OVERVIEW OF VIETNAM POWER SYSTEM
General introduction
Northern
Central
Southern
OVERVIEW OF VIETNAM POWER SYSTEM
Current Vietnam Power Generation
58% 53%
Source: EVN
OVERVIEW OF VIETNAM POWER SYSTEM
Vietnam Renewable Development in 2020-2030
60,000 100%
71%
83% 90%
80% 84% 71%
54016
50,000 78% 80%
75% 68% 80%
72% 74% 74% 72%
49336
70% 70%
6… 66% 67% 68%
45410
70%
40,000
41422
60%
38642
38219
35126
(MW)
33650
30,000 50%
30931
29775
28109
40%
26475
25809
23527
20,000
22210
21542
30%
20010
18603
18481
16490
15763
15416
20%
13867
13512
10,000 12636
12270
11576
11286
10627
10187
10010
9255
10%
8893
8283
7872
5655
6552
7408
0 0%
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
P_instal (P1) Annual peak load (P2) P2/P1
Ninh Thuan
Binh Thuan
Ninh Thuan
Binh Thuan
Completed
Waiting Signed PPA
RE Approved COD
Province Master Plan (updated on
Sources Master Plan (updated on
Approval July 2019)
July 2019)
Ninh Thuan
1500
1050 1125
1014
1000 900
500
0
Ninh Thuan Binh Thuan
1000
737
632
500
0
Ninh Thuan Binh Thuan
Substation/ Current
New/Upgraded Master Plan EVN plan Remark
Transmission line Status
Substation
220kV Thap Cham 2x125 2x250 2025 2019
220kV Da Nhim 2x63 2x125 2018 2020
220kV Ninh Phuoc 2x250 2022 2021
220kV Ca Na 2x250 2021-2022
500kV Thuan Nam New 3x900 2024
Transmission Line
220kV Nha Trang - Thap ACSR400 -
2018
Cham 2x88.06
220kV Nha Trang - Thap ACSR400 -
2022
Cham 2x88.06
2xACSR500 -
220kV Vinh Tan - Ca Na 2022
2x14
2xACSR330 -
220kV Transit Ninh Phuoc New 2020 Vinh Tan - Thap Cham
4x4.5
2xACSR330 -
220kV Transit Thuan Nam New 2023 Vinh Tan - Thap Cham
4x25
220kV Ninh Phuoc - Thuan 2xACSR330 -
New 2023
Nam 2x25
4xACSR330 -
500kV Transit Thuan Nam New 2024 Van Phong - Vinh Tan
4x20
500kV Thuan Nam - Chon 4xACSR330 -
New 2025
Thanh 2x350
THE DEVELOPMENT STATUS OF GRID & RE SOURCES
Upgrade plan of Binh Thuan’s grid (approved in Master Plan & planned by EVN)
220kV Nhanh re Phan Ri 2 3xACSR400 - 4x3 2020 Vinh Tan - Phan Thiet
220kV Nhanh re Hong Phong 3xACSR400 - 2x1 2024 Phan Thiet 2 - Phan Ri 2
Transmission Congestion
Power Flow Fluctuation
Low Inertia Generator
Volt/VAr Control
Protection Coordination
RISKS!
RE GRID OPERATIONAL ISSUES
Mitigation and Counter Measures