33-26-23-420-050-A
(3) Make sure that the electrical connectors are clean and in the correct
condition.
(5) Install the sign housing (5) with the washers (3) and the screws (2).
Subtask 33-26-23-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1WJ, 11WJ.
Subtask 33-26-23-710-050
(1) Do the operational test of the lavatory lighted signs (Ref. TASK 33-
26-00-710-001).
EFF :
ALL 33-26-23
Page 411
May 01/07
R
IAC
5. Close-up
________
Subtask 33-26-23-942-051
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-26-23
Page 412
May 01/07
IAC
LIGHT - WORK, CABIN ATTENDANT - DESCRIPTION AND OPERATION
_________________________________________________________
1. _______
General
The cabin attendant work-lights (referred to as the work lights) are high
intensity work-lights which are installed at the attendant stations.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS
DOOR
-------------------------------------------------------------------------------
2LZ RELAY - POWER CONTROL 2000VU 221
3LZ POWER UNIT 2000VU 221
4LZ ATTENDANT WORK LIGHT 2000VU 221
5LZ ATTENDANT WORK LIGHT 2000VU 221
10LZ ATTENDANT WORK LIGHT 2001VU 264
12LZ POWER UNIT 2001VU 264
13LZ POWER UNIT 2042VU 263
14LZ ATTENDANT WORK LIGHT 2042VU 263
15LZ ATTENDANT WORK LIGHT 2001VU 264
R -------------------------------------------------------------------------------
R FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
R | | | | DOOR | REF.
R -------------------------------------------------------------------------------
R 6LZ PUSHBUTTON SWITCH 2063VU 220 33-27-00
R 7LZ PUSHBUTTON SWITCH 2063VU 220 33-27-00
R 203LZ StA-PISA 2000VU 220 33-27-41
R 204LZ ATTENDANT WORK LIGHT 2000VU 220 33-27-12
R 205LZ ATTENDANT WORK LIGHT 2000VU 220 33-27-12
R 16LZ PUSHBUTTON SWITCH 2062VU 260 33-27-00
R 212LZ StA-PISA 2001VU 260 33-27-41
R 210LZ ATTENDANT WORK LIGHT 2001VU 260 33-27-12
R 214LZ ATTENDANT WORK LIGHT 612RH 260 33-27-12
EFF :
ALL 33-27-00
Page 1
May 01/07
IAC
Cabin Attendant Work-Light - Component Location
Figure 001
R
EFF :
001-012, 014-099, 33-27-00
Page 2
May 01/06
IAC
R Cabin Attendant Work-Light - Component Location
R Figure 001A
EFF :
101-199, 33-27-00
Page 3
May 01/07
IAC
R **ON A/C 901-999,
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
6LZ PUSHBUTTON SWITCH 2063VU 220 33-27-00
7LZ PUSHBUTTON SWITCH 2063VU 220 33-27-00
203LZ StA-PISA 2000VU 220 33-27-41
204LZ ATTENDANT WORK LIGHT 2000VU 220 33-27-12
205LZ ATTENDANT WORK LIGHT 2000VU 220 33-27-12
6LZ PUSHBUTTON SWITCH 2063VU 260 33-27-00
7LZ PUSHBUTTON SWITCH 2063VU 260 33-27-00
16LZ PUSHBUTTON SWITCH 2062VU 260 33-27-00
212LZ StA-PISA 2001VU 260 33-27-41
211LZ ATTENDANT WORK LIGHT 2001VU 260 33-27-12
215LZ ATTENDANT WORK LIGHT 2001VU 260 33-27-12
214LZ ATTENDANT WORK LIGHT 612RH 260 33-27-12
3. __________________
System Description
Push the MAIN OFF membrane switch on the forward attendant panel 120RH to
turn off the work lights together with all lights in other cabin systems.
EFF :
ALL 33-27-00
Page 4
Aug 01/07
IAC
Cabin Attendant Work-Light - Component Location
Figure 001B
R
EFF :
901-999, 33-27-00
Page 5
Aug 01/07
IAC
R **ON A/C 101-199, 901-999,
R Push the LIGHTS MAIN ON/OFF button at the Flight Attendant Panel (FAP)
R 120RH to turn on/off the work lights at the same time with all the lights
in the other cabin systems.
4. _____________________
Component Description
R
(Ref. Fig. 002)
R
Push the work light membrane-switch to complete the 6VAC circuit for the
work light. The related work light comes on. The integral light in the
membrane switch comes on when the work light operates.
Push the work light membrane-switch again to turn off the related work
light.
Push the POWER ATTN membrane switch on the forward attendant panel 120RH
again to turn off all the work lights.
R
EFF :
ALL 33-27-00
Page 6
Aug 01/07
IAC
Cabin Attendant Work-Light - Schematic
Figure 002
R
EFF :
001-012, 014-099, 33-27-00
Page 7
May 01/07
IAC
Push the MAIN OFF membrane switch on the forward attendant panel 120RH to
turn off all the work lights together with the lights in other cabin
systems.
R
EFF :
ALL 33-27-00
Page 8
Aug 01/07
IAC
INTENTIONALLY BLANK
R
33-27-00
Page 9
Aug 01/07
IAC
Cabin Attendant Work-Light - Schematic
Figure 002A (SHEET 1)
R
EFF :
101-199, 33-27-00
Page 10
Aug 01/07
IAC
Cabin Attendant Work-Light - Schematic
Figure 002A (SHEET 2)
R
EFF :
101-199, 33-27-00
Page 11
Aug 01/07
IAC
Cabin Attendant Work-Light - Schematic
Figure 002B (SHEET 1)
R
EFF :
901-999, 33-27-00
Page 12
Aug 01/07
IAC
Cabin Attendant Work-Light - Schematic
Figure 002B (SHEET 2)
R
EFF :
901-999, 33-27-00
Page 13
Aug 01/07
IAC
LIGHT - WORK, CABIN ATTENDANT - ADJUSTMENT/TEST
_______________________________________________
TASK 33-27-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-27-00-860-050
(2) Energize the Cabin Intercommunication Data System (CIDS) (Ref. TASK
23-73-00-861-001).
EFF :
ALL 33-27-00
Page 501
May 01/06
R
IAC
**ON A/C 001-012, 014-099,
Subtask 33-27-00-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - ATTND WORK 1LZ J05
Subtask 33-27-00-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - ATTND WORK 1LZ J03
EFF :
ALL 33-27-00
Page 502
Feb 01/07
IAC
**ON A/C ALL
4. Procedure
_________
Subtask 33-27-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- push the POWER ATTN membrane - the POWER ATTN integral light of the
switch. membrane switch comes on.
2. On the switch panels 2062VU and On the circuit breaker panels 2000VU,
2063VU: 2001VU and the Passenger Service /
Information Unit (PS/IU) 2042VU:
- push the POWER ATTN membrane - the POWER ATTN integral light of the
switch. membrane switch goes off.
- in less then 10 s push the - the POWER ATTN integral light of the
POWER ATTN membrane switch membrane switch comes on.
again.
EFF :
ALL 33-27-00
Page 503
Aug 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
On the circuit breaker panels 2000VU,
2001VU and the PS/IU 2042VU.
4. On the switch panels 2062VU and On the circuit breaker panels 2000VU,
2063VU: 2001VU and the PS/IU 2042VU:
- push the POWER ATTN membrane - the POWER ATTN integral light of the
switch. membrane switch goes off.
Subtask 33-27-00-710-050-B
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the LIGHT MAIN ON/OFF - The LIGHT MAIN ON/OFF indication on
membrane switch. the membrane switch comes on.
- Set the LIGHT page. - All possible cabin lighting zones are
shown.
R
EFF :
001-012, 014-099, 101-199, 33-27-00
Page 504
Aug 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - Push the pushbutton 6LZ. - The cabin attendant work-light 205LZ
R comes on.
R - Push the pushbutton 6LZ again. - The cabin attendant work-light 205LZ
R goes off.
R - Push the pushbutton 7LZ again. - The cabin attendant work-light 204LZ
R goes off.
R - Push the pushbutton 16LZ again. - The cabin attendant work-light 214LZ
R goes off.
R - Push the pushbutton 16LZ again. - The cabin attendant work-light 210LZ
R goes off.
R
EFF :
101-199, 33-27-00
Page 505
May 01/07
IAC
**ON A/C 901-999,
Subtask 33-27-00-710-050-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the LIGHT MAIN ON/OFF - The LIGHT MAIN ON/OFF indication on
membrane switch. the membrane switch comes on.
- Set the LIGHT page. - All possible cabin lighting zones are
shown.
R - Push the button 6LZ again. - The cabin attendant work-light 205LZ
goes off.
R - Push the button 7LZ again. - The cabin attendant work-light 204LZ
goes off.
EFF :
901-999, 33-27-00
Page 506
May 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - Push the button 16LZ again. - The cabin attendant work-light 214LZ
goes off.
R - Push the button 6LZ again. - The cabin attendant work-light 211LZ
goes off.
R - Push the button 7LZ again. - The cabin attendant work-light 215LZ
goes off.
Subtask 33-27-00-740-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- push the POWER READ and POWER - the POWER READ and POWER ATTN
ATTN membrane switches. integral lights of the membrane
switches come on.
- push the SYSTEM TEST line - the SYSTEM TEST menu comes on.
select key.
EFF :
001-012, 014-099, 901-999, 33-27-00
Page 507
May 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- push CONT until the
READING/WORK LIGHTS display
comes on.
- push the READING/WORK LIGHTS - the page RDG/WORK LIGHTS TEST comes
line select key. on.
In the cabin:
- push the POWER READ and POWER - the POWER READ and POWER ATTN
ATTN membrane switches. integral lights of the membrane
switches go off.
R
EFF :
001-012, 014-099, 33-27-00
Page 508
May 01/07
IAC
**ON A/C ALL
5. Close-up
________
Subtask 33-27-00-862-050
EFF :
ALL 33-27-00
Page 509
May 01/07
R
IAC
TASK 33-27-00-740-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-27-00-860-051
(2) Energize the Cabin Intercommunication Data System (CIDS) (Ref. TASK
23-73-00-861-001).
(3) Procedure to Get Access to the SYSTEM REPORT/TEST/COM Page (Ref. TASK
31-32-00-860-003).
EFF :
ALL 33-27-00
Page 510
May 01/07
R
IAC
R **ON A/C 001-012, 014-099,
Subtask 33-27-00-865-052
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - ATTND WORK 1LZ J05
R Subtask 33-27-00-865-052-A
R -------------------------------------------------------------------------------
R PANEL SERVICE IDENT. LOCATION
R -------------------------------------------------------------------------------
R 2000VU LIGHT - ATTND WORK 1LZ J03
EFF :
ALL 33-27-00
Page 511
May 01/08
IAC
R **ON A/C ALL
4. Procedure
_________
Subtask 33-27-00-740-051
A. BITE Test of the Cabin Attendant Work-lights and Passenger Reading Lights
on the Multipurpose Control and Display Unit (MCDU) 3CA
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the POWER READ and POWER - the POWER READ and POWER ATTN
ATTN membrane switches. indication lights of the membrane
switches come on.
- Push the line key adjacent to - The CIDS 1 main menu page comes on.
the CIDS 1 indication.
- Push the TEST line select key. - The CIDS 1 TEST menu comes on.
- Push the READING/WORK LIGHTS - The page RDG/WORK LIGHTS TEST comes
line select key. on.
In the cabin:
EFF :
ALL 33-27-00
Page 512
May 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
On the MCDU screen:
- Push the MCDU MENU key. - The MCDU menu comes on.
- Push the POWER READ and POWER - The POWER READ and POWER ATTN
ATTN membrane switches. indication lights of the membrane
switches go off.
Subtask 33-27-00-740-051-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the line select key - The CIDS main menu page comes on.
adjacent to the CIDS 1
indication.
- Push the line select key - The SYSTEM/TESTS menu page comes on.
adjacent to the SYSTEM TESTS >
indication.
- Push the line select key - The ILLUMINATION TEST menu page comes
adjacent to the < ILLUMINATION on.
TEST indication.
EFF :
ALL 33-27-00
Page 513
May 01/08
R
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the line select key - The display TEST IN PROGRESS 5s comes
adjacent to the < START TEST on.
indication.
In the cabin:
- All the passenger reading lights come
on for approx. 5s.
- Push the line select key - The CIDS main menu page comes on.
adjacent to the RETURN
indication.
5. Close-up
________
Subtask 33-27-00-862-051
(1) On the MCDU, set the BRT knob to the OFF position.
EFF :
ALL 33-27-00
Page 514
May 01/08
IAC
LIGHT - WORK, CABIN ATTENDANT (4LZ,5LZ,10LZ,14LZ) - REMOVAL/INSTALLATION
________________________________________________________________________
TASK 33-27-12-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
WARNING : YOU MUST BE CAREFUL WHEN YOU OPEN THE PANELS 2000VU OR 2001VU AS
_______
THESE ARE IN A HIGH VOLTAGE AREA.
NOTE : The removal procedure is the same for all cabin attendant work-lights.
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-27-12
Page 401
Aug 01/07
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-27-12-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - ATTND WORK 1LZ J05
Subtask 33-27-12-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - ATTND WORK 1LZ J03
EFF :
ALL 33-27-12
Page 402
Aug 01/07
IAC
**ON A/C 001-012, 014-099,
Subtask 33-27-12-010-050
B. Get Access
(b) Disengage and lower one side of the combi panel 2042VU.
R Subtask 33-27-12-010-050-C
R B. Get Access
EFF :
001-012, 014-099, 101-199, 33-27-12
Page 403
May 01/07
IAC
(3) FOR 214LZ
(b) Disengage and lower one side of the Passenger Service Unit (PSU)
612RH.
Subtask 33-27-12-010-050-B
B. Get Access
4. Procedure
_________
R
EFF :
ALL 33-27-12
Page 404
Aug 01/07
IAC
Cabin Attendant Work-Light.
Figure 401/TASK 33-27-12-991-001
R
EFF :
001-012, 014-099, 33-27-12
Page 405
Aug 01/07
IAC
Cabin Attendant Work-Light.
Figure 401A/TASK 33-27-12-991-001-A
R
EFF :
101-199, 901-999, 33-27-12
Page 406
Aug 01/07
IAC
**ON A/C ALL
Subtask 33-27-12-020-051
(1) Disconnect the electrical connectors (2) from the cabin attendant
R work-lights (3).
(3) Remove the circlip (1) and the cabin attendant work-lights (3).
R
EFF :
ALL 33-27-12
Page 407
Aug 01/07
IAC
TASK 33-27-12-400-001
NOTE : The installation procedure is the same for all cabin attendant
____
work-lights.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-27-12
Page 408
Feb 01/08
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-27-12-865-051
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - ATTND WORK 1LZ J05
Subtask 33-27-12-865-051-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - ATTND WORK 1LZ J03
4. Procedure
_________
EFF :
ALL 33-27-12
Page 409
Aug 01/07
IAC
**ON A/C ALL
Subtask 33-27-12-860-050
(3) Make sure that the STEPLADDER 1.0 M (3.3 FT) is in position below the
related panel.
(4) Make sure that the related circuit breaker panel is lowered.
Subtask 33-27-12-420-050
(1) Install the cabin attendant work-lights (3) with the circlip (1).
R (3) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 33-27-12-410-052
C. Close Access
EFF :
ALL 33-27-12
Page 410
Aug 01/07
IAC
(2) FOR 10LZ, 15LZ
Subtask 33-27-12-410-052-C
C. Close Access
Subtask 33-27-12-410-052-B
C. Close Access
R
EFF :
ALL 33-27-12
Page 411
Aug 01/07
IAC
**ON A/C ALL
Subtask 33-27-12-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LZ.
Subtask 33-27-12-860-051
(2) Remove the lens (4) from the related cabin attendant work-light.
(3) Install the ADJUSTING DEVICE to the work-light housing-rim and turn
clockwise to lock.
(4) On the forward attendant panel 120RH push the MAIN ON and POWER ATTN
pushbutton switches.
R Subtask 33-27-12-860-051-B
R NOTE : The lens (4) stays on the TOOL - ADJUSTMENT, READING LIGHT during
____
R the adjustment procedure.
R (2) Install the TOOL - ADJUSTMENT, READING LIGHT to remove the lens (4)
R from the related cabin attendant work-light (3).
R (3) Turn the small end of the TOOL - ADJUSTMENT, READING LIGHT in the
R direction of the cabin attendant work-light (3).
EFF :
ALL 33-27-12
Page 412
Feb 01/08
IAC
R (4) Install the TOOL - ADJUSTMENT, READING LIGHT to the cabin attendant
R work-light (3) and lock it.
R (5) On the Flight Attendant Panel (FAP) 120RH push the LIGHT MAIN
R ON/OFF button.
Subtask 33-27-12-860-051-A
(2) Remove the lens (4) from the related cabin attendant work-light (3).
(4) On the Flight Attendant Panel (FAP) 120RH push the LIGHT MAIN ON/OFF
button.
Subtask 33-27-12-710-051
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Push the related button to on. - The work light beam will fall onto
the related cabin attendant seat.
EFF :
ALL 33-27-12
Page 413
Feb 01/08
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- Adjust the beam with the - The work light beam will fall onto
optical adjusting tool to the the middle edge of the cabin
middle edge of the related attendant seat.
cabin attendant seat.
- Push the related button to off. - The work light goes off.
5. Close-up
________
Subtask 33-27-12-860-052
(1) On the forward attendant panel 120RH push the POWER ATTN pushbutton
switch to off.
(3) Install the lens (4) into the work light housing.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
R Subtask 33-27-12-860-052-B
R (1) On the FAP 120RH push the LIGHT MAIN ON/OFF button.
R (2) Unlock the TOOL - ADJUSTMENT, READING LIGHT and remove it from the
R cabin attendant work-light (3).
R (3) Turn the end of the TOOL - ADJUSTMENT, READING LIGHT with the lens
R (4) in the direction of the cabin attendant work-light (3).
EFF :
ALL 33-27-12
Page 414
Feb 01/08
IAC
R (4) Install the lens (4) into the work light housing and remove the TOOL-
R ADJUSTMENT, READING LIGHT.
R (5) Make sure that the work area is clean and clear of tool(s) and other
R items.
Subtask 33-27-12-860-052-A
(1) On the FAP 120RH push the LIGHT MAIN ON/OFF button.
(3) Install the lens (4) into the work light housing.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-27-12-862-051
EFF :
ALL 33-27-12
Page 415
Feb 01/08
IAC
POWER UNIT - CABIN ATTENDANT WORK LIGHT - REMOVAL/INSTALLATION
______________________________________________________________
TASK 33-27-38-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-27-38-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - ATTND WORK 1LZ J05
R
EFF :
001-012, 014-099, 33-27-38
Page 401
Aug 01/07
IAC
R
Subtask 33-27-38-010-050
B. Get Access
(b) Disengage and lower one side of the combi panel 2042VU.
4. Procedure
_________
Subtask 33-27-38-020-050
(a) Remove the screws (5), the washers (6), the nuts (8) and the
power unit (1).
(a) Remove the screws (5), the washers (6), the spacers (10), and the
power unit (1).
R
EFF :
001-012, 014-099, 33-27-38
Page 402
Aug 01/07
IAC
Power Unit
Figure 401/TASK 33-27-38-991-001
R
EFF :
001-012, 014-099, 33-27-38
Page 403
Aug 01/07
IAC
TASK 33-27-38-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-27-38
Page 404
Aug 01/07
IAC
3. __________
Job Set-up
Subtask 33-27-38-910-050
(1) Make sure that the related panel is disengaged and lowered.
(2) Make sure that the stepladder is in position below the related panel.
(3) Make the electrical cables (4) shorter if necessary and install the
cable terminals (11) and the housings (12) with the CRIMPING DEVICE.
4. Procedure
_________
Subtask 33-27-38-420-050
(a) Put the power unit (1) in position and install with the washers
(6), the screws (5) and the nuts (8).
(a) Put the power unit (1) in position and install with the washers
(6), the spacers (10) and the screws (5).
R
EFF :
001-012, 014-099, 33-27-38
Page 405
Aug 01/07
IAC
Subtask 33-27-38-410-050
B. Close Access
Subtask 33-27-38-710-050
5. Close-up
________
Subtask 33-27-38-410-051
A. Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
001-012, 014-099, 33-27-38
Page 406
Aug 01/07
IAC
_________________________________________________________________________
PISA (PASSENGER INTERFACE AND SUPPLY ADAPTER) - STAND ALONE (203LZ,212LZ)
____________________
REMOVAL/INSTALLATION
TASK 33-27-41-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
101-199, 901-999, 33-27-41
Page 401
Feb 01/08
IAC
3. __________
Job Set-up
Subtask 33-27-41-010-050
A. Get Access
R (1) Put the ACCESS PLATFORM 1M(3 FT) in position at the access door
121AL.
(a) Put the STEPLADDER 0.5 M (1.6 FT) in position below the circuit
breaker panel 2000VU.
(a) Put the STEPLADDER 0.5 M (1.6 FT) in position below the circuit
breaker panel 2001VU.
Subtask 33-27-41-941-050
B. Safety Precautions
(1) Make sure that the external power connector is not connected to the
aircraft EXT PWR receptacle.
(2) Put warning notice(s) in position on the access door 121AL to tell
persons not to connect the external power connector to the aircraft
EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
(4) In the cockpit, put warning notice(s) in position to tell persons not
to operate the pushbutton switches on these overhead panels:
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
EFF :
101-199, 901-999, 33-27-41
Page 402
Feb 01/08
IAC
Subtask 33-27-41-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU AIR COND/CIDS/SDF/DIR2 ESS 18WH C06
49VU AIR COND/CIDS/SDF/DIR1 ESS 15WH C05
49VU COM/CIDS/DEU B/ESS 153RH G03
R
R
EFF :
101-199, 901-999, 33-27-41
Page 403
Feb 01/07
IAC
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R **ON A/C 101-199, 901-999,
4. Procedure
_________
Subtask 33-27-41-020-050
NOTE : The removal procedure for the StA-PISA 203LZ and 212LZ is the
____
same. Only one procedure is given.
(1) Do the subsequent steps to open the related circuit breaker panel:
(a) Release the quick-release fasteners and lower the related circuit
breaker panel 2000VU or 2001VU carefully. The circuit breaker
panel is held to the adjacent center ceiling panel by a detent
hook.
(b) Release the detent hook and lower one side of the related circuit
breaker panel until it hangs in the vertical position.
(b) Release the related spring latches (4),(5) and (9) and carefully
disconnect the electrical connectors (6, 7 and 8 - if installed)
from the StA-PISA (1).
R
EFF :
101-199, 901-999, 33-27-41
Page 404
Feb 01/07
IAC
Stand Alone Passenger Interface and Supply Adapter (StA PISA)
Figure 401/TASK 33-27-41-991-001
R
EFF :
101-199, 901-999, 33-27-41
Page 405
Feb 01/07
IAC
(d) Make a note of the position of the StA-PISA (1) before you remove
it.
(e) Make a note of the position of the cable clips which keep the
related cable loom in position.
(f) Hold the StA-PISA (1) and remove the screws (2), the washers (3)
and the related cable clips.
(h) If you do not install a new StA-PISA directly after the removal,
make sure you close the related circuit breaker panel before you
leave the A/C.
R
EFF :
101-199, 901-999, 33-27-41
Page 406
Feb 01/07
IAC
TASK 33-27-41-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
101-199, 901-999, 33-27-41
Page 407
Feb 01/07
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-27-41-860-050
(1) Make sure that the related circuit breaker panel is disengaged and
lowered.
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related
circuit breaker panel.
(3) Make sure that the access platform is in position at the access door
121AL.
(5) Make sure that the external power connector is not connected to the
aircraft receptacle.
(6) Make sure that a warning notice is in position on the access door
121AL to tell persons not to use the external power receptacle.
(7) In the cockpit, on the overhead ELEC panel 35VU, make sure that these
pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
EFF :
101-199, 901-999, 33-27-41
Page 408
Feb 01/08
IAC
(8) In the cockpit, make sure that a warning notice is in position to
tell persons not to operate the pushbutton switches on these overhead
panels:
- 21VU (EMER ELEC PWR),
- 25VU (APU section),
- 35VU (ELEC).
Subtask 33-27-41-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU AIR COND/CIDS/SDF/DIR2 ESS 18WH C06
49VU AIR COND/CIDS/SDF/DIR1 ESS 15WH C05
49VU COM/CIDS/DEU B/ESS 153RH G03
R
R
EFF :
101-199, 901-999, 33-27-41
Page 409
Feb 01/07
IAC
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R 121VU COM NAV/CIDS/DEU A NORM/L AFT 167RH M11
R 121VU COM NAV/CIDS/DEU A NORM/R FWD 164RH M10
R 121VU COM NAV/CIDS/DEU A NORM/L FWD 163RH M09
R 121VU COM NAV/CIDS/DEU B/NORM 162RH M08
R 121VU COM NAV/CIDS/DIR NORM/2 156RH M06
R 121VU COM NAV/CIDS/DIR NORM/1 151RH M05
4. Procedure
_________
Subtask 33-27-41-420-050
NOTE : The installation procedure for the StA-PISA 203LZ and 212LZ is the
____
same. Only one procedure is given.
(c) Make sure that the ground bonding points of the StA-PISA are free
of paint and corrosion.
(d) Put the StA-PISA (1) in the correct position as recorded in the
removal procedure.
R
EFF :
101-199, 901-999, 33-27-41
Page 410
Feb 01/07
IAC
(e) Make sure the related cable clips are in the correct position on
the cable loom as noted in the removal procedure.
(f) Put the cable clips and the cable loom in position.
(j) Make sure that the electrical connectors are clean and in the
correct condition.
CAUTION : MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE
_______
CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING
LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND
THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE
UNIT.
1
_ Safety the electrical connectors (6, 7 and 8 - if installed)
with the related spring latches (4),(5) and (9).
(2) Do the subsequent steps to close the related circuit breaker panel:
(a) Install the related circuit breaker panel 2000VU or 2001VU with
the detent hook and the quick-release fasteners.
Subtask 33-27-41-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6XG, 1LZ, 150RH, 157RH, 153RH, 151RH, 156RH, 162RH, 163RH, 164RH, 167RH,
168RH, 15WH, 18WH, 14WH, 17WH
EFF :
101-199, 901-999, 33-27-41
Page 411
Feb 01/07
IAC
Subtask 33-27-41-740-050
R (2) Do the interface and power-up test of the CIDS. (Ref. TASK 23-73-00-
R 740-005)
5. Close-up
________
Subtask 33-27-41-862-050
Subtask 33-27-41-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
101-199, 901-999, 33-27-41
Page 412
Feb 01/08
IAC
CARGO AND SERVICE COMPARTMENTS - DESCRIPTION AND OPERATION
__________________________________________________________
1. _______
General
The cargo and service compartment lighting-system provides illumination to
the service area, forward and aft cargo compartment, avionics compartment
and wheel wells. A maintenance outlet is installed in the air conditioning
duct and accessory compartment.
2. __________________
System Description
EFF :
ALL 33-30-00
Page 1
Feb 01/07
IAC
Service Compartment Lights
Figure 001
R
EFF :
001-012, 014-099, 33-30-00
Page 2
May 01/06
IAC
Service Compartment Lights
Figure 001A
R
EFF :
101-199, 901-999, 33-30-00
Page 3
Feb 01/07
IAC
C. Forward and Aft Cargo-Compartment Lighting
EFF :
ALL 33-30-00
Page 4
May 01/07
IAC
Cargo Compartment Lights
Figure 002
R
EFF :
001-012, 014-099, 33-30-00
Page 5
May 01/06
IAC
R Cargo Compartment Lights
R Figure 002A
EFF :
101-199, 33-30-00
Page 6
Feb 01/07
IAC
Cargo Compartment Lights
R Figure 002B
R
EFF :
901-999, 33-30-00
Page 7
Feb 01/07
IAC
Avionics Compartment Lights
Figure 003
R
EFF :
ALL 33-30-00
Page 8
Feb 01/07
IAC
Wheel Well Lights
Figure 004
EFF :
001-012, 014-099, 33-30-00
Page 9
Feb 01/07
R
IAC
R Wheel Well Lights
R Figure 004A
R
EFF :
101-199, 901-999, 33-30-00
Page 10
May 01/07
IAC
R **ON A/C 001-012, 014-099,
The system comprises the lighting installation of the wheel wells and the
hydraulic compartment. Electrical outlets are provided in the wheel wells
for maintenance purposes. A switch in the left-hand wheel well controls
the lights.
EFF :
ALL 33-30-00
Page 11
May 01/07
IAC
Wheel Well Lights
R Figure 004B
EFF :
001-012, 014-099, 33-30-00
Page 12
May 01/07
IAC
R Wheel Well Lights
R Figure 004C
EFF :
001-012, 014-099, 33-30-00
Page 13
May 01/07
IAC
SERVICE AREA LIGHTING - DESCRIPTION AND OPERATION
_________________________________________________
1. _______
General
The service area lighting system comprises the lights installed in the APU
compartment and in Section 19. Electrical outlets are provided for portable
maintenance lights.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
4LJ LIGHT-SERVICE AREA 312 314AL 33-31-00
5LJ LIGHT-SERVICE AREA 311 314AL 33-31-00
6LJ LIGHT-SERVICE AREA 311 315AL 33-31-00
8LJ OUTLET-28 V DC 312 311AL 33-31-00
10LJ OUTLET-28 V DC 312 314AR 33-31-00
3. __________________
System Description
EFF :
ALL 33-31-00
Page 1
Feb 01/07
IAC
Service Area Lighting - Component Location
Figure 001
R
EFF :
001-012, 014-099, 33-31-00
Page 2
May 01/06
IAC
Service Area Lighting - Component Location
Figure 001A
R
EFF :
101-199, 901-999, 33-31-00
Page 3
Feb 01/07
IAC
Service Area Lighting - Schematic
Figure 002
EFF :
001-012, 014-099, 33-31-00
Page 4
May 01/06
IAC
Service Area Lighting - Schematic
Figure 002A
R
EFF :
101-199, 901-999, 33-31-00
Page 5
Feb 01/07
IAC
R **ON A/C ALL
The lights and outlets are supplied with 28 V DC from busbar 208PP through
the circuit breakers 2LJ and 1LJ. Switch 11LJ controls the APU light 6LJ and
switch 3LJ controls the two lights 4LJ and 5LJ in Section 19. When busbar
208PP is energized and the circuit breaker 1LJ is closed, power is available
at the two maintenance outlets in Section 19.
EFF :
ALL 33-31-00
Page 6
May 01/06
IAC
SERVICE AREA LIGHTING - ADJUSTMENT/TEST
_______________________________________
TASK 33-31-00-710-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R 3. __________
Job Set-up
Subtask 33-31-00-861-050
EFF :
ALL 33-31-00
Page 501
May 01/08
IAC
**ON A/C 001-012, 014-019,
Subtask 33-31-00-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT SEC 19 1LJ D07
2001VU LIGHT APU 2LJ D08
Subtask 33-31-00-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT SEC 19 1LJ F05
2001VU LIGHT APU 2LJ F06
Subtask 33-31-00-865-050-B
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT SEC 19 1LJ E07
2001VU LIGHT APU 2LJ E08
EFF :
ALL 33-31-00
Page 502
May 01/08
R
IAC
**ON A/C ALL
Subtask 33-31-00-010-050
C. Get Access
4. Procedure
_________
Subtask 33-31-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the control switch 3LJ to - the service area lights 4LJ and 5LJ
the ON position. come on.
- set the control switch 3LJ to - the service area lights 4LJ and 5LJ
the OFF position. go off.
- set the control switch 11LJ to - the service area light 6LJ comes on.
the ON position.
- set the control switch 11LJ to - the service area light 6LJ goes off.
the OFF position.
EFF :
ALL 33-31-00
Page 503
May 01/08
R
IAC
R 5. Close-up
________
Subtask 33-31-00-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-31-00-862-050
EFF :
ALL 33-31-00
Page 504
May 01/08
IAC
TASK 33-31-00-720-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific multimeter
No specific access platform 3 m (9 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R 3. __________
Job Set-up
Subtask 33-31-00-861-051
Subtask 33-31-00-865-051
EFF :
ALL 33-31-00
Page 505
May 01/08
IAC
Subtask 33-31-00-010-052
C. Get Access
4. Procedure
_________
Subtask 33-31-00-860-050
Subtask 33-31-00-720-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R 5. Close-up
________
Subtask 33-31-00-410-051
A. Close Access
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-31-00
Page 506
May 01/08
IAC
Subtask 33-31-00-862-051
EFF :
ALL 33-31-00
Page 507
Feb 01/96
IAC
LIGHT - SERVICE AREA - REMOVAL/INSTALLATION
___________________________________________
TASK 33-31-11-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-31-11
Page 401
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-31-11-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT APU 2LJ D08
121VU APU/ECB/SPLY 1KD L41
121VU APU/APU/CTL 2KD L42
Subtask 33-31-11-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT APU 2LJ E08
121VU APU/ECB/SPLY 1KD L41
121VU APU/APU/CTL 2KD L42
Subtask 33-31-11-010-050
B. Get Access
(1) Put the access platform in position below the APU compartment.
WARNING : LOCK THE MECHANISM OF THE ACCESS DOOR 316AR WITH THE PIP
_______
PIN WHEN YOU OPEN THE ACCESS DOOR. THIS WILL PREVENT
INJURY.
EFF :
ALL 33-31-11
Page 402
Feb 01/07
IAC
(3) Put the switch 11LJ at Zone 315 in the OFF position.
4. Procedure
_________
Subtask 33-31-11-020-050
(a) Remove the screws (12), the grid-screen (7), the lens (8) and the
seal (9) from the housing (11).
(a) Remove the screws (6), the washers (5) and hold the service area
light (4) to get access to the electrical connectors (1).
(b) Remove the nuts (3), the washers (2) and the electrical
connectors (1).
EFF :
ALL 33-31-11
Page 403
Feb 01/07
IAC
Service Area Light
Figure 401/TASK 33-31-11-991-001
R
EFF :
001-012, 014-099, 33-31-11
Page 404
May 01/06
IAC
Service Area Light
Figure 401A/TASK 33-31-11-991-001-A
R
EFF :
101-199, 901-999, 33-31-11
Page 405
Feb 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-31-11-020-050-A
(1) Remove the screws (4) with the washers (5) and hold the service area
light (1) to get access to the electrical connectors (2) and (3).
R
EFF :
101-199, 901-999, 33-31-11
Page 406
Feb 01/07
IAC
**ON A/C ALL
TASK 33-31-11-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-31-11
Page 407
Feb 01/08
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-31-11-865-051
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT APU 2LJ D08
121VU APU/ECB/SPLY 1KD L41
121VU APU/APU/CTL 2KD L42
EFF :
ALL 33-31-11
Page 408
Feb 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-31-11-865-051-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT APU 2LJ E08
121VU APU/ECB/SPLY 1KD L41
121VU APU/APU/CTL 2KD L42
Subtask 33-31-11-860-050
(1) Make sure, that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position below the APU doors.
WARNING : LOCK THE MECHANISM OF THE ACCESS DOOR 316AR WITH THE PIP
_______
PIN WHEN YOU OPEN THE ACCESS DOOR. THIS WILL PREVENT
INJURY.
(a) Make sure, that the APU doors 315AL and 316AR are open.
(3) Make sure, that the switch 11LJ at zone 315 is in the OFF position.
4. Procedure
_________
EFF :
ALL 33-31-11
Page 409
Feb 01/07
IAC
R **ON A/C 001-012, 014-099,
Subtask 33-31-11-910-050
(3) Apply the SEALANTS (Material No. 09-003) to the mating surface of the
service area light (4).
(4) Apply the SPECIAL MATERIALS (Material No. 05-002) to the washers (5)
and the screws (6).
Subtask 33-31-11-420-051
(2) Make sure that the electrical connectors are clean and in the correct
condition.
(4) Put the the seal (9) in position on the housing (11) and align the
screw holes.
(6) Put the grid-screen in position over the lens (8), align the screw
holes and install the screws (12).
(7) Hold the service area light (4) adjacent to its correct installation
position.
(8) Put the electrical connectors (1) on the terminals of the service
area light (4) and install the washers (2) and the nuts (3).
(9) Put the service area light (4) in its correct installation position,
align the screw holes, install the screws (6) and the washers (5).
R
EFF :
001-012, 014-099, 33-31-11
Page 410
May 01/06
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-31-11-910-050-A
(3) Apply the SPECIAL MATERIALS (Material No. 05-002) to the washers (5)
and the screws (4).
Subtask 33-31-11-420-051-A
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
(2) Make sure that the electrical connectors are clean and in the correct
condition.
(3) Connect and secure the electrical connectors (2) and (3).
(4) Put the service area light (1) in the correct installation position
at the structure (6).
(5) Install the washers (5) and the screws (4) and tighten.
Subtask 33-31-11-865-062
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2LJ, 1KD, and 2KD
Subtask 33-31-11-710-050
D. Do the operational test of the service area light (Ref. TASK 33-31-00-
710-001).
EFF :
ALL 33-31-11
Page 411
Feb 01/07
IAC
5. Close-up
________
Subtask 33-31-11-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-31-11
Page 412
May 01/06
R
IAC
TASK 33-31-11-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-31-11
Page 413
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-31-11-865-052
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT SEC 19 1LJ D07
Subtask 33-31-11-865-052-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT SEC 19 1LJ E07
Subtask 33-31-11-010-051
B. Get Access
(1) Put a warning notice in the cockpit to tell persons not to operate
the flight controls.
(4) Put the switch 3LJ at Zone 312 in the OFF position.
EFF :
ALL 33-31-11
Page 414
Feb 01/07
IAC
4. Procedure
_________
Subtask 33-31-11-020-051
(a) Remove the screws (12), the grid-screen (7), the lens (8) and the
seal (9) from the housing (11).
(a) Remove the screws (6), the washers (5) and hold the service area
light (4) to get access to the electrical connections (1).
(b) Remove the nuts (3), the washers (2) and the electrical
connections (1).
EFF :
ALL 33-31-11
Page 415
Feb 01/07
IAC
Service Area Light
Figure 402/TASK 33-31-11-991-002
EFF :
001-012, 014-099, 33-31-11
Page 416
May 01/06
IAC
Service Area Light
Figure 402A/TASK 33-31-11-991-002-A
R
EFF :
101-199, 901-999, 33-31-11
Page 417
Feb 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-31-11-020-051-A
(1) Remove the screws (1) with the washers (2) and hold the service area
light (3) to get access to the electrical connectors (5) an (6).
R
EFF :
101-199, 901-999, 33-31-11
Page 418
Feb 01/07
IAC
**ON A/C ALL
TASK 33-31-11-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-31-11
Page 419
Feb 01/08
IAC
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-31-11-865-053
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT SEC 19 1LJ D07
Subtask 33-31-11-865-053-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT SEC 19 1LJ E07
EFF :
ALL 33-31-11
Page 420
Feb 01/07
IAC
Subtask 33-31-11-860-051
(1) Make sure, that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position below the access door at zone 312.
(3) Make sure, that the switch 3LJ at zone 312 is in the OFF position.
4. Procedure
_________
Subtask 33-31-11-910-051
(3) Apply the SEALANTS (Material No. 09-003) to the mating surface of the
service area light (4).
(4) Apply the SPECIAL MATERIALS (Material No. 05-002) to the washers (5)
and the screws (6).
EFF :
ALL 33-31-11
Page 421
Feb 01/07
IAC
Subtask 33-31-11-420-052
(b) Install the new seal (9) ,the lens (8) and the grid-screen (7)
with the screws (12) on the housing (11).
(b) Hold the service area light (4) and install the electrical
connections (1) with the washers (2) and the nuts (3).
(c) Install the service area light (4) with the washers (2) and the
screws (6).
Subtask 33-31-11-910-051-A
(3) Apply the SPECIAL MATERIALS (Material No. 05-002) to the screws (1)
and the washers (2).
Subtask 33-31-11-420-052-A
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
(2) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
ALL 33-31-11
Page 422
Feb 01/07
IAC
R (3) Connect and secure the electrical connectors (5) and (6).
R (4) Put the service area light (3) in the correct installation position
R at the structure (4).
R (5) Install the washers (2) and the screws (1) and tighten.
R Subtask 33-31-11-865-063
R C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
R breaker(s):
R 1LJ
Subtask 33-31-11-710-051
R D. Do the operational test of the service area light (Ref. TASK 33-31-00-
710-001).
5. Close-up
________
Subtask 33-31-11-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-31-11
Page 423
May 01/06
IAC
R **ON A/C 101-199, 901-999,
TASK 33-31-11-000-003
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-31-11-865-054
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT APU 2LJ E08
121VU APU/ECB/SPLY 1KD L41
121VU APU/APU/CTL 2KD L42
R
EFF :
101-199, 901-999, 33-31-11
Page 424
Feb 01/07
IAC
Subtask 33-31-11-010-052
B. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the
APU compartment.
WARNING : LOCK THE MECHANISM OF THE ACCESS DOOR 316AR WITH THE PIP
_______
PIN WHEN YOU OPEN THE ACCESS DOOR. THIS WILL PREVENT
INJURY.
(3) Set the switch 11LJ at zone 315 to the OFF position.
4. Procedure
_________
Subtask 33-31-11-020-052
(2) Remove the cover assembly (4) from the housing (1).
(3) Remove the lamp (5) from the light assembly (2) and discard the lamp.
R
EFF :
101-199, 901-999, 33-31-11
Page 425
Feb 01/07
IAC
Service Area Light
Figure 403/TASK 33-31-11-991-003
R
EFF :
101-199, 901-999, 33-31-11
Page 426
Feb 01/07
IAC
TASK 33-31-11-400-003
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
101-199, 901-999, 33-31-11
Page 427
Feb 01/08
IAC
3. __________
Job Set-up
Subtask 33-31-11-865-055
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT APU 2LJ E08
121VU APU/ECB/SPLY 1KD L41
121VU APU/APU/CTL 2KD L42
Subtask 33-31-11-860-052
(1) Make sure, that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position below the APU doors.
(2) Make sure, that the APU access doors are open.
WARNING : LOCK THE MECHANISM OF THE ACCESS DOOR 316AR WITH THE PIP
_______
PIN WHEN YOU OPEN THE ACCESS DOOR. THIS WILL PREVENT
INJURY.
(a) Make sure, that the APU doors 315AL and 316AR are open.
(3) Make sure, that the switch 11LJ at zone 315 is in the OFF position.
4. Procedure
_________
Subtask 33-31-11-910-052
(3) Apply the SPECIAL MATERIALS (Material No. 05-002) to the captive
screws (3).
R
EFF :
101-199, 901-999, 33-31-11
Page 428
Feb 01/07
IAC
Subtask 33-31-11-420-053
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
(1) Put the lamp (5) in the light assembly (2) and turn it clockwise to
lock the lamp in position.
(2) Correctly align the cover assembly (4) with the screw holes of the
housing (1).
Subtask 33-31-11-865-064
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2LJ, 1KD, 2KD
Subtask 33-31-11-710-052
D. Do the operational test of the service area light (Ref. TASK 33-31-00-
710-001).
5. Close-up
________
Subtask 33-31-11-410-054
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
101-199, 901-999, 33-31-11
Page 429
Feb 01/07
IAC
TASK 33-31-11-000-004
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-31-11-865-056
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT SEC 19 1LJ E07
Subtask 33-31-11-010-053
B. Get Access
(1) Put a warning notice in the cockpit to tell persons not to operate
the flight controls.
(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone
312.
R
EFF :
101-199, 901-999, 33-31-11
Page 430
Feb 01/07
IAC
(3) Open the access door 312AR
(4) Set the switch 3LJ at zone 312 to the OFF position.
4. Procedure
_________
Subtask 33-31-11-020-053
(2) Remove the cover assembly (4) from the housing (1).
(3) Remove the lamp (3) from the light assembly (2) and discard the lamp.
R
EFF :
101-199, 901-999, 33-31-11
Page 431
Feb 01/07
IAC
Service Area Light
Figure 404/TASK 33-31-11-991-004
R
EFF :
101-199, 901-999, 33-31-11
Page 432
Feb 01/07
IAC
TASK 33-31-11-400-004
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-31-11-865-057
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU LIGHT SEC 19 1LJ E07
EFF :
101-199, 901-999, 33-31-11
Page 433
Feb 01/08
IAC
Subtask 33-31-11-860-053
(1) Make sure, that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position below the access door at zone 312.
(3) Make sure, that the switch 3LJ at zone 312 is in the OFF position.
4. Procedure
_________
Subtask 33-31-11-910-053
(3) Apply the SPECIAL MATERIALS (Material No. 05-002) to the captive
screws (5).
Subtask 33-31-11-420-054
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
(1) Put the lamp (3) in the light assembly (2) and turn it clockwise to
lock the lamp in position.
(2) Correctly align the cover assembly (4) with the screw holes of the
housing (1).
R
EFF :
101-199, 901-999, 33-31-11
Page 434
Feb 01/07
IAC
(3) Install the captive screws (5) and tighten.
Subtask 33-31-11-865-065
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LJ
Subtask 33-31-11-710-053
D. Do the operational test of the service area light (Ref. TASK 33-31-00-
710-001).
5. Close-up
________
Subtask 33-31-11-410-055
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
101-199, 901-999, 33-31-11
Page 435
Feb 01/07
IAC
________________________________________________________
AIR CONDITIONING DUCT AND ACCESSORY COMPARTMENT LIGHTING
DESCRIPTION AND OPERATION
_________________________
1. _______
General
The air conditioning compartment is provided with an electrical outlet for a
portable maintenance light.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS
DOOR
-------------------------------------------------------------------------------
2LK OUTLET - 28 V DC 138
3. System
__________________
Description
(Ref. Fig. 002)
The electrical outlet is supplied from the 28 V DC busbar 208PP. When the
busbar is energized and the circuit breaker 1LK is closed, power is
available at the maintenance outlet 2LK. The outlet is designed for use up
to a maximum of 50 Watts.
EFF :
ALL 33-32-00
Page 1
Feb 01/96
IAC
R Air Conditioning Duct and Accessory Compartment Lighting - Component Location
Figure 001
EFF :
ALL 33-32-00
Page 2
Aug 01/96
IAC
Air Conditioning Duct and Accessory Compartment Lighting - Schematic
Figure 002
EFF :
ALL 33-32-00
Page 3
Feb 01/96
IAC
AIR CONDITIONING DUCT AND ACCESSORY COMPARTMENT LIGHTING - ADJUSTMENT/TEST
__________________________________________________________________________
TASK 33-32-00-720-001
Functional Test of the Maintenance Socket in the Air Conditioning Duct and
Accessory Compartment (LK)
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific multimeter
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-32-00-861-050
EFF :
ALL 33-32-00
Page 501
May 01/06
R
IAC
**ON A/C 001-012, 014-099,
Subtask 33-32-00-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU AIR CONDTN COMPT OUTLET 1LK B08
Subtask 33-32-00-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU AIR CONDTN COMPT OUTLET 1LK G08
Subtask 33-32-00-010-050
C. Get Access
EFF :
ALL 33-32-00
Page 502
Feb 01/07
IAC
4. Procedure
_________
Subtask 33-32-00-720-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
On the multimeter:
5. Close-up
________
Subtask 33-32-00-410-050
A. Close Access
Subtask 33-32-00-862-050
EFF :
ALL 33-32-00
Page 503
May 01/06
R
IAC
FWD - AFT CARGO COMPARTMENT LIGHTING - DESCRIPTION AND OPERATION
________________________________________________________________
1. _______
General
The fluorescent lamps, which are installed in the ceiling, illuminate the
forward and aft cargo compartments. Each fluorescent lamp is installed in a
lampholder which includes the ballast unit.
A loading area light is installed in each of the loading areas.
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS ATA
DOOR REF.
-------------------------------------------------------------------------------
6LU SWITCH - FWD CARGO COMPT. 132
7LU SWITCH - FWD LOADING AREA 132
8LU SWITCH - AFT CARGO COMPT. 2024VU 152
9LU SWITCH - AFT LOADING AREA 2024VU 152
11LU LOADING AREA LIGHT FWD 132
12LU LOADING AREA LIGHT AFT 152
13LU BALLAST UNIT 130 33-34-11
13LU-1 FLUORESCENT LAMP 130 33-34-11
14LU BALLAST UNIT 130 33-34-11
14LU-1 FLUORESCENT LAMP 130 33-34-11
15LU BALLAST UNIT 150 33-34-11
15LU-1 FLUORESCENT LAMP 150 33-34-11
16LU BALLAST UNIT 150 33-34-11
16LU-1 FLUORESCENT LAMP 150 33-34-11
17LU BALLAST UNIT 150 33-34-11
17LU-1 FLUORESCENT LAMP 150 33-34-11
EFF :
ALL 33-34-00
Page 1
May 01/06
IAC
FWD and AFT Cargo Compartment Lighting - Component Location
Figure 001
R
EFF :
001-012, 014-099, 33-34-00
Page 2
May 01/06
IAC
R **ON A/C 101-199,
R -------------------------------------------------------------------------------
R FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS ATA
R DOOR REF.
R -------------------------------------------------------------------------------
R 6LU SWITCH - FWD CARGO COMPT. 132
R 7LU SWITCH - FWD LOADING AREA 132
R 8LU SWITCH - AFT CARGO COMPT. 2024VU 152
R 9LU SWITCH - AFT LOADING AREA 2027VU 152
R 11LU LOADING AREA LIGHT FWD 132
R 12LU LOADING AREA LIGHT AFT 152
R 13LU BALLAST UNIT 130 33-34-11
R 13LU-1 FLUORESCENT LAMP 130 33-34-11
R 14LU BALLAST UNIT 130 33-34-11
R 14LU-1 FLUORESCENT LAMP 130 33-34-11
R 15LU BALLAST UNIT 150 33-34-11
R 15LU-1 FLUORESCENT LAMP 150 33-34-11
R 16LU BALLAST UNIT 150 33-34-11
R 16LU-1 FLUORESCENT LAMP 150 33-34-11
R 17LU BALLAST UNIT 160 33-34-11
R 17LU-1 FLUORESCENT LAMP 160 33-34-11
R 18LU SWITCH - AFT CARGO COMPT. 160
R 20LU BALLAST UNIT 130 33-34-11
R 20LU-1 FLUORESCENT LAMP 130 33-34-11
R 21LU BALLAST UNIT 130 33-34-11
R 21LU-1 FLUORESCENT LAMP 130 33-34-11
R 22LU BALLAST UNIT 150 33-34-11
R 22LU-1 FLUORESCENT LAMP 150 33-34-11
R
EFF :
101-199, 33-34-00
Page 3
Feb 01/07
IAC
FWD and AFT Cargo Compartment Lighting - Component Location
Figure 001A
R
EFF :
101-199, 901-999, 33-34-00
Page 4
Feb 01/07
IAC
R **ON A/C 901-999,
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS ATA
DOOR REF.
-------------------------------------------------------------------------------
6LU SWITCH - FWD CARGO COMPT. 132
7LU SWITCH - FWD LOADING AREA 132
8LU SWITCH - AFT CARGO COMPT. 2024VU 152
9LU SWITCH - AFT LOADING AREA 2027VU 152
11LU LOADING AREA LIGHT FWD 132
12LU LOADING AREA LIGHT AFT 152
13LU BALLAST UNIT 130 33-34-11
13LU-1 FLUORESCENT LAMP 130 33-34-11
15LU BALLAST UNIT 150 33-34-11
15LU-1 FLUORESCENT LAMP 150 33-34-11
16LU BALLAST UNIT 150 33-34-11
16LU-1 FLUORESCENT LAMP 150 33-34-11
17LU BALLAST UNIT 160 33-34-11
17LU-1 FLUORESCENT LAMP 160 33-34-11
3. __________________
System Description
The 115VAC from busbar 214XPA supplies the ceiling lamps 13LU-1 and 14LU-1
of the forward cargo compartment through circuit breaker 1LU. The toggle
switch 6LU controls the ballast units of these ceiling lamps.
The 115VAC from busbar 214XPB supplies the aft cargo compartment ceiling
lamps 15LU-1, 16LU-1 and 17LU-1 through the circuit breaker 2LU. The toggle
switch 8LU controls the ballast units of these ceiling lamps.
The 28VDC busbar 602PP supplies the forward loading-area light through the
circuit breaker 3LU and the toggle switch 7LU.
R
EFF :
ALL 33-34-00
Page 5
Feb 01/07
IAC
The 28VDC busbar 602PP supplies the aft loading-area light through the
circuit breaker 3LU and toggle switch 9LU.
The 115VAC busbar 214XPA supplies the ceiling lamp 13LU-1 of the forward
cargo compartment through the circuit breaker 1LU. The toggle switch 6LU
controls the ballast unit of this ceiling lamp.
The 115VAC busbar 214XPB supplies the ceiling lamps 15LU-1, 16LU-1 and
17LU-1 of the aft cargo compartment through the circuit breaker 2LU. The
toggle switch 8LU controls the ballast units of these ceiling lamps.
The 28VDC busbar 602PP supplies the forward loading-area light 11LU through
the circuit breaker 3LU and the toggle switch 7LU.
EFF :
ALL 33-34-00
Page 6
Feb 01/07
IAC
FWD and AFT Cargo Compartment Lighting - Schematic
Figure 002
R
EFF :
001-012, 014-099, 33-34-00
Page 7/8
Feb 01/07
IAC
INTENTIONALLY BLANK
R
33-34-00
Page 9
Feb 01/07
IAC
FWD and AFT Cargo Compartment Lighting - Schematic
Figure 002A (SHEET 1)
EFF :
101-199, 901-999, 33-34-00
Page 10
Feb 01/07
IAC
FWD and AFT Cargo Compartment Lighting - Schematic
Figure 002A (SHEET 2)
EFF :
101-199, 901-999, 33-34-00
Page 11
Feb 01/07
IAC
The 28VDC busbar 602PP supplies the aft loading-area light 12LU through the
circuit breaker 3LU and the toggle switch 9LU.
EFF :
901-999, 33-34-00
Page 12
Feb 01/07
IAC
FWD - AFT CARGO COMPARTMENT LIGHTING - ADJUSTMENT/TEST
______________________________________________________
TASK 33-34-00-710-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
To make sure that the FWD, AFT and bulk cargo-compartment lighting operates
correctly.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-34-00-861-050
EFF :
ALL 33-34-00
Page 501
Feb 01/07
IAC
**ON A/C 001-012, 014-099,
Subtask 33-34-00-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU CARGO COMPT LIGHT - FWD 1LU B04
2000VU CARGO COMPT LIGHT - AFT 2LU B05
2000VU CARGO COMPT LIGHT - LDG AREA 3LU B06
Subtask 33-34-00-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - CARGO COMPT - FWD 1LU J06
2000VU LIGHT - CARGO COMPT - AFT 2LU J07
2000VU LIGHT - LDG AREA 3LU J08
Subtask 33-34-00-010-050
C. Get Access
(a) Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-
001).
(2) For the AFT Cargo Compartment and the Bulk Cargo Compartment:
(a) Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-
001).
EFF :
ALL 33-34-00
Page 502
Feb 01/07
IAC
(b) Put the access platform in position at the AFT cargo-compartment
door 826.
R Subtask 33-34-00-010-050-A
R C. Get Access
R (a) Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-
R 001).
R (a) Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-
R 001).
R (a) Open the bulk cargo-compartment door 827 (Ref. TASK 52-30-00-860-
R 006).
EFF :
ALL 33-34-00
Page 503
Feb 01/07
IAC
R **ON A/C ALL
4. Procedure
_________
Subtask 33-34-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the switch 6LU to the OFF - the ceiling lights 13LU and 14LU go
position. off.
- set the switch 7LU to the ON - the forward loading-area light 11LU
position. comes on.
- set the switch 7LU to the OFF - the forward loading-area light 11LU
position. goes off.
EFF :
ALL 33-34-00
Page 504
Feb 01/07
IAC
R **ON A/C 101-199,
R Subtask 33-34-00-710-050-B
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - set the switch 6LU to the OFF - the ceiling lights 13LU, 14LU, 20LU
R position. and 21LU go off.
R - set the switch 7LU to the ON - the forward loading-area light 11LU
R position. comes on.
R - set the switch 7LU to the OFF - the forward loading-area light 11LU
R position. goes off.
Subtask 33-34-00-710-050-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the switch 6LU to the OFF - the ceiling light 13LU goes off.
position.
R
EFF :
101-199, 901-999, 33-34-00
Page 505
Feb 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the switch 7LU to the ON - the forward loading-area light 11LU
position. comes on.
- set the switch 7LU to the OFF - the forward loading-area light 11LU
position. goes off.
Subtask 33-34-00-710-051
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the switch 8LU to the OFF - the ceiling light 17LU goes off.
position.
- set the switch 9LU to the ON - the AFT loading-area light 12LU comes
position. on.
- set the switch 9LU to the OFF - the AFT loading-area light 12LU goes
position. off.
EFF :
001-012, 014-099, 901-999, 33-34-00
Page 506
Feb 01/07
IAC
R **ON A/C 101-199,
R Subtask 33-34-00-710-051-A
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - set the switch 8LU to the OFF - the ceiling lights 15LU, 16LU and
R position. 22LU go off.
R - set the switch 9LU to the ON - the AFT loading-area light 12LU comes
R position. on.
R - set the switch 9LU to the OFF - the AFT loading-area light 12LU goes
R position. off.
R - set the switch 18LU to the OFF - the ceiling light 17LU goes off.
R position.
EFF :
101-199, 33-34-00
Page 507
Feb 01/07
IAC
R **ON A/C ALL
5. Close-up
________
Subtask 33-34-00-410-050
A. Close Access
(a) Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-
002).
