Download as pdf
Download as pdf
You are on page 1of 1
DRAWING LIST HRER STAGE/TItHNRDetail Drowing/MIK SPECIALITY /# db Water / $B PAGE 1_OF_2. PROJECT _[or0n2-SM SOUTD CEMENT PLANT FOR SUKABM PROEC(BI WY OONESA 3 SCG TERRA | CFOO2-SCOHHA SI 50001/dMRARLERTE (S81) = ITEMS | 05c-Suspension Preheater CONCH FRRERRA | 05c- BETAE ATG Dl NOJ DRAWING NO. DRAWING TITLE {__REV, AND DATE/HHA | SIZE] Roya fal eo (8 RO] RI RZ | RS [eve 1 [oF002-05c~Wo'| Design Note v4 aod Sah 2 |oF002-05c—W02| Lut Doing of 40000n Ver Sule Danae Ping nko [f.000 £0.000m RHA AE (al 3 |F002-05c—W03] Lut ving of 0850/28 eer Say Ding Ping fu. | [ovo] 10.950m/25.850m FBSA EE 4 [0F002-05c~WO4] tout Dvn of 5.5/8 ler Spl aD pn 714.0824 000 36.350m/48.350m ¥ EEA RAE BL 5; [oF002-05c—W05| Lou Dov of B50 Water Suny ond Danae Ping odanae 1.000 61.950mF HSE AH aE 6 [CF002-05c—WO6| Ca Hr Sap ad Ren Pye at Car Pug Poe Sten 4.024 1.009 SERRA RR ERNST 7 {or002-05e-Wo7| Pipe Fixing and Pressure Gage Installation bor40ka4 0.500 PURER RARE 8 [CF002-05c—W08| Sena aan of Sen Aruna fs Enigma ena 1.000 | asia aE RRR | 9 |cF002-05c-W09| The Smal Crean 009 MGR aE er 10 {Cr002-05e-wo) Dimensional Drow E ee) ~fosad SALAS Aa ee | | 12 (CF002-05e-W12| Nain Materia List lens as00 | EH lei ioment ond Material List (5 Poges) leo as29 ESO Ting rk CHECK iit: 20 VERIFY / Hi DATE / RAE 2014.03.24 y 7

You might also like