1- Installing the new PPR pipeline from city network pipe to suction header of lifting pumps.
2- Installing the lifting pump as per specs and BOQ and local and standard plumbing codes.
3- Installing discharge header and pipe riser to filling each potable water stainless steel
tanks as per drawings.
4- Installing the booster pump as per specs and BOQ and local and standard plumbing
codes.
5- Installing PPR pipeline discharge header of booster pumps and pipe riser to basement
floor to supply to existing potable water network & potable water internal risers as per
drawings.
6- Cut main CPVC pipeline (which from concrete fire tank) to all region (boiler room,
kitchen, laundry and others) except potable water network and potable water internal
risers.
7- Reconnect main CPVC pipeline to boiler room, kitchen, laundry and others.
8- New System operating as all potable water of the building shall be supplied from roof
tanks any
other places supplied from concrete fire tank.
9- The contractor shall be maintain all thing of original form and any damage cost bear it
to the contractor .
End of scope
.ﻃﺮﻳﻘﺔ اﻟﺒﻴﺎﻧﺎت
1- .ﺗﺮﻛﻴﺐ ﺧﻂ أﻧﺎﺑﻴﺐ ﻃﺎﻋﻮن اﻟﻤﺠﺘﺮات اﻟﺼﻐﻴﺮة اﻟﺠﺪﻳﺪ ﻣﻦ ﺷﺒﻜﺔ أﻧﺎﺑﻴﺐ اﻟﻤﺪﻳﻨﺔ إﻟﻰ رأس اﻟﺸﻔﻂ ﻟﻤﻀﺨﺎت اﻟﺮﻓﻊ
2 - ﺗﺜﺒﻴﺖ ﻣﻀﺨﺔ اﻟﺮﻓﻊ وﻓﻘﺎ ﻟﻠﻤﻮاﺻﻔﺎت وBOQ .ورﻣﻮز اﻟﺴﺒﺎﻛﺔ اﻟﻤﺤﻠﻴﺔ واﻟﻤﻌﻴﺎرﻳﺔ
3- ﺗﺜﺒﻴﺖ رأس اﻟﺘﺼﺮﻳﻒ وﻧﺎﻓﺬة اﻷﻧﺎﺑﻴﺐ ﻟﻤﻞء ﻛﻞ ﺧﺰاﻧﺎت ﻣﻴﺎه اﻟﺸﺮب اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ اﻟﻔﻮﻻذ اﻟﻤﻘﺎوم ﻟﻠﺼﺪأ ﺣﺴﺐ
.اﻟﺮﺳﻮﻣﺎت
4- ﺗﺜﺒﻴﺖ ﻣﻀﺨﺔ ﻣﻌﺰزة ﺣﺴﺐ اﻟﻤﻮاﺻﻔﺎت وBOQ .ورﻣﻮز اﻟﺴﺒﺎﻛﺔ اﻟﻤﺤﻠﻴﺔ واﻟﻤﻌﻴﺎرﻳﺔ
5 - ﺗﺜﺒﻴﺖ رأس ﺗﺼﺮﻳﻒ ﺧﻂ أﻧﺎﺑﻴﺐ ﻃﺎﻋﻮن اﻟﻤﺠﺘﺮات اﻟﺼﻐﻴﺮة ﻣﻦ ﻣﻀﺨﺎت اﻟﺪاﻋﻢ واﻟﻨﺎﻫﺾ ﻟﻸﻧﺎﺑﻴﺐ إﻟﻰ اﻟﻄﺎﺑﻖ اﻟﺴﻔﻠﻲ
.ﻟﺘﺰوﻳﺪ ﺷﺒﻜﺎت اﻟﻤﻴﺎه اﻟﺼﺎﻟﺤﺔ ﻟﻠﺸﺮب واﻟﻨﺎﻫﺾ اﻟﺪاﺧﻠﻲ ﻟﻤﻴﺎه اﻟﺸﺮب ﺣﺴﺐ اﻟﺮﺳﻮﻣﺎت
اﻟﺮﺋﻴﺴﻲ )ﻣﻦ ﺧﺰان ﺣﺮﻳﻖ ﺧﺮﺳﺎﻧﻲ( إﻟﻰ ﻛﻞ اﻟﻤﻨﻄﻘﺔ )ﻏﺮﻓﺔ اﻟﻐﻼﻳﺔ ،واﻟﻤﻄﺒﺦ ،واﻟﻐﺴﻴﻞ CPVCﻗﻄﻊ ﺧﻂ أﻧﺎﺑﻴﺐ 6-
وﻏﻴﺮﻫﺎ( ﺑﺎﺳﺘﺜﻨﺎء ﺷﺒﻜﺔ ﻣﻴﺎه اﻟﺸﺮب واﻟﻨﺎﻫﺾ اﻟﺪاﺧﻠﻲ ﻟﻤﻴﺎه اﻟﺸﺮب.
اﻟﺮﺋﻴﺴﻲ ﺑﻐﺮﻓﺔ اﻟﻤﺮﺟﻞ واﻟﻤﻄﺒﺦ واﻟﻐﺴﻴﻞ وﻏﻴﺮﻫﺎCPVC .أﻋﺪ ﺗﻮﺻﻴﻞ ﺧﻂ أﻧﺎﺑﻴﺐ 7-
ﻧﻈﺎم ﺟﺪﻳﺪ ﻳﻌﻤﻞ ﺣﻴﺚ ﻳﺘﻢ ﺗﺰوﻳﺪ ﺟﻤﻴﻊ ﻣﻴﺎه اﻟﺸﺮب ﻓﻲ اﻟﻤﺒﻨﻰ ﻣﻦ ﺧﺰاﻧﺎت اﻟﺴﻖف 8-
ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﺤﻔﺎظ ﻋﻠﻰ ﻛﻞ ﺷﻲء ﻓﻲ ﺷﻜﻠﻪ اﻷﺻﻠﻲ وأي ﺗﻜﻠﻔﺔ أﺿﺮار ﺗﺘﺤﻤﻠﻪ ﻟﻠﻤﻘﺎول9- .
ﻧﻬﺎﻳﺔ اﻟﻨﻄﺎق