BILL OF QUANTITY

Project Name : Perkuatan tower Metro TV 120m - MAKASAR


Client :

NO. Satuan Volume Harga Satuan Total Harga REMARKS


Uraian Profile
(Rp) (Rp)

1 EL.+0.00 - EL.+24.00 Pipa CHS 165.2x7.1 kg 2,736.00


Pipa CHS 114.3x6 kg 1,259.89

2 EL.+24.00 - EL.+42.00 Pipa CHS 89.1x5.5 kg 813.60

3 EL.+60.00 - EL.+72.00 Pipa CHS 89.1x5.5 kg 542.40

4 EL.+96.00 - EL.+108.00 L70x70x7 kg 885.60

5 EL.+108.00 - EL.+114.00 Pipa CHS 89.1x5.5 kg 271.20

6 Klem Plat t = 8 mm Plate 8mm kg 2,481.85


7 Plate sambungan/stiffener Plate 8mm kg 596.85
8 Flange Pipa Plate 12mm kg 316.57

9 Baut Hotdip Galvanized pcs 2,000.00


10 jasa hotdip galvanize kg 9,903.96
11

TOTAL -
ROUND -

NOTES :
1 Final quantity subject to reconfirm based on approval drawing
2 Scope of Work :
- Include : Supply Material; Fabrication; Galvanizing
- Exclude : transport to site ; painting;erection
3 Exclude ppn 10%