(3) For the AFT Cargo Compartment and the Bulk Cargo Compartment:
(a) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-
002).
R Subtask 33-34-00-410-050-A
R A. Close Access
R (a) Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-
R 002).
R (a) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-
R 002).
R (a) Close the bulk cargo-compartment door 827 (Ref. TASK 52-30-00-
R 860-008).
EFF :
ALL 33-34-00
Page 508
Feb 01/07
IAC
R **ON A/C ALL
Subtask 33-34-00-862-050
EFF :
ALL 33-34-00
Page 509
Feb 01/07
IAC
BALLAST UNIT WITH LAMPHOLDER (13LU,14LU,15LU,16LU,17LU) - SERVICING
___________________________________________________________________
TASK 33-34-11-600-001
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
NOTE : The procedure is the same for all the ballast units with lampholder in
____
the FWD and AFT cargo compartment.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-34-11
Page 301
May 01/06
R
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-34-11-865-053
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU CARGO COMPT LIGHT - FWD 1LU B04
2000VU CARGO COMPT LIGHT - AFT 2LU B05
EFF :
ALL 33-34-11
Page 302
Feb 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-34-11-865-053-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - CARGO COMPT - FWD 1LU J06
2000VU LIGHT - CARGO COMPT - AFT 2LU J07
Subtask 33-34-11-010-052
B. Get Access
(2) Open the FWD and/or AFT cargo-compartment door and install the
actuator safety-locks (Ref. TASK 52-30-00-860-001).
4. Procedure
_________
EFF :
ALL 33-34-11
Page 303
Feb 01/07
IAC
Ballast Unit with Lampholder
Figure 301/TASK 33-34-11-991-002
R
EFF :
001-012, 014-099, 33-34-11
Page 304
May 01/06
IAC
R Ballast Unit with Lampholder
R Figure 301A/TASK 33-34-11-991-002-B
EFF :
101-199, 33-34-11
Page 305
Feb 01/07
IAC
Ballast Unit with Lampholder
R Figure 301B/TASK 33-34-11-991-002-A
R
EFF :
901-999, 33-34-11
Page 306
Feb 01/07
IAC
**ON A/C ALL
Subtask 33-34-11-020-053
(1) Release the quick-release fasteners (1) around the glass cover (2).
(2) Remove the glass cover (2) from the lamp housing (6).
(3) Push the buttons (4) at each end of the lampholder (5).
Subtask 33-34-11-420-051
(4) Install the glass cover (2) to the lamp housing (6).
Subtask 33-34-11-865-054
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LU and 2LU.
5. Close-up
________
Subtask 33-34-11-710-051
EFF :
ALL 33-34-11
Page 307
Feb 01/07
R
IAC
Subtask 33-34-11-410-051
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the actuator safety-locks and close the FWD and/or AFT
cargo-compartment door (Ref. TASK 52-30-00-860-002).
EFF :
ALL 33-34-11
Page 308
Feb 01/07
IAC
BALLAST UNIT WITH LAMPHOLDER (13LU,14LU,15LU,16LU,17LU) - REMOVAL/INSTALLATION
______________________________________________________________________________
TASK 33-34-11-000-001
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
NOTE : The procedure is the same for all the fluorescent lighting in the fwd
____
and aft cargo compartment.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-34-11
Page 401
May 01/06
R
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-34-11-865-050
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU CARGO COMPT LIGHT - FWD 1LU B04
2000VU CARGO COMPT LIGHT - AFT 2LU B05
EFF :
ALL 33-34-11
Page 402
Feb 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-34-11-865-050-A
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - CARGO COMPT - FWD 1LU J06
2000VU LIGHT - CARGO COMPT - AFT 2LU J07
R Subtask 33-34-11-010-050
R B. Get Access
R (2) Open the related cargo-compartment door and install the actuator
R safety-locks (Ref. TASK 52-30-00-860-001).
R (3) Remove the ceiling panel in the FWD cargo-compartment to get access
R to the electrical connector (5):
R FOR 13LU
R remove 131AC,
R FOR 14LU
R remove 131BC.
R (4) Remove the ceiling panel in the AFT cargo-compartment to get access
R to the electrical connector (5):
R FOR 15LU
R remove 151BC,
R FOR 16LU
R remove 151CC,
R FOR 17LU
R remove 161AC.
EFF :
ALL 33-34-11
Page 403
Feb 01/07
IAC
R **ON A/C 101-199,
R Subtask 33-34-11-010-050-B
R B. Get Access
R (2) Open the related cargo-compartment door and install the actuator
R safety-locks (Ref. TASK 52-30-00-860-001).
R (3) Remove the ceiling panel in the FWD cargo-compartment to get access
R to the electrical connector (5):
R FOR 13LU
R remove 131AC,
R FOR 14LU
R remove 131BC,
R FOR 20LU
R remove 131CC,
R FOR 21LU
R remove 131DC.
R (4) Remove the ceiling panel in the AFT cargo-compartment to get access
R to the electrical connector (5):
R FOR 15LU
R remove 151BC,
R FOR 16LU
R remove 151CC,
R FOR 17LU
R remove 161AC,
R FOR 22LU
R remove 151AC.
R
EFF :
101-199, 33-34-11
Page 404
Feb 01/07
IAC
R **ON A/C 901-999,
Subtask 33-34-11-010-050-A
B. Get Access
(2) Open the related cargo-compartment door and install the actuator
safety-locks (Ref. TASK 52-30-00-860-001).
(3) Remove the ceiling panel in the FWD cargo-compartment to get access
to the electrical connector (5):
FOR 13LU
remove 131AC.
(4) Remove the ceiling panel in the AFT cargo-compartment to get access
to the electrical connector (5):
FOR 15LU
remove 151BC,
FOR 16LU
remove 151CC,
FOR 17LU
remove 161AC.
4. Procedure
_________
R
EFF :
ALL 33-34-11
Page 405
Feb 01/07
IAC
Ballast Unit with Lampholder
Figure 401/TASK 33-34-11-991-001
R
EFF :
001-012, 014-099, 33-34-11
Page 406
Feb 01/07
IAC
R Ballast Unit with Lampholder
R Figure 401A/TASK 33-34-11-991-001-B
R
EFF :
101-199, 33-34-11
Page 407
Feb 01/07
IAC
R **ON A/C 901-999,
Subtask 33-34-11-020-051
(4) Remove the glass cover (2) from the lamp housing (10).
(5) Push the buttons (4) at each end of the lampholder (6) and remove the
fluorescent lamp (3).
(6) Remove the screws (11), the washers (12) and the nuts (13).
(7) Remove the cover plate (8) and the gasket (9) from the lamp housing
(10).
(9) Remove the ballast unit and lampholder (6) and the reflector (7) from
the lamp housing (10).
EFF :
ALL 33-34-11
Page 408
Feb 01/07
IAC
Ballast Unit with Lampholder
R Figure 401B/TASK 33-34-11-991-001-A
R
EFF :
901-999, 33-34-11
Page 409
Feb 01/07
IAC
TASK 33-34-11-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-34-11
Page 410
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-34-11-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU CARGO COMPT LIGHT - FWD 1LU B04
2000VU CARGO COMPT LIGHT - AFT 2LU B05
Subtask 33-34-11-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU LIGHT - CARGO COMPT - FWD 1LU J06
2000VU LIGHT - CARGO COMPT - AFT 2LU J07
4. Procedure
_________
EFF :
ALL 33-34-11
Page 411
Feb 01/07
IAC
R **ON A/C 901-999,
Subtask 33-34-11-420-050
(3) Install the reflector (7) and the ballast unit and lampholder (6) to
the lamp housing (10) with the screws (14).
(4) Put the electrical connector (5) through the hole in the lamp housing
(10).
(5) Install the gasket (9) and the cover plate (8) with the screws (11),
the washers (12) and the nuts (13).
(7) Install the glass cover (2) with the quick-release fasteners (1).
(9) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 33-34-11-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LU and 2LU.
Subtask 33-34-11-710-050
EFF :
ALL 33-34-11
Page 412
Feb 01/07
IAC
5. Close-up
________
Subtask 33-34-11-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the related ceiling panel(s) in the FWD and/or AFT cargo
compartment.
(3) Remove the actuator safety-locks and close the FWD and/or AFT
cargo-compartment door(s) (Ref. TASK 52-30-00-860-002).
EFF :
ALL 33-34-11
Page 413
Feb 01/07
IAC
LIGHT - LOADING AREA (11LU,12LU) - REMOVAL/INSTALLATION
_______________________________________________________
TASK 33-34-12-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-34-12
Page 401
Feb 01/07
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-34-12-861-050
Subtask 33-34-12-010-050
B. Get Access
(1) Open the FWD and/or AFT cargo-compartment door(s) (Ref. TASK 52-30-
00-860-001).
(3) Set the FWD Loading-Area Light switch 7LU and/or the AFT Loading-Area
Light switch 9LU to the ON position.
EFF :
ALL 33-34-12
Page 402
Feb 01/07
IAC
(4) Remove the applicable cargo-compartment ceiling panel:
FOR 11LU
131AC (Ref. TASK 25-54-12-000-002).
FOR 12LU
151CC (Ref. TASK 25-55-11-000-002).
Subtask 33-34-12-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R FOR 11LU, 12LU
4. Procedure
_________
Subtask 33-34-12-020-050
(a) Remove the screws (7) from the access panel (6).
(c) Remove the screws (9), the washers (8) and the nuts (12).
EFF :
ALL 33-34-12
Page 403
May 01/07
IAC
Removal/installation of the Loading-Area Light
Figure 401/TASK 33-34-12-991-001
R
EFF :
001-012, 014-099, 33-34-12
Page 404
May 01/06
IAC
(d) Remove the bracket assembly (5) and the gasket (4).
(f) Remove the screws (2), the washers (1) and the nuts (13) from the
bracket (14).
R (b) Remove the clamping ring (1) and the lens (3).
R (c) Remove the bulb (4) from the loading-area light housing (5).
Subtask 33-34-12-020-050-A
(1) Hold the housing (1) and remove the six screws (4) that attach the
frame (3) on the housing (1).
(2) Carefully remove the frame (3) with the loosely assembled lens (2)
from the housing (1).
EFF :
ALL 33-34-12
Page 405
May 01/07
IAC
Removal/installation of the Loading-Area Light
Figure 401A/TASK 33-34-12-991-001-A
R
EFF :
101-199, 901-999, 33-34-12
Page 406
Feb 01/07
IAC
R Removal/Installation of the Bulb of the Loading-Area Light
Figure 402/TASK 33-34-12-991-002
EFF :
001-012, 014-099, 33-34-12
Page 407
May 01/07
IAC
R **ON A/C ALL
TASK 33-34-12-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
EFF :
ALL 33-34-12
Page 408
May 01/06
IAC
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-34-12
Page 409
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-34-12-860-050
(2) Make sure that the FWD and/or AFT cargo-compartment door(s)
(Ref. TASK 52-30-00-860-001) is (are) open.
(3) Make sure that the access platform are in position at the FWD and/or
AFT cargo-compartment door.
(4) Make sure that the FWD Loading-Area Light switch 7LU and/or the AFT
Loading-Area Light switch 9LU is in the ON position.
(6) Make sure that you have access to the applicable 2000VU series
panel(s).
EFF :
ALL 33-34-12
Page 410
Aug 01/06
R
IAC
Subtask 33-34-12-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R FOR 11LU, 12LU
4. Procedure
_________
Subtask 33-34-12-420-050
R (a) Install the bulb (4) in the loading-area light housing (5).
EFF :
ALL 33-34-12
Page 411
May 01/07
IAC
R (b) Install the lens (3) and the clamping ring (1).
R (b) Put the gasket (4) in position on the bracket assembly (5) and
R install the screws (9), the washers (8) and the nuts (12) on the
bracket (3).
(d) Make sure that the electrical connectors are clean and in the
correct condition.
(f) Install the loading-area light-housing (10) with the screws (2),
the washers (1) and the nuts (13) on the bracket (14) on the
aircraft structure.
(g) Install the access panel (6) with the screws (7) on the bracket
assembly (5).
EFF :
001-012, 014-099, 33-34-12
Page 412
May 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-34-12-420-050-A
R (1) Put the new gasket (5) around the lens (2).
(3) Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-002) to the
threads of screws (4).
(4) Carefully hold the frame (3) with the lens (2) and align the holes of
the housing (1) with those in the frame (3).
(5) Attach the housing (1) to the frame (3) with the six screws (4).
Subtask 33-34-12-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 11LU, 12LU
3LU
EFF :
ALL 33-34-12
Page 413
Feb 01/07
IAC
Subtask 33-34-12-710-050
C. Do this test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the switch 7LU to the ON - the forward loading-area light 11LU
position. comes on.
- set the switch 7LU to the OFF - the forward loading-area light 11LU
position. goes off.
- set the switch 9LU in the ON - the aft loading area light 12LU comes
position. on.
- set the switch 9LU to the OFF - the loading area light 12LU goes off.
position.
5. Close-up
________
Subtask 33-34-12-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Set the FWD Loading-Area Light switch 7LU and/or the AFT Loading-Area
Light switch 9LU to the OFF position.
EFF :
ALL 33-34-12
Page 414
Aug 01/06
R
IAC
(5) Close the FWD and/or AFT cargo-compartment door(s) (Ref. TASK 52-30-
00-860-002).
Subtask 33-34-12-862-050
R
EFF :
ALL 33-34-12
Page 415
Aug 01/06
IAC
AVIONICS COMPARTMENT LIGHTING - DESCRIPTION AND OPERATION
_________________________________________________________
1. _______
General
The avionics compartment lighting system consists of six lights, five 28 VDC
outlets and three 115 VAC outlets.
2. __________________
Component Location
_______________________________________________________________________________
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
6LS LT-DOME, AVIONICS COMPT FWD R 122 811 33-35-11
7LS LT-DOME, AVIONICS COMPT FWD L 121 811 33-35-11
8LS LT-DOME, AVIONICS COMPT LAT R 126 822 33-35-11
9LS LT-DOME, AVIONICS COMPT AFT L 127 824 33-35-11
10LS LT-DOME, AVIONICS COMPT AFT R 128 824 33-35-11
13LS OUTLET-AVIONICS COMPT, AFT L 127 824
14LS OUTLET-AVIONICS COMPT, AFT R 128 824
15LS OUTLET-AVIONICS COMPT, FWD L 121 811
16LS OUTLET-AVIONICS COMPT, LATERAL R 126 822
17LS OUTLET-AVIONICS COMPT, AFT R 128 824
18LS OUTLET-AVIONICS COMPT, LATERAL R 126 822
19LS OUTLET-AVIONICS COMPT, FWD R 122 811
20LS OUTLET-AVIONICS COMPT, LATERAL L 125 812
22LS LT-DOME, AVIONICS COMPT LAT L 125 812 33-35-11
23LS P/B SW-AVIONICS COMPT LT 50VU 212
24LS RELAY-PWR SPLY, AVIONICS COMPT 103VU 126
AFT L DOME LIGHT
25LS RELAY-PWR SPLY, AVIONICS COMPT 103VU 126
FWD R DOME LIGHT
EFF :
ALL 33-35-00
Page 1
Feb 01/07
IAC
Avionics Compartment Lighting - Component Location
Figure 001
EFF :
001-010, 33-35-00
Page 2
Feb 01/96
IAC
Avionics Compartment Lighting - Component Location
Figure 001A
R
EFF :
011-012, 014-099, 101-199, 901-999, 33-35-00
Page 3
Feb 01/07
IAC
3. System
__________________
Description
(Ref. Fig. 002)
The avionics compartment lighting system consists of a number of lights and
maintenance outlets. The busbar 601PP supplies the five maintenance outlets
with 28 VDC through circuit breaker 11LS. The busbar 216XP supplies the
three maintenance outlets with 115 VAC through circuit breaker 12LS. The
outlets are located in the forward and aft parts of the avionics
compartement.
Six dome lights provide the illumination of the avionics compartment.
The busbar 601PP supplies the lights with 28 VDC through circuit breaker 1LS
and relays 24LS and 25LS. The relay 24LS controls the power supply to the
lateral L, aft L and R dome lights. The relay 25LS controls the power supply
to the lateral R, forward L and R dome lights. The door proximity switches
transmit the ground signal to relays 24LS and 25LS.
4. Operation/Control
________________________________
and Indicating
(Ref. Fig. 003)
If the conditions below are obeyed:
- busbar energized,
- circuit breaker 1LS closed,
- all avionics compartment doors closed,
- the two relays 24LS and 25LS energized,
all the lights are off.
A. Auto Mode
(1) When the service door in zone 125 or zone 128 is open, the associated
proximity switch removes the ground for relay 24LS. Relay 24LS
de-energizes and the L lateral, L and R aft dome lights come on.
(2) When the service door in zone 120 or zone 126 is open, the associated
proximity switch removes the ground for relay 25LS. Relay 25LS
de-energizes and the R lateral, L and R forward dome lights come on.
B. Manual Mode
When the pushbutton switch 23LS is pressed, the two relays 24LS and 25LS
de-energize and the avionics compartment lights come on. The integral
light in the pushbutton switch comes on.
EFF :
ALL 33-35-00
Page 4
Feb 01/96
IAC
Avionics Compartment Lighting - Electrical Outlets
Figure 002
EFF :
ALL 33-35-00
Page 5
Feb 01/96
IAC
Avionics Compartment Lighting - Schematic
Figure 003
EFF :
ALL 33-35-00
Page 6
Feb 01/96
IAC
AVIONICS COMPARTMENT LIGHTING - ADJUSTMENT/TEST
_______________________________________________
TASK 33-35-00-720-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-35-00-861-051
EFF :
ALL 33-35-00
Page 501
May 01/02
IAC
Subtask 33-35-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/AVNCS COMPT/DOME 1LS Z07
Subtask 33-35-00-010-050
(6) Do not open the lateral left door 812 of the avionics compartment.
(7) Do not open the lateral right door 822 of the avionics compartment.
(8) Do not open the aft door 824 of the avionics compartment.
EFF :
ALL 33-35-00
Page 502
Aug 01/06
IAC
4. Procedure
_________
Subtask 33-35-00-720-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
4. Close the aft door 824 of the Look through the door 811.
avionics compartment (Ref. TASK Make sure that:
52-41-00-410-002). - the two aft dome-lights (10LS, 9LS)
go off in the avionics compartment,
- the lateral left dome-light (22LS)
goes off in the avionics compartment.
5. Open the lateral left door 812 of Look through the door 812:
the avionics compartment. - You must get the same results as in
paragraph 3.
EFF :
ALL 33-35-00
Page 503
May 01/06
R
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
6. Close the lateral left door 812 Look through the door 812:
of the avionics compartment. - You must get the same results as in
paragraph 4.
9. Close the right lateral door 822 Look through the access door 812:
of the avionics compartment. - You must get the same results as in
paragraph 7.
5. Close-up
________
Subtask 33-35-00-410-050
A. Close Access
(1) Close the lateral left door 812 of the avionics compartment.
Subtask 33-35-00-862-051
EFF :
ALL 33-35-00
Page 504
May 01/06
R
IAC
______________________________________________________________
LIGHT - DOME, AVIONICS COMPARTMENT (6LS,7LS,8LS,9LS,10LS,22LS)
____________________
REMOVAL/INSTALLATION
TASK 33-35-11-000-002
Removal of the Avionics-Compartment Dome Lights (6LS, 7LS, 8LS, 9LS, 10LS,
22LS)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-35-11
Page 401
Feb 01/96
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-35-11-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/AVNCS COMPT/DOME 1LS Z07
Subtask 33-35-11-010-051
EFF :
ALL 33-35-11
Page 402
Feb 01/07
IAC
4. Procedure
_________
Subtask 33-35-11-020-052
(1) Loosen the six screws (7). During this operation, hold the cover (6).
Subtask 33-35-11-020-053
(1) Loosen the four screws (1) and the washers (2).
During this operation hold the dome light (4).
EFF :
ALL 33-35-11
Page 403
Feb 01/07
IAC
Avionics-Compartment Dome Lights
Figure 401/TASK 33-35-11-991-001
EFF :
001-010, 33-35-11
Page 404
Feb 01/96
IAC
Avionics-Compartment Dome Lights
Figure 401A/TASK 33-35-11-991-001-A
R
EFF :
011-012, 014-099, 101-199, 901-999, 33-35-11
Page 405
Feb 01/07
IAC
R **ON A/C 011-012, 014-099, 101-199, 901-999,
Subtask 33-35-11-020-052-A
(1) Loosen the three captive screws (7). During this operation, hold the
cover (6).
Subtask 33-35-11-020-053-A
(1) Loosen the three screws (2) from the housing (3).
During this operation hold the dome light (4).
R
EFF :
011-012, 014-099, 101-199, 901-999, 33-35-11
Page 406
Feb 01/07
IAC
**ON A/C ALL
TASK 33-35-11-400-002
Installation of the Avionics-Compartment Dome Lights (6LS, 7LS, 8LS, 9LS, 10LS,
22LS)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-35-11
Page 407
May 01/02
R
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-35-11-865-054
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/AVNCS COMPT/DOME 1LS Z07
Subtask 33-35-11-010-052
EFF :
ALL 33-35-11
Page 408
Feb 01/07
IAC
FOR 22LS
- make sure that the access platform is in position at the zone 123,
- make sure that the door 812 is open.
4. Procedure
_________
Subtask 33-35-11-420-052
(5) Lock the new dome light (4) with the four screws (1) and the washers
(2).
(6) Make sure that the electrical connectors (5) are in the correct
condition.
EFF :
ALL 33-35-11
Page 409
Feb 01/07
IAC
Subtask 33-35-11-420-053
(2) Put the cover (6) in position on the dome light (4).
Hold it in this position.
(3) Lock the cover (6) with the six screws (7).
Subtask 33-35-11-420-052-A
(5) Lock the new dome light (4) with the three screws (2).
(6) Make sure that the electrical connectors (5) are in the correct
condition.
Subtask 33-35-11-420-053-A
(2) Put the cover (6) in position on the dome light (4).
Hold it in this position.
(3) Lock the cover (6) with the three captive screws (7).
EFF :
ALL 33-35-11
Page 410
Feb 01/07
IAC
**ON A/C ALL
Subtask 33-35-11-865-055
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LS.
Subtask 33-35-11-720-051
5. Close-up
________
Subtask 33-35-11-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-35-11
Page 411
May 01/02
IAC
WHEEL WELL LIGHTING - DESCRIPTION AND OPERATION
_______________________________________________
1. General
_______
R
The wheel well lighting-system has the lighting of the main wheel wells and
the hydraulic compartment. For maintenance practices an electrical outlet is
installed at the front wheel well and in the hydraulic compartment.
R
2. __________________
Component Location
R
-------------------------------------------------------------------------------
FIN FUNCTIONAL DESIGNATION PANEL ZONE ACCESS ATA
DOOR REF.
-------------------------------------------------------------------------------
3LL OUTLET - 28 V DC NOSEWHEEL WELL COMPT RH 123
4LL OUTLET - 28 V DC HYDR. COMPT. 2025VU 191
7LL WHEEL WELL LIGHT LH 147 33-37-11
8LL WHEEL WELL LIGHT RH 148 33-37-11
9LL HYDR. COMPT. LIGHT LH 195 33-37-11
10LL HYDR. COMPT. LIGHT RH 196 33-37-11
12LL TOGGLE SWITCH - HYDR. COMPT. 2025VU 191
3. __________________
System Description
EFF :
ALL 33-37-00
Page 1
May 01/07
IAC
Wheel Well Lighting - Component Location
Figure 001
R
EFF :
001-012, 014-099, 33-37-00
Page 2
May 01/06
IAC
Wheel Well Lighting - Component Location
Figure 001A
R
EFF :
101-199, 901-999, 33-37-00
Page 3
May 01/07
IAC
R Wheel Well Lighting - Component Location
R Figure 001B
R
EFF :
001-012, 014-099, 33-37-00
Page 4
May 01/07
IAC
R
One dome light is installed in each of the main-wheel well compartments. Two
dome lights are installed in the hydraulic compartments LH and RH. The
R busbar 202PP supplies 28VDC to all four lights through the circuit breaker
R 2LL and the control switch 12LL. An outlet 3LL is installed in the nosewheel
well for maintenance purposes. Another outlet 4LL is installed in the
hydraulic compartment, adjacent to the control switch 12LL, on panel 2025VU.
When the control switch is set to the ON position, all lights come on.
R
R
EFF :
ALL 33-37-00
Page 5
May 01/07
IAC
Wheel Well Lighting - Schematic
Figure 002
R
EFF :
001-012, 014-099, 33-37-00
Page 6
May 01/07
IAC
Wheel Well Lighting - Schematic
Figure 002A
R
EFF :
101-199, 901-999, 33-37-00
Page 7
Feb 01/07
IAC
R Wheel Well Lighting - Schematic
R Figure 002B
EFF :
001-012, 014-099, 33-37-00
Page 8
May 01/07
IAC
WHEEL WELL LIGHTING - ADJUSTMENT/TEST
_____________________________________
TASK 33-37-00-710-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-37-00
Page 501
Feb 01/96
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-37-00-861-050
Subtask 33-37-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WHL WELL/LTG/DOME 2LL X08
Subtask 33-37-00-010-050
C. Get Access
(1) Open the main gear doors for access (Ref. TASK 32-12-00-010-001).
(2) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00-
864-003).
(3) Install the GROUND LOCK SLEEVE on the main-gear door actuator.
FOR 12LL
EFF :
ALL 33-37-00
Page 502
Aug 01/06
IAC
4. Procedure
_________
Subtask 33-37-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the control switch 12LL to - the hydraulic compartment lights 9LL
the OFF position. and 10LL go off.
In the MLG wheel well:
- the wheel well lights 7LL and 8LL go
off.
5. Close-up
________
Subtask 33-37-00-410-050
A. Close Access
(1) Remove the GROUND LOCK SLEEVE from the main-gear door actuator
(Ref. TASK 32-12-00-410-001).
(2) Pressurize the Yellow hydraulic system to close the main gear doors
(Ref. TASK 29-10-00-863-002).
(6) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-37-00
Page 503
May 01/07
IAC
INTENTIONALLY BLANK
R
33-37-00
Page 504
May 01/07
IAC
Subtask 33-37-00-862-050
EFF :
ALL 33-37-00
Page 505
May 01/06
R
IAC
TASK 33-37-00-720-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
WARNING : MAKE SURE THAT THE NLG DOWNLOCK SAFETY PIN AND THE TWO DOOR SAFETY
_______
PINS ARE INSTALLED.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-37-00
Page 506
May 01/06
R
IAC
3. __________
Job Set-up
Subtask 33-37-00-861-051
Subtask 33-37-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WHL WELL/LTG/OUT 1LL X07
Subtask 33-37-00-010-052
C. Get Access
(1) Open the nose gear doors for access (Ref. TASK 32-22-00-010-001).
(2) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00-
864-003).
(3) Install the SAFETY PIN - NLG DOOR on the nose gear doors.
FOR 3LL
FOR 4LL
EFF :
ALL 33-37-00
Page 507
Aug 01/06
IAC
4. Procedure
_________
Subtask 33-37-00-720-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 33-37-00-410-051
A. Close Access
(2) Remove the SAFETY PIN - NLG from the nose gear door (Ref. TASK 32-22-
00-410-001).
(4) Pressurize the Yellow hydraulic system to close the nose gear doors.
(5) Make sure that the work area is clean and clear of tool(s) and other
items.
FOR 4LL
EFF :
ALL 33-37-00
Page 508
May 01/06
R
IAC
Subtask 33-37-00-862-051
EFF :
ALL 33-37-00
Page 509
May 01/06
IAC
LIGHT - DOME, MLG L AND R WELL (7LL,8LL) - REMOVAL/INSTALLATION
_______________________________________________________________
TASK 33-37-11-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
R NOTE : The procedure is the same for all MLG dome lights (HELLA).
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-37-11
Page 401
May 01/07
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-37-11-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/WHL WELL/LTG/DOME 2LL X08
Subtask 33-37-11-010-050
B. Get Access
R
EFF :
001-012, 014-099, 33-37-11
Page 402
May 01/07
IAC
R - Put the ACCESS PLATFORM 2M (6 FT) in position at zone 195.
R FOR 10LL
R - Open the access panel 196BB.
R - Put the ACCESS PLATFORM 2M (6 FT) in position at zone 196.
R Subtask 33-37-11-010-050-A
R B. Get Access
4. Procedure
_________
Subtask 33-37-11-020-050
EFF :
001-012, 014-099, 33-37-11
Page 403
May 01/07
IAC
R MLG Dome Light
Figure 401/TASK 33-37-11-991-001
EFF :
001-012, 014-099, 33-37-11
Page 404
May 01/07
IAC
R MLG Dome Light
R Figure 401A/TASK 33-37-11-991-001-A
EFF :
001-012, 014-099, 33-37-11
Page 405
May 01/07
IAC
(3) Remove the screws (2) and the washers (3).
R
EFF :
001-012, 014-099, 33-37-11
Page 406
May 01/07
IAC
TASK 33-37-11-400-001
R WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
R YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
R NOTE : The procedure is the same for all MLG dome lights (HELLA).
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-37-11
Page 407
May 01/07
IAC
R **ON A/C 001-012, 014-099,
3. __________
Job Set-up
Subtask 33-37-11-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/WHL WELL/LTG/DOME 2LL X08
4. Procedure
_________
Subtask 33-37-11-420-050
R (4) Support the MLG dome light (1) and install the electrical connectors
R (6) with the washers (5) and the nuts (4).
R (5) Install the MLG dome light (1) with the washers (3) and the screws
(2).
R
EFF :
001-012, 014-099, 33-37-11
Page 408
May 01/07
IAC
Subtask 33-37-11-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2LL.
Subtask 33-37-11-710-050
C. Do the operational test of the wheel well lights (Ref. TASK 33-37-00-710-
001).
5. Close-up
________
Subtask 33-37-11-410-050
A. Close Access
R
R (1) Make sure that the work area is clean and clear of tool(s) and other
items.
R Subtask 33-37-11-410-050-A
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R
EFF :
001-012, 014-099, 33-37-11
Page 409
May 01/07
IAC
R (3) Close the applicable access door:
R FOR 7LL
R - Close the left MLG door 734 (Ref. TASK 32-12-00-410-001).
R FOR 8LL
R - Close the right MLG door 744 (Ref. TASK 32-12-00-410-001).
R
EFF :
001-012, 014-099, 33-37-11
Page 410
May 01/07
IAC
**ON A/C ALL
TASK 33-37-11-000-002
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
R NOTE : The procedure is the same for all MLG dome lights (AIRSIGNA).
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-37-11
Page 411
May 01/07
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-37-11-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/WHL WELL/LTG/DOME 2LL X08
EFF :
ALL 33-37-11
Page 412
May 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-37-11-010-052
B. Get Access
R Subtask 33-37-11-010-052-A
R B. Get Access
EFF :
ALL 33-37-11
Page 413
May 01/07
IAC
**ON A/C ALL
4. Procedure
_________
Subtask 33-37-11-020-052
(1) Loosen the captive screws (4) and remove the cover assembly (3).
R (2) Remove the lamp(s) (2) from the light assembly (5) and discard the
R lamp(s).
EFF :
ALL 33-37-11
Page 414
May 01/07
IAC
R MLG Dome Light
Figure 402/TASK 33-37-11-991-002
R
EFF :
101-199, 901-999, 33-37-11
Page 415
May 01/07
IAC
R MLG Dome Light
R Figure 402A/TASK 33-37-11-991-002-A
R
EFF :
001-012, 014-099, 33-37-11
Page 416
May 01/07
IAC
**ON A/C ALL
TASK 33-37-11-400-002
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
NOTE : The procedure is the same for all MLG dome lights (AIRSIGNA).
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-37-11
Page 417
Feb 01/08
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-37-11-865-054
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/WHL WELL/LTG/DOME 2LL X08
EFF :
ALL 33-37-11
Page 418
Feb 01/08
R
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-37-11-860-050
R Subtask 33-37-11-860-050-A
EFF :
ALL 33-37-11
Page 419
May 01/07
IAC
R FOR 10LL
R - Make sure, that the access panel 196BB is open.
R - Make sure, that the ACCESS PLATFORM 2M (6 FT) is in position at
R zone 196.
4. Procedure
_________
Subtask 33-37-11-420-051
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
R (1) Put the lamp(s) (2) in the light assembly (5) and turn it clockwise
R to lock the lamp(s) in position.
(2) Correctly align the cover assembly (3) with the screw holes of the
housing (1).
EFF :
ALL 33-37-11
Page 420
May 01/07
IAC
(3) Apply the SPECIAL MATERIALS (Material No. 05-002) to the captive
screws (4).
Subtask 33-37-11-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2LL.
Subtask 33-37-11-710-051
C. Do the operational test of the wheel well lights (Ref. TASK 33-37-00-710-
001).
5. Close-up
________
Subtask 33-37-11-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-37-11
Page 421
May 01/07
IAC
R **ON A/C 001-012, 014-099,
R Subtask 33-37-11-410-051-A
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R
EFF :
001-012, 014-099, 33-37-11
Page 422
May 01/07
IAC
**ON A/C ALL
TASK 33-37-11-000-003
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
R NOTE : The procedure is the same for all MLG dome lights (AIRSIGNA).
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-37-11
Page 423
May 01/07
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-37-11-865-056
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/WHL WELL/LTG/DOME 2LL X08
EFF :
ALL 33-37-11
Page 424
May 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-37-11-010-053
B. Get Access
R
R Subtask 33-37-11-010-053-A
R B. Get Access
EFF :
ALL 33-37-11
Page 425
May 01/07
IAC
**ON A/C ALL
4. Procedure
_________
Subtask 33-37-11-020-053
R (3) Move the MLG dome light (1) to get access to the electrical
R connectors (2) and (3).
EFF :
ALL 33-37-11
Page 426
May 01/07
IAC
R MLG Dome Light
Figure 403/TASK 33-37-11-991-003
EFF :
101-199, 901-999, 33-37-11
Page 427
May 01/07
IAC
R MLG Dome Light
R Figure 403A/TASK 33-37-11-991-003-A
EFF :
001-012, 014-099, 33-37-11
Page 428
May 01/07
IAC
**ON A/C ALL
TASK 33-37-11-400-003
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
NOTE : The procedure is the same for all MLG dome lights (AIRSIGNA).
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-37-11
Page 429
Feb 01/08
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-37-11-865-057
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/WHL WELL/LTG/DOME 2LL X08
EFF :
ALL 33-37-11
Page 430
Feb 01/08
R
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-37-11-860-051
R Subtask 33-37-11-860-051-A
EFF :
ALL 33-37-11
Page 431
May 01/07
IAC
**ON A/C ALL
4. Procedure
_________
Subtask 33-37-11-420-052
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
(4) Make sure that the electrical connectors are clean and in the correct
condition.
R (5) Hold the MLG dome light (1) at its correct installation position.
(6) Support the MLG dome light (1) and connect the electrical connectors
(2) and (3).
(7) Apply the SPECIAL MATERIALS (Material No. 05-002) to the washers (5)
and the screws (4).
(8) Install the MLG dome light (1) with the washers (5) and the screws
(4).
EFF :
ALL 33-37-11
Page 432
May 01/07
IAC
(9) Tighten the screws (4).
Subtask 33-37-11-865-058
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2LL.
Subtask 33-37-11-710-052
C. Do the operational test of the wheel well lights (Ref. TASK 33-37-00-710-
001).
5. Close-up
________
Subtask 33-37-11-410-052
A. Close Access
R
R (1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-37-11
Page 433
May 01/07
IAC
R **ON A/C 001-012, 014-099,
R Subtask 33-37-11-410-052-A
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
EFF :
001-012, 014-099, 33-37-11
Page 434
May 01/07
IAC
EXTERIOR - DESCRIPTION AND OPERATION
____________________________________
1. _______
General
The external lights provide the following illuminations:
- lights to illuminate the runway and the taxiway,
- lights to illuminate the wing leading edges and the engine nacelles,
- lights to give an indication of the aircraft position and to reduce
possible collision in the air or on the ground.
2. System
__________________
Description
The toggle switches on the overhead panel 25VU control the external lights
as follows:
D. Navigation Light
(Ref. Fig. 002)
The dual navigation light system indicates the aircraft position and
direction.
It has:
- a red color light 9LA, incorporating two lamps, installed in the
left-hand wing-tip.
- a green color light 10LA, incorporating two lamps, installed in the
right-hand wing-tip.
- a white light 15LA, incorporating two lamps installed on the tail cone
at the extreme aft of the aircraft.
EFF :
ALL 33-40-00
Page 1
Feb 01/96
IAC
External Lights - Component Location
Figure 001 (SHEET 1)
EFF :
ALL 33-40-00
Page 2
Feb 01/96
IAC
External Lights - Component Location
Figure 001 (SHEET 2)
EFF :
ALL 33-40-00
Page 3
Feb 01/96
IAC
External Lights - Component Location
Figure 001 (SHEET 3)
EFF :
ALL 33-40-00
Page 4
Feb 01/96
IAC
INTENTIONALLY BLANK
33-40-00
Page 5
Feb 01/96
IAC
External Lights - Component Location
Figure 002 (SHEET 1)
EFF :
ALL 33-40-00
Page 6
Feb 01/96
IAC
External Lights - Component Location
Figure 002 (SHEET 2)
EFF :
ALL 33-40-00
Page 7
Feb 01/96
IAC
A three position switch, 3LA on the panel 25VU, controls the lights.
E. Landing Lights
(Ref. Fig. 003)
The landing light system provides lighting to illuminate the runway when
the aircraft lands at night.
Two landing lights 7LB and 8LB are installed one on the underside of each
wing. Each light has a separate control switch 5LB and 6LB.
They can be extended at all aircraft speeds.
F. Anticollision/Beacon Lights
(Ref. Fig. 002)
Two anticollision/beacon lights are installed, 7LV on the top and 6LV on
the bottom of the aircraft fuselage. The anticollision/beacon lights are
high intensity red discharge lamps. Each lamp is supplied from an
individual power unit. The anticollision/beacon lights flash at approx.
60 flashes per minute, when the BEACON switch 2LV is in the ON position.
Three strobe lights are installed, two at each wing tip on the leading
edges 16LV and 17LV and one on the tail cone 19LV. The strobe lights are
high intensity white lights synchronized to operate alternately with the
anticollision/beacon light. The forward facing strobe lights flash at
approx. 120 flashes per minute and the rearward facing strobe light
flashes at approx. 60 flashes per minute. This occures when the STROBE
switch 11LV is either in the ON or AUTO position.
G. Logo Lights
(Ref. Fig. 002)
Two logo lights, 3LY in the left and 4LY in the right, are installed in
the horizontal stabilizers. They light up the airlines logo on the fin
when:
- the aircraft is in the landing phase of the flight,
- the aircraft is taxiing,
- the aircraft is in the take off phase of the flight.
A three position switch, 3LA on the panel 25VU, controls the logo lights
together with the navigation lights.
EFF :
ALL 33-40-00
Page 8
Feb 01/96
IAC
External Lights - Component Location
Figure 003
EFF :
ALL 33-40-00
Page 9
Feb 01/96
IAC
NAVIGATION LIGHTS - DESCRIPTION AND OPERATION
_____________________________________________
1. _______
General
The Navigation Light system gives an external, visual indication of the
position of the aircraft and its direction of flight.
2. Component
__________________
Location
R (Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
9LA LT-NAVIGATION, L WING TIP 534 534 33-41-11
10LA LT-NAVIGATION, R WING TIP 634 634 33-41-11
13LA XFMR-TAIL NAVIGATION LIGHT 317 317AL 33-41-16
15LA LT-NAVIGATION, TAIL 317 317 33-41-15
3. System
__________________
Description
R (Ref. Fig. 001)
A forward-facing navigation light assembly is installed at the leading edge
of each wing tip. A rearward-facing navigation light assembly is installed
on the tail cone, below the APU exhaust. Each light assembly has a different
colored lens:
- the left wing-tip navigation light 9LA has a red lens
- the right wing-tip navigation light 10LA has a green lens
- the tail navigation light 15LA has a clear lens.
The navigation lights are controlled by the toggle switch 3LA which is
installed on the overhead panel 25VU in the cockpit. The switch has three
positions, which are identified NAV & LOGO 2/1/OFF.
4. Power
____________
Supply
R (Ref. Fig. 002)
The SERVICE BUS 2, 216XP supplies the navigation light systems 1 and 2 with
115V AC 400Hz. The power is supplied to each system through the related
circuit breakers 1LA and 2LA. These circuit breakers are installed on the
panel 122VU in the cockpit. Relays 6LA and 7LA connect the supply to the
step-down transformers of the related navigation lights. These relays are
installed on the panel 103VU.
5. Interface
_________
EFF :
ALL 33-41-00
Page 1
Nov 01/04
IAC
Navigation Lights - Component Location
Figure 001
EFF :
ALL 33-41-00
Page 2
Feb 01/96
IAC
Navigation Lights - Schematic
Figure 002
EFF :
ALL 33-41-00
Page 3
Feb 01/96
IAC
6. Component
_____________________
Description
R (Ref. Fig. 001)
7. Operation/Control
________________________________
and Indicating
R (Ref. Fig. 001)
With the switch 3LA set to position 1, the 115V AC SERVICE BUS 2, 216XP
supplies power through:
- the circuit breaker 1LA
- the switch 3LA (to energize the relay 6LA)
- the relay 6LA to the step-down transfomers of the related navigation
lights.
R
The step-down transformers in the wing-tip navigation light assemblies
supply 28V AC to the related lamp. The lamp comes on.
Each step-down transformer in the step-down transformer assembly 13LA
supplies 12V AC to its related tail navigation light. The lamp comes on.
With the switch 3LA set to position 2, the operation is almost the same, but
this time the power is supplied through the circuit breaker 2LA and the
relay 7LA.
EFF :
ALL 33-41-00
Page 4
Nov 01/04
IAC
NAVIGATION LIGHTS - DEACTIVATION/REACTIVATION
_____________________________________________
TASK 33-41-00-040-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-41-00
Page 401
May 01/02
IAC
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-41-00-941-050
A. Safety Precautions
(2) Put a warning notice on panel 25VU to tell persons not to operate the
navigation lights or the strobe lights.
(3) Put the access platform below the applicable zone 534 (634).
EFF :
ALL 33-41-00
Page 402
Nov 01/00
IAC
Subtask 33-41-00-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
4. Procedure
_________
Subtask 33-41-00-040-050
(a) You must replace the glazing panel (Ref. TASK 57-37-12-000-001),
(Ref. TASK 57-37-12-400-001) if it has one of these conditions:
- a longitudinal crack of more than 153 mm (6.0236 in.) in length
- a vertical crack of more than 25.4 mm (1.0000 in.) in length
- broken glazing.
(b) If the glazing panel has a longitudinal crack of less than 153 mm
(6.0236 in.) or a vertical crack of less than 25.4 mm (1.0000
in.), do the repair that follows:
1
_ Drill a 6.4 mm (0.2519 in.) dia. hole at the end of the crack.
2
_ Use fine abrasive paper to make the repair area rough. The
repair area is 5.0 mm (0.1968 in.) more than and all around
the tape.
3
_ Clean the surface of the glazing panel with MISCELLANEOUS
(Material No. 19-003) made moist with warm soap solution.
4
_ Dry the surface of the glazing panel with a clean
MISCELLANEOUS (Material No. 19-003).
5
_ Apply SPECIAL MATERIALS (Material No. 05-065) to cover the
crack and the stop drilled hole.
EFF :
ALL 33-41-00
Page 403
Aug 01/06
IAC
R Repair of the Wing-Tip Navigation Light Glazing Panel
Figure 401/TASK 33-41-00-991-003- 13 (SHEET 1)
EFF :
ALL 33-41-00
Page 404
Nov 01/05
IAC
R Repair of the Wing-Tip Navigation Light Glazing Panel
Figure 401/TASK 33-41-00-991-003- 23 (SHEET 2)
EFF :
ALL 33-41-00
Page 405
Nov 01/05
IAC
R Repair of the Wing-Tip Navigation Light Glazing Panel
Figure 401/TASK 33-41-00-991-003- 33 (SHEET 3)
EFF :
ALL 33-41-00
Page 406
Nov 01/05
IAC
NOTE : Make sure that the tape is installed correctly and has
____
no bubbles, wrinkles or tears in it.
6
_ Let the tape cure for not less than 15 mins at a minimum
temperature of 15 deg.C (59.00 deg.F).
7
_ Make an entry in the aircraft technical log that the glazing
panel has a temporary repair.
8
_ Examine the temporary repair(s) for an increase in the length
of the crack(s).
R (2) For a post modification 25268 (pre modification 28219) glazing panel:
(a) You must replace the glazing panel (Ref. TASK 57-37-12-000-001),
(Ref. TASK 57-37-12-400-001) if it has one of these conditions:
- a crack of more than 25 mm (0.9842 in.) in length
- more than 3 cracks from one bolt hole
- more than 2 cracks from one bolt hole are in the direction of
the panel edge
- more than 6 bolt holes have cracks
- more than 2 adjacent bolt holes have cracks
- the glazing is broken.
(b) If the glazing panel has a crack of more than 12.0 mm (0.4724
in.) and is less than 25 mm (0.9842 in.) in length, do the
temporary repair that follows:
NOTE : Cracks that are in the direction of the panel edge must
____
not be stop drilled.
1
_ Drill a 6.4 mm (0.2519 in.) dia. hole at the end of the crack.
2
_ Clean the surface of the glazing panel with MISCELLANEOUS
(Material No. 19-003) made moist with warm soap solution.
3
_ Dry the surface of the glazing panel with a clean
MISCELLANEOUS (Material No. 19-003).
EFF :
ALL 33-41-00
Page 407
Nov 01/05
IAC
4
_ To make a weather seal, apply SEALANTS (Material No. 09-045)
or PR1829 Polysulphide Sealant for Glazings to cover the crack
and stop drilled hole.
5
_ Make an entry in the aircraft technical log that the glazing
panel has a temporary repair.
6
_ Examine temporary repair(s) for an increase in the length of
the crack(s).
R (3) For a post modification 28219, 30791, 30889 or 32153 glazing panel:
(a) You must replace the glazing panel (Ref. TASK 57-37-12-000-001),
(Ref. TASK 57-37-12-400-001) if it has one of these conditions:
- more than one crack
- a vertical or longitudinal crack of more than 30 mm (1.1811
in.) in length
- a crack in the direction of the panel edge
- minimum thickness after polishing is less than 3.33 mm (0.1311
in.)
- broken glazing
- damage to the steel shield.
1
_ Drill a 6.4 mm (0.2519 in.) dia. hole at the end of the crack.
2
_ Use fine abrasive paper to make the repair area rough. The
repair area is 5.0 mm (0.1968 in.) more than and all around
the tape.
3
_ Clean the surface of the glazing panel with MISCELLANEOUS
(Material No. 19-003) made moist with warm soap solution.
4
_ Dry the surface of the glazing panel with a clean
MISCELLANEOUS (Material No. 19-003).
EFF :
ALL 33-41-00
Page 408
Nov 01/05
IAC
5
_ To make a weather seal, apply SEALANTS (Material No. 09-045)
or PR1829 Polysulphide Sealant for Glazings to cover the stop
drilled hole.
6
_ Apply SPECIAL MATERIALS (Material No. 05-065) to cover the
crack and the stop drilled hole.
NOTE : Make sure that the tape is installed correctly and has
____
no bubbles, wrinkles or tears in it.
7
_ Let the tape cure for not less than 15 mins at a minimum
temperature of 15 deg.C (59.00 deg.F).
8
_ Make an entry in the aircraft technical log that the glazing
panel has a temporary repair.
9
_ Examine the temporary repair for an increase in the length of
the crack.
5. Close-up
________
Subtask 33-41-00-865-053
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LA, 2LA, 10LV.
Subtask 33-41-00-942-050
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-41-00
Page 409
Nov 01/05
R
IAC
TASK 33-41-00-440-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
ALL 33-41-00
Page 410
May 01/06
IAC
3. __________
Job Set-up
Subtask 33-41-00-941-051
A. Safety Precautions
(2) Put a warning notice on panel 25VU to tell persons not to operate the
navigation lights or the strobe lights.
(3) Put the access platform below the applicable zone 534 (634).
Subtask 33-41-00-865-054
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
4. Procedure
_________
Subtask 33-41-00-440-050
(1) Replace the wing-tip navigation light glazing panel (Ref. TASK 57-37-
12-000-001), (Ref. TASK 57-37-12-400-001).
5. Close-up
________
Subtask 33-41-00-865-055
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LA, 2LA, 10LV.
EFF :
ALL 33-41-00
Page 411
Aug 01/06
IAC
INTENTIONALLY BLANK
R
33-41-00
Page 412
May 01/06
IAC
Subtask 33-41-00-942-051
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(6) Write in the aircraft technical log that the glazing panel of the
wing-tip navigation light has been replaced.
EFF :
ALL 33-41-00
Page 413
May 01/01
R
IAC
TASK 33-41-00-040-002
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-41-00
Page 414
May 01/01
R
IAC
3. __________
Job Set-up
Subtask 33-41-00-941-054
A. Safety Precautions
(2) Put a warning notice in the cockpit to tell persons not to operate
the tail navigation light.
(3) Put a warning notice in position to tell persons not to operate the
APU.
Subtask 33-41-00-941-052
B. Get Access
(1) Put the access platform at the APU tail-cone exhaust area Zone 317.
Subtask 33-41-00-865-056
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
EFF :
ALL 33-41-00
Page 415
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-41-00-040-051
(2) Write a note in the aircraft technical log that the lens has been
deactivated.
5. Close-up
________
Subtask 33-41-00-865-057
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2KD, 1KD, 1LA, 2LA.
Subtask 33-41-00-942-052
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-41-00
Page 416
Aug 01/06
IAC
TASK 33-41-00-440-002
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-41-00-941-055
A. Safety Precautions
EFF :
ALL 33-41-00
Page 417
May 01/06
R
IAC
(2) Put a warning notice in the cockpit to tell persons not to operate
the tail navigation light.
(3) Put a warning notice in position to tell persons not to operate the
APU.
Subtask 33-41-00-941-053
B. Get Access
(1) Put the access platform in position at the APU tail-cone exhaust area
Zone 317.
Subtask 33-41-00-865-058
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
4. Procedure
_________
Subtask 33-41-00-440-051
(2) Write a note in the aircraft technical log that the lens of the tail
navigation light has been reactivated.
EFF :
ALL 33-41-00
Page 418
Aug 01/06
IAC
5. Close-up
________
Subtask 33-41-00-865-059
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2KD, 1KD, 1LA, 2LA.
Subtask 33-41-00-942-053
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-41-00
Page 419
May 01/01
IAC
NAVIGATION LIGHTS - ADJUSTMENT/TEST
___________________________________
TASK 33-41-00-710-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-41-00
Page 501
May 01/05
IAC
3. __________
Job Set-up
Subtask 33-41-00-941-056
A. Safety Precautions
(2) Put a warning notice on the panel 25VU to tell persons not to operate
the navigation lights or the strobe lights.
Subtask 33-41-00-861-050
4. Procedure
_________
Subtask 33-41-00-710-050-A
A. Operational Test
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. On the EXT LT control panel 25VU: - the NAV 1 lamps of the navigation
- put the toggle switch NAV & LOGO lights (9LA and 10LA) come on
(3LA) to the 1 position - the NAV 1 lamp of the navigation
light (15LA) comes on
- put the toggle switch NAV & LOGO - the NAV 2 lamps of the navigation
(3LA) to the 2 position lights (9LA and 10LA) come on and the
NAV 1 lamps go off
- the NAV 2 lamp of the navigation
light (15LA) comes on and the NAV 1
lamp goes off
- put the toggle switch NAV & LOGO - the navigation lights (9LA, 10LA and
(3LA) to the OFF position. 15LA) go off.
EFF :
ALL 33-41-00
Page 502
May 01/05
R
IAC
Navigation Lights - Component Location
Figure 501/TASK 33-41-00-991-001
EFF :
ALL 33-41-00
Page 503
Feb 01/96
IAC
5. Close-up
________
Subtask 33-41-00-862-050
Subtask 33-41-00-942-054
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-41-00
Page 504
Feb 01/96
IAC
LIGHT - NAVIGATION (9LA,10LA) - REMOVAL/INSTALLATION
____________________________________________________
TASK 33-41-11-000-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-41-11
Page 401
Nov 01/98
IAC
3. __________
Job Set-up
Subtask 33-41-11-941-052
A. Safety Precautions
(2) Put a warning notice in position on panel 25VU to tell persons not to
operate the strobe lights or the navigation lights.
Subtask 33-41-11-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
Subtask 33-41-11-010-052
C. Get Access
(1) Put the access platform below applicable zone 534 or 634.
(2) Remove the wingtip glazing panel (1) (Ref. TASK 57-37-12-000-001).
4. Procedure
_________
Subtask 33-41-11-020-050
EFF :
ALL 33-41-11
Page 402
Aug 01/06
IAC
Wingtip Navigation Light
Figure 401/TASK 33-41-11-991-001
EFF :
ALL 33-41-11
Page 403
Feb 01/96
IAC
(2) Pull out the navigation light (3) sufficiently and disconnect the
electrical connector (2).
EFF :
ALL 33-41-11
Page 404
Feb 01/96
IAC
TASK 33-41-11-400-001
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-41-11
Page 405
May 01/06
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-41-11-941-053
A. Safety Precautions
(2) Make sure that the warning notice is on the panel 25VU to tell
persons not to operate the strobe lights or the navigation lights.
Subtask 33-41-11-860-050
(1) Make sure that the access platform is in position below the
applicable zone 534 or 634.
(2) Make sure that the navigation light glazing panel (1) has been
removed (Ref. TASK 57-37-12-000-001).
EFF :
ALL 33-41-11
Page 406
May 01/06
IAC
4. Procedure
_________
Subtask 33-41-11-420-053
(1) Clean the component interface and/or the adjacent area with a clean
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-004).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
Subtask 33-41-11-420-052
(1) Remove the blanking cap from the electrical connector (2).
(2) Put the navigation light (3) in position and connect the electrical
connector (2).
EFF :
ALL 33-41-11
Page 407
May 01/06
IAC
(3) Install the navigation light (3) with the washers (4) and the bolts
(5) (Ref. TASK 20-28-00-912-004).
Subtask 33-41-11-420-052-A
(1) Remove the blanking cap from the electrical connector (2).
(2) Put the navigation light (3) in position and connect the electrical
connector (2).
(3) Clean the electrical connector (2) with a MISCELLANEOUS (Material No.
19-003) made moist with CLEANING AGENTS (Material No. 11-004).
(5) Install the navigation light (3) with the washers (4) and the bolts
(5) (Ref. TASK 20-28-00-912-004).
Subtask 33-41-11-861-050
Subtask 33-41-11-865-051
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LA, 2LA.
EFF :
ALL 33-41-11
Page 408
Feb 01/07
IAC
Subtask 33-41-11-710-050
E. Test
5. Close-up
________
Subtask 33-41-11-862-050
Subtask 33-41-11-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the wingtip glazing panel (1) (Ref. TASK 57-37-12-400-001).
Subtask 33-41-11-942-050
C. Removal of Equipment
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-41-11
Page 409
May 01/06
R
IAC
TASK 33-41-11-000-002
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-41-11
Page 410
Aug 01/07
IAC
3. __________
Job Set-up
Subtask 33-41-11-941-051
A. Safety Precautions
R (2) Put a WARNING NOTICE in position on the panel 25VU to tell persons
R not to operate:
R - the strobe lights
R - the navigation lights.
R
Subtask 33-41-11-865-055
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
Subtask 33-41-11-010-053
C. Get Access
R (1) Put the ACCESS PLATFORM 4M (13 FT) below applicable zone 534 or 634.
4. Procedure
_________
Subtask 33-41-11-020-051-A
EFF :
ALL 33-41-11
Page 411
Aug 01/07
IAC
R Wingtip Navigation Light Lamp - Location and Details
R Figure 402/TASK 33-41-11-991-002
EFF :
ALL 33-41-11
Page 412
Aug 01/06
IAC
CAUTION : DO NOT USE NON APPROVED METAL TOOLS TO REMOVE THE LAMP FROM THE
_______
LAMP HOLDER. THESE METAL TOOLS CAN CAUSE DAMAGE TO THE LAMP
REFLECTOR AND THE LAMP HOLDER.
CAUTION : DO NOT APPLY TOO MUCH FORCE TO THE BULB OR SOCKET CONTACTS. TOO
_______
MUCH FORCE CAN CAUSE PERMANENT DEFORMATION OF THE SOCKET, AND
AS A RESULT, ARCING AND THUS BULB FAILURE.
R (1) Release the clips (4) that hold the glass (3) of the navigation light
R in position.
R (3) Use a lint-free cloth to carefully remove the lamp (1) from the
R navigation light as follows:
R (a) Carefully push the lamp (1) vertically up (or down) to release
R the lower (or higher) location spigot.
R (b) Carefully pull and remove the lamp (1) from the lamp socket.
EFF :
ALL 33-41-11
Page 413
Aug 01/06
IAC
TASK 33-41-11-400-002
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-41-11
Page 414
Aug 01/07
IAC
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-41-11-941-054
A. Safety Precautions
R (2) Make sure that the WARNING NOTICE is on the panel 25VU to tell
R persons not to operate:
R - the strobe lights
R - the navigation lights.
