ILLUMINATION LEVEL-Boiler # 1 Area

For theQuarter : July - Sept-19


Standard as Standard Unit # 1
As per Odisha
SN LOCATION AREA per IS 3646 as per IFC Illumination
Factories Rule
(lux) (lux) (lux)
1 ID fan A Motor area 0M 100 200 22 52
2 ID fan B Motor area 0M 100 200 22 49
3 ID fan A duct area 0M 100 200 22 33
4 ID fan B duct area 0M 100 200 22 45
5 PA fan A Motor area 0M 100 200 22 53
6 PA fan B Motor area 0M 100 200 22 67
7 PA fan A Oil station area 0M 100 200 65 57.4
8 PA fan B oil station area 0M 100 200 65 53.2
9 FD Fan A Motor area 0M 100 200 22 31.5
10 FD fan A oil station area 0M 100 200 65 41.7
11 FD Fan B Motor area 0M 100 200 22 43.1
12 FD fan B oil station area 0M 100 200 65 74.3
13 SA-A Fan area 0M 100 200 22 57.4
14 SA-B Fan area 0M 100 200 22 43.8
15 Coal Mill-A(Front side) 0M 100 200 65 121
16 Coal Mill-A (Back side) 0M 100 200 65 87.3
17 Coal Mill-B(Front side) 0M 100 200 65 157.8
18 Coal Mill-B(Back side) 0M 100 200 65 101.5
19 Coal Mill-C(Front side) 0M 100 200 65 175
20 Coal Mill-C(Back side) 0M 100 200 65 111
21 Coal Mill-D(Front side) 0M 100 200 65 169
22 Coal Mill-D(Back side) 0M 100 200 65 120
23 Coal Mill-E(Front side) 0M 100 200 65 154
24 Coal Mill-E(Back side) 0M 100 200 65 117
25 Coal Mill-F(Front side) 0M 100 200 65 130
26 Coal Mill-F(Back side) 0M 100 200 65 110
27 Boiler MCC 0M 200-300 500 65 90
28 Coal feeder A(Front side) 13.7 M 100 200 65 45.8
29 Coal feeder B(Front side) 13.7 M 100 200 65 67.2
30 Coal feeder C(Front side) 13.7 M 100 200 65 105.2
31 Coal feeder D(Front side) 13.7 M 100 200 65 98
32 Coal feeder E(Front side) 13.7 M 100 200 65 69.3
33 Coal feeder F(Front side) 13.7 M 100 200 65 67.2
34 Classifier-A 13.7 M 100 200 22 45
35 Coal feeder B 13.7 M 100 200 22 98.2
36 Coal feeder C 13.7 M 100 200 22 70.2
37 Coal feeder D 13.7 M 100 200 22 55
38 Coal feeder E 13.7 M 100 200 22 59
39 Coal feeder F 13.7 M 100 200 22 65
40 0M Front side 50 100 65 85
41 Rear side 50 100 65 87
42 Left Side 50 100 65 101.2
43 Right side 50 100 65 98.6
44 6.9M Front side 50 100 7 22
45 Rear side 50 100 7 21
46 Left Side 50 100 7 18
47 Right side 50 100 7 17
48 13.7 M Front side 100 200 65 110
49 Rear side 100 200 65 76
50 Left Side 100 100 65 110
51 Right side 100 100 65 132
52 22.7 M Front side 50 200 7 87.4
53 Rear side 50 200 7 32
54 Left Side 50 100 7 51
55 Right side 50 100 7 70.3
56 BCW PUMP A 100 200 65 45.2
57 BCW PUMP B 100 200 65 70
58 BCW PUMP C 100 200 65 187.5
59 27.9 M Front side 100 200 65 41.4
60 Rear side 50 20 7 12
61 Left Side 50 20 7 32
62 Right side 50 20 7 32
63 31 M Front side 100 200 65 67.8
64 Rear side 50 20 7 15
65 Left Side 50 20 7 20
66 Right side 50 20 7 35
67 33.8 M Front side 100 200 65 76
68 Rear side 50 20 7 20
69 Left Side 50 20 7 35
70 Right side 50 20 7 21
71 36.9 M Front side 100 200 65 78.5
72 Rear side 100 200 65 70.4
73 Left Side 50 100 7 21
74 Right side 50 100 7 56
75 39.1 M Front side 50 20 7 113.2
76 Rear side 100 200 65 98
77 Left Side 50 100 7 5
78 Right side 50 100 7 113.2
79 41.5 M Front side 50 20 7 32
80 Rear side 50 20 7 35
81 Left Side 50 20 7 23.4
82 Right side 50 20 7 16
83 43.9 M Front side 50 20 7 89.4
84 Rear side 50 20 7 112.6
85 Left Side 50 20 7 54.2
86 Right side 50 20 7 47.3
87 46.6 M Front side 50 20 7 5
88 Rear side 50 20 7 90.5
89 Left Side 50 20 7 30.3
90 Right side 50 20 7 47.3
93 49.9 Left Side 50 20 7 16.2
94 Right side 50 20 7 24.5
95 54 M Front side 50 20 7 3
96 Rear side 50 20 7 21
97 Left Side 50 20 7 21
98 Right side 50 20 7 26
103 58.7 M Front side 100 200 65 75.5
58.7 M
104 Rear side 100 200 65 43
105 Left Side 50 100 7 34.7
106 Right side 50 100 7 25
107 61.7 M Front side 100 200 65 49.3
108 Rear side 100 200 7 33
109 Left Side 50 100 7 54
110 Right side 50 100 7 37
111 65 M Front side 100 200 65 43.5
112 Rear side 100 200 65 89.4
113 Left Side 50 100 7 58
114 Right side 50 100 7 53
115 67.1 M Front side 100 200 65 41.9
116 Rear side 100 200 65 42.9
117 Left Side 50 100 7 21
118 Right side 50 100 7 154
119 72 M Front side 100 200 65 78.4
120 Rear side 100 200 65 77.9
121 Left Side 50 100 7 21
122 Right side 50 100 7 134.7
123 BOILER DRUM HOUSE Left side 100 200 65 87
124 Right side 100 200 65 89
126 Rear side 100 200 65 86
127 Left side 100 200 65 108.5
128 Right side 100 200 65 133.6
Note:
Calibration of Lux Meter: 2111649
Serial No: 2111649
Date of Calibration: 08.02.2019
Due Date of Calibration:08.02.2020

