Dehshar High School

BOQ

A Main School Building


a Civil Works
S.No. Description Quantity Unit Rate (USD) Amount (USD)

All work items shall be carried as per drawing,


specification and instruction of the Engineer.

1 Site Clearance and Preparatory Works:

Clearing and leveling of the total school building site area


(Approximate soil Cutting= 3910.84 Cum & Filling with the
same material with proper compaction =1312.82cum;
including exploding rock if necessary & the school compound
should be levelled as per drawing); dimolshing existing old
1.1 1.00 LS
building of size 114 sqm, including disposing excavated
materials nad debris outside the school compound and if
necessary bringing filling materials from outside. The school
compound should be well cleaned after completion of the
construction works.
2 Sub-Structure Works :

Earthwork in excavation in foundation, trenches etc in all


kinds of soils ramming the bottom, stacking the excavated
materials at least 3.0m clear from the edge of excavation,
2.1 411.82 Cum.
pumping out water and shoring of trenches if necessary and
then backfilling with stacked soil in 150mm layers,watering &
ramming and disposing off all surplush excavated soil.

Providing and laying M20 (1:1.5:3) concrete at base of


2.2 foundation wall footing including the form work & excluding 47.19 Cum.
the steel reinfcement and using vibrator,curing all complete

Providing and laying stone masonry for foundation in 1:4


2.3 324.61 Cum.
cement mortar in perfect line & level and curing all complete

Providing and laying reinforced cement concrete 1:1.5:3


(M20) in Plinth beam in perfect line & level with proper
2.4 compaction using vibrator and curing all complete including 35.73 cum
cost of the form works and excluding the steel
reinforcement.
3 Superstructure Works :

Providing and laying one layer Tar paper with bitumen on


3.1 plinth level under the stone masonry walls for insullation all 169.25 Sqm
complete
Providing and laying stone masonry for walls in 1:4 cement
3.2 426.04 Cum.
mortar in perfect line & level and curing all complete

Providing and laying reinforced cement concrete 1:1.5:3


(M20) in Lintel, Ring beam etc in perfect line & level with
3.3 proper compaction using vibrator and curing all complete 37.31 cum
including cost of the form works and excluding the steel
reinforcement.

Supplying and fixing steel reinforcement (Fe 415) with


3.4 bending placing in position and binding with GI wire including 9.87 Ton
cost of the binding wire
Providing and laying plain cement concrete 1:2:4 on base of I
beams and between of stone wall for straight leveling
3.5 including centering & shuttering work where necessary, in 44.89 Cum.
perfect line & level with proper compaction, curing all
complete.
Providing and fixing wooden door (frame and shutter) with
fixed glass (4mm. Thick) for lighting on top including
3.6 32.50 Sqm.
necessaries best quality fixtures (tower bolts ,lock, hinges
etc) all complete.

Providing and fixing wooden combine door & window (frame


and shutter) including 4mm thick clear glass and mosquito
3.7 20.88 Sqm.
net in window and necessary best quality acessories (tower
bolts, lock, hinges etc.) all complete.

Providing and fixing wooden window (frame and shutter)


including 4mm thick clear glass and mosquito net in window
3.8 71.88 Sqm.
and necessary best quality acessories (tower bolts, lock,
hinges etc.)all complete.

4 Flooring Works :

Providing and filling with soil in 150mm. layers, watering &


4.1 135.72 Cum.
ramming all complete

Providing and filling gravel/sand including watering and


4.2 133.77 Cum.
compacting all complete.

Providing and laying double layer 70mm. & 80mm thick plain
cement concrete 1:2:4 (M15) for internal building and
4.3 110.42 Cum.
100mm thick for outside building in perfect line including
necessary formworks and curing all complete

Providing and laying one layer Bitumen paper with bitumen


4.4 519.31 Sqm
on floor as per drawin all complete

Providing and laying approved color 20mm thick Terazzo tile-


nonskidding in Rooms,corridors & Verandah (cast in situ
terazoo flooring over external staircase) with cement mortar
4.5 623.41 Sqm
base and thickness to match the given floor level of the
building in perfect line and level (minimum base thickness
2cm.) including grinding and polishing all complete.

5 Finishing Work :

20mm or more thick cement plaster in 1:4 cement mortar


5.1 with smooth finish in line & level including raking the joins, 1059.46 Sqm.
wetting the surface and curing all complete on inner walls.

1:3 cement pointing on stone wall including raking the joints


5.2 558.80 Sqm.
and curing all complete in outer wall.

1:3 cement plaster with neat cement finish for blackboard


5.3 10.00 Nos.
including curing all complete.