R
Subtask 33-41-11-860-052
R (1) Make sure that the ACCESS PLATFORM 4M (13 FT) is in position below
the applicable zone 534 or 634.
(2) Make sure that the navigation light glazing panel is removed
(Ref. TASK 57-37-12-000-001).
EFF :
ALL 33-41-11
Page 415
Aug 01/07
IAC
4. Procedure
_________
Subtask 33-41-11-420-054
(1) Clean the component interface and/or the adjacent area with a clean
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the lamp (1) and the glass (3) are clean and in the
correct condition.
(3) Make sure that the gasket (2) is not damaged. If necessary, replace
the gasket (2).
Subtask 33-41-11-420-051-A
CAUTION : USE ONLY APPROVED LAMPS. LAMPS THAT ARE NOT APPROVED CAN CAUSE
_______
DAMAGE TO THE NAVIGATION-LIGHT TRANSFORMER AND LAMP-HOLDER.
CAUTION : DO NOT APPLY TOO MUCH FORCE TO THE BULB OR SOCKET CONTACTS. TOO
_______
MUCH FORCE CAN CAUSE PERMANENT DEFORMATION OF THE SOCKET, AND
AS A RESULT, ARCING AND THUS BULB FAILURE.
(2) Put the base of the lamp (1) into the lamp socket. Carefully push the
lamp (1) and make sure that the two locating spigots engage the slots
of the contact strip.
(3) Put the gasket (2) and the glass (3) in position on the navigation
light and install the two clips (4).
EFF :
ALL 33-41-11
Page 416
Aug 01/07
R
IAC
Subtask 33-41-11-861-051
Subtask 33-41-11-865-056
R D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R 1LA, 2LA, 10LV.
Subtask 33-41-11-710-051
E. Test
5. Close-up
________
Subtask 33-41-11-862-051
Subtask 33-41-11-410-051
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-41-11-942-051
C. Removal of Equipment
EFF :
ALL 33-41-11
Page 417
Aug 01/07
IAC
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-41-11
Page 418
Aug 01/06
IAC
LIGHT - NAVIGATION, TAIL (15LA) - REMOVAL/INSTALLATION
______________________________________________________
TASK 33-41-15-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-41-15-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
EFF :
ALL 33-41-15
Page 401
Aug 01/06
IAC
R
Subtask 33-41-15-941-050
B. Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the APU
tail-cone-exhaust area, Zone 317.
4. Procedure
_________
Subtask 33-41-15-020-051-A
WARNING : DO NOT REMOVE THE STROBE LIGHT FOR AT LEAST TEN MINUTES AFTER
_______
YOU DE-ENERGIZE THE ELECTRICAL CIRCUITS. THE HIGH VOLTAGE
ELECTRICAL CURRENT IN THE CAPACITOR OF THE STROBE LIGHT IS
DANGEROUS.
(3) Remove the tail navigation light (3) from the APU exhaust
access-fairing (4) sufficiently to get access to the electrical
connectors (5) and (6).
(4) Disconnect the electrical connectors (5) and (6) from the tail
navigation light (3).
EFF :
ALL 33-41-15
Page 402
Aug 01/06
IAC
R Tail Navigation Light 15LA
R Figure 401/TASK 33-41-15-991-001-A
EFF :
ALL 33-41-15
Page 403
Nov 01/04
IAC
TASK 33-41-15-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
Material No. 09-019 USA AMS 3267/3
LOW ADHESION CORROSION INHIBITING SEALANT
(Ref. 20-31-00)
Material No. 09-023 USA MIL-S-38249 TYPE I
FIRE WALL SEALANT (Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
EFF :
ALL 33-41-15
Page 404
May 01/05
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-41-15-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
4. Procedure
_________
Subtask 33-41-15-910-050
EFF :
ALL 33-41-15
Page 405
Aug 01/06
IAC
Subtask 33-41-15-420-051-A
(1) Remove the blanking caps from the electrical connectors (5) and (6).
(2) Make sure that the electrical connectors are clean and in the correct
condition.
(3) Connect the electrical connectors (5) and (6) to the tail navigation
light (3).
(4) Put the tail navigation light (3) in position on the APU exhaust
access-fairing (4).
(5) Install the the screws (1) and the washers (2).
(6) Clean the outer side of the tail navigation light (3) with a,
MISCELLANEOUS (Material No. 19-003).
(7) Apply the SEALANTS (Material No. 09-023), or the SEALANTS (Material
No. 09-019) to all sides of the mating flange of the tail navigation
light (3), the washers (2) and the screws (1).
Subtask 33-41-15-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LA, 2LA, 10LV, 1KD, 2KD.
Subtask 33-41-15-861-050
Subtask 33-41-15-710-050
E. Do the operational test of the tail navigation lights (Ref. TASK 33-41-
00-710-001) and (Ref. TASK 33-48-00-710-002).
EFF :
ALL 33-41-15
Page 406
Aug 01/06
R
IAC
5. Close-up
________
Subtask 33-41-15-942-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-41-15-862-050
EFF :
ALL 33-41-15
Page 407
Aug 01/06
R
IAC
TASK 33-41-15-000-002
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-41-15-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
EFF :
ALL 33-41-15
Page 408
Aug 01/06
IAC
R
Subtask 33-41-15-941-051
B. Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the APU
tail-cone-exhaust area, Zone 317.
4. Procedure
_________
Subtask 33-41-15-020-052
(5) Remove the lens (7) from the tail navigation light (1).
(7) Remove the clips (6) and (10) and the white lenses (5) and (11).
EFF :
ALL 33-41-15
Page 409
Aug 01/06
IAC
R Tail Navigation Light 15LA
R Figure 402/TASK 33-41-15-991-002
EFF :
ALL 33-41-15
Page 410
Nov 01/04
IAC
TASK 33-41-15-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-41-15
Page 411
May 01/08
IAC
3. __________
Job Set-up
Subtask 33-41-15-865-054
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
4. Procedure
_________
Subtask 33-41-15-910-051
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
Subtask 33-41-15-420-052
EFF :
ALL 33-41-15
Page 412
May 01/08
R
IAC
R (4) Put the white lenses (5) and (11) in position on the tail navigation
light (1) and install the clips (6) and (10).
R (6) Put the lens (7) in position on the tail navigation light (1).
R (7) Install the screws (9) each with a new sealing-ring (8).
Subtask 33-41-15-865-055
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LA, 2LA, 10LV, 1KD, 2KD.
Subtask 33-41-15-861-051
Subtask 33-41-15-710-051
R E. Do the operational test of the tail navigation lights (Ref. TASK 33-41-
R 00-710-001) and (Ref. TASK 33-48-00-710-002).
5. Close-up
________
Subtask 33-41-15-942-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-41-15-862-051
EFF :
ALL 33-41-15
Page 413
May 01/05
IAC
TRANSFORMER - TAIL NAVIGATION LIGHT (13LA) - REMOVAL/INSTALLATION
_________________________________________________________________
TASK 33-41-16-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-41-16-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
EFF :
ALL 33-41-16
Page 401
Aug 01/07
IAC
Subtask 33-41-16-010-050
B. Get Access
R (1) Put the access platform in the APU tail-cone exhaust area Zone 317.
R (2) Remove the APU exhaust access fairing 317AL (Ref. TASK 52-41-18-000-
R 001) or, as an alternative, the tail navigation light 15LA (Ref. TASK
R 33-41-15-000-001).
4. Procedure
_________
Subtask 33-41-16-020-051
R (5) Remove the transformer plate (7) with the transformer from the APU
R exhaust access fairing.
EFF :
ALL 33-41-16
Page 402
Aug 01/07
IAC
R Tail Navigation-Light Transformer 13LA
Figure 401/TASK 33-41-16-991-001
EFF :
ALL 33-41-16
Page 403
Aug 01/07
IAC
TASK 33-41-16-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-41-16
Page 404
Feb 01/08
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-41-16-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
4. Procedure
_________
R WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
_______
R MATERIAL.
R THIS MATERIAL IS DANGEROUS.
Subtask 33-41-16-910-050
(3) Apply the SEALANTS (Material No. 09-003) to the mating surfaces.
EFF :
ALL 33-41-16
Page 405
Aug 01/07
IAC
R (4) Apply the putty, SPECIAL MATERIALS (Material No. 05-002) to the
R screws (2) and (4) and the washers (3) and (5).
Subtask 33-41-16-420-050
R (1) Install the transformer plate (7) with the transformer in the APU
R exhaust access fairing.
R (2) Install the screw (4) and the washer (5) for bonding (Ref. TASK 20-
R 28-00-912-004).
R (4) Seal the screws (2) and (4) and the washers (3) and (5) with the
R SEALANTS (Material No. 09-023).
Subtask 33-41-16-410-050
R C. Install the APU exhaust access fairing 317AL (Ref. TASK 52-41-18-400-001)
R or, as an alternative, the tail navigation light 15LA (Ref. TASK 33-41-
R 15-400-001).
Subtask 33-41-16-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LA, 2LA, 10LV, 1KD, 2KD.
Subtask 33-41-16-710-050
E. Do the operational test ot the tail navigation lights (Ref. TASK 33-41-
00-710-001) and (Ref. TASK 33-48-00-710-002).
EFF :
ALL 33-41-16
Page 406
Aug 01/07
IAC
5. Close-up
________
Subtask 33-41-16-942-050
EFF :
ALL 33-41-16
Page 407
Aug 01/07
IAC
LANDING LIGHTS - DESCRIPTION AND OPERATION
__________________________________________
1. _______
General
R Two retractable landing lights are installed on the bottom of the wings at
R Zone 571 and 671. The lights operate through maximum operating speeds (VMo).
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
7LB LT-LANDING, L 571 571 33-42-11
8LB LT-LANDING, R 671 671 33-42-11
3. System
__________________
Description
(Ref. Fig. 001)
R The left-hand (LH) landing light 7LB and the right-hand (RH) landing light
R 8LB are installed on the bottom of the LH and RH wings. Each landing light
R has an independent extension/retraction and illumination circuit. Two toggle
R switches, LAND L 5LB and LAND R 6LB, control the landing light system. These
R switches are installed on the overhead panel 25VU in the cockpit. When the
R landing lights are extended, an indication LAND LT is shown on the cathode
R ray tube (CRT) as a memo message. The CRT is a part of the Electronic
R Centralized Aircraft Monitoring system (ECAM) (Ref. 31-52-00).
4. Power
____________
Supply
(Ref. Fig. 002)
R The 115V AC busbars, 101XP and 202XP, supply power to the LH and RH landing
R lights through the circuit breakers 1LB, 2LB, 3LB and 4LB. These circuit
R breakers are installed on panel 122VU in the cockpit. The circuit breakers
R 1LB and 2LB control the power supply to the LH and RH landing light
R step-down transformers. The circuit breakers 3LB and 4LB control the power
R supply to the LH and RH single-phase motors of the landing lights.
5. Interface
_________
Not Applicable
EFF :
ALL 33-42-00
Page 1
May 01/05
IAC
R Landing Lights - Component Location
Figure 001
EFF :
ALL 33-42-00
Page 2
Nov 01/04
IAC
R Landing Lights - Schematic
Figure 002
EFF :
ALL 33-42-00
Page 3
May 01/05
IAC
6. Component
_____________________
Description
(Ref. Fig. 002)
R The toggle switches LAND L 5LB and LAND R 6LB have three switch
R positions, which are labelled ON, OFF and RETRACT.
7. Operation/Control
________________________________
and Indicating
(Ref. Fig. 001)
R A. Two control switches 5LB and 6LB are installed on the overhead panel
R 25VU. The switch LAND L controls the left-hand landing light and the
switch LAND R controls the right-hand landing light. These switches are
operated from RETRACT to OFF to ON for extension and illumination of the
R landing lights. Then from ON to OFF to RETRACT, to set the landing lights
R to off and to retract them. These operations are as follows:
- RETRACT to OFF
Power is supplied to the extend coil of the related motor, through a
microswitch, to extend the related landing light.
- OFF to ON
Power is supplied to the related power relay, through the full-wave
rectifier and the closed contacts of a microswitch. This connects 115V
R AC, 400Hz, to the step-down transformer which decreases the voltage to
R 28V AC. The related landing light comes on.
- ON to OFF
This removes power from the related power relay and opens the contacts
of the microswitch. This removes 115V AC, 400 Hz, from the step-down
transformer and the related landing light goes off.
- OFF to RETRACT
EFF :
ALL 33-42-00
Page 4
May 01/05
IAC
Power is supplied to the retract coil of the related motor, which
R retracts the related landing light. The landing light stays off.
EFF :
ALL 33-42-00
Page 5
May 01/05
IAC
LANDING LIGHTS - DEACTIVATION/REACTIVATION
__________________________________________
TASK 33-42-00-040-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THERE ARE NO SIGNS OF FUEL CONTAMINATION IN THE
_______
LANDING LIGHT ASSEMBLY.
IF YOU FIND FUEL CONTAMINATION, NO PERSON MUST OPERATE THE LANDING
LIGHT UNTIL:
- YOU REPAIR THE FUEL LEAK
- YOU REPLACE THE LANDING LIGHT ASSEMBLY.
IF YOU DO NOT OBEY THIS PRECAUTION, IGNITION OF THE REMAINING FUEL IN
THE LANDING LIGHT CAN OCCUR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-42-00
Page 401
Feb 01/07
IAC
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-42-00-941-052
A. Safety Precautions
R (2) Put a WARNING NOTICE in position on panel 25VU to tell persons not to
R operate the landing lights.
R
R Subtask 33-42-00-860-051
R (a) In zone 571 (671), make sure the travel range of the landing
R light is clear.
R (b) In the cockpit, on the lighting panel 25VU, set the LAND L (R)
R switch to RETRACT.
EFF :
ALL 33-42-00
Page 402
Feb 01/08
IAC
R (c) Make sure the landing light retracts.
R (4) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE below the applicable
R zone 571(671).
Subtask 33-42-00-865-057
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 7LB
122VU LIGHTING/LANDING LT/L/CTL 3LB T05
122VU LIGHTING/LANDING LT/L/SPLY 1LB T04
FOR 8LB
122VU LIGHTING/LANDING LT/R/CTL 4LB T07
122VU LIGHTING/LANDING LT/R/SPLY 2LB T06
4. Procedure
_________
Subtask 33-42-00-040-050
(1) Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-052) across the
opening of the applicable landing light 7LB(8LB).
NOTE : Make sure that the tape is correctly installed and has no
____
bubbles, wrinkles or tears in it.
(2) Write a note in the aircraft technical log that the applicable
landing light 7LB(8LB) is deactivated.
EFF :
ALL 33-42-00
Page 403
Feb 01/08
IAC
R Landing Light Hole - Location
Figure 401/TASK 33-42-00-991-002
EFF :
ALL 33-42-00
Page 404
Nov 01/04
IAC
5. Close-up
________
Subtask 33-42-00-942-052
R A. Removal of Equipment
R (4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-42-00
Page 405
Feb 01/08
IAC
TASK 33-42-00-440-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THERE ARE NO SIGNS OF FUEL CONTAMINATION IN THE
_______
LANDING LIGHT ASSEMBLY.
IF YOU FIND FUEL CONTAMINATION, NO PERSON MUST OPERATE THE LANDING
LIGHT UNTIL:
- YOU REPAIR THE FUEL LEAK
- YOU REPLACE THE LANDING LIGHT ASSEMBLY.
IF YOU DO NOT OBEY THIS PRECAUTION, IGNITION OF THE REMAINING FUEL IN
THE LANDING LIGHT CAN OCCUR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-42-00
Page 406
Feb 01/08
R
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-42-00-941-053
A. Safety Precautions
R (2) Put a WARNING NOTICE in position on panel 25VU to tell persons not to
R operate the landing lights.
R
R Subtask 33-42-00-860-052
R (2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE below the applicable
R zone 571(671).
Subtask 33-42-00-865-059
R C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 7LB
122VU LIGHTING/LANDING LT/L/CTL 3LB T05
122VU LIGHTING/LANDING LT/L/SPLY 1LB T04
FOR 8LB
122VU LIGHTING/LANDING LT/R/CTL 4LB T07
122VU LIGHTING/LANDING LT/R/SPLY 2LB T06
EFF :
ALL 33-42-00
Page 407
Feb 01/08
IAC
4. Procedure
_________
Subtask 33-42-00-440-050
(1) Remove the high speed tape from the opening of the applicable landing
light 7LB(8LB).
(2) Remove the applicable landing light 7LB(8LB) (Ref. TASK 33-42-11-000-
001).
(3) Install the applicable landing light 7LB(8LB) (Ref. TASK 33-42-11-
400-003).
(4) Write a note in the aircraft technical log that the applicable
landing light 7LB(8LB) is reactivated.
5. Close-up
________
Subtask 33-42-00-865-060
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 7LB
1LB, 3LB
FOR 8LB
2LB, 4LB.
Subtask 33-42-00-942-053
B. Removal of Equipment
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-42-00
Page 408
Feb 01/08
IAC
LANDING LIGHTS - ADJUSTMENT/TEST
________________________________
TASK 33-42-00-710-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THERE ARE NO SIGNS OF FUEL CONTAMINATION IN THE
_______
LANDING LIGHT ASSEMBLY.
IF YOU FIND FUEL CONTAMINATION, NO PERSON MUST OPERATE THE LANDING
LIGHT UNTIL:
- YOU REPAIR THE FUEL LEAK
- YOU REPLACE THE LANDING LIGHT ASSEMBLY.
IF YOU DO NOT OBEY THIS PRECAUTION, IGNITION OF THE REMAINING FUEL IN
THE LANDING LIGHT CAN OCCUR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-42-00
Page 501
Feb 01/07
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-42-00-941-051
A. Safety Precautions
R (2) Put a WARNING NOTICE in position on the panel 25VU to tell persons
not to operate the landing lights.
Subtask 33-42-00-861-050
Subtask 33-42-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/LANDING LT/R/CTL 4LB T07
122VU LIGHTING/LANDING LT/R/SPLY 2LB T06
122VU LIGHTING/LANDING LT/L/CTL 3LB T05
122VU LIGHTING/LANDING LT/L/SPLY 1LB T04
EFF :
ALL 33-42-00
Page 502
Feb 01/07
IAC
4. Procedure
_________
Subtask 33-42-00-710-050
R CAUTION : DO NOT OPERATE THE RETRACTABLE LANDING LIGHT 7LB (8LB) FOR MORE
_______
R THAN ONE MINUTE WHEN THE AIRCRAFT IS ON THE GROUND. THE LANDING
R LIGHT CAN BECOME DAMAGED IF IT OPERATES WITH NO AIRFLOW TO KEEP
R THE LIGHT UNIT COOL. MAKE SURE THAT THERE IS A MINIMUM PERIOD
R OF FIVE MINUTES BETWEEN EACH OPERATION, TO LET THE TEMPERATURE
R OF THE LIGHT UNIT DECREASE.
(1) Make sure that the travel range(s) of the applicable landing light(s)
is(are) clear.
NOTE : This test is for the left landing light. For the right landing
____
light, use the indications in parenthesis.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. Set the LAND L(LAND R) switch to - the landing light extends fully in
OFF. not more than 10 seconds.
2. Set the LAND L(LAND R) switch to - the landing light comes on.
ON.
3. Set the LAND L(LAND R) switch to - the landing light goes off.
OFF.
4. Set the LAND L(LAND R) switch to - the landing light retracts in not
RETRACT. more than 10 seconds.
EFF :
ALL 33-42-00
Page 503
Feb 01/07
IAC
5. Close-up
________
Subtask 33-42-00-862-050
Subtask 33-42-00-942-051
B. Removal of Equipment
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
R
EFF :
ALL 33-42-00
Page 504
Nov 01/02
IAC
**ON A/C 001-012, 014-019,
TASK 33-42-00-820-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THERE ARE NO SIGNS OF FUEL CONTAMINATION IN THE
_______
LANDING LIGHT ASSEMBLY.
IF YOU FIND FUEL CONTAMINATION, NO PERSON MUST OPERATE THE LANDING
LIGHT UNTIL:
- YOU REPAIR THE FUEL LEAK
- YOU REPLACE THE LANDING LIGHT ASSEMBLY.
IF YOU DO NOT OBEY THIS PRECAUTION, IGNITION OF THE REMAINING FUEL IN
THE LANDING LIGHT CAN OCCUR.
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
001-012, 014-019, 33-42-00
Page 505
Nov 01/03
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-42-00-941-050
A. Safety Precautions
(2) Put a warning notice in position on panel 25VU to tell persons not to
operate the landing lights.
Subtask 33-42-00-010-050
B. Get Access
Subtask 33-42-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/LANDING LT/R/CTL 4LB T07
122VU LIGHTING/LANDING LT/R/SPLY 2LB T06
122VU LIGHTING/LANDING LT/L/CTL 3LB T05
122VU LIGHTING/LANDING LT/L/SPLY 1LB T04
EFF :
001-012, 014-019, 33-42-00
Page 506
Nov 01/02
R
IAC
Subtask 33-42-00-860-050
(1) Make sure that the travel range of the applicable landing light is
clear.
4. Procedure
_________
Subtask 33-42-00-865-052
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3LB, 4LB
Subtask 33-42-00-220-050
NOTE : The subsequent steps are for the left landing light. For the
____
right landing light, use the indications in parenthesis.
(2) On panel 25VU, set the LAND L(LAND R) switch to the OFF position.
(3) Measure the extension angle of the landing light with a vernier
protractor. Use the rear of the lamp housing as the datum surface.
Subtask 33-42-00-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/LANDING LT/R/CTL 4LB T07
122VU LIGHTING/LANDING LT/L/CTL 3LB T05
EFF :
001-012, 014-019, 33-42-00
Page 507
Nov 01/02
R
IAC
Landing-Light Extension-Limit-Switch Assembly
Figure 501/TASK 33-42-00-991-001
EFF :
001-012, 014-019, 33-42-00
Page 508
Nov 01/02
R
IAC
Subtask 33-42-00-820-052
CAUTION : DO NOT MAKE THE EXTENSION ANGLE MORE THAN 90 DEGS. THIS CAN
_______
CAUSE DAMAGE TO THE MOTOR.
Subtask 33-42-00-220-051
WARNING : MAKE SURE THAT THE TRAVEL RANGE OF THE LANDING LIGHT REMAINS
_______
CLEAR.
IF AN ADJUSTMENT IS MADE, IT IS POSSIBLE THAT THE LANDING LIGHT
WILL MOVE.
(1) Make sure that the landing light is in the extended position with the
adjustment screw against the extension limit switch.
(3) If necessary, do the adjustment steps again until the extension angle
is correct.
Subtask 33-42-00-865-056
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LB, 2LB, 3LB, 4LB.
Subtask 33-42-00-710-051
G. Operational Test
(1) On panel 25VU, put the applicable landing light switch to the RETRACT
position.
(2) Do an operational test of the applicable landing light (Ref. TASK 33-
42-00-710-001).
EFF :
001-012, 014-019, 33-42-00
Page 509
Nov 01/02
R
IAC
5. Close-up
________
Subtask 33-42-00-862-051
Subtask 33-42-00-942-050
B. Removal of Equipment
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
001-012, 014-019, 33-42-00
Page 510
Nov 01/02
IAC
LIGHT - LANDING (7LB,8LB) - REMOVAL/INSTALLATION
________________________________________________
TASK 33-42-11-000-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THERE ARE NO SIGNS OF FUEL CONTAMINATION IN THE
_______
LANDING LIGHT ASSEMBLY.
IF YOU FIND FUEL CONTAMINATION, NO PERSON MUST OPERATE THE LANDING
LIGHT UNTIL:
- YOU REPAIR THE FUEL LEAK
- YOU REPLACE THE LANDING LIGHT ASSEMBLY.
IF YOU DO NOT OBEY THIS PRECAUTION, IGNITION OF THE REMAINING FUEL IN
THE LANDING LIGHT CAN OCCUR.
R CAUTION : WHEN YOU REPLACE A LANDING LIGHT ASSEMBLY, EXAMINE THE APPLICABLE
_______
R LANDING LIGHT ASSEMBLY FOR SIGNS OF FUEL CONTAMINATION. IF YOU FIND
R FUEL CONTAMINATION, EXAMINE THE ITEMS THAT FOLLOW FOR SIGNS OF FUEL
R LEAKAGE:
R - THE FUEL PUMP(S) 21QA(26QA) OR 25QA(22QA)
R - THE WATER DRAIN VALVE 25QM(26QM) DIRECTLY FORWARD OF THE LANDING
R LIGHT ASSEMBLY.
R REFER TO AMM 28-11-00-06 FOR LEAKAGE LIMITS AND REPAIR AS NECESSARY.
R IF YOU DO NOT REPAIR THE LEAK, NO PERSONS MUST OPERATE THE APPLICABLE
R LANDING LIGHT UNTIL:
R - THE LEAK IS REPAIRED
R - THE LANDING LIGHT ASSEMBLY IS REPLACED.
1. __________________
Reason for the Job
Self Explanatory
EFF :
ALL 33-42-11
Page 401
May 01/04
IAC
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-42-11-941-052
A. Safety Precautions
(2) Put a warning notice in the cockpit to tell persons not to operate
the landing lights.
EFF :
ALL 33-42-11
Page 402
May 01/06
R
IAC
Subtask 33-42-11-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/LANDING LT/R/CTL 4LB T07
122VU LIGHTING/LANDING LT/R/SPLY 2LB T06
122VU LIGHTING/LANDING LT/L/CTL 3LB T05
122VU LIGHTING/LANDING LT/L/SPLY 1LB T04
Subtask 33-42-11-010-050
C. Get Access
4. Procedure
_________
Subtask 33-42-11-210-058
(1) Examine the landing light assembly for signs of fuel contamination.
(2) If you find fuel contamination, examine the items that follow for
fuel leakage:
- the fuel pumps 21QA(26QA) and 25QA(22QA) (Ref. TASK 28-21-51-000-
001)
- the water drain valve 25QM(26QM) (Ref. TASK 28-11-41-000-003)
- the wing tank structure (Ref. TASK 28-11-00-280-002).
Repair the leak(s) as necessary.
EFF :
ALL 33-42-11
Page 403
Aug 01/06
IAC
Landing Light 7LB (8LB)
Figure 401/TASK 33-42-11-991-002
EFF :
ALL 33-42-11
Page 404
Nov 01/02
R
IAC
Subtask 33-42-11-020-050
(1) Disconnect the electrical connector (4) from the light assembly (1).
EFF :
ALL 33-42-11
Page 405
May 01/06
R
IAC
TASK 33-42-11-400-003
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THERE ARE NO SIGNS OF FUEL CONTAMINATION IN THE
_______
LANDING LIGHT ASSEMBLY.
IF YOU FIND FUEL CONTAMINATION, NO PERSON MUST OPERATE THE LANDING
LIGHT UNTIL:
- YOU REPAIR THE FUEL LEAK
- YOU REPLACE THE LANDING LIGHT ASSEMBLY.
IF YOU DO NOT OBEY THIS PRECAUTION, IGNITION OF THE REMAINING FUEL IN
THE LANDING LIGHT CAN OCCUR.
CAUTION : WHEN YOU REPLACE A LANDING LIGHT ASSEMBLY, EXAMINE THE APPLICABLE
_______
LANDING LIGHT ASSEMBLY FOR SIGNS OF FUEL CONTAMINATION. IF YOU FIND
FUEL CONTAMINATION, EXAMINE THE ITEMS THAT FOLLOW FOR SIGNS OF FUEL
LEAKAGE:
- THE FUEL PUMP(S) 21QA(26QA) OR 25QA(22QA)
- THE WATER DRAIN VALVE 25QM(26QM) DIRECTLY FORWARD OF THE LANDING
LIGHT ASSEMBLY.
REFER TO AMM 28-11-00-06 FOR LEAKAGE LIMITS AND REPAIR AS NECESSARY.
IF YOU DO NOT REPAIR THE LEAK, NO PERSONS MUST OPERATE THE APPLICABLE
LANDING LIGHT UNTIL:
- THE LEAK IS REPAIRED
- THE LANDING LIGHT ASSEMBLY IS REPLACED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-42-11
Page 406
May 01/06
R
IAC
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-42-11-941-055
A. Safety Precautions
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the landing lights.
EFF :
ALL 33-42-11
Page 407
May 01/06
IAC
Subtask 33-42-11-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/LANDING LT/R/CTL 4LB T07
122VU LIGHTING/LANDING LT/R/SPLY 2LB T06
122VU LIGHTING/LANDING LT/L/CTL 3LB T05
122VU LIGHTING/LANDING LT/L/SPLY 1LB T04
Subtask 33-42-11-860-050
4. Procedure
_________
Subtask 33-42-11-420-050
(1) Clean the component interface and/or the adjacent area with a clean
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
EFF :
ALL 33-42-11
Page 408
Aug 01/06
IAC
(c) Apply Prime coating 1200 on the light assembly (1) and install
the seal (3) with BONDING AND ADHESIVE COMPOUNDS (Material No.
08-004A).
(5) If you install the assembly you removed, examine the lamp reflector,
the lamp glass and the electrical connector for correct condition.
Subtask 33-42-11-420-052
(1) Install the light assembly (1) on the wing bottom skin.
(3) Remove the blanking cap from the electrical connector (4).
(4) Make sure that the electrical connector (4) is in the correct
condition.
(5) Connect the electrical connector (4) to the light assembly (1). Make
sure that the connector orientation will let you install a drip loop.
(Ref. Fig. 401/TASK 33-42-11-991-002)
(6) Make sure that the extension angle of the landing light is correct
(Ref. TASK 33-42-00-820-001).
Subtask 33-42-11-420-052-A
(1) Install the light assembly (1) on the wing bottom skin.
(3) Remove the blanking cap from the electrical connector (4).
(4) Make sure that the electrical connector (4) is in the correct
condition.
EFF :
ALL 33-42-11
Page 409
Aug 01/06
R
IAC
(5) Connect the electrical connector (4) to the light assembly (1). Make
sure that the connector orientation will let you install a drip loop.
(Ref. Fig. 401/TASK 33-42-11-991-002)
Subtask 33-42-11-420-052-B
(1) Install the light assembly (1) on the wing bottom skin.
(3) Remove the blanking cap from the electrical connector (4).
(4) Make sure that the electrical connector (4) is in the correct
condition.
(5) Connect the electrical connector (4) to the light assembly (1). Make
sure that the connector orientation will let you install a drip loop.
(Ref. Fig. 401/TASK 33-42-11-991-002)
(6) Clean the electrical connector (4) with a MISCELLANEOUS (Material No.
19-003) made moist with CLEANING AGENTS (Material No. 11-026).
Subtask 33-42-11-865-058
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LB, 2LB, 3LB, 4LB.
EFF :
ALL 33-42-11
Page 410
Feb 01/07
IAC
Subtask 33-42-11-710-051
D. Operational Test
(1) Do an operational test of the applicable landing light (Ref. TASK 33-
42-00-710-001).
(2) Clean the landing light glass with a clean MISCELLANEOUS (Material
No. 19-003).
5. Close-up
________
Subtask 33-42-11-942-050
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-42-11
Page 411
Aug 01/06
R
IAC
TASK 33-42-11-000-002
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
WARNING : MAKE SURE THAT THERE ARE NO SIGNS OF FUEL CONTAMINATION IN THE
_______
LANDING LIGHT ASSEMBLY.
IF YOU FIND FUEL CONTAMINATION, NO PERSON MUST OPERATE THE LANDING
LIGHT UNTIL:
- YOU REPAIR THE FUEL LEAK
- YOU REPLACE THE LANDING LIGHT ASSEMBLY.
IF YOU DO NOT OBEY THIS PRECAUTION, IGNITION OF THE REMAINING FUEL IN
THE LANDING LIGHT CAN OCCUR.
CAUTION : WHEN YOU REPLACE A LANDING LIGHT LAMP, EXAMINE THE APPLICABLE LANDING
_______
LIGHT ASSEMBLY FOR SIGNS OF FUEL CONTAMINATION. IF YOU FIND FUEL
CONTAMINATION, EXAMINE THE ITEMS THAT FOLLOW FOR SIGNS OF FUEL
LEAKAGE:
- THE FUEL PUMP(S) 21QA(26QA) OR 25QA(22QA)
- THE WATER DRAIN VALVE 25QM(26QM) DIRECTLY FORWARD OF THE LANDING
LIGHT ASSEMBLY.
REFER TO AMM 28-11-00-06 FOR LEAKAGE LIMITS AND REPAIR AS NECESSARY.
IF YOU DO NOT REPAIR THE LEAK, NO PERSONS MUST OPERATE THE APPLICABLE
LANDING LIGHT UNTIL:
- THE LEAK IS REPAIRED
- THE LANDING LIGHT ASSEMBLY IS REPLACED.
1. __________________
Reason for the Job
Self Explanatory
EFF :
ALL 33-42-11
Page 412
May 01/06
R
IAC
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-42-11-941-053
A. Safety Precautions
(2) Put a warning notice in the cockpit to tell persons not to operate
the landing lights.
Subtask 33-42-11-010-051
B. Get Access
(1) Put the access platform below the applicable landing light.
EFF :
ALL 33-42-11
Page 413
May 01/06
R
IAC
Subtask 33-42-11-860-051
(a) In zone 571 (671), make sure the travel range of the landing
light is clear.
(b) In the cockpit, on the lighting panel 25VU, set the LAND L (R)
switch to OFF.
Subtask 33-42-11-865-055
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/LANDING LT/R/CTL 4LB T07
122VU LIGHTING/LANDING LT/R/SPLY 2LB T06
122VU LIGHTING/LANDING LT/L/CTL 3LB T05
122VU LIGHTING/LANDING LT/L/SPLY 1LB T04
EFF :
ALL 33-42-11
Page 414
Aug 01/06
IAC
R **ON A/C ALL
4. Procedure
_________
Subtask 33-42-11-210-059
(1) Examine the landing light assembly for signs of fuel contamination.
(2) If you find fuel contamination, examine the items that follow for
fuel leakage:
- the fuel pumps 21QA(26QA) and 25QA(22QA) (Ref. TASK 28-21-51-000-
001)
- the water drain valve 25QM(26QM) (Ref. TASK 28-11-41-000-003)
- the wing tank structure (Ref. TASK 28-11-00-280-002).
Repair the leak(s) as necessary.
Subtask 33-42-11-020-052
(1) Hold the lamp (7) and remove the screw (5) and the clamp (6).
(2) Remove the lamp (7) from the lamp housing (1) to get access to the
electrical terminals (3).
(3) Remove the screws (2) and disconnect the two electrical terminals
(3). Remove the lamp (7).
EFF :
ALL 33-42-11
Page 415
May 01/06
IAC
Landing Light Lamp
Figure 402/TASK 33-42-11-991-004
EFF :
ALL 33-42-11
Page 416
May 01/06
R
IAC
TASK 33-42-11-400-004
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
WARNING : MAKE SURE THAT THERE ARE NO SIGNS OF FUEL CONTAMINATION IN THE
_______
LANDING LIGHT ASSEMBLY.
IF YOU FIND FUEL CONTAMINATION, NO PERSON MUST OPERATE THE LANDING
LIGHT UNTIL:
- YOU REPAIR THE FUEL LEAK
- YOU REPLACE THE LANDING LIGHT ASSEMBLY.
IF YOU DO NOT OBEY THIS PRECAUTION, IGNITION OF THE REMAINING FUEL IN
THE LANDING LIGHT CAN OCCUR.
CAUTION : WHEN YOU REPLACE A LANDING LIGHT LAMP, EXAMINE THE APPLICABLE LANDING
_______
LIGHT ASSEMBLY FOR SIGNS OF FUEL CONTAMINATION. IF YOU FIND FUEL
CONTAMINATION, EXAMINE THE ITEMS THAT FOLLOW FOR SIGNS OF FUEL
LEAKAGE:
- THE FUEL PUMP(S) 21QA(26QA) OR 25QA(22QA)
- THE WATER DRAIN VALVE 25QM(26QM) DIRECTLY FORWARD OF THE LANDING
LIGHT ASSEMBLY.
REFER TO AMM 28-11-00-06 FOR LEAKAGE LIMITS AND REPAIR AS NECESSARY.
IF YOU DO NOT REPAIR THE LEAK, NO PERSONS MUST OPERATE THE APPLICABLE
LANDING LIGHT UNTIL:
- THE LEAK IS REPAIRED
- THE LANDING LIGHT ASSEMBLY IS REPLACED.
1. __________________
Reason for the Job
Self Explanatory
EFF :
ALL 33-42-11
Page 417
May 01/06
R
IAC
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-42-11-941-056
A. Safety Precautions
R (2) Make sure that the WARNING NOTICE is in position to tell persons not
to operate the landing lights.
Subtask 33-42-11-860-052
(1) Make sure that the landing light is in the extended position.
(2) Make sure that the LAND L (R) switch (in the cockpit) is set to OFF
position.
EFF :
ALL 33-42-11
Page 418
May 01/07
IAC
R (3) Make sure that the ACCESS PLATFORM 1M (3 FT) is in position below the
applicable landing light.
Subtask 33-42-11-865-056
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/LANDING LT/R/CTL 4LB T07
122VU LIGHTING/LANDING LT/R/SPLY 2LB T06
122VU LIGHTING/LANDING LT/L/CTL 3LB T05
122VU LIGHTING/LANDING LT/L/SPLY 1LB T04
4. Procedure
_________
Subtask 33-42-11-420-053
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Make sure that the electrical terminals (3) and the lamp terminals
(7) are clean and in the correct condition.
Subtask 33-42-11-420-051
(1) Make sure the seal (4) is correctly installed in the lamp housing
(1).
(2) Connect the two electrical terminals (3) to the lamp (7) with the
screws (2). Tighten the screws (2).
(3) Install the lamp (7) in the lamp housing (1). Make sure the filament
of the lamp is horizontal, as shown on the filament position plate
(8).
EFF :
ALL 33-42-11
Page 419
May 01/07
IAC
(4) Install the clamp (6) with the screw (5). Tighten the screw (5).
Subtask 33-42-11-865-057
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LB, 2LB, 3LB, 4LB.
Subtask 33-42-11-710-052
D. Operational Test
(1) Do the operational test of the landing light (Ref. TASK 33-42-00-710-
001).
5. Close-up
________
Subtask 33-42-11-860-053
Subtask 33-42-11-942-051
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-42-11
Page 420
May 01/07
IAC
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-42-11
Page 421
May 01/06
IAC
RUNWAY TURNOFF LIGHTS - DESCRIPTION AND OPERATION
_________________________________________________
1. _______
General
The runway turnoff lights illuminate the lateral areas of the runway.
Two light units are installed on the nose landing gear.
2. Component
__________________
Location
(Ref. Fig. 001)
_______________________________________________________________________________
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
2LC SW-EXT LT/RWY TURN OFF 25VU 210
3LC1 LT-RUNWAY TURNOFF, L 711 33-43-11
3LC2 LT-RUNWAY TURNOFF, R 711 33-43-11
6LC RELAY-PWR SPLY, RWY TURN OFF LT 103VU 126
3. ___________
Description
(Ref. Fig. 002)
The runway turnoff-light system consists of:
R - two single-filament lamps (or halogen lamps in alternate solution) 3LC1
R and 3LC2, which are installed in a fixed position on the nose landing
R gear. Each lamp is rated at 150 Watts.
- a transformer, which produces the rated operating voltage
- a power control relay 6LC
- a control switch 2LC, which is installed in the cockpit on the overhead
panel.
4. _________
Operation
(Ref. Fig. 002)
The 115 VAC busbars 204XP and 103XP supply power to the runway turnoff-light
system, through circuit breakers 1LC1 and 1LC2. A switch 2LC controls the
control circuit, it gets power from the 28 VDC busbar 202PP through circuit
breaker 2LR. A ground signal for the power control relay 6LC is available
from the landing gear computer.
The ground signal is connected, when the nose landing gear is locked down.
The power control relay 6LC and the control switch 2LC get power when the
busbars are energized and the circuit breakers are closed. The runway
turnoff lights come on when the switch 2LC is in the RWY TURN OFF position.
When the nose landing gear is unlocked, the ground signal for the power
control relay is disconnected. The runway turnoff lights 3LC1 and 3LC2 go
off.
EFF :
ALL 33-43-00
Page 1
May 01/06
IAC
R Runway Turnoff Lights - Component Location
Figure 001
EFF :
ALL 33-43-00
Page 2
May 01/06
IAC
Runway Turnoff Lights - Schematic
Figure 002
EFF :
ALL 33-43-00
Page 3
Feb 01/96
IAC
RUNWAY TURNOFF LIGHTS - DEACTIVATION/REACTIVATION
_________________________________________________
TASK 33-43-00-040-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-43-00
Page 401
Feb 01/08
IAC
3. __________
Job Set-up
Subtask 33-43-00-941-051
A. Safety Precautions
Subtask 33-43-00-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
4. Procedure
_________
Subtask 33-43-00-040-051
CAUTION : IF THE LAMP IS REMOVED, SAFETY THE WIRES WITH HIGH-SPEED TAPE.
_______
R (1) You must remove (Ref. TASK 33-43-11-000-001) the runway turnoff light
R if there are these two conditions:
- if there are cracks on the front face, and
- if there is movement of the parts of the front glass (the
supporting structure does not hold them tightly).
R (2) If you do not remove the cracked runway turnoff-light, you can do an
alternative repair as follows:
(b) Dry the surface of the runway turnoff-light lens with a clean
MISCELLANEOUS (Material No. 19-003).
EFF :
ALL 33-43-00
Page 402
Feb 01/08
IAC
(c) Apply SPECIAL MATERIALS (Material No. 05-065) or BONDING AND
ADHESIVE COMPOUNDS (Material No. 08-052) to cover the crack(s).
NOTE : Make sure that the tape is correctly installed and has no
____
bubbles, wrinkles or tears in it.
R (d) Let the tape cure for 15 minutes minimum at a minimum temperature
R of 15 deg.C (59.00 deg.F)
5. Close-up
________
Subtask 33-43-00-865-054
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LC1, 1LC2.
Subtask 33-43-00-942-052
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-43-00
Page 403
Feb 01/08
IAC
TASK 33-43-00-440-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-43-00-941-052
A. Safety Precautions
Subtask 33-43-00-865-055
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
EFF :
ALL 33-43-00
Page 404
Aug 01/07
R
IAC
4. Procedure
_________
Subtask 33-43-00-440-050
(1) Replace the runway turnoff light (Ref. TASK 33-43-11-000-001) and
(Ref. TASK 33-43-11-400-001).
5. Close-up
________
Subtask 33-43-00-865-056
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LC1, 1LC2.
Subtask 33-43-00-942-053
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-43-00
Page 405
Aug 01/07
R
IAC
RUNWAY TURNOFF LIGHTS - ADJUSTMENT/TEST
_______________________________________
TASK 33-43-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-43-00-861-051
Subtask 33-43-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/CTL 2LR W09
122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
EFF :
ALL 33-43-00
Page 501
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-43-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the RWY TURN OFF switch to - the runway turnoff lights go off.
OFF.
5. Close-up
________
Subtask 33-43-00-862-051
EFF :
ALL 33-43-00
Page 502
Aug 01/06
IAC
LIGHT - RUNWAY TURNOFF (3LC1,3LC2) - REMOVAL/INSTALLATION
_________________________________________________________
TASK 33-43-11-000-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-43-11
Page 401
May 01/06
R
IAC
3. __________
Job Set-up
Subtask 33-43-11-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 3LC1
R
122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
R
FOR 3LC2
R
122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
4. Procedure
_________
Subtask 33-43-11-020-050
(2) Put the blanking cap on the disconnected electrical connector (5) and
on its support.
(3) Remove the two nuts (1) and the washers (2). During this operation,
hold the optical unit.
EFF :
ALL 33-43-11
Page 402
Aug 01/06
IAC
Runway Turnoff Light
Figure 401/TASK 33-43-11-991-001
EFF :
ALL 33-43-11
Page 403
Feb 01/96
IAC
TASK 33-43-11-400-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-43-11-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 3LC1
122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
FOR 3LC2
122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
EFF :
ALL 33-43-11
Page 404
Feb 01/08
IAC
4. Procedure
_________
Subtask 33-43-11-420-050
(3) Make sure that the filament of the lamp and the lens are in the
correct condition.
(4) Remove the blanking cap from the electrical connector (5) and from
the support.
(5) Make sure that the electrical connector (5) is in the correct
condition.
(7) Put the optical unit (4) in position on its support (3). Hold it in
this position.
(8) Apply SPECIAL MATERIALS (Material No. 05-002) to the screws (1).
(9) Install the optical unit (4) with the two screws (1) and the washers
(2).
Subtask 33-43-11-420-050-A
(3) Make sure that the filament of the lamp and the lens are in the
correct condition.
EFF :
ALL 33-43-11
Page 405
Feb 01/08
R
IAC
(4) Remove the blanking cap from the electrical connector (5) and from
the support.
(5) Make sure that the electrical connector (5) is in the correct
condition.
(7) Put the optical unit (4) in position on its support (3). Hold it in
this position.
(8) Apply SPECIAL MATERIALS (Material No. 05-002) to the screws (1).
(9) Install the optical unit (4) with the two screws (1) and the washers
(2).
Subtask 33-43-11-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 3LC1
R 1LC1
FOR 3LC2
R 1LC2
Subtask 33-43-11-710-051
(1) Do the operational test of the runway turnoff lights (Ref. TASK 33-
43-00-710-001).
5. Close-up
________
Subtask 33-43-11-942-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-43-11
Page 406
May 01/08
IAC
TASK 33-43-11-960-002
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-43-11
Page 407
May 01/08
R
IAC
INTENTIONALLY BLANK
R
33-43-11
Page 408
Feb 01/08
IAC
R C. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 33-43-11-865-064
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R FOR 3LC1
R 122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
R FOR 3LC2
R 122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
R 4. Procedure
_________
R Subtask 33-43-11-020-056
R (c) If the gasket (3) on the retainer (2) is defective, remove and
R discard it.
R (d) Pull the lamp (4) away from the support (6) and disconnect the
R two electrical terminals (5).
EFF :
ALL 33-43-11
Page 409
Aug 01/06
IAC
R Lamp of the Runway Turnoff Light
R Figure 402/TASK 33-43-11-991-003- 12 (SHEET 1)
EFF :
ALL 33-43-11
Page 410
Aug 01/06
IAC
R Lamp of the Runway Turnoff Light
R Figure 402/TASK 33-43-11-991-003- 22 (SHEET 2)
EFF :
ALL 33-43-11
Page 411
Aug 01/06
IAC
R (2) For the lamp (4) (alternate configuration):
R (a) Remove the screw (8), the washer (7) and the insulating washer
R (9).
R (c) Pull the lamp (4) away from the support (6).
R (f) If the gasket (3) on the support (6) is defective, remove and
R discard it.
R Subtask 33-43-11-420-056
R (b) Connect the two electrical terminals (5) to the lamp (4) and put
R it in position on its support (6). Hold it in this position.
R (f) TORQUE the screw (1) to between 6 and 7 lbf.in (0.06 and 0.07
R m.daN).
R (c) Connect the two electrical terminals (5) to the lamp (4) and put
R it in position on its support (6). Hold it in this position.
EFF :
ALL 33-43-11
Page 412
Aug 01/06
IAC
(d) Put the retainer (2) in position.
(e) Install the insulating washer (9), the washer (7), and the screw
(8).
Subtask 33-43-11-865-065
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 3LC1
- 1LC1.
FOR 3LC2
- 1LC2.
Subtask 33-43-11-710-054
(1) Do the operational test of the runway turnoff lights (Ref. TASK 33-
43-00-710-001).
5. Close-up
________
Subtask 33-43-11-942-054
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-43-11
Page 413
Feb 01/07
IAC
TASK 33-43-11-960-001
Replacement of the Halogen Bulb of the Runway Turnoff Light (3LC1, 3LC2)
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-43-11
Page 414
May 01/07
IAC
R D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-43-11-865-062
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 3LC1
122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
FOR 3LC2
122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
4. Procedure
_________
Subtask 33-43-11-020-054
(1) Remove the screw (2), the washer (3) and the insulating washer (1).
(3) Pull the lens (5) away from the support (9).
(4) Remove the two screws (6) and the two washers (7).
EFF :
ALL 33-43-11
Page 415
May 01/07
IAC
Replacement of the Halogen Bulb
R Figure 403/TASK 33-43-11-991-006
EFF :
ALL 33-43-11
Page 416
Aug 01/06
IAC
Subtask 33-43-11-420-054
NOTE : Make sure that the pinched seal (11) end points forward.
____
(2) Install the two washers (7) and the two screws (6).
(3) Tighten the two screws (6). Apply one more quarter turn to the two
screws (6) after contact.
R (6) Clean the surface of the lens (5) with CLEANING AGENTS (Material No.
R 11-010) made moist with warm soap solution.
R (7) Dry the surface of the lens (5) with a clean MISCELLANEOUS (Material
R No. 19-003).
R (10) Install the insulating washer (1), the washer (3), and the screw (2).
R (11) Put a gage with a thickness of 8 mm (0.3149 in.) between the two
brackets of the retainer (4).
R (12) Tighten the screw (2) until the two brackets touch the gage without
visual signs of distortion of the retainer (4).
Subtask 33-43-11-865-063
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 3LC1
- 1LC1.
FOR 3LC2
- 1LC2.
EFF :
ALL 33-43-11
Page 417
May 01/07
IAC
Subtask 33-43-11-710-053
D. Operational Test
(1) Do the operational test of the runway turnoff lights (Ref. TASK 33-
43-00-710-001).
5. Close-up
________
Subtask 33-43-11-942-053
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-43-11
Page 418
May 01/07
R
IAC
TASK 33-43-11-960-003
Replacement of the Lens and the mirror of the Runway Turnoff Light (3LC1, 3LC2)
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-43-11
Page 419
May 01/07
IAC
R C. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 33-43-11-865-066
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R FOR 3LC1
R 122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
R FOR 3LC2
R 122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
R 4. Procedure
_________
R Subtask 33-43-11-020-057
R (1) Remove the screw (2), the washer (3) and the insulating washer (1).
R (5) Pull the lens (5) away from the mirror (10).
R (6) Remove the two screws (6) and the two washers (7).
R (8) If the gasket (12) on the support (13) is defective, remove and
R discard it.
EFF :
ALL 33-43-11
Page 420
Aug 01/06
IAC
R Lens and Mirror of the Runway Turnoff Light
R Figure 404/TASK 33-43-11-991-007
EFF :
ALL 33-43-11
Page 421
Aug 01/06
IAC
R Subtask 33-43-11-420-057
R (1) Carefully put the halogen bulb (9) in position on a new mirror (10).
R NOTE : Make sure that the pinched seal (8) end points forward.
____
R (2) Install the two washers (7) and the two screws (6).
R (3) Tighten the two screws (6). Tighten them one more quarter turn after
R contact.
R (5) Put a new lens (5) in position on a new mirror (10) with the halogen
R bulb installed.
R (8) Install the insulating washer (1), the washer (3), and the screw (2).
R (9) Put a gage with a thickness of 8 mm (0.3149 in.) between the two
R brackets of the retainer (4).
R (10) Tighten the screw (2) until the two brackets touch the gage without
R visual signs of distortion of the retainer (4).
R Subtask 33-43-11-865-067
R C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
R breaker(s):
R FOR 3LC1
R - 1LC1.
R FOR 3LC2
R - 1LC2.
EFF :
ALL 33-43-11
Page 422
Aug 01/06
IAC
R Subtask 33-43-11-710-055
R D. Operational Test
R (1) Do the operational test of the runway turnoff lights (Ref. TASK 33-
R 43-00-710-001).
R 5. Close-up
________
R Subtask 33-43-11-942-055
R A. Make sure that the work area is clean and clear of tool(s) and other
R items.
EFF :
ALL 33-43-11
Page 423
Aug 01/06
IAC
LIGHT - RUNWAY TURNOFF (3LC1,3LC2) - ADJUSTMENT/TEST
____________________________________________________
TASK 33-43-11-730-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
R CAUTION : MAKE SURE THAT THE ITEMS IN THE FIXTURES, TOOLS, TEST AND SUPPORT
_______
R EQUIPMENT PARAGRAPH ARE APPLICABLE TO YOUR AIRCRAFT (THIS LIST IS
R NOT CUSTOMIZED). REFER TO THE APPLICABLE SUBTASKS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-43-11
Page 501
May 01/06
IAC
3. __________
Job Set-up
Subtask 33-43-11-865-058
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 3LC1
122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
FOR 3LC2
122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
Subtask 33-43-11-860-050
(1) Make sure that the aircraft fuselage is in the horizontal position.
4. Procedure
_________
Subtask 33-43-11-820-050
(1) Install the ADJUSTING TOOL - TURN OFF LIGHT (98D33403502000) (3) on
the light.
(2) Set the clinometer to an angle of 0 deg. +/-2 minutes. Put it against
the tool (3) to make sure that the installation is horizontal.
(3) Adjust the tool (3) if necessary and tighten the nuts (2).
R
EFF :
001-012, 014-099, 33-43-11
Page 502
May 01/06
IAC
Adjustment of the Runway Turnoff Light
Figure 501/TASK 33-43-11-991-004
R
EFF :
001-012, 014-099, 33-43-11
Page 503
May 01/06
IAC
(c) Loosen the nuts (1), move the light to get the angle of 2 deg. 30
minutes +/-2 minutes.
(d) TORQUE the nuts (1) to between 0.6 and 0.75 m.daN (53.09 and
66.37 lbf.in) and make sure that the adjustment is correct.
(e) Remove the clinometer and the ADJUSTING TOOL - TURN OFF LIGHT
(98D33403502000).
5. Close-up
________
Subtask 33-43-11-865-059
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LC1, 1LC2
R
EFF :
001-012, 014-099, 33-43-11
Page 504
May 01/06
IAC
TASK 33-43-11-730-001- 01
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-43-11
Page 505
May 01/06
IAC
3. __________
Job Set-up
Subtask 33-43-11-865-060
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 3LC1
122VU LIGHTING/EXT LT/RWY TURN OFF/L 1LC1 W06
FOR 3LC2
122VU LIGHTING/EXT LT/RWY TURN OFF/R 1LC2 W05
Subtask 33-43-11-860-051
4. Procedure
_________
Subtask 33-43-11-820-051
(1) Install the screen (2) in front of the aircraft. The distance between
the screen and the nose landing gear must be 10 m (32.80 ft.).
(2) Turn the screen (2) 45 deg. away from the aircraft axis (with the
nose landing gear as a rotation axis).
(a) Measure the distance X between the aircraft centerline and the
ground. To do this, measure the distance between one of the
leveling triangles and the ground (Ref. AMM 11-21-08 P.Block
001).
R
EFF :
001-012, 014-099, 33-43-11
Page 506
May 01/06
IAC
NOTE : To get an accurate distance, the aircraft must be on a
____
horizontal surface.
(b) Subtract the vertical value 3.091 m (10.14 ft.) from the distance
X. This gives you the value Y which is the distance between
the ground and the target on the screen. You must adjust the
light beam to the center of the target.
(c) Loosen the nuts (1), and move the light to adjust the light beam
on the target.
(d) TORQUE the nuts (1) to between 0.6 and 0.75 m.daN (53.09 and
66.37 lbf.in) and make sure that the adjustment is correct.
5. Close-up
________
Subtask 33-43-11-865-061
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LC1, 1LC2
R
EFF :
001-012, 014-099, 33-43-11
Page 507
May 01/06
IAC
Adjustment of the Runway Turnoff Light - Alternative Procedure
Figure 502/TASK 33-43-11-991-005- 12 (SHEET 1)
R
EFF :
001-012, 014-099, 33-43-11
Page 508
May 01/06
IAC
Adjustment of the Runway Turnoff Light - Alternative Procedure
Figure 502/TASK 33-43-11-991-005- 22 (SHEET 2)
R
EFF :
001-012, 014-099, 33-43-11
Page 509
May 01/06
IAC
TAXI AND TAKE OFF LIGHTS - DESCRIPTION AND OPERATION
____________________________________________________
1. _______
General
The taxi and take-off light system illuminates the runway during the taxi
and the take off phase. Two light units provide the lighting. They are
installed on the nose landing gear.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
4LR SW-EXT LT/NOSE 25VU 210
5LR RELAY-PWR SPLY, TO LT 107VU 126
6LR RELAY-PWR SPLY, TAXI LT 107VU 126
7LR LT-TAKE OFF 711 33-46-11
8LR LT-TAXI 711 33-46-12
3. __________________
System Description
R
(Ref. Fig. 002)
The taxi and take-off light system consists of:
R - a single filament light (or halogen lamp in alternate solution) 8LR, rated
R at 450 Watts, installed on the nose landing gear in a fixed position
- a transformer, to produce rated operating voltage
R - a single filament light (or halogen lamp in alternate solution) 7LR, rated
R at 600 Watts, installed on the nose landing gear in a fixed position
- a transformer, to produce rated operating voltage
- two power supply relays 5LR for the takeoff and 6LR for the taxi light
- a switch 4LR, on the cockpit overhead panel.
The 115 VAC busbar 204XP supplies power to the taxi light through the
circuit breaker 1LR and relay 6LR. The 115 VAC busbar 103XP supplies power
to the take off light through the circuit breaker 3LR and relay 5LR. The 28
VDC busbar 202PP supplies power to the switch 4LR through the circuit
breaker 2LR. The landing-gear computer supplies the power supply relays 5LR
and 6LR with a ground signal when the nose landing gear is downlocked.
R
4. Operation/Control
________________________________
and Indicating
(Ref. Fig. 002)
With energized busbars and closed circuit breakers, 115 VAC is supplied to
the contacts of the power relays. The control switch is supplied with 28
VDC. When the nose landing gear is downlocked, the power supply relays get a
ground signal. When the control switch 4LR is in the TAXI position, the
relay 6LR energizes and the taxi light 8LR comes on.
