Abstract: This project targets an intelligent metering information for distribution of the electrical
energy intelligently as well as effectively to the customers. Arduino and GSM based
prepaid/postpaid energy meters for advanced metering and charge system is ready to read and
send information via wireless protocol through GSM electronic equipment. GSM module uses
the network coverage of the SIM. Smart Electric Meter uses SMS or/and Wi-Fi to send the
power/unit information to cloud, so user will access the info area module Apps and websites.
Smart Electric meters can save cash, labour, efforts and time and at constant time it'll effectively
monitor the electricity consumption, usage and fraud. It’s safe and simple to use and user
friendly. The metering system uses low-cost elements which is able to decrease the general cost
of the instrumentality increasing its affordability and penetration in non-metering areas.
Keywords:
Smart Metering, Short Message Services (SMS), Global System for Mobile
Communication (GSM) and Arduino, Master Station Unit (MSU).
1. Introduction:
The task is to create the linkage structure that is highly healthy, at constant time low energy
consuming and low-priced.
Monitoring and keeping following of electricity consumption for verification may be a tedious
task these days since manual meter reading and recording is hip. it's necessary to understand
from the client read purpose that if one is charged fairly and consistent with the requirement.
Automation of the system can allow users to watch energy meter readings over the internet
within the time period [8].
Electricity meter is the most common device which is used to measure the quantity of electrical
energy used by means of the clients [7]. Registered companies put in these devices at every
single site like residential places, industries, organizations to charge the electrical energy usage
through loads such as LED bulbs, machinery and other applications. Furthermost remarkable
type is used as pay as you go energy calculation devices [2].
1
Units =
2
Pulse =
3
PF =
The electricity meters costs the immediate power consumption, calculate its product and offers
instant energy. This energy is built-in after a time period which provides the electrical energy
consumed after the duration. These may perhaps also be single or three phase meters depend on
on the source consumed by using housing or industrial installations. For residential customers, it
can be linked between phase and load. However for superior loads, step down current changers
need to be placed to separate power meters from greater flows.
3. Smart Meters:
A Smart meter is the expanded model of a conventional analog electrical energy meters being
used in 95% of the places all through the world. They come with an in-home display graph that
specifies how much electricity is consuming by customer in rupees and units, then sends capture
data to user account which shows estimated bill. Smart meters calculates how much electrical
energy one is using, as properly as at what fee and presents it on users account. This device
displays consumption and as programmed transfers all the information to the electricity provider
after every 30 days [3].
Usually the present Smart meters accessible in the market have the following features [8]:
Addition features:
a. IOT primarily based monitoring on the use of internet site and app.
b. Integration to the Smart Home.
c. One to many monitoring.
4. Proposed System:
The proposed proposed electricity meter with advanced prepaid billing device is a system to
make electrical energy billing consumer friendly and a lot more readable to the common man.
The Smart Energy meter includes an energy meter, a GSM modem, a microcontroller (Arduino)
and a relay circuit, which is linked between the power meter and the load. The offered smart
electricity meter is capable to deliver all the metering and billing facilities like counting the used
energy, sending the produced invoice via the SMS (short message service) over the GSM service
as well as the security services like tempering etc. Truthfully at present, the electricity system of
Pakistan is fully conventional and it is actual highly slow, defective so our offered electricity
meter is incredibly justified for countrywide placement [9].
A Smart meter works by way of immediate contact without delay with wi-fi information
procedure through your power seller, so the company will continuously get exact meter reading
and there is no want for us to take a meter studying through ourselves [5]. Proposed system can
work in a range of distinct customs, consisting of the use of wireless cellular cellphone type
technology to ship data [6].
The algorithm for encoding a Terminal Readers has been mentioned in the following.
i. Phase 1: Look for the customer to set the Smart Card in the 1st port.
ii. Phase 2: Reset the Display screen along with the counter units of the TR and verify
either this are thoroughly in reset situation.
iii. Phase 3: Look at the cost value (consumable level of power for the particular
voucher) of the voucher with check the charges. When it is higher than M( lowest
level of power absorbed in storage space time period ) transmit logic ‘1’ to each the
I/P of the J-K F/F to boosts the transfer models RU1 with RU2 as well as to link the
primary replace with the energy connection along with the optical source( OS ) with
the traffic . Pair the section; make an account to keep the electricity utilized when it
comes to cost price for a limited period in addition to assist the EPROM. Fix the
metering system along with the converter that transforms the electricity utilized to
cost price.
iv. Phase 4: Verify the validity of the Voucher. In case it is not authenticated, show
“the voucher is not valid” and also look for the customer to set a different voucher.
