Professional Documents
Culture Documents
Ater Beg
Ater Beg
6
,
ATTERBERG LIMITS
(SNI 03 - 1967 - 1966) (03 - 3422 - 1994)
Sampel :
Tanggal #REF!
Pekerjaan :
Lokasi UNTAG 17 AGUSTUS 1945 SAMARINDA
BATAS PLASTIS
No. No. Cawan 9 10
1 Berat Cawan (W1) Gr 14.01 9.73
2 Berat Tanah Basah + Cawan (W2) Gr 15.11 10.67
3 Berat Tanah Kering + Cawan (W3) Gr 14.9 10.45
4 Berat Air (W4) = (W2 - W3) Gr 0.21 0.22
5 Berat Tanah Kering (W5) = (W3 - W1) Gr 0.89 0.72
6 Kadar Air (W) = (W4:W5) x 100 % 23.60 30.56
7 Kadar Air Rata - Rata % 27.07553
Kadar Air (%)
80
70
60
50
40
30
20
10
0
Kadar Air (
Grafik Batas Cair
80
70
60
50
30
40
30
20
10
1 10
Jumlah Pukulan
Grafik Batas Cair
25
ERBERG LIMITS
67 - 1966) (03 - 3422 - 1994)
Dihitung : kelompok 2
Dikerjakan : kelompok 2
Diperiksa : MUSRIFAH TOHIR, ST, . MT
43 45 16 41.850
3 4 5 6 43 35.089
9.94 14.49 14.9 14.4 45 36.232
31.16 45.51 42.48 38.63 0 27.695
25.65 37.45 35.14 32.19 50 27.170
5.51 8.06 7.34 6.44
15.71 22.96 20.24 17.79
35.073 35.105 36.265 36.200
35.089 36.232
ik Batas Cair
ik Batas Cair
10 100
25
umlah Pukulan