EFF :
ALL 33-46-00
Page 1
May 01/06
IAC
R Taxi and Take off Lights - Component Location
Figure 001
EFF :
ALL 33-46-00
Page 2
May 01/06
IAC
Taxi and Take off Lights - Schematic
Figure 002
EFF :
ALL 33-46-00
Page 3
Feb 01/96
IAC
With the switch 4LR in the T.O position, the relay 5LR energizes and
continues to energize the relay 6LR. The taxi light 8LR and the take off
light 7LR come on.
When the nose landing gear is unlocked, the ground signal for the power
supply relays is removed.
The take off light and the taxi light go off.
You can also switch off the lights with the switch 4LR in the OFF position.
EFF :
ALL 33-46-00
Page 4
May 01/06
R
IAC
TAXI AND TAKE OFF LIGHTS - DEACTIVATION/REACTIVATION
____________________________________________________
TASK 33-46-00-040-001
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-46-00
Page 401
Nov 01/07
IAC
3. __________
Job Set-up
Subtask 33-46-00-941-050
A. Safety Precautions
(1) Put a warning notice on the EXT LT section of the panel 25VU to tell
persons not to operate the taxi light.
Subtask 33-46-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
4. Procedure
_________
Subtask 33-46-00-040-050
CAUTION : IF THE LAMP IS REMOVED, SAFETY THE WIRES WITH HIGH-SPEED TAPE.
_______
(1) You must remove (Ref. TASK 33-46-12-000-001) or replace (Ref. TASK
33-46-12-000-001) and (Ref. TASK 33-46-12-400-001) the taxi light if
there are these two conditions:
- if there are cracks on the front face, and
- if there is movement of the parts of the front glass (the
supporting structure does not hold them tightly).
(2) You can do an alternative repair as follows if there are these two
conditions:
- if there are cracks on the front face, and
- if there is no movement of the parts of the front glass.
(a) Clean the surface of the taxi light lens with MISCELLANEOUS
(Material No. 19-003) made moist with warm soap solution.
(b) Dry the surface of the taxi light lens with a clean MISCELLANEOUS
(Material No. 19-003).
EFF :
ALL 33-46-00
Page 402
Nov 01/07
R
IAC
R (c) Apply SPECIAL MATERIALS (Material No. 05-065) or BONDING AND
R ADHESIVE COMPOUNDS (Material No. 08-052) to cover the crack(s).
NOTE : Make sure that the tape is correctly installed and has no
____
bubbles, wrinkles or tears in it.
5. Close-up
________
Subtask 33-46-00-865-052
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
1LR
Subtask 33-46-00-942-053
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-00
Page 403
Nov 01/07
IAC
TASK 33-46-00-440-001
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-46-00-941-051
A. Safety Precautions
(1) Put a warning notice on the EXT LT section of the panel 25VU to tell
persons not to operate the taxi light.
EFF :
ALL 33-46-00
Page 404
May 01/04
R
IAC
Subtask 33-46-00-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
4. Procedure
_________
Subtask 33-46-00-440-050
(1) Replace the taxi light (Ref. TASK 33-46-12-000-001) and (Ref. TASK
33-46-12-400-001).
5. Close-up
________
Subtask 33-46-00-865-054
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LR
Subtask 33-46-00-942-052
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-00
Page 405
Nov 01/07
R
IAC
TASK 33-46-00-040-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-46-00
Page 406
Nov 01/07
IAC
3. __________
Job Set-up
Subtask 33-46-00-941-052
A. Safety Precautions
Subtask 33-46-00-865-055
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
4. Procedure
_________
Subtask 33-46-00-040-051
CAUTION : IF THE LAMP IS REMOVED, SAFETY THE WIRES WITH HIGH-SPEED TAPE.
_______
(1) You must remove (Ref. TASK 33-46-11-000-001) or replace (Ref. TASK
33-46-11-000-001) and (Ref. TASK 33-46-11-400-001) the take off light
if there are these two conditions:
- if there are cracks on the front face, and
- if there is movement of the parts of the front glass (the
supporting structure does not hold them tightly).
(2) If you do not remove or replace the cracked take-off light, you can
do an alternative repair as follows:
(a) Clean the surface of the take-off light lens with MISCELLANEOUS
(Material No. 19-003) made moist with warm soap solution.
(b) Dry the surface of the take-off light lens with a clean
MISCELLANEOUS (Material No. 19-003).
EFF :
ALL 33-46-00
Page 407
Aug 01/07
R
IAC
R (c) Apply SPECIAL MATERIALS (Material No. 05-065) or BONDING AND
R ADHESIVE COMPOUNDS (Material No. 08-052) to cover the crack(s).
NOTE : Make sure that the tape is correctly installed and has no
____
bubbles, wrinkles or tears in it.
(3) If it is not necessary to replace the take off light, write in the
aircraft technical log that the take off light is damaged.
5. Close-up
________
Subtask 33-46-00-865-056
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
3LR
Subtask 33-46-00-942-054
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-00
Page 408
Nov 01/07
IAC
TASK 33-46-00-440-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-46-00-941-053
A. Safety Precautions
Subtask 33-46-00-865-057
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
EFF :
ALL 33-46-00
Page 409
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-46-00-440-051
(1) Replace the take off light (Ref. TASK 33-46-11-000-001) and
(Ref. TASK 33-46-11-400-001).
5. Close-up
________
Subtask 33-46-00-865-058
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3LR
Subtask 33-46-00-942-055
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-00
Page 410
Aug 01/06
IAC
TAXI AND TAKE OFF LIGHTS - ADJUSTMENT/TEST
__________________________________________
TASK 33-46-00-710-001
1. __________________
Reason for the Job
Make sure that the taxi and take off lights operate correctly.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-46-00-861-051
Subtask 33-46-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/CTL 2LR W09
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
EFF :
ALL 33-46-00
Page 501
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-46-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the NOSE selector switch to - the taxi and take off lights come on,
TO,
- set the NOSE selector switch to - the taxi and take off lights go off.
OFF.
5. Close-up
________
Subtask 33-46-00-862-051
EFF :
ALL 33-46-00
Page 502
Aug 01/06
IAC
R **ON A/C 001-012, 014-099,
TASK 33-46-00-730-001
R CAUTION : MAKE SURE THAT THE ITEMS IN THE FIXTURES, TOOLS, TEST AND SUPPORT
_______
R EQUIPMENT PARAGRAPH ARE APPLICABLE TO YOUR AIRCRAFT (THIS LIST IS
R NOT CUSTOMIZED). REFER TO THE APPLICABLE SUBTASKS.
1. __________________
Reason for the Job
To make sure that the light mounts are parallel to the aircraft centerline.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-46-00-010-050
R A. Open the Main Doors of the Nose Gear (Ref. TASK 32-22-00-010-001).
R
EFF :
001-012, 014-099, 33-46-00
Page 503
May 01/06
IAC
4. Procedure
_________
Subtask 33-46-00-820-050
(1) Remove the taxi light (8LR) (Ref. TASK 33-46-12-000-001) and the take
off light (7LR) (Ref. TASK 33-46-11-000-001).
(4) Move the rod of the tooling assembly (4) laterally. The rod must
slide freely from the left sleeve to the right sleeve.
(6) Make sure that you can turn the rod freely in the two sleeves.
(7) Remove the right and left needles (2), then remove the sleeve (3) and
tooling assembly (4) .
(8) Install the taxi light (8LR) (Ref. TASK 33-46-12-400-001) and the
take off light (7LR) (Ref. TASK 33-46-11-400-001).
5. Close-up
________
Subtask 33-46-00-410-050
A. Close the Main Doors of the Nose Gear (Ref. TASK 32-22-00-410-001).
R
EFF :
001-012, 014-099, 33-46-00
Page 504
May 01/06
IAC
Adjustment of the Taxi Light and Take Off Light Mounts
Figure 501/TASK 33-46-00-991-001
R
EFF :
001-012, 014-099, 33-46-00
Page 505
May 01/06
IAC
LIGHT - TAKE OFF (7LR) - REMOVAL/INSTALLATION
_____________________________________________
TASK 33-46-11-000-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-46-11
Page 401
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-46-11-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
4. Procedure
_________
Subtask 33-46-11-020-050
(1) Disconnect the electrical connector (12) from the socket (11).
(2) Put the blanking caps on the disconnected electrical connector (12)
and the socket (11).
(3) Remove the nut (6), the washer (7), the screw (9) and the washer (8).
(4) Remove the nuts (5), the washers (4), the screws (1) and the washers
(2). During this operation, hold the light (10).
EFF :
ALL 33-46-11
Page 402
Feb 01/07
IAC
Take Off Light
Figure 401/TASK 33-46-11-991-001
R
EFF :
001-012, 014-099, 33-46-11
Page 403
May 01/06
IAC
Take Off Light
Figure 401A/TASK 33-46-11-991-001-A
R
EFF :
101-199, 901-999, 33-46-11
Page 404
Feb 01/07
IAC
TASK 33-46-11-400-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-46-11
Page 405
Feb 01/08
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-46-11-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
4. Procedure
_________
Subtask 33-46-11-420-050
(3) Make sure that the filament of the bulb and the lens of the optical
unit are in the correct condition.
(6) Apply SPECIAL MATERIALS (Material No. 05-002) to the screws (1) and
(9).
EFF :
ALL 33-46-11
Page 406
Feb 01/07
IAC
(7) Install the light (10) in the lower fork of the support (3).
(10) Install the washer (7) and tighten the nut (6).
(14) Install the washer (4) and tighten the nut (5).
(16) Remove the blanking caps from the electrical connector (12) and the
socket (11).
(17) Make sure that the electrical connector (12) and the socket (11) are
in the correct condition.
(18) Connect the electrical connector (12) to the socket (11) and lock it.
Subtask 33-46-11-420-050-A
(3) Make sure that the filament of the bulb and the lens of the optical
unit are in the correct condition.
(6) Apply SPECIAL MATERIALS (Material No. 05-002) to the screws (1) and
(9).
EFF :
ALL 33-46-11
Page 407
Feb 01/07
IAC
(7) Install the light (10) in the lower fork of the support (3).
(10) Install the washer (7) and tighten the nut (6).
(14) Install the washer (4) and tighten the nut (5).
(15) Remove the blanking caps from the electrical connector (12) and the
socket (11).
(16) Make sure that the electrical connector (12) and the socket (11) are
in the correct condition.
(17) Connect the electrical connector (12) to the socket (11) and lock it.
Subtask 33-46-11-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3LR
Subtask 33-46-11-710-051
(1) Do the operational test of the Take off Light (Ref. TASK 33-46-00-
710-001).
5. Close-up
________
Subtask 33-46-11-942-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-11
Page 408
Feb 01/07
R
IAC
TASK 33-46-11-960-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-46-11
Page 409
Feb 01/07
IAC
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-46-11-865-058
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
EFF :
ALL 33-46-11
Page 410
Feb 01/07
R
IAC
INTENTIONALLY BLANK
R
33-46-11
Page 411
Feb 01/07
IAC
INTENTIONALLY BLANK
R
33-46-11
Page 412
Feb 01/07
IAC
R
4. Procedure
_________
Subtask 33-46-11-020-054
CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
DAMAGE TO EQUIPMENT.
(d) Pull the lamp (4) away from the support (6) and disconnect the
two electrical terminals (5).
(f) If the gasket (7) on the support (6) is defective, remove and
discard it.
R (a) Remove the screw (1), the washer (7) and the insulating washer
R (8).
R (c) Pull the lamp (3) away from the support (6) and disconnect the
R three electrical terminals (5).
EFF :
ALL 33-46-11
Page 413
Aug 01/06
IAC
R Lamp of the Take off Light
R Figure 402/TASK 33-46-11-991-003- 12 (SHEET 1)
EFF :
ALL 33-46-11
Page 414
Aug 01/06
IAC
R Lamp of the Take off Light
R Figure 402/TASK 33-46-11-991-003- 22 (SHEET 2)
EFF :
ALL 33-46-11
Page 415
Aug 01/06
IAC
(e) If the gasket (4) on the support (6) is defective, remove and
discard it.
Subtask 33-46-11-420-054
R (b) Connect the two electrical terminals (5) to a new lamp (4) and
R install it in position on its support (6). Hold it in this
position.
(f) TORQUE the screw (1) to between 6 and 7 lbf.in (0.06 and 0.07
m.daN).
R (c) Connect the three electrical terminals (5) to a new lamp (3) and
R put it in position on its support (6). Hold it in this position.
R NOTE : After connection, remove the tape that attaches the two
____
R electrical terminals together.
EFF :
ALL 33-46-11
Page 416
Aug 01/06
IAC
(d) Put the retainer (2) in position.
(e) Install the insulating washer (8), the washer (7) and the screw
(1).
Subtask 33-46-11-865-059
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3LR
Subtask 33-46-11-710-053
(1) Do the operational test of the Take off Light (Ref. TASK 33-46-00-
710-001).
5. Close-up
________
Subtask 33-46-11-942-053
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-11
Page 417
Feb 01/07
IAC
TASK 33-46-11-960-002
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-46-11
Page 418
May 01/07
IAC
R D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-46-11-865-066
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
4. Procedure
_________
Subtask 33-46-11-020-055
(1) Remove the screw (1), the washer (10) and the insulating washer (11).
(3) Pull the lens (3) away from the support (7).
NOTE : Put an adhesive tape to hold the mirror (8) in position on the
____
support (7).
(4) Remove the two screws (4) and the two washers (5).
EFF :
ALL 33-46-11
Page 419
May 01/07
IAC
R Replacement of the Halogen Bulb
Figure 403/TASK 33-46-11-991-006
EFF :
ALL 33-46-11
Page 420
Aug 01/06
IAC
Subtask 33-46-11-420-055
NOTE : Make sure that the pinched seal (9) end points forward.
____
(2) Install the two washers (5) and the two screws (4).
(3) Tighten the two screws (4). Apply one more quarter turn to the two
screws (4) after contact.
R (6) Clean the surface of the lens (3) with CLEANING AGENTS (Material No.
R 11-010) made moist with warm soap solution.
R (7) Dry the surface of the lens (3) with a clean MISCELLANEOUS (Material
R No. 19-003).
R (10) Install the insulating washer (11), the washer (10) and the screw
(1).
R (12) Tighten the screw (1) until the two brackets touch the gage without
visual signs of distortion of the retainer (2).
Subtask 33-46-11-865-067
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3LR
EFF :
ALL 33-46-11
Page 421
May 01/07
IAC
Subtask 33-46-11-710-054
D. Operational Test
(1) Do the operational test of the take off light (Ref. TASK 33-46-00-
710-001).
5. Close-up
________
Subtask 33-46-11-942-054
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-11
Page 422
May 01/07
R
IAC
TASK 33-46-11-960-003
Replacement of the Lens and the Mirror of the Take Off Light (7LR)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-46-11
Page 423
May 01/07
R
IAC
3. __________
Job Set-up
Subtask 33-46-11-865-068
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
4. Procedure
_________
Subtask 33-46-11-020-057
(1) Remove the screw (2), the washer (3) and the insulating washer (1).
(5) Pull the lens (5) away from the mirror (10).
(6) Remove the two screws (6) and the two washers (7).
(8) If the gasket (12) on the support (13) is defective, remove and
discard it.
EFF :
ALL 33-46-11
Page 424
May 01/07
R
IAC
Lens and Mirror of the Take Off Light (7LR)
Figure 404/TASK 33-46-11-991-007
EFF :
ALL 33-46-11
Page 425
May 01/07
R
IAC
Subtask 33-46-11-420-057
(1) Carefully put the halogen bulb (9) in position on a new mirror (10).
NOTE : Make sure that the pinched seal (8) end points forward.
____
(2) Install the two washers (7) and the two screws (6).
(3) Tighten the two screws (6). Tighten them one more quarter turn after
contact.
(5) Put a new lens (5) in position on a new mirror (10) with the halogen
bulb installed.
NOTE : After connection, remove the tape that attaches the two
____
electrical terminals together.
(9) Install the insulating washer (1), the washer (3), and the screw (2).
(10) Put a gage with a thickness of 11 mm (0.4330 in.) between the two
brackets of the retainer (4).
(11) Tighten the screw (2) until the two brackets touch the gage without
visual signs of distortion of the retainer (4).
Subtask 33-46-11-865-069
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
- 3LR.
EFF :
ALL 33-46-11
Page 426
May 01/07
R
IAC
Subtask 33-46-11-710-055
D. Operational Test
(1) Do the operational test of the take off light (Ref. TASK 33-46-00-
710-001).
5. Close-up
________
Subtask 33-46-11-942-055
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-11
Page 427
May 01/07
IAC
LIGHT - TAKE OFF (7LR) - ADJUSTMENT/TEST
________________________________________
TASK 33-46-11-730-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
R CAUTION : MAKE SURE THAT THE ITEMS IN THE FIXTURES, TOOLS, TEST AND SUPPORT
_______
R EQUIPMENT PARAGRAPH ARE APPLICABLE TO YOUR AIRCRAFT (THIS LIST IS
R NOT CUSTOMIZED). REFER TO THE APPLICABLE SUBTASKS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-46-11
Page 501
May 01/06
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-46-11-865-062
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TO 3LR W07
Subtask 33-46-11-860-050
(1) Make sure that the aircraft fuselage is in the horizontal position.
4. Procedure
_________
Subtask 33-46-11-820-051
(1) Install the ADJUSTING TOOL - TAKE OFF LIGHT (98D33403500000) on the
light.
(3) Adjust the tool (3) if necessary and tighten the nuts (2).
R
EFF :
001-012, 014-099, 33-46-11
Page 502
May 01/06
IAC
Adjustment of the Take Off Light
Figure 501/TASK 33-46-11-991-004
R
EFF :
001-012, 014-099, 33-46-11
Page 503
May 01/06
IAC
(4) Angular adjustment of the take off light
(c) Tighten or loosen the nuts (1) of the lower fork to get the angle
of 0 deg. 12 minutes + or - 2 minutes.
(d) Tighten the nuts (1) and make sure that the adjustment is
correct.
(e) Remove the clinometer and the ADJUSTING TOOL - TAKE OFF LIGHT
(98D33403500000).
(f) Safety the nuts (1) together with MISCELLANEOUS (Material No. 19-
010).
5. Close-up
________
Subtask 33-46-11-865-063
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3LR
R
EFF :
001-012, 014-099, 33-46-11
Page 504
May 01/06
IAC
TASK 33-46-11-730-001- 01
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-46-11
Page 505
May 01/06
IAC
3. __________
Job Set-up
Subtask 33-46-11-865-064
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
Subtask 33-46-11-860-051
4. Procedure
_________
Subtask 33-46-11-820-052
(1) Install the screen (2) in front of the aircraft. The distance between
the screen and the nose landing gear must be 10 m (32.80 ft.).
(a) Measure the distance X between the aircraft centerline and the
ground. To do this, measure the distance between one of the
leveling triangles and the ground (Ref. AMM 11-21-08 P.Block
001).
(b) Subtract the vertical value 2.2 m (7.21 ft.) from the distance
X. This gives you the value Y, which is the distance between
the ground and the target on the screen. You must adjust the
light beam to the center of the target.
R
EFF :
001-012, 014-099, 33-46-11
Page 506
May 01/06
IAC
(c) Tighten or loosen the nuts (1) of the lower fork to adjust the
light beam on the target.
(d) Tighten the nuts (1) and make sure that the adjustment is
correct.
(e) Safety the nuts (1) together with MISCELLANEOUS (Material No. 19-
010).
5. Close-up
________
Subtask 33-46-11-865-065
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3LR
R
EFF :
001-012, 014-099, 33-46-11
Page 507
May 01/06
IAC
Adjustment of the Take Off Light - Alternative Procedure
Figure 502/TASK 33-46-11-991-005- 12 (SHEET 1)
R
EFF :
001-012, 014-099, 33-46-11
Page 508
May 01/06
IAC
Adjustment of the Take Off Light - Alternative Procedure
Figure 502/TASK 33-46-11-991-005- 22 (SHEET 2)
R
EFF :
001-012, 014-099, 33-46-11
Page 509
May 01/06
IAC
LIGHT - TAXI (8LR) - REMOVAL/INSTALLATION
_________________________________________
TASK 33-46-12-000-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-46-12
Page 401
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-46-12-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
4. Procedure
_________
Subtask 33-46-12-020-050
(1) Disconnect the electrical connector (12) from the socket (11).
(2) Put the blanking caps on the disconnected electrical connector (12)
and the socket (11).
(3) Remove the nut (6), the washer (7), the screw (9) and the washer (8).
(4) Remove the nuts (5), the washers (4), the screws (1) and the washers
(2). During this operation, hold the light (10).
EFF :
ALL 33-46-12
Page 402
Feb 01/07
IAC
Taxi Light
R Figure 401/TASK 33-46-12-991-001-B
R
EFF :
001-012, 014-027, 33-46-12
Page 403
Nov 01/99
IAC
Taxi Light
R Figure 401A/TASK 33-46-12-991-001-A
R
EFF :
028-099, 33-46-12
Page 404
Nov 01/99
IAC
Taxi Light
Figure 401B/TASK 33-46-12-991-001-C
R
EFF :
101-199, 901-999, 33-46-12
Page 405
Feb 01/07
IAC
(5) Remove the light (10) from its support (3).
EFF :
ALL 33-46-12
Page 406
Feb 01/07
R
IAC
TASK 33-46-12-400-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-46-12
Page 407
Feb 01/08
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-46-12-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
4. Procedure
_________
Subtask 33-46-12-420-050
(3) Make sure that the filament of the bulb and the lens of the optical
unit are in the correct condition.
EFF :
ALL 33-46-12
Page 408
Feb 01/08
R
IAC
(6) Apply SPECIAL MATERIALS (Material No. 05-002) to the screws (1) and
(9).
(7) Install the light (10) in the lower fork on the support (3).
(10) Install the washer (7) and tighten the nut (6).
(14) Install the washers (4) and tighten the nuts (5).
(16) Remove the blanking caps from the electrical connector (12) and the
socket (11).
(17) Make sure that the electrical connector (12) and the socket (11) are
in the correct condition.
(18) Connect the electrical connector (12) to the socket (11) and lock it.
Subtask 33-46-12-420-050-A
(3) Make sure that the filament of the bulb and the lens of the optical
unit are in the correct condition.
EFF :
ALL 33-46-12
Page 409
Feb 01/08
R
IAC
(6) Apply SPECIAL MATERIALS (Material No. 05-002) to the screws (1) and
(9).
(7) Install the light (10) in the lower fork on the support (3).
(10) Install the washer (7) and tighten the nut (6).
(14) Install the washers (4) and tighten the nuts (5).
(15) Remove the blanking caps from the electrical connector (12) and the
socket (11).
(16) Make sure that the electrical connector (12) and the socket (11) are
in the correct condition.
(17) Connect the electrical connector (12) to the socket (11) and lock it.
Subtask 33-46-12-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LR
Subtask 33-46-12-710-051
(1) Do the operational test of the taxi light (Ref. TASK 33-46-00-710-
001).
EFF :
ALL 33-46-12
Page 410
Feb 01/08
R
IAC
5. Close-up
________
Subtask 33-46-12-942-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-12
Page 411
Feb 01/08
R
IAC
TASK 33-46-12-960-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-46-12
Page 412
Feb 01/08
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-46-12-865-058
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
4. Procedure
_________
Subtask 33-46-12-020-054-B
(c) Pull the lamp (3) away from the support (5) and disconnect the
two electrical terminals (4).
(a) Remove the washer (9), the screw (10) and the insulating washer
(8).
EFF :
ALL 33-46-12
Page 413
Aug 01/06
IAC
R Lamp of the Taxi Light
R Figure 402/TASK 33-46-12-991-003-B12 (SHEET 1)
EFF :
ALL 33-46-12
Page 414
Aug 01/06
IAC
R Lamp of the Taxi Light
R Figure 402/TASK 33-46-12-991-003-B22 (SHEET 2)
EFF :
ALL 33-46-12
Page 415
Aug 01/06
IAC
(c) Pull the lamp (3) away from the support (5) and disconnect the
two electrical terminals (4).
(e) If the gasket (6) on the support (5) is defective, remove and
discard it.
Subtask 33-46-12-420-054-B
(a) Connect the two electrical terminals (4) to the new lamp (3) and
install it in position on its support (5). Hold it in this
position.
(c) Attach the assembly. To do this, tighten the four screws (1).
(b) Connect the two electrical terminals (4) to the new lamp (3) and
install it in position on its support (5). Hold it in this
position.
(d) Install the insulating washer (8), the washer (9) and the screw
(10).
EFF :
ALL 33-46-12
Page 416
Feb 01/07
IAC
(f) For the SHL technology:
- Put a gage with a thickness of 7 mm (0.2755 in.) between the
two brackets of the clamp (7).
- Tighten the screw (10) until the two brackets touch the gage
without visual signs of distortion of the clamp (7).
- Remove the gage.
Subtask 33-46-12-865-059
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LR
Subtask 33-46-12-710-053
(1) Do the operational test of the taxi light (Ref. TASK 33-46-00-710-
001).
5. Close-up
________
Subtask 33-46-12-942-053
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-12
Page 417
May 01/07
R
IAC
TASK 33-46-12-960-002
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-46-12
Page 418
May 01/07
IAC
R D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-46-12-865-066
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
4. Procedure
_________
Subtask 33-46-12-020-055
(1) Remove the screw (1), the washer (2) and the insulating washer (3).
(3) Pull the lens (5) away from the support (9).
(4) Remove the two screws (6) and the two washers (7).
EFF :
ALL 33-46-12
Page 419
May 01/07
IAC
Replacement of the Halogen Bulb
Figure 403/TASK 33-46-12-991-007
EFF :
ALL 33-46-12
Page 420
Aug 01/06
R
IAC
Subtask 33-46-12-420-055
NOTE : Make sure that the pinched seal (11) end points forward.
____
(2) Install the two washers (7) and the two screws (6).
(3) Tighten the two screws (6). Apply one more quarter turn to the two
screws (6) after contact.
R (6) Clean the surface of the lens (5) with CLEANING AGENTS (Material No.
R 11-010) made moist with warm soap solution.
R (7) Dry the surface of the lens (5) with a clean MISCELLANEOUS (Material
R No. 19-003).
R (10) Install the insulating washer (3), the washer (2), and the screw (1).
R (11) Put a gage with a thickness of 7 mm (0.2755 in.) between the two
brackets of the retainer (4).
R (12) Tighten the screw (1) until the two brackets touch the gage without
visual signs of distortion of the retainer (4).
Subtask 33-46-12-865-067
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LR
EFF :
ALL 33-46-12
Page 421
May 01/07
IAC
Subtask 33-46-12-710-054
D. Operational Test
(1) Do the operational test of the taxi light (Ref. TASK 33-46-00-710-
001).
5. Close-up
________
Subtask 33-46-12-942-054
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-12
Page 422
May 01/07
R
IAC
TASK 33-46-12-960-003
Replacement of the Lens and the Mirror of the Taxi Light (8LR)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-46-12
Page 423
May 01/07
R
IAC
3. __________
Job Set-up
Subtask 33-46-12-865-068
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
4. Procedure
_________
Subtask 33-46-12-020-057
(1) Remove the screw (1), the washer (2) and the insulating washer (3).
(5) Pull the lens (5) away from the mirror (10).
(6) Remove the two screws (6) and the two washers (7).
(8) If the gasket (11) on the support (13) is defective, remove and
discard it.
Subtask 33-46-12-420-057
(1) Carefully put the halogen bulb (9) in position on a new mirror (10).
NOTE : Make sure that the pinched seal (8) end points forward.
____
(2) Install the two washers (7) and the two screws (6).
EFF :
ALL 33-46-12
Page 424
May 01/07
R
IAC
Lens and Mirror of the Taxi Light (8LR)
Figure 404/TASK 33-46-12-991-008
EFF :
ALL 33-46-12
Page 425
May 01/07
R
IAC
(3) Tighten the two screws (6). Tighten them one more quarter turn after
contact.
(5) Put a new lens (5) in position on a new mirror (10) with the halogan
bulb installed.
(8) Install the insulating washer (3), the washer (2), and the screw (1).
(9) Put a gage with a thickness of 7 mm (0.2755 in.) between the two
brackets of the clamp (4).
(10) Tighten the screw (1) until the two brackets touch the gage without
visual signs of distortion of the clamp (4).
Subtask 33-46-12-865-069
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LR
Subtask 33-46-12-710-055
D. Operational Test
(1) Do the operational test of the taxi light (Ref. TASK 33-46-00-710-
001).
5. Close-up
________
Subtask 33-46-12-942-055
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-46-12
Page 426
May 01/07
IAC
LIGHT - TAXI (8LR) - ADJUSTMENT/TEST
____________________________________
TASK 33-46-12-730-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
R CAUTION : MAKE SURE THAT THE ITEMS IN THE FIXTURES, TOOLS, TEST AND SUPPORT
_______
R EQUIPMENT PARAGRAPH ARE APPLICABLE TO YOUR AIRCRAFT (THIS LIST IS
R NOT CUSTOMIZED). REFER TO THE APPLICABLE SUBTASKS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-46-12
Page 501
May 01/06
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-46-12-865-060
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
Subtask 33-46-12-860-050
(1) Make sure that the aircraft fuselage is in the horizontal position.
4. Procedure
_________
Subtask 33-46-12-820-050
(3) Adjust the tool (3) if necessary and tighten the nuts (2).
R
EFF :
001-012, 014-099, 33-46-12
Page 502
May 01/06
IAC
Adjustment of the Taxi Light
Figure 501/TASK 33-46-12-991-004
R
EFF :
001-012, 014-099, 33-46-12
Page 503
May 01/06
IAC
(4) Angular adjustment of the taxi light
(c) Tighten or loosen the nuts (1) of the lower fork to get the angle
of 1 deg. 56 minutes + or - 2 minutes.
(d) Tighten the nuts (1) and make sure that the adjustment is
correct.
(e) Remove the clinometer and the ADJUSTING TOOL - TAXI LIGHT
(98D33403501000).
(f) Safety the nuts (1) together with MISCELLANEOUS (Material No. 19-
010).
5. Close-up
________
Subtask 33-46-12-865-061
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LR
R
EFF :
001-012, 014-099, 33-46-12
Page 504
May 01/06
IAC
TASK 33-46-12-730-001- 01
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-46-12
Page 505
May 01/06
IAC
3. __________
Job Set-up
Subtask 33-46-12-865-064
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/TAXI 1LR W08
Subtask 33-46-12-860-052
4. Procedure
_________
Subtask 33-46-12-820-052
(1) Install the screen (2) in front of the aircraft. The distance between
the screen and the nose landing gear must be 10 m (32.80 ft.).
(a) Measure the distance X between the aircraft centerline and the
ground. To do this, measure the distance between one of the
leveling triangles and the ground (Ref. AMM 11-21-08 P.Block
001).
(b) Subtract the vertical value 2.48 m (8.13 ft.) from the distance
X. This gives you the value Y, which is the distance between
the ground and the target on the screen. You must adjust the
light beam to the center of the target.
R
EFF :
001-012, 014-099, 33-46-12
Page 506
May 01/06
IAC
(c) Tighten or loosen the nuts (1) of the lower fork to adjust the
light beam on the target.
(d) Tighten the nuts (1) and make sure that the adjustment is
correct.
(e) Safety the nuts (1) together with MISCELLANEOUS (Material No. 19-
010).
5. Close-up
________
Subtask 33-46-12-865-065
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LR
R
EFF :
001-012, 014-099, 33-46-12
Page 507
May 01/06
IAC
Adjustment of the Taxi Light - Alternative Procedure
Figure 502/TASK 33-46-12-991-006- 12 (SHEET 1)
R
EFF :
001-012, 014-099, 33-46-12
Page 508
May 01/06
IAC
Adjustment of the Taxi Light - Alternative Procedure
Figure 502/TASK 33-46-12-991-006- 22 (SHEET 2)
R
EFF :
001-012, 014-099, 33-46-12
Page 509
May 01/06
IAC
LOGO LIGHTS - DESCRIPTION AND OPERATION
_______________________________________
1. _______
General
R The logo lights are installed to give illumination of the airlines emblem
R (logo), which is marked on each side of the vertical fin. They come on in
R conjunction with the navigation lights.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
3LY LIGHT-LOGO, L 334 33-47-00
4LY LIGHT-LOGO, R 344 33-47-00
R 3. System
__________________
Description
R (Ref. Fig. 002)
R The logo lights 4LY and 5LY are installed on the horizontal stabilizer in
R the zones 334 and 344. Each logo light consists of a housing which contains
R the lamp assembly and a step-down transformer. The step-down transformer
R lower the aircrafts 115VAC to 28VAC power supply.
R The toggle switch NAV/LOGO 3LA, installed on the cockpit overhead panel
R 25VU, controls the logo lights together with the navigation lights. The
R toggle switch has these positions:
R - 2,
R - 1,
R - OFF.
R When you set the toggle switch 3LA to the 1 (2) position the logo lights
R come on automatically with the NAV1 (NAV2) lights during the subsequent
R flight phases:
R - taxiing,
R - take off,
R - landing.
4. Power
____________
Supply
R (Ref. Fig. 002)
R 115 V AC is supplied to each logo light from the normal busbars 101XP and
R 202XP.This is controlled through the circuit breakers 1LY and 2LY. The
R circuit breakers 1LY and 2LY are installed on the circuit breaker panel
R 122VU.
EFF :
ALL 33-47-00
Page 1
Nov 01/04
IAC
R Logo Lights - Component Location
R Figure 001
EFF :
ALL 33-47-00
Page 2
May 01/98
IAC
R Logo Lights - Schematic
R Figure 002
EFF :
ALL 33-47-00
Page 3
May 01/98
IAC
R 5. _________
Operation
R (Ref. Fig. 002)
R With the switch NAV & LOGO (3LA) set to 1 or 2, 115 V AC is supplied to the
R relays 6LA and 7LA. When the flaps are lowered to 15 degrees or more, or the
R landing-gear struts are compressed, a ground signal is received. This
R energizes the coil of the relay 5LY. Power is then supplied to the step-down
R transformer of the light assemblies. From these transformers a decreased
R voltage of 28 V DC is supplied to the logo lights 3LY (4LY) which causes the
R logo lights to go on.
R When the landing-gear is retracted, and the flaps are retracted to less than
R 15 degrees, the ground signal is removed. In this condition, the logo lights
R go out. Also, with the switch 3LA set to OFF, the relays 6LA and 7LA are
R de-energized which causes the logo lights to go out.
R
EFF :
ALL 33-47-00
Page 4
Nov 01/04
IAC
LOGO LIGHTS - DEACTIVATION/REACTIVATION
_______________________________________
TASK 33-47-00-040-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-47-00
Page 401
Nov 01/07
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-47-00-860-052
(1) On panel 25VU make sure that the switch 3LA NAV & LOGO ON/OFF is in
the OFF position.
Subtask 33-47-00-860-053
Subtask 33-47-00-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/LOGO/L 2LY V03
122VU LIGHTING/LOGO/R 1LY V02
Subtask 33-47-00-941-050
R D. Safety Precautions
R
R (1) Put the WARNING NOTICE in the flight compartment to tell persons not
R to operate the logo light.
EFF :
ALL 33-47-00
Page 402
Nov 01/07
IAC
Subtask 33-47-00-010-051
R E. Get Access
R
R (1) Put the ACCESS PLATFORM 5M (16 FT) in position in zone 334AB for the
R left hand logo light and/or zone 344AB for the right hand logo light.
4. Procedure
_________
Subtask 33-47-00-040-050
NOTE : It is not necessary to remove the logo light lamp. You must
____
only remove the lens of the logo light.
R (3) Put the high speed tape SPECIAL MATERIALS (Material No. 05-065) on
R the logo light hole.
NOTE : If this kind of high speed tape is not available you can also
____
use SPECIAL MATERIALS (Material No. 05-096) as alternative
solution.
(4) Write a note in the technical log book that the logo light lens has
been deactivated.
5. Close-up
________
Subtask 33-47-00-865-053
Subtask 33-47-00-942-052
B. Removal of Equipment
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R
EFF :
ALL 33-47-00
Page 403
Nov 01/07
IAC
R (2) Remove the access platform(s).
R
R (3) Remove the ground support and maintenance equipment, the special and
R standard tools and all other items.
R
EFF :
ALL 33-47-00
Page 404
Nov 01/07
IAC
TASK 33-47-00-440-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-47-00
Page 405
Nov 01/07
IAC
3. __________
Job Set-up
Subtask 33-47-00-860-056
(1) On panel 25VU make sure that the switch 3LA NAV & LOGO ON/OFF is in
the OFF position.
Subtask 33-47-00-860-057
Subtask 33-47-00-865-055
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/LOGO/L 2LY V03
122VU LIGHTING/LOGO/R 1LY V02
Subtask 33-47-00-941-053
R D. Safety Precautions
R
R (1) Put the WARNING NOTICE in the flight compartment to tell persons not
R to operate the logo light
Subtask 33-47-00-010-050
R E. Get Access
R
R (1) Put the ACCESS PLATFORM 5M (16 FT) in position in zone 334AB for the
R left hand logo light and/or zone 344AB for the right hand logo light.
EFF :
ALL 33-47-00
Page 406
Nov 01/07
IAC
4. Procedure
_________
Subtask 33-47-00-440-051
R (1) Remove the high speed tape cover from the logo light hole.
R (2) Clean the area around the hole of the tape adhesive.
(4) Write a note in the aircraft technical log that the logo light lens
of the tail navigation light has been reactivate.
5. Close-up
________
Subtask 33-47-00-865-056
Subtask 33-47-00-942-054
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (4) Remove the ground support and maintenance equipment, the special and
R standard tools and all other items.
R
EFF :
ALL 33-47-00
Page 407
Nov 01/07
IAC
R TASK 33-47-00-040-001- 01
R WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
R START A TASK ON OR NEAR:
R - THE FLIGHT CONTROLS
R - THE FLIGHT CONTROL SURFACES
R - THE LANDING GEAR AND THE RELATED DOORS
R - COMPONENTS THAT MOVE.
R WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
R MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
R DAMAGE.
R 1. __________________
Reason for the Job
R 2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
EFF :
ALL 33-47-00
Page 408
Nov 01/07
IAC
R C. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 33-47-00-860-058
R (1) On panel 25VU make sure that the switch 3LA NAV & LOGO ON/OFF is in
R the OFF position.
R Subtask 33-47-00-860-059
R Subtask 33-47-00-865-057
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 122VU LIGHTING/LOGO/L 2LY V03
R 122VU LIGHTING/LOGO/R 1LY V02
R Subtask 33-47-00-941-055
R D. Safety Precautions
R (1) Put the WARNING NOTICE in the flight compartment to tell persons not
R to operate the logo light.
EFF :
ALL 33-47-00
Page 409
Nov 01/07
IAC
R Subtask 33-47-00-010-052
R E. Get Access
R (1) Put the ACCESS PLATFORM 5M (16 FT) in position 334AB for the left
R hand logo light and/or zone 344AB for the right hand logo light.
R 4. Procedure
_________
R Subtask 33-47-00-040-051
R NOTE : It is not necessary to remove the logo light lamp. You must
____
R only remove the lens of the logo light.
R (3) Put the high speed tape BONDING AND ADHESIVE COMPOUNDS (Material No.
R 08-052) on the logo light hole.
R (4) Write a note in the technical log book that the logo light lens has
R been deactivated.
R 5. Close-up
________
R Subtask 33-47-00-942-055
R A. Removal of Equipment
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (3) Remove the ground support and maintenance equipment, the special and
R standard tools and all other items.
EFF :
ALL 33-47-00
Page 410
Nov 01/07
IAC
R TASK 33-47-00-440-001- 01
R WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
R START A TASK ON OR NEAR:
R - THE FLIGHT CONTROLS
R - THE FLIGHT CONTROL SURFACES
R - THE LANDING GEAR AND THE RELATED DOORS
R - COMPONENTS THAT MOVE.
R WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
R MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
R DAMAGE.
R 1. __________________
Reason for the Job
R 2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
EFF :
ALL 33-47-00
Page 411
Nov 01/07
IAC
R 3. __________
Job Set-up
R Subtask 33-47-00-860-060
R (1) On panel 25VU make sure that the switch 3LA NAV & LOGO ON/OFF is in
R the OFF position.
R Subtask 33-47-00-860-061
R Subtask 33-47-00-865-058
R C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
R tagged
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 122VU LIGHTING/LOGO/L 2LY V03
R 122VU LIGHTING/LOGO/R 1LY V02
R Subtask 33-47-00-941-056
R D. Safety Precautions
R (1) Put the WARNING NOTICE in the flight compartment to tell persons not
R to operate the logo light.
R Subtask 33-47-00-010-053
R E. Get Access
R (1) Put the ACCESS PLATFORM 5M (16 FT) in position in zone 334AB for the
R left hand logo light and/or zone 344AB for the right hand logo light.
EFF :
ALL 33-47-00
Page 412
Nov 01/07
IAC
R 4. Procedure
_________
R Subtask 33-47-00-440-052
R (1) Remove the high speed tape cover from the logo light hole.
R (2) Clean the area around the hole of the tape adhesive.
R (4) Write a note in the aircraft technical log that the logo light lens
R of the tail navigation light has been reactivate.
R 5. Close-up
________
R Subtask 33-47-00-865-059
R Subtask 33-47-00-942-056
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (4) Remove the ground support and maintenance equipment, the special and
R standard tools and all other items.
EFF :
ALL 33-47-00
Page 413
Nov 01/07
IAC
LOGO LIGHTS - ADJUSTMENT/TEST
_____________________________
TASK 33-47-00-710-002
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-47-00-860-050
(3) Get access to the L/G page on the MCDU (Ref. TASK 31-32-00-860-009).
EFF :
ALL 33-47-00
Page 501
May 01/06
IAC
Subtask 33-47-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/LOGO/L 2LY V03
122VU LIGHTING/LOGO/R 1LY V02
122VU LIGHTING/EXT LT/TAXI AND TAKE OFF/CTL 2LR W09
4. Procedure
_________
Subtask 33-47-00-710-050-A
A. Do this test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the NAV/LOGO control switch - the logo lights 3LY and 4LY come on.
3LA to the 2 position.
- push the LGCIU2 line select - the LGCIU2 MENU page comes on.
key.
- push the NEXT PAGE pushbutton - the LANDING GEAR SIMULATION page
comes on.
- push the LH+RH line select key. - the LH+RH menu page comes on.
EFF :
ALL 33-47-00
Page 502
Aug 01/06
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- push the EXTENDED line select On the THS:
key. - the logo lights 3LY and 4LY go off.
- set the NAV/LOGO control switch - the logo lights 3LY and 4LY remain
3LA to the 1 position. on.
- set the NAV/LOGO control switch - the logo lights 3LY and 4LY go off.
3LA to the OFF position.
5. Close-up
________
Subtask 33-47-00-860-051
(3) De- energize the aircraft electrical circuits (Ref. TASK 24-41-00-
862-002).
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-47-00
Page 503
May 01/06
R
IAC
LIGHT - LOGO - MAINTENANCE PRACTICES
____________________________________
TASK 33-47-11-600-001
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
NOTE : The procedure is the same for the two logo lights.
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-47-11
Page 201
Aug 01/07
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-47-11-860-051
(1) On panel 25VU make sure that the switch 3LA NAV & LOGO ON/OFF is in
the OFF position.
Subtask 33-47-11-860-050
Subtask 33-47-11-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 3LY
122VU LIGHTING/LOGO/L 2LY V03
FOR 4LY
122VU LIGHTING/LOGO/R 1LY V02
EFF :
ALL 33-47-11
Page 202
Aug 01/07
IAC
R
Subtask 33-47-11-941-050
R D. Safety Precautions
R
(1) Put the warning notices in the flight compartment to tell persons not
to operate the logo lights.
R (2) Put the access platform in position at zone 334 for the left logo
R light and/or zone 344 for the right logo light.
4. Procedure
_________
Subtask 33-47-11-020-052
(1) Remove the countersunk screws (1) around the frame assembly (2).
(2) Remove the frame assembly (2) and the seal (3).
(3) Release the quick-release fasteners (5) and remove the attach ring
(4).
(4) Remove the beam lamp (6) with the seal (8).
Subtask 33-47-11-020-053
R (1) Remove the screws (10) and disconnect the terminals of the electrical
R wires (11) from the electrical connector (7).
EFF :
ALL 33-47-11
Page 203
Aug 01/06
IAC
R Lamp of the Logo Light 3LY/4LY
Figure 201/TASK 33-47-11-991-001
EFF :
ALL 33-47-11
Page 204
Aug 01/06
IAC
Subtask 33-47-11-420-050
Subtask 33-47-11-420-052
(2) Connect the terminals of the electrical wires (11) in the electrical
connectors (7) of the beam lamp (6).
NOTE : Make sure that the terminals of the electrical wires (11) are
____
correctly positioned in the electrical connectors (7).
(4) Install the beam lamp (6) with the seal (8) and tighten it with the
attach ring (4).
(6) Install the seal ring (3) and the frame assembly (2) and tighten it
with the countersunk screws (1).
R (7) Apply a fillet of SEALANTS (Material No. 09-001) between the frame
R assembly (2) contour and the spar box skin surface.
Subtask 33-47-11-370-050
E. Painting
(1) Apply STRUCTURE PAINTS (Material No. 16-016) to the heads of the
countersunk screws (1).
R Subtask 33-47-11-865-063
R F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
EFF :
ALL 33-47-11
Page 205
Aug 01/07
IAC
R Subtask 33-47-11-710-053
R G. Operational Test
5. Close-up
________
Subtask 33-47-11-942-054
(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-47-11-861-053
EFF :
ALL 33-47-11
Page 206
Aug 01/07
IAC
LIGHT - LOGO - REMOVAL/INSTALLATION
___________________________________
TASK 33-47-11-000-002
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
NOTE : The procedure is the same for the two logo lights.
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-47-11
Page 401
Aug 01/06
IAC
3. __________
Job Set-up
Subtask 33-47-11-860-056
(1) On panel 25VU make sure that the switch 3LA NAV & LOGO ON/OFF is in
the OFF position.
Subtask 33-47-11-865-059
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/LOGO/L 2LY V03
122VU LIGHTING/LOGO/R 1LY V02
Subtask 33-47-11-941-054
C. Safety Precautions
(1) Put the warning notices in the flight compartment to tell the persons
not to operate the logo lights.
(2) Put the access platfom in position at zone 334 for the left logo
light and/or zone 344 for the right logo light.
4. Procedure
_________
Subtask 33-47-11-020-057
(1) Remove the screws (1) around the frame assembly (2).
(2) Remove the frame assembly (2) and the seal (3).
(3) Remove the screws (9) from the housing (4) and remove the housing
(4).
EFF :
ALL 33-47-11
Page 402
Aug 01/06
IAC
Logo Light 3YL/4YL
Figure 401/TASK 33-47-11-991-003
EFF :
ALL 33-47-11
Page 403
Aug 01/06
IAC
(4) Disconnent the electrical connector (5).
(5) Remove the screw (6), the washer (7) and the bonding lead (8) from
the bottom of the housing (4).
EFF :
ALL 33-47-11
Page 404
Aug 01/06
IAC
TASK 33-47-11-400-002
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
NOTE : The procedure is the same for the two logo lights.
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-47-11
Page 405
Aug 01/06
IAC
3. __________
Job Set-up
Subtask 33-47-11-860-057
(1) On panel 25VU make sure that the switch 3LA NAV & LOGO is in the OFF
position.
(2) Make sure that the aircraft electrical circuits are de-energized.
(3) Make sure that the platform is in position at zone 334 for the left
logo light and/or 344 for the right logo light.
Subtask 33-47-11-865-060
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/LOGO/L 2LY V03
122VU LIGHTING/LOGO/R 1LY V02
Subtask 33-47-11-210-052
(1) Make sure that the parts retained from the removed component are
clean and in the correct conditions.
4. Procedure
_________
Subtask 33-47-11-420-056
(1) Install the bonding lead (8), the washer (7) and the screw (6).
EFF :
ALL 33-47-11
Page 406
Aug 01/06
IAC
(3) Apply a layer of SEALANTS (Material No. 09-001) to the spar box skin
that will be in contact with the housing logo light (4) and apply a
layer of SPECIAL MATERIALS (Material No. 05-013) to the housing logo
light surface that will be in contact with the spar box skin.
(4) Put in position the logo light housing (4) and tighten the screws
(9).
(6) Put the frame assy (2) in position on the seal (3) and tighten the
screws (1).
(7) Apply a fillet of SEALANTS (Material No. 09-001) between the frame
assy contour and the spar box skin surface.
Subtask 33-47-11-370-054
B. Painting
(1) Apply STRUCTURE PAINTS (Material No. 16-016) to the heads of the
screws (1).
R Subtask 33-47-11-865-061
R C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
Subtask 33-47-11-710-052
R D. Operational Test
EFF :
ALL 33-47-11
Page 407
Aug 01/07
IAC
5. Close-up
________
Subtask 33-47-11-942-052
(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-47-11
Page 408
Aug 01/07
IAC
ANTI-COLLISION/STROBE LIGHTING - DESCRIPTION AND OPERATION
__________________________________________________________
1. General
_______
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
3LV PWR SPLY UNIT-UPPER BEACON 244 33-48-36
4LV PWR SPLY UNIT-LOWER BEACON 192 33-48-37
6LV LIGHT-BEACON, LOWER 191 33-48-12
7LV LIGHT-BEACON, UPPER 244 33-48-11
14LV PWR SPLY UNIT-WING TIP STROBE LIGHT 634 634AB 33-48-38
632
15LV PWR SPLY UNIT-L WING TIP STROBE 534 534AB 33-48-38
LIGHT 631
16LV LIGHT-STROBE, R WING TIP 634 33-48-14
17LV LIGHT - STROBE, L WING TIP 534 33-48-14
18LV PWR SPLY UNIT-TAIL CONE STROBE LIGHT 311 33-48-39
19LV LIGHT-STROBE, TAIL CONE 317 33-48-13
EFF :
ALL 33-48-00
Page 1
Feb 01/07
IAC
Anti-Collision/Beacon and Strobe Lighting - Component Location
Figure 001 (SHEET 1)
R
EFF :
001-012, 014-099, 33-48-00
Page 2
May 01/06
IAC
Anti-Collision/Beacon and Strobe Lighting - Component Location
Figure 001 (SHEET 2)
R
EFF :
001-012, 014-099, 33-48-00
Page 3
May 01/06
IAC
Anti-Collision/Beacon and Strobe Lighting - Component Location
Figure 001A (SHEET 1)
R
EFF :
101-199, 901-999, 33-48-00
Page 4
Feb 01/07
IAC
Anti-Collision/Beacon and Strobe Lighting - Component Location
Figure 001A (SHEET 2)
R
EFF :
101-199, 901-999, 33-48-00
Page 5
Feb 01/07
IAC
3. __________________
System Description
A. Anti-Collision/Beacon Lights
The two anti-collision/beacon lights which do not rotate flash at a rate
of 60 +/- 10 flashes per minute. Both lights give 360 degrees of
horizontal, and 75 degrees of vertical diffusion.
EFF :
ALL 33-48-00
Page 6
Feb 01/07
IAC
Anti-Collision/Beacon Light and Strobe Lights
Figure 002
R
EFF :
001-012, 014-099, 33-48-00
Page 7
May 01/06
IAC
Anti-Collision/Beacon Light and Strobe Lights
Figure 002A
R
EFF :
101-199, 901-999, 33-48-00
Page 8
Feb 01/07
IAC
Anti-Collision/Beacon Light and Strobe Light - Power Unit
Figure 003
EFF :
ALL 33-48-00
Page 9
May 01/06
R
IAC
B. Strobe Lights
The two forward facing strobe lights and the rearward facing strobe light
flash at the same time at a rate of 60 +/- 10 flashes per minute.
Additionally a second flash tube in the forward facing strobe lights
flashes at a rate of 60 +/- 10 flashes per minute. This produces 120 +/-
10 flashes per minute in the forward direction and 60 +/- 10 flashes per
minute in the rearward direction.
A. Anti-Collision/Beacon Lights
R The two anti-collision/beacon lights which do not turn, flash at a rate
R of 55 +/- 5 flashes per minute. The two lights give 360 degrees of
R horizontal, and 75 degrees of vertical diffusion.
B. Strobe Lights
The two forward facing strobe lights and the rearward facing strobe light
R flash at the same time at a rate of 55 +/- 5 flashes per minute. A second
R flash tube in the forward facing strobe lights flashes at a rate of 55
R +/- 5 flashes per minute. This gives 110 +/- 10 flashes per minute in the
R forward direction and 55 +/- 5 flashes per minute in the rearward
R direction.
4. Power
____________
Supply
The 115VAC 101XP and 202XP are three phase busbars which supply power
through the circuit breakers 1LV and 5LV to the power units 3LV and 4LV. The
power units, which control the flash rate, supply the power to each
anti-collision/beacon light.
The 115VAC three phase busbar 202XP supplies power through the circuit
breaker 10LV to the power units 14LV,15LV and 18LV. The power units, which
control the flash rate, supply power to each strobe light. The landing gear
computer supplies 28VDC to the coil of the relay 13LV when the landing gear
struts are compressed.
5. _____________________
Component Description
EFF :
ALL 33-48-00
Page 10
Nov 01/07
IAC
R **ON A/C 101-199, 901-999,
(1) A transformer is mounted in the base of the light. The housing of the
anti-collision/beacon transformer is provided with cooling fins.
(3) The seperate power unit supplies the anode/cathode with a 400 to
500VDC. Also it supplies a start pulse for the anti-collision/beacon
and the strobe lights.
B. Power Unit
(Ref. Fig. 004)
The power unit supplies a high voltage frequency to start and operate the
anti-collision/beacon and the strobe lights. In the forward facing strobe
light there are two circuits the same.
(2) An AC/DC Converter converts the 200V/400Hz input power to the various
DC voltages used in the power unit.
(3) The flash rate is given by a timer to the connected light unit.
EFF :
ALL 33-48-00
Page 11
Feb 01/07
IAC
(6) The blocking converter is made inoperative after each flash by an arc
blanking circuit. It reduces the arc-burning current of the connected
light unit to give complete arc-suppression.
6. Operation
_________
A. Anti-Collision/Beacon Lights
The system is supplied with power when the busbars are energized and the
circuit breakers 1LV and 5LV are closed. The power control relay contacts
8LV and 9LV are supplied with 200VAC. The control switch 2LV in the
BEACON ON position energizes the relay 8LV and 9LV. The power units 3LV
and 4LV are supplied with 200VAC. The anti-collision light 7LV and 6LV
flash at a rate of 60+-10 flashes per minutes.
R A. Anti-Collision/Beacon Lights
The system is supplied with power when the busbars are energized and the
circuit breakers 1LV and 5LV are closed. The power control relay contacts
8LV and 9LV are supplied with 200VAC. The control switch 2LV in the
BEACON ON position energizes the relay 8LV and 9LV. The power units 3LV
and 4LV are supplied with 200VAC. The anti-collision light 7LV and 6LV
R flash at a rate of 55 +/- 5 flashes per minute.
EFF :
ALL 33-48-00
Page 12
Nov 01/07
IAC
Anti-Collision/Beacon and Strobe Lighting - Schematic
Figure 004
EFF :
ALL 33-48-00
Page 13/14
May 01/06
IAC
R **ON A/C ALL
B. Strobe Light
The strobe light system is supplied with three phase 200VAC/400Hz when
the busbar is energized and the circuit breaker 10LV is closed.
(1) With the switch STROBE 11LV set to AUTO, 115VAC is supplied to the
power relay 12LV. 28VDC, from the landing gear computer, is removed
when the landing gear struts are extended. This de-energizes the coil
of the control relay 13LV and gives a ground signal for the power
relay 12LV. The power units 14LV, 15LV and 18LV are supplied with
200VAC. From these power units an increased voltage is produced to
operate the strobe lights 16LV, 17LV and 19LV.
28VDC is supplied to the coil of relay 13LV when the landing gear
struts are compressed. This energizes the coil of the control relay
13LV and removes the ground signal. The power relay 12LV is
de-energized and the three phase 200VAC/400Hz is removed from the
power units 14LV, 15LV and 18LV.
(2) With the switch STROBE 11LV set to ON, 115VAC is supplied to the
power relay 12LV. It also gives a ground signal for the coil of the
power relay 12LV. The power units 14LV, 15LV and 18LV are supplied
with three phase 200VAC/400Hz from the power relay 12LV. The strobe
lights flash as described.
EFF :
ALL 33-48-00
Page 15
May 01/06
IAC
ANTI-COLLISION/STROBE LIGHTING - DEACTIVATION/REACTIVATION
__________________________________________________________
TASK 33-48-00-040-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-00
Page 401
Feb 01/07
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-00-941-052
(1) Make sure that the strobe lights operate correctly (Ref. TASK 33-48-
00-710-002).
(3) Put a WARNING NOTICE in position to tell persons not to operate the
anti-collision lights.
EFF :
ALL 33-48-00
Page 402
Feb 01/07
IAC
Subtask 33-48-00-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
4. Procedure
_________
Subtask 33-48-00-040-050
(1) Remove the countersunk screws (1) from the lens (23) (Ref. TASK 33-
48-11-000-001) or (Ref. TASK 33-48-12-000-001).
NOTE : Make match marks on the screws (1) and/or their positions to
____
help with the installation procedure (different screw sizes).
