Professional Documents
Culture Documents
RAB Lap. Futsal
RAB Lap. Futsal
RAB Lap. Futsal
Kecamatan : Tahunan
Desa : Tahunan
POTONGAN A
Urugan Tanah
Tanah As
Rabat Beton
Lantai Kerja
1
Tulkok D 10mm
Beugel Ø6mm
60
DENAH PENULANGAN PLAT
Ulir D10mm
4100
DENAH LAPANGAN FUTSAL & VOLI
4100
SITE LAPANGAN VOLLI
4400
BANGUNAN
Jalan Lingkungan
Tanggal survei :
Take Of Sheet (TOS)
Volume = P x L
= 93.6 m2
Volume = P x L X T
= 26.40 m3
Volume = P x L X T
= 35.88 m3
Urugan Pasir Urug (foot plat tribun)
Lebar = 1.00 m
Tebal (T) = 0.05 m
Panjang = 1.00 m
Volume = P x L X T
= 1.10 m3
250 Lantai Kerja (lapangan) k.100
Lebar (L) = 17.5 m
Tebal (T) = 0.05 m
Panjang (P) = 41 m
= P x L X T
Volume = 35.875 m3
Pengecatan
Ulir D10mm
Panjang = 41 m
Volume = P x L
= 717.5 m2
Panjang = 117 / 3
= 39.00 Lembar papan
Pembulatan = 39 / 2
= 19.5
Pembulatan = 20 Lembar papan
Begisting Sloof
Papan Kayu Randu Tebal 2cm Panjang 3m
Begisting Kolom
Papan Kayu Randu Tebal 2cm Panjang 3m
Begisting Balok 1
Papan Kayu Randu Tebal 2cm Panjang 3m
Begisting Balok 3
Papan Kayu Randu Tebal 2cm Panjang 3m
Panjang (P) = 39 m
= P x L
Volume = 124.8 m2
1750
Pembesian
1. Tulangan Tribun
Volume = 811.10 m2
Volume = 26.40 m3
x 22
Volume = 36.98 m3
x 22
Volume = 36.98 m3
x 22
Volume = 71.75 m3
Volume = 6.60 m3
x 22
Volume = 7.31 m3
Volume = 3.17 m3
Volume = 12.79 m3
x 11
Volume = 15.91 m3
Volume = 717.50 m2
Kebutuhan Papan Randu P.3m = 20 Lbr
x 12
x 22
/ 12
Btg
Btg
Besi Ulir D 12mm = 278.00 Btg /
x 8 = 10.66 Kg Per-Btg
x 22 = 2962.368 Kg
/ 12
Btg
Btg
x 10
Besi Polos Ø6mm = 174.00 Btg /
/ 12 = 2.64 Kg Per-Btg
= 459.36 Kg
Btg
x 10
x 11
/ 12
Btg
/ 0.15
x 1.2
/ 12
x 11
Btg
/ 0.15
x 1.1
/ 12
Btg
/ 0.15
x 1.9
/ 12
Btg
/ 0.15
x 1.5
/ 12
x 11
Btg
= 832.00
= 832.00
= 3587.5
= 3587.5
Plastik = 842.30 m2
NO KODE ANALISA
1 A.2.2.1.9
(AHSP Kab.
Jepara 2017)
2 A.2.3.1.1
(AHSP Kab.
Jepara 2017)
3 A.2.3.1.11
(AHSP Kab.
Jepara 2017)
4 A.4.1.1.4
(AHSP Kab.
Jepara 2017)
5 A.4.1.1.17
(AHSP Kab.
Jepara 2017)
6 A.4.1.1.3
(AHSP Kab.
Jepara 2017)
7 A.4.1.1.7
(AHSP Kab.
Jepara 2017)
8 A.4.1.1.21
(AHSP Kab.
Jepara 2017)
9 A.4.1.1.22
(AHSP Kab.
Jepara 2017)
10 A.4.1.1.23
(AHSP Kab.
Jepara 2017)
11 A.4.1.1.24
(AHSP Kab.
Jepara 2017)
12 A.4.7.1.11.2
(AHSP Kab.
