Professional Documents
Culture Documents
MEP Checklist
MEP Checklist
MEP Checklist
Project Architect :
Mechanical Engineer :
Electrical Engineer :
Structural Engineer :
Civil Engineer :
Coordinated
A. Plan Check MECHANICAL AND PLUMBING- Verify that: Yes No N/A BY Date
1. Division 15 floor plans match architectural floor plans . ( )
2. New gas , water , sewer , etc., lines connect to existing ( ) ( ) ( ) ( )
architectural locations.
Roof plan.