Name & Signature of Safety Officer Name & Signature of Electrician/Engineer


oiler # 1 Area

Action Plan Target Date Responsibility

Exsisting lights to be made ready 10/12/2019 Rakesh Behera


Exsisting lights to be made ready 10/12/2019 Rakesh Behera

Exsisting lights to be made ready 10/12/2019 Rakesh Behera

Exsisting lights to be made ready 10/14/2019 Rakesh Behera


Exsisting lights to be made ready 10/11/2019 Rakesh Behera

Exsisting lights to be made ready 10/19/2019 Rakesh Behera

10/19/2019 Rakesh Behera

Exsisting lights to be made ready 10/19/2019 Rakesh Behera

Exsisting lights to be made ready 10/19/2019 Rakesh Behera

Exsisting lights to be made ready 10/19/2019 Rakesh Behera


Exsisting lights to be made ready 10/19/2019 Rakesh Behera

Exsisting lights to be made ready 10/19/2019 Rakesh Behera

Exsisting lights to be made ready 10/19/2019 Rakesh Behera

Exsisting lights to be made ready 10/19/2019 Rakesh Behera


Exsisting lights to be made ready 10/19/2019 Rakesh Behera
neer
ILLUMINATION LEVEL-Boiler # 2 Area
For theQuarter :July - Sept-19
Standard as Standard As per Odisha Unit # 2
SN LOCATION AREA per IS 3646 as per IFC Factories Rule Illumination
(lux) (lux) (lux)
7 PA fan A Oil station area 0M 100 200 65 55
8 PA fan B oil station area 0M 100 200 65 53
10 FD fan A oil station area 0M 100 200 65 51.2
28 Coal feeder A(Front side) 13.7 M 100 200 65 54
29 Coal feeder B(Front side) 13.7 M 100 200 65 69
33 Coal feeder F(Front side) 13.7 M 100 200 65 69.3
56 BCW PUMP A 100 200 65 45
27.9 M Front
59 43
side 100 200 65
58.7 M Rear
104 48.4
side 100 200 65
61.7 M Front
107 46.3
side 100 200 65
67.1 M Front
115 41.3
side 100 200 65
Rear
116 42.8
side 100 200 65
Rear
126 62.4
side 100 200 65

Note:
Calibration of Lux Meter: 2111649
Serial No: 2111649
Test Date of Calibration: 08.02.2019
Due Date of Calibration: 08.02.2020

Name & Signature of Safety Officer Name & Signature of Electrician/Engineer


-Boiler # 2 Area

Action Plan Target Date Responsibility

Exsisting lights to be made ready 10/21/2019 Rakesh Behera


Exsisting lights to be made ready 10/21/2019 Rakesh Behera
Exsisting lights to be made ready 10/21/2019 Rakesh Behera

Exsisting lights to be made ready 10/23/2019 Rakesh Behera


Exsisting lights to be made ready 10/23/2019 Rakesh Behera
Exsisting lights to be made ready 10/23/2019 Rakesh Behera
Exsisting lights to be made ready 10/26/2019 Rakesh Behera

10/26/2019 Rakesh Behera


Exsisting lights to be made ready
10/26/2019 Rakesh Behera
Exsisting lights to be made ready
10/26/2019 Rakesh Behera
Exsisting lights to be made ready
10/26/2019 Rakesh Behera
Exsisting lights to be made ready
10/26/2019 Rakesh Behera
Exsisting lights to be made ready
10/26/2019 Rakesh Behera
Exsisting lights to be made ready

/Engineer
ILLUMINATION LEVEL-Boiler - Area
For the month :July - Sept-19
Standard as Unit # 3
Standard as As per Odisha
SN LOCATION AREA per IS 3646 Illumination
per IFC (lux) Factories Rule
(lux) (lux)

