Professional Documents
Culture Documents
Siaran Khas 3 Mei 2015 PDF
Siaran Khas 3 Mei 2015 PDF
SIARAN KHAS
Special Release 3
(UNTUK KERJA-KERJA MEKANIKAL DAN
ELEKTRIKAL)
(For Mechanical and Electrical Works)
MEI
MAY
2015
Muka Surat
Page
Nota teknikal 17
Technical notes
Jadual tarikh pengeluaran Siaran Khas 3 (Untuk Kerja-kerja Mekanikal dan Elektrikal), 18
Malaysia, Januari-Disember 2015
Schedule of release dates for Special Release 3 (For Mechanical and Electrical Works),
Malaysia, January-December 2015
i
JADUAL
TABLE
Jadual 1: Indeks harga seunit bagi copper cables
Table 1: Unit price index for copper cables
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
1.3) Cables laid underground (per meter run) 2014 Dis 98.4 98.3 98.8
(i) 120 sq. mm and above 2015 Jan 98.6 98.6 99.1
Feb 96.9 97.2 96.8
Mac 97.5 97.7 97.2
Apr 100.1 99.7 98.5
Mei 100.7 100.2 98.2
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
1
Jadual 1: Indeks harga seunit bagi copper cables (samb.)
Table 1: Unit price index for copper cables (cont'd)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
1.3) Cables laid underground (per meter run) 2014 Dis 97.7 96.5 100.2
ii) Below 120 sq. mm 2015 Jan 97.5 96.5 100.1
Feb 96.5 96.3 99.1
Mac 97.0 96.5 99.3
Apr 99.8 98.6 99.2
Mei 100.3 98.7 99.5
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
1.4) Cables on tray/ladder (per meter run) 2014 Dis 98.4 98.3 98.8
i) 120 sq. mm and above 2015 Jan 98.6 98.6 99.1
Feb 96.9 97.2 96.8
Mac 97.5 97.7 97.2
Apr 100.1 99.7 98.5
Mei 100.7 100.2 98.2
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
1.4) Cables on tray/ladder (per meter run) 2014 Dis 97.7 96.5 100.2
ii) Below 120 sq. mm 2015 Jan 97.5 96.5 100.1
Feb 96.5 96.3 99.1
Mac 97.0 96.5 99.3
Apr 99.8 98.6 99.2
Mei 100.3 98.7 99.5
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
2
Jadual 1: Indeks harga seunit bagi copper cables (samb.)
Table 1: Unit price index for copper cables (cont'd)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
3
Jadual 2: Indeks harga seunit bagi switchgears
Table 2: Unit price index for switchgears
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
(2) Switchgears
4
Jadual 2: Indeks harga seunit bagi switchgears (samb.)
Table 2: Unit price index for switchgears (cont'd)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
(2) Switchgears
2.4) TPN & SPN Distribution Boards 2014 Dis 101.4 102.0 100.0
(Incomer breaker 100A 2015 Jan 101.4 102.0 100.0
and below) Feb 101.4 102.6 101.1
Mac 101.4 102.6 101.1
Apr 105.3 103.8 107.6
Mei 105.3 103.8 107.3
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
5
Jadual 3: Indeks harga seunit bagi transformers
Table 3: Unit price index for transfomers
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
(3) Transformers
3.1) Low loss cast resin transformer 2014 Dis 83.3 76.4 83.3
2015 Jan 83.3 76.4 83.3
Feb 83.3 76.4 83.3
Mac 83.3 76.4 83.3
Apr 81.3 76.4 81.3
Mei 81.3 76.4 81.3
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
3.2) Low loss hermetically sealed 2014 Dis 114.9 98.1 114.9
(oil filled) transformer 2015 Jan 114.9 98.1 114.9
Feb 115.2 96.3 115.2
Mac 115.1 96.3 115.1
Apr 113.0 96.3 113.0
Mei 112.2 93.4 112.2
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
6
Jadual 4: Indeks harga seunit bagi generators
Table 4: Unit price index for generators
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
(4) Generators
7
Jadual 5: Indeks harga seunit bagi lightning protection system and earthing system
Table 5: Unit price index for lightning protection system and earthing system
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
R = Kemaskini/Revised
8
Jadual 6: Indeks harga seunit bagi air conditioning system
Table 6: Unit price index for air conditioning system
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
9
Jadual 6: Indeks harga seunit bagi air conditioning system (samb.)
Table 6: Unit price index for air conditioning system (cont'd)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
10
Jadual 6: Indeks harga seunit bagi air conditioning system (samb.)
