Emer PR-Status
Emer PR-Status
Emer PR-Status
113 3 Sabari 0
Relea Item of Final
Purchase Requisition Changed TODAY
se Plant requisitio Release Material
Requisition Date On Date
State n date
113 2 Sabari 0
Relea Item of Final
Purchase Requisition Changed TODAY
se Plant requisitio Release Material
Requisition Date On Date
State n date
Already 3 Qty
has ordered
113 5 KRJ 3 and remaining
will be close by
user in PR
113 1 Sabari 0
TSMPL - Pending Emergency PR on 09.11.20
Store Final Released
Sl.No. Indent No. Date Particulars Qty U/M Req For
Stock Date
nsn EMPR/0251/19-20 11/08/2019 Seat GP operator-1807306 2 No D11R-02 & 05 8/14/2019
EMPR/0258/19-20 20/08/2019 DG25KVA Ball Valve 05040319 2 No DG 25 KVA 8/24/2019
23/08/2019 Travel Device VOE14681190 2 No EC 750 DL
EMPR/0260/19-20 8/26/2019
23/08/2019 Swing Device VOE14647335 2 No EC 750 DL
4/09/2019 Ball 4199643 1 No ZX 450-02
EMPR/0279/19-20 9/6/2019
4/09/2019 Ball Support 4128130 74 No ZX 450-02
ACY 2/09/2019 O Ring- 4443632 4 No ZX 870-01
2/09/2019 Coupling 3040803 2 No ZX 650-11
2/09/2019 Gear 2045794 2 No ZX 650-11
2/09/2019 Gear 2045793 1 No ZX 650-11
EMPR/0276/19-20 2/09/2019 Gear-2052160 2 No ZX 870-01 9/5/2019
2/09/2019 Gear 2052159 1 No ZX 870-01
2/09/2019 Oils Seal-4641671 2 No 2 ZX 870H-& ZX 650-11
2/09/2019 O Ring-4218005 5 No 1 ZX 650-11
2/09/2019 PTO O ring 4637148 3 No 5 All ZX 870H & ZX 650H
EMPR/0282/19-20 4/09/2019 Door lock 4642477 1 No ZX 650-11 9/5/2019
20KL
EMPR/0267/19-20 31/08/2019 INTERMEDIATE SHAFT 1 No 9/6/2019
(Ashok Leyland)
8/09/2019 4270421260 cover 1 No WD600
EMPR/0292/19-20 9/14/2019
8/09/2019 4270421270 Chain 1 No WD600
20KL
EMPR/0267/19-20 31/08/2019 INTERMEDIATE SHAFT 1 No 9/15/2019
(Ashok Leyland)
SANDVIK DRILL
lip EMPR/0323/19-20 25/09/2019 Display 56029525 1 No 10/3/2019
LEOPARD DI 550 (1)
All mid range
equipments / Hire
EMPR/0313/19-20 03-10-2019 BB Mirror RH A4008100702 20 No 4 10/20/2019
Equipments ( Crawler
Section )
All mid range
equipments / Hire
EMPR/0313/19-20 03-10-2019 BB Mirror LH - A4008110533 20 No 3 10/20/2019
Equipments ( Crawler
Section )
CMA EMPR/0339/19-20 9/10/2019 DG Engine Valve Cover 4006216 1 No 750 Kva DG 10/20/2019
D155-12 &
EMPR/0358/19-20 18-10-2019 Spring ND0921240010 4 No
D275A-01
D155-12 &
EMPR/0358/19-20 18-10-2019 Valve ND0921210011 4 No
D275A-01
D155-12 &
EMPR/0358/19-20 18-10-2019 Fuel priming ND0921300360 2 No
D275A-01
cma EMPR/0345/19-20 10/12/2019 Atlas Copco DG oil service kit -4153136757 4 No Atlascopco DG
Komatsu Dozer
sjn EMPR/0348/19-20 14/10/2019 Hose - 17A0341641 1 No
D155A6
Komatsu Dozer
EMPR/0348/19-20 14/10/2019 Hose - 17A0341771 1 No
D155A6
Komatsu Dozer
EMPR/0348/19-20 14/10/2019 Hose -2090341711 1 No
D155A6
Komatsu Dozer
EMPR/0348/19-20 14/10/2019 Hose-0948310312 1 No
D155A6
Komatsu Dozer
EMPR/0348/19-20 14/10/2019 Hose-17A0341612 1 No
D155A6
Komatsu Dozer
EMPR/0348/19-20 14/10/2019 Hose-17A0371731 1 No
D155A6
Komatsu Dozer
EMPR/0348/19-20 14/10/2019 Clamp-0728900035 2 No
D155A6
Komatsu Dozer
EMPR/0348/19-20 14/10/2019 Tube-17A0341930 1 No
D155A6
ZX870H/ZX650H/ZX47
sjn EMPR/0372/19-20 30/10/2019 Lube Oil Filter 4696643/4658521RCP 20 No 10/11/2019
0H/ZX450H
ZX870H/ZX650H/ZX47
EMPR/0372/19-20 30/10/2019 Fuel Filter 4326739/4078360 5 No 10/11/2019
0H/ZX450H
10KVA mahindra
EMPR/0372/19-20 30/10/2019 Lube Oil Filter-PI530500/F002H23439 5 No 10/11/2019
DG/Bolero
Power Transmitting System 114 26/08/2019 15/11/2019 81 need to soure used one
Power Transmitting System 114 26/08/2019 15/11/2019 81 need to soure used one
EQPT.& STR. 122 6/09/2019 15/11/2019 70 Local and Overseas vendor regret to quote. Clarification on process.