1 ID fan A Motor area 0M 100 200 22 35


2 ID fan B Motor area 0M 100 200 22 32
3 ID fan A duct area 0M 100 200 22 26.7
4 ID fan B duct area 0M 100 200 22 62.3
5 PA fan A Motor area 0M 100 200 22 55
6 PA fan B Motor area 0M 100 200 22 28.9
7 PA fan A Oil station area 0M 100 200 65 75.2
8 PA fan B oil station area 0M 100 200 65 77.4
9 FD Fan A Motor area 0M 100 200 22 72.3
10 FD fan A oil station area 0M 100 200 65 54.2
11 FD Fan B Motor area 0M 100 200 22 69.2
12 FD fan B oil station area 0M 100 200 65 73.2
13 SA-A Fan area 0M 100 200 22 89.5
14 SA-B Fan area 0M 100 200 22 75.2
15 Coal Mill-A(Front side) 0M 100 200 65 89
16 Coal Mill-A (Back side) 0M 100 200 65 43.2
17 Coal Mill-B(Front side) 0M 100 200 65 51.1
18 Coal Mill-B(Back side) 0M 100 200 65 68.4
19 Coal Mill-C(Front side) 0M 100 200 65 73
20 Coal Mill-C(Back side) 0M 100 200 65 60.2
21 Coal Mill-D(Front side) 0M 100 200 65 79.3
22 Coal Mill-D(Back side) 0M 100 200 65 77
23 Coal Mill-E(Front side) 0M 100 200 65 73
24 Coal Mill-E(Back side) 0M 100 200 65 69
25 Coal Mill-F(Front side) 0M 100 200 65 84
26 Coal Mill-F(Back side) 0M 100 200 65 70.2
27 Boiler MCC 0M 200-300 500 65 89.3
28 Coal feeder A(Front side) 13.7 M 100 200 65 83.2
29 Coal feeder B(Front side) 13.7 M 100 200 65 77.2
30 Coal feeder C(Front side) 13.7 M 100 200 65 75
31 Coal feeder D(Front side) 13.7 M 100 200 65 72
32 Coal feeder E(Front side) 13.7 M 100 200 65 76.8
33 Coal feeder F(Front side) 13.7 M 100 200 65 80
34 Classifier-A 13.7 M 100 200 22 15.6
35 Classifier-B 13.7 M 100 200 22 32
36 Classifier-C 13.7 M 100 200 22 45
37 Classifier-D 13.7 M 100 200 22 33
38 Classifier-E 13.7 M 100 200 22 38
39 Classifier-F 13.7 M 100 200 22 37
40 0M Front side 50 100 65 92.1
41 Rear side 50 100 65 73
42 Left Side 50 100 65 49.2
43 Right side 50 100 65 46
44 6.9M Front side 50 100 7 24
45 Rear side 50 100 7 29
46 Left Side 50 100 7 42
47 Right side 50 100 7 20
48 13.7 M Front side 100 200 65 50.2
49 Rear side 100 200 65 56
50 Left Side 100 100 22 26
51 Right side 100 100 65 55
52 22.7 M Front side 50 200 7 39
53 Rear side 50 200 7 32
54 Left Side 50 100 7 `16
55 Right side 50 100 7 41
56 BCW PUMP A 100 200 65 43.8
57 BCW PUMP B 100 200 65 52
58 BCW PUMP C 100 200 65 46
59 27.9 M Front side 100 200 65 57
60 Rear side 100 200 7 47
61 Left Side 50 100 7 89
62 Right side 50 100 7 13
63 31 M Front side 100 200 65 54
64 Rear side 100 200 7 9.5
65 Left Side 50 100 7 18
66 Right side 50 100 7 18.3
67 33.8 M Front side 100 200 65 52
68 Rear side 100 200 7 19.2
69 Left Side 50 100 7 18
70 Right side 50 100 7 21.5
71 36.9 M Front side 100 200 65 55
72 Rear side 100 200 65 43.8
73 Left Side 50 100 7 13
74 Right side 50 100 7 24.2
75 39.1 M Front side 100 200 7 13
76 Rear side 100 200 65 44.5
77 Left Side 50 100 7 15
78 Right side 50 100 7 11.2
79 41.5 M Front side 100 200 7 12
80 Rear side 100 200 7 11
81 Left Side 50 100 7 15
82 Right side 50 100 7 13
83 43.9 M Front side 100 200 7 21
84 Rear side 100 200 7 23
85 Left Side 50 100 7 17.4
86 Right side 50 100 7 13
87 46.6 M Front side 100 200 7 23
88 Rear side 100 200 7 37
89 Left Side 50 100 7 21
90 Right side 50 100 7 43.8
91 49.9 M Front side 100 200 7 32
92 Rear side 100 200 7 35
93 Left Side 50 100 7 26
94 Right side 50 100 7 28
95 54 M Front side 100 200 7 17
96 Rear side 100 200 7 43
97 Left Side 50 100 65 57
98 Right side 50 100 65 48.9
99 57 M Front side 100 200 7 23
100 Rear side 100 200 7 21
101 Left Side 50 100 65 44.6
102 Right side 50 100 7 15
103 58.7 M Front side 100 200 7 33
104 Rear side 100 200 7 18.2
105 Left Side 50 100 65 52.2
106 Right side 50 100 65 52.4
107 61.7 M Front side 100 200 7 32
108 Rear side 100 200 7 19.3
109 Left Side 50 100 65 52.1
110 Right side 50 100 65 53
111 65 M Front side 100 200 7 23
112 Rear side 100 200 7 47
113 Left Side 50 100 65 98.2
114 Right side 50 100 65 167
115 67.1 M Front side 100 200 7 34
116 Rear side 100 200 7 32
117 Left Side 50 100 65 54.8
118 Right side 50 100 65 59.2
119 72 M Front side 100 200 65 61.2
120 Rear side 100 200 65 61.7
121 Left Side 50 100 65 60.1
122 Right side 50 100 7 54
123 BOILER DRUM HOUSE Left side 100 200 65 82.2
124 Right side 100 200 65 88
125 78 M Front side 100 200 65 49
126 Rear side 100 200 65 77
127 Left dide 100 200 65 43.6
128 Right side 100 200 65 54.2

Note:
Calibration of Lux Meter: 2111649
Serial No: 2111649
Test Date of Calibration: 08.02.2019
Due Date of Calibration: 08.02.2020

Name & Signature of Safety Officer Name & Signature of Electrician/Engineer


oiler - Area
ept-19

Action Plan Target Date

Exsisting lights to be made ready 10/11/2019

Exsisting lights to be made ready 10/11/2019


Exsisting lights to be made ready 10/11/2019

Exsisting lights to be made ready 10/11/2019

Exsisting lights to be made ready 10/11/2019

Exsisting lights to be made ready 9/19/2019

Exsisting lights to be made ready 10/15/2019


Exsisting lights to be made ready 10/15/2019
Exsisting lights to be made ready 10/15/2019
Exsisting lights to be made ready 10/15/2019
Exsisting lights to be made ready 10/15/2019
Exsisting lights to be made ready 10/15/2019

Exsisting lights to be made ready 10/15/2019


Exsisting lights to be made ready 10/15/2019
Exsisting lights to be made ready 10/15/2019
Exsisting lights to be made ready 10/19/2019

Exsisting lights to be made ready 10/19/2019

Exsisting lights to be made ready 10/19/2019

Exsisting lights to be made ready 10/19/2019


Exsisting lights to be made ready 10/19/2019

Exsisting lights to be made ready 10/23/2019


Exsisting lights to be made ready 10/23/2019
Exsisting lights to be made ready 10/23/2019

