MEM677

Project Management
Assignment 1
Lecturer: Assoc. Prof. Ts. Dr. Nor Hayati Saad

This Assignment is designed to assess CO2 [PO2];

Course Outcomes

CO2: Associate case studies to address project management challenges [PO2,


LO3, SS1] {C4}

PO2 Able to Identify, formulate, conduct research literature and analyse


complex engineering problems reaching substantiated conclusions using
first principles of mathematics, natural sciences and engineering sciences
(WK1 to WK4)

DESCRIPTION

You are required to identify a completed project in Malaysia as a focused case for this
assignment. Students have to review all materials published in newspaper, magazine,
refereed journal, or any reliable source of references. Each student needs to ensure different
project is selected across the class.
Students have to identify, summarize the project, and analyze challenges faced by the
company/ project team in any FIVE (5) project management life cycle (Initiation, Planning,
Execution, Monitoring and Controlling, and Project Closing) for the selected project. Student
are also advised to review the projects challenges based on the TEN (10) PMBOK (Project
Management Body of Knowledge). Students have to analyze overall input for the project and
formulate and propose some solutions for the project. Present your written work in a form of
an individual booklet. Students have to submit the booklet in the form of hard and soft copy.
The project booklet will be marked/ assessed by referring to rubrics of assessment as
highlighted in Table 1- Assignment 1 Assessment Rubric.
You may refer to multiple references in order to complete the work. Please take note: -

1. Use provided Cover Page for the work submission in hard copy (please print separately
the cover page and attach together with the submitted booklet)
2. Submit the soft copy of the work in the provided link:
3. Please consider proper citation for all references used. Please attach all reference
materials in a Google Drive and share the link of the Google Drive in the provided link
(2)

Submission Date: 4 December 2019 (Wednesday)

Page 1 of 3
Table 1 –Assignment 1 Assessment Rubric

(This rubric will be used as a guide to mark the student’ work)

Scale 1 2 3 4 5
Factor
Criteria Poor Acceptable Excellent
Proper selected
project/ name with
Excellent
description of the
Name of the
Fair project by
completed  Poor
description providing images
Project & description
1 and only 1 for the completed 2
Project Photo and no Photo
photo is and during the
provided
provided development
(10)
phase of the
project with
explanation.

Excellent
Summary of
presentation of
project:
Project summary
Location in
to include
Malaysia,
Location in
Duration of
Malaysia,

Project (start Poor Fair
Duration of
and end date), presentation presentation of
2 Project (start and 3
Project Cost, of summary of summary of
end date), Project
Owner of the project project
Cost, Owner of
project/ Project
the project/
contractor/
Project contractor/
Project
Project Developer
Developer

(15)
clear and
excellent
identification of 5
Project
5 Project  Insufficient
Fair Management
Management identification
identification of Challenges OR
Challenges of

identification
 5 Project 5 Project
and analyses  5 Project Management Key
Management
Management Successful
Challenges
OR Challenges
and analyses Factors, to
3 and analyses include: analyses 10
5 Project
OR of 5 Project
Management OR management life
Key Successful
5 Project cycle (Initiation
Factors 5 Project
Management stage, Planning,
identification Management
Key Execution,
and analyses Key
Successful Monitoring and
Successful control and
Factors
(50) Factors Project Closing)
and 10 PMBOK
(Project
Management

Page 2 of 3
Body of
Knowledge area)

Excellent
Fair Formulation and
Insufficient
proposal of
Formulation
Formulation solution for the
and proposal of Formulation
and proposal challenges faced
solution for the and proposal
of solution for by the company
challenges of solution for
the challenges (proposed
faced by the the challenges
faced by the solutions for every
company faced by the
company challenges faced
company
OR by the company
4 OR OR 3
OR
Reflection on

Reflection on Reflection on
overall Factors Reflection on
overall Factors overall
which cause overall success of
which cause Factors which
the success of the selected
the success of cause the
the selected project (to relate
the selected success of the
project. with any 10 of
project. (15) selected
PMBOK)
project.

Excellent project
booklet
presentation
(proper colors with
Excellent and
excellent creative
creative Fair project
Poor project design of booklet)
preparation of booklet
booklet and excellent
the project presentation
presentation citation and
booklet (A5 or (black and
5 (black and references (news 2
A4 size) with white) and
white) and no paper: title,
proper citation insufficient
citation and author, published
and references. citation and
references. date, column;
(10) references.
Magazine: Name,
author, date of
publish ; and other
standard citation
and references)
Assessment Value: (100%) 20%

Page 3 of 3