Professional Documents
Culture Documents
Tender Masjid Al-Muhajirin - Sum
Tender Masjid Al-Muhajirin - Sum
To Collection 12,800.00
To Collection 5,000.00
To Collection 2,500.00
To Collection 500.00
To Collection 14,560.80
Bangunan Masjid
Supply 200mm x 200mm Grade 45
a Initial pile 9m long No 127 260.00 33,020.00
b Extension pile 9m long No 127 240.00 30,480.00
b Extension pile 6m long No 127 180.00 22,860.00
To Collection 141,840.00
Bangunan Fasiliti
a Supply 200mm x 200mm Grade 45
b Initial pile 9 m long no 48 260.00 12,480.00
c Extension Pile 9m long no 48 240.00 11,520.00
d Extension Pile 6m long no 48 180.00 8,640.00
To Collection 59,000.00
To Collection 47,130.00
To Collection 32,000.00
EXCAVATION
a Oversite to reduce level not exceed 1m m3 431 6.00 2,586.00
b Allow for keeping all excavation free from running water sum 500.00
Base
c Anti termite treatment m2 622 5.00 3,110.00
d Import earth fill m3 858 35.00 30,030.00
Hardcore
e 150mm thk hardcore m2 1,429 8.00 11,432.00
f Approved 0.25mm thk polyethelene m2 1,429 6.00 8,574.00
To Collection 56,232.00
Reinforcement
Ground Beam
j 25mm kg 620 3.60 2,232.00
k 20mm kg 1,756 3.60 6,321.60
l 16mm kg 921 3.60 3,315.60
m 12mm kg 2,279 3.60 8,204.40
To Collection 152,464.80
In grd beam,
b 12mm dia kg 8 3.60 28.80
c 10mm dia kg 2,609 3.60 9,392.40
Fabric Reinforcement
d No. A8 m2 3,121 26.00 81,146.00
Formwork
g Side of pile cap m2 237 30.00 7,110.00
h Side of ground beam m2 920 30.00 27,600.00
To Collection 125,896.40
Reinforcement
Column
25mm dia kg 2,582 3.60 9,295.20
20mm dia kg 175 3.60 630.00
Page 1 of 5/Blk D1
Bill No . 3 - Bangunan Masjid
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
Roof Beam
25mm dia kg 7,275 3.60 26,190.00
20mm dia kg 1,510 3.60 5,436.00
16mm dia kg 1,989 3.60 7,160.40
12mm dia kg 3,603 3.60 12,970.80
To Collection 149,623.20
Formwork
To Collection 72,447.60
Fabric Reinforcement
d BRC No. A8 m2 109 26.00 2,834.00
Formwork Class F1
e Sided and Soffit of Concrete Roof Slab m2 159 32.00 5,088.00
Finishes
f Two Coat Waterproofing m2 183 24.00 4,392.00
g 50mm cement screed m2 113 14.00 1,582.00
h forming scupper m 30 10.00 300.00
To Collection 29,565.00
To Collection 45,732.00
To Collection 24,610.00
To Collection 73,335.00
Tile finishes
c 300 x 300 Qiblat Wall m2 287 80.00 22,960.00
Painting
d Wall , Fin Wall m2 512 12.00 6,144.00
Page 3 of 5/Blk D1
Bill No . 3 - Bangunan Masjid
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
To Collection 12,600.00
Painting
h on plasterboard m2 1,480 12.00 17,760.00
j On plaster surface m2 288 12.00 3,456.00
To Collection 85,053.00
Bill 3/19
a 13mm bib tap no 39 50.00 1,950.00
b 150mm UPVC Floor Trap no 13 20.00 260.00
c Testing sum 100.00
To Collection 2,310.00
Bill 3/20
To Collection 0.00
Chandeliar Hook
e Metal Hook no 1 1,000.00
Tunjuk Langit
h Tunjuk langit islamic symbol crescent no 1 2,500.00
To Collection 12,010.00
Abulation Stool
d 450 x 450 x 100 h no 34 30.00 1,020.00
e 450 x 450 x 650 h no 4 40.00 160.00
To Collection 10,680.00
Mimbar
a Reinforced Concrete Grade 30 m3 1 290.00 290.00
b 10mm high tensile kg 41 3.60 147.60
Page 4 of 5/Blk D1
Bill No . 3 - Bangunan Masjid
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
To Collection 26,982.60
To Collection 3,176.00
To Collection 1,364,952.60
Page 5 of 5/Blk D1
CADANGAN MEMBINA SEBUAH MASJID AL-MUHAJIRIN , DIATAS LOT 62592, KAMPUNG ULU CHEPOR, MUKIM ULU
KINTA, DAERAH KINTA, PERAK DARUL RIDZUAN.