Exsisting lights to be made ready 10/23/2019


Exsisting lights to be made ready 10/23/2019

Exsisting lights to be made ready 10/23/2019


Exsisting lights to be made ready 10/25/2019

Exsisting lights to be made ready 10/25/2019


Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019

Exsisting lights to be made ready 10/25/2019


Exsisting lights to be made ready 10/25/2019
ILLUMINATION LEVEL-Boiler -4 Area
For the month : July - Sept-19
As per
Standard as Unit # 4
Standard as Odisha
SN LOCATION AREA per IS 3646 Illumination
per IFC (lux) Factories
(lux) (lux)
Rule
10 FD fan A oil station area 0M 100 200 65 57.4
16 Coal Mill-A (Back side) 0M 100 200 65 37
17 Coal Mill-B(Front side) 0M 100 200 65 49.4
34 Classifier-A 13.7 M 100 200 22 18.4
35 Classifier-B 13.7 M 100 200 22 14.2
36 Classifier-C 13.7 M 100 200 22 11
38 Classifier-E 13.7 M 100 200 22 13.6
39 Classifier-F 13.7 M 100 200 22 13.2
42 0M Left Side 50 100 65 43.8
43 Right side 50 100 65 48.9
44 6.9M Front side 50 100 7 14.2
45 Rear side 50 100 7 15
46 Left Side 50 100 7 14.8
47 Right side 50 100 7 18.4
48 13.7 M Front side 100 200 65 51.2
49 Rear side 100 200 65 54
50 Left Side 100 100 22 27.7
51 Right side 100 100 65 47.3
56 BCW PUMP A 100 200 65 43.7
57 BCW PUMP B 100 200 65 47.8
58 BCW PUMP C 100 200 65 43.6
59 27.9 M Front side 100 200 65 58
63 31 M Front side 100 200 65 54.7
67 33.8 M Front side 100 200 65 54
71 36.9 M Front side 100 200 65 52.6
72 Rear side 100 200 65 50
76 39.1 M Rear side 100 200 65 47.8
97 54 M Left Side 50 100 65 52
98 Right side 50 100 65 57
101 57 M Left Side 50 100 65 50.2
105 58.7 M Left Side 50 100 65 44.2
106 Right side 50 100 65 54.2
109 61.7 M Left Side 50 100 65 52.7
110 Right side 50 100 65 54
117 67.1 M Left Side 50 100 65 53.2
118 Right side 50 100 65 54
119 72 M Front side 100 200 65 60.1
120 Rear side 100 200 65 53
121 Left Side 50 100 65 54.7
125 78 M Front side 100 200 65 47
126 Rear side 100 200 65 0.3
127 Left dide 100 200 65 45
128 Right side 100 200 65 54
Note:
Calibration of Lux Meter: 2111649
Serial No: 2111649
Test Date of Calibration: 08.02.2019
Due Date of Calibration: 08.02.2020

Name & Signature of Safety Officer Name & Signature of Electrician/Engineer


oiler -4 Area
Sept-19

Action Plan Target Date

Exsisting lights to be made ready 10/12/2019


Exsisting lights to be made ready 10/12/2019
Exsisting lights to be made ready 10/12/2019
Exsisting lights to be made ready 10/14/2019
Exsisting lights to be made ready 10/14/2019
Exsisting lights to be made ready 10/14/2019
Exsisting lights to be made ready 10/14/2019
Exsisting lights to be made ready 10/14/2019
Exsisting lights to be made ready 10/17/2019
Exsisting lights to be made ready 10/17/2019
Exsisting lights to be made ready 10/17/2019
Exsisting lights to be made ready 10/17/2019
Exsisting lights to be made ready 10/17/2019
Exsisting lights to be made ready 10/17/2019
Exsisting lights to be made ready 10/17/2019
Exsisting lights to be made ready 10/17/2019
Exsisting lights to be made ready 10/17/2019
Exsisting lights to be made ready 10/17/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/21/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019
ILLUMINATION LEVEL-ESP Area
For the month : July - Sept-19

Standard as As per Unit # 1


Standard as
S.NO LOCATION AREA per IS 3646 Odisha Illumination
per IFC (lux) Factories Rule
(lux) (lux)

1 ESP 100 200 65 72


ESP
2 Fabric Filter 100 200 65 10
3 switchgear room 100 200 65 10
ESP control Cable gallery
4 50 20 7 16
building
5 Stairs 50 20 7 21

between ESP control


6 ESP building and ESP 50 20 7 17.5

Standard as Standard as As per Unit # 2


S.NO LOCATION AREA per design per design Odisha Illumination
(lux) (lux) Factories Rule (lux)
ESP 100 200 65 87.4
1 ESP
Fabric Filter 100 200 65 72.6
switchgear room 100 200 65 55.2
ESP control Cable gallery
2 50 20 7 21
building
Stairs 50 20 7 26.5

between ESP control


3 ESP building and ESP 50 20 7 11

Standard as Standard as As per Unit # 3


S.NO LOCATION AREA per design per design Odisha Illumination
(lux) (lux) Factories Rule (lux)
ESP 100 200 65 87.3
1 ESP
Fabric Filter 100 200 65 72.5
switchgear room 100 200 65 69.4
ESP control Cable gallery
2 50 20 7 11
building
Stairs 50 20 7 21

between ESP control


3 ESP 50 20 9.3
building and ESP
7
Standard as Standard as As per Unit # 4
S.NO LOCATION AREA per design per design Odisha Illumination
(lux) (lux) Factories Rule (lux)
ESP 100 200 65 72
1 ESP
Fabric Filter 100 200 65 69
switchgear room 100 200 65 79
ESP control Cable gallery
2 50 20 7 35
building
Stairs 50 20 7 19
between ESP control
3 ESP 50 20 55
building and ESP
7

Note:
Calibration of Lux Meter: 2111649
Serial No: 2111649
Test Date of Calibration: 08.02.2019
Due Date of Calibration: 08.02.2020

Name & Signature of Safety Officer Name & Signature of Electrician/Engineer


EL-ESP Area

Action Plan Target Date

Exsisting lights to be made ready 10/12/2019


Exsisting lights to be made ready 10/13/2019

Action Plan Target Date

Exsisting lights to be made ready 10/15/2019

Action Plan Target Date

Action Plan Target Date


ILLUMINATION LEVEL-AHP Area
For the month : July - Sept-19
As per
Standard as per Standard as per Odisha Lux Reading Unit
SI. No Location/Description IS 3646 (lux) IFC (lux) Factories (# 1 & # 2)
Rule

