BOG Report
BOG Report
Case C/D Line CAPC Unloading Circulation Flow Rate BOG Cal. Flow Rate BOG Act.
1 x x x x 750 750
2 o x x x 1112 991
3 o o x x 2060 1954
4 o o o x 2102 -
5 o o o o 2236 -
6 x o o o 2236 2227
7 x x o o 1288 ?
8 x x x o 884 937
9 x o x x 1698 1513
10 x x o x 1154 1235
11 x o o x 2102 2093
12 o x x o 1246 ?
13 o x o o 1288 -
14 o o x o 2194 ?
15 o x o x 1235 -
16 x o x o 1832 ?
Prandl Number
Pr = 0.71
Reynold Number
Pump Rundown Line
r0 = 0.3258 m
ri = 0.0508 m
Re4 = 463280.0
ho4 = 15.4 W/m2.K
QL = 11923.2 W
Nu = 8.9
BOG(L) = 95.0 kg/h
Heat Ingress from pump
Pump rate out
V = 13.6 m3/h
= 7685.0 kg/h
Qp = 9544.0 W
BOG(P) = 72.4 kg/h
BOG rate from pumping
BOG = 167.5 kg/h
BOG = 134.0 Nm3/h
Case Power Failure
P1 710 mmH2O
P2 855 mmH2O
Q 1130 Nm3/h
t 12 h
ID 30 m
L 27 m
V 19085.175 m3
Vpor Vol 12405.364 m3
T -102 degC
171 K
n 2213.6131 mol
49.584934 Nm3/h
Theoretical Calculation
Case CO-2103 50% 750 Nm3/h
CO-2101 100% 995 Nm3/h
BOG recovered 1745 Nm3/h
Theoretical Generation
Assume:
No Unloading
CAPC 15 tph
Minimum flow PU-2101 open
BOG Gen 2316 Nm3/h
BOG unrecovered 571 Nm3/h
P1 710 mmH2O
P2 855 mmH2O
FI21050.PV 1130 Nm3/h
t 12 h
ID 30 m
L 27 m
V 19085.175 m3
Vpor Vol 12405.364 m3
T -102 degC
171 K
n 2213.6131 mol
49.584934 Nm3/h
Case A B C D
1 x x x x
2 o x x x
3 o o x x
4 o o o x
5 o o o o
6 x o o o
7 x x o o
8 x x x o
9 x o x x
10 x x o x
11 x o o x
12 o x x o
13 o x o o
14 o o x o
15 o x o x
16 x o x o
x No
o Yes
UNLOADING +
CAPC CAPC ONLY
CIRCULATION
ONLY
C/D ONLY
CO-2101 and CO-2102 Test Run Result
1. Background
Ethylene liquefaction system is an integral part of storage ethylene boil off gas (BOG) recovery. Ethylene is
compressed by CO-2101 and liquified by utilizing CO-2102 refrigerant R-22 system. In order to perform
adequacy check of the liquefaction capacity, CO-2101 and CO-2102 performance should be evaluated. Since
both compressors had been recently overhauled, actual test run of the system will show the amount of BOG
generation rate compared with the compression flow rate. This comparison shall conclude the actual BOG
liquefaction capacity and the verified BOG generation rate calculation for future Ethylene storage BOG
treatment consideration.
3. Method
4. Result
4.1 Compressor Test Result
CO-2101 CO-2102
1st Stage 2nd Stage 1st Stage 2nd Stage
Pin Pout Tin Tout Pin Pout Tin Tout Pin Tin Pin Pout Tin Tout
kg/cm2.G degC kg/cm2.G degC kg/cm2.G degC kg/cm2.G degC
25-09-2017
0.079 3.6 32 127 3.6 20.2 37 126 0.5 -19 1.2 17 40 56
0.079 3.6 32 113.6 3.6 20.2 37 110.7
07-10-2017 (after HE-2104 cleaning)
0.077 3.5 40 137 3.5 17.6 38 125 0.05 -32 0.8 13.2 - 50
0.077 3.5 40 122.4 3.5 17.6 38 103.8
Theorietical calculation
Actual Data
Appendix-A. Heat Duty Calculation of C2H4 Liquefaction System
4.2.2 Second Test Run (07-10-2017) after HE-2104 Refrigerant condenser cleaning at sea water side