Bill No . 4 - Bangunan Fasility
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
EXCAVATION
a Oversite to reduce level not exceed 1m m3 212 8.00 1,696.00
b Allow for keeping all excavation free from running water sum 500.00
Base
c Anti termite treatment m2 825 6.00 4,950.00
d Import earth fill m3 435 35.00 15,225.00
Hardcore
e 150mm thk hardcore m2 724 16.00 11,584.00
To Collection 33,955.00
Concrete Works
c Grade 15 - Foundation m3 43 210.00 9,030.00
Reinforcement
Pile Cap & Stump
j 25mm kg 60 3.60 216.00
k 20mm kg 255 3.60 918.00
l 16mm kg 278 3.60 1,000.80
m 12mm kg 692 3.60 2,491.20
Ground Beam
n 25mm kg 895 3.60 3,222.00
o 20mm kg 1,112 3.60 4,003.20
p 16mm kg 1,164 3.60 4,190.40
To Collection 75,145.60
Ground Beam
d 12mm dia kg 9 3.60 32.40
e 10mm dia kg 1,900 3.60 6,840.00
Fabric Reinforcement
A8 m2 1,119 26.00 29,094.00
Formwork
g Side of pile cap m2 281 32.00 8,992.00
h Side of ground beam m2 220 32.00 7,040.00
To Collection 54,216.00
Frames
Bill 3/4 Concrete Works
Reinforced Concrete Grade 30
a Column m3 23 270.00 6,210.00
b Roofbeam m3 31 270.00 8,370.00
c Trefoil Arch Beam m3 46 270.00 12,420.00
Reinforcement
Column
Page 1 of 4/Blk D1
Bill No . 4 - Bangunan Fasility
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
Roof Beam
12mm dia kg 1,798 3.60 6,472.80
Roof Beam
10mm dia kg 1,042 3.60 3,751.20
6mm dia kg 224 3.60 806.40
To Collection 54,050.40
To Collection 26,853.60
Ironmongeries
a Satinless Steel Butt Hinges Pairs 21 30.00 630.00
b Cylindrical lockset no 2 180.00 360.00
c Indocator Bolt no 12 30.00 360.00
To Collection 10,490.00
Page 2 of 4/Blk D1
Bill No . 4 - Bangunan Fasility
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
To Collection 600.00
To Collection 46,424.00
Tile finishes
c Ceramic Wall Tiles m2 357 80.00 28,560.00
Mosaic Wall Tiles m2 21 85.00 1,785.00
Painting
d Wall , Fin Wall m2 150 12.00 1,800.00
e wall , column m2 387 12.00 4,644.00
g Ribbed Concrete Finishes m2 73 120.00 8,760.00
To Collection 51,993.00
Painting
h on plasterboard m2 643 12.00 7,716.00
To Collection 31,792.00
Bill 4/14
a 700 x 700 Vetrious China Counter Top Basin no 8 550.00 4,400.00
b 700 x 700 Vetrious China Wall Hung Vanity Basin no 2 350.00 700.00
Pedestal Wash doen water closet no 4 600.00 2,400.00
Pedestal Wash doen water closet no 2 650.00 1,300.00
To Collection 1,620.00
Bill 4/16
Page 3 of 4/Blk D1
Bill No . 4 - Bangunan Fasility
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
To Collection 0.00
Tempat Wuduk
h Tunjuk langit islamic symbol crescent no 2 2,500.00 5,000.00
To Collection 14,155.00
To Collection 5,325.00
To Collection 515,363.60
Page 4 of 4/Blk D1
CADANGAN MEMBINA SEBUAH MASJID AL-MUHAJIRIN , DIATAS LOT 62592, KAMPUNG ULU CHEPOR, MUKIM ULU
KINTA, DAERAH KINTA, PERAK DARUL RIDZUAN.
