Chainage Size of Culvert Catchment Area

The distance The fall in


Hill Road from the level from
Sl. Culvert critical point the critical
No No Segmen Progressiv Width Height Area to the point to the
t e (m) (m) Lengt Widt Lengt Widt Area
(Hect. structure in structure in
h (m) h (m) h (m) h (m) (Hect.)
) km m
Chainage Size of Culvert Catchment Area
The distance The fall in
Hill Road from the level from
Sl. Culvert critical point the critical
No No Segmen Progressiv Width Height Area to the point to the
t e (m) (m) Lengt Widt Lengt Widt Area
(Hect. structure in structure in
h (m) h (m) h (m) h (m) (Hect.)
) km m
30 SEPTEMBER 2019

1. LISTED CHAINAGE OF REMAINING 70 CULVERTS OF MIZORAM PACKAGE 6.


2. GEO TAGGING OF 173 CULVERTS OF MIZORAM PACKAGE 8.
3. PLOTTING OF CATCHMENT AREA OF 130 CULVERTS IN GOOGLE EARTH.
4. TAKEN THE VALUES OF CATCHMENT AREA (LENGTH WIDTH AND ROAD LENGTH FROM GOOGLE EARTH) OF 100 CULVERTS.
5. LISTED CHAINAGES OF CULVERTS 120 OUT OF 160 OF MIZORAM PACKAGE 8.

01 & 02 October 2019

1. Plotted catchment area of remaining 46 culverts of Mizoram package 8 in google earth.


2. Taken the values of catchment area of remaining 76 culverts of Mizoram package 8
3. Data entry completed for 176 culverts
4. Hydrology is completed with 4 culverts unsafe
5. Loha MNB 71+200 hydrology done
6. Submitted LOHA MNB 88+937 hydrology
7. Listed Encumbrance list of trees of Mizoram package 3 for 16 KM
8. Prepared BARAKU MAKARU DESIGN FILES FOR SUBMISSION
9. Compared survey chainages of culverts with DPR data for schedule B of Mizoram package 6