However the validity of the voucher is checked out. This method would be done
again for a limited time period.
v. Phase five: Verify the cost price of the charge card with that saved in the ROM of
the TR. In case it is equivalent to P- M, show “the amounts are zero”.
vi. Phase six: Study an indication from the front section regarding if another charge
card are going to be entered or otherwise.
vii. Phase seven: When there is absolutely no network (i.e. fresh charge card will never
be entered), forward ‘1’ to the F/F to de-energizes RU1 as well as RU2 so the
electrical power cable would be cut off via shift S1 or OS is going to be turned off
from the traffic by means of key S2 as the two the I/P of the OR gateway has
become 0.
viii. Phase eight: When a message is get from the front part section, screen to install the
charge card in the 2nd port and also request to insert the fresh password.
ix. Phase nine: Verify the password with that saved in the ROM, In case it is not
matched up, in that case request to insert another password this method is going to
be continued for a limited period. After the period ends, show “period over”
together with forward ‘1’ to cut the source. At this point when there is any kind of
disrupt for example energy is linked by someone( At this point the hooking position
is seen as identified , but then to stay away from interference and also threat to cut
the hooking , the customer needs to contact an electric professional who might not
be located at that point . However the offered method will help us to obtain the
customer free of the trouble of hooking by disconnecting the series from the
hooking purpose as well as reconnecting the cable by means of an additional neglect
cable. [2])
x. Phase ten: Study disrupt along with the form of interruption.
xi. Phase eleven: Verify the form of interruption.
xii. Phase twelve: In case the interruption is because of energy hooking, forward ‘1’ to
each input/output of the J-K F/F also to the device RU3 to link the by-pass wire.
However if it really is because of denial of the charge card, forward ‘1’ to only the
inputs/outputs of the J-K F/F to remove the primary cable via RU1 and also RU2.
xiii. Phase thirteen: Whenever the charge card is once again placed in the initial port,
whereas an interruption takes place. Forward ‘1’ to each of the I/P of the J-K F/F to
reline the electrical power cable with the key shift along with the OS with the traffic
by means of RU2 or RU1 respectively , although RU3 stays non-active [1].
Start
Read any interrupt presnt at the input terminal
If D & C = 0?
If I1?
NO From B
Yes YES NO
Place the Card and Compre its Authentication
If I2 ?
YES NO
Card is not
Valid is not Display"No Balance" Connect the J-K Flip Flop and send Logic 1 to
If Authenticated?
the J and K inout of the J - K F/F
YES From A
Send logic 1 to both
NO
Read the Consumeable the I/P of the J - K
(price) Value of the Card F/F and to the Relay Insert the card in the second slot
unit to connect the
bypass line
Enter the new password
If P-M=0? YES
NO NO
Check the password with that stored in ROM
Read the Meter reading from the meter EPROM, convert it to price
value and compare it with that of the card
NO
If it is valid? If the time over?
Send logic 1 to both the I/P of the J-K F/F to connect the main switch with the main Yes
line . Set the register to stotre the enrgy consumed in terms of price value and set
the counter. Entering password is over
Compare EC with P
B
If EC = P - M?
NO
YES
Balance is zero. Read a signal S2 from the front panel to know whether a new
card will placed or not.
If S2 = 1?
A
NO Yes
Send a signal to disconnect
the supply line with the
main switch and the meter.
Stop
1. Operating frequency 50 hz
5. Memory: non-volatile
Table 1 : Difference between Proposed meters and Traditional Electricity Digital Meter
5. Duration recommended Heavy period needed for the Roughly nil time period
to repay the monthly system to be aware of the necessary for settling up of
bill sum of money in order to the monthly bill
take care of the monthly bill.
6. Person strength Great individual potential Zero individual strength
mandatory needed
7. Amount Productive price is quite high Relatively modest
8. Security Simply no security Secure and safe
5. Results:
5.1 Outcome – 1 :
Figure 1 presents all parts are linked and working. It has meter, LCD, modem, GSM and bulbs.