Bill No . 5 - Tapak TNB Kompak
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
To Collection 31,960.00
Bill 5/2
a Compound Metal Fence m 21 180.00 3,780.00
b Compound Metal Gate no 1 3,500.00 3,500.00
c Asphalt Premix Compound m2 15 60.00 900.00
To Collection 8,180.00
Page 1 of 1/Blk D1
CADANGAN MEMBINA SEBUAH MASJID AL-MUHAJIRIN , DIATAS LOT 62592, KAMPUNG ULU CHEPOR, MUKIM
ULU KINTA, DAERAH KINTA, PERAK DARUL RIDZUAN.
Bill No . 6 - SPAH
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
Bill 6/1
a Construct Complete Structure no 1 6,000.00 6,000.00
b Metal Perimeter Cladding no 1 12,500.00 12,500.00
c Opening Panel no 1 600.00 600.00
d FRP 880 gallons no 1 3,800.00 3,800.00
To Collection 22,900.00
Page 1 of 1/Blk D1
CADANGAN MEMBINA SEBUAH MASJID AL-MUHAJIRIN , DIATAS LOT 62592, KAMPUNG ULU CHEPOR, MUKIM
ULU KINTA, DAERAH KINTA, PERAK DARUL RIDZUAN.
Bill No . 7 - Kerja Luar
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
Relocation
a Relocate Existing TNB/STMB Services no 2 10,000.00 20,000.00
Site Clearance
b Strip, clear from site sum 3,500.00
c Temporary Earth Drain sum 800.00
Earthwork
d Excavation oversite m2 19,316 3.00 57,948.00
e Excavation to formation level m3 9,434 6.00 56,604.00
e Filling to make up platform level m3 6,604 8.00 52,832.00
Filling to make up platform level : imported m3 448 40.00 17,920.00
f Disposed Surplus m3 2,831 8.00 22,648.00
To Collection 232,252.00
SALIRAN PERMUKAAN
To Collection 40,958.00
Sumps
d Maximum Depth 1.20m no 4 1,000.00 4,000.00
e RC Sump exceeding 1.2m < 2.4m no 18 2,200.00 39,600.00
To Collection 71,500.00
To Collection 7,100.00
Page 1 of 4/Blk D1
Bill No . 7 - Kerja Luar
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
Road Base
d 375mm thk crushed aggregate m2 2,538 9.00 22,842.00
e Crushed aggregates edgings m 61 20.00 1,220.00
To Collection 46,904.00
Pavement Marking
e 100mm wide int. line m 25 7.00 175.00
f 150mm wide edge & stop line m 10 7.00 70.00
g 150mm parking line no 72 30.00 2,160.00
h turn left/ring arrow no 2 250.00 500.00
i go stright / turn no 2 150.00 300.00
j go straight arrow no 2 150.00 300.00
k OKU Parking no 3 50.00 150.00
l Motorcycle Parking no 66 10.00 660.00
Bill 7/9
a Road Kerbs m 61 38.00 2,318.00
b Scupper Drain m 33 45.00 1,485.00
c inlet grating no 11 45.00 495.00
To Collection 35,424.00
To Collection 7,998.00
RETIKULASI AIR
Bill 7/12 a 25mm dia HDPE PN 16 encased 32mm galvanised m 50 45.00 2,250.00
b 100ND CLMS m 551 90.00 49,590.00
c 50mm dia UPVC PN15 m 318 18.00 5,724.00
d 100mm sluice valve no 1 600.00 600.00
To Collection 58,164.00
Bill 7/13
a 50mm sluice valve no 1 450.00 450.00
Page 2 of 4/Blk D1
Bill No . 7 - Kerja Luar
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
Bill 7/14
a Twin Pillar Hydrant no 2 1,200.00 2,400.00
b LAP Indicator Post no 10 90.00 900.00
c Breaking existing premix m 10 120.00 1,200.00
d 100m bulk meter no 1 1,800.00 1,800.00
e 50m domestic water meter no 1 200.00 200.00
To Collection 6,500.00
Bill 7/15
a Connection to main sum 4,500.00
b flushing & Sterelising sum 1,500.00
e Water Pressure Leakage Test Sum 1,500.00
To Collection 7,500.00
SALIRAN KOTORAN
Bill 3/17 a 225 vcp M 42 110.00 4,620.00
b 225 vcP M 42 110.00 4,620.00
