Type of Vehicle From Bridge to From Bridge to From Daman to From Daman to
Daman Town Bridge Town
2-Wheeler, Auto 1599 818 1569 1536
Rickshaw and Car
Heavy Vehicle 106 112 129 67
IRCON has submitted Proposal for the same for approval to Valsad(R&B) Division. Administrative
Approval of amounting 14.65 Cr for Railway Portion was approved, while approach portion approval
is pending
Daman Side in Cr Railway Portion NH-48 Side in Cr Demolition Cost Total Cost in Cr
in Cr in Cr
28.82 14 24.25 1 68.07
Proposal 2
Demolition of Existing two Lane ROB and Reconstruction with Four Lane ROB with 4 Slip Road
to minimise traffic issue
In this proposal Four Lane ROB is proposed for through movement from NH side to Daman. Four Slip
Road (2 Towards Daman Side+ 2 Towards NH Side) have been proposed to diverse the traffic at
important junctions.
Length:2080m
Cost of Bridge
Daman Side in Cr Railway Portion NH-48 Side in Cr Demolition Cost Total Cost in Cr
in Cr in Cr
61.26 14 58.4 1 134.66
Proposal 3
Demolition of Existing two Lane ROB and Reconstruction with Four Lane ROB with 4 Slip Road
with Under pass
In Addition to Proposal 2, Limited height Subway need to be provided for movement of People of town
for market area ie station road area so that they don’t need to extra travel the whole ROB
Length:2080m
Length of Underpass: 300m
Cost of Bridge
Proposal 4
Demolition of Existing two Lane ROB and Reconstruction with Four Lane ROB upto Existing
ROB length and Two Lane ROB thereafter
In this proposal Four Lane ROB is to be constructed From Gold Coin Circle to Gandhi Circle(i.e
existing ROB) and then eccentric two lane ROB may be constructed so that if need arise in future it
may be widened to Four Lane ROB.
Length:1180m(Four Lane)+900m(Two Lane)
Cost of Bridge
Proposal 5
Demolition of Existing two Lane ROB and Reconstruction with Two Lane ROB
In this proposal Two Lane ROB is to be constructed with Revised Height at Railway Portion.
Length:1180m(Two Lane)
Cost of Bridge