1 Below Ash settling tank area 100 200 65 43


Dewatering Bin unloading floor
2 100 200 41.7
area 65
Dewatering Bin conveyor floor area
3 50 100 42.5
(el 5M) 65
6 Above ash settling tank area 100 50 22 15.2
7 Terminal sile outer periphery 50 20 7 5.5
10 Fly Ash MCC area 100 200 65 41
11 GEHO pump area shed 100 200 65 45.8
21 Transfer silo area (6 M) 100 50 22 21
23 Below Ash settling tank area 100 200 65 47.2
Dewatering Bin unloading floor
24 100 200 52
area 65
Dewatering Bin conveyor floor area
25 100 200 58
(el 5M) 65
Outer Periphery of ash settling tank
26 100 100 48.2
area 65
27 stair case between settling tank 100 100 65 40.2
28 Above ash settling tank area 100 200 65 41.5
29 Terminal sile outer periphery 100 200 65 42
30 Terminal silo blower area 100 200 65 46
31 Terminal sile staircase 100 100 65 42
32 Fly Ash MCC area 100 200 65 41
33 GEHO pump area shed 100 200 65 49.3

34 Between AHP control room and silo 100 200 51.2


65
38 HCSD Transformer room 100 200 65 41
41 Outer periphery of transfer silo 100 100 65 42
42 Transfer silo area (0 M) 100 200 65 53
43 Transfer silo area (6 M) 100 200 65 42
44 Transfer silo area Top 100 200 65 44

Note:
Calibration of Lux Meter: 2111649
Serial No: 2111649
Test Date of Calibration: 08.02.2019
Due Date of Calibration: 08.02.2020

Name & Signature of Safety Officer Name & Signature of Electrician/Engineer


HP Area

ACTION Plan Target date

Exsisting lights to be made ready 10/13/2019

10/13/2019
Exsisting lights to be made ready
10/13/2019
Exsisting lights to be made ready
Exsisting lights to be made ready 10/13/2019
Exsisting lights to be made ready 10/13/2019
Exsisting lights to be made ready 10/15/2019
Exsisting lights to be made ready 10/15/2019
Exsisting lights to be made ready 10/15/2019
Exsisting lights to be made ready 10/15/2019

10/15/2019
Exsisting lights to be made ready
10/15/2019
Exsisting lights to be made ready
10/18/2019
Exsisting lights to be made ready
Exsisting lights to be made ready 10/18/2019
Exsisting lights to be made ready 10/18/2019
Exsisting lights to be made ready 10/18/2019
Exsisting lights to be made ready 10/18/2019
Exsisting lights to be made ready 10/18/2019
Exsisting lights to be made ready 10/18/2019
Exsisting lights to be made ready 10/18/2019

10/23/2019
Exsisting lights to be made ready
Exsisting lights to be made ready 10/23/2019
Exsisting lights to be made ready 10/23/2019
Exsisting lights to be made ready 10/23/2019
Exsisting lights to be made ready 10/23/2019
Exsisting lights to be made ready 10/23/2019
ILLUMINATION LEVEL-Turbine Area
For the month : July - Sept-19
UNIT # 1.