c End Cap no 2 150.00 300.00
d Insitu Brick Manhole 750 x 750 no 2 600.00 1,200.00
e 1200mm precast concrete manhole no 3 2,200.00 6,600.00
f exceed 2.0m < 3.0m no 1 2,600.00 2,600.00
To Collection 19,940.00
To Collection 240,000.00
Bill 7/19
a External Works sum 20,000.00
b JPP sum 5,000.00
c Connection , jointing perimeter drain no 1 500.00 500.00
d Maintainace Sewerage System cycle 12 500.00 6,000.00
e Testing sum 7,000.00
To Collection 38,500.00
Bill 7/20 COLLECTION
Bill 7/17 19,940.00
Bill 7/18 240,000.00
Bill 7/19 38,500.00
Page 3 of 4/Blk D1
Bill No . 7 - Kerja Luar
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
Bill 7/23
a 1600mm chainlink fencing m 432 120.00 51,840.00
b Sliding gate no 1 6,000.00 6,000.00
c Sign Wall no 1 8,000.00 8,000.00
To Collection 65,840.00
Bill 7/26
a Goal Post No 2 2,500.00 5,000.00
To Collection 5,000.00
To Collection 1,203,600.00
Page 4 of 4/Blk D1
CADANGAN MEMBINA SEBUAH MASJID AL-MUHAJIRIN , DIATAS LOT 62592, KAMPUNG ULU CHEPOR, MUKIM ULU
KINTA, DAERAH KINTA, PERAK DARUL RIDZUAN.
Bill No . 8 - Mekanikal & Elektrikal
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
Bill8/1 Preliminaries
a Shopdrawing Set 6 1,000.00 6,000.00
Others
d Site Clearing sum 500.00
e Make it good sum 1,000.00
e Liasing with authorities sum 1,500.00
g Submission document sum 1,000.00
To Collection 21,000.00
LV Switch Board
d Main Switch Board no 1 36,000.00 36,000.00
e Wall Mounted Automatic Power Factor no 1 16,000.00 16,000.00
DB M1 no 1 3,600.00 3,600.00
DB M1A no 1 3,600.00 3,600.00
DB M 1B no 1 3,600.00 3,600.00
DB M 2 no 1 3,600.00 3,600.00
DB M3 no 1 3,600.00 3,600.00
DB M4 no 1 3,600.00 3,600.00
DB M5 no 1 3,600.00 3,600.00
To Collection 91,700.00
Submains Cabling
From MSM -M
d DBM1 Lot 3,500.00
e DBM 1A Lot 3,500.00
DBM 1B Lot 3,500.00
DB M2 Lot 3,500.00
DB M3 Lot 3,500.00
DB M4 Lot 3,500.00
DB"M 5 Lot 3,500.00
Power Factor Board Lot 3,500.00
To Collection 34,500.00
To Collection 42,515.00
Bill 8/5 Electrical Fittings
a 2 x 2 LED Panel Nos 18 160.00 2,880.00
b 2 x 2 LED Panel Nos 1 180.00 Rate Only
c 1 x 28 W Bare Channel Nos 1 120.00 Rate Only
Page 1 of 4/Blk D1
Bill No . 8 - Mekanikal & Elektrikal
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
To Collection 58,585.00
PA System
2 x 360 Power Amp no 3 1,800.00 5,400.00
100 Watts Horned Speaker no 4 1,200.00 4,800.00
Speaker Point no 4 200.00 800.00
Installation Sum 800.00
To Collection 37,000.00
Page 2 of 4/Blk D1
Bill No . 8 - Mekanikal & Elektrikal
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
To Collection 8,400.00
To Collection 18,850.00
To Collection 1,900.00
Page 3 of 4/Blk D1
Bill No . 8 - Mekanikal & Elektrikal
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
Bill 8/21
a ABC Dry Powder No 6 300.00 1,800.00
To Collection 1,800.00
Page 4 of 4/Blk D1
CADANGAN MEMBINA SEBUAH MASJID AL-MUHAJIRIN , DIATAS LOT 62592, KAMPUNG ULU CHEPOR, MUKIM ULU
KINTA, DAERAH KINTA, PERAK DARUL RIDZUAN.
Bill No . 9 - Wang Peruntukan Sementara
PAGE NO ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM)
Bill 9/1
a Allow 10,000.00 for signages sum 10,000.00
b profit 3% sum 300.00
c Attendace 3% sum 300.00
To Collection 10,600.00
Page 1 of 1/Blk D1