Compariosn approval received rom User end. But considering the high value
Power Take Off (PTO) 114 5/09/2019 15/11/2019 71
for Gear Items we are in process to develop the gears locally based on sample
Compariosn approval received rom User end. But considering the high value
Power Take Off (PTO) 114 5/09/2019 15/11/2019 71
for Gear Items we are in process to develop the gears locally based on sample
Compariosn approval received rom User end. But considering the high value
Power Take Off (PTO) 114 5/09/2019 15/11/2019 71
for Gear Items we are in process to develop the gears locally based on sample
Compariosn approval received rom User end. But considering the high value
Power Take Off (PTO) 114 5/09/2019 15/11/2019 71
for Gear Items we are in process to develop the gears locally based on sample
Compariosn approval received rom User end. But considering the high value
Power Take Off (PTO) 114 5/09/2019 15/11/2019 71
for Gear Items we are in process to develop the gears locally based on sample
Compariosn approval received rom User end. But considering the high value
Power Take Off (PTO) 114 5/09/2019 15/11/2019 71
for Gear Items we are in process to develop the gears locally based on sample
Compariosn approval received rom User end. But considering the high value
Power Take Off (PTO) 114 5/09/2019 15/11/2019 71
for Gear Items we are in process to develop the gears locally based on sample
Compariosn approval received rom User end. But considering the high value
Power Take Off (PTO) 114 5/09/2019 15/11/2019 71
for Gear Items we are in process to develop the gears locally based on sample
Compariosn approval received rom User end. But considering the high value
Power Take Off (PTO) 114 5/09/2019 15/11/2019 71
for Gear Items we are in process to develop the gears locally based on sample
Cabin & Accessories 122 5/09/2019 15/11/2019 71 Awaiting for Local supplier quote.
Clarification ig going on with gainwell. As per user dept the said part no is fittings whereas
ENGINE 113 21/09/2019 15/11/2019 55
as per gainwell it is Receiver assy
Power transmission system 114 21/09/2019 15/11/2019 55 Purchase Order under approval
Power transmission system 114 21/09/2019 15/11/2019 55 4 Nos available at Stock. As confirmed by NSN please close this PR
Equipment & Structure 122 30/09/2019 15/11/2019 46 Kept under Hold by Mr AST Sir
Equipment and Structure 122 10/7/2019 15/11/2019 39 Awaiting for Local supplier quote.
Equipment and Structure 122 10/7/2019 15/11/2019 39 Awaiting for Local supplier quote.
Cabin & accessories 122 10/7/2019 15/11/2019 39 Awaiting for Local supplier quote.
5 Nos are in Open Order:4103002995. Please close this item as the EC700 has
Power transmission system 114 10/7/2019 15/11/2019 39
shifted to MCL as confirmed by Mr SJN
Power transmission system 114 10/7/2019 15/11/2019 39 Will be processed through SAP as equipment transferred to MCL
Power transmission system 114 10/7/2019 15/11/2019 39 Will be processed through SAP as equipment transferred to MCL
Power tranmitting system 115 23/10/2019 15/11/2019 23 Awaiting for Old Use Spares Offer
Power tranmitting system 115 23/10/2019 15/11/2019 23 Awaiting for Old Use Spares Offer
Power tranmitting system 115 23/10/2019 15/11/2019 23 Awaiting for Old Use Spares Offer
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Power Transmitting system 114 30/10/2019 15/11/2019 16 Under Clarification with ESCC
Equipment & structure 122 30/10/2019 15/11/2019 16 Trial PO made from 1506. Will send once received the material.
Equipment & structure 122 30/10/2019 15/11/2019 16 Trial PO made from 1506. Will send once received the material.
PSN sir approval done and need to send for MD sir approval
Compariosn approval received from User end. But considering the high value
for Gear Items we are in process to develop the gears locally based on sample
(Sample Send to vendor)
Compariosn approval received from User end. But considering the high value
for Gear Items we are in process to develop the gears locally based on sample
(Sample Send to vendor)
Compariosn approval received from User end. But considering the high value
for Gear Items we are in process to develop the gears locally based on sample
(Sample Send to vendor)
Compariosn approval received from User end. But considering the high value
for Gear Items we are in process to develop the gears locally based on sample
(Sample Send to vendor)
Compariosn approval received from User end. But considering the high value
for Gear Items we are in process to develop the gears locally based on sample
(Sample Send to vendor)
Compariosn approval received from User end. But considering the high value
for Gear Items we are in process to develop the gears locally based on sample
(Sample Send to vendor)
Compariosn approval received from User end. But considering the high value
for Gear Items we are in process to develop the gears locally based on sample
(Sample Send to vendor)
Compariosn approval received from User end. But considering the high value
for Gear Items we are in process to develop the gears locally based on sample
(Sample Send to vendor)
Compariosn approval received from User end. But considering the high value
for Gear Items we are in process to develop the gears locally based on sample
(Sample Send to vendor)
Clarification ig going on with gainwell. As per user dept the said part no is fittings whereas
as per gainwell it is Receiver assy
As per user, the price of mirror is higher.So user said that to arrange it from
locally
5 Nos are in Open Order:4103002995. Please close this item as the EC700 has
UPDATED
shifted to MCL as confirmed by Mr SJN
Will be processed through SAP as equipment transferred to MCL
Purchase Order
Under Process
PO Created-5101000239 on 07.11.2019
Under Process
The same cushion were Placed order on MAG Rubber.So, waiting for arriaval of
that material.
The same cushion were Placed order on MAG Rubber.So, waiting for arriaval of
that material.