(2) Remove and discard the remaining part of the lens (23) and the seal
(22) or (32).
(3) Remove the countersunk screws (3) from the plate (18).
EFF :
ALL 33-48-00
Page 403
Feb 01/07
IAC
Anti-Collision (Beacon) Lights
Figure 401/TASK 33-48-00-991-001
R
EFF :
001-012, 014-099, 33-48-00
Page 404
May 01/06
IAC
Anti-Collision (Beacon) Lights
Figure 401A/TASK 33-48-00-991-001-A
R
EFF :
101-199, 901-999, 33-48-00
Page 405
Feb 01/07
IAC
(4) Lift the light assembly until you can see the electrical connector
(9).
(5) Disconnect the electrical connector (9) from the light assembly and
support the electrical connector (9).
(6) Remove the screws (2) from the cage (20) and remove the cage (20).
(7) Remove the screws (11) from the housing (12) and remove the housing
(12).
(8) Disconnect the electrical connectors (17) from the transformer (13).
(9) Carefully remove the reflector (19) from the plate (18).
NOTE : Remove only the reflector (19) and not the light assembly.
____
(10) Install the transformer (13) in the housing (12) with the screws
(11).
(11) Install the plate (18) on the housing (12) with the screws (2).
(12) Make sure that the electrical connectors are clean and in the correct
condition.
(14) Install the plate (18) and the seal (14) or (34) on the flange (10)
with the countersunk screws (3).
(15) Make and install a cover for the cable hole in the plate (18) from
the high speed tape, BONDING AND ADHESIVE COMPOUNDS (Material No. 08-
061).
(16) Clean the surface of the fuselage (8) around the anti-collision light
with a lint-free cotton cloth, MISCELLANEOUS (Material No. 19-003)
made moist with a warm soap solution.
(17) Make sure that no liquid goes into the inside of the plate (18).
(18) Dry the surface with a dry lint-free cotton cloth, MISCELLANEOUS
(Material No. 19-003).
EFF :
001-012, 014-099, 33-48-00
Page 406
Feb 01/07
R
IAC
(19) Apply the high speed tape, BONDING AND ADHESIVE COMPOUNDS (Material
No. 08-061) on the top of the plate (18) and the adjacent area of the
fuselage (8).
(20) Make sure that the high speed tape is installed correctly. The high
speed tape must seal all of the opening for the anti-collision light.
(21) Write in the aircraft technical log that the anti-collision light has
a temporary repair.
(22) Keep the circuit breakers 1LV and 5LV open, safetied and tagged.
Subtask 33-48-00-040-050-A
(1) Remove the countersunk screws (1) from the lens (23) (Ref. TASK 33-
48-11-000-001) or (Ref. TASK 33-48-12-000-001).
NOTE : Make match marks on the screws (1) and/or their positions to
____
help with the installation procedure (different screw sizes).
(2) Remove and discard the remaining part of the lens (23) and the seal
(22) or (32).
(3) Remove the screws (2) from the flash tube assy (21).
(4) Remove the countersunk screws (3) from the housing (15).
(5) Lift the housing (15) sufficiently to get access to the plate (4).
EFF :
ALL 33-48-00
Page 407
Feb 01/07
IAC
(9) Remove the transformer (7) from the housing (15).
(10) Support the transformer (7) and disconnect the electrical connectors
(17) from the transformer (7).
(11) Carefully remove the flash tube assy (21) from the housing (15).
NOTE : Remove only the flash tube assy (21) and not the light
____
assembly.
(12) Install the transformer (7) in the housing (15) with the screw (6).
(13) Install the plate (4) on the housing (15) with the screws (5).
(14) Install the housing (15) and the seal (14) or (34) on the flange (10)
with the countersunk screws (3).
(15) Make and install a cover for the cable hole in the housing (15) from
the high speed tape, BONDING AND ADHESIVE COMPOUNDS (Material No. 08-
061).
(16) Clean the surface of the fuselage (8) around the anti-collision light
with a lint-free cotton cloth, MISCELLANEOUS (Material No. 19-003)
made moist with a warm soap solution.
(17) Make sure that no liquid goes into the inside of the housing (15).
(18) Dry the surface with a dry lint-free cotton cloth, MISCELLANEOUS
(Material No. 19-003).
(19) Apply the high speed tape, BONDING AND ADHESIVE COMPOUNDS (Material
No. 08-061) on the top of the housing (15) and the adjacent area of
the fuselage (8).
NOTE : Do not cover the removed flash tube assy (21) with tape.
____
(20) Make sure that the high speed tape is installed correctly. The high
speed tape must seal all of the opening for the anti-collision light.
(21) Write in the aircraft technical log that the anti-collision light has
a temporary repair.
(22) Keep the circuit breakers 1LV and 5LV open, safetied and tagged.
R
EFF :
101-199, 901-999, 33-48-00
Page 408
Feb 01/07
IAC
**ON A/C ALL
TASK 33-48-00-440-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
ALL 33-48-00
Page 409
Feb 01/07
IAC
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-00
Page 410
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-48-00-941-053
(1) Make sure that the WARNING NOTICE is in position to tell persons not
to operate the anti-collision lights.
Subtask 33-48-00-865-053
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
4. Procedure
_________
EFF :
ALL 33-48-00
Page 411
Feb 01/07
IAC
INTENTIONALLY BLANK
R
33-48-00
Page 412
Feb 01/07
IAC
R **ON A/C 001-012, 014-099,
Subtask 33-48-00-440-050
NOTE : For the torque values of the screws see the related AMM 20-21-11
____
(Ref. TASK 20-21-11-911-001).
(2) Remove the tape from the cable hole in the plate (18) of the
anti-collision light.
(4) Remove the countersunk screws (3) from the plate (18).
(5) Lift the light assembly until you can see the electrical connector
(9).
(6) Disconnect the electrical connector (9) from the light assembly and
support the electrical connector (9).
(8) Remove the screws (2) from the plate (18) and remove the plate (18).
(9) Remove the screws (11) from the housing (12) and remove the
transformer (13).
(10) Make sure that the work area is clean and clear of tool(s) and other
items.
(11) Make sure that the ignition wire of the xenon flash tube is fixed
below the reflector (19).
EFF :
001-012, 014-099, 33-48-00
Page 413
May 01/06
IAC
(12) Put the leads of the reflector (19) through the cable hole of the
plate (18).
(14) Make sure that the electrical connectors are clean and in the correct
condition.
(16) Install the transformer (13) in the housing (12) with the screws
(11).
(17) Install the cage (20), the reflector (19) and the plate (18) on the
housing (12) with the screws (2).
(19) Install the plate (18) and the seal (14) or (34) on the flange (10)
with the countersunk screws (3).
(20) Apply the SEALANTS (Material No. 09-013) to the heads of the
countersunk screws (3) (Ref. TASK 20-28-00-912-004) and let it dry.
(21) Apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No.
07-001B) to the head of the countersunk screw (3) which gives the
electrical bonding.
(22) For the lens drain plug of the new lens (23) obey subsequent:
FOR 6LV
remove the lens drain plug from the new lens (23) if installed.
NOTE : You must remove the lens drain plug from the new lens (23) to
____
prevent that the condensed water stays in the lens (23).
FOR 7LV
make sure that the lens drain plug is correctly installed in the new
lens (23).
EFF :
001-012, 014-099, 33-48-00
Page 414
May 01/06
IAC
(23) Install a new seal:
FOR 6LV
install a new seal (22).
FOR 7LV
install a new seal (32).
(24) Install the new lens (23) on the fuselage (8) with the countersunk
screws (1) (Ref. TASK 33-48-11-400-001) or (Ref. TASK 33-48-12-400-
001).
NOTE : Refer to the match marks made during the removal procedure for
____
the screw (1) installation in the correct position.
Subtask 33-48-00-440-050-A
NOTE : For the torque values of the screws see the related AMM 20-21-11
____
(Ref. TASK 20-21-11-911-001).
(2) Remove the tape from the cable hole in the housing (15) of the
anti-collision light.
(4) Remove the countersunk screws (3) from the housing (15).
(5) Lift the housing (15) until you can see the electrical connector (9).
(6) Disconnect the electrical connector (9) from the housing (15) and
support the electrical connector (9).
EFF :
ALL 33-48-00
Page 415
Feb 01/07
IAC
(7) Replace the seal:
FOR 6LV
discard the seal (14) and install a new seal (14).
FOR 7LV
discard the seal (34) and install a new seal (34).
(8) Make sure that the electrical connectors are clean and in the correct
condition.
(10) Remove the screws (5) and the plate (4) from the housing (15).
(11) Remove the screw (6) and the transformer (7) from the housing (15).
(13) Make sure that the work area is clean and clear of tool(s) and other
items.
(14) Put the leads of the flash tube assy (21) through the cable hole of
the housing (15).
(15) Install the flash tube assy (21) on the housing (15).
(16) Make sure that the electrical connectors are clean and in the correct
condition.
(18) Install the transformer (7) in the housing (15) with the screw (6).
(19) Install the plate (4) on the housing (15) with the screws (5).
(20) Install the housing (15) and the seal (14) or (34) on the flange (10)
with the countersunk screws (3).
(21) Apply the SEALANTS (Material No. 09-013) to the heads of the
countersunk screws (3) (Ref. TASK 20-28-00-912-004) and let it dry.
(22) Apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No.
07-001B) to the head of the countersunk screw (3) which gives the
electrical bonding.
R
EFF :
101-199, 901-999, 33-48-00
Page 416
Feb 01/07
IAC
R (23) Install the flash tube assy (21) on the housing (15) with the four
R screws (2).
R (24) For the rubber bung (24) of the new lens (23) obey subsequent:
R FOR 6LV
R remove the rubber bung (24) from the new lens (23) if installed.
R NOTE : You must remove the rubber bung (24) from the new lens (23) to
____
R prevent that the condensed water stays in the lens (23).
R FOR 7LV
R make sure that the rubber bung (24) is correctly installed in the new
R lens (23).
R (26) Install the new lens (23) on the fuselage (8) with the countersunk
R screws (1) (Ref. TASK 33-48-11-400-001) or (Ref. TASK 33-48-12-400-
R 001).
R NOTE : The pin (16) must engage in the rubber bung (24) if installed.
____
R NOTE : Refer to the match marks made during the removal procedure for
____
R the screw (1) installation in the correct position.
5. Close-up
________
Subtask 33-48-00-942-052
(3) Write in the aircraft technical log that the lens of the
anti-collision light has been replaced.
EFF :
ALL 33-48-00
Page 417
May 01/06
IAC
Subtask 33-48-00-865-054
EFF :
ALL 33-48-00
Page 418
May 01/06
IAC
ANTI-COLLISION/STROBE LIGHTING - ADJUSTMENT/TEST
________________________________________________
TASK 33-48-00-710-001
WARNING : DO NOT LOOK DIRECTLY AT THE LIGHT FLASH DURING THE TEST.
_______
SUPPLY A COVER, OR SHIELD, TO GIVE PROTECTION FROM THE LIGHT FLASH TO
PERSONS IN THE TEST AREA.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-00-861-050
Subtask 33-48-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
EFF :
ALL 33-48-00
Page 501
Aug 01/06
IAC
R
4. Procedure
_________
WARNING : DO NOT LOOK DIRECTLY AT THE LIGHT FLASH DURING THE TEST.
_______
SUPPLY A COVER, OR SHIELD, TO GIVE PROTECTION FROM THE LIGHT FLASH
TO PERSONS IN THE TEST AREA.
Subtask 33-48-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 33-48-00
Page 502
Aug 01/06
IAC
**ON A/C 101-199, 901-999,
Subtask 33-48-00-710-050-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R
R - Put the switch BEACON 2LV in - The upper beacon light 7LV and the
R the ON position. lower beacon light 6LV come on.
R These lights flash at a rate of 55
R +/- 5 flashes per minute.
R
R - Put the switch BEACON 2LV in - The upper beacon light 7LV and the
R the OFF position. lower beacon light 6LV go off.
5. Close-up
________
Subtask 33-48-00-862-050
EFF :
ALL 33-48-00
Page 503
Nov 01/07
IAC
TASK 33-48-00-710-002
WARNING : DO NOT LOOK DIRECTLY AT THE LIGHT FLASH DURING THE TEST.
_______
SUPPLY A COVER, OR SHIELD, TO GIVE PROTECTION FROM THE LIGHT FLASH TO
PERSONS IN THE TEST AREA.
1. __________________
Reason for the Job
Make sure that the Beacon/Strobe lights (Red) and the Strobe lights (White)
operate correctly.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-00-861-051
Subtask 33-48-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
122VU LIGHTING/WING/STROBE 10LV V05
EFF :
ALL 33-48-00
Page 504
Feb 01/07
R
IAC
Subtask 33-48-00-869-050
4. Procedure
_________
WARNING : DO NOT LOOK DIRECTLY AT THE LIGHT FLASH DURING THE TEST.
_______
SUPPLY A COVER, OR SHIELD, TO GIVE PROTECTION FROM THE LIGHT FLASH
TO PERSONS IN THE TEST AREA.
Subtask 33-48-00-710-051
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 33-48-00
Page 505
Feb 01/07
R
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
4. On the SYSTEM/REPORT TEST L/G On the MCDU:
page of the MCDU: - the LGCIU 2 page comes on.
- push the LGCIU 2 line key.
- push the NEXT PAGE pushbuttom - the LANDING GEAR MENU page comes on.
switch.
- push the LANDING GEAR - the LGCIU LANDING GEAR SIMULATION
SIMULATION line key. MENU page comes on.
- push the LH + RH line key.
- the LGCIU LH + RH MENU page comes on.
- push the EXTENDED line key. - the strobe lights come on and flash
in alternate synchronization with the
- push the COMPRESSED line key. upper and lower beacons.
- the strobe lights go off.
- push the RETURN line key. - the LGCIU MENU LANDING GEAR
SIMULATION page comes on.
- push the RETURN line key. - the LGCIU MENU page comes on.
- push the RETURN line key. - the SYSTEM REPORT/TEST L/G page comes
on.
EFF :
001-012, 014-099, 33-48-00
Page 506
Feb 01/07
R
IAC
**ON A/C 101-199, 901-999,
Subtask 33-48-00-710-051-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R
R - Put the switch BEACON 2LV in - The upper beacon light 7LV and the
R the ON position. lower beacon light 6LV come on.
R These lights flash at a rate of 55
R +/- 5 flashes per minute.
R 2. On the overhead panel 25VU: On the wing tips and the tailcone:
R
R - Put the switch STROBE 11LV in - The strobe lights 17LV and 16LV at
R the ON position. the end of the wing tips come on.
R - The strobe light 19LV at the tailcone
R below the APU exhaust comes on.
R These lights flash at a rate of 55
R +/- 5 flashes per minute.
R 3. In the cockpit on the EXT LT On the wing tips and the tailcone:
panel 25VU:
R - Push the LGCIU 2 line key. - The LGCIU 2 page comes on.
EFF :
101-199, 901-999, 33-48-00
Page 507
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - Push the NEXT PAGE pushbutton - The LANDING GEAR MENU page comes on.
R switch.
R - Push the LH + RH line key. - The LGCIU LH + RH MENU page comes on.
R
R - Push the EXTENDED line key. - The strobe lights come on and flash
R in alternate synchronization with the
R upper and lower beacons.
R
R - Push the COMPRESSED line key. - The strobe lights go off.
R - Push the RETURN line key. - The LGCIU MENU LANDING GEAR
R SIMULATION page comes on.
R - Push the RETURN line key. - The LGCIU MENU page comes on.
R
R - Push the RETURN line key. - The SYSTEM REPORT/TEST L/G page comes
R on.
R 5. In the cockpit on the EXT LT On the wing tips and the tailcone:
panel 25VU:
R - Put the switch STROBE 11LV in - The strobe lights stay off.
R the OFF position.
R
R - Put the switch BEACON 2LV in - The upper beacon light 7LV and the
R the OFF position. lower beacon light 6LV go off.
R
EFF :
101-199, 901-999, 33-48-00
Page 508
Nov 01/07
IAC
**ON A/C ALL
5. Close-up
________
Subtask 33-48-00-860-050
A. Close Access
(1) On the MCDU, push the line key adjacent to the RETURN indication
until the CFDS menu page comes into view.
(2) On the ECAM control panel, set the UPPER DISPLAY and LOWER DISPLAY
potentiometers to OFF.
Subtask 33-48-00-862-051
EFF :
ALL 33-48-00
Page 509
Nov 01/07
IAC
LIGHT - BEACON, UPPER (7LV) - REMOVAL/INSTALLATION
__________________________________________________
TASK 33-48-11-000-001
Removal of the Upper Beacon/Strobe Light 7LV from the Outside of the Fuselage
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
NOTE : You can also remove the upper beacon/strobe light from the inside of the
____
fuselage (Ref. TASK 33-48-11-000-002).
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-11
Page 401
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-48-11-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
Subtask 33-48-11-010-055
B. Get Access
(1) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel
25VU is in the OFF position.
4. Procedure
_________
Subtask 33-48-11-020-051
(1) Remove the countersunk screws (11) from the lens (9).
NOTE : Make match marks on the screws (11) and/or their positions to
____
help with the installation procedure (different screw sizes).
EFF :
ALL 33-48-11
Page 402
Feb 01/07
IAC
R Upper Beacon/Strobe Light 7LV
Figure 401/TASK 33-48-11-991-004
EFF :
001-012, 014-099, 33-48-11
Page 403
Feb 01/08
IAC
R Upper Beacon/Strobe Light 7LV
Figure 401A/TASK 33-48-11-991-004-A
EFF :
101-199, 901-999, 33-48-11
Page 404
Nov 01/07
IAC
(2) Remove the lens (9) and discard the seal (8).
(3) Remove the countersunk screws (5) from the light assembly (2).
(4) Lift the light assembly (2) until the electrical connector (1) is
visible.
(5) Disconnect the electrical connector (1) from the light assembly (2).
(7) Remove the light assembly (2) with the seal (12) from the aircraft.
EFF :
ALL 33-48-11
Page 405
Feb 01/07
R
IAC
TASK 33-48-11-400-001
Installation of the Upper Beacon/Strobe Light 7LV from the Outside of the
Fuselage
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-48-11
Page 406
May 01/06
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-11-860-052
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(2) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel
25VU is in the OFF position.
EFF :
ALL 33-48-11
Page 407
Nov 01/07
IAC
Subtask 33-48-11-865-053
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
4. Procedure
_________
Subtask 33-48-11-420-051
R NOTE : For the torque values that you must use for the screws, refer to
____
R (Ref. TASK 20-21-11-911-001).
EFF :
ALL 33-48-11
Page 408
Nov 01/07
IAC
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Prepare the electrical bonding point at the flange (3) (Ref. TASK 20-
28-00-912-004).
(5) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Connect the electrical connector (1) to the light assembly (2).
R (7) Use the correct sequence when you tighten the countersunk screws (5).
R Install the light assembly (2) and the new seal (12) with the
R countersunk screws (5) on the flange (3).
(8) Apply SEALANTS (Material No. 09-013) to the heads of the countersunk
screws (5) and let it dry.
(9) Apply PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-
001B) to the head of the countersunk screw (5) which gives the
electrical bonding.
R (a) Use the correct sequence when you tighten the countersunk screws
R (11).
R Install the lens (9) with a new seal (8) and the countersunk
R screws (11) and tighten.
(b) Make sure that the lens drain plug (10) is installed.
(a) Make sure that the bung (10) is correctly installed in the lens
(9).
R (b) Use the correct sequence when you tighten the countersunk screws
R (11).
R Install the lens (9) with a new seal (8) and the countersunk
R screws (11) and tighten.
R
EFF :
001-012, 014-099, 33-48-11
Page 409
Nov 01/07
IAC
R NOTE : It is necessary to refer to the match marks made during
____
R the removal procedure for the screw (11) installation in
R the correct position.
R (12) Make sure that the pin (13) engages in the bung (10).
Subtask 33-48-11-420-051-A
(3) Prepare the electrical bonding point at the flange (3) (Ref. TASK 20-
28-00-912-004).
(5) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Connect the electrical connector (1) to the light assembly (2).
R (7) Use the correct sequence when you tighten the countersunk screws (5).
R Install the light assembly (2) and the new seal (12) with the
R countersunk screws (5) on the flange (3).
(8) Apply SEALANTS (Material No. 09-013) to the heads of the countersunk
screws (5) (Ref. TASK 20-28-00-912-004) and let it dry.
(9) Apply PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-
001B) to the head of the countersunk screw (5) which gives the
electrical bonding.
(10) Make sure that the bung (10) is correctly installed in the lens (9).
R (11) Use the correct sequence when you tighten the countersunk screws
R (11).
R Install the lens (9) with a new seal (8) and the countersunk screws
R (11) and tighten.
EFF :
ALL 33-48-11
Page 410
Nov 01/07
IAC
R NOTE : It is necessary to refer to the match marks made during the
____
R removal procedure for the countersunk screw (11) installation
R in the correct position.
R (12) Make sure that the pin (13) engages in the bung (10).
Subtask 33-48-11-860-051
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
Subtask 33-48-11-865-054
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
Subtask 33-48-11-710-050
D. Do this test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- put the switch 2LV BEACON - the upper beacon/strobe light 7LV
ON-OFF to the OFF position. goes off.
EFF :
ALL 33-48-11
Page 411
Nov 01/07
IAC
5. Close-up
________
Subtask 33-48-11-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-48-11-862-055
EFF :
ALL 33-48-11
Page 412
Nov 01/07
R
IAC
TASK 33-48-11-000-002
Removal of the Upper Beacon/Strobe Light 7LV from the Inside of the Fuselage
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
NOTE : You can also remove the upper beacon/strobe light from the outside of
____
the fuselage (Ref. TASK 33-48-11-000-001).
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-11
Page 413
Nov 01/07
R
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-48-11-860-050
(1) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel
25VU is in the OFF position.
(2) Make sure that the switch 4WL EMER EXIT LT OFF-ARM-ON on the overhead
panel 25VU is in the OFF position.
(3) Make sure that the pushbutton EMERG LIGHT on the FWD Attendant Panel
(FAP) 120RH is in the released position.
Subtask 33-48-11-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
Subtask 33-48-11-010-053
C. Get Access
(2) Remove the center ceiling panel 241CC to get access to the upper
beacon/strobe light (Ref. TASK 25-23-41-000-001).
4. Procedure
_________
EFF :
ALL 33-48-11
Page 414
Nov 01/07
R
IAC
**ON A/C ALL
Subtask 33-48-11-020-052
(1) Disconnect the electrical connector (1) from the light assembly (2).
(3) Loosen the screw (7), remove the attach ring (6) from the flange (3)
and discard the O-ring (4).
(4) Remove the movable part of the flange (3) together with the light
assembly (2).
(6) Remove the light assembly (2) with the seal (12) from the flange (3).
EFF :
ALL 33-48-11
Page 415
Nov 01/07
R
IAC
TASK 33-48-11-400-002
Installation of the Upper Beacon/Strobe Light 7LV from the Inside of the
Fuselage
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-48-11
Page 416
Nov 01/07
R
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-11-860-054
(1) Make sure that the stepladder is in position below the ceiling panel
241CC.
(3) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel
25VU is in the OFF position.
(4) Make sure that the switch 4WL EMER EXIT LT OFF-ARM-ON on the overhead
panel 25VU is in the OFF position.
(5) Make sure that the pushbutton EMERG LIGHT on the FWD Attendant Panel
(FAP) 120RH is in the released position.
EFF :
ALL 33-48-11
Page 417
Nov 01/07
R
IAC
Subtask 33-48-11-865-055
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
4. Procedure
_________
Subtask 33-48-11-420-052
EFF :
ALL 33-48-11
Page 418
Nov 01/07
IAC
(3) Prepare the electrical bonding point at the flange (3) (Ref. TASK 20-
28-00-912-004).
R (4) Use the correct sequence when you tighten the countersunk screws (5).
R Install the light assembly (2) and the new seal (12) with the
R countersunk screws (5) on the flange (3).
(5) Apply SEALANTS (Material No. 09-013) to the heads of the countersunk
screws (5) (Ref. TASK 20-28-00-912-004) and let it dry.
(6) Apply PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-
001B) to the head of the countersunk screw (5) which gives the
electrical bonding.
(7) Make sure that the bung (10) is correctly installed in the lens (9).
(8) Put the light assembly (2) together with the movable part of the
flange (3) in position.
R
R (a) Make sure that the pin (13) engages correctly in the bung (10).
R (10) Install the V-clamp (6) with a new O-ring (4) and tighten the screw
(7).
R (11) Safety the screw (7) with BONDING AND ADHESIVE COMPOUNDS (Material
No. 08-007).
R (13) Make sure that the electrical connectors are clean and in the correct
condition.
R (14) Connect the electrical connector (1) to the light assembly (2).
R
EFF :
001-012, 014-099, 33-48-11
Page 419
Nov 01/07
IAC
**ON A/C 101-199, 901-999,
Subtask 33-48-11-420-052-A
(3) Prepare the electrical bonding point at the flange (3) (Ref. TASK 20-
28-00-912-004).
R (4) Use the correct sequence when you tighten the countersunk screws (5).
R Install the light assembly (2) and the new seal (12) with the
R countersunk screws (5) on the flange (3).
(5) Apply SEALANTS (Material No. 09-013) to the heads of the countersunk
screws (5) (Ref. TASK 20-28-00-912-004) and let it dry.
(6) Apply PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-
001B) to the head of the countersunk screw (5) which gives the
electrical bonding.
(7) Make sure that the bung (10) is correctly installed in the lens (9).
(8) Put the light assembly (2) together with the movable part of the
flange (3) in position.
R
R (9) Make sure that the pin (13) engages correctly in the bung (10).
R (10) Install the V-clamp (6) with a new O-ring (4) and tighten the screw
(7).
R (11) Safety the screw (7) with BONDING AND ADHESIVE COMPOUNDS (Material
No. 08-007).
R (13) Make sure that the electrical connectors are clean and in the correct
condition.
R (14) Connect the electrical connector (1) to the light assembly (2).
R
EFF :
101-199, 901-999, 33-48-11
Page 420
Nov 01/07
IAC
**ON A/C ALL
Subtask 33-48-11-860-053
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
Subtask 33-48-11-865-056
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
Subtask 33-48-11-710-051
D. Do this test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- put the swich 2LV BEACON ON-OFF - the upper beacon/strobe light 7LV
to the OFF position. goes off.
EFF :
ALL 33-48-11
Page 421
Nov 01/07
R
IAC
5. Close-up
________
Subtask 33-48-11-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-48-11-862-054
R
EFF :
ALL 33-48-11
Page 422
Nov 01/07
IAC
TASK 33-48-11-000-003
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
WARNING : DO NOT TOUCH THE STROBE LIGHTS FOR AT LEAST 5 MINUTES AFTER
_______
OPERATION. THE STROBE LIGHT WILL STILL BE HOT.
WARNING : DO NOT REMOVE THE STROBE LIGHT FOR AT LEAST TEN MINUTES AFTER YOU
_______
DE-ENERGIZE THE ELECTRICAL CIRCUITS. THE HIGH VOLTAGE ELECTRICAL
CURRENT IN THE CAPACITOR OF THE STROBE LIGHT IS DANGEROUS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-11-941-053
A. Safety Precautions
(1) Put a WARNING NOTICE on panel 25VU to tell persons not to operate the
strobe lights or the navigation lights.
EFF :
ALL 33-48-11
Page 423
Nov 01/07
R
IAC
Subtask 33-48-11-865-059
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
Subtask 33-48-11-010-057
C. Get Access
(1) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel
25VU is in the OFF position.
4. Procedure
_________
Subtask 33-48-11-020-054
A. Removal of the Flash Tube Assembly of the Upper Beacon/Strobe Light 7LV
(2) Remove the countersunk screws (2) from the structure (3).
(3) Remove the lens (9) and discard the seal (8).
(4) Remove the countersunk screws (6) from the light assembly (4).
(5) Lift the flash tube assembly (7) until you can see the electrical
connectors (5).
(6) Disconnect the electrical connectors (5) from the light assembly (4).
(7) Remove the flash tube assembly (7) from the light assembly (4).
R
EFF :
ALL 33-48-11
Page 424
Nov 01/07
IAC
R Flash Tube Assembly of the Upper Beacon Light
Figure 402/TASK 33-48-11-991-006
EFF :
ALL 33-48-11
Page 425
Nov 01/07
IAC
TASK 33-48-11-400-003
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
WARNING : DO NOT TOUCH THE STROBE LIGHTS FOR AT LEAST 5 MINUTES AFTER
_______
OPERATION. THE STROBE LIGHT WILL STILL BE HOT.
WARNING : DO NOT REMOVE THE STROBE LIGHT FOR AT LEAST TEN MINUTES AFTER YOU
_______
DE-ENERGIZE THE ELECTRICAL CIRCUITS. THE HIGH VOLTAGE ELECTRICAL
CURRENT IN THE CAPACITOR OF THE STROBE LIGHT IS DANGEROUS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-11
Page 426
Feb 01/07
R
IAC
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-11-941-054
A. Safety Precautions
(1) Make sure that the WARNING NOTICE is in position on panel 25VU to
tell persons not to operate the strobe lights or the navigation
lights.
EFF :
ALL 33-48-11
Page 427
Nov 01/07
IAC
Subtask 33-48-11-860-056
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(2) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel
25VU is in the OFF position.
Subtask 33-48-11-865-060
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
4. Procedure
_________
Subtask 33-48-11-420-054
R NOTE : For the torque values that you must use for the screws, refer to
____
R (Ref. TASK 20-21-11-911-001).
R
EFF :
ALL 33-48-11
Page 428
Nov 01/07
IAC
(4) Make sure that the electrical connectors are clean and in the correct
condition.
(5) Connect the electrical connectors (5) to the light assembly (4).
(6) Put the new TUBE ASSEMBLY-FLASH (7) on the light assembly (4).
R (7) Use the correct sequence when you tighten the countersunk screws (6).
R Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-013) to the
R threads of the countersunk screws (6), then install the screws and
tighten.
R (10) Use the correct sequence when you tighten the countersunk screws (2).
R Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-013) to the
R threads of the countersunk screws (2), then install the screws and
tighten.
(11) Apply SEALANTS (Material No. 09-013) to the heads of the countersunk
screws (2) (Ref. TASK 20-28-00-912-004) and let it dry.
Subtask 33-48-11-860-057
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
Subtask 33-48-11-865-061
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
EFF :
ALL 33-48-11
Page 429
Nov 01/07
IAC
Subtask 33-48-11-710-053
D. Do this test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- put the switch 2LV BEACON - the upper beacon/strobe light 7LV
ON-OFF in the OFF position. goes off.
5. Close-up
________
Subtask 33-48-11-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-48-11-862-056
Subtask 33-48-11-942-054
C. Removal of Equipment
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-48-11
Page 430
Nov 01/07
R
IAC
LIGHT - BEACON,LOWER (6LV) - REMOVAL/INSTALLATION
_________________________________________________
TASK 33-48-12-000-001
Removal of the Lower Beacon/Strobe Light 6LV from the Fuselage Outside
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-12
Page 401
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-48-12-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
Subtask 33-48-12-869-050
B. Make sure that the switch 2LV BEACON ON-OFF on the overhead panel 25VU is
in the OFF position.
4. Procedure
_________
Subtask 33-48-12-020-051
(2) Remove the lens (6) and discard the seal (7).
(3) Remove the screws (3) and (9) from the mount plate (8).
EFF :
ALL 33-48-12
Page 402
Feb 01/07
IAC
R Lower Beacon/Strobe Light
Figure 401/TASK 33-48-12-991-001
EFF :
001-012, 014-099, 33-48-12
Page 403
Nov 01/07
IAC
R Lower Beacon/Strobe Light
Figure 401A/TASK 33-48-12-991-001-A
EFF :
101-199, 901-999, 33-48-12
Page 404
Nov 01/07
IAC
(4) Remove the light assembly (2) until the electrical connector (1) is
visible.
(5) Disconnect the electrical connector (1) from the light assembly (2).
(7) Remove the light assembly (2) with the seal (10)
EFF :
ALL 33-48-12
Page 405
Aug 01/06
R
IAC
TASK 33-48-12-400-001
Installation of the Lower Beacon/Strobe Light 6LV from the Fuselage Outside
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-12
Page 406
Nov 01/07
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-12-869-051
A. Make sure that the switch 2LV BEACON ON-OFF on the overhead panel 25VU is
in the OFF position.
Subtask 33-48-12-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
4. Procedure
_________
EFF :
ALL 33-48-12
Page 407
Feb 01/07
IAC
R **ON A/C ALL
Subtask 33-48-12-420-050
R NOTE : For the torque values that you must use for the screws, refer to
____
R (Ref. TASK 20-21-11-911-001).
(3) Prepare the electrical bonding point at the mount plate (8)
(Ref. TASK 20-28-00-912-004).
(5) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Connect the electrical connector (1) to the light assembly (2).
R (7) Use the correct sequence when you tighten the screws (3) and (9).
R Install the light assembly (2) and the new seal (10) with the screws
R (3) and (9) on the mount plate (8).
(8) Apply SEALANTS (Material No. 09-013) to the heads of the screws (9)
and let it dry.
(9) Apply PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-
001B) to the sealant of the srews (9).
R
EFF :
ALL 33-48-12
Page 408
Nov 01/07
IAC
R (10) On all lights, but not on PN 2LA55010-00:
R (b) Use the correct sequence when you tighten the screws (4).
R Install the lens (6) with a new seal (7) and the screws (4) and
R tighten.
R (b) Use the correct sequence when you tighten the screws (4).
R Install the lens (6) with a new seal (7) and the screws (4) and
R tighten.
Subtask 33-48-12-420-050-A
(3) Prepare the electrical bonding point at the mount plate (8)
(Ref. TASK 20-28-00-912-004).
(5) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Connect the electrical connector (1) to the light assembly (2).
R (7) Use the correct sequence when you tighten the screws (3) and (9).
R Install the light assembly (2) and the new seal (10) with the screws
R (3) and (9) on the mount plate (8).
(8) Apply SEALANTS (Material No. 09-013) to the heads of the screws (9)
and let it dry.
(9) Apply PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-
001B) to the sealant of the srews (9).
EFF :
ALL 33-48-12
Page 409
Nov 01/07
IAC
(10) Make sure that the bung (5) is removed.
R (11) Use the correct sequence when you tighten the screws (4).
R Install the lens (6) with a new seal (3) and the screws (4) and
R tighten.
Subtask 33-48-12-865-053
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
Subtask 33-48-12-710-051
C. Do this test
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- put the switch 2LV BEACON - the lower beacon/strobe light 6LV
ON-OFF to the OFF position. goes off.
5. Close-up
________
Subtask 33-48-12-860-050
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-48-12
Page 410
Nov 01/07
IAC
TASK 33-48-12-700-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-12-861-050
Subtask 33-48-12-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
EFF :
ALL 33-48-12
Page 411
Feb 01/07
R
IAC
INTENTIONALLY BLANK
R
33-48-12
Page 412
Aug 01/06
IAC
R **ON A/C ALL
4. Procedure
_________
Subtask 33-48-12-710-050
A. Do this test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- put the switch BEACON 2LV to - the lower beacon/strobe light 6LV
the OFF position. goes off.
5. Close-up
________
Subtask 33-48-12-410-050
A. Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-48-12-862-050
EFF :
ALL 33-48-12
Page 413
May 01/06
IAC
R TASK 33-48-12-000-002
R WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
R ENVIRONMENT.
R WARNING : DO NOT TOUCH THE STROBE LIGHTS FOR AT LEAST 5 MINUTES AFTER
_______
R OPERATION. THE STROBE LIGHT WILL STILL BE HOT.
R WARNING : DO NOT REMOVE THE STROBE LIGHT FOR AT LEAST TEN MINUTES AFTER YOU
_______
R DE-ENERGIZE THE ELECTRICAL CIRCUITS. THE HIGH VOLTAGE ELECTRICAL
R CURRENT IN THE CAPACITOR OF THE STROBE LIGHT IS DANGEROUS.
R 1. __________________
Reason for the Job
R Self Explanatory
R 2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 33-48-12-941-050
R A. Safety Precautions
R (1) Put a WARNING NOTICE on panel 25VU to tell persons not to operate the
R strobe lights or the navigation lights.
EFF :
ALL 33-48-12
Page 414
May 01/06
IAC
Subtask 33-48-12-865-056
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
Subtask 33-48-12-010-051
C. Make sure that the switch 2LV BEACON ON-OFF on the overhead panel 25VU is
in the OFF position.
4. Procedure
_________
Subtask 33-48-12-020-052
A. Removal of the Flash Tube Assembly of the Lower Beacon/Strobe Light 6LV
(1) Remove the countersunk screws (2) from the structure (9).
(2) Remove the lens (4) and discard the seal (5).
(3) Remove the countersunk screws (1) from the light assembly (8).
(4) Lift the light assembly (8) until you can see the electrical
connectors (7).
(5) Disconnect the electrical connectors (7) from the light assembly (8).
(6) Remove the flash tube assembly (6) from the light assembly (8).
EFF :
ALL 33-48-12
Page 415
Nov 01/07
R
IAC
R Flash Tube Assembly of the Lower Beacon Light
Figure 402/TASK 33-48-12-991-002
EFF :
ALL 33-48-12
Page 416
Nov 01/07
IAC
R TASK 33-48-12-400-002
R WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
R ENVIRONMENT.
R WARNING : DO NOT TOUCH THE STROBE LIGHTS FOR AT LEAST 5 MINUTES AFTER
_______
R OPERATION. THE STROBE LIGHT WILL STILL BE HOT.
R WARNING : DO NOT REMOVE THE STROBE LIGHT FOR AT LEAST TEN MINUTES AFTER YOU
_______
R DE-ENERGIZE THE ELECTRICAL CIRCUITS. THE HIGH VOLTAGE ELECTRICAL
R CURRENT IN THE CAPACITOR OF THE STROBE LIGHT IS DANGEROUS.
R 1. __________________
Reason for the Job
R Self Explanatory
R 2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
EFF :
ALL 33-48-12
Page 417
May 01/06
IAC
R C. Expendable Parts
R -------------------------------------------------------------------------------
R FIG.ITEM |DESIGNATION |IPC-CSN
R -------------------------------------------------------------------------------
R D. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 33-48-12-941-051
R A. Safety Precautions
R (1) Make sure that the WARNING NOTICE is in position on panel 25VU to
R tell persons not to operate the strobe lights or the navigation
R lights.
R Subtask 33-48-12-860-053
R (1) Make sure that the parts retained from the removed component are
R clean and in the correct condition.
R (2) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel
R 25VU is in the OFF position.
EFF :
ALL 33-48-12
Page 418
May 01/06
IAC
Subtask 33-48-12-865-057
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
4. Procedure
_________
Subtask 33-48-12-420-051
(4) Make sure that the electrical connectors are clean and in the correct
condition.
(5) Connect the electrical connectors (7) to the light assembly (8).
(6) Put the new TUBE ASSEMBLY-FLASH (6) on the light assembly (8).
R
R (7) Use the correct sequence when you tighten the countersunk screws (1).
R Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-013) to the
R threads of the countersunk screws (1), then install the countersunk
R screws and tighten. (Ref. TASK 20-21-11-911-001)
EFF :
ALL 33-48-12
Page 419
Nov 01/07
IAC
(8) Make sure that the bung (3) is removed from the lens (4) to drain the
condensation.
R (10) Use the correct sequence when you tighten the countersunk screws (2).
R Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-013) to the
R threads of the countersunk screws (2), then install the countersunk
R screws and tighten. (Ref. TASK 20-21-11-911-001)
(11) Apply SEALANTS (Material No. 09-013) to the heads of the countersunk
screws (2) (Ref. TASK 20-28-00-912-004) and let it dry.
Subtask 33-48-12-861-052
Subtask 33-48-12-865-058
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
Subtask 33-48-12-710-053
D. Do this test
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- put the switch 2LV BEACON - the lower beacon/strobe light 6LV
ON-OFF in the OFF position. goes off.
EFF :
ALL 33-48-12
Page 420
Nov 01/07
IAC
5. Close-up
________
Subtask 33-48-12-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-48-12-862-051
Subtask 33-48-12-942-050
C. Removal of Equipment
(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-48-12
Page 421
Aug 01/06
R
IAC
LIGHT - STROBE, TAIL CONE (19LV) - REMOVAL/INSTALLATION
_______________________________________________________
TASK 33-48-13-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-13
Page 401
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-48-13-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
Subtask 33-48-13-010-050
B. Get Access
(Ref. Fig. 401/TASK 33-48-13-991-003)
(1) Put the access platform in position at the APU tail cone exhaust-area
Zone 317.
(2) Remove the tail navigation light (15LA) (3) (Ref. TASK 33-41-15-000-
001).
Subtask 33-48-13-010-050-A
B. Get Access
(Ref. Fig. 401A/TASK 33-48-13-991-003-A)
(1) Put the access platform in position at the APU tail cone exhaust-area
Zone 317.
(2) Remove the lens from the tail navigation light (15LA) (3) (Ref. TASK
33-41-15-000-002).
EFF :
ALL 33-48-13
Page 402
Feb 01/07
IAC
R Tail Cone Strobe Light
R Figure 401/TASK 33-48-13-991-003
R
EFF :
001-012, 014-099, 33-48-13
Page 403
Aug 01/06
IAC
Tail Cone Strobe Light
Figure 401A/TASK 33-48-13-991-003-A
R
EFF :
101-199, 901-999, 33-48-13
Page 404
Feb 01/07
IAC
**ON A/C ALL
4. Procedure
_________
Subtask 33-48-13-020-050
WARNING : DO NOT REMOVE THE STROBE LIGHT FOR AT LEAST TEN MINUTES AFTER
_______
YOU DE-ENERGIZE THE ELECTRICAL CIRCUITS. THE HIGH VOLTAGE
ELECTRICAL CURRENT IN THE CAPACITOR OF THE STROBE LIGHT IS
DANGEROUS.
WARNING : BE CAREFUL IF YOU TOUCH THE STROBE LIGHT WITH THE COVER REMOVED
_______
AND THE POWER APPLIED. SOME COMPONENTS HAVE DANGEROUS VOLTAGES.
WARNING : DO NOT TOUCH THE STROBE LIGHTS FOR AT LEAST 5 MINUTES AFTER
_______
OPERATION. THE STROBE LIGHT WILL STILL BE HOT.
(1) Remove the screws (1), the washers (2) and the tail cone strobe-light
(4) from the tail navigation light (3).
EFF :
ALL 33-48-13
Page 405
Feb 01/07
IAC
TASK 33-48-13-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-13
Page 406
Feb 01/08
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-48-13-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
122VU LIGHTING/WING/STROBE 10LV V05
4. Procedure
_________
Subtask 33-48-13-910-050
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
EFF :
ALL 33-48-13
Page 407
Feb 01/07
IAC
Subtask 33-48-13-420-051
(1) Apply SPECIAL MATERIALS (Material No. 05-002) to the washers (2) and
the screws (1).
(2) Install the tail cone strobe-light (4) in the tail navigation light
(3) with the washers (2) and the screws (1).
Subtask 33-48-13-410-051
C. Close Access
(Ref. Fig. 401/TASK 33-48-13-991-003)
(1) Install the tail navigation light (15LA) (3) (Ref. TASK 33-41-15-400-
001).
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-48-13-410-051-A
C. Close Access
(Ref. Fig. 401A/TASK 33-48-13-991-003-A)
(1) Install the lens of the tail navigation light (15LA) (3) (Ref. TASK
33-41-15-400-002).
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-48-13-865-056
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
EFF :
ALL 33-48-13
Page 408
Feb 01/07
IAC
Subtask 33-48-13-710-050
WARNING : DO NOT LOOK DIRECTLY AT THE LIGHT FLASH DURING THE TEST.
_______
SUPPLY A COVER, OR SHIELD, TO GIVE PROTECTION FROM THE LIGHT
FLASH TO PERSONS IN THE TEST AREA.
5. Close-up
________
Subtask 33-48-13-410-050
A. Close Access
EFF :
ALL 33-48-13
Page 409
Feb 01/07
R
IAC
R TASK 33-48-13-960-002
R WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
R YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
R 1. __________________
Reason for the Job
R Self Explanatory
R 2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Expendable Parts
R -------------------------------------------------------------------------------
R FIG.ITEM |DESIGNATION |IPC-CSN
R -------------------------------------------------------------------------------
R C. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
EFF :
ALL 33-48-13
Page 410
Nov 01/06
IAC
R 3. __________
Job Set-up
R Subtask 33-48-13-865-054
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 121VU APU/APU/CTL 2KD L42
R 121VU APU/ECB/SPLY 1KD L41
R 122VU LIGHTING/EXT LT/NAV1/AND LOGO/LT 1LA T03
R 122VU LIGHTING/EXT LT/NAV2/AND LOGO/LT 2LA T02
R 122VU LIGHTING/WING/STROBE 10LV V05
R Subtask 33-48-13-010-052
R B. Get Access
R (1) Put the access platform in position at the APU tail cone exhaust-area
R Zone 317.
R (2) Remove the lens from the tail navigation light (15LA) (Ref. TASK 33-
R 41-15-000-002).
R 4. Procedure
_________
R Subtask 33-48-13-960-051
R WARNING : DO NOT REMOVE THE STROBE LIGHT FOR AT LEAST TEN MINUTES AFTER
_______
R YOU DE-ENERGIZE THE ELECTRICAL CIRCUITS. THE HIGH VOLTAGE
R ELECTRICAL CURRENT IN THE CAPACITOR OF THE STROBE LIGHT IS
R DANGEROUS.
R WARNING : BE CAREFUL IF YOU TOUCH THE STROBE LIGHT WITH THE COVER REMOVED
_______
R AND THE POWER APPLIED. SOME COMPONENTS HAVE DANGEROUS VOLTAGES.
R WARNING : DO NOT TOUCH THE STROBE LIGHTS FOR AT LEAST 5 MINUTES AFTER
_______
R OPERATION. THE STROBE LIGHT WILL STILL BE HOT.
EFF :
ALL 33-48-13
Page 411
Nov 01/06
IAC
R Replacement of the Strobe-Light Flash-Tube Assembly
R Figure 402/TASK 33-48-13-991-004
EFF :
ALL 33-48-13
Page 412
Nov 01/06
IAC
R (1) Remove the screws (1) and the lens (2).
R (3) Remove the screws (4) and discard the flash tube assembly (5).
R (4) Install the new flash tube assembly (5) with the screws (4).
R (5) Install the new gasket (3) and the lens (2) with the screws (1).
R Subtask 33-48-13-410-052
R B. Close Access
R (1) Install the lens of the tail navigation light (15LA) (Ref. TASK 33-
R 41-15-400-002).
R (2) Make sure that the work area is clean and clear of tool(s) and other
R items.
R Subtask 33-48-13-865-055
R C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
R breaker(s):
R Subtask 33-48-13-710-052
R WARNING : DO NOT LOOK DIRECTLY AT THE LIGHT FLASH DURING THE TEST.
_______
R SUPPLY A COVER, OR SHIELD, TO GIVE PROTECTION FROM THE LIGHT
R FLASH TO PERSONS IN THE TEST AREA.
EFF :
ALL 33-48-13
Page 413
Nov 01/06
IAC
R 5. Close-up
________
R Subtask 33-48-13-410-053
R A. Close Access
EFF :
ALL 33-48-13
Page 414
Nov 01/06
IAC
LIGHT - STROBE, WING TIP (16LV,17LV) - REMOVAL/INSTALLATION
___________________________________________________________
TASK 33-48-14-000-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : DO NOT TOUCH THE STROBE LIGHTS FOR AT LEAST 5 MINUTES AFTER
_______
OPERATION. THE STROBE LIGHT WILL STILL BE HOT.
WARNING : DO NOT REMOVE THE STROBE LIGHT FOR AT LEAST TEN MINUTES AFTER YOU
_______
DE-ENERGIZE THE ELECTRICAL CIRCUITS. THE HIGH VOLTAGE ELECTRICAL
CURRENT IN THE CAPACITOR OF THE STROBE LIGHT IS DANGEROUS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-14
Page 401
Feb 01/96
IAC
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-14-941-050
A. Safety Precautions
(2) Put a warning notice in the cockpit on panel 25VU to tell persons not
to operate the navigation lights or the strobe lights.
Subtask 33-48-14-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
Subtask 33-48-14-010-050
C. Get Access
(1) Put the access platform in position below the applicable zone 534 or
634.
(2) Remove the applicable glazing panel (3) (Ref. TASK 57-37-12-000-001).
EFF :
ALL 33-48-14
Page 402
Aug 01/06
IAC
Strobe Light
Figure 401/TASK 33-48-14-991-001
EFF :
ALL 33-48-14
Page 403
Feb 01/96
IAC
4. Procedure
_________
Subtask 33-48-14-020-050
(2) Remove the strobe light sufficiently to get access to the electrical
connector (1).
EFF :
ALL 33-48-14
Page 404
Feb 01/96
IAC
TASK 33-48-14-400-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-14
Page 405
May 01/06
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-14-941-053
A. Safety Precautions
(2) Make sure that the warning notice is in position on panel 25VU to
tell persons not to operate the navigation lights or the strobe
lights.
Subtask 33-48-14-860-052
(1) Make sure that the access platform is in position below the
applicable zone 534, 634.
EFF :
ALL 33-48-14
Page 406
May 01/06
IAC
Subtask 33-48-14-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/WING/STROBE 10LV V05
4. Procedure
_________
Subtask 33-48-14-420-052
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-004).
(2) Clean the glazing panel with a MISCELLANEOUS (Material No. 19-003)
made moist with soap solution.
(4) Make sure that the parts retained from the removed component are
clean and in the correct condition.
EFF :
ALL 33-48-14
Page 407
Feb 01/07
R
IAC
**ON A/C 001-012, 014-099,
Subtask 33-48-14-420-050
(1) Remove the blanking caps from the disconnected electrical connectors.
(2) Connect the electrical connector (1) to the strobe light (2).
(3) Install the strobe light (2) with the bolts (4) and the washers (5).
(4) Electrically bond the aft bottom bolt (4) (Ref. TASK 20-28-00-912-
004).
Subtask 33-48-14-420-050-A
(1) Remove the blanking caps from the disconnected electrical connectors.
(2) Connect the electrical connector (1) to the strobe light (2).
(3) Clean the electrical connector (1) with a MISCELLANEOUS (Material No.
19-003) made moist with CLEANING AGENTS (Material No. 11-004).
(5) Install the strobe light (2) with the bolts (4) and the washers (5).
(6) Electrically bond the aft bottom bolt (4) (Ref. TASK 20-28-00-912-
004).
Subtask 33-48-14-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
10LV.
EFF :
ALL 33-48-14
Page 408
Feb 01/07
IAC
Subtask 33-48-14-710-050
D. Test
WARNING : DO NOT LOOK DIRECTLY AT THE LIGHT FLASH DURING THE TEST.
_______
SUPPLY A COVER, OR SHIELD, TO GIVE PROTECTION FROM THE LIGHT
FLASH TO PERSONS IN THE TEST AREA.
WARNING : BE CAREFUL IF YOU TOUCH THE STROBE LIGHT WITH THE COVER REMOVED
_______
AND THE POWER APPLIED. SOME COMPONENTS HAVE DANGEROUS VOLTAGES.
(1) Do the applicable operational test on the strobe light (Ref. TASK 33-
48-00-710-001) (Ref. TASK 33-48-00-710-002).
Subtask 33-48-14-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
5. Close-up
________
Subtask 33-48-14-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable glazing panel (3) (Ref. TASK 57-37-12-400-
001).
Subtask 33-48-14-865-054
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
10LV.
EFF :
ALL 33-48-14
Page 409
Aug 01/06
IAC
Subtask 33-48-14-942-052
C. Removal of Equipment
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-48-14
Page 410
Aug 01/06
R
IAC
TASK 33-48-14-000-002
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : DO NOT TOUCH THE STROBE LIGHTS FOR AT LEAST 5 MINUTES AFTER
_______
OPERATION. THE STROBE LIGHT WILL STILL BE HOT.
WARNING : DO NOT REMOVE THE STROBE LIGHT FOR AT LEAST TEN MINUTES AFTER YOU
_______
DE-ENERGIZE THE ELECTRICAL CIRCUITS. THE HIGH VOLTAGE ELECTRICAL
CURRENT IN THE CAPACITOR OF THE STROBE LIGHT IS DANGEROUS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-14
Page 411
May 01/06
R
IAC
3. __________
Job Set-up
Subtask 33-48-14-941-052
A. Safety Precautions
(1) Put a warning notice on panel 25VU to tell persons not to operate the
strobe lights or the navigation lights.
Subtask 33-48-14-865-055
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
Subtask 33-48-14-010-051
C. Get Access
(1) Put the access platform in position under the applicable wing-tip
strobe light in zone 534 or 634.
(2) Remove the glazing panel (1) from the applicable wing-tip strobe
light (Ref. TASK 57-37-12-000-001).
4. Procedure
_________
Subtask 33-48-14-020-053
CAUTION : BE CAREFULL WHEN YOU REMOVE THE ATTACHMENT SCREWS. THE LENS CAN
_______
FALL OUT.
(1) Remove the screws (2), the lens (3) and the gasket (4).
EFF :
ALL 33-48-14
Page 412
Aug 01/06
IAC
Strobe Light Flash Tube Assembly
Figure 402/TASK 33-48-14-991-002
EFF :
ALL 33-48-14
Page 413
Aug 01/06
R
IAC
(2) Remove the screws (5) and carefully remove the flash tube assembly
(6).
EFF :
ALL 33-48-14
Page 414
Aug 01/06
R
IAC
TASK 33-48-14-400-002
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
EFF :
ALL 33-48-14
Page 415
May 01/06
R
IAC
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-14-941-054
A. Safety Precautions
(2) Make sure that the warning notice is on panel 25VU to tell persons
not to operate the strobe lights or the navigation lights.
Subtask 33-48-14-860-053
(1) Make sure that the access platform is in position below the
applicable wing-tip strobe light in zone 534 or 634.
Subtask 33-48-14-865-056
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
EFF :
ALL 33-48-14
Page 416
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-48-14-420-053
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Clean the glazing panel with a MISCELLANEOUS (Material No. 19-003)
made moist with a warm soap solution.
Subtask 33-48-14-420-051
(1) Install the flash tube assembly (6) and the screws (5).
(2) Install a new gasket (4), the lens (3) and the screws (2).
Subtask 33-48-14-865-057
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
EFF :
ALL 33-48-14
Page 417
Aug 01/06
IAC
R
Subtask 33-48-14-710-051
D. Test
WARNING : DO NOT LOOK DIRECTLY AT THE LIGHT FLASH DURING THE TEST.
_______
SUPPLY A COVER, OR SHIELD, TO GIVE PROTECTION FROM THE LIGHT
FLASH TO PERSONS IN THE TEST AREA.
WARNING : BE CAREFUL IF YOU TOUCH THE STROBE LIGHT WITH THE COVER REMOVED
_______
AND THE POWER APPLIED. SOME COMPONENTS HAVE DANGEROUS VOLTAGES.
(1) Do the applicable operational test of the strobe lights (Ref. TASK
33-48-00-710-001) (Ref. TASK 33-48-00-710-002).
Subtask 33-48-14-865-058
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
5. Close-up
________
Subtask 33-48-14-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the glazing panel (1) on the applicable wing-tip strobe light
(Ref. TASK 57-37-12-400-001).
EFF :
ALL 33-48-14
Page 418
Aug 01/06
IAC
Subtask 33-48-14-865-059
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
10LV.
Subtask 33-48-14-942-055
C. Removal of Equipment
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-48-14
Page 419
May 01/06
IAC
POWER SUPPLY UNIT - UPPER BEACON LIGHT (3LV) - REMOVAL/INSTALLATION
___________________________________________________________________
TASK 33-48-36-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
Subtask 33-48-36-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
EFF :
ALL 33-48-36
Page 401
Aug 01/06
IAC
R
Subtask 33-48-36-860-050
(1) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel
25VU is in the OFF position.
(2) Make sure that the switch 4WL EMER EXIT LT OFF-ARM-ON on the overhead
panel 25VU is in the OFF position.
(3) Make sure that the pushbutton EMERG LIGHT on the FWD Attendant Panel
(FAP) is in the released position.
Subtask 33-48-36-010-050
C. Get Access
(2) Remove the center ceiling panel 241CC to get access to the power
supply unit (1) (Ref. TASK 25-23-41-000-001).
4. Procedure
_________
Subtask 33-48-36-020-050
(1) Remove and discard the lockwire from the electrical connector (5).
(2) Disconnect the electrical connectors (2) and (5) from the power
supply unit (1).
(5) Remove the power supply unit (1) from the fuselage.
EFF :
ALL 33-48-36
Page 402
Aug 01/06
IAC
Power Supply Unit 3LV
Figure 401/TASK 33-48-36-991-001
EFF :
ALL 33-48-36
Page 403
Aug 01/06
R
IAC
TASK 33-48-36-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-36
Page 404
Aug 01/06
R
IAC
3. __________
Job Set-up
Subtask 33-48-36-860-051
(1) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel
25VU is in the OFF position.
(2) Make sure that the switch 4WL EMER EXIT LT OFF-ARM-ON on the overhead
panel 25VUis in the OFF position.
(3) Make sure that the pushbutton EMERG LIGHT on the FWD Attendant Panel
(FAP) is in the released position.
(5) Make sure that the center ceiling panel 241CC is removed.