Providing and fixing wooden frame for blackboard all


5.4 74.00 Rm.
complete

Two or more coats of approved colour water proof plastic


5.5 paint with plaster of paris (gypsam) base giving uniform 1059.46 Sqm.
colour on plastered walls all complete.
Two or more coats of approved colour oil paint with one coat
5.6 of primer on wooden doors and windows and wooden ceiling 823.08 Sqm.
giving uniform color all complete.

6 Roofing Works :

Providing and fixing 24 gauge GI sheet roofing including


necessary wooden structures, ventilation window, wooden
6.1 747.67 Sqm.
board under the projection, nail, screws etc. all complete as
per drawing.

Providing and fixing I Beams 140x70x5mm @ 60cm c/c


6.2 including two or more coats of approved color oil paint over 1030.20 Rm
a coat of red oxide and necessary accessories all complete.

providing and fixing wooden planks 3cm, one layers of Plastic


6.3 sheet (500 Gauge), 15cm thick glass wool on the roof as per 732.67 Sqm.
drawing all complete.

Providing and fixing 100mm dia. GI sheet chimney pipe with


6.4 13.00 Set
cover on roof all complete.

Providing and fixing 15 cmx15 cm drain pipe of 22 gauge GI


6.5 8.00 Rm
sheet for drainage of water from roof all complete.

7 Miscellaneous Items :

Providing and fixing 50 X 25mm profile box baluster,


longitudinal tie of 40 X 20mm profile box and 40mm. (1.5
7.1 inch) diameter mild steel pipe hand rail in ramp including a 13.40 Rm
coat of red oxide paint and two coats of approved colour oil
paint all complete.

Providing and fixing plywood (18mm thick) and wood for


7.2 Projection around the building, including paint etc all 109.50 sqm
complete .

Providing & fixing polystyrene (4x15 cm) and Bitumen (4x6


cm) with 8mm thick aluminium sheet in expansion joints
7.3 6.00 Rm
fixing by screws (one side tight and other side light fix on
groves) for floor all complete.

Providing & fixing folded GI sheet (24 gauge) in expansion


7.4 joints between two vertical wall both internal and external 15.48 Rm
end all complete.

Providing and fixing best quality of plumbing fixtures


including a wash basin,15mm dia GI pipe for water supply,
7.5 1.00 Job
50mm dia PVC pipe for waste water and vent with necessary
fittings as per drawing all complete for laboratory room .

Providing and fixing 500lts capacity metallic overhead water


tank including metallic frame of 3.5m height,10cm. thick
7.6 1.00 Job
polystrene insulation covered and other necessary fittings &
accessories all complete.
Construction of Sewer Manhole (100x100 cm internal size
and height1200 mm.) including Excavation, Backfilling, Brick
7.7 soling, P.C.C. of 1:2:4, GI opening, Plastering & Punning work 1.00 No
and other necessary works as per drawings, specification &
instruction all complete.

Construction of Soakpit (internal diamenter 120 cm and


depth 300 cm.) including Excavation, Backfilling, stone
masonry (60 cm thick) in 1:6 cement mortar, R.C.C. (1:2:4)
cover, gravel (75mm. size) filling inside the pit, sand filling
7.8 1.00 No
outside the pit wall (20cm. thick) and other necessary works
including connectime pipe (110mm. dia. PE/PVC) from the
sewere manhole to soakpit as per drawings, specification &
instruction all complete.
Providing and fixing two row wooden rail (plank of 15cm
width and 2.5cm thick for wall protection) on the 3 sides of
wall of class rooms, upper rail centered at the height of desk
7.9 323.00 Rm
top and lower rail centered at the height of bench top)
including screwing the plank to the wall and varnish painting
all complete .
Providing and filling gravel/sand (15cm thick) including
watering and compacting all arround the plinth protection
7.10' walkway, connection between main entrance to the building, 47.74 Cum.
connection between building to the latrine as per drawing all
complete.

Providing and laying precast concrete block (5x20x100cm)


7.11 around the edge of gravel filling area all complete as per 158.28 Rm
drawing all complete.

Providing and laying of 32 mm PN=10, Length 3300 meter PE


pipe with required fittings for drinking water and irrigation of
school including excavation of trench for pipeline and back
7.12 1.00 LS
filling, one sping box at source of water, one break pressure
tank in between pipeline, ready to use for water supply
purpose
Providing and constructing a stone masonry water reservoir
7.13 in school compond as per drawing, instrcutions of engineer, 1.00 LS
ready to use for water supply purpose
Providing and constructing a stone masonry rain water
drainage (20x20cm in section in required slope including
7.14 excavation, 1:6 masonry, PCC bed 1:2:4 all compelte) in 184.00 RM
school compound as per drawing and instrcutions of
engineer
Sub-Total Civil Works (A) -

b. Electrical Works
S.No. Description Quantity Unit Rate (USD) Amount (USD)

Providing and fixing in position of all work items with all


necessary fittings complete with testing and ready for
operation as per drawing, specifications, manufacturer's
recommendations and Engineer's instructions.