Jepara 2017)
Modifikasi
1
13 Lansump (LS)
14 Lansump (LS)
15 Lansump (LS)
16 Lansump (LS)
17 Lansump (LS)
20 Lansump (LS)
Urugan Pasir
Pekerja HOK 36.98
Mandor HOK 36.98
Pasir Urug m3 36.98
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100) Pasir Beton Lokal
Pekerja HOK 36.98
Tukang Batu HOK 36.98
Kepala Tukang HOK 36.98
Mandor HOK 36.98
Portland Semen Zak 36.98
Pasir Beton (lokal) m3 36.98
Kerikil (maksimum 30 mm) m3 36.98
Air Ltr 36.98
Polos Ø6mm
Pekerja HOK 459.36
Tukang Besi HOK 459.36
Kepala Tukang HOK 459.36
Mandor HOK 459.36
Besi Beton (polos/ulir) Kg 459.36
Kawat Beton Kg 459.36
Ulir D10mm
Pekerja HOK 4426.98
Tukang Besi HOK 4426.98
Kepala Tukang HOK 4426.98
Mandor HOK 4426.98
Besi Beton (polos/ulir) Kg 4426.98
Kawat Beton Kg 4426.98
Ulir D12mm
Pekerja HOK 2962.37
Tukang Besi HOK 2962.37
Kepala Tukang HOK 2962.37
Mandor HOK 2962.37
Besi Beton (polos/ulir) Kg 2962.37
Kawat Beton Kg 2962.37
Ulir D13mm
Pekerja HOK 3257.28
Tukang Besi HOK 3257.28
Kepala Tukang HOK 3257.28
Mandor HOK 3257.28
Besi Beton (polos/ulir) Kg 3257.28
Kawat Beton Kg 3257.28
Cat Khusus Lantai Lapangan Sekelas Propan Tennokote (Untuk permukaan lapangan)
Pekerja HOK 718
Tukang Cat HOK 718
Kepala Tukang HOK 718
Mandor HOK 718
Cat Kg 718
Las Taksir
Upah
Pekerja HOK
Tukang (Batu, Kayu, Besi, Cat) HOK
Kepala Tukang HOK
Mandor HOK
: 2017
: Implementasi Undang Undang Desa
811 m2
KEBUTUHAN KEBUTUHAN
KOEFISIEN
MATERIAL TENAGA
0.1 81.11
0.05 40.56
0.7500 19.80
0.0250 0.66
0.3000 11.09
0.0100 0.37
1.2000 44.37
1.200 44.37
0.200 7.40
0.020 0.74
0.060 2.22
4.600 170.085
0.638 23.58
0.734 27.12
200.000 7395
0.070 32.16
0.070 32.16
0.007 3.22
0.004 1.84
1.050 482.33
0.015 6.89
0.070 309.89
0.070 309.89
0.007 30.99
0.004 17.71
1.050 4648.32
0.015 66.40
0.070 207.37
0.070 207.37
0.007 20.74
0.004 11.85
1.050 3110.49
0.015 44.44
0.070 228.01
0.070 228.01
0.007 22.80
0.004 13.03
1.050 3420.14
0.015 48.86
1.650 118.39
0.275 19.73
0.028 2.01
0.083 5.96
5.520 339.70
0.591 42.44
0.723 51.87
215.000 15426.25
1.650 75.54
0.275 12.59
0.028 1.28
0.083 3.80
7.420 339.70
0.499 22.83
0.748 34.24
215.000 9842.915
0.520 38.00
0.260 19.00
0.026 1.90
0.026 1.90
0.045 3.29
0.300 21.92
0.100 7.31
0.660 27.88
0.330 13.94
0.033 1.39
0.033 1.39
0.040 1.69
0.400 16.90
0.200 8.45
0.015 0.63
0.350 14.78
0.660 78.42
0.330 39.21
0.033 3.92
0.033 3.92
0.040 4.75
0.400 47.53
0.200 23.76
0.018 2.14
0.350 41.59
0.660 82.37
0.330 41.18
0.033 4.12
0.033 4.12
0.040 4.99
0.400 49.92
0.200 24.96
0.015 1.87
0.350 43.68
6.000 748.80
apangan)
0.0280 20.09
0.0420 30.14
0.0042 3.01
0.0030 2.15
0.1800 129.15
1.000 0.24
1.000 0.4095
1.000 16.00
1.000 842.3
1.000 44.00
849.48 850.00
44.37 43.00
23.58 22.00
65.26 65.00
113.23 113.00
3.32 3.00
1.96 2.00
187 187.00
- -
43.68 44.00
41.59 42.00
842.30 842.00
261.00 261.00
278.00 278.00
597.92 598.00
174.00 174.00
166.59 54.00
129.15 129.00
44.00 44.00
1374.47 1374.00
960.60 961.00
96.12 96.00
110.81 111.00
4.00 4.00
5.00 4.00
1.00 1.00
1.00 1.00
10.00 10.00
16.00 16.00
30% 30%Harga bahan
RENCANA ANGGARAN BIAYA PRASARANA (RAB)
1.BAHAN
PC 50 Kg 850.00 65,000 55,250,000.00
Pasir Hurug 43.00 82,000 3,526,000.00
Pasir Beton (Lokal) untuk Lantai Kerja (K.100) 22.00 179,000 3,938,000.00
Pasir Beton (Muntilan) untuk cor Beton (K.125 - K.225) 65.00 377,500 24,537,500.00
Split 2/3 113.00 247,000 27,911,000.00
Papan Kayu Randu 3.00 1,000,000 3,000,000.00
Kayu 5/7 Kayu Hutan 2.00 2,750,000 5,500,000.00
Bambu Panjang Maksimal 6m 187.00 20,000 3,740,000.00
Minyak Begisting 0.00 -
Triplek 4mm 44.00 60,000 2,640,000.00
Plywood tebal 9mm (asumsi 2 kali pakai) 21.00 100,000 2,100,000.00
Plastik 842.00 4,000 3,368,000.00
Besi Ulir D13mm 261.00 99,000 25,839,000.00
Besi Ulir D12mm 278.00 85,000 23,630,000.00
Besi Ulir D10mm 598.00 59,000 35,282,000.00
Besi Polos Ø6mm 174.00 21,000 3,654,000.00
Kawat Beton/Bendrat 54.00 -
Cat Sekelas Propan Tennokote (untuk Lantai Lapangan) 129.00 -
Baut Ankur 44.00 18,000 792,000.00
……………………… ………………………..