Subtask 33-48-36-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/BEACON/UPPER 1LV U06
4. Procedure
_________
Subtask 33-48-36-420-050
(3) Put the power supply unit (1) in position on the fuselage.
EFF :
ALL 33-48-36
Page 405
Aug 01/06
IAC
(4) Install the power supply unit (1) with the screws (4) and the washers
(3) and tighten.
(5) Apply STRUCTURE PAINTS (Material No. 16-003) on one of the screws (4)
(Ref. TASK 20-28-00-912-004).
(7) Make sure that the electrical connectors are clean and in the correct
condition.
(8) Connect the electrical connectors (2) and (5) to the power supply
unit (1).
Subtask 33-48-36-710-050
5. Close-up
________
Subtask 33-48-36-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the center ceiling panel 241CC (Ref. TASK 25-23-41-400-001).
EFF :
ALL 33-48-36
Page 406
Aug 01/06
R
IAC
POWER SUPPLY UNIT - LOWER BEACON LIGHT (4LV) - REMOVAL/INSTALLATION
___________________________________________________________________
TASK 33-48-37-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
Subtask 33-48-37-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
EFF :
ALL 33-48-37
Page 401
Aug 01/06
IAC
R
Subtask 33-48-37-860-050
(1) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel
25VU is in the OFF position.
Subtask 33-48-37-010-050
C. Get Access
(1) Remove the access panel 191HB at the belly fairing to get access to
the power supply unit (1) (Ref. TASK 53-35-13-000-002).
4. Procedure
_________
Subtask 33-48-37-020-050
(1) Remove and discard the lockwire from the electrical connector (5).
(2) Disconnect the electrical connectors (2) and (5) from the power
supply unit (1).
(5) Remove the power supply unit (1) from the fuselage.
EFF :
ALL 33-48-37
Page 402
Aug 01/06
IAC
Power Supply Unit 4LV
Figure 401/TASK 33-48-37-991-001
EFF :
ALL 33-48-37
Page 403
Feb 01/96
IAC
TASK 33-48-37-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-37-860-051
(1) Make sure that the switch 2LV BEACON ON-OFF on the overhead panel is
in the OFF position.
(2) Make sure that the access panel 191HB at the belly fairing is
removed.
EFF :
ALL 33-48-37
Page 404
Aug 01/06
R
IAC
Subtask 33-48-37-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
4. Procedure
_________
Subtask 33-48-37-420-050
(3) Put the power supply unit (1) in position on the fuselage.
(4) Install the power supply unit (1) with the screws (4) and the washers
(3) and tighten.
(5) Apply STRUCTURE PAINTS (Material No. 16-003) on one of the screws (4)
(Ref. TASK 20-28-00-912-004).
(7) Make sure that the electrical connectors are clean and in the correct
condition.
(8) Connect the electrical connectors (2) and (5) to the power supply
unit (1).
EFF :
ALL 33-48-37
Page 405
Aug 01/06
IAC
INTENTIONALLY BLANK
R
33-48-37
Page 406
Aug 01/06
IAC
Subtask 33-48-37-710-050
5. Close-up
________
Subtask 33-48-37-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panel 191HB to the belly fairing (Ref. TASK 53-35-
13-400-002).
EFF :
ALL 33-48-37
Page 407
May 01/06
IAC
POWER SUPPLY UNIT - WING TIP STROBE LIGHT (14LV,15LV) - REMOVAL/INSTALLATION
____________________________________________________________________________
TASK 33-48-38-000-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-38-941-052
A. Safety Precautions
(2) Put a warning notice in position on panel 25VU to tell persons not to
operate the strobe lights or the navigation lights.
EFF :
ALL 33-48-38
Page 401
May 01/06
R
IAC
Subtask 33-48-38-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
Subtask 33-48-38-010-050
C. Get Access
(1) Put the access platform in position below the applicable access panel
534AB(634AB).
4. Procedure
_________
Subtask 33-48-38-020-050
(1) Disconnect the electrical connectors (1) from the power supply unit
(4).
EFF :
ALL 33-48-38
Page 402
Aug 01/06
IAC
Power Supply Unit
Figure 401/TASK 33-48-38-991-001
EFF :
ALL 33-48-38
Page 403
Feb 01/96
IAC
(2) Put blanking caps on the disconnected electrical connectors.
NOTE : The power supply unit has two location pins. They locate in
____
the location pin sockets of the wing tip.
EFF :
ALL 33-48-38
Page 404
Feb 01/96
IAC
TASK 33-48-38-400-001
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-38
Page 405
Feb 01/96
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-38-941-053
A. Safety Precautions
(2) Make sure that the warning notice in on panel 25VU to tell persons
not to operate the strobe lights or the navigation lights.
Subtask 33-48-38-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
Subtask 33-48-38-860-050
(1) Make sure that the access platform is position below the applicable
power suppply unit.
(2) Make sure that the access panels 534AB (634AB) are removed.
EFF :
ALL 33-48-38
Page 406
Aug 01/06
IAC
4. Procedure
_________
Subtask 33-48-38-420-051
(1) Clean the component interface and/or the adjacent area with a clean
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-004).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
Subtask 33-48-38-420-050
(1) Carefully install the power supply unit (4), and make sure that the
location pins are correctly engaged in their sockets.
(2) Attach the power supply unit (4) with the bolts (3) and the washers
(2).
(3) Electrically bond the applicable bolt (3) (Ref. TASK 20-28-00-912-
004):
- for the left wing bond the inboard bolt (3)
- for the right wing bond the outboard bolt (3).
(4) Remove the blanking caps from the disconnected electrical connectors.
(5) Connect the electrical connectors (1) to the power supply unit.
EFF :
ALL 33-48-38
Page 407
Aug 01/06
R
IAC
Subtask 33-48-38-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
10LV.
Subtask 33-48-38-710-050
D. Test
WARNING : DO NOT LOOK DIRECTLY AT THE LIGHT FLASH DURING THE TEST.
_______
SUPPLY A COVER, OR SHIELD, TO GIVE PROTECTION FROM THE LIGHT
FLASH TO PERSONS IN THE TEST AREA.
Subtask 33-48-38-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
5. Close-up
________
Subtask 33-48-38-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-48-38
Page 408
Aug 01/06
IAC
Subtask 33-48-38-865-054
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
10LV.
Subtask 33-48-38-942-052
C. Removal of Equipment
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 33-48-38
Page 409
Aug 01/06
R
IAC
POWER SUPPLY UNIT - TAIL CONE STROBE LIGHT (18LV) - REMOVAL/INSTALLATION
________________________________________________________________________
TASK 33-48-39-000-001
Removal of the Power Supply Unit (18LV) of the Tail Cone Strobe-Light
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-39-861-050
Subtask 33-48-39-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
EFF :
ALL 33-48-39
Page 401
Aug 01/06
IAC
R
Subtask 33-48-39-010-050
C. Get Access
(1) Put the access platform in position below the access door 314AR at
Zone 310.
4. Procedure
_________
Subtask 33-48-39-020-050
(1) Remove and discard the lockwires from the electrical connectors (4)
and (5).
EFF :
ALL 33-48-39
Page 402
Aug 01/06
IAC
Power Supply Unit
Figure 401/TASK 33-48-39-991-001
EFF :
ALL 33-48-39
Page 403
Feb 01/96
IAC
TASK 33-48-39-400-001
Installation of the Power Supply Unit (18LV) of the Tail Cone Strobe-Light
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-48-39
Page 404
May 01/06
IAC
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-48-39-860-050
(1) Make sure that the access platform is in position below the access
door 314AR.
(3) Make sure that the aircraft electrical circuits are energized
(Ref. TASK 24-41-00-861-002).
Subtask 33-48-39-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
EFF :
ALL 33-48-39
Page 405
Aug 01/06
IAC
R
4. Procedure
_________
WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
_______
MATERIAL.
THIS MATERIAL IS DANGEROUS.
Subtask 33-48-39-910-050
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Remove the used sealant from the ground bonding surface of the
support and the power supply unit with a nonmetallic scraper.
(5) Make sure that the ground bonding surfaces have no signs of paint,
sealant or corrosion.
(6) Clean the ground bonding surfaces with CLEANING AGENTS (Material No.
11-003) and a lint-free cloth.
Subtask 33-48-39-420-050
(1) Make sure that the ground bonding attachment point point is clean
(Ref. TASK 20-28-00-912-004).
(2) Install the power supply unit (1) with the washers (3) and the screws
(2).
(5) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
ALL 33-48-39
Page 406
Aug 01/06
IAC
(6) Connect the electrical connectors (4) and (5).
(7) Safety the electrical connectors (4) and (5) with MISCELLANEOUS
(Material No. 19-010)
(8) Apply SEALANTS (Material No. 09-013) to the ground bonding attachment
point.
(9) Make sure that the bonding contact resistance between the power
supply unit and the support is not higher than 10 milliohms
(Ref. TASK 20-28-00-720-007).
Subtask 33-48-39-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/WING/STROBE 10LV V05
Subtask 33-48-39-710-050
5. Close-up
________
Subtask 33-48-39-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-48-39-862-050
EFF :
ALL 33-48-39
Page 407
Aug 01/06
IAC
WING AND ENGINE SCAN LIGHTING - DESCRIPTION AND OPERATION
_________________________________________________________
1. _______
General
The wing and engine scan lights illuminate the wing leading edge and the
engine nacelle, on each side of the aircraft fuselage. These areas can be
examined during the flight or on the ground.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
2LX SW-EXT LT/WING 25VU 210
3LX LT-WING & ENG SCAN, L 231 33-49-11
4LX LT-WING & ENG SCAN, R 232 33-49-11
3. ___________
Description
(Ref. Fig. 002)
The wing and engine scan light system has two lights 3LX and 4LX with a
fixed single filament. The lights are installed one on each side in the
forward fuselage of the aircraft. An attached transformer gives the rated
operation voltage to each light. Electrical power comes from the 115 VAC
busbars 202XP and 103XP through the circuit breakers 1LX and 5LX.
4. _________
Operation
(Ref. Fig. 002)
The switch 2LX is supplied with 115 VAC when:
- the busbars 202XP and 103XP are energized,
- the circuit breakers 1LX and 5LX are closed.
The wing and engine scan lights come on when the switch 2LX is in the ON
position.
EFF :
ALL 33-49-00
Page 1
Feb 01/96
IAC
Wing and Engine Scan Lights - Component Location
Figure 001
EFF :
ALL 33-49-00
Page 2
Feb 01/96
IAC
Wing and Engine Scan Lights - Schematic
Figure 002
EFF :
ALL 33-49-00
Page 3
Feb 01/96
IAC
WING AND ENGINE SCAN LIGHTING - DEACTIVATION/REACTIVATION
_________________________________________________________
TASK 33-49-00-040-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
33-49-11-000-001 Removal of the Wing and Engine Scan Light (3LX, 4LX)
R
EFF :
ALL 33-49-00
Page 401
Feb 01/08
IAC
3. __________
Job Set-up
Subtask 33-49-00-941-050
A. Safety Precautions
Subtask 33-49-00-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/R 1LX W03
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/L 5LX W02
4. Procedure
_________
Subtask 33-49-00-040-050
R (1) If you do not replace the cracked wing and engine scan light, you can
R do an alternative repair with transparent high-speed tape as follows:
(a) Clean the surface of the wing and engine scan-light lens with
MISCELLANEOUS (Material No. 19-003) made moist with warm soap
solution.
(b) Dry the surface of the wing and engine scan-light lens with a
clean MISCELLANEOUS (Material No. 19-003).
NOTE : Make sure that the tape is correctly installed and has no
____
bubbles, wrinkles or tears in it.
(d) Let the tape cure for 15 minutes minimum at a minimum temperature
of 15 deg.C (59.00 deg.F).
R
EFF :
ALL 33-49-00
Page 402
Feb 01/08
IAC
R (e) Write in the aircraft technical log that the wing and engine scan
R light is damaged.
R (2) If you do not replace the cracked wing and engine scan light, you can
R do an alternative repair with non-transparent high-speed tape. Then
R do the deactivation of the wing and engine scan light as follows:
R - In the forward passenger compartment:
R (a) Disconnect the movable connector from the applicable light and
R put a blanking cap on the disconnected connector (Ref. TASK 33-
49-11-000-001).
R (b) Write in the aircraft technical log that the wing and engine scan
R light is deactivated.
5. Close-up
________
Subtask 33-49-00-865-052
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LX, 5LX.
Subtask 33-49-00-942-051
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-49-00
Page 403
Feb 01/08
IAC
TASK 33-49-00-440-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
33-49-11-000-001 Removal of the Wing and Engine Scan Light (3LX, 4LX)
33-49-11-400-001 Installation of the Wing and Engine Scan Light (3LX,
4LX)
3. __________
Job Set-up
Subtask 33-49-00-941-051
A. Safety Precautions
EFF :
ALL 33-49-00
Page 404
May 01/05
IAC
Subtask 33-49-00-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/R 1LX W03
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/L 5LX W02
4. Procedure
_________
Subtask 33-49-00-440-050
(1) Replace the wing and engine scan light (Ref. TASK 33-49-11-000-001)
and (Ref. TASK 33-49-11-400-001).
5. Close-up
________
Subtask 33-49-00-865-054
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1LX, 5LX
Subtask 33-49-00-942-052
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-49-00
Page 405
Aug 01/06
IAC
WING AND ENGINE SCAN LIGHTING - ADJUSTMENT/TEST
_______________________________________________
TASK 33-49-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-49-00-861-051
Subtask 33-49-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/R 1LX W03
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/L 5LX W02
EFF :
ALL 33-49-00
Page 501
Aug 01/06
IAC
R
4. Procedure
_________
Subtask 33-49-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the EXT LT/WING selector - the wing/engine scan lights go off.
switch to OFF.
5. Close-up
________
Subtask 33-49-00-862-051
EFF :
ALL 33-49-00
Page 502
Aug 01/06
IAC
LIGHT - WING AND ENGINE SCAN (3LX,4LX) - REMOVAL/INSTALLATION
_____________________________________________________________
TASK 33-49-11-000-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-49-11
Page 401
Feb 01/96
IAC
3. __________
Job Set-up
Subtask 33-49-11-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 4LX
R
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/R 1LX W03
R
FOR 3LX
R
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/L 5LX W02
Subtask 33-49-11-010-051
B. Get Access
(3) Remove the thermal and acoustic insulation in zones 231 and 232.
4. Procedure
_________
Subtask 33-49-11-020-050
(a) Loosen the 16 screws (2) which attach the wing and engine scan
light (1) to the structure (3) of the aircraft.
EFF :
ALL 33-49-11
Page 402
Aug 01/06
IAC
Wing and Engine Scan Light
Figure 401/TASK 33-49-11-991-001
EFF :
ALL 33-49-11
Page 403
Aug 01/06
R
IAC
(2) Inside the forward passenger compartment:
(a) Disconnect the movable connector (4) from the light (1) and put a
blanking cap on the disconnected connector.
NOTE : It could be possible that the wing and engine scan lights are
____
not easy to remove. Do not use tools which could damage the
aircraft structure.
EFF :
ALL 33-49-11
Page 404
Aug 01/06
R
IAC
TASK 33-49-11-400-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-49-11
Page 405
Nov 01/04
IAC
3. __________
Job Set-up
Subtask 33-49-11-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 4LX
R
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/R 1LX W03
R
FOR 3LX
R
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/L 5LX W02
Subtask 33-49-11-010-052
B. Get Access
(1) Make sure that the access platform is in position in zone 230.
(2) Make sure that the sidewall panel is removed in the forward passenger
compartment:
- FOR 3LX
231RW.
- FOR 4LX
232KW.
(3) Make sure that the thermal and acoustic insulation is removed in zone
231/232.
4. Procedure
_________
Subtask 33-49-11-914-050
A. Installation of a sealant
EFF :
ALL 33-49-11
Page 406
Aug 01/06
IAC
(3) Remove the used sealant from the aircraft structure with a non-
metallic scraper.
(4) Clean the aircraft structure with CLEANING AGENTS (Material No. 11-
003) and a lint-free cloth.
(5) Install the SEALANTS (Material No. 09-019) between the wing and
engine scan light (1) and the structure (3) of the aircraft.
Subtask 33-49-11-420-050
(1) Inside the forward passenger compartment, install the new wing and
engine scan light (1).
(2) Remove the blanking cap and connect the movable connector (4) to the
light (1).
(3) Outside the aircraft, tighten the 16 screws (2) which attach the wing
and engine scan light (1) to the aircraft structure (3).
Subtask 33-49-11-865-061
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 4LX
R
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/R 1LX W03
R
FOR 3LX
R
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/L 5LX W02
Subtask 33-49-11-710-050
(1) Do the operational test of the Wing and Engine Scan Lights (Ref. TASK
33-49-00-710-001).
EFF :
ALL 33-49-11
Page 407
Aug 01/06
IAC
5. Close-up
________
Subtask 33-49-11-410-050
A. Close Access
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-49-11
Page 408
Aug 01/06
R
IAC
TASK 33-49-11-960-001
WARNING : WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU WORK ON THE LIGHT.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-49-11
Page 409
Aug 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-49-11-865-059
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
FOR 4LX
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/R 1LX W03
FOR 3LX
122VU LIGHTING/EXT LT/WING/AND ENG SCAN/L 5LX W02
Subtask 33-49-11-010-050
B. Get Access
4. Procedure
_________
Subtask 33-49-11-020-052
(1) Remove the four screw (2) from the lens assembly (1).
(2) Remove the lens assembly (1) away from the housing (7).
EFF :
ALL 33-49-11
Page 410
Aug 01/07
IAC
Lamp of the Wing and Engine Scan Light
Figure 402/TASK 33-49-11-991-003
R
EFF :
001-012, 014-099, 33-49-11
Page 411
Aug 01/06
IAC
Lamp of the Wing and Engine Scan Light
Figure 402A/TASK 33-49-11-991-003-A
R
EFF :
101-199, 901-999, 33-49-11
Page 412
Feb 01/07
IAC
(3) Remove the screw (11), the washers (10) and the nut (9). Release the
terminal (3) from the lens assembly (1).
(4) Remove the two screws (4) from the retainer (5).
(6) Pull the lamp (8) away from the housing (7) and disconnect the two
electrical terminals (6).
Subtask 33-49-11-420-053
(1) Connect the electrical terminals (6) to the new lamp (8) and install
it in the position in its housing (7). Hold it in this position.
(4) Attach the terminal (3) to the lens assembly (1) with the nut (9),
the washers (10) and the screw (11).
(5) Install the lens assembly (1) in the position on the housing (7).
Subtask 33-49-11-020-052-A
(5) Remove the lamp holder (5) from the lamp assembly (2).
R
EFF :
ALL 33-49-11
Page 413
Feb 01/07
IAC
(6) Remove the lamp (4) from the lamp holder (5).
Subtask 33-49-11-420-053-A
(3) Carefully, put the lamp holder (5) in position on the lamp assembly
(2).
R NOTE : Manually adjust to centre the optical support of the lamp. Use
____
R a shim and check that the peripheral gap between the lamp
R assembly (2) and the lamp houssing assembly (1) is 0.5 mm
R minimum.
Subtask 33-49-11-865-060
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 4LX
1LX
FOR 3LX
5LX
Subtask 33-49-11-710-053
(1) Do the operational test of the Wing and Engine Scan Lights (Ref. TASK
33-49-00-710-001).
EFF :
ALL 33-49-11
Page 414
Aug 01/07
IAC
5. Close-up
________
Subtask 33-49-11-942-054
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-49-11
Page 415
Feb 01/07
R
IAC
EMERGENCY LIGHTING - DESCRIPTION AND OPERATION
______________________________________________
1. General
_______
2. __________________
Component Location
EFF :
ALL 33-50-00
Page 1
Feb 01/07
IAC
C. FPEEPMS
The FPEEPMS is installed on the floor or on the seats (as applicable) at
the aisle and the emergency-exit area. The system provides floor-level
illumination of the passenger aisles and escape routes in the event that
smoke obscures normal emergency lighting.
EFF :
ALL 33-50-00
Page 2
Feb 01/07
IAC
**ON A/C ALL
3. __________________
System Description
A. General
The cabin emergency-lighting system is supplied with power, when the AC
normal busbar and the DC essential busbar are energized and the circuit
breakers are closed.
You can control the cabin emergency-lighting system with the control
switch EMER EXIT LT, installed in the cockpit. The pushbutton EMERG ON,
installed on the FAP, is connected in parallel to the control switch EMER
EXIT LT. The control switch EMER EXIT LT 4 WL has these three positions:
- OFF
- ARM
- ON
Each of the set positions cause the cabin emergency-lighting system to
operate in a different way.
(3) ON Position
The cabin emergency lighting system is activated; all cabin emergency
lights are on. The lights are supplied by the DC essential busbar or,
in case of a DC essential busbar failure, by the EPSU batteries.
4. Power
____________
Supply
The emergency lighting system is supplied with 115 V AC from the normal
busbar 103XP-B and with 28 V DC from the essential busbar 801PP. The circuit
breakers 1WL and 2WL are installed on the circuit breaker panel 49VU. The
circuit breaker 3WL is installed on circuit breaker panel 122VU. When the DC
essential aircraft power supply is not available, the integrated batteries
of the EPSUs supply the cabin emergency lighting system. They can supply the
system for a least 10 minutes.
5. _________
BITE Test
EFF :
ALL 33-50-00
Page 3
Feb 01/07
R
IAC
**ON A/C 001-012, 014-099,
A. General
Each EPSU has two different integrated BITE functions:
- A system test
- A battery capacity test
The EPSUs have an interface to the CIDS to read the BITE results of a
system test and a battery capacity test.
A. General
Each EPSU has two different integrated BITE functions:
- A system test
- A battery capacity test
The EPSUs have an interface to the CIDS to read the BITE results of a
system test and a battery capacity test on the CFDS/MCDU.
EFF :
ALL 33-50-00
Page 4
Feb 01/07
IAC
- The output voltage of the battery pack
- The battery heating device
- The proper function of the EPSU logic and switching circuits
- If the connected loads are in the pre-determined values
The system test has a limit of 20 seconds to prevent discharge of the
battery pack.
EFF :
101-199, 901-999, 33-50-00
Page 5
Feb 01/07
IAC
CABIN EMERGENCY LIGHTING - DESCRIPTION AND OPERATION
____________________________________________________
1. General
_______
- the illumination of the cabin and the exit areas in the event of a
failure of the main lighting system,
EFF :
ALL 33-51-00
Page 1
Feb 01/07
IAC
R **ON A/C ALL
2. __________________
Component Location
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
10WL POWER SUPPLY UNIT-EMERGENCY 221BC 221 831 33-51-38
11WL POWER SUPPLY UNIT-EMERGENCY 241KW 241 831 33-51-38
12WL POWER SUPPLY UNIT-EMERGENCY 242KW 242 831 33-51-38
13WL POWER SUPPLY UNIT-EMERGENCY 261KW 261 832 33-51-38
20WL LIGHT-EMERGENCY, CABIN 222 841 33-51-11
21WL LIGHT-EMERGENCY, CABIN 221 831 33-51-11
22WL2 LIGHT-EMERGENCY, CABIN 232 831 33-51-11
22WL4 LIGHT-EMERGENCY, CABIN 242 831 33-51-11
22WL6 LIGHT-EMERGENCY, CABIN 242 832 33-51-11
22WL8 LIGHT-EMERGENCY, CABIN 252 832 33-51-11
22WL10 LIGHT-EMERGENCY, CABIN 252 832 33-51-11
23WL1 LIGHT-EMERGENCY, CABIN 231 831 33-51-11
23WL3 LIGHT-EMERGENCY, CABIN 231 831 33-51-11
23WL5 LIGHT-EMERGENCY, CABIN 241 832 33-51-11
23WL7 LIGHT-EMERGENCY, CABIN 251 832 33-51-11
23WL9 LIGHT-EMERGENCY, CABIN 251 832 33-51-11
32WL LIGHT-EMERGENCY, CABIN 262 842 33-51-11
33WL LIGHT-EMERGENCY, CABIN 261 832 33-51-11
40WL SIGN-EXIT MARKING 222 841 33-51-16
41WL SIGN-EXIT MARKING 221 831 33-51-16
42WL SIGN-EXIT MARKING 242 841 33-51-16
43WL SIGN-EXIT MARKING 241 831 33-51-16
44WL SIGN-EXIT MARKING 262 842 33-51-16
45WL SIGN-EXIT MARKING 261 832 33-51-16
50WL SIGN-EXIT LOCATION, 1 SIDED 221 831 33-51-17
51WL SIGN-EXIT LOCATION, 1 SIDED 241 831 33-51-17
52WL SIGN-EXIT LOCATION, 1 SIDED 261 832 33-51-17
53WL SIGN-EXIT LOCATION, 1 SIDED 241 831 33-51-17
60WL LIGHT-EMERGENCY, OVERWING 242 831 33-51-15
61WL LIGHT-EMERGENCY, OVERWING 241 831 33-51-15
62WL LIGHT-EMERGENCY, OVERWING 242 831 33-51-15
63WL LIGHT-EMERGENCY, OVERWING 241 831 33-51-15
70WL1 ESCAPE HATCH HANDLE LIGHT 241 831 33-51-11
R
EFF :
ALL 33-51-00
Page 2
Feb 01/07
IAC
Cabin Emergency Lighting - Component Location
Figure 001
R
EFF :
001-012, 014-099, 33-51-00
Page 3
Feb 01/07
IAC
Cabin Emergency Lighting - Component Location
R Figure 001A
R
EFF :
101-199, 901-999, 33-51-00
Page 4
May 01/07
IAC
INTENTIONALLY BLANK
R
33-51-00
Page 5
May 01/07
IAC
Cabin Emergency Lighting - Component Location
Figure 002 (SHEET 1)
R
EFF :
001-012, 014-099, 33-51-00
Page 6
Aug 01/07
IAC
Cabin Emergency Lighting - Component Location
Figure 002 (SHEET 2)
R
EFF :
001-012, 014-099, 33-51-00
Page 7
Aug 01/07
IAC
Cabin Emergency Lighting - Component Location
Figure 002 (SHEET 3)
R
EFF :
001-012, 014-099, 33-51-00
Page 8
Aug 01/07
IAC
R Cabin Emergency Lighting - Component Location
R Figure 002A
EFF :
101-199, 33-51-00
Page 9
Aug 01/07
IAC
Cabin Emergency Lights - Component Location
R Figure 002B
R
EFF :
901-901, 33-51-00
Page 10
May 01/07
IAC
R Cabin Emergency Lighting - Component Location
R Figure 002C
R
EFF :
902-999, 33-51-00
Page 11
Aug 01/07
IAC
Lavatory Auxiliary Lights - Component Location
Figure 003
EFF :
001-012, 014-099, 33-51-00
Page 12
Aug 01/07
R
IAC
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
70WL2 ESCAPE HATCH HANDLE LIGHT 242 831 33-51-11
70WL3 ESCAPE HATCH HANDLE LIGHT 241 831 33-51-11
70WL4 ESCAPE HATCH HANDLE LIGHT 242 831 33-51-11
80WL LIGHT-AUXILIARY, LAVATORY 223 831 33-51-14
81WL LIGHT-AUXILIARY, LAVATORY 263 832 33-51-14
83WL LIGHT-AUXILIARY, LAVATORY 264 842 33-51-14
90WL1 SIGN-EXIT MARKING, WALL MOUNTED 221 831 33-51-13
90WL2 SIGN-EXIT MARKING, WALL MOUNTED 222 841 33-51-13
90WL3 SIGN-EXIT MARKING, WALL MOUNTED 241 831 33-51-13
90WL4 SIGN-EXIT MARKING, WALL MOUNTED 242 831 33-51-13
90WL5 SIGN-EXIT MARKING, WALL MOUNTED 241 831 33-51-13
90WL6 SIGN-EXIT MARKING, WALL MOUNTED 242 831 33-51-13
90WL7 SIGN-EXIT MARKING, WALL MOUNTED 261 832 33-51-13
90WL8 SIGN-EXIT MARKING, WALL MOUNTED 262 842 33-51-13
100WL1 LIGHT-EMERGENCY, SEAT MOUNTED 200 831 33-51-19
100WL2 LIGHT-EMERGENCY, SEAT MOUNTED 200 831 33-51-19
100WL3 LIGHT-EMERGENCY, SEAT MOUNTED 200 831 33-51-19
100WL4 LIGHT-EMERGENCY, SEAT MOUNTED 200 831 33-51-19
100WL5 LIGHT-EMERGENCY, SEAT MOUNTED 200 832 33-51-19
100WL6 LIGHT-EMERGENCY, SEAT MOUNTED 200 832 33-51-19
100WL7 LIGHT-EMERGENCY, SEAT MOUNTED 200 832 33-51-19
100WL8 LIGHT-EMERGENCY, SEAT MOUNTED 200 832 33-51-19
100WL9 LIGHT-EMERGENCY, SEAT MOUNTED 200 832 33-51-19
100WL10 LIGHT-EMERGENCY, SEAT MOUNTED 200 832 33-51-19
100WL11 LIGHT-EMERGENCY, SEAT MOUNTED 200 832 33-51-19
101WL1 LIGHT-EMERG. EXIT LOC., SEAT MOUNTED 200 831 33-51-18
101WL2 LIGHT-EMERG. EXIT LOC., SEAT MOUNTED 200 831 33-51-18
101WL3 LIGHT-EMERG. EXIT LOC., SEAT MOUNTED 200 831 33-51-18
101WL4 LIGHT-EMERG. EXIT LOC., SEAT MOUNTED 200 831 33-51-18
150WL1 LIGHT-EMERGENCY, WALL MOUNTED 200 831 33-51-19
361WL1 LIGHT-EMERGENCY, WALL MOUNTED 200 832 33-51-19
361WL2 LIGHT-EMERGENCY, WALL MOUNTED 200 832 33-51-19
R
EFF :
001-012, 014-099, 33-51-00
Page 13
Aug 01/07
IAC
**ON A/C 101-199,
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
10WL POWER SUPPLY UNIT-EMERGENCY 221BC 221 831 33-51-38
11WL POWER SUPPLY UNIT-EMERGENCY 251KC 251 834 33-51-38
12WL POWER SUPPLY UNIT-EMERGENCY 251KC 221 834 33-51-38
13WL POWER SUPPLY UNIT-EMERGENCY 33WR 260 832 33-51-38
14WL POWER SUPPLY UNIT-EMERGENCY 231JC 231 833 33-51-38
15WL POWER SUPPLY UNIT-EMERGENCY 231JC 231 833 33-51-38
20WL LIGHT-EMERGENCY, CABIN 222 841 33-51-11
21WL LIGHT-EMERGENCY, CABIN 221 831 33-51-11
32WL LIGHT-EMERGENCY, CABIN 262 842 33-51-11
33WL LIGHT-EMERGENCY, CABIN 261 832 33-51-11
34WL LIGHT-EMERGENCY, CABIN 232 843 33-51-11
35WL LIGHT-EMERGENCY, CABIN 231 833 33-51-11
36WL LIGHT-EMERGENCY, CABIN 252 844 33-51-11
37WL LIGHT-EMERGENCY, CABIN 251 834 33-51-11
40WL SIGN-EXIT MARKING 222 841 33-51-16
41WL SIGN-EXIT MARKING 221 831 33-51-16
42WL SIGN-EXIT MARKING 252 844 33-51-16
43WL SIGN-EXIT MARKING 251 834 33-51-16
44WL SIGN-EXIT MARKING 262 842 33-51-16
45WL SIGN-EXIT MARKING 261 832 33-51-16
46WL SIGN-EXIT MARKING 232 843 33-51-16
47WL SIGN-EXIT MARKING 231 833 33-51-16
50WL SIGN-EXIT LOCATION, 1 SIDED 221 831 33-51-17
51WL SIGN-EXIT LOCATION, 1 SIDED 251 834 33-51-17
52WL SIGN-EXIT LOCATION, 1 SIDED 261 832 33-51-17
53WL SIGN-EXIT LOCATION, 1 SIDED 251 834 33-51-17
54WL SIGN-EXIT LOCATION, 1 SIDED 231 833 33-51-17
55WL SIGN-EXIT LOCATION, 1 SIDED 231 833 33-51-17
90WL1 SIGN-EXIT MARKING, WALL MOUNTED 221 831 33-51-13
90WL2 SIGN-EXIT MARKING, WALL MOUNTED 222 841 33-51-13
90WL3 SIGN-EXIT MARKING, WALL MOUNTED 231 833 33-51-13
90WL4 SIGN-EXIT MARKING, WALL MOUNTED 232 843 33-51-13
90WL5 SIGN-EXIT MARKING, WALL MOUNTED 251 834 33-51-13
90WL6 SIGN-EXIT MARKING, WALL MOUNTED 252 844 33-51-13
90WL7 SIGN-EXIT MARKING, WALL MOUNTED 261 832 33-51-13
90WL8 SIGN-EXIT MARKING, WALL MOUNTED 262 842 33-51-13
200WL LIGHT-EMERGENCY, CABIN 231 831 33-51-11
201WL LIGHT-EMERGENCY, CABIN 231 831 33-51-11
EFF :
101-199, 33-51-00
Page 14
Aug 01/07
R
IAC
Lavatory Auxiliary Lights - Component Location
Figure 003A
R
EFF :
101-199, 33-51-00
Page 15
Aug 01/07
IAC
Lavatory Auxiliary Lights - Component Location
Figure 003B
R
EFF :
901-999, 33-51-00
Page 16
Aug 01/07
IAC
Emergency Power Supply Unit - Component Location
Figure 004
R
EFF :
101-199, 33-51-00
Page 17
Aug 01/07
IAC
Emergency Power Supply Unit - Component Location
Figure 004A
R
EFF :
901-999, 33-51-00
Page 18
Aug 01/07
IAC
Exit Marking and Exit Location Signs - Component Location
Figure 005
R
EFF :
101-199, 33-51-00
Page 19
Aug 01/07
IAC
Exit Marking and Exit Location Signs - Component Location
Figure 005A
R
EFF :
901-999, 33-51-00
Page 20
Aug 01/07
IAC
Wall Mounted Exit Marking Signs - Component Location
Figure 006
R
EFF :
101-199, 33-51-00
Page 21
Aug 01/07
IAC
Wall Mounted Exit Marking Signs - Component Location
Figure 006A
R
EFF :
901-999, 33-51-00
Page 22
Aug 01/07
IAC
Photoluminescent Light Strips - Component Location
Figure 007
R
EFF :
101-199, 33-51-00
Page 23
Aug 01/07
IAC
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
202WL LIGHT-EMERGENCY, CABIN 231 833 33-51-11
203WL LIGHT-EMERGENCY, CABIN 231 833 33-51-11
204WL LIGHT-EMERGENCY, CABIN 241 833 33-51-11
205WL LIGHT-EMERGENCY, CABIN 241 834 33-51-11
206WL LIGHT-EMERGENCY, CABIN 251 834 33-51-11
207WL LIGHT-EMERGENCY, CABIN 251 834 33-51-11
208WL LIGHT-EMERGENCY, CABIN 251 834 33-51-11
209WL LIGHT-EMERGENCY, CABIN 251 832 33-51-11
210WL LIGHT-EMERGENCY, CABIN 251 832 33-51-11
22LQ1 LIGHT-AUXILIARY, LAVATORY 221 831 33-51-14
22LQ4 LIGHT-AUXILIARY, LAVATORY 261 832 33-51-14
22LQ9 LIGHT-AUXILIARY, LAVATORY 251 832 33-51-14
22LQ10 LIGHT-AUXILIARY, LAVATORY 252 842 33-51-14
PHOTOLUMINESCENT-STRIP, FLOOR-PROXIMITY 200 831 33-51-21
EMERGENCY-ESCAPE-PATH-MARKING
(Ref. Fig. 001A, 002B, 003B, 004A, 005A, 006A, 007A, 008)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
10WL POWER SUPPLY UNIT-EMERGENCY 221BC 221 831 33-51-38
11WL POWER SUPPLY UNIT-EMERGENCY 241KW 241 831 33-51-38
12WL POWER SUPPLY UNIT-EMERGENCY 242KW 242 831 33-51-38
13WL POWER SUPPLY UNIT-EMERGENCY 33WR 260 832 33-51-38
20WL LIGHT-EMERGENCY, CABIN 222 841 33-51-11
21WL LIGHT-EMERGENCY, CABIN 221 831 33-51-11
32WL LIGHT-EMERGENCY, CABIN 262 842 33-51-11
33WL LIGHT-EMERGENCY, CABIN 261 832 33-51-11
40WL SIGN-EXIT MARKING 222 841 33-51-16
41WL SIGN-EXIT MARKING 221 831 33-51-16
42WL SIGN-EXIT MARKING 242 841 33-51-16
43WL SIGN-EXIT MARKING 241 831 33-51-16
44WL SIGN-EXIT MARKING 262 842 33-51-16
45WL SIGN-EXIT MARKING 261 832 33-51-16
50WL SIGN-EXIT LOCATION, 1 SIDED 221 831 33-51-17
51WL SIGN-EXIT LOCATION, 1 SIDED 241 831 33-51-17
52WL SIGN-EXIT LOCATION, 1 SIDED 261 832 33-51-17
53WL SIGN-EXIT LOCATION, 1 SIDED 241 831 33-51-17
R
EFF :
101-199, 901-901, 33-51-00
Page 24
Aug 01/07
IAC
Photoluminescent Light Strips - Component Location
Figure 007A
R
EFF :
901-901, 33-51-00
Page 25
Aug 01/07
IAC
R Photoluminescent Light Strips - Component Location
R Figure 007B
R
EFF :
902-999, 33-51-00
Page 26
Aug 01/07
IAC
Overwing Emergency Light and Escape Hatch Handle Light - Component Location
Figure 008
EFF :
901-999, 33-51-00
Page 27
Aug 01/07
R
IAC
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
60WL LIGHT-EMERGENCY, OVERWING 242 831 33-51-15
61WL LIGHT-EMERGENCY, OVERWING 241 831 33-51-15
62WL LIGHT-EMERGENCY, OVERWING 242 831 33-51-15
63WL LIGHT-EMERGENCY, OVERWING 241 831 33-51-15
70WL1 ESCAPE HATCH HANDLE LIGHT 241 831 33-51-11
70WL2 ESCAPE HATCH HANDLE LIGHT 242 831 33-51-11
90WL1 SIGN-EXIT MARKING, WALL MOUNTED 221 831 33-51-13
90WL2 SIGN-EXIT MARKING, WALL MOUNTED 222 841 33-51-13
90WL3 SIGN-EXIT MARKING, WALL MOUNTED 241 831 33-51-13
90WL4 SIGN-EXIT MARKING, WALL MOUNTED 242 831 33-51-13
90WL5 SIGN-EXIT MARKING, WALL MOUNTED 261 832 33-51-13
90WL6 SIGN-EXIT MARKING, WALL MOUNTED 262 842 33-51-13
200WL LIGHT-EMERGENCY, CABIN 231 831 33-51-11
201WL LIGHT-EMERGENCY, CABIN 231 831 33-51-11
202WL LIGHT-EMERGENCY, CABIN 241 831 33-51-11
203WL LIGHT-EMERGENCY, CABIN 241 831 33-51-11
204WL LIGHT-EMERGENCY, CABIN 251 832 33-51-11
205WL LIGHT-EMERGENCY, CABIN 251 832 33-51-11
206WL LIGHT-EMERGENCY, CABIN 261 832 33-51-11
22LQ1 LIGHT-AUXILIARY, LAVATORY 221 831 33-51-14
22LQ4 LIGHT-AUXILIARY, LAVATORY 261 832 33-51-14
22LQ5 LIGHT-AUXILIARY, LAVATORY 262 842 33-51-14
PHOTOLUMINESCENT STRIP-FLOOR PROXIMITY 200 831 33-51-21
EMERGENCY ESCAPE PATH MARKING
R (Ref. Fig. 001A, 002C, 003B, 004A, 005A, 006A, 007B, 008)
R -------------------------------------------------------------------------------
R FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
R | | | | DOOR | REF.
R -------------------------------------------------------------------------------
R 10WL POWER SUPPLY UNIT-EMERGENCY 221BC 221 831 33-51-38
R 11WL POWER SUPPLY UNIT-EMERGENCY 241KW 241 831 33-51-38
R 12WL POWER SUPPLY UNIT-EMERGENCY 242KW 242 831 33-51-38
R 13WL POWER SUPPLY UNIT-EMERGENCY 33WR 260 832 33-51-38
R 20WL LIGHT-EMERGENCY, CABIN 222 841 33-51-11
R 21WL LIGHT-EMERGENCY, CABIN 221 831 33-51-11
R 32WL LIGHT-EMERGENCY, CABIN 262 842 33-51-11
R 33WL LIGHT-EMERGENCY, CABIN 261 832 33-51-11
R 40WL SIGN-EXIT MARKING 222 841 33-51-16
R
EFF :
901-999, 33-51-00
Page 28
Aug 01/07
IAC
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
R 41WL SIGN-EXIT MARKING 221 831 33-51-16
R 42WL SIGN-EXIT MARKING 242 841 33-51-16
R 43WL SIGN-EXIT MARKING 241 831 33-51-16
R 44WL SIGN-EXIT MARKING 262 842 33-51-16
R 45WL SIGN-EXIT MARKING 261 832 33-51-16
R 50WL SIGN-EXIT LOCATION, 1 SIDED 221 831 33-51-17
R 51WL SIGN-EXIT LOCATION, 1 SIDED 241 831 33-51-17
R 52WL SIGN-EXIT LOCATION, 1 SIDED 261 832 33-51-17
R 53WL SIGN-EXIT LOCATION, 1 SIDED 241 831 33-51-17
R 60WL LIGHT-EMERGENCY, OVERWING 242 831 33-51-15
R 61WL LIGHT-EMERGENCY, OVERWING 241 831 33-51-15
R 62WL LIGHT-EMERGENCY, OVERWING 242 831 33-51-15
R 63WL LIGHT-EMERGENCY, OVERWING 241 831 33-51-15
R 70WL1 ESCAPE HATCH HANDLE LIGHT 241 831 33-51-11
R 70WL2 ESCAPE HATCH HANDLE LIGHT 242 831 33-51-11
R 90WL1 SIGN-EXIT MARKING, WALL MOUNTED 221 831 33-51-13
R 90WL2 SIGN-EXIT MARKING, WALL MOUNTED 222 841 33-51-13
R 90WL3 SIGN-EXIT MARKING, WALL MOUNTED 241 831 33-51-13
R 90WL4 SIGN-EXIT MARKING, WALL MOUNTED 242 831 33-51-13
R 90WL5 SIGN-EXIT MARKING, WALL MOUNTED 261 832 33-51-13
R 90WL6 SIGN-EXIT MARKING, WALL MOUNTED 262 842 33-51-13
R 200WL LIGHT-EMERGENCY, CABIN 231 831 33-51-11
R 201WL LIGHT-EMERGENCY, CABIN 231 831 33-51-11
R 202WL LIGHT-EMERGENCY, CABIN 241 831 33-51-11
R 203WL LIGHT-EMERGENCY, CABIN 241 831 33-51-11
R 204WL LIGHT-EMERGENCY, CABIN 251 832 33-51-11
R 205WL LIGHT-EMERGENCY, CABIN 251 832 33-51-11
R 206WL LIGHT-EMERGENCY, CABIN 261 832 33-51-11
R 22LQ1 LIGHT-AUXILIARY, LAVATORY 221 831 33-51-14
R 22LQ4 LIGHT-AUXILIARY, LAVATORY 261 832 33-51-14
R 22LQ5 LIGHT-AUXILIARY, LAVATORY 262 842 33-51-14
R PHOTOLUMINESCENT STRIP-FLOOR PROXIMITY 200 831 33-51-21
R EMERGENCY ESCAPE PATH MARKING
3. __________________
System Description
R
EFF :
ALL 33-51-00
Page 29
Aug 01/07
IAC
**ON A/C 001-012, 014-099,
EFF :
ALL 33-51-00
Page 30
Aug 01/07
IAC
Cabin Emergency Lighting - Schematic
Figure 009
R
EFF :
001-012, 014-099, 33-51-00
Page 31/32
May 01/07
IAC
INTENTIONALLY BLANK
R
33-51-00
Page 33
May 01/07
IAC
R Cabin Emergency Lighting - Schematic
R Figure 009A (SHEET 1)
R
EFF :
101-199, 33-51-00
Page 34
May 01/07
IAC
R Cabin Emergency Lighting - Schematic
R Figure 009A (SHEET 2)
R
EFF :
101-199, 33-51-00
Page 35
May 01/07
IAC
R Cabin Emergency Lighting - Schematic
R Figure 009A (SHEET 3)
R
EFF :
101-199, 33-51-00
Page 36
May 01/07
IAC
INTENTIONALLY BLANK
R
33-51-00
Page 37
May 01/07
IAC
Cabin Emergency Lighting - Schematic
Figure 009B (SHEET 1)
R
EFF :
901-901, 33-51-00
Page 38
May 01/07
IAC
Cabin Emergency Lighting - Schematic
Figure 009B (SHEET 2)
R
EFF :
901-901, 33-51-00
Page 39
May 01/07
IAC
Cabin Emergency Lighting - Schematic
Figure 009B (SHEET 3)
R
EFF :
901-901, 33-51-00
Page 40
May 01/07
IAC
INTENTIONALLY BLANK
R
33-51-00
Page 41
May 01/07
IAC
R Cabin Emergency Lighting - Schematic
R Figure 009C (SHEET 1)
EFF :
902-999, 33-51-00
Page 42
Aug 01/07
IAC
R Cabin Emergency Lighting - Schematic
R Figure 009C (SHEET 2)
EFF :
902-999, 33-51-00
Page 43
Aug 01/07
IAC
R Cabin Emergency Lighting - Schematic
R Figure 009C (SHEET 3)
EFF :
902-999, 33-51-00
Page 44
Aug 01/07
IAC
Lavatory Auxiliary Lights - Schematic
Figure 010
R
EFF :
001-012, 014-099, 33-51-00
Page 45
May 01/07
IAC
R Lavatory Auxiliary Lights - Schematic
R Figure 010A
R
EFF :
101-199, 33-51-00
Page 46
May 01/07
IAC
R **ON A/C 902-999,
4. ____________
Power Supply
The 28VDC essential busbar 801PP and the 115VAC normal busbar 103XP supply
the Emergency Power Supply Units (EPSUs). The EPSUs convert 28VDC into 6VDC
to operate the lights in the system. A battery in each EPSU is charged
continuously when the essential busbar is energized and the circuit breakers
are closed. Each of the four EPSUs supplies electrical power to different
emergency lights and signs. The emergency lights and signs are always
supplied with power, even if the aircraft has crashed and the fuselage has
broken. This is because the four EPSUs are installed in different places in
the cabin.
R
EFF :
ALL 33-51-00
Page 47
Aug 01/07
IAC
Lavatory Auxiliary Lights - Schematic
Figure 010B
R
EFF :
901-999, 33-51-00
Page 48
Aug 01/07
IAC
The EMER EXIT LT switch 4WL on the overhead panel 25VU controls the
emergency lighting system. Self-monitoring circuit breakers 1WL, 2WL and 3WL
protect the system from too much current flow. The EMER EXIT LT switch 4WL
has three positions, OFF, ARM and ON. Each of these positions gives a
discrete ground signal to all EPSUs. The EPSUs also monitor the correct
voltage of the AC and DC busbars. When the voltage on these busbars falls
below a specified level, the emergency lighting automatically comes on. This
is when the EMER EXIT LT switch 4WL is in the ARM position.
When only the AC normal busbar fails:
- the 28VDC essential busbar supplies the emergency lighting system through
the 28VDC/6VDC converter in each EPSU.
When the 28VDC essential busbar fails:
- the internal batteries in the EPSUs supply the emergency lighting system.
When the LIGHT EMER pushbutton switch and its integral light on the forward
attendant panel 120RH are on:
- the converters or the internal batteries in the EPSUs supply the emergency
lighting system.
An open or short circuit in the control lines causes the emergency lighting
to come on. The internal test program in the EPSUs finds defects in the load
circuits.
The 28VDC essential busbar 801PP and the 115VAC normal busbar 103XP supply
the Emergency Power Supply Units (EPSUs). The EPSUs 10WL thru 13WL convert
28VDC into 6VDC to operate the lights in the normal emergency light system
and the marking system of the emergency escape path. A battery in each EPSU
is charged continuously when the essential busbar is energized and the
circuit breakers are closed. Each of the EPSUs supplies electrical power to
different emergency lights and signs. The emergency lights and signs are
always supplied with power, even if the aircraft has crashed and the
fuselage has broken. This is because the four EPSUs are installed in
different places in the cabin.
The EMER EXIT LT switch 4WL on the overhead panel 25VU controls the
emergency lighting system. Self-monitoring circuit breakers 1WL, 2WL and 3WL
protect the system from too much current flow. The EMER EXIT LT switch 4WL
has three positions, OFF, ARM and ON. Each of these positions gives a
discrete ground signal to all EPSUs. The EPSUs also monitor the correct
voltage of the AC and DC busbars. When the voltage on these busbars falls
EFF :
ALL 33-51-00
Page 49
Aug 01/07
R
IAC
below a specified level, the emergency lighting automatically comes on. This
is when the EMER EXIT LT switch 4WL is in the ARM position.
When only the AC normal busbar fails:
- the 28VDC essential busbar supplies the emergency lighting system through
the 28VDC/6VDC converter in each EPSU.
When the 28VDC essential busbar fails:
- the internal batteries in the EPSUs supply the emergency lighting system.
When the EMER pushbutton switch and its integral light on the flight
attendant panel 120RH are on:
- the converters or the internal batteries in the EPSUs supply the emergency
lighting system.
An open or short circuit in the control lines causes the emergency lighting
to come on. The internal test program in the EPSUs finds defects in the load
circuits.
When the emergency exit hatches are open and the slides are released, the
respective overwing emergency lights and the integral lights in the
respective escape slide come on.
When the passenger/crew doors are open and the slides are armed, the
integral lights in the respective escape slide come on.
When the passenger/crew doors or the emergency exit doors are open and the
slides are armed, the integral lights in the respective escape slide come
on.
EFF :
ALL 33-51-00
Page 50
Aug 01/07
R
IAC
**ON A/C 101-199, 901-999,
When the EMER EXIT LT control switch 4WL is in the OFF position and the DC
essential busbar 801PP is energized:
- The EMER EXIT LT OFF annunciator light 5WL in the cockpit comes on.
You can test the emergency lighting system through the Programming and Test
Panel (PTP) 110RH of the Cabin Intercommunication Data System (CIDS).
There are two tests :
- the BAT test indicates the battery capacity condition of the emergency
power-supply units 10WL thru 13WL,
- the SYS test indicates the condition of the internal loads, the external
loads and the battery charge limiter of the emergency power-supply units
10WL thru 13WL.
Internal loads are all electrical loads located inside the cabin and
served by these emergency power-supply units.
External loads are all electrical loads located outside the cabin and
served by these emergency power-supply units.
You can test the emergency lighting system through the Centralized Fault
Display System/Multipurpose Control and Display Unit (CFDS/MCDU).
There are two tests :
- the BAT test indicates the battery capacity condition of the emergency
power-supply units 10WL thru 13WL,
EFF :
ALL 33-51-00
Page 51
Aug 01/07
R
IAC
- the SYS test indicates the condition of the internal loads, the external
loads and the battery charge limiter of the emergency power-supply units
10WL thru 13WL.
Internal loads are all electrical loads located inside the cabin and
served by these emergency power-supply units.
External loads are all electrical loads located outside the cabin and
served by these emergency power-supply units.
Before you start the BAT test, you must select the applicable code on the
PTP 110RH. A note BATTERY TEST ACTIVATE comes on on the PTP display. Two
hours could be necessary to complete the test. When the TEST EMER LIGHT BAT
membrane switch on the PTP 110RH in the cabin is pushed:
- a Light Emitting Diode (LED) in the TEST EMER LIGHT BAT membrane switch
comes on to show the start of the battery test,
- the BAT OK annunciator light adjacent to the membrane switch comes on when
the battery test in all the power supply units is completed.
When the test is completed, an acknowledge code is selected on the PTP. The
LED in the TEST EMER LIGHT BAT membrane switch and the BAT OK annunciator
light go off.
When the TEST EMER LIGHT SYS membrane switch on the programming and test
panel 110RH is pushed:
- the SYS OK annunciator light adjacent to the membrane switch comes on when
the system test of all power supply units is completed.
The exit location signs, the exit marking signs and the escape hatch-handle
lights come on automatically when the NO SMOKING signs come on, or if
selected, when the landing gear extends.
The exit location signs and the exit marking signs switch on automatically
when the NO SMOKING signs come on, or if selected, when the landing gear
extends.
EFF :
ALL 33-51-00
Page 52
Aug 01/07
R
IAC
**ON A/C 101-199, 901-999,
The circuit breakers used in the emergency lighting system are a special
type. When a circuit breaker is open a pair of contacts closes to complete
the monitoring circuit (Ref. 31-59-00).
5. _____________________
Component Description
(c) A 6VDC battery supplies the loads whenever the system is not
selected OFF and the power supply from the essential busbar is
not available. The essential busbar charges the battery through
the 28VDC/6VDC unit converter. Whenever the ambient temperature
falls below +20 DEG. C (68 DEG. F), the 28VDC essential busbar
provides electrical heating for the battery. The battery is
changed without removal of the emergency power-supply unit.
(d) A test circuit tests the condition of the unit battery, the unit
logic and the related loads. The battery test procedure starts
after coding selection when the TEST EMER LIGHT BAT membrane
switch on the programming and test panel 110RH (CIDS) is pushed.
R
EFF :
ALL 33-51-00
Page 53
Aug 01/07
IAC
Emergency Power-Supply Unit
Figure 011
R
EFF :
001-012, 014-099, 33-51-00
Page 54
Aug 01/07
IAC
If all batteries are serviceable, the BAT OK annunciator light
adjacent to the membrane switch comes on. The system test
procedure starts when the EMER LIGHT SYS membrane switch on the
programming and test panel 110RH is pushed. The test circuit
carries out an interrogation of the units and monitors the output
current.
If all units are serviceable the SYS OK annunciator light
adjacent to the membrane switch comes on. This test loop
completes only when unit output currents are within the expected
value. An individual test on each emergency power-supply unit
must be carried out when either the BAT OK or SYS OK annunciator
light does not come on. The individual test starts when the
pushbutton on the unit is pushed. A defective unit will cause a
red LED on the unit to come on. A green light in the LED
indicates a serviceable emergency power-supply unit.
There are three pairs of red and green LED. One pair provides
indication of defects in the external loads. One pair provides
indication of defects in the internal loads. One pair provides
indication of defects in the battery. Each output is separately
fused. The fuses are installed on top of the emergency
power-supply unit.
(c) A 6VDC battery which supplies the loads when the system is not
selected OFF and the power supply from the essential busbar is
not available. The essential busbar charges the battery through
the 28VDC/6VDC unit converter. When the ambient temperature falls
below +20 DEG. C (68 DEG. F) the 28VDC essential busbar gives
electrical heating for the battery. The battery can be replaced
without removal of the emergency power-supply unit.
R
EFF :
001-012, 014-099, 101-199, 33-51-00
Page 55
Aug 01/07
IAC
Emergency Power-Supply Unit
Figure 011A
EFF :
101-199, 901-999, 33-51-00
Page 56
Aug 01/07
R
IAC
(d) A test circuit which tests the condition of the battery unit, the
unit logic and the related loads.
The battery test procedure starts after selection of the EPSU BAT
CAP TEST on the CIDS page of the MCDU/CFDS. If all the batteries
are serviceable, the TEST OK legend shows on the MCDU.
The system test procedure starts after selection of the EPSU SYS
R TEST on the CIDS page of the MCDU/CFDS. The test monitors the
R circuits of the EPSUs and the output currents.
If all the units are serviceable the TEST OK legend shows on the
MCDU. This test loop is completed only when all the unit output
currents are in the correct tolerance.
You must do a test of each emergency power-supply unit when the
EPSU BAT CAP TEST or the EPSU SYS TEST thru the CFDS/MCDU do not
give the correct results.
The isolated test starts when you push the TEST membrane switch
on the EPSU. A defective emergency lighting system will cause a
red LED on the EPSU to come on. The green LED SYSTEM OK on the
EPSU shows a serviceable emergency lighting system.
The four red LEDs show the indication of defects:
- in the exterior lights (external loads),
- in the interior lights (internal loads),
- in the battery,
- in the unit.
Each output has its own fuse. The fuses are installed in the
EPSU.
EFF :
101-199, 901-999, 33-51-00
Page 57
Feb 01/08
IAC
(1) Each EPSU consists of the subsequent:
(c) A 6VDC battery supplies the loads whenever the system is not
selected OFF and the power supply from the essential busbar is
not available. The essential busbar charges the battery through
the 28VDC/6VDC unit converter. Whenever the ambient temperature
falls below +20 DEG. C (68 DEG. F) the 28VDC essential busbar
provides electrical heating for the battery. The battery could be
replaced without removal of the emergency power-supply unit.
(d) A test circuit tests the condition of the battery unit, the unit
logic and the related loads. The battery test procedure starts
after coding selection when the EPSU BAT CAP TEST on the CIDS
page of the MCDU/CFDS is selected. If all batteries are
serviceable, the TEST OK legend is shown on the MCDU.
R The system test procedure starts when EPSU SYS TEST on the CIDS
R page of the MCDU/CFDS is selected. The test circuit carries out
an interrogation of the units and monitors the output current.
