Satish K Kewalramani – VP Projects


E.Mail: satishkk11@gmail.com ; Mo: +91 9892226885

Personal Data

Position in Firm: Head Projects


Yrs of Experience: 30 yrs in Heavy Chem & Fertilisers (H2SO4 / Oleum etc) & Power Projects
Nationality: Indian
Date of Birth: January 05, 1962

Education

Nagpur University, Nagpur (Maharashtra) INDIA – B Tech (Chem Engg) - 1984


Guru GD University, Bilaspur (MP) INDIA, PGD- in-Business Management - 1986

Membership in Professional Bodies: The Institution of Engineers (India)

Languages known: Fluent in English; Hindi; Sindhi; Marathi; Gujarati & Chhattisgarhi.
Country of Experience:
Brazil, China, India, Iraq, Japan, Saudi Arabia, United Arab Emirates, United Kingdom, USA
Key Specialization Areas and Broad Work Experience:

1. Specialist in Projects of Sulphuric Acid / Oleum / Fertilisers (SSP / GSSP) and


set-up Green field Projects in Rama Group (Pune / Indore & Udaipur Units).
Designated as GM Projects.
2. Worked with M/s. Monsanto world leaders in Sulphuric Acid Technology &
Products.
3. Associated with M/s. SS Engineering Consultants (H2SO4/Oleum etc.)

4. In India Solid fuel based Projects as COAL / Lignite / Biomass are my main
experience. Major Equipment’s as STG by Harbin-China / BHEL / Shin Nippon-
Japan etc and Boiler /ESP system by BHEL / Wuxi-China / Thermax / CVL etc
5. Biomass Power Projects (Independently Handled –Concept till Commissioning):
Set up Green Power Projects in India on various Fuel as Baggasse / Rice Husk /
Cotton Stalks / Corn Hops / Rice & Wheat straw‘s; Juli Flora etc
 GAPS Power (Aurangabad) = 13 MW Biomass IPP. Designated as COO.
 Spark Green Energy (Ahmednagar & Satara) = 25 MW x 2No’s Biomass
IPP. Designated as CEO.
 Worked in Sri Lanka in a 3 MW CPP 140 kms from Colombo in
Pollunnourva @ M/s. Nipuna Rice based on Rice Husk
6. Worked with Power Project Consultants as:
 FICHTNER Consulting Engineers (Germany) at India Office for their Power
Projects in INDIA; South East Asia & GCC as Saudi Arabia in Combined
Cycle & Simple Cycle Projects. Main Gas Turbine by M/s. SIEMENS.

Satish K Kewalramani 23/01/2019


Curriculum Vitae

Satish K Kewalramani – VP Projects


E.Mail: satishkk11@gmail.com ; Mo: +91 9892226885

 M/s. ILF Consulting Engineers (Germany) at Abu-Dhabi Office for their


Power Projects in UAE in Combine & Simple Cycle. Main Gas Turbine by
M/s. GE. ADGAS Power Project @ Das Island completed & handed over in
Jan 2017.
7. Worked in Combined & Simple Cycle Projects from Concept to
Commissioning. Project Feasibility studies; FEED Report preparation; Technical
Due Diligence Report; Detailed Engineering for Power Projects; Preparation of
conceptual Design and Tendering specification of STG / GTG & BOP’s;
Review and Approval of EPC contractors Design Submittals; Project
Engineering co-ordination with various disciplines for timely Submittals as per
LOD’s; Vendor Engineering Approval; Supervision & Inspection of Mechanical
Erection/Installation; Site testing & Commissioning; Site Co-ordination with
various disciplines (Civil / Elect / I & C etc) for Interfaces at site.

Satish K Kewalramani 23/01/2019


Curriculum Vitae

Satish K Kewalramani – VP Projects


E.Mail: satishkk11@gmail.com ; Mo: +91 9892226885

Professional Experience
June 17 to SEYA Industries Ltd, Mumbai as VP-Projects (Chemicals & Power).
present Greenfield Project location is Boisar.