Table 6: Unit price index for air conditioning system (cont'd)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
11
Jadual 7: Indeks harga seunit bagi motor (pumpset)
Table 7: Unit price index for motor (pumpset)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
7. Motor (Pumpset)
12
LAMPIRAN
APPENDIX
Lampiran A
Appendix A
1.2) Cables in galvanized trunking (per meter run) 1.4353 1.6624 1.5669
(2) Switchgears
2.1) HT Switchgears 1.0183 1.0814 1.1800
2.2) LV Switchboards (Incomer breaker 600A and above) 1.0020 1.2538 1.0160
2.4) TPN & SPN Distribution Boards (Incomer breaker 1.0060 1.0549 1.0930
100A and below)
(3) Transformers
3.2) Low loss hermetically sealed (oil filled) transformer 1.1640 1.2890 1.3390
(4) Generators
13
Lampiran A
Appendix A
14
Lampiran B
Appendix B
Contoh mengira indeks lama Busduct bagi Example for calculating the old index of
bulan Januari 2013 untuk kawasan Busduct for the month of January 2013 for
Semenanjung Malaysia adalah seperti berikut: Peninsular Malaysia is as follows:
j
I lama Januari 2013 = FP (seperti di Old j I for January 2013 = AF (as in
Lampiran A) x j I baru Januari 2013 Appendix A) x new j I for January 2013
iaitu, indeks lama Januari 2013 i.e. old index for January 2013
= 1.6680 x 100.0 = 1.6680 x 100.0
= 166.8000 = 166.8000
= 166.8 = 166.8
di mana, where,
FP = Faktor Pelarasan AF = Adjustment Factor
j j
I = Indeks bagi kategori bangunan j I = Index for building category j
j = 1, ……… 8 j = 1,…..… 8
15
NOTA TEKNIKAL
TECHNICAL NOTES
Technical notes on Component Cost Index
Nota teknikal Indeks Kos Komponen
of the Mechanical and Electrical
Kerja-kerja Mekanikal dan Elektrikal (M&E)
Works (M&E)
(Julai 2012=100)
(July 2012=100)
Indeks Kos Komponen Kerja-kerja Mekanikal The Component Cost Index of the Mechanical
dan Elektrikal (M&E) digunakan dalam and Electrical Works (M&E) is used in Special
Pelaksanaan Syarat Perubahan Harga dalam Provisions to the Conditions of Contract
kontrak-kontrak bangunan kerajaan sahaja. (Variation of Price) in government building
Indeks harga seunit diterbitkan mengikut tiga contracts only. The unit price indices are
(3) kawasan iaitu Semenanjung Malaysia, reported according to three (3) regions, that is
Sabah dan Sarawak. Peninsular Malaysia, Sabah and Sarawak.
Spesifikasi untuk komponen mekanikal dan The specification of the selected mechanical
elektrikal terpilih disediakan oleh Jabatan Kerja and electrical components are determined by
Raya (JKR) dan Lembaga Pembangunan Public Works Department (JKR) and
Industri Pembinaan Malaysia (CIDB). Harga Construction Industry Development Board
bagi komponen elektrikal diperoleh dari Malaysia (CIDB). The prices for electrical
pungutan harga yang dibuat oleh Jabatan components are obtained from the price
Perangkaan Malaysia. Bagi komponen collection conducted by Department of
mekanikal, harga diperoleh dari pembekal. Statistics, Malaysia. For mechanical
components, the prices are obtained from the
suppliers.
Mulai penerbitan Januari 2013, Indeks Kos Starting from January 2013 publication, the
Komponen Kerja-kerja Mekanikal dan Elektrikal Component Cost Index of the Mechanical and
adalah berasaskan kepada tahun asas yang Electrical Works is based on the revised base
ditukar daripada (Disember 2007=100) kepada year which has been changed from
(Julai 2012=100). (December 2007=100) to (July 2012=100).
Bagi kontrak-kontrak yang telah ditandatangani For contracts signed before January 2013,
sebelum Januari 2013, sila lihat ‘Jadual faktor please refer to the ‘Adjustment factor table’
pelarasan’ (Lampiran A) dan ‘Contoh mengira (Appendix A) and the ‘Example for calculating
Indeks Lama Kos Bahan Binaan Bangunan’ the Old Building Materials Cost Index’
(Lampiran B) untuk panduan dalam (Appendix B) for the implementation of the
Pelaksanaan Syarat Perubahan Harga. Bagi Variation of Price. For contracts commencing
kontrak-kontrak mulai Januari 2013 dan January 2013 and thereafter, the new index is
seterusnya, indeks baru hendaklah digunakan to be used without any further adjustment.
terus tanpa sebarang pelarasan.
17
Jadual tarikh pengeluaran Siaran Khas 3 (Untuk Kerja-Kerja Mekanikal
dan Elektrikal), Malaysia, Januari - Disember 2015
Schedule Of Release Dates For Special Release 3 (For Mechanical
And Electrical Works), Malaysia, January - December 2015
18