If all units are serviceable the TEST OK legend is shown on the
MCDU. This test loop completes only when all unit output currents
are within the expected value. An individual test on each
emergency power-supply unit must be carried out when the EPSU BAT
CAP TEST or the EPSU SYS TEST thru the CFDS/MCDU fails.
The isolated test starts when you push the TEST membrane switch
on the EPSU. A defective emergency lighting system will cause a
red LED on the EPSU to come on. The green LED SYSTEM OK on the
EPSU shows a serviceable emergency lighting system.
The four red LEDs show the indication of defects:
- in the exterior lights (external loads),
- in the interior lights (internal loads),
- in the battery,
- in the unit.
Each output has its own fuse. The fuses are installed in the
EPSU.
EFF :
901-999, 33-51-00
Page 58
Feb 01/08
IAC
**ON A/C 001-012, 014-099,
B. Exit Lights
(1) The exit signs consist of a plastic case housing, a lens and a number
of 6VDC lamps connected in parallel. There are different types:
(c) Exit marking signs 40WL thru 45WL, single-sided, one for each
passenger/crew door and one for each pair of emergency exits.
(2) The escape hatch-handle lights 70WL1 thru 70WL4 consist of a plastic
case housing, a lens and two 6VDC lamps connected parallel. One
escape hatch-handle light is installed in each emergency exit.
(1) Cabin emergency light units 20Wl thru 33WL consist of a housing and a
lens, containing two 6VDC lamps.
D. External Lights
(1) Overwing emergency lights 60WL thru 63WL consist of a housing, a lens
and one 6VDC lamp.
(2) Wall-mounted exit markers 90WL1 thru 90WL8, single-sided, one for
each of the passenger/crew doors and one for each of the emergency
exits.
R
EFF :
001-012, 014-099, 33-51-00
Page 59
Aug 01/07
IAC
F. System Control
(2) The emergency lighting system comes on when the LIGHT EMER pushbutton
on the forward attendant panel 120RH is pushed. The pushbutton
contains an integral light.
(3) The NO SMOKING switch 190RH on the overhead panel 25VU controls the
relay 8WL in the relay box 103VU. The relay 8WL switches the exit
signs on or off.
(1) The cabin emergency lights 20WL, 21WL, 32WL thru 37WL and 200WL thru
210WL consist of a housing, a lens and a number of LED connected in
parallel.
C. Exit Signs
(1) The exit signs consist of a plastic case housing, a lens and a number
of LED connected in parallel. There are different types:
(c) The exit marking signs 40WL thru 47WL, single-sided, one for each
passenger/crew door and one for each emergency exit door.
D. External Lights
(1) The escape slide lights are integrated in the escape slides and
consist of a number of 6VDC lamps.
R
EFF :
001-012, 014-099, 101-199, 33-51-00
Page 60
Aug 01/07
IAC
E. Floor Proximity Lights
(1) The wall-mounted exit-marking signs 90WL, single sided, one for each
passenger/crew door and one for each emergency exit door, contain
five 6VDC lamps.
F. System Control
(1) The EMER EXIT LT switch 4WL on the overhead panel 25VU is a
3-position double-pole toggle switch. It is used to switch the
emergency lighting system on (ON position) and off (OFF position).
The emergency lighting comes on automatically when the toggle switch
is selected to ARM, if the battery busbar power fails. The toggle
switch must be pulled to make a selection. This prevents accidental
system selection.
(2) The emergency lighting system comes on when the EMER pushbutton on
the Flight Attendant Panel (FAP) 120RH is pushed. The pushbutton
contains an internal light.
(3) The NO SMOKING switch 190RH on the overhead panel 25VU controls the
relay 8WL in the relay box 103VU. The relay 8WL switches the exit
signs on or off.
(1) The cabin emergency lights 20WL, 21WL, 32WL, 33WL and 200WL thru
206WL have:
- a housing
- a lens
- a number of LEDs connected in parallel.
C. Exit Signs
R
EFF :
101-199, 901-901, 33-51-00
Page 61
Aug 01/07
IAC
(b) The ceiling-mounted exit-location signs 51WL and 53WL are
single-sided for the emergency exits.
(c) The exit marking signs 40WL thru 45WL are single-sided. There is
one for each passenger/crew door and one for each emergency exit.
D. External Lights
(2) The escape slide lights are a part of the escape slides. Their 6VDC
lamps are connected in parallel.
(1) The wall-mounted exit-marking signs 90WL. There is one for each
passenger/crew door and one for each emergency exit. They have:
- a plastic case housing
- a lens
- a number of LEDs.
F. System Control
(1) The EMER EXIT LT switch 4WL on the overhead panel 25VU is a
3-position double-pole toggle switch. The positions are ON, OFF and
ARM. It sets the emergency lighting system to on or off. The
emergency lighting comes on automatically when the toggle switch is
set to ARM, if there is a failure of the battery busbar power.
The toggle switch must be pulled to make a selection. This prevents
accidental system selection.
(2) The emergency lighting system comes on when the LIGHT EMER pushbutton
switch on the forward attendant panel 120RH is pushed. The pushbutton
switch has an internal light.
(3) The NO SMOKING switch 190RH on the overhead panel 25VU controls the
relay 8WL in the relay box 103VU through the CIDS. The relay 8WL sets
the exit signs on or off.
R
EFF :
901-901, 33-51-00
Page 62
Aug 01/07
IAC
**ON A/C 902-999,
B. Exit Lights
(1) The exit signs consist of a plastic case housing, a lens and a number
of LED connected in parallel. There are different types:
(c) The exit marking signs 40WL thru 45WL, single-sided, one for each
passenger/crew door and one for each emergency exit.
(2) The escape hatch-handle lights 70WL1 and 70WL2 consist of a plastic
case housing, a lens and two LED connected in parallel.
One escape hatch-handle light is installed in each emergency exit.
(1) The cabin emergency lights 20WL, 21WL, 32WL, 33WL and 200WL thru
206WL consist of a housing, a lens and a number of LED connected in
parallel.
D. External Lights
(1) The overwing emergency lights 60WL thru 63WL consist of a housing, a
lens and two 6VDC lamps connected in parallel.
(2) The escape slide lights, integrated in the escape slides, consist of
a number of 6VDC lamps.
(1) The wall-mounted exit-marking signs 90WL1 thru 90WL6, single sided,
one for each passenger/crew door and one for each emergency exit, are
modules with LED.
F. System Control
(1) The EMER EXIT LT switch 4WL on the overhead panel 25VU is a
3-position double-pole toggle switch. It is used to switch the
emergency lighting system on (ON position) and off (OFF position).
The emergency lighting comes on automatically when the toggle switch
is set to ARM, if the battery busbar power fails. The toggle switch
must be pulled to make a selection. This prevents accidental system
selection.
EFF :
902-999, 33-51-00
Page 63
Feb 01/08
R
IAC
(2) The emergency lighting system comes on when the EMER button on the
Flight Attendant Panel (FAP) 120RH is pushed. The button has a light.
(3) The NO SMOKING switch 190RH on the overhead panel 25VU controls the
relay 8WL in the relay box 103VU. The relay 8WL switches the exit
signs on or off.
R (1) The photoluminescent strips have no electrical power supply and are
R self-luminescent. They are charged by the cabin lights. The charging
R and discharging time can be increased and decreased by the related
R conditions:
R - Length of time of the charging
R - Light intensity during the charging
R - Color filter film (if installed).
6. Operation
_________
(1) The system is supplied with power when the busbars 103XP-B and 801PP
are energized and the circuit breakers 1WL, 2WL and 3WL are closed.
With the EMER EXIT LT switch 4WL and the LIGHT EMER pushbutton switch
on the forward attendant panel 120RH in the OFF positions the
power-supply units control-line OFF is grounded. All lights and signs
are off and the battery in each power-supply unit is on charge. The
EMER EXIT LT OFF annunciator light 5WL comes on.
EFF :
ALL 33-51-00
Page 64
Feb 01/08
IAC
Cabin Emergency Lighting - Switching Table
Figure 012
R
EFF :
001-012, 014-099, 33-51-00
Page 65
Aug 01/07
IAC
**ON A/C 901-901,
(1) The system is supplied with power when the busbars 103XP-B and 801PP
are energized and the circuit breakers 1WL, 2WL and 3WL are closed.
With the EMER EXIT LT switch 4WL and the EMER pushbutton switch on
the flight attendant panel 120RH in the OFF positions the
power-supply units control-line OFF is grounded. All lights and signs
are off and the battery in each power-supply unit is on charge. The
EMER EXIT LT OFF annunciator light 5WL comes on.
R
EFF :
ALL 33-51-00
Page 66
Aug 01/07
IAC
Cabin Emergency Lighting - Switching Table
Figure 012A
R
EFF :
101-199, 901-999, 33-51-00
Page 67
Aug 01/07
IAC
(3) The exit signs and the emergency-escape hatch-handle lights go off
when the NO SMOKING switch 190RH is in the OFF position. The ground
signal is removed from the EXIT SIGN control line. The exit signs and
the emergency-escape hatch-handle lights also go off when the landing
gear retracts and the NO SMOKING switch 190RH is in the AUTO
position.
(3) The exit signs go off when the NO SMOKING switch 190RH is in the OFF
position. The ground signal is removed from the EXIT SIGN control
line. The exit signs also go off when the landing gear retracts and
the NO SMOKING switch 190RH is in the AUTO position.
(4) With the EMER EXIT LT switch 4WL in the ARM position, the
power-supply units control-line ARM is grounded. The EMER EXIT LT OFF
annunciator light 5WL goes off. If the power supply on the 115VAC
normal busbar 103XP fails, the cabin emergency lights and the floor
proximity lights come on. The lights are supplied with power through
the 28VDC/6VDC converter in each emergency power-supply unit.
(5) If the 28VDC essential busbar voltage falls below 16VDC +/- 1VDC, the
batteries in the power supply units provide the power supply and
continue to supply the loads for at least 12 minutes.
(6) With the EMER EXIT LT switch 4WL in the ON position, the power-supply
units control-line ON is grounded. This control line also has a
ground connection, when the LIGHT EMER pushbutton switch on the
forward attendant panel 120RH is pushed. In either case the cabin
emergency lights, the exit signs, the escape hatch-handle lights and
the floor proximity lights come on. The 28VDC/6VDC converter of the
power supply units supply these loads as long as the 28VDC essential
busbar power is available. If the essential busbar fails see above.
EFF :
ALL 33-51-00
Page 68
Aug 01/07
R
IAC
R **ON A/C 101-199,
R (6) With the EMER EXIT LT switch 4WL in the ON position, the emergency
R power-supply units control-line ON is grounded. This control line
R also has a ground connection, when the EMER button on the Flight
R Attendant Panel (FAP) 120RH is pushed. In each condition the cabin
R emergency lights, the exit signs and the wall-mounted exit-marking
R signs come on. The 28VDC/6VDC converter of the emergency power-supply
R units supply these loads as long as the 28VDC essential busbar power
R is available. If the essential busbar has a failure see above.
R (6) With the EMER EXIT LT switch 4WL in the ON position, the power-supply
R units control-line ON is grounded. This control line also has a
R ground connection, when the EMER button on the Flight Attendant Panel
R (FAP) 120RH is pushed. In each condition the cabin emergency lights,
R the exit signs, the escape hatch-handle lights and the wall-mounted
R exit-marking signs come on. The 28VDC/6VDC converter of the emergency
R power-supply units supply these loads as long as the 28VDC essential
R busbar power is available. If the essential busbar has a failure see
R above.
(7) With the passenger/crew doors open and the escape slides armed,
independent of switch positions, the integral lights in the
respective escape slides come on.
With the emergency exit hatches removed and the escape slides
released, independent of switch positions, the integral lights in the
respective escape slides and two overwing lights at these hatches
come on.
(7) With the passenger/crew doors or the emergency exit doors open and
the escape slides armed, independent of switch positions, the
integral lights in the respective escape slides come on.
EFF :
ALL 33-51-00
Page 69
Aug 01/07
IAC
**ON A/C 001-012, 014-099,
(8) With the essential busbar 801PP energized and the circuit breaker
79WL closed, a 28VDC auxiliary light comes on in each lavatory.
(8) With the essential busbar 401PP energized and the circuit breaker
79WL closed, a 28VDC auxiliary light comes on in each lavatory.
7. _________
BITE TEST
The emergency power-supply units 10WL thru 13WL start the following
tests:
- internal logic circuits,
- battery charging and monitoring circuits,
- 28VDC power supply,
- 115VAC power supply,
- external loads and
EFF :
ALL 33-51-00
Page 70
Aug 01/07
R
IAC
- internal loads.
A. General
Each EPSU has two different integrated BITE functions:
- a system test,
- a battery capacity test.
The EPSUs have an interface to the CIDS to read the BITE results of a
system test and a battery capacity test.
R
EFF :
ALL 33-51-00
Page 71
Aug 01/07
IAC
- EPSU UNIT,
- EPSU BATTERY,
- EPSU 28 VDC,
- EPSU 115 VAC,
- EPSU EXT LOAD,
- EPSU INT LOAD.
R
EFF :
001-012, 014-099, 33-51-00
Page 72
Aug 01/07
IAC
- the escape hatch-handle lights,
- the exit location signs,
- the exit marking signs,
- the wall-mounted exit marking signs,
- the seat/wall-mounted emergency-lights,
- the seat/wall-mounted emergency-exit location-lights.
The GND SCAN mode on the programming and test panel 110RH (CIDS)
gives the operator information on the status of the emergency
power-supply units. After a failure message, the test buttons of the
individual emergency power-supply units are pushed. A red LED shows
the defective emergency power-supply units or the associated
defective loads.
EFF :
ALL 33-51-00
Page 73
Aug 01/07
R
IAC
NOTE : For detailed system information refer to 23-73-00.
____
The GND SCAN mode on the programming and test panel 110RH (CIDS)
gives the operator information on the status of the emergency
power-supply units. After a failure message, the test buttons of the
individual emergency power-supply units are pushed. A red LED shows
the defective emergency power-supply units or the associated
defective loads.
If the annunciator light does not come on, the display of the programming
and test panel 110RH (CIDS) shows the message EPSU BAT CAP. The message
EPSU BAT CAP indicates that one or more batteries of the emergency
power-supply units 10WL thru 13WL is/are defective.
The GND SCAN mode on the programming and test panel 110RH (CIDS) gives
the operator information on the status of the emergency power-supply
units. After a failure message the test buttons of the individual
emergency power-supply units are pushed. A red LED indicates the
defective emergency power-supply units or the defective batteries.
C. Description
The EPSUs and the CIDS use a RS232 interface for the data exchange of
both BITE functions. You can start the two different BITE functions only
on the ground with a related CFDS/MCDU test menu page. Additionally the
start of the battery capacity test is code protected against inadvertent
action, because the batteries are discharged during the battery capacity
test.
R
EFF :
ALL 33-51-00
Page 74
Aug 01/07
IAC
The EPSUs only accept the test start commands when the subsequent
conditions are fulfilled:
- aircraft on ground,
- all emergency lights OFF,
- 28 V DC available,
- 115 V AC available,
- control switch EMER EXIT LT 4WL in OFF position,
- pushbutton EMER on the FAP in OFF position,
- control switch NO SMOKING 190RH in OFF position.
When you start the system test via a CFDS/MCDU test page action the
CIDS transmit the EPSU SYS TEST data word through the related DEU
Bs to the EPSUs. When the EPSU SYS TEST data word is accepted the
EPSUs are set to the system test mode.
When the EPSUs can start the system test the status message TEST IN
PROGRESS is send to the CIDS. The system test will be completed
within approximately 60 seconds. When the system test is completed
the test results are sent to the CIDS and shown as a test result
message on the CFDS/MCDU.
When the EPSUs cannot start the system test the reason for not
starting the system test is sent to the CIDS and shown as a status
message on the CFDS/MCDU.
You can start the battery capacity test via a CFDS/MCDU test page
action. The test start procedure is protected against accidental
operation with a code. When the EPSUs accept the code you can start
the battery capacity test and the EPSUs are set to the battery
capacity test mode. The status message EPSU BAT CAP TEST IN
PROGRESS is sent to the CFDS/MCDU.
Before the main battery capacity test starts a system test is
automatically done. If there is a system failure the battery capacity
test is stopped.
EFF :
101-199, 901-999, 33-51-00
Page 75
Aug 01/07
R
IAC
EPSU System Test - MCDU Start Menu
Figure 013
EFF :
101-199, 901-999, 33-51-00
Page 76
Aug 01/07
R
IAC
MCDU Failure Page (1/2)
Figure 014
EFF :
101-199, 901-999, 33-51-00
Page 77
Aug 01/07
R
IAC
MCDU Failure Page (2/2)
Figure 015
EFF :
101-199, 901-999, 33-51-00
Page 78
Aug 01/07
R
IAC
EPSU Battery Capacity Test - MCDU Menu Pages (1/2)
Figure 016
EFF :
101-199, 901-999, 33-51-00
Page 79
Aug 01/07
R
IAC
EPSU Battery Capacity Test - MCDU Menu Pages (2/2)
Figure 017
EFF :
101-199, 901-999, 33-51-00
Page 80
Aug 01/07
R
IAC
The maximum time for a delayed battery capacity test is 24 hours.
After a delay of more than 24 hours, the battery capacity test is
stopped.
D. Operation
EFF :
101-199, 901-999, 33-51-00
Page 81
Aug 01/07
R
IAC
When the battery capacity test cannot start, a status message shows
the reason for not start the test.
After approximately 3 hours, when the battery capacity is completed,
a test result message or a status message comes on.
EFF :
101-199, 901-999, 33-51-00
Page 82
Aug 01/07
IAC
CABIN EMERGENCY LIGHTING - DEACTIVATION/REACTIVATION
____________________________________________________
TASK 33-51-00-040-001
Deactivation of the EMER SYSTEM TEST of the Cabin Emergency Lighting System
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-00-861-057
Subtask 33-51-00-865-056
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
EFF :
ALL 33-51-00
Page 401
Nov 01/07
IAC
R
Subtask 33-51-00-860-055
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
R
4. Procedure
_________
Subtask 33-51-00-710-060
NOTE : The time to do this test must not be more than 3 minutes, to
____
prevent discharge of the emergency lighting batteries.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-51-00
Page 402
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
3. On the circuit breaker panel In the cabin:
49VU:
- close the circuit breakers 1WL - all the cabin emergency lights go off
and 2WL. - all the exit marking signs go off
- all the exit location signs go off
- all the electrical lights of the
Floor-Proximity Emergency-Escape-Path
Marking-System go off
- all the emergency-escape hatch-handle
lights go off.
5. Close-up
________
Subtask 33-51-00-862-056
R
EFF :
001-012, 014-099, 33-51-00
Page 403
Nov 01/07
IAC
R **ON A/C ALL
TASK 33-51-00-040-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-00-861-058
Subtask 33-51-00-865-057
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
EFF :
ALL 33-51-00
Page 404
Nov 01/07
IAC
INTENTIONALLY BLANK
R
33-51-00
Page 405
Nov 01/07
IAC
INTENTIONALLY BLANK
R
33-51-00
Page 406
Nov 01/07
IAC
R **ON A/C 001-012, 014-099,
Subtask 33-51-00-860-058
(1) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the
ARM position.
R Subtask 33-51-00-860-058-A
R (1) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
R button and its light are off.
R (2) On the overhead panel 25VU, make sure that the NO SMOKING switch
R 190RH is in the OFF position.
R (3) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the
R ARM position.
EFF :
ALL 33-51-00
Page 407
Aug 01/07
IAC
R **ON A/C ALL
4. Procedure
_________
Subtask 33-51-00-710-061
NOTE : The time taken to do this test must not be more than 3 minutes, to
____
prevent discharge of the emergency lighting batteries.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 33-51-00
Page 408
Aug 01/07
IAC
**ON A/C 101-199,
Subtask 33-51-00-710-061-A
NOTE : The time to do this test must not be more than 3 minutes, to
____
prevent discharge of the emergency lighting batteries.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 33-51-00-860-060
(1) Set the EMER EXIT LT switch 4WL on the overhead panel 25VU to the OFF
position.
EFF :
ALL 33-51-00
Page 409
Aug 01/07
R
IAC
TASK 33-51-00-440-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-00-860-059
4. Procedure
_________
Subtask 33-51-00-810-051
EFF :
ALL 33-51-00
Page 410
Aug 01/07
IAC
CABIN EMERGENCY LIGHTING - ADJUSTMENT/TEST
__________________________________________
TASK 33-51-00-710-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
R Subtask 33-51-00-860-072
R (2) Get access to the SYSTEM/REPORT/TEST COM Page : (Ref. TASK 31-32-00-
R 860-003).
EFF :
ALL 33-51-00
Page 501
Nov 01/07
IAC
R (3) Make sure that the Cabin-Intercommunication Data System (CIDS) is
R energized (Ref. TASK 23-73-00-861-001).
R (4) On the Flight Attendant Panel (FAP) 120RH in the cabin, make sure
R that the pushbutton-switch EMER is released (position out/indicator
R light is off).
R (5) On the overhead panel 25VU in the cockpit make sure that:
R - The switch 4WL EMER EXIT LT is in the OFF position
R - The switch 190RH NO SMOKING is in the OFF position
R - The indicator 5WL EMER EXIT LT OFF is on.
Subtask 33-51-00-861-050
(2) Energize the Cabin Intercommunicatin Data System (CIDS) (Ref. TASK
23-73-00-861-001).
Subtask 33-51-00-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
R
EFF :
ALL 33-51-00
Page 502
Nov 01/07
IAC
R **ON A/C 001-012, 014-099,
Subtask 33-51-00-869-055
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
4. Procedure
_________
Subtask 33-51-00-710-050
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R
EFF :
ALL 33-51-00
Page 503
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
system. Any associated failure
message can be ignored for
maintenance.
R Subtask 33-51-00-710-073
R B. Do this test:
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - Push the line select key - The system test starts and
R START TEST. the message TEST IN PROGRESS 60S
R shows, then
R the message TEST OK shows.
R
EFF :
ALL 33-51-00
Page 504
Nov 01/07
IAC
R **ON A/C ALL
5. Close-up
________
Subtask 33-51-00-862-050
R
EFF :
ALL 33-51-00
Page 505
Nov 01/07
IAC
TASK 33-51-00-710-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
ALL 33-51-00
Page 506
Nov 01/07
IAC
3. __________
Job Set-up
Subtask 33-51-00-860-050
(2) Energize the Cabin Intercommunication System (CIDS) (Ref. TASK 23-73-
00-861-001).
R Subtask 33-51-00-860-074
R (2) Get access to the SYSTEM/REPORT/TEST COM Page : (Ref. TASK 31-32-00-
R 860-003).
R (3) Make sure that the Cabin Intercommunication Data System (CIDS) is
R energized (Ref. TASK 23-73-00-861-001).
R (4) On the Flight Attendant Panel (FAP) 120RH in the cabin make sure that
R the pushbutton-switch EMER is released (position out/indicator light
R is off).
R (5) On the overhead panel 25VU in the cockpit make sure that
R - The switch 4WL EMER EXIT LT is in the OFF position
R - The switch 190RH NO SMOKING is in the OFF position
R - The indicator 5WL EMER EXIT LT OFF is on.
R (6) Put a warning notice in position at the MCDU to tell persons not to
R use the MCDU after the test start.
R
EFF :
ALL 33-51-00
Page 507
Nov 01/07
IAC
R **ON A/C ALL
Subtask 33-51-00-865-052
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
4. Procedure
_________
Subtask 33-51-00-860-051
(1) Make sure that the emergency escape hatches are closed and the covers
of the control handles are installed.
(2) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(3) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
R
EFF :
ALL 33-51-00
Page 508
Nov 01/07
IAC
Subtask 33-51-00-710-052
NOTE : Make sure that the aircraft power supply stays on during this
____
test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- push the SYST TEST line select - the SYST TEST menu comes on.
key.
- push the EMER LIGHT BATTERY - the ENTER ACCESS CODE page comes on.
line select key.
- push the ENTER line select key. - the EMER BATTERY TEST page and the
PUSH BAT KEY display comes on.
- push the TEST EMER-LIGHT BAT - the integral light of the BAT
membrane switch. membrane switch comes on.
- on the PTP display a clock comes on
and shows the time taken for the
test.
R
EFF :
001-012, 014-099, 33-51-00
Page 509
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
NOTE : If you select another mode/menu
____
on the PTP when the battery
capacity check is running. And
you then push the RET line
select key the PTP will not show
the EMER BATTERY TEST page. But
it will show the first page of
the mode/menu you selected
before.
- push the EMER LIGHT BATTERY - the EMER BATTERY TEST page comes on.
line select key.
- push the BAT TEST RESET line - the SYST TEST menu comes on.
select key. - the BAT OK light goes off.
- the integral light of the BAT
membrane switch goes off.
R Subtask 33-51-00-710-075
R C. Do this test:
R NOTE : After the start of the test, the MCDU must stay in the menu page
____
R CIDS/EPSU BAT CAP TEST during the full test to get the test
R result, because the test result cannot get through the menu page
R CIDS/EPSU BAT CAP TEST RESULT (CIDS fault).
EFF :
ALL 33-51-00
Page 510
Nov 01/07
IAC
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R - Push the down-arrow function - The message IN PROGRESS 60S comes on,
R key. then the menu page
R EPSU BAT CAP TEST 2/2 shows.
R - Push the line select key - The message CONFIRM START OF TEST
R START TEST. shows.
R - Push the line select key - The message TEST IN PROGRESS 3HR
R CONFIRM START OF TEST. shows, then the message TEST OK
R shows.
R
EFF :
101-199, 901-999, 33-51-00
Page 511
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R RETURN, until the menu page
R MCDU MENU comes into view.
5. Close-up
________
Subtask 33-51-00-862-052
R
EFF :
ALL 33-51-00
Page 512
Nov 01/07
IAC
TASK 33-51-00-710-003- 01
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-00-860-057
4. Procedure
_________
Subtask 33-51-00-920-050
(1) Remove the batteries of all Emergency Power Supply Units (EPSU)
(Ref. TASK 33-51-38-000-002).
(2) Install fully charged batteries to all EPSU (Ref. TASK 33-51-38-400-
002).
EFF :
ALL 33-51-00
Page 513
May 01/08
IAC
R **ON A/C ALL
TASK 33-51-00-710-004
Check manual Operation from both Control Panels and check all Cabin Lights and
Signs illuminated by Batteries
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-00-861-053
Subtask 33-51-00-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
EFF :
ALL 33-51-00
Page 514
May 01/08
IAC
4. Procedure
_________
Subtask 33-51-00-860-052
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
Subtask 33-51-00-710-053
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the cabin:
R - The signs and the lights of the
R emergency lighting system come on.
In the cabin:
R - The signs and the lights of the
R emergency lighting system go off.
EFF :
ALL 33-51-00
Page 515
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - Push the LIGHT EMER pushbutton - The red light of the LIGHT EMER
R switch. pushbutton switch comes on.
In the cabin:
R - The signs and the lights of the
R emergency lighting system come on.
In the cabin:
R - The signs and the lights of the
R emergency lighting system go off.
Subtask 33-51-00-860-052-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton switch and its integral light are off.
R
EFF :
ALL 33-51-00
Page 516
Nov 01/07
IAC
Subtask 33-51-00-710-053-A
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the cabin:
- the signs and lights of the emergency
lighting system come on.
In the cabin:
- the signs and lights of the emergency
lighting system go off.
In the cabin:
- the signs and lights of the emergency
lighting system come on.
In the cabin:
- the signs and lights of the emergency
lighting system go off.
EFF :
101-199, 901-999, 33-51-00
Page 517
Nov 01/07
R
IAC
**ON A/C ALL
Subtask 33-51-00-710-057
R NOTE : The time to do this test must not be more than 1 minute. This is
____
R to prevent the discharge of the emergency lighting batteries.
(1) Do this test with the circuit breakers 1WL and 2WL on the circuit
breaker panel 49VU.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R - Close the circuit breakers 1WL - The emergency lights and signs go
R and 2WL. off.
5. Close-up
________
Subtask 33-51-00-862-053
EFF :
ALL 33-51-00
Page 518
Nov 01/07
IAC
TASK 33-51-00-710-006
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-00
Page 519
Nov 01/07
R
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-00-861-056
Subtask 33-51-00-010-053
B. Get Access
(2) Remove the ceiling panel to get access to the emergency power-supply
unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001).
(3) Remove the lower sidewall panel to get access to the emergency
power-supply unit:
FOR 11WL
remove 241KW at the left emergency exits (Ref. TASK 25-23-44-000-
001),
FOR 12WL
EFF :
ALL 33-51-00
Page 520
Nov 01/07
R
IAC
remove 242KW at the right emergency exits (Ref. TASK 25-23-44-000-
001).
(4) Remove the door frame lining to get access to the emergency
power-supply unit:
FOR 13WL
remove 261KW at the left AFT passenger/crew door (Ref. TASK 25-23-45-
000-003).
Subtask 33-51-00-010-053-B
B. Get Access
(2) Remove the ceiling panel to get access to the emergency power-supply
unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001),
FOR 11WL
remove 251KC between the rear emergency exit doors (Ref. TASK 25-23-
41-000-001),
FOR 12WL
remove 251KC between the rear emergency exit doors (Ref. TASK 25-23-
41-000-001),
FOR 14WL
remove 231JC between the forward emergency exit doors (Ref. TASK 25-
23-41-000-001),
FOR 15WL
remove 231JC between the forward emergency exit doors (Ref. TASK 25-
23-41-000-001),
EFF :
001-012, 014-099, 101-199, 33-51-00
Page 521
Nov 01/07
R
IAC
(3) Lower one side of the emergency oxygen container to get access to the
emergency power-supply unit:
FOR 13WL
disengage and lower one side of the emergency oxygen container 33WR
between the AFT passenger/crew doors (Ref. TASK 35-21-41-000-001).
Subtask 33-51-00-010-053-A
B. Get Access
(2) Remove the ceiling panel to get access to the emergency power-supply
unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001).
(3) Remove the lower sidewall panel to get access to the emergency
power-supply unit:
FOR 11WL
remove 241KW at the left emergency exit(s) (Ref. TASK 25-23-44-000-
001),
FOR 12WL
remove 242KW at the right emergency exit(s) (Ref. TASK 25-23-44-000-
001).
(4) Lower one side of the emergency oxygen container to get access to the
emergency power-supply unit:
FOR 13WL
disengage and lower one side of the emergency oxygen container 33WR
between the AFT passenger/crew doors (Ref. TASK 35-21-41-000-001).
R
EFF :
101-199, 901-999, 33-51-00
Page 522
Nov 01/07
IAC
**ON A/C ALL
Subtask 33-51-00-865-055
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
Subtask 33-51-00-869-057
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
Subtask 33-51-00-869-057-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton switch and its integral light are off.
EFF :
ALL 33-51-00
Page 523
Nov 01/07
R
IAC
**ON A/C ALL
4. Procedure
_________
Subtask 33-51-00-710-059
NOTE : The test is the same for all emergency power-supply units.
____
(1) Do this test when the SYSTEM TEST through the PTP is not available.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 33-51-00
Page 524
Nov 01/07
R
IAC
**ON A/C 101-199, 901-999,
Subtask 33-51-00-710-059-A
NOTE : The test is the same for all emergency power-supply units.
____
(1) Do this test when the SYSTEM TEST through the MCDU is not available.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 33-51-00-410-053
A. Close Access
EFF :
ALL 33-51-00
Page 525
Nov 01/07
R
IAC
(3) Install the door frame lining:
FOR 13WL
install 261KW at the left AFT passenger/crew door (Ref. TASK 25-23-
45-400-008).
Subtask 33-51-00-410-053-B
A. Close Access
R
EFF :
001-012, 014-099, 101-199, 33-51-00
Page 526
Nov 01/07
IAC
**ON A/C 901-999,
Subtask 33-51-00-410-053-A
A. Close Access
Subtask 33-51-00-862-055
EFF :
ALL 33-51-00
Page 527
Nov 01/07
R
IAC
TASK 33-51-00-710-007
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-00-861-059
Subtask 33-51-00-865-058
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
EFF :
ALL 33-51-00
Page 528
Nov 01/07
R
IAC
**ON A/C 001-012, 014-099,
Subtask 33-51-00-860-061
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
Subtask 33-51-00-860-061-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton switch is off and its internal light is dim.
EFF :
ALL 33-51-00
Page 529
Nov 01/07
R
IAC
**ON A/C ALL
4. Procedure
_________
Subtask 33-51-00-710-062
A. Test of the Emergency Lighting in the Cabin with the LIGHT EMER
Pushbutton Switch
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. In the cabin, on the FAP 120RH: In the cabin, on the FAP 120RH:
- push the LIGHT EMER pushbutton - the red integral light of the LIGHT
switch. EMER pushbutton switch comes on.
In the cabin:
- the emergency lighting comes on.
2. In the cabin, on the FAP 120RH: In the cabin, on the FAP 120RH:
- push the LIGHT EMER pushbutton - the red integral light of the LIGHT
switch. EMER pushbutton switch goes off.
In the cabin:
- the emergency lighting goes off.
EFF :
ALL 33-51-00
Page 530
Nov 01/07
R
IAC
**ON A/C 101-199, 901-999,
Subtask 33-51-00-710-062-A
A. Test of the Emergency Lighting in the Cabin with the EMER Pushbutton
Switch
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. In the cabin, on the FAP 120RH: In the cabin, on the FAP 120RH:
- push the EMER pushbutton - the integral light of the EMER
switch. pushbutton switch comes on.
In the cabin:
- the emergency lighting comes on.
2. In the cabin, on the FAP 120RH: In the cabin, on the FAP 120RH:
- push the EMER pushbutton - the red internal light of the EMER
switch. pushbutton switch becomes dim.
In the cabin:
- the emergency lighting goes off.
5. Close-up
________
Subtask 33-51-00-862-058
EFF :
ALL 33-51-00
Page 531
Nov 01/07
R
IAC
TASK 33-51-00-710-008
Operational Test of the Emergency Lighting in the Cabin by EMER EXIT LT
Switch
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-00-861-060
Subtask 33-51-00-865-059
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
R
EFF :
ALL 33-51-00
Page 532
Nov 01/07
IAC
**ON A/C 001-012, 014-099,
Subtask 33-51-00-860-062
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
Subtask 33-51-00-860-062-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton switch and its integral light are off.
R
EFF :
ALL 33-51-00
Page 533
Nov 01/07
IAC
**ON A/C ALL
4. Procedure
_________
Subtask 33-51-00-710-063
A. Test of the Emergency Lighting in the Cabin with the EMER EXIT LT Switch
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the cabin:
- the emergency lighting comes on.
In the cabin:
- the emergency lighting goes off.
5. Close-up
________
Subtask 33-51-00-862-059
EFF :
ALL 33-51-00
Page 534
Nov 01/07
R
IAC
TASK 33-51-00-720-001
Check Door Switch Power supplied by Emer. Light System and check Door Switch
Operation to activate the Exterior Lights
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-00
Page 535
Nov 01/07
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-00-861-054
Subtask 33-51-00-865-054
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
EFF :
ALL 33-51-00
Page 536
Nov 01/07
R
IAC
**ON A/C 001-012, 014-099,
Subtask 33-51-00-010-050
C. Get Access
(2) Remove the ceiling panel to get access to the emergency power-supply
unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001),
(3) Remove the door frame lining to get access to the emergency
power-supply unit:
FOR 13WL
remove 261KW at the left AFT passenger/crew door (Ref. TASK 25-23-45-
000-003).
Subtask 33-51-00-010-050-B
C. Get Access
R
EFF :
001-012, 014-099, 101-199, 33-51-00
Page 537
Nov 01/07
IAC
(2) Remove the ceiling panel to get access to the emergency power-supply
unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001),
FOR 11WL
remove 251KC between the rear emergency exit doors (Ref. TASK 25-23-
41-000-001),
FOR 12WL
remove 251KC between the rear emergency exit doors (Ref. TASK 25-23-
41-000-001),
FOR 14WL
remove 231JC between the forward emergency exit doors (Ref. TASK 25-
23-41-000-001),
FOR 15WL
remove 231JC between the forward emergency exit doors (Ref. TASK 25-
23-41-000-001),
FOR 13WL
remove 261CC at the left AFT passenger/crew door (Ref. TASK 25-23-42-
000-002).
Subtask 33-51-00-010-050-A
C. Get Access
(2) Remove the ceiling panel to get access to the emergency power-supply
unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001),
FOR 13WL
remove 261CC at the left AFT passenger/crew door (Ref. TASK 25-23-42-
000-002).
R
EFF :
101-199, 901-999, 33-51-00
Page 538
Nov 01/07
IAC
**ON A/C ALL
4. Procedure
_________
Subtask 33-51-00-860-053
(1) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(4) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(5) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
(7) Use the digital multimeter (DGTL multimeter) for this test.
Subtask 33-51-00-860-053-A
(1) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(3) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
EFF :
ALL 33-51-00
Page 539
Nov 01/07
R
IAC
(4) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(5) On the FLight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton switch and its integral light are off.
(7) Use the digital multimeter (DGTL multimeter) for this test.
Subtask 33-51-00-710-054
B. Test of the door-switch power supplies with the EMER-EXIT LT switch 4WL
WARNING : BEFORE YOU START WORK ON THE DOOR, MAKE SURE THAT:
_______
- THE EMERGENCY CONTROL HANDLE IS IN THE DISARMED POSITION WITH
THE SAFETY PIN INSTALLED.
- THE PERCUSSION LEVER OF THE DOOR-DAMPER AND
EMERGENCY-OPERATION CYLINDER IS IN THE DISARMED POSITION WITH
THE SAFETY PIN INSTALLED.
NOTE : The time taken to do this test should not exceed 3 minutes to
____
prevent discharge of the emergency lighting batteries.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 33-51-00
Page 540
Nov 01/07
R
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- the DOOR symbols are shown in green
and the SLIDE messages are shown in
white.
- open the circuit breakers 13WN - the DOOR symbols become amber and the
and 15WN. SLIDE messages go out of view.
- set the EMER EXIT LT switch 4WL - the DOORS symbols become green and
to the ON position. the SLIDE messages come into view.
- set the EMER EXIT LT switch 4WL - the DOOR symbols become amber and the
to the OFF position. SLIDE messsages go out of view.
Subtask 33-51-00-710-054-A
B. Test of the door-switch power supplies with the EMER-EXIT LT switch 4WL
WARNING : BEFORE YOU START WORK ON THE DOOR, MAKE SURE THAT:
_______
- THE EMERGENCY CONTROL HANDLE IS IN THE DISARMED POSITION WITH
THE SAFETY PIN INSTALLED.
- THE PERCUSSION LEVER OF THE DOOR-DAMPER AND
EMERGENCY-OPERATION CYLINDER IS IN THE DISARMED POSITION WITH
THE SAFETY PIN INSTALLED.
EFF :
ALL 33-51-00
Page 541
Nov 01/07
R
IAC
WARNING : DO NOT OPEN THE PASSENGER/CREW DOORS.
_______
NOTE : The time taken to do this test should not exceed 3 minutes to
____
prevent discharge of the emergency lighting batteries.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- open the circuit breakers 13WN - the DOOR symbols become amber and the
and 15WN. SLIDE messages go out of view.
- set the EMER EXIT LT switch 4WL - the DOORS symbols become green and
to the ON position. the SLIDE messages come into view.
- set the EMER EXIT LT switch 4WL - the DOOR symbols become amber and the
to the OFF position. SLIDE messsages go out of view.
R
EFF :
101-199, 33-51-00
Page 542
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- put the escape-slide control
handle to the DISARMED
position.
- install the safety pin.
Subtask 33-51-00-720-050
WARNING : BEFORE YOU START WORK ON THE DOOR, MAKE SURE THAT:
_______
- THE EMERGENCY CONTROL HANDLE IS IN THE DISARMED POSITION WITH
THE SAFETY PIN INSTALLED.
- THE PERCUSSION LEVER OF THE DOOR-DAMPER AND
EMERGENCY-OPERATION CYLINDER IS IN THE DISARMED POSITION WITH
THE SAFETY PIN INSTALLED.
NOTE : Make sure that the EMER EXIT LT switch 4WL on the SIGNS panel 25VU
____
is in the OFF position. This test is for the FWD RH/LH
passenger/crew doors. For the AFT RH/LH passenger/crew doors use
the information in the brackets.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. On the aircraft:
- make sure that the related
passenger/crew door is closed.
R
EFF :
ALL 33-51-00
Page 543
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
3. In the cockpit, on the secondary
circuit breaker panel 122VU:
- open the circuit breaker, CABIN
EMER LT, 3WL.
NOTE : The closed circuit is in the kilo ohm range because the door switches
____
are electronic types.
- set the slide control handle to - the DGTL multimeter shows a closed
the ARMED position. circuit.
- set the slide control handle to - the DGTL multimeter shows an open
the DISARMED position. circuit.
R
EFF :
ALL 33-51-00
Page 544
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- connect the positive test lead
of the DGTL multimeter to pin D
of the connector 10WL-A
(13WL-A),
- connect the negative test lead
of the DGTL multimeter to pin m
of the connector 10WL-A
(13WL-A).
- set the slide control handle - the DGTL multimeter shows a closed
to the ARMED position. circuit.
- set the slide control handle - the DGTL multimeter shows an open
to the DISARMED position. circuit.
R
EFF :
ALL 33-51-00
Page 545
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- install the safety pin in the
control handle of the escape
slide.
R
EFF :
ALL 33-51-00
Page 546
Nov 01/07
IAC
**ON A/C 001-012, 014-099,
Subtask 33-51-00-720-051
WARNING : MAKE SURE THAT THE SAFETY PIN IS CORRECTLY INSTALLED IN THE
_______
HATCH FRAME IF THE EMERGENCY EXIT HATCH IS REMOVED. THIS
PREVENTS AN ACCIDENTAL OPERATION OF THE ESCAPE SLIDE MECHANISM
DURING THE MAINTENANCE.
NOTE : This test is for the left emergency exits. The test for the right
____
emergency exits is the same.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- pull down and remove the cover - the SLIDE ARMED light on the cabin
flap from the hatch, lining comes on,
- push the latch pin against the - the SLIDE ARMED light goes off.
spring and turn it a quarter
turn counterclockwise to
retract it to the DISARMED
position,
R
EFF :
001-012, 014-099, 33-51-00
Page 547
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- the overwing emergency lights come
on,
- push the latch pin against the - the overwing emergency lights go off.
spring and turn it a quarter
turn clockwise to extend it to
the ARMED position,
- install and close the removed - the SLIDE ARMED light goes off.
cover flap on the hatch.
3. On the aft left emergency escape Between the left emergency exits:
hatch:
- pull down and remove the cover - the SLIDE ARMED light comes on,
flap from the hatch,
- push the latch pin against the - the SLIDE ARMED light goes off.
spring and turn it a quarter
turn counterclockwise to
retract it to the DISARMED
position,
- push the latch pin against the - the overwing emergency lights go off.
spring and turn it a quarter
turn clockwise to extend it to
the ARMED position,
- install and close the removed - the SLIDE ARMED light goes off.
cover flap on the hatch.
R
EFF :
001-012, 014-099, 33-51-00
Page 548
Nov 01/07
IAC
**ON A/C 101-199,
Subtask 33-51-00-720-051-B
WARNING : BEFORE YOU START WORK ON THE DOOR, MAKE SURE THAT:
_______
- THE EMERGENCY CONTROL HANDLE IS IN THE DISARMED POSITION WITH
THE SAFETY PIN INSTALLED.
- THE PERCUSSION LEVER OF THE DOOR-DAMPER AND
EMERGENCY-OPERATION CYLINDER IS IN THE DISARMED POSITION WITH
THE SAFETY PIN INSTALLED.
NOTE : Make sure that the EMER EXIT LT switch 4WL on the SIGNS panel 25VU
____
is in the OFF position. This test is for the forward RH/LH
emergency-exit doors. For the rear RH/LH emergency-exit doors use
the information in the brackets.
(1) Do the test of the forward and rear emergency-exit door switches of
the emergency-exit escape-slide lighting.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. On the aircraft:
- make sure that the related
emergency-exit door is closed.
R
EFF :
101-199, 33-51-00
Page 549
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- remove the electrical connector
15WL-A (11WL-A).
NOTE : The closed circuit is in the kilo ohm range because the door switches
____
are electronic types.
- set the slide control handle to - the DGTL multimeter shows a closed
the ARMED position. circuit.
- set the slide control handle to - the DGTL multimeter shows an open
the DISARMED position. circuit.
R
EFF :
101-199, 33-51-00
Page 550
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
8. On the forward (rear) left
emergency-exit door:
13. On the forward (rear) right In Zone 231 (251) on the DGTL
emergency-exit door: multimeter:
- remove the safety pin from the
control handle of the escape
slide.
EFF :
101-199, 33-51-00
Page 551
Nov 01/07
R
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the slide control handle - the DGTL multimeter shows a closed
to the ARMED position. circuit.
- set the slide control handle - the DGTL multimeter shows an open
to the DISARMED position. circuit.
R
EFF :
101-199, 33-51-00
Page 552
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- close the circuit breakers,
LIGHTING EMER LT CABIN, 1WL
and 2WL.
Subtask 33-51-00-720-051-A
WARNING : MAKE SURE THAT THE SAFETY PIN IS CORRECTLY INSTALLED IN THE
_______
HATCH FRAME IF THE EMERGENCY EXIT HATCH IS REMOVED. THIS
PREVENTS AN ACCIDENTAL OPERATION OF THE ESCAPE SLIDE MECHANISM
DURING THE MAINTENANCE.
NOTE : This test is for the left emergency exit. The test for the right
____
emergency exit is the same.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R
EFF :
101-199, 901-999, 33-51-00
Page 553
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- pull down and remove the cover - the SLIDE ARMED light on the cabin
flap from the hatch, lining comes on,
- push the latch pin against the - the SLIDE ARMED light goes off.
spring and turn it a quarter
turn counterclockwise to
retract it to the DISARMED
position,
- push the latch pin against the - the overwing emergency lights go off.
spring and turn it a quarter
turn clockwise to extend it to
the ARMED position,
- install and close the removed - the SLIDE ARMED light goes off.
cover flap on the hatch.
Subtask 33-51-00-710-055
E. Do the operational test of the emergency lighting system (Ref. TASK 33-
51-00-710-001).
R
EFF :
ALL 33-51-00
Page 554
Nov 01/07
IAC
5. Close-up
________
Subtask 33-51-00-860-054
Subtask 33-51-00-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-51-00
Page 555
Nov 01/07
R
IAC
**ON A/C 101-199,
Subtask 33-51-00-410-050-B
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
101-199, 33-51-00
Page 556
Nov 01/07
IAC
**ON A/C 901-999,
Subtask 33-51-00-410-050-A
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-51-00-862-054
EFF :
ALL 33-51-00
Page 557
Nov 01/07
R
IAC
TASK 33-51-00-710-009
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-00-861-061
Subtask 33-51-00-865-060
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
R
EFF :
ALL 33-51-00
Page 558
Nov 01/07
IAC
4. Procedure
_________
Subtask 33-51-00-860-063
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
Subtask 33-51-00-710-064
R NOTE : All the individual lamps in the cabin lights and signs must come
____
R on or go off as necessary during the subsequent test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the cabin:
R - The signs and the lights of the
R emergency lighting system come on.
In the cabin:
R - The signs and the lights of the
R emergency lighting system go off.
R
EFF :
ALL 33-51-00
Page 559
Nov 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
3. On the FAP 120RH: On the FAP 120RH:
R - Push the LIGHT EMER pushbutton - The red light of the LIGHT EMER
R switch. pushbutton switch comes on.
In the cabin:
R - The signs and the lights of the
R emergency lighting system come on.
In the cabin:
R - The signs and the lights of the
R emergency lighting system go off.
Subtask 33-51-00-860-063-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton switch and its integral light are off.
R
EFF :
ALL 33-51-00
Page 560
Nov 01/07
IAC
Subtask 33-51-00-710-064-A
R NOTE : All the individual lamps in the cabin lights and signs must come
____
R on or go off as necessary during the subsequent test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the cabin:
R - The signs and the lights of the
R emergency lighting system come on.
In the cabin:
R - The signs and the lights of the
R emergency lighting system go off.
In the cabin:
R - The signs and the lights of the
R emergency lighting system come on.
In the cabin:
R - The signs and the lights of the
R emergency lighting system go off.
EFF :
101-199, 901-999, 33-51-00
Page 561
Nov 01/07
IAC
**ON A/C ALL
5. Close-up
________
Subtask 33-51-00-862-060
R
EFF :
ALL 33-51-00
Page 562
Nov 01/07
IAC
LIGHT - EMERGENCY, CABIN (20WL,21WL,28WL,32WL,33WL) - REMOVAL/INSTALLATION
__________________________________________________________________________
TASK 33-51-11-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
NOTE : The procedure is the same for all cabin emergency lights.
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-11
Page 401
Aug 01/07
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-11-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
Subtask 33-51-11-860-050-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
EFF :
ALL 33-51-11
Page 402
Aug 01/07
IAC
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
Subtask 33-51-11-860-050-B
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
R Subtask 33-51-11-860-050-C
R (1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
R 4WL is in the OFF position.
R (2) On the overhead panel 25VU, make sure that the NO SMOKING switch
R 190RH is in the OFF position.
R (3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
R pushbutton and its light are off.
Subtask 33-51-11-010-052
C. Get Access
FOR 70WL1
Remove the access panel 241CW.
FOR 70WL2
Remove the access panel 242CW.
FOR 70WL3
Remove the access panel 241LW.
EFF :
ALL 33-51-11
Page 403
Aug 01/07
IAC
FOR 70WL4
Remove the access panel 242LW.
Subtask 33-51-11-010-052-A
C. Get Access
FOR 70WL1
Remove the access panel 241FW.
FOR 70WL2
Remove the access panel 242FW.
4. Procedure
_________
EFF :
ALL 33-51-11
Page 404
Aug 01/07
IAC
**ON A/C 901-999,
Subtask 33-51-11-020-050
(a) Carefully remove the lens (2), (6) from the light housing (4),
(7).
(b) Release the attachment clips (5), (9) and remove the light
housing (4), (7) from the mounting hole.
(c) Support the light housing (4), (7) and disconnect the electrical
connectors (1), (8).
(a) Carefully remove the lens (2), (6) from the light housing (4),
(7).
R Subtask 33-51-11-020-050-C
R (a) Release the attachment clip (3) and remove the light housing (2)
R from the wall panel.
R (b) Hold the light housing (2) and disconnect the electrical
R connectors (4) from the Faston tabs (1).
R
EFF :
ALL 33-51-11
Page 405
Aug 01/07
IAC
Cabin Emergency Light
Figure 401/TASK 33-51-11-991-001- 12 (SHEET 1)
R
EFF :
001-012, 014-099, 33-51-11
Page 406
Feb 01/07
IAC
Cabin Emergency Light
Figure 401/TASK 33-51-11-991-001- 22 (SHEET 2)
R
EFF :
001-012, 014-099, 33-51-11
Page 407
Feb 01/07
IAC
R Cabin Emergency Light
R Figure 401A/TASK 33-51-11-991-001-D12 (SHEET 1)
EFF :
101-199, 33-51-11
Page 408
Aug 01/07
IAC
R Cabin Emergency Light
R Figure 401A/TASK 33-51-11-991-001-D22 (SHEET 2)
EFF :
101-199, 33-51-11
Page 409
Aug 01/07
IAC
R Cabin Emergency Light
Figure 401B/TASK 33-51-11-991-001-A12 (SHEET 1)
EFF :
901-901, 33-51-11
Page 410
May 01/08
IAC
R Cabin Emergency Light
Figure 401B/TASK 33-51-11-991-001-A22 (SHEET 2)
EFF :
901-901, 33-51-11
Page 411
May 01/08
IAC
R Cabin Emergency Light
R Figure 401C/TASK 33-51-11-991-001-C12 (SHEET 1)
R
EFF :
902-999, 33-51-11
Page 412
Aug 01/07
IAC
R Cabin Emergency Light
R Figure 401C/TASK 33-51-11-991-001-C22 (SHEET 2)
R
EFF :
902-999, 33-51-11
Page 413
Aug 01/07
IAC
Cabin Emergency Light - Escape-Hatch Handle Lighting
Figure 402/TASK 33-51-11-991-002
R
EFF :
001-012, 014-099, 33-51-11
Page 414
Aug 01/07
IAC
Cabin Emergency Light - Escape-Hatch Handle Lighting
Figure 402A/TASK 33-51-11-991-002-A
R
EFF :
901-999, 33-51-11
Page 415
Aug 01/07
IAC
R (c) Remove the light housing (2).
R (a) Carefully remove the lens (5), (12) from the light housing (6),
R (10).
R (b) Release the attachment clips (8), (11) and remove the light
R housing (6), (10) from the mounting hole.
R (c) Hold the light housing (6), (10) and disconnect the electrical
R connectors (7), (9).
Subtask 33-51-11-020-050-A
(a) Carefully remove the lens (3) from the light housing (4).
(b) Remove the screws (1) and remove the light housing (4) from the
mounting hole.
(c) Support the light housing (4) and disconnect the electrical
connector (2).
(a) Carefully remove the lens (5) from the light housing (6).
(b) Release the attachment clips (8) and remove the light housing (6)
from the mounting hole.
R
EFF :
101-199, 901-901, 33-51-11
Page 416
Aug 01/07
IAC
(c) Support the light housing (6) and disconnect the electrical
connectors (7).
R Subtask 33-51-11-020-050-D
R (a) Release the attachment clip (3) and remove the light housing (2)
R from the wall panel.
R (b) Hold the light housing (2) and disconnect the electrical
R connectors (4) from the Faston tabs (1).
R (a) Carefully remove the lens (5) from the light housing (6).
R (b) Release the attachment clips (8) and remove the light housing (6)
R from the mounting hole.
R (c) Hold the light housing (6) and disconnect the electrical
R connectors (7).
R
EFF :
901-999, 33-51-11
Page 417
Aug 01/07
IAC
**ON A/C 001-012, 014-099,
Subtask 33-51-11-020-051
(b) Release the spring clips (18) and remove the escape hatch-handle
light (15).
Subtask 33-51-11-020-051-A
(b) Release the spring clips (16) and remove the escape hatch-handle
light (15).
R
EFF :
001-012, 014-099, 901-999, 33-51-11
Page 418
Aug 01/07
IAC
**ON A/C ALL
TASK 33-51-11-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-11
Page 419
Aug 01/07
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-11-860-051-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
Subtask 33-51-11-860-051-B
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
R
EFF :
ALL 33-51-11
Page 420
Aug 01/07
IAC
R **ON A/C 901-999,
R Subtask 33-51-11-860-051-C
R (1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
R 4WL is in the OFF position.
R (2) On the overhead panel 25VU, make sure that the NO SMOKING switch
R 190RH is in the OFF position.
R (3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
R pushbutton and its light are off.
Subtask 33-51-11-010-054
B. Make sure that the access panels 241CW, 242CW, 241LW, 242LW are open.
Subtask 33-51-11-010-054-A
B. Make sure that the access panels 241FW, 242FW are open.
Subtask 33-51-11-865-053
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
R
EFF :
ALL 33-51-11
Page 421
Aug 01/07
IAC
4. Procedure
_________
Subtask 33-51-11-910-050
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
ALL 33-51-11
Page 422
Aug 01/07
IAC
**ON A/C 001-012, 014-099,
Subtask 33-51-11-420-050
(a) Make sure that the electrical connectors are clean and in the
correct condition.
(b) Connect the electrical connectors (1), (8) to the light housing
(4), (7).
(d) Install the lens (2), (6) to the light housing (4), (7).
Make sure that you hear a click when the lens (2), (6) locks in
position.
(a) Install the bulb(s) (3), (10) in the light housing (4), (7).
(b) Install the lens (2), (6) to the light housing (4), (7).
Make sure that you hear a click when the lens (2), (6) locks in
position.
R Subtask 33-51-11-420-050-C
R (b) Make sure that the electrical connectors are clean and in the
R correct condition.
R (c) Connect the electrical connectors (4) to the Faston tabs (1).
R
EFF :
001-012, 014-099, 101-199, 33-51-11
Page 423
Aug 01/07
IAC
R (d) Install the light housing (2) on the wall panel.
R Make sure that you hear a click when the light housing (2) locks
R in position.
R (a) Make sure that the electrical connectors are clean and in the
R correct condition.
R (b) Connect the electrical connectors (7), (9) to the light housing
R (6), (10).
R (d) Install the lens (5), (12) on the light housing (6), (10).
R Make sure that you hear a click when the lens (5), (12) locks in
R position.
Subtask 33-51-11-420-050-A
(b) Make sure that the electrical connectors are clean and in the
correct condition.
(c) Connect the electrical connector (2) to the light housing (4).
(d) Install the light housing (4) with the screws (1).
R
EFF :
101-199, 901-901, 33-51-11
Page 424
Aug 01/07
IAC
(2) Installation of the Cabin Emergency-Light Assembly mounted in the
Door-Area
(a) Make sure that the electrical connectors are clean and in the
correct condition.
(b) Connect the electrical connectors (7) to the light housing (6).
R Subtask 33-51-11-420-050-D
R (b) Make sure that the electrical connectors are clean and in the
R correct condition.
R (c) Connect the electrical connectors (4) to the Faston tabs (1).
R (a) Make sure that the electrical connectors are clean and in the
R correct condition.
R (b) Connect the electrical connectors (7) to the light housing (6).
EFF :
901-999, 33-51-11
Page 425
Aug 01/07
IAC
R (c) Install the light housing (6).
R Make sure that you hear a click when the light housing (6) locks
R in position.