Standard as Standard as As per Unit #1


Odisha
SN LOCATION per IS 3646 per IFC (lux) Illumination
Factories
(lux) (lux)
Rule
0M
1 Sluice pump 100 200 65 73
2 CCCWP-A 100 200 65 69.4
3 CCCWP-B 100 200 65 75
4 OCC Water A 100 200 65 72.8
5 OCC Water B 100 200 65 77
6 H2 sampling point 100 200 65 80.3
7 N2 filling station 100 200 65 42
8 CO2 filling station 100 200 65 43
9 Electric water stainer 100 200 65 77
10 Evaporating cooling unit- A 100 200 65 82
11 Evaporating cooling unit- B 100 200 65 69
12 Vaccum pump-A 100 200 65 45
13 Vaccum pump-B 100 200 65 53
14 Vaccum pump-C 100 200 65 47
15 Hydrogen dryer Unit 100 200 65 80
16 Seal oil system 100 200 65 69
17 Condenser front side 100 200 65 79
18 Condenser back side 100 200 65 44
19 Condenser de watering pump A 100 200 65 50.4
20 Condenser de watering pump B 100 200 65 54
21 Rubber ball recirculating pump 100 200 65 52
22 Oil transforemer pump area 100 200 65 77
23 Oil purifying device 100 200 65 82
24 Bypass EH oil device Unit 100 200 65 69
25 Oil cooler Unit 100 200 65 68
26 Jacking Oil Pump Unit 100 200 65 69
27 Turbine MCC front side 100 200 65 68
28 Turbine MCC back side 100 200 65 69
29 Mix bed Unit area 100 200 65 44.3
30 fire resistant oil pump 100 200 65 82
31 Stator cooling water Unit 100 200 65 69
32 CPU analizer 100 200 65 68
33 Condenset pump (CEP)-A & B 100 200 65 69
34 TDBFP Booster pump A 100 200 65 68
35 TDBFP Booster pump B 100 200 65 69
36 MDBFP 100 200 65 77
37 LP heater emergency drain valve Unit 100 200 65 72
38 Lubricating cooler of the M-BFP Unit 100 200 65 66
39 CPU regeneration system 100 200 65 72
40 CPU control room 100 200 65 76
41 Maintenance Bay of Unit-1 & 2 100 200 65 74
6.9 M
42 Gland steam vent condensor 100 200 65 69
43 Deaerator water level Unit 100 200 65 68
44 Drainage of main steam piping 100 200 65 69
45 MOT 100 200 65 68
46 Governing valve unit 100 200 65 69
47 IP HP control valve station 100 200 65 44.4
48 CEP recirculation Unit 100 200 65 77
49 LP heater-7 100 200 65 82
50 LP heater-8 100 200 65 69
51 Exciatation transformer R phase Front 100 200 65 68
52 Exciatation transformer R phase Back 100 200 65 69
53 Exciatation transformer Y phase Front 100 200 65 42.5
54 Exciatation transformer Y phase Back 100 200 65 69
55 Exciatation transformer B phase Front 100 200 65 42.7
56 Exciatation transformer B phase Back 100 200 65 72
57 Neutral grounding transformer panel 100 200 65 76
58 LP heater No.6 100 200 65 74
59 IP feed water piping 1 100 200 65 75
60 IP feed water piping 2 100 200 65 79.4
61 No 5 LP heater 100 200 65 73.8
62 Auxillary steam header Unit 100 200 65 42.6
63 6th extraction steam pneumatic drain valve area 100 200 65 77
64 Between butter fly valve A & B 100 200 65 82
13.7 M
65 Generator area 200 200 65 90
66 Turbine area 200 200 65 97
67 4th steam extraction piping 200 200 65 88
68 LP feed water turbine 200 200 65 87
69 seal oil tank smoke extractor fan 200 200 65 92
70 NO 1 HP heater 200 200 65 92
71 NO 2 HP heater 200 200 65 92
72 NO 3 hp heater 200 200 65 87
73 TD FWP-A 200 200 65 69
74 TD FWP-B 200 200 65 82
75 Deaerator floor 200 200 65 76
UNIT-2
As per
Standard as Standard as Unit #2
Odisha
0M LOCATION per IS 3646 per IFC (lux) Factories Illumination
(lux) (lux)
Rule
1 Sluice pump 100 200 65 76
2 CCCWP-A 100 200 65 74
3 CCCWP-B 100 200 65 75
4 OCC Water A 100 200 65 79.8
5 OCC Water B 100 200 65 73.3
6 H2 sampling point 100 200 65 81.3
7 N2 filling station 100 200 65 41
8 CO2 filling station 100 200 65 43
9 Electric water stainer 100 200 65 87
10 Evaporating cooling unit- A 100 200 65 68
11 Evaporating cooling unit- B 100 200 65 74
12 Vaccum pump-A 100 200 65 42
13 Vaccum pump-B 100 200 65 87
14 Vaccum pump-C 100 200 65 43
15 Hydrogen dryer Unit 100 200 65 69
16 Seal oil system 100 200 65 82
17 Condenser front side 100 200 65 76
18 Condenser back side 100 200 65 42.1
19 Condenser de watering pump A 100 200 65 45
20 Condenser de watering pump B 100 200 65 48
21 Rubber ball recirculating pump 100 200 65 43
22 Oil transforemer pump area 100 200 65 80
23 Oil purifying device 100 200 65 69
24 Bypass EH oil device Unit 100 200 65 68
25 Oil cooler Unit 100 200 65 69
26 Jacking Oil Pump Unit 100 200 65 88
27 Turbine MCC front side 100 200 65 69
28 Turbine MCC back side 100 200 65 66
29 Mix bed Unit area 100 200 65 41.5
30 fire resistant oil pump 100 200 65 68
31 Stator cooling water Unit 100 200 65 75
32 CPU analizer 100 200 65 87
33 Condenset pump (CEP)-A & B 100 200 65 70
34 TDBFP Booster pump A 100 200 65 78
35 TDBFP Booster pump B 100 200 65 73
36 MDBFP 100 200 65 77
37 LP heater emergency drain valve Unit 100 200 65 98
38 Lubricating cooler of the M-BFP Unit 100 200 65 101.2
39 CPU regeneration system 100 200 65 66
40 CPU control room 100 200 65 72
41 Maintenance Bay of Unit-1 & 2 100 200 65 83
6.9 M
42 Gland steam vent condensor 100 200 65 77
43 Deaerator water level Unit 100 200 65 82
44 Drainage of main steam piping 100 200 65 69
45 MOT 100 200 65 68
46 Governing valve unit 100 200 65 42
47 IP HP control valve station 100 200 65 73
48 CEP recirculation Unit 100 200 65 77
49 LP heater-7 100 200 65 98
50 LP heater-8 100 200 65 88
51 Exciatation transformer R phase Front 100 200 65 40.3
52 Exciatation transformer R phase Back 100 200 65 68
53 Exciatation transformer Y phase Front 100 200 65 48
54 Exciatation transformer Y phase Back 100 200 65 75
55 Exciatation transformer B phase Front 100 200 65 46
56 Exciatation transformer B phase Back 100 200 65 76
57 Neutral grounding transformer panel 100 200 65 69.4
58 LP heater No.6 100 200 65 75
59 IP feed water piping 1 100 200 65 75
60 IP feed water piping 2 100 200 65 85
61 No 5 LP heater 100 200 65 89.4
62 Auxillary steam header Unit 100 200 65 40.5
63 6th extraction steam pneumatic drain valve area 100 200 65 87
64 Between butter fly valve A & B 100 200 65 72
13.7 M
65 Generator area 200 200 65 68
66 Turbine area 200 200 65 75
67 4th steam extraction piping 200 200 65 87
68 LP feed water turbine 200 200 65 70
69 seal oil tank smoke extractor fan 200 200 65 78
70 NO 1 HP heater 200 200 65 43
71 NO 2 HP heater 200 200 65 41
72 NO 3 hp heater 200 200 65 98
73 TD FWP-A 200 200 65 98
74 TD FWP-B 200 200 65 66
75 Deaerator floor 200 200 65 72