2013 - 2017 PMC by ILF Consulting Engineers, Abu Dhabi, PO Box 73250/UAE
Completed Ongoing: - ADGAS @ Das Island Abu Dhabi, UAE – 42 MW.
Ongoing Engineering @ Cegelec Paris.
2012 - 2013 ILF Consulting Engineers, Abu Dhabi, PO Box 73250/UAE
(Completed) Saudi Electricity Company @ Najran; Saudi Arabia – 160 MW (80 MW x 2
No and @ Sharourah; Saudi Arabia – 160 MW (80 MW x 2 No:’s)

Khabat Power Plant and Bazyan Sub Station, IRAQ – 300 MW


Client: HanmiGlobal Middle East LLC, United Arab Emirates
Key Project data: 300 MW oil fired power plant and 400 KV GIS S/s.
Scope of work: Owner Engg & Site Construction Management
Position: Lead Project Engineer / Project Co-ordinator.
Responsible for verification & review of Design documents and approvals
till As-Built stage; complete Project Co-ordination / Complete Mechanical
Design Review and Overall Project Lead Design Co-ordination.

2012 – 2013 MIRFA IWPP, Abu Dhabi, Project Management (Owners Engineers),
(Completed) United Arab Emirates
Client: Sumitomo Corporation, Japan
Key project data: 1400 MW (GTG & STG) + 30 MIGD SWRO
Scope of work: Conceptual study and Technical Advisory Services,
RFP’s; Bid technical Comparative and recommendations;
2nd Phase of Owners Engineering review under finalization.
Position: Lead Engr, responsible for Technical Due Diligence Report
2011 - 2012 Spark Green Energy, Mumbai/India – 2 x 55 MW Green Power
Position: Project Head
Client: BEST Mumbai
Key Project Data: Coal & Biomass Green Power - Biomass Power Project
2No:'s x 55MW
Position: Project Head,
Scope: responsible for Power Project implementation from Concept to
Commissioning
2010 - 2011 Rafha Power Project, Riyadh/Saudi Arabia – 75MW x 2 No:’s
Position: Lead Project Engineer
Client: Saudi Electricity Company
Key Project Data: 2 No:’s GTG’s by SIEMENS 75 MW x 2 No:’s
Scope: Selection & Ordering of all Power Plant Equipments with
testing and Site delivery ready for erection. Detailed Engg
compliance and Cat-1 approval by SEC approving execution. Final As-
built compliance and co-ordination with Owners & Engg consultants.
2009 - 2010 Al Arrab Power, Riyadh/Saudi Arabia – 3 x 25 MW and 2 x 120 MW
Position: Chief Engr/Acting PM
Project: Duba & Tabouk Power Plants,
Client: SEC Saudi Arabia