Ceiling and wall fixtures ioncluding cables in PE conduict,


conceal wiring system cable running under wall and RCC
1
structures, switches, junction boxes and other necessary
accessories all complete.

Fluorescent light fixtures with 2x36W (energy efficient


1.1 46.00 Set
fluorescent tubes)

Fluorescent light fixtures with 1x40W (energy efficient


1.2 13.00 Set
fluorescent tubes)
Power socket (switched socket) including cables in PE
2 50.00 Set
conduit, conceal wiring system etc. all complete.

Main switch box (panel board) with 2x16Amp CB+RCBO,


3 1.00 No.
12x20Amp CB+RCBO and 1x40Amp

Distrubution boxes with 1x100Amp MCBs and 2x60Amp Fuse


4 1.00 No.
all complete.

Earthing set with 600 x 600 x 3mm. Cu plate, 8Sq. mm. Cu


5 1.00 No.
wire including 15mm dia PE pipe, salt and coal all complete.

Sub-Total Electrical works(B) -


Total Cost of Main School Building A (a+b) -

B Latrine (6 toilets)
Construction of latrin (6 toilet): excavation and backfilling,
stone masonry work in foundation, Stone work, RCC toilet
slab, vents, plastering, painting, roofing with I -beam covered
1 75.36 Sqm.
with wooden truss and GI sheet, clay, plastic, mud plaster
etc. all complete as per drawing and and instruction of
engineer
Total Cost of Latrine -

C Boundary Wall, Main Gate


Earthwork in excavation in foundation, trenches etc in all
kinds of soils ramming the bottom, stacking the excavated
materials at leas3.0m clear from the edge of
1 excavation,pumping out water and shoring of trenches if 419.35 Cum
necessary and then backfilling with stacked soil in 150mm
layers,watering & ramming and disposing off all surplush
excavated soil.
Providing and laying stone masonry in 1:6 cement mortar in
2 perfect line & level including provision of weep whole in 645.82 Cum
staggered position and curing all complete
Providing and laying reinforced cement concrete 1:1.5:3
(M20) in top of wall and medial of wall in perfect line & level
3 with proper compaction using vibrator and curing all 6.17 Cum
complete including cost of the form works and excluding the
steel reinforcement.
Supplying and fixing steel reinforcement (Fe 415) with
4 bending placing in position and binding with GI wire including 0.98 Ton
cost of the binding wire
Providing and laying plane cement concrete 1:2:4 (M15) on
5 top of wall in perfect line & level and curing all complete 10.82 Cum
including cost of the form works.

1:3 cement pointing on stone wall including raking the joints


6 1013.05 sqm
and curing all complete.

Providing and fixing hand rail over Retaining wall with 20 X


40 mm profile box baluster, longitudinal tie of GI pipe 2 inch
and 40mm. (1.5 inch) diameter mild steel pipe and one side
7 68.58 Rm
with CGI 24 Gauge sheet cover including a coat red oxide
paint and two coats of approved colour oil paint all complete
as per drawing over wall type 4 & 5.

Providing and fixing MS gates (3.5m wide main door and


8 1.2m wide manual door) with RCC columns in perfect line 1.00 LS
and level all complete as per drawing.

Total Cost of Boundary wall, Main Gate -


D Garbage Management

Providing and fixing in position of Garbage managing


equipments with necessary fittings, all complete as per
drawing, specifications and Engineer's instructions.
1 Basket having code 201/240 Lit 1.00 Sets
2 PCC ring of 90cm dia having Garbage Incineration system. 1.00 Sets

Total Cost of Garbage Management -


E Furniture
Providing and fixing in position of all the furnitures with
necessary fittings, painting all complete as per drawing,
specifications and Engineer's instructions.
1 Desk for 2 student (size 110x39x80cm) LxWxH 120.00 Sets
Chair for 2 student for class room ( size 110x39x80cm)
2 120.00 Sets
LxWxH
3 Desk for teacher having one box (size 120x60x77cm) 17.00 Sets
4 Chair for teacher ( size 42x40x45cm) 30.00 Sets
5 Desk for principal two box (size 160x80x77cm) 1.00 Sets
6 Chair for principal (size 55x50x65 cm ) 1.00 Sets
7 Metallic shelve (size30x120x180 cm)/ DxWxH 4.00 Sets
8 Tea/Coffee Table with shelve size as per sample 2.00 Sets
9 Computer table for computer lab room 10.00 Sets
10 A Large size Table for Lab class room (5.0m x 1.7m.) 1.00 Sets
11 Red bar stool (chair) for computer Lab 20.00 Sets
12 Red bar stool (chair) for Lab and Lab class room 40.00 Sets
Total Cost Furniture -

Total Project Cost -