UNIT-3
As per
Standard as Standard as Unit #3
Odisha
0M LOCATION per IS 3646 per IFC (lux) Factories Illumination
(lux) (lux)
Rule
1 Sluice pump 100 200 65 82
2 CCCWP-A 100 200 65 69
3 CCCWP-B 100 200 65 68
4 OCC Water A 100 200 65 69
5 OCC Water B 100 200 65 68
6 H2 sampling point 100 200 65 69
7 N2 filling station 100 200 65 42
8 CO2 filling station 100 200 65 46
9 Electric water stainer 100 200 65 66
10 Evaporating cooling unit- A 100 200 65 72
11 Evaporating cooling unit- B 100 200 65 76
12 Vaccum pump-A 100 200 65 41.2
13 Vaccum pump-B 100 200 65 73
14 Vaccum pump-C 100 200 65 42
15 Hydrogen dryer Unit 100 200 65 66
16 Seal oil system 100 200 65 68
17 Condenser front side 100 200 65 70
18 Condenser back side 100 200 65 42
19 Condenser de watering pump A 100 200 65 45
20 Condenser de watering pump B 100 200 65 43
21 Rubber ball recirculating pump 100 200 65 40.4
22 Oil transforemer pump area 100 200 65 87
23 Oil purifying device 100 200 65 70
24 Bypass EH oil device Unit 100 200 65 78
25 Oil cooler Unit 100 200 65 73
26 Jacking Oil Pump Unit 100 200 65 77
27 Turbine MCC front side 100 200 65 98
28 Turbine MCC back side 100 200 65 86
29 Mix bed Unit area 100 200 65 46
30 fire resistant oil pump 100 200 65 69
31 Stator cooling water Unit 100 200 65 68
32 CPU analizer 100 200 65 69
33 Condenset pump (CEP)-A & B 100 200 65 68
34 TDBFP Booster pump A 100 200 65 69
35 TDBFP Booster pump B 100 200 65 77
36 MDBFP 100 200 65 72
37 LP heater emergency drain valve Unit 100 200 65 66
38 Lubricating cooler of the M-BFP Unit 100 200 65 72
39 CPU regeneration system 100 200 65 76
40 CPU control room 100 200 65 74
41 Maintenance Bay of Unit-1 & 2 100 200 65 85
6.9 M
42 Gland steam vent condensor 100 200 65 69
43 Deaerator water level Unit 100 200 65 68
44 Drainage of main steam piping 100 200 65 69
45 MOT 100 200 65 68
46 Governing valve unit 100 200 65 41.8
47 IP HP control valve station 100 200 65 75
48 CEP recirculation Unit 100 200 65 73
49 LP heater-7 100 200 65 69
50 LP heater-8 100 200 65 87
51 Exciatation transformer R phase Front 100 200 65 43.2
52 Exciatation transformer R phase Back 100 200 65 69
53 Exciatation transformer Y phase Front 100 200 65 44
54 Exciatation transformer Y phase Back 100 200 65 73
55 Exciatation transformer B phase Front 100 200 65 44
56 Exciatation transformer B phase Back 100 200 65 87
57 Neutral grounding transformer panel 100 200 65 68
58 LP heater No.6 100 200 65 75
59 IP feed water piping 1 100 200 65 87
60 IP feed water piping 2 100 200 65 70
61 No 5 LP heater 100 200 65 78
62 Auxillary steam header Unit 100 200 65 43
63 6th extraction steam pneumatic drain valve area 100 200 65 77
64 Between butter fly valve A & B 100 200 65 98
13.7 M
65 Generator area 200 200 65 80
66 Turbine area 200 200 65 69
67 4th steam extraction piping 200 200 65 68
68 LP feed water turbine 200 200 65 69
69 seal oil tank smoke extractor fan 200 200 65 88
70 NO 1 HP heater 200 200 65 44
71 NO 2 HP heater 200 200 65 40.5
72 NO 3 hp heater 200 200 65 66
73 TD FWP-A 200 200 65 72
74 TD FWP-B 200 200 65 76
75 Deaerator floor 200 200 65 74
UNIT-4
As per
Standard as Standard as Unit #4
Odisha
0M LOCATION per IS 3646 per IFC (lux) Factories Illumination
(lux) (lux)
Rule
1 Sluice pump 100 200 65 70
2 CCCWP-A 100 200 65 78
3 CCCWP-B 100 200 65 73
4 OCC Water A 100 200 65 77
5 OCC Water B 100 200 65 98
6 H2 sampling point 100 200 65 103
7 N2 filling station 100 200 65 46
8 CO2 filling station 100 200 65 53
9 Electric water stainer 100 200 65 83
10 Evaporating cooling unit- A 100 200 65 68
11 Evaporating cooling unit- B 100 200 65 76
12 Vaccum pump-A 100 200 65 43
13 Vaccum pump-B 100 200 65 75
14 Vaccum pump-C 100 200 65 45
15 Hydrogen dryer Unit 100 200 65 87
16 Seal oil system 100 200 65 67
17 Condenser front side 100 200 65 75
18 Condenser back side 100 200 65 41
19 Condenser de watering pump A 100 200 65 43
20 Condenser de watering pump B 100 200 65 42
21 Rubber ball recirculating pump 100 200 65 45
22 Oil transforemer pump area 100 200 65 87
23 Oil purifying device 100 200 65 79
24 Bypass EH oil device Unit 100 200 65 84
25 Oil cooler Unit 100 200 65 88
26 Jacking Oil Pump Unit 100 200 65 83
27 Turbine MCC front side 100 200 65 68
28 Turbine MCC back side 100 200 65 76
29 Mix bed Unit area 100 200 65 43.4
30 fire resistant oil pump 100 200 65 69
31 Stator cooling water Unit 100 200 65 68
32 CPU analizer 100 200 65 69
33 Condenset pump (CEP)-A & B 100 200 65 68
34 TDBFP Booster pump A 100 200 65 69
35 TDBFP Booster pump B 100 200 65 77
36 MDBFP 100 200 65 72
37 LP heater emergency drain valve Unit 100 200 65 66
38 Lubricating cooler of the M-BFP Unit 100 200 65 72
39 CPU regeneration system 100 200 65 76
40 CPU control room 100 200 65 74
41 Maintenance Bay of Unit-1 & 2 100 200 65 85
6.9 M
42 Gland steam vent condensor 100 200 65 80
43 Deaerator water level Unit 100 200 65 69
44 Drainage of main steam piping 100 200 65 68
45 MOT 100 200 65 69
46 Governing valve unit 100 200 65 48
47 IP HP control valve station 100 200 65 69
48 CEP recirculation Unit 100 200 65 66
49 LP heater-7 100 200 65 69
50 LP heater-8 100 200 65 75
51 Exciatation transformer R phase Front 100 200 65 44
52 Exciatation transformer R phase Back 100 200 65 78
53 Exciatation transformer Y phase Front 100 200 65 46
54 Exciatation transformer Y phase Back 100 200 65 77
55 Exciatation transformer B phase Front 100 200 65 42
56 Exciatation transformer B phase Back 100 200 65 69
57 Neutral grounding transformer panel 100 200 65 68
58 LP heater No.6 100 200 65 69
59 IP feed water piping 1 100 200 65 77
60 IP feed water piping 2 100 200 65 72
61 No 5 LP heater 100 200 65 66
62 Auxillary steam header Unit 100 200 65 43.6
63 6th extraction steam pneumatic drain valve area 100 200 65 76
64 Between butter fly valve A & B 100 200 65 74
13.7 M
65 Generator area 200 200 65 87
66 Turbine area 200 200 65 75
67 4th steam extraction piping 200 200 65 69
68 LP feed water turbine 200 200 65 87
69 seal oil tank smoke extractor fan 200 200 65 77
70 NO 1 HP heater 200 200 65 42
71 NO 2 HP heater 200 200 65 41.4
72 NO 3 hp heater 200 200 65 75
73 TD FWP-A 200 200 65 86
74 TD FWP-B 200 200 65 75
75 Deaerator floor 200 200 65 41.2