5.2 Outcome – 2 :
After ensuring whether the system is connected to the internet or not. It then checks for the sms
to provide other relevant information to facilitate customer.
Figure 3 LCD Display screen showing The Digital meter Examining FOR Text message
5.3 Outcome 3:
It shows complete information which appears on every user’s profile respective to their
consumed power usage. Moreover, it presents day by day usage also, if it is required by the user.
5.4 Outcome 4:
To be able to execute the wireless functions for the metering device the structure for the Text
messaging order to get in touch with the digital meter device will be as entails:
It demonstrates the typical electrical consumption of the machine for the various stages that the
machine experiences. The very first noticeable circumstance is the machine utilizes nearly one
half of the energy whenever functioning from a 6V power supply. This is due to the large
quantities of the energy attracted is controlled linearly to 5V; the duration of the energy is
dissipated like high temperature. Accordingly the current attracted is around the same thing,
however the energy reduces like the power supply voltage gets near 5V. This power usage may
be substantially upgraded by using a regulator rather than of a linear regulator.
Table 2 Analysis of the Electrical Consumption for the Model on 6Volt and 12Volt
S.NO Volt Ampere Watt
1. Unit Start-up 12 266 3.192
444
401 411 421
302 314
266 274
8
6 6 6 6 6
4.812 5.052
4 3.624
3.192
2 2.466 2.664
1.644 1.884Watt
0 Volt
Consumed Power
6. Conclusion:
Arduino and GSM primarily based Smart Energy Meter for advanced metering and billing
machine is built which is in a position to study and send statistics through wi-fi protocol using
GSM science via GSM modem, succesful of managing the meter as properly as the line
connection. Though, this task wants more modification for more reliable and higher degree of
pride and safety. For GSM module the coverage coverage of the SIM used is one might be bit
difficult due to network power issues.
7. References:
[1] Win Adiyansyah Indra, Fatimah Bt Morad, Norfadzlia Binti Mohd Yusof and Siti Asma Che Aziz,
“GSM-Based Smart Energy Meter with Arduino Uno”, International Journal of Applied Engineering
Research, Vol. 13, No. 6, pp. 3948-3953, 2018.
[2] M. Patel Umang and M. Modi Mitul, “A Review on Smart Meter System”, International Journal of
Innovative Research in Electrical, Electronics, Instrumentation and Control Engineering, Vol. 3, No. 12,
December 2015.
[3] M. S. Vidyashree, “GSM Based Smart Energy Meter to Implement Billing System and To Control
Electricity Theft”, International Journal of Current Engineering and Scientific Research (IJCESR), Vol.
4, No. 1, 2017
[4] Samarth Pandit, Sneha Mandhre, Meghana Nichal, “Smart Energy Meter using internet of Things
(IoT)”, VJER-Vishwakarma Journal of Engineering Research, Vol. 1, No. 2, pp. 222-229, June 2017.
[5] Ashna.k, Sudhish N George, "GSM Based Automatic Energy Meter Reading System with Instant
Billing", 978-1-4673-5090-7/13/$31.00 ©2013 IEEE.
[6] Subhashis Maitra, “Embedded Energy Meter- A New Concept To Measure The Energy Consumed By A
Consumer And To Pay The Bill", 978-1-4244-1762-9/08/$25.00 ©2008 IEEE.
[7] Ashna.k, Sudhish N George, "GSM Based Automatic Energy Meter Reading System with Instant
Billing", 978-1-4673-5090-7 IEEE, This project was supported and financed by National Institute of
Technology, Calicut, INDIA, 673601, 2013.
[8] Shaista Hassan Mir, Sahreen Ashruf, Sameena, Yasmeen Bhat and Nadeem Beigh, “Review on Smart
Electric Metering System Based on GSM/IOT”, Asian Journal of Electrical Sciences, ISSN: 2249-6297,
Vol. 8, No. 1, 2019, pp. 1-6.
[9] Md. Masadur Rahman, Noor-E-Jannat, Mohd. Ohidul Islam, Md. Serazus Salakin, “Arduino and GSM
based smart energy meter for advanced metering and billing system”, (ICEEICT), 2015.
[10] P. Bharath, N. Ananth, S. Vijetha, K.V. Jyothi Prakash, “Wireless Automated Digital Energy Meter”, IEEE
International Conference on Sustainable Energy Technologies, 2008.