Pollution Prevention and Mitigation Measures (P2M2s)

a. Schedule of Phasing, Staging and Sequencing


b. Scheduled Site Meeting
c. Construction Markers
d. Stabilized Construction Entrance
e. Stream/drainage way/waterway/watercourse buffers
f. Perimeter Control
g. Sediment Basin/Trap
h. Runoff Management
i. Temporary or permanent watercourse diversion
j. Temporary or permanent watercourse crossing
k. Temporary or permanent roadways
l. Temporary Stabilization
m. Stockpile Soil Management
n. Spoil Management Area (Disposal Area)
o. Dewatering practices
p. Active Treatment System (ATS)
q. Discharge
r. Corrective Actions
s. Site Inspections
t. Maintenance
u. Standards and Specifications for P2M2s

Best Management Practices (BMPs)

Site Planning and Management

i. Biomass
ii. Preserve Existing Trees & Vegetation
iii. Resource On-Site Rocks
iv. Stockpile Topsoil
v. Salvage Trees (Translocation)
vi. Establish Nursery

Erosion Control

i. Land Grading – Terracing


ii. Soil Roughening
iii. Mulching & Hydromulching
iv. Hydroseeding
v. Turfing
vi. Temporary Cover Geotextile Mat
vii. Temporary fiber net Cover
viii. Seeding
ix. Re-Vegetation
x. Hydromulch-Hydroseed
xi. Rolled Erosion Control Product
Runoff Control

i. Diversion
ii. Check Dam
iii. Dissipator
iv. Pipe Slope Drain
v. Temporary Cut-off Drain
vi. Soil Retention
vii. Flume / Chute
viii. Rolling Dip
ix. Inlet Protection
x. Outlet Protection
xi. Level Spreader
xii. Riprap

Sediment Control

i. Wash Trough and Stabilized Entrance/Exit


ii. Construction Road Stabilization
iii. Brush Barrier
iv. Silt Fence
v. Sediment Basin / Trap
vi. Fiber Rolls / Wattles
vii. ATS – Polymer
viii. Application of FLOC LOG
ix. Turbidity Curtain

General Construction Control

i. Street Cleaning
ii. Water Browser
iii. Secondary Containment System
iv. Sanitation
v. Concrete Washout