Note:
Calibration of Lux Meter: 2111649
Serial No: 2111649
Test Date of Calibration: 08.02.2019
Due Date of Calibration: 08.02.2020

Name & Signature of Safety Officer Name & Signature of Electrician/Engineer


ne Area
-19

Action Plan Target

Exsisting lights to be made ready 10/13/2019


Exsisting lights to be made ready 10/13/2019

Exsisting lights to be made ready 10/13/2019


Exsisting lights to be made ready 10/13/2019
Exsisting lights to be made ready 10/13/2019

Exsisting lights to be made ready 10/13/2019


Exsisting lights to be made ready 10/13/2019
Exsisting lights to be made ready 10/13/2019
Exsisting lights to be made ready 10/13/2019

Exsisting lights to be made ready 10/13/2019


Exsisting lights to be made ready 10/16/2019

Exsisting lights to be made ready 10/16/2019

Exsisting lights to be made ready 10/16/2019

Action Plan Target

Exsisting lights to be made ready 10/14/2019


Exsisting lights to be made ready 10/14/2019

Exsisting lights to be made ready 10/14/2019

Exsisting lights to be made ready 10/14/2019


Exsisting lights to be made ready 10/14/2019
Exsisting lights to be made ready 10/14/2019
Exsisting lights to be made ready 10/14/2019
Exsisting lights to be made ready 10/14/2019

Exsisting lights to be made ready 10/14/2019

Exsisting lights to be made ready 10/17/2019

Exsisting lights to be made ready 10/17/2019

Exsisting lights to be made ready 10/17/2019

Exsisting lights to be made ready 10/17/2019

Exsisting lights to be made ready 10/17/2019


Exsisting lights to be made ready 10/19/2019
Exsisting lights to be made ready 10/19/2019

Action Plan Target

Exsisting lights to be made ready 10/13/2019


Exsisting lights to be made ready 10/13/2019

Exsisting lights to be made ready 10/13/2019

Exsisting lights to be made ready 10/13/2019

Exsisting lights to be made ready 10/13/2019


Exsisting lights to be made ready 10/13/2019
Exsisting lights to be made ready 10/13/2019
Exsisting lights to be made ready 10/13/2019

Exsisting lights to be made ready 10/13/2019


Exsisting lights to be made ready 10/17/2019

Exsisting lights to be made ready 10/17/2019

Exsisting lights to be made ready 10/17/2019

Exsisting lights to be made ready 10/17/2019

Exsisting lights to be made ready 10/17/2019

Exsisting lights to be made ready 10/17/2019


Exsisting lights to be made ready 10/17/2019

Action Plan Target

Exsisting lights to be made ready 10/22/2019


Exsisting lights to be made ready 10/22/2019
Exsisting lights to be made ready 10/22/2019

Exsisting lights to be made ready 10/22/2019

Exsisting lights to be made ready 10/22/2019


Exsisting lights to be made ready 10/22/2019
Exsisting lights to be made ready 10/22/2019
Exsisting lights to be made ready 10/22/2019
Exsisting lights to be made ready 10/22/2019

Exsisting lights to be made ready 10/24/2019

Exsisting lights to be made ready 10/24/2019

Exsisting lights to be made ready 10/24/2019

Exsisting lights to be made ready 10/24/2019

Exsisting lights to be made ready 10/24/2019


Exsisting lights to be made ready 10/25/2019
Exsisting lights to be made ready 10/25/2019

Exsisting lights to be made ready 10/25/2019


COMMON AREA ILLUMINATION LEVEL
For the month : July - Sept-19
As per ILLUMINATIO
Standard Standard Odisha
S.N LOCATION AREA as per IS as per IFC Factories N LEVEL
3646 (lux) (lux) (IN lUX)
Rule
1 Compressor House- Ground Floor 100 100 65 43
2 Ph-1 First Floor 100 100 65 41
3 Compressor House- Ground Floor 100 100 65 45
4 Ph-2 First Floor 100 100 65 53.6
13 Tank area 100 100 65 40.5
15 Pump house 100 100 65 49
16 Stabilizer dosing room 200-300 500 65 67
DM Plant
22 DM water storage tank area 100 100 65 47
Chemical loading unloading
23 50 50 65 67
front area

Note:
Calibration of Lux Meter: 2111649
Serial No: 2111649
Test Date of Calibration: 08.02.2019
Due Date of Calibration: 08.02.2020

Name & Signature of Safety Officer Name & Signature of Electrician/Engineer


ON LEVEL

Action Plan Target Responsibility

Exsisting lights to be made ready 10/20/2019 Rakesh Behera


Exsisting lights to be made ready 10/20/2019 Rakesh Behera
Exsisting lights to be made ready 10/23/2019 Rajib Behera
Exsisting lights to be made ready 10/23/2019 Rajib Behera
Exsisting lights to be made ready 10/15/2019 S. Chattaraj
Exsisting lights to be made ready 10/15/2019 S. Chattaraj
Exsisting lights to be made ready 10/15/2019 S. Chattaraj
Exsisting lights to be made ready 10/15/2019 S. Chattaraj

Exsisting lights to be made ready 10/15/2019 S. Chattaraj