Subtask 33-51-11-420-052
(b) Make sure that the electrical connectors are clean and in the
correct condition.
Subtask 33-51-11-420-052-A
EFF :
001-012, 014-099, 901-999, 33-51-11
Page 426
Aug 01/07
IAC
(b) Make sure that the electrical connectors are clean and in the
correct condition.
Subtask 33-51-11-865-051
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1WL, 2WL.
Subtask 33-51-11-861-050
Subtask 33-51-11-710-050
F. Do this test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. In the cockpit on the SIGNS panel In the cockpit, on the SIGNS panel
25VU: 25VU:
- set the EMER EXIT LT switch 4WL - the EMER EXIT LT OFF annunciator 5WL
to the ON position. goes off.
In the cabin:
- the related emergency light comes on.
EFF :
ALL 33-51-11
Page 427
Feb 01/08
IAC
5. Close-up
________
Subtask 33-51-11-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-51-11-410-053-A
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-51-11-862-050
EFF :
ALL 33-51-11
Page 428
Aug 01/07
IAC
SIGN - EXIT MARKING, WALL MOUNTED - REMOVAL/INSTALLATION
________________________________________________________
TASK 33-51-13-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-13
Page 401
Aug 01/07
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-13-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
Subtask 33-51-13-860-050
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
EFF :
ALL 33-51-13
Page 402
Aug 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-51-13-860-050-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
4. Procedure
_________
EFF :
ALL 33-51-13
Page 403
Aug 01/07
IAC
Cabin Wall-Mounted Emergency-Exit-Markers
Figure 401/TASK 33-51-13-991-001
R
EFF :
001-012, 014-099, 33-51-13
Page 404
May 01/07
IAC
R Cabin Wall-Mounted Emergency-Exit-Markers
R Figure 401A/TASK 33-51-13-991-001-C
R
EFF :
101-199, 33-51-13
Page 405
May 01/07
IAC
Cabin Wall-Mounted Emergency-Exit-Markers
Figure 401B/TASK 33-51-13-991-001-A
R
EFF :
901-999, 33-51-13
Page 406
Aug 01/07
IAC
**ON A/C 001-012, 014-099,
Subtask 33-51-13-020-050
(b) Carefully remove the lens (5) from the light housing (6).
(c) Remove the screws (3) and the washers (2) from the light housing
(6).
(d) Remove the light housing (6) from the wall panel.
(e) Support the light housing (6) and disconnect the electrical
connections (7) with the insertion/removal tool M 15.570-22.
(b) Carefully remove the lens (5) from the light housing (6).
Subtask 33-51-13-020-050-B
(1) Carefully remove the lens (3) from the light housing (2).
(2) Release the two attachment clips (1) and remove the light housing (2)
from the wall panel.
(3) Support the light housing (2) and disconnect the electrical
connectors (4).
R
EFF :
ALL 33-51-13
Page 407
Aug 01/07
IAC
(4) Remove the light housing (2).
R
EFF :
101-199, 901-999, 33-51-13
Page 408
Aug 01/07
IAC
**ON A/C ALL
TASK 33-51-13-400-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-13
Page 409
May 01/07
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-13-860-052
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
Subtask 33-51-13-860-052-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
EFF :
ALL 33-51-13
Page 410
Aug 01/07
IAC
**ON A/C ALL
Subtask 33-51-13-865-055
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
4. Procedure
_________
Subtask 33-51-13-420-050
(a) Make sure that the electrical connectors are clean and in the
correct condition.
EFF :
ALL 33-51-13
Page 411
Aug 01/07
IAC
(b) Connect the electrical connections (7) with the insertion/removal
tool M15.570-22.
(c) Install the light housing (6) with the washers (2) and the screws
(3) to the wall panel.
(d) Install the lens (5) with the screw (4) to the light housing (6).
(b) Install the lens (5) with the screw (4) to the light housing (6).
Subtask 33-51-13-420-050-B
(a) Make sure that the electrical connectors are clean and in the
correct condition.
(b) Connect the electrical connectors (4) to the light housing (2).
R
EFF :
ALL 33-51-13
Page 412
Aug 01/07
IAC
**ON A/C ALL
Subtask 33-51-13-865-051
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1WL, 2WL.
Subtask 33-51-13-860-051
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the overhead panel 25VU, make sure that the EMER EXIT LT OFF
annunciator light 5WL is on.
Subtask 33-51-13-710-050
D. Do this test:
NOTE : The time taken to do this test should not exceed 3 min to prevent
____
discharge of the emergency lighting batteries.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
In the cabin:
- the related wall-mounted
emergency-exit-marker comes on.
In the cabin:
EFF :
ALL 33-51-13
Page 413
Aug 01/07
R
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- the related wall-mounted
emergency-exit-marker goes off.
5. Close-up
________
Subtask 33-51-13-860-053
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-51-13
Page 414
Aug 01/07
R
IAC
R LIGHT - AUXILIARY, LAVATORY (80WL,81WL,82WL,83WL) - REMOVAL/INSTALLATION
________________________________________________________________________
TASK 33-51-14-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-14
Page 401
May 01/06
IAC
R **ON A/C 001-012, 014-099,
3. __________
Job Set-up
Subtask 33-51-14-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 79WL H07
Subtask 33-51-14-010-050
B. Get Access
4. Procedure
_________
Subtask 33-51-14-020-050
(2) Remove the screws (1), the washers (2) and the auxiliary lavatory
light (4) from the lavatory structure.
R
EFF :
001-012, 014-099, 33-51-14
Page 402
May 01/06
IAC
Auxiliary Lavatory Light 80WL
Figure 401/TASK 33-51-14-991-001
EFF :
001-012, 014-019, 33-51-14
Page 403
Feb 01/96
IAC
Auxiliary Lavatory Light 80WL
Figure 401A/TASK 33-51-14-991-001-A
R
EFF :
020-099, 33-51-14
Page 404
May 01/03
IAC
**ON A/C 020-099,
Subtask 33-51-14-020-050-A
(2) Remove the screws (1), the washers (2) and the auxiliary lavatory
light (3) from the lavatory structure.
EFF :
020-099, 33-51-14
Page 405
May 01/06
R
IAC
R **ON A/C 001-012, 014-099,
TASK 33-51-14-400-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-51-14
Page 406
May 01/06
IAC
R **ON A/C 001-012, 014-099,
3. __________
Job Set-up
Subtask 33-51-14-860-050
(1) Make sure that the stepladder is in position below access panel
221AC.
Subtask 33-51-14-865-066
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 79WL H07
4. Procedure
_________
Subtask 33-51-14-420-050
R
EFF :
001-012, 014-099, 33-51-14
Page 407
May 01/06
IAC
(3) Connect the electrical connections (3) with the insertion/removal
tool M15.570-22 to the auxiliary lavatory light (4).
(4) Install the auxiliary lavatory light (4) to the lavatory structure
with the washers (2) and the screws (1).
Subtask 33-51-14-420-050-A
(4) Install the auxiliary lavatory light (3) to the lavatory structure
with the washers (2) and the screws (1).
Subtask 33-51-14-861-050
Subtask 33-51-14-865-054
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
79WL.
Subtask 33-51-14-710-055
D. Test
(1) Make sure that the auxiliary lavatory light 80WL comes on. when the
circuit breaker has been closed.
R
EFF :
001-012, 014-099, 33-51-14
Page 408
May 01/06
IAC
5. Close-up
________
Subtask 33-51-14-410-055
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-51-14-862-051
R
EFF :
001-012, 014-099, 33-51-14
Page 409
May 01/06
IAC
TASK 33-51-14-000-002
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-51-14
Page 410
May 01/06
IAC
R **ON A/C 001-012, 014-099,
3. __________
Job Set-up
Subtask 33-51-14-865-051
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 79WL H07
Subtask 33-51-14-010-051
B. Get Access
Subtask 33-51-14-010-051-A
B. Get Access
4. Procedure
_________
R
EFF :
001-012, 014-099, 33-51-14
Page 411
May 01/06
IAC
Auxiliary Lavatory Light 81WL
Figure 402/TASK 33-51-14-991-002
EFF :
001-012, 014-019, 33-51-14
Page 412
Feb 01/96
IAC
R **ON A/C 020-099,
Subtask 33-51-14-020-051
(1) Remove the screws (2) from the lavatory ceiling panel (3).
(2) Lower the lavatory ceiling panel (3) to the full length of the
retainer strips (1).
(3) Remove the srews (6), the washers (5) and the cover (7) from the
lavatory ceiling panel (3).
(5) Remove the screws (8), the washers (9) and the auxiliary lavatory
light (4) from the lavatory ceiling panel (3).
Subtask 33-51-14-020-051-A
(2) Remove the screws (1), the washers (2) and the auxiliary lavatory
light (3) from the lavatory structure.
EFF :
ALL 33-51-14
Page 413
May 01/03
IAC
Auxiliary Lavatory Light 81WL
Figure 402A/TASK 33-51-14-991-002-A
R
EFF :
020-099, 33-51-14
Page 414
May 01/03
IAC
R **ON A/C 001-012, 014-099,
TASK 33-51-14-400-002
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-51-14
Page 415
May 01/06
IAC
R **ON A/C 001-012, 014-099,
3. __________
Job Set-up
Subtask 33-51-14-865-067
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 79WL H07
Subtask 33-51-14-410-060
Subtask 33-51-14-410-060-A
4. Procedure
_________
R
EFF :
001-012, 014-099, 33-51-14
Page 416
May 01/06
IAC
**ON A/C 020-099,
Subtask 33-51-14-420-051
(4) Install the auxiliary lavatory light (4) to the lavatory structure
with the washers (9) and the screws (8).
CAUTION : MAKE SURE THAT THE AIR EXTRACTION GRILL, THE SMOKE DETECTOR
_______
AND THE AIR EXTRACTION DUCT ARE IN LINE WITH THE EXTRACTOR
AIRFLOW.
INCORRECT INSTALLATION CAN CAUSE MALFUNCTION OF THE SMOKE
DETECTOR.
(5) Install the cover (7) with the washers (5) and the screws (6).
(6) Install the lavatory ceiling panel (3) with the screws (2).
(7) Make sure that the auxiliary lavatory light (4) in the air extraction
grill (11) does nut cover the air extraction-duct inlet.
Subtask 33-51-14-420-051-A
R
EFF :
001-012, 014-099, 33-51-14
Page 417
May 01/06
IAC
(3) Connect the electrical connections (4) with the insertion/removal
tool M15.570-22 to the auxiliary lavatory light (3).
(4) Install the auxiliary lavatory light (3) to the lavatory structure
with the washers (2) and the screws (1).
Subtask 33-51-14-861-051
Subtask 33-51-14-865-055
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
79WL.
Subtask 33-51-14-710-056
D. Test
(1) Make sure that the auxiliary lavatory light 81WL comes on when you
close the circuit breaker.
5. Close-up
________
Subtask 33-51-14-410-061
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
001-012, 014-099, 33-51-14
Page 418
May 01/06
IAC
**ON A/C 020-099,
Subtask 33-51-14-410-061-A
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-51-14-862-052
R
EFF :
001-012, 014-099, 33-51-14
Page 419
May 01/06
IAC
TASK 33-51-14-000-004
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-51-14
Page 420
May 01/06
IAC
**ON A/C 001-012, 014-099,
3. __________
Job Set-up
Subtask 33-51-14-865-053
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 79WL H07
Subtask 33-51-14-010-055
B. Get Access
(1) Put the stepladder in position below the access panel 261AC.
4. Procedure
_________
Subtask 33-51-14-020-055
(1) Remove the clamp (2) from the lavatory ventilation flexible-hose (1).
(2) Lift the lavatory ventilation flexible-hose (1) clear of the cover
(9).
(3) Remove the screws (3), the washers (4) and the cover (9).
EFF :
001-012, 014-099, 33-51-14
Page 421
Nov 01/06
R
IAC
Auxiliary Lavatory Light 83WL
Figure 403/TASK 33-51-14-991-004
EFF :
001-012, 014-019, 33-51-14
Page 422
Feb 01/96
IAC
Auxiliary Lavatory Light 83WL
Figure 403A/TASK 33-51-14-991-004-A
R
EFF :
020-099, 33-51-14
Page 423
May 01/03
IAC
(4) Disconnect the electrical connections (6) with the insertion/removal
tool M15.570-22 from the auxiliary lavatory light (5).
(5) Remove the screws (8), the washers (7) and the auxiliary lavatory
light (5).
Subtask 33-51-14-020-055-A
(2) Remove the screws (1), the washers (2) and the auxiliary lavatory
light (3).
R
EFF :
001-012, 014-099, 33-51-14
Page 424
Nov 01/06
IAC
R **ON A/C 001-012, 014-099,
TASK 33-51-14-400-004
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-51-14
Page 425
May 01/06
IAC
R **ON A/C 001-012, 014-099,
3. __________
Job Set-up
Subtask 33-51-14-865-069
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 79WL H07
Subtask 33-51-14-860-051
(1) Make sure that the stepladder is in position below the access panel
261AC.
4. Procedure
_________
Subtask 33-51-14-420-056
R
EFF :
001-012, 014-099, 33-51-14
Page 426
May 01/06
IAC
(3) Install the auxiliary lavatory light (5) to the lavatory structure
with the washers (7) and the screws (8).
CAUTION : MAKE SURE THAT THE AIR EXTRACTION GRILL, THE SMOKE DETECTOR
_______
AND THE AIR EXTRACTION DUCT ARE IN LINE WITH THE EXTRACTOR
AIRFLOW.
INCORRECT INSTALLATION CAN CAUSE MALFUNCTION OF THE SMOKE
DETECTOR.
(5) Install the cover (9) with the washers (4) and the screws (3).
(6) Make sure that the auxiliary lavatory light (5) in the air extraction
grill (10) does not cover the air extraction-duct inlet.
(7) Lower the lavatory ventilation flexible-hose (1) onto the cover (9).
Subtask 33-51-14-420-056-A
(3) Install the auxiliary lavatory light (3) to the lavatory structure
with the washers (2) and the screws (1).
(5) Install the lavatory ventilation flexible-hose (1) with the clamp
(2).
Subtask 33-51-14-861-053
R
EFF :
001-012, 014-099, 33-51-14
Page 427
May 01/06
IAC
Subtask 33-51-14-865-057
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
79WL.
Subtask 33-51-14-710-058
D. Test
(1) Make sure that the auxiliary lavatory light 83WL comes on when you
close the circuit breaker.
5. Close-up
________
Subtask 33-51-14-410-054
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-51-14-862-050
R
EFF :
001-012, 014-099, 33-51-14
Page 428
May 01/06
IAC
**ON A/C 101-199, 901-999,
TASK 33-51-14-000-006
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
101-199, 901-999, 33-51-14
Page 429
May 01/07
IAC
**ON A/C 101-199, 901-999,
3. __________
Job Set-up
Subtask 33-51-14-865-064
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 79WL H07
2000VU LAV FWD/OCCUPIED 1WJ F01
2001VU LAVATORY AFT/OCCUPIED 11WJ B04
4. Procedure
_________
Subtask 33-51-14-020-058
(1) Push the locking catches (2) of the auxiliary/mirror light housing
(3) to remove the auxiliary/mirror light housing (3).
(2) Identify the electrical connectors (1) before you disconnect them.
EFF :
101-199, 901-999, 33-51-14
Page 430
Aug 01/07
IAC
R Auxiliary/Mirror Lavatory Light
R Figure 404/TASK 33-51-14-991-006-A
R
EFF :
101-199, 33-51-14
Page 431
May 01/07
IAC
Auxiliary/Mirror Lavatory Light
R Figure 404A/TASK 33-51-14-991-006
R
EFF :
901-999, 33-51-14
Page 432
May 01/07
IAC
(3) Disconnect the electrical connectors (1) from the auxiliary/mirror
light housing (3).
EFF :
101-199, 901-999, 33-51-14
Page 433
May 01/07
R
IAC
TASK 33-51-14-400-006
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
101-199, 901-999, 33-51-14
Page 434
May 01/07
IAC
**ON A/C 101-199, 901-999,
3. __________
Job Set-up
Subtask 33-51-14-865-071
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 79WL H07
2000VU LAV FWD/OCCUPIED 1WJ F01
2001VU LAVATORY AFT/OCCUPIED 11WJ B04
4. Procedure
_________
Subtask 33-51-14-420-058
(3) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
101-199, 901-999, 33-51-14
Page 435
Aug 01/07
IAC
(4) Connect the electrical connectors (1) as identified during the
removal procedure to the auxiliary/mirror light housing (3).
NOTE : Make sure that you hear a click when the catches (2) lock in
____
position.
Subtask 33-51-14-861-059
Subtask 33-51-14-865-065
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s): 79WL, 1WJ, 11WJ.
Subtask 33-51-14-710-060
D. Test
(1) Make sure that the auxiliary lavatory light comes on when you close
the circuit breaker 79WL.
(2) Make sure that the mirror lavatory light comes on when you close and
lock the lavatory door.
R
5. Close-up
________
Subtask 33-51-14-860-053
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
101-199, 901-999, 33-51-14
Page 436
Aug 01/07
IAC
LIGHT - EMERGENCY, OVERWING (60WL,61WL,62WL,63WL) - REMOVAL/INSTALLATION
________________________________________________________________________
TASK 33-51-15-000-001
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The procedure is the same for all emergency overwing lights 60 WL (61WL,
____
62WL, 63WL).
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 901-999, 33-51-15
Page 401
Feb 01/07
IAC
3. __________
Job Set-up
Subtask 33-51-15-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
Subtask 33-51-15-860-050
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
R Subtask 33-51-15-860-050-A
R (1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
R 4WL is in the OFF position.
R (2) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
R button and its light are off.
EFF :
001-012, 014-099, 901-999, 33-51-15
Page 402
Aug 01/07
IAC
R **ON A/C 001-012, 014-099, 901-999,
Subtask 33-51-15-010-051
C. Get Access
(2) Put the wing mats in position at the respective emergency overwing
light.
4. Procedure
_________
Subtask 33-51-15-020-050
(d) Remove the screw (2) and disconnect the bonding strap (3).
(b) Remove the lens (6) and the sealing (7) from the light housing
(10).
EFF :
001-012, 014-099, 901-999, 33-51-15
Page 403
Aug 01/07
IAC
Emergency Overwing Light 60WL/61WL/62WL/63WL
Figure 401/TASK 33-51-15-991-001
R
EFF :
001-012, 014-099, 901-999, 33-51-15
Page 404
Feb 01/07
IAC
(3) Remove the lens diffuser (8).
EFF :
001-012, 014-099, 901-999, 33-51-15
Page 405
Aug 01/07
R
IAC
TASK 33-51-15-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-15-860-052
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
EFF :
001-012, 014-099, 901-999, 33-51-15
Page 406
Aug 01/07
IAC
R **ON A/C 901-999,
R Subtask 33-51-15-860-052-A
R (1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
R 4WL is in the OFF position.
R (2) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
R button and its light are off.
Subtask 33-51-15-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
4. Procedure
_________
Subtask 33-51-15-910-050
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
EFF :
001-012, 014-099, 901-999, 33-51-15
Page 407
Aug 01/07
IAC
Subtask 33-51-15-420-050
(b) Make sure that the electrical connectors are clean and in the
correct condition.
(d) Install the bonding strap (3) with the screw (2) (Ref. TASK 20-
28-00-912-004).
(e) Make sure that the work area is clean and clear of tool(s) and
other items.
(c) Install the lens (6) and the sealing (7) with the screws (5) to
the light housing (10).
Subtask 33-51-15-865-051
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1WL, 2WL, 3WL.
EFF :
001-012, 014-099, 901-999, 33-51-15
Page 408
Aug 01/07
R
IAC
Subtask 33-51-15-860-051
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
Subtask 33-51-15-710-053
E. Do this test.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- pull down and remove the cover - the SLIDE ARMED light on the cabin
flap from one of the related lining comes on,
hatches,
- push the latch pin against the - the SLIDE ARMED light goes off,
spring and turn it a quarter
turn counterclockwise to
retract it to the DISARMED
position.
- push the latch pin against the - the SLIDE ARMED light comes on.
spring and turn it a quarter
turn clockwise to extend it to
the ARMED position.
EFF :
001-012, 014-099, 901-999, 33-51-15
Page 409
Aug 01/07
R
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
3. At the emergency exits: At the emergency exits:
- install and close the removed - the SLIDE ARMED light goes off.
cover flap on the related
hatch.
5. Close-up
________
Subtask 33-51-15-410-053
A. Close Access
Subtask 33-51-15-862-052
EFF :
001-012, 014-099, 901-999, 33-51-15
Page 410
Aug 01/07
IAC
SIGN - EMERGENCY EXIT (40WL,41WL,42WL,43WL,44WL,45WL) - REMOVAL/INSTALLATION
____________________________________________________________________________
TASK 33-51-16-000-001
NOTE : The procedure is the same for all emergency exit signs.
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-16
Page 401
Feb 01/07
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-51-16-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
Subtask 33-51-16-860-050
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
EFF :
ALL 33-51-16
Page 402
Aug 01/07
IAC
**ON A/C 101-199,
Subtask 33-51-16-860-050-B
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
R Subtask 33-51-16-860-050-C
R (1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
R 4WL is in the OFF position.
R (2) On the overhead panel 25VU, make sure that the NO SMOKING switch
R 190RH is in the OFF position
R (3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
R pushbutton and its internal light are off.
R
EFF :
101-199, 901-999, 33-51-16
Page 403
Aug 01/07
IAC
R (4) Put the stepladder in position:
R
R FOR 40WL, 41WL
R in Zone 222 or in Zone 221
R
R FOR 42WL, 43WL
R in Zone 242 or in Zone 241
R
R FOR 44WL, 45WL
R in Zone 262 or in Zone 261.
4. Procedure
_________
Subtask 33-51-16-020-050
(3) Remove the emergency exit sign (1) sufficiently to get access to the
electrical connectors (5).
R
EFF :
ALL 33-51-16
Page 404
Aug 01/07
IAC
Emergency Exit Sign
Figure 401/TASK 33-51-16-991-001
R
EFF :
001-012, 014-099, 101-199, 33-51-16
Page 405
Aug 01/07
IAC
Emergency Exit Sign
Figure 401A/TASK 33-51-16-991-001-A
R
EFF :
901-999, 33-51-16
Page 406
Aug 01/07
IAC
**ON A/C 101-199,
Subtask 33-51-16-020-050-A
(1) Remove the lenses (1), (6) from the housings (4), (9).
(2) Remove the screws (2), (7) and the washers (3), (8).
R
EFF :
101-199, 33-51-16
Page 407
Aug 01/07
IAC
**ON A/C ALL
TASK 33-51-16-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-16
Page 408
Aug 01/07
R
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-51-16-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
Subtask 33-51-16-860-053
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
Subtask 33-51-16-860-053-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
EFF :
ALL 33-51-16
Page 409
Aug 01/07
IAC
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
4. Procedure
_________
Subtask 33-51-16-910-056
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
Subtask 33-51-16-420-050
(2) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
ALL 33-51-16
Page 410
Aug 01/07
R
IAC
(4) Install the emergency exit sign (1) with the washers (4) and the
screws (3) on the fuselage structure.
Subtask 33-51-16-420-050-A
(2) Make sure that the electrical connectors are clean and in the correct
condition.
(5) Install the screws (2), (7) and the washers (3), (8).
Subtask 33-51-16-865-053
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1WL, 2WL
Subtask 33-51-16-860-051
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
EFF :
ALL 33-51-16
Page 411
Aug 01/07
R
IAC
(3) On the overhead panel 25VU, make sure that the EMER EXIT LT OFF
annunciator light 5WL is on.
Subtask 33-51-16-710-051
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- set the EMER EXIT LT switch 4WL to - the related emergency exit sign comes
the ON position. on.
On the overhead panel 25VU:
- the EMER EXIT LT OFF annunciator
light 5WL goes off.
- set the EMER EXIT LT switch 4WL to - the related emergency exit sign goes
the OFF position. off.
On overhead panel 25VU:
- the EMER EXIT LT OFF annunciator
light 5WL comes on.
5. Close-up
________
Subtask 33-51-16-860-052
(1) Make sure that the work area is clean and clear of tools and other
items.
EFF :
ALL 33-51-16
Page 412
Aug 01/07
IAC
SIGN - EMERGENCY EXIT LOCATION (50WL,51WL,52WL,53WL) - REMOVAL/INSTALLATION
___________________________________________________________________________
TASK 33-51-17-000-001
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
NOTE : The procedure is the same for all emergency exit location-signs.
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-17
Page 401
Feb 01/07
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-17-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
Subtask 33-51-17-860-050
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
EFF :
ALL 33-51-17
Page 402
Aug 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-51-17-860-050-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
4. Procedure
_________
EFF :
ALL 33-51-17
Page 403
Aug 01/07
IAC
Emergency Exit Location Sign
Figure 401/TASK 33-51-17-991-001
R
EFF :
001-012, 014-099, 33-51-17
Page 404
May 01/07
IAC
R Emergency Exit Location Sign
R Figure 401A/TASK 33-51-17-991-001-B
R
EFF :
101-199, 33-51-17
Page 405
Feb 01/07
IAC
Emergency Exit Location Sign
R Figure 401B/TASK 33-51-17-991-001-A
R
EFF :
901-999, 33-51-17
Page 406
Feb 01/07
IAC
**ON A/C ALL
Subtask 33-51-17-020-050
(3) Lower the emergency exit location-sign (4) to get access to the
electrical connectors (5).
EFF :
ALL 33-51-17
Page 407
May 01/07
R
IAC
TASK 33-51-17-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-17
Page 408
May 01/07
R
IAC
**ON A/C ALL
3. __________
Job Set-up
Subtask 33-51-17-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
Subtask 33-51-17-860-053
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
Subtask 33-51-17-860-053-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
EFF :
ALL 33-51-17
Page 409
Aug 01/07
IAC
R (3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
R pushbutton and its internal light are off.
4. Procedure
_________
Subtask 33-51-17-910-051
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
Subtask 33-51-17-420-050
(2) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
ALL 33-51-17
Page 410
May 01/07
IAC
(3) Connect the electrical connectors (5).
Subtask 33-51-17-865-053
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1WL, 2WL.
Subtask 33-51-17-860-051
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the overhead panel 25VU, make sure that the EMER EXIT LT OFF
annunciator light 5WL is on.
Subtask 33-51-17-710-051
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 33-51-17
Page 411
May 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
On the overhead panel 25VU:
- the EMER EXIT LT OFF annunciator
light 5WL comes on.
5. Close-up
________
Subtask 33-51-17-860-052
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-51-17
Page 412
May 01/07
IAC
LIGHT - EMERGENCY EXIT LOCATION, SEAT/WALL MOUNTED - REMOVAL/INSTALLATION
_________________________________________________________________________
TASK 33-51-18-000-001
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
CAUTION : DO NOT DISCONNECT THE CONNECTOR DURING OPERATION. ARCING CAN DAMAGE
_______
THE CONTACT PINS.
NOTE : The procedure is the same for all the seat/wall-mounted emergency-exit
____
location-lights.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-51-18
Page 401
May 01/06
IAC
3. __________
Job Set-up
Subtask 33-51-18-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
Subtask 33-51-18-860-050
(1) Make sure that the EMER EXIT LT switch 4WL on the overhead panel 25VU
is in the OFF position
(2) Make sure that the LIGHT EMER pushbutton switch and its integral
light on the forward attendant panel 120RH are off.
4. Procedure
_________
Subtask 33-51-18-020-050
(a) Carefully remove the lens (4) from the light housing (2).
(b) Release the two attachment clips (1) and remove the light housing
(2) from the passenger seat.
(c) Support the light housing (2) and disconnect the electrical
connectors (5).
(a) Carefully remove the lens (4) from the light housing (2).
R
EFF :
001-012, 014-099, 33-51-18
Page 402
May 01/06
IAC
Seat-Mounted Emergency-Exit Location-Light
Figure 401/TASK 33-51-18-991-001
R
EFF :
001-012, 014-099, 33-51-18
Page 403
May 01/06
IAC
TASK 33-51-18-400-001
NOTE : The procedure is the same for all the seat/wall-mounted emergency-exit
____
location- lights.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-18-860-053
(1) Make sure that the EMER EXIT LT switch 4WL on the overhead panel 25VU
is in the OFF position.
(2) Make sure that the LIGHT EMER pushbutton switch and its integral
light on the forward attendant panel 120RH are off.
R
EFF :
001-012, 014-099, 33-51-18
Page 404
May 01/06
IAC
Subtask 33-51-18-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
4. Procedure
_________
Subtask 33-51-18-910-050
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
Subtask 33-51-18-420-050
(a) Make sure that the electrical connectors are clean and in the
correct condition.
(b) Connect the electrical connectors (5) to the light housing (2).
(c) Install the light housing (2) with the reflectors at the top to
the passenger seat.
Make sure that you hear a click when the light housing (2) locks
in position.
(d) Install the lens (4) with the red stripe at the top to the light
housing (2).
Make sure that you hear a click when the lens (4) locks in
position.
R
EFF :
001-012, 014-099, 33-51-18
Page 405
May 01/06
IAC
(2) Installation of the Bulb(s) of the Light
(b) Install the lens (4) with the red stripe at the top to the light
housing (2).
Make sure that you hear a click when the lens (4) locks in
position.
Subtask 33-51-18-861-050
Subtask 33-51-18-710-050
D. Do the operational test of the cabin emergency lighting (Ref. TASK 33-51-
00-710-001).
5. Close-up
________
Subtask 33-51-18-860-052
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
001-012, 014-099, 33-51-18
Page 406
May 01/06
IAC
LIGHT - EMERGENCY, SEAT/WALL MOUNTED - REMOVAL/INSTALLATION
___________________________________________________________
TASK 33-51-19-000-001
WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______
ENVIRONMENT.
CAUTION : DO NOT DISCONNECT THE CONNECTOR DURING OPERATION. ARCING CAN DAMAGE
_______
THE CONTACT PINS.
NOTE : The procedure is the same for all the seat/wall-mounted emergency
____
lights.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
001-012, 014-099, 33-51-19
Page 401
May 01/06
IAC
3. __________
Job Set-up
Subtask 33-51-19-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
Subtask 33-51-19-860-050
(1) Make sure that the EMER EXIT LT switch 4WL on the overhead panel 25VU
is in the OFF position
(2) Make sure that the LIGHT EMER pushbutton switch and its integral
light on the forward attendant panel 120RH are off.
4. Procedure
_________
Subtask 33-51-19-020-050
(1) Carefully remove the lens (4) from the housing (2).
(2) Release the two attach/detach clips (1) and remove the housing (2)
from the passenger seat.
(3) Support the housing (2) and disconnect the electrical connectors (5).
(4) Remove the housing (2) and keep it together with the lens (4) in a
welded plastic bag.
R
EFF :
001-012, 014-099, 33-51-19
Page 402
May 01/06
IAC
Seat-Mounted Emergency Light
Figure 401/TASK 33-51-19-991-001
R
EFF :
001-012, 014-099, 33-51-19
Page 403
May 01/06
IAC
TASK 33-51-19-400-001
NOTE : The procedure is the same for all the seat/wall-mounted emergency
____
lights.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-19-860-054
(1) Make sure that the EMER EXIT LT switch 4WL on the overhead panel 25VU
is in the OFF position.
(2) Make sure that the LIGHT EMER pushbutton switch and its integral
light on the forward attendant panel 120RH are off.
R
EFF :
001-012, 014-099, 33-51-19
Page 404
May 01/06
IAC
Subtask 33-51-19-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
4. Procedure
_________
Subtask 33-51-19-910-050
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
Subtask 33-51-19-420-050
(1) Connect the electrical connectors (5) to the housing (2) (Ref. AIPC
33511901030).
(2) Install the housing (2) with the reflectors at the top to the related
passenger seat.
NOTE : Make sure that you hear a click when the housing locks in
____
position.
(4) Install the lens (4) (Ref. AIPC 33511901010) to the housing (2).
NOTE : Make sure that you hear a click when the lens locks in
____
position.
R
EFF :
001-012, 014-099, 33-51-19
Page 405
May 01/06
IAC
Subtask 33-51-19-861-050
Subtask 33-51-19-710-050
D. Do the operational test of the cabin emergency lighting (Ref. TASK 33-51-
00-710-001).
5. Close-up
________
Subtask 33-51-19-860-053
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
001-012, 014-099, 33-51-19
Page 406
May 01/06
IAC
______________________________________________________________________
PHOTOLUMINESCENT STRIP - FLOOR PROXIMITY EMERGENCY ESCAPE PATH MARKING
____________________
REMOVAL/INSTALLATION
TASK 33-51-21-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
101-199, 901-999, 33-51-21
Page 401
Aug 01/07
IAC
**ON A/C 101-199, 901-999,
3. __________
Job Set-up
Subtask 33-51-21-860-050
4. Procedure
_________
Subtask 33-51-21-020-050
(1) Remove the sealant (4) between the non textile floor covering and the
photoluminescent strip (1) with a nonmetallic scraper.
(2) Remove the photoluminescent strips (1) and (2) from the floor panels.
Use a nonmetallic scraper to help the removal procedure.
(3) Remove the filler (3) together with the photoluminescent strips (1)
and (2), if installed.
EFF :
101-199, 901-999, 33-51-21
Page 402
Aug 01/07
IAC
INTENTIONALLY BLANK
33-51-21
Page 403
Aug 01/06
IAC
R Photoluminescent Strip (Floor Mounted)
R of the Floor-Proximity Emergency-Escape Path-Marking
R Figure 401/TASK 33-51-21-991-001-B12 (SHEET 1)
EFF :
101-199,
33-51-21 Page 404
May 01/07
IAC
R Photoluminescent Strip (Floor Mounted)
R of the Floor-Proximity Emergency-Escape Path-Marking
R Figure 401/TASK 33-51-21-991-001-B22 (SHEET 2)
EFF :
101-199,
33-51-21 Page 405
May 01/07
IAC
Photoluminescent Strips (Floor Mounted)
of the Floor-Proximity Emergency-Escape Path-Marking
Figure 401A/TASK 33-51-21-991-001-A12 (SHEET 1)
R EFF :
901-901,
33-51-21 Page 406
May 01/07
IAC
Photoluminescent Strips (Floor Mounted)
of the Floor-Proximity Emergency-Escape Path-Marking
Figure 401A/TASK 33-51-21-991-001-A22 (SHEET 2)
R EFF :
901-901,
33-51-21 Page 407
May 01/07
IAC
R Photoluminescent Strip (Floor-Mounted)
R of the Floor-Proximity Emergency-Escape Path-Marking
R Figure 401B/TASK 33-51-21-991-001-C12 (SHEET 1)
EFF :
902-999,
33-51-21 Page 408
Aug 01/07
IAC
R Photoluminescent Strip (Floor-Mounted)
R of the Floor-Proximity Emergency-Escape Path-Marking
R Figure 401B/TASK 33-51-21-991-001-C22 (SHEET 2)
EFF :
902-999,
33-51-21 Page 409
Aug 01/07
IAC
TASK 33-51-21-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
101-199, 901-999, 33-51-21
Page 410
May 01/07
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-21-860-051
A. Make sure that the ground service network is energized (Ref. TASK 24-42-
00-861-001).
4. Procedure
_________
EFF :
101-199, 901-999, 33-51-21
Page 411
Aug 01/07
IAC
**ON A/C 101-199, 901-999,
Subtask 33-51-21-910-050
(2) Clean the component interface and/or the adjacent area on the floor
panels with CLEANING AGENTS (Material No. 11-003).
Subtask 33-51-21-420-050
(a) Between the ends of the filler (3) must be a distance of 2.0 mm
(0.0787 in.).
(d) Align the filler (3) and install it with a soft cotton cloth.
(a) Between the ends of the photoluminescent strips (1) and (2) must
be a distance of 2.0 mm (0.0787 in.).
EFF :
101-199, 901-999, 33-51-21
Page 412
Aug 01/07
R
IAC
(b) Cut the photoluminescent strips (1) and (2) to the correct
length.
(c) Remove the protective foil from the photoluminescent strips (1)
and (2).
(d) Align the photoluminescent strips (1) and (2) and install it with
a soft cotton cloth. Do the installation with light hand pressure
from one end of the photoluminescent strip (1) and (2) to the
other.
(e) Make sure that the photoluminescent strips (1) and (2) are
correctly installed.
(3) Apply SEALANTS (Material No. 09-036) (4) between the photoluminescent
strips (1) and (2) and the non-textile floor-covering.
5. Close-up
________
Subtask 33-51-21-860-052
EFF :
101-199, 901-999, 33-51-21
Page 413
Aug 01/07
R
IAC
TASK 33-51-21-920-002
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-21-941-050
4. Procedure
_________
Subtask 33-51-21-020-051
A. Remove and discard the Strips of the Photoluminescent Floor Path Marking
System (Ref. TASK 33-51-21-000-001).
Subtask 33-51-21-420-051
B. Install the new Strips of the Photoluminescent Floor Path Marking System
(Ref. TASK 33-51-21-400-001).
EFF :
101-199, 901-999, 33-51-21
Page 414
Aug 01/07
IAC
______________________________________________________________________
PHOTOLUMINESCENT STRIP - FLOOR PROXIMITY EMERGENCY ESCAPE PATH MARKING
_________________
CLEANING/PAINTING
TASK 33-51-21-100-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-21-860-053
R
EFF :
101-199, 901-999, 33-51-21
Page 701
Feb 01/07
IAC
4. Procedure
_________
Subtask 33-51-21-110-050
R (1) Attach the masking paper to each side of the photoluminescent strip
R (1), to protect the floor covering (2) from contamination.
(2) Use a lint-free cloth and a mixture of warm water and a mild
R detergent to remove the heavy contamination from the photoluminescent
R strip (1).
R
R (3) Make sure that you do not damage the floor covering (2).
R (4) Use a clean lint-free cloth and clean water to remove the remaining
contamination.
R (6) Use a clean lint-free cloth to dry and polish the photoluminescent
R strip (1).
5. Close-up
________
Subtask 33-51-21-860-054
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
101-199, 901-999, 33-51-21
Page 702
Feb 01/07
IAC
Floor Mounted Photoluminescent-Strips
Figure 701/TASK 33-51-21-991-003
R
EFF :
101-199, 901-999, 33-51-21
Page 703
Feb 01/07
IAC
POWER SUPPLY UNIT - EMERGENCY (10WL,11WL,12WL,13WL) - REMOVAL/INSTALLATION
__________________________________________________________________________
TASK 33-51-38-000-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
CMM 335107
EFF :
ALL 33-51-38
Page 401
Feb 01/07
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-38-860-050
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
EFF :
ALL 33-51-38
Page 402
Aug 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-51-38-860-050-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
Subtask 33-51-38-865-050
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
Subtask 33-51-38-010-050
C. Get Access
EFF :
ALL 33-51-38
Page 403
Aug 01/07
IAC
(2) Remove the ceiling panel to get access to the the emergency
power-supply unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001).
(3) Remove the lower sidewall panel to get access to the emergency
power-supply unit:
FOR 11WL
remove 241KW at the left emergency exits (Ref. TASK 25-23-44-000-
001),
FOR 12WL
remove 242KW at the right emergency exits (Ref. TASK 25-23-44-000-
001).
(4) Remove the door frame lining to get access to the emergency
power-supply unit:
FOR 13WL
remove 261KW at the left AFT passenger/crew door (Ref. TASK 25-23-45-
000-003).
Subtask 33-51-38-010-050-B
C. Get Access
R (2) Remove the ceiling panel to get access to the emergency power-supply
R unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001),
R
EFF :
001-012, 014-099, 101-199, 33-51-38
Page 404
May 01/07
IAC
FOR 11WL
remove 251KC between the rear emergency exit doors (Ref. TASK 25-23-
41-000-001),
FOR 12WL
remove 251KC between the rear emergency exit doors (Ref. TASK 25-23-
41-000-001),
FOR 14WL
remove 231JC between the forward emergency exit doors (Ref. TASK 25-
23-41-000-001),
FOR 15WL
remove 231JC between the forward emergency exit doors (Ref. TASK 25-
23-41-000-001),
(3) Lower one side of the emergency oxygen container and remove the
ceiling panel to get access to the emergency power-supply unit:
FOR 13WL
- disengage and lower one side of the emergency oxygen container 33WR
between the AFT passenger/crew doors (Ref. TASK 35-21-41-000-001),
R - do not disconnect the electrical connector of the emergency oxygen
R container.
- remove the ceiling panel 261CC at the left AFT passenger/crew door
(Ref. TASK 25-23-42-000-002).
Subtask 33-51-38-010-050-A
C. Get Access
R (2) Remove the ceiling panel to get access to the emergency power-supply
R unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001),
(3) Remove the lower sidewall panel to get access to the emergency
power-supply unit:
FOR 11WL
remove 241KW at the left emergency exit(s) (Ref. TASK 25-23-44-000-
001),
R
EFF :
101-199, 901-999, 33-51-38
Page 405
May 01/07
IAC
FOR 12WL
remove 242KW at the right emergency exit(s) (Ref. TASK 25-23-44-000-
001).
FOR 13WL
(4) Open the ceiling filler-panel door adjacent to the ceiling panel
261CC at the left AFT passenger/crew door.
4. Procedure
_________
Subtask 33-51-38-020-051
(3) Remove the screws (3) and the washers (4) from the emergency
power-supply unit (1).
R
EFF :
ALL 33-51-38
Page 406
May 01/07
IAC
Emergency Power-Supply Unit
Figure 401/TASK 33-51-38-991-001
R
EFF :
001-012, 014-099, 33-51-38
Page 407
May 01/07
IAC
Emergency Power-Supply Unit
Figure 401A/TASK 33-51-38-991-001-B
R
EFF :
101-199, 33-51-38
Page 408
May 01/07
IAC
Emergency Power-Supply Unit
R Figure 401B/TASK 33-51-38-991-001-A
R
EFF :
901-999, 33-51-38
Page 409
Feb 01/07
IAC
(6) Carefully remove the battery (6) from the emergency power-supply unit
(1).
(7) Keep the battery (6) and/or the spare batteries under work shop
conditions connected to a constant power source (Ref. CMM 335107).
EFF :
ALL 33-51-38
Page 410
May 01/07
R
IAC
TASK 33-51-38-400-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-38
Page 411
May 01/07
R
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-38-860-053
(2) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(3) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(4) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
EFF :
ALL 33-51-38
Page 412
Aug 01/07
IAC
**ON A/C 101-199,
Subtask 33-51-38-860-053-B
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
R Subtask 33-51-38-860-053-C
R (2) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
R 4WL is in the OFF position.
R (3) On the overhead panel 25VU, make sure that the NO SMOKING switch
R 190RH is in the OFF position.
R (4) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
R pushbutton and its internal light are off.
R
EFF :
101-199, 901-999, 33-51-38
Page 413
Aug 01/07
IAC
**ON A/C ALL
Subtask 33-51-38-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
4. Procedure
_________
Subtask 33-51-38-420-050
(2) Install the emergency power-supply unit (1) with the screws (3) and
the washers (4).
EFF :
ALL 33-51-38
Page 414
Aug 01/07
R
IAC
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 33-51-38-865-054
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
Subtask 33-51-38-860-052
(a) Pull down and remove the cover flap from one of the related
hatches.
NOTE : The SLIDE ARMED light on the cabin lining at the emergency
____
exits comes on.
(b) Push the latch pin against the spring and turn it a quarter turn
counterclockwise to retract it to the DISARMED position.
(c) Make sure that the overwing emergency lights come on.
(d) Push the latch pin against the spring and turn it a quarter turn
clockwise to extend it to the ARMED position.
EFF :
ALL 33-51-38
Page 415
Aug 01/07
R
IAC
(e) Make sure that the overwing emergency lights go off.
(f) Install and close the removed cover flap on the related hatch.
(3) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the ON
position.
(4) Make sure also that all the other lights and signs of the emergency
lighting system connected to this emergency power-supply unit are
operate correctly.
(5) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the
OFF position.
(6) Make sure that the battery is fully charged before you install it in
the power-supply unit (Ref. CMM 335107).
(7) Carefully put the battery (6) in the emergency power-supply unit (1)
and install the screws (5).
NOTE : To measure and keep the load values, the load programming
____
(TEACH IN) of the EPSU starts automatically when:
- the AC and the DC power are available
- on the FAP 120RH the LIGHT EMER pushbutton switch and its
integral light are off
- on the overhead panel 25VU the EMER EXIT LT switch 4WL is in
the OFF position
- on the overhead panel 25VU the NO SMOKING switch 190RH is in
the OFF position
- the overwing emergency lights are off
- the emergency power-supply unit is installed on the A/C for
the first time, or
the battery was removed for more than 5 s and is then
installed again.
Subtask 33-51-38-860-052-A
(2) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the ON
position.
EFF :
ALL 33-51-38
Page 416
Aug 01/07
R
IAC
(3) Make sure that all the lights and signs of the emergency lighting
system connected to this emergency power-supply unit are operate
correctly.
(4) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the
OFF position.
(5) Make sure that the battery is fully charged before you install it in
the power-supply unit (Ref. CMM 335107).
(6) Carefully put the battery (6) in the emergency power-supply unit (1)
and install the screws (5).
NOTE : To measure and keep the load values, the load programming
____
(TEACH IN) of the EPSU starts automatically when:
- the AC and the DC power are available
- on the FAP 120RH the LIGHT EMER pushbutton switch and its
integral light are off
- on the overhead panel 25VU the EMER EXIT LT switch 4WL is in
the OFF position
- on the overhead panel 25VU the NO SMOKING switch 190RH is in
the OFF position
- the emergency power-supply unit is installed on the A/C for
the first time, or
the battery was removed for more than 5 s and is then
installed again.
Subtask 33-51-38-740-050
D. Do this test.
NOTE : The test is the same for all emergency power-supply units.
____
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
**ON EPSU P/N 3214-5X
R
EFF :
001-012, 014-099, 101-199, 33-51-38
Page 417
May 01/07
IAC
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
come on for approx. 1 min, if all
test loops are completed without
malfunction.
**ON EPSU P/N 3214-54-10
Subtask 33-51-38-740-050-A
D. Do this test.
NOTE : The test is the same for all emergency power-supply units.
____
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 33-51-38
Page 418
May 01/07
R
IAC
**ON A/C ALL
5. Close-up
________
Subtask 33-51-38-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R
EFF :
ALL 33-51-38
Page 419
May 01/07
IAC
**ON A/C 101-199,
Subtask 33-51-38-410-052-B
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Engage the emergency oxygen container and install the ceiling panel:
FOR 13WL
- lift and engage the emergency oxygen container 33WR between the AFT
passenger/crew doors (Ref. TASK 35-21-41-400-001),
- install the ceiling panel 261CC at the left AFT passenger/crew door
(Ref. TASK 25-23-42-400-002).
Subtask 33-51-38-410-052-A
A. Close Access
R
EFF :
101-199, 901-999, 33-51-38
Page 420
May 01/07
IAC
(2) Install the lower sidewall panel:
FOR 11WL
install 241KW at the left emergency exit(s) (Ref. TASK 25-23-44-400-
001),
FOR 12WL
install 242KW at the right emergency exit(s) (Ref. TASK 25-23-44-400-
001).
FOR 13WL
(3) Close the ceiling filler-panel adjacent to the ceiling panel 261CC at
the left AFT passenger/crew door.
Subtask 33-51-38-862-051
EFF :
ALL 33-51-38
Page 421
May 01/07
R
IAC
TASK 33-51-38-000-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
CMM 335107
EFF :
ALL 33-51-38
Page 422
May 01/07
R
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-38-860-051
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
EFF :
ALL 33-51-38
Page 423
Aug 01/07
IAC
R **ON A/C 101-199, 901-999,
Subtask 33-51-38-860-051-A
(1) On the overhead panel 25VU, make sure that the EMER EXIT LT switch
4WL is in the OFF position.
(2) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(3) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
Subtask 33-51-38-865-055
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
Subtask 33-51-38-010-051
C. Get Access
EFF :
ALL 33-51-38
Page 424
Aug 01/07
IAC
(2) Remove the ceiling panel to get access to the emergency power-supply
unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001).
(3) Remove the lower sidewall panel to get access to the emergency
power-supply unit:
FOR 11WL
remove 241KW at the left emergency exits (Ref. TASK 25-23-44-000-
001),
FOR 12WL
remove 242KW at the right emergency exits (Ref. TASK 25-23-44-000-
001).
(4) Remove the door frame lining to get access to the emergency
power-supply unit:
FOR 13WL
remove 261KW at the left AFT passenger/crew door (Ref. TASK 25-23-45-
000-003).
Subtask 33-51-38-010-051-B
C. Get Access
(2) Remove the ceiling panel to get access to the emergency power-supply
unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001),
R
EFF :
001-012, 014-099, 101-199, 33-51-38
Page 425
May 01/07
IAC
FOR 11WL
remove 251KC between the rear emergency exit doors (Ref. TASK 25-23-
41-000-001),
FOR 12WL
remove 251KC between the rear emergency exit doors (Ref. TASK 25-23-
41-000-001),
FOR 14WL
remove 231JC between the forward emergency exit doors (Ref. TASK 25-
23-41-000-001),
FOR 15WL
remove 231JC between the forward emergency exit doors (Ref. TASK 25-
23-41-000-001),
(3) Lower one side of the emergency oxygen container to get access to the
emergency power-supply unit:
FOR 13WL
disengage and lower one side of the emergency oxygen container 33WR
R between the AFT passenger/crew doors (Ref. TASK 35-21-41-000-001),
R do not disconnect the electrical connector of the emergency oxygen
R container.
Subtask 33-51-38-010-051-A
C. Get Access
(2) Remove the ceiling panel to get access to the emergency power-supply
unit:
FOR 10WL
remove 221BC at the left FWD passenger/crew door (Ref. TASK 25-23-42-
000-001).
(3) Remove the lower sidewall panel to get access to the emergency
power-supply unit:
FOR 11WL
remove 241KW at the left emergency exit(s) (Ref. TASK 25-23-44-000-
001),
FOR 12WL
R
EFF :
101-199, 901-999, 33-51-38
Page 426
May 01/07
IAC
remove 242KW at the right emergency exit(s) (Ref. TASK 25-23-44-000-
001).
(4) Lower one side of the emergency oxygen container to get access to the
emergency power-supply unit:
FOR 13WL
disengage and lower one side of the emergency oxygen container 33WR
between the AFT passenger/crew doors (Ref. TASK 35-21-41-000-001).
4. Procedure
_________
Subtask 33-51-38-020-053
(2) Carefully remove the battery (6) from the emergency power-supply unit
(1).
(3) Keep the battery (6) and/or the spare batteries under work shop
conditions connected to a constant power source (Ref. CMM 335107).
EFF :
ALL 33-51-38
Page 427
May 01/07
R
IAC
TASK 33-51-38-400-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 33-51-38
Page 428
May 01/07
R
IAC
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 33-51-38-865-056
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 2WL H06
49VU LIGHTING/EMER LT/CABIN 1WL H05
122VU LIGHTING/CABIN/EMER/LT 3WL V07
R
EFF :
ALL 33-51-38
Page 429
May 01/07
IAC
R **ON A/C 001-012, 014-099,
Subtask 33-51-38-860-054
(3) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(4) On the Forward Attendant Panel (FAP) 120RH, make sure that the LIGHT
EMER pushbutton switch and its integral light are off.
(a) Pull down and remove the cover flap from one of the related
hatches.
NOTE : The SLIDE ARMED light on the cabin lining at the emergency
____
exits comes on.
(b) Push the latch pin against the spring and turn it a quarter turn
counterclockwise to retract it to the DISARMED position.
(c) Make sure that the overwing emergency lights come on.
(d) Push the latch pin against the spring and turn it a quarter turn
clockwise to extend it to the ARMED position.
R
EFF :
001-012, 014-099, 33-51-38
Page 430
Aug 01/07
IAC
(f) Install and close the removed cover flap on the related hatch.
(6) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the ON
position.
(7) Make sure that the other loads connected to the emergency
power-supply unit operate.
(8) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the
OFF position.
Subtask 33-51-38-860-054-B
(3) On the overhead panel 25VU, make sure that the NO SMOKING switch
190RH is in the OFF position.
(4) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
pushbutton and its internal light are off.
(5) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the ON
position.
R
EFF :
001-012, 014-099, 101-199, 33-51-38
Page 431
Aug 01/07
IAC
(6) Make sure that the loads connected to the emergency power-supply unit
operate.
(7) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the
OFF position.
R Subtask 33-51-38-860-054-C
R (3) On the overhead panel 25VU, make sure that the NO SMOKING switch
R 190RH is in the OFF position.
R (4) On the Flight Attendant Panel (FAP) 120RH, make sure that the EMER
R pushbutton and its internal light are off.
R (a) Pull down and remove the cover flap from one of the related
R hatches.
R NOTE : The SLIDE ARMED light on the cabin lining at the emergency
____
R exits comes on.
R (b) Push the latch pin against the spring and turn it a quarter turn
R counterclockwise to retract it to the DISARMED position.
R (c) Make sure that the overwing emergency lights come on.
R
EFF :
101-199, 901-999, 33-51-38
Page 432
Aug 01/07
IAC
R (d) Push the latch pin against the spring and turn it a quarter turn
R clockwise to extend it to the ARMED position.
R (f) Install and close the removed cover flap on the related hatch.
R (6) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the ON
R position.
R (7) Make sure that the other loads connected to the emergency
R power-supply unit operate.
R (8) On the overhead panel 25VU, set the EMER EXIT LT switch 4WL to the
R OFF position.
4. Procedure
_________
EFF :
ALL 33-51-38
Page 433
Aug 01/07
IAC
R **ON A/C 001-012, 014-099,
Subtask 33-51-38-420-052
NOTE : Make sure that the contacts between the battery and the emergency
____
power supply unit are clean and in good condition.
(1) Carefully install the battery (6) to the emergency power-supply unit
(1) with the screws (5) and tighten.
NOTE : Make sure that the battery is fully charged before you install
____
it to the emergency power-supply unit (Ref. CMM 335107).
NOTE : To measure and keep the load values, the load programming
____
(TEACH IN) of the EPSU starts automatically when:
- the AC and the DC power are available,
- on the FAP 120RH the LIGHT EMER pushbutton switch and its
integral light are off,
- on the overhead panel 25VU the EMER EXIT LT switch 4WL is in
the OFF position,
- on the overhead panel 25VU the NO SMOKING switch 190RH is in
the OFF position,
- the overwing emergency lights are off,
- the emergency power-supply unit is installed on the A/C for
the first time, or
the battery was removed for more than 5 s and is then
installed again.
R Subtask 33-51-38-420-052-C
R (1) Make sure that the contacts between the battery and the EPSU are
R clean and in good condition.
R (2) Carefully install the battery (6) to the EPSU (1) with the screws (5)
R and tighten.
R
EFF :
001-012, 014-099, 101-199, 33-51-38
Page 434
Aug 01/07
IAC
R (3) Make sure that the battery is fully charged before you install it to
R the EPSU (Ref. CMM 335107).
R NOTE : To measure and keep the load values, the load programming
____
R (TEACH IN) of the
R EPSU starts automatically when:
R - The AC and the DC power are available.
R - On the Flight Attendant Panel (FAP) 120RH the EMER button
R and its light are off.
R - On the overhead panel 25VU the EMER EXIT LT switch 4WL is in
R the OFF position.
R - On the overhead panel 25VU the NO SMOKING switch 190RH is in
R the OFF position.
R - The EPSU is installed on the A/C for the first time, or
R the battery was removed for more than 5 s and is then
R installed again.
R Subtask 33-51-38-420-052-B
R (1) Make sure that the contacts between the battery and the EPSU are
R clean and in good condition.
R (2) Carefully install the battery (6) to the EPSU (1) with the screws (5)
R and tighten.
R (3) Make sure that the battery is fully charged before you install it to
R the EPSU (Ref. CMM 335107).
R NOTE : To measure and keep the load values, the load programming
____
R (TEACH IN) of the EPSU starts automatically when:
R - The AC and the DC power are available.
R - On the Flight Attendant Panel (FAP) 120RH the EMER button
R and its light are off.
R - On the overhead panel 25VU the EMER EXIT LT switch 4WL is in
R the OFF position.
R - On the overhead panel 25VU the NO SMOKING switch 190RH is in
R the OFF position.
R - The overwing emergency lights are off.
R - The EPSU is installed on the A/C for the first time, or
R the battery was removed for more than 5 s and is then
R installed again.
R
EFF :
101-199, 901-999, 33-51-38
Page 435
Aug 01/07
IAC
**ON A/C 001-012, 014-099,
Subtask 33-51-38-710-052
B. Do this test.
NOTE : The test is the same for all batteries of the emergency
____
power-supply units.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
**ON EPSU P/N 3214-5X
R
EFF :
001-012, 014-099, 33-51-38
Page 436
Aug 01/07
IAC
**ON A/C 101-199, 901-999,
Subtask 33-51-38-710-052-A
B. Do this test.
NOTE : The test is the same for all batteries of the emergency
____
power-supply units.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 33-51-38-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 33-51-38
Page 437
Aug 01/07
R
IAC
(4) Install the door frame lining:
FOR 13WL
install 261KW at the left AFT passenger/crew door (Ref. TASK 25-23-
45-400-008).
Subtask 33-51-38-410-053-B
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
001-012, 014-099, 101-199, 33-51-38
Page 438
Aug 01/07
IAC
**ON A/C 901-999,
Subtask 33-51-38-410-053-A
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 33-51-38-862-052
EFF :
ALL 33-51-38
Page 439
Aug 01/07
IAC