Hydro Test Risk Assessment CS Tank
Hydro Test Risk Assessment CS Tank
Risk Assessment
PROJECT: (2X660)MW Jawaharpur Super Thermal Power Station Site Revision No:00
04.Exceeding Maximum Personal injury 4 3 12 01. Ensue the pressure relieving devices
Allowable Pressure is set at Maximum allowable pressure for
weakest portion of the pressure the system.
02.Prepare test procedure and obtain client
3 2 6
approval.
03.Provide separate gauge for pressurizing
pump and
pipe /equipment.
Likely hood Severity *Risk Factor Number ** Residual Risk Number
1: Unlikely/Improbable (less than once a year) 2: Unlikely/Improbable E(1-3): Acceptable/Trivial E(1-3): Acceptable/Trivial
2: Remote (less than once a half-year) 4: Remote D(4-6): Tolerable D(4-6): Tolerable
3: Quite Possible/Occasional(once a month) 6: Quite Possible/Occasional C(7-9): Moderate/Acceptable with Review C(7-9): Moderate/Acceptable with Review
4: Likely/Probable(more than once a week) 8: Likely/Probable B(10-12): Substantial B(10-12): Substantial
5: Very Likely/Frequent( more than once a day) 10: Catastrophic/Very High A(13-15): Unacceptable A(13-15): Unacceptable
Page2 / 3
Personal injury 3 3 9 01. Keep away from the pressurized
segment of the system being hydro –
tested.
02. Monitor the pressure gauge from a
safe distance away from the potential 2 2 4
05.injury to Workers source of high pressure jetting.( such
as flance.
03. Worn Mandatory PPEs.
Do not stand near by pressurized Equipment.
04. Provide proper access.
Properties damage 4 3 12 01. Never increase the hydro –test
pressure more the maximum allowable
pressure for the weakest portion in the
06.Damage to Equipment/ 3 2 6
System
segment or pressure rating of the hose
& coupling.