Satish K Kewalramani 23/01/2019


Curriculum Vitae

Satish K Kewalramani – VP Projects


E.Mail: satishkk11@gmail.com ; Mo: +91 9892226885

Key project data: Duba 3 No:'s x 25 MW Siemens GTG


Tabouk 2 No:'s x 120 MW Siemens GTG
Position: Chief Engr / Acting Project Mgr
Scope: Selection & Ordering of all Power Plant Equipments; FAT and
Site delivery ready for erection. Detailed Engg compliance and Cat-1
approval by SEC / Lahmeyer approving execution. Final As-built
compliance and co-ordination with Owners & Engg consultants
2006 - 2009 Fichtner Consulting, Mumbai/India – Power Project Consultants for
Coal based Power
Position: Chief Engr Mechanical
Scope: Design & Engg for IPP’s & Captive Power Projects in India
Client: Adani Power-IPP; Binani cements-CPP; Nilanchal Cements-CPP.
Key Project Data: CPP on Coal / Lignite - 125MW x 2 No:'s; 225 MW x 2
No:’s; 135MW x 4 streams etc
Scope: Project Manager and Mechanical Designer.
2005 - 2006 GAPS Power & Infrastructure Pvt Ltd, Mumbai/India – Green Power
Position: COO @ GAPS Biomass Green Power, India
Client: Maharashtra State Electricity Board
Key project data: 13 MW Green Power based on Cotton Stalks/Baggasse
Scope: responsible for Biomass Green Power implementation from
Concept to Commissioning. Has a TG Boiler with a Steam Turbine Peter
brotherhood-UK design
2002 - 2005 Varun Energy Services, Mumbai/India
Position: Technical Head – Consultant Power Projects
Clients: Euro ceramics-CPP; Gujarat Spices; Vimal Oil; Ruchi Group etc
Scope: Consultancy Services to Power Projects from Concept to
Commissioning on various fuels as Lignite / Coal / Rice Husk.
Key Project Data: Euro -10 MW CPP on Lignite; Guj Ambuja – 20 MW on
Lignite/Coal;
1996 - 2002 Rama Group, Mumbai/India
Position: GM (Projects)
Scope: Set-up from Concept to Commissioning of POWER Projects.
Energy Auditor for the Rama Group. Set-up on Waste Heat Recovery
Boiler a CPP of 7.5 MW with Shin-Nippon Japan Steam Turbine System
Key Projects: Captive Power Projects.
1995 - 1996 Monsanto Inc, USA, Mumbai/India
Position: Sales Manager for India Sub-Continent
Client: Fertilizer & Sulphuric Acid Industries for Waste Heat Recovery
Boiler System and Pollution Control System.
Scope: EPC contracts for WHRB (Foster wheeler design); Sulphuric
Acid Projects; Plant study for energy balance
1989 - 1995 Rama Group, Mumbai/India
Position: Manager (Projects)
Scope: Set-up from Concept to Commissioning of Projects; Revamping
of in-house operating Projects. Energy Auditor for the Rama Group
Key Projects: Projects in Power / Fertilizer; Sulphuric Acid; Edible Oil &
Gelatin
1987 - 1989 Vidarbha Phosphates & Fertilisers Ltd, Wardha, Maharashtra/India

Satish K Kewalramani 23/01/2019


Curriculum Vitae

Satish K Kewalramani – VP Projects


E.Mail: satishkk11@gmail.com ; Mo: +91 9892226885

Position: Asst. P M
Scope: Set-up from Concept to Commissioning of Fertilizer & Sulphuric
Acid Projects with a 2 MW Captive Power from Waste Heat Recovery.
Energy & Safety Auditor for the VPFL Group
Key Projects: Power / Fertilizer; Sulphuric Acid.
1985 - 1987 BEC Fertilisers Ltd, Bilaspur, CG India/India
Position: Project Engr
Scope: Set-up from Concept to Commissioning of Fertilizer & Sulphuric
Acid Projects with a 1.50 MW Captive Power from Waste Heat Recovery.
Energy & Safety Auditor for the BEC Group
Key Projects: Power / Fertilizer; Sulphuric Acid
1984 - 1985 Grasim Industries Ltd, Nagda, MP India/India
Position: Shift Engr
Scope: Auxiliary Department/H2SO4 Operations in shift.
Key Project: H2SO4 Production & Viscose Staple Fibre – Auxiliary Deptt.

Extensive Travelled (international & domestic): Travelled extensively to Projects to Sites /


Vendors shops etc in India / abroad / etc. Travelled round the Globe to USA / Japan /
Germany / Holland / England / China etc for FAT; Training and Workshop Audit of
Steam Turbine and Boiler Companies.

Computer knowledge: Good hands on experience and working knowledge on Computer


and using self-LAP TOP only throughout the Project. Familiar with MS Project / Excel / Auto
Cad / etc.

Thanks and Regards;

Satish K Kewalramani
E.Mail: satishkk11@gmail.com
Mo: India Mo: + 91 98922 26885

Satish K Kewalramani 23/01/2019

You might also like