Tittle:
GROUPWIDE MASTER SERVICE
AGREEMENT (MSA) FOR INTEGRATED
TURNAROUND MAIN MECHANICAL &
MAINTENANCE MECHANICAL STATIC
(TA4MS)
Rev Issue Date Prepared Checked Approved Issue Purpose Owner Signature
00 15/8/2019 din
Review and Endorsement Record
Revision : 00
1. Purpose.............................................................................................4
2. Scope ................................................................................................4
3. Reference .........................................................................................4
4. Definition ...........................................................................................5
5. Abbreviation ......................................................................................5
6. Legend ..............................................................................................5
7. Appendix ...........................................................................................7
2. Scope
This document covers all works step of inspection and testing on piping fabrication at
workshop and piping installation at Company site location for new piping spool, to
repair the existing piping system in Company facility, performed by Technical
Maintenance (TM) team or Contractor (CTR) at workshop and site location.
The material scope in this ITP covers material carbon steel only.
When any utility engaged with Company Business has their own ITP and/or
procedures, it shall be submitted to company for review and approval prior used.
3. Reference
a. ASME B31.3 Process Piping.
b. ASME Code Section II Part A Ferrous Material Specification.
c. ASME Code Section V Nondestructive Testing Qualification.
d. ASME Code Section IX Welding and Welder Qualification.
e. Project Procedures:
i. Insulation Procedure.
ii. Guideline for Lifting/Crane Operation Management System.
iii. General Piping Fabrication and Installation Procedure
iv. Joint Integrity Testing Procedure.
v. Non Conformance Procedure.
vi. Post Weld Heat Treatment Procedure.
vii. General Piping NDT Procedure.
viii. Piping Pressure Testing Procedure.
ix. Company Specification for Protection Coatings.
x. Company Specification for Handover System & Certification Manual.
xi. Company Specification for Protective Coating.
xii. WPS/PQR
5. Abbreviation
a. AFC : Approved for Construction
b. ASME : American Society Mechanical Engineer
c. ASTM : American Standard Testing Material
d. COM : Company’s Commissioning Department
e. CTR : Contractor
f. DPT : Dye Penetration Testing
g. MPI : Magnetic Particle Identification
h. NACE : National American Corrosion Engineer
i. OPS : Company’s Operation Department
j. PMI : Positive Material Identification
k. PQR : Procedure Qualification Record
l. QA/QC : Company’s Quality Assurance / Quality Control Department
m. RT : Radiography Testing
n. TM : Company’s Technical Maintenance Department
o. UT : Ultrasonic Testing
p. WPS : Welding Procedure Specification
6. Legend
a. H (Hold Point)
Work shall not be proceed without formal notification from the assigned
Quality Representative from Company. A signature signifying involvement of
the assigned Quality representative is required on the referenced Quality
Record
b. W (Witness)
Personnel doing the work shall notify assigned Quality Representative from
Company when the work is to be performed so that witnessing activities could
take place. Work does not stop if signed Quality Representative is not
c. M (Monitoring)
Verifying work and testing activities on an ongoing basis as deemed
necessary, also known as patrol inspection or spot check.
d. R (Review)
Review of document such as procedure, drawing inspection and testing
records etc, at a direction of Company.
e. P (Perform)
Perform or provide or prepare or execute the inspection point
f. A (Approved)
Defined as acceptance/approving of an plan or action after review or confirm
documents.
Page 8 of 10
TITTLE: INSPECTION TEST PLAN (ITP) Legend
4 FABRICATION WORK
5 REPAIR PROCEDURES
STS EDAC SCIENCE-TECH SOLUTION SDN BHD
ITP No:STS/ITP/2019/00 Rev:0
Page 9 of 10
TITTLE: INSPECTION TEST PLAN (ITP) Legend
Page 10 of 10