4.2 4.7 4.8 5 5.3 5.5 5.8 6 6.4 6.5 7 7.2 7.5 7.7 8 8.

4 9
SIMPSON GUMPERTZ & HEGER
Engineering of Structures
and Building Enclosures

B.3 Simpson Gumpertz & Heger Inc. Boston


41 Seyon Street, Building 1, Suite 500 Chicago
Los Angeles
Waltham, Massachusetts 02453 New York
LE4-1 LE1-10 LE1-14 PIECE RENAMED TO main:781.907.9000 fax:781.907.9009 San Francisco
SHOW PROPER www.sgh.co Washington, DC
DESIGN TYPE m

LE3-1 LE1-11 LE1-1 LE1-16 LE1-7


Submitted stadia units

LE1-9 LD2-5 LD1-1 LD2-10 LE1-8

LG2-4 LG1-3 LG2-14


B.7 LD2-4 LD2-3
LC4-9 LC4-18

LG2-3 LC4-8 LC4-17 LG2-13


LE1-7 LC4-7 LC4-16 LE3-4
LC4-6 LC4-15
LE1-8 LC4-5 LC4-14 LE1-9
LC2-51 LC2-54
C LC2-22 LC4-4 LC4-13 LC5-10 LC2-55 Consultan
LD2-3 LD2-4
LC2-21 LC4-3 LC4-12 LC5-9 LC2-56
LG2-2 LG2-12
LC2-20 LC2-50
LC4-2 LC4-11 LC5-8
LC2-19
C.1 LC2-18 LC4-1 LC4-10
LC5-7
C.2 LC2-17 LC5-6
LC2-16 LB1-1 LB1-8 LC5-1
LB2-2
LC3-2 LC5-2
LC5-3
C.4 LB1-2 LC5-4

LE1-17
LE1-4

LC5-5

LE1-11
C.6
LE1-3

LB2-1A
LD2-1

LD2-5
LG2-11
LG2-1

LC2-53
LC2-43

LC2-42
LC2-7

LC2-41
C.7
LC2-6

LC2-40
LC2-5

LC2-39
LC2-4

LC2-38
LC2-3

LC2-37
LC2-2

LC2-36
LC2-1

LC3-6
LC3-1

LC7-9
LC7-3

LC7-8
LC7-2

LC7-7
LC7-1

LF1-3
LA2-1
100 400
Total Pcs = 52 Nos.
D No. of dwgs = 44 Nos. Total Pcs = 57 Nos.

9
No. of Pcs done = 42 Nos.
Remaining Pcs= 10 Nos.
No. of dwgs = 49 Nos.
No. of Pcs done = 19 Nos.
Remaining Pcs= 38 Nos. 12
NOTE:
THE FOLLOWING UNITS HAVE BEEN

LC6-1
LC6-1
LC6-4
LC6-1
LC1-1
LC1-1
LC1-1
LC1-1
LC1-1
LC1-1
LC1-1
LC1-7
LG1-1

LG1-6
LD1-1

LD1-1
LE2-1

LE1-1

LA1-2

LE1-1

LE2-4
LC1-3
LC1-1
LC1-1
LC1-1
LC1-1
LC1-1
LC1-1
LC1-1
LC6-1
LC6-4
LC6-1
LC6-1

LF1-1
REVISED TO HAVE THREADED INSERTS
PER RFI-773 AND COORDINATION CALL ON
19 MAY 2017:
LB1-3, LC3-7, LC3-8, LC4-1, LC4-10, LC4-19,
LC4-20, LC6-3, LC6-4, LC7-6, LC7-9, AND
LC7-11

Total Pcs = 232 Nos.


No. of dwgs = 195 Nos.
E No. of Pcs done = 135 Nos.
Remaining Pcs= 58 Nos.
Pcs sent = 28 pcs (04-08-2017 )
Pcs sent = 11 pcs ( 18-08-2017)
LC1-4
LC1-2
LC1-2
LC1-2
LC1-2
LC1-2
LC1-2
LC1-2
LC6-2
LC6-3
LC6-2
LC6-2
LG1-2

LG1-5
LD1-2

LD1-2
LE2-2

LE1-2

LA1-2

LE1-2

LE2-3
LF1-1
LC6-2
LC6-2
LC6-3
LC6-2
LC1-2
LC1-2
LC1-2
LC1-2
LC1-2
LC1-2
LC1-2
LC1-6
Pics repeat in seq. 11_300

10
L-C-7-S Total Pcs = 72 Nos. Total Pcs = 51 Nos.
L-C-8-S
L-C-9-S
L-C-10-S
F
L-C-11-S
No. of dwgs = 59 Nos.
No. of Pcs done = 35 Nos.
Remaining Pcs= 37 Nos.
No. of dwgs = 43 Nos.
No. of Pcs done = 39 Nos.
Remaining Pcs = 12 Nos.
11 Pics repeat in seq. 10_200
L-C-7-S
L-C-8-S
LC7-10
LC7-10
LC7-11

L-C-9-S
LA2-2

L-C-12-S
L-C-13-S 200 L-C-10-S
L-C-11-S
LF1-2

LC7-1
LC7-2

300 L-C-12-S
LC7-6
LC3-3

LC3-5
LC2-29
LC2-8

LC2-30
LC2-9
LC2-10

LC2-31
L-C-13-S
LC2-11

LC2-32
LC2-12

LC2-33
LB1-3
LC2-13

LC2-34
LC2-14

LC2-35
LC2-48

LC2-52
LG2-10
LG2-5
LD2-2

LD2-6

LE1-18
10 20 JUN SUBMISSION 14
LE1-5

LE1-19
9 20 MAR SUBMISSION 13
LE1-6

LB2-1 PIECE RENAMED TO SHOW


LC5-5 8 2 FEB SUBMISSION 12
LC5-4
PROPER DESIGN TYPE 7 27 JAN SUBMISSION 10
LB1-9
LC5-3 6 25 JAN SUBMISSION 9
LC5-2 LC3-4 PIECE RELEASED
LC5-1 LB2-2 1' - 0 5/8" 9 5/8" LC2-15 5 19 JAN SUBMISSION 7
LB1-4 LB1-5 LB1-6 LB1-7 ENDS SWITCHED
LC2-23 4 5 JAN SUBMISSION 4
F.7 LC5-6
LC3-7 LC4-19 LC4-20 LC3-8
I:\BOS\Projects\2016\160842.00-USTA\Drawings\REVIT\LOCAL USERS\ANGillis\160842.00-USTA_ANGillis.rvt

LC5-7 LC2-24 3 4 JAN SUBMISSION 3


LC2-29 LC4-21 LC4-22 LC2-8 LC2-25 2 3 JAN SUBMISSION 2
LC5-8
LC2-49 LC2-28 No. Date Description By
LG2-6 LC5-9 LC2-30 LC1-8 LC2-9 LG2-9
LC2-45 LC2-26
LD2-8 LC2-46 LC5-10 LC1-2 LC2-27 LD2-7
LC2-31 LC2-10
G LE1-15
LC2-47
LC2-32 LC1-2 LC2-11
LC2-59
LE1-12
LC2-33 LC1-2 LC2-12
LE3-3
LG2-7
LC2-34 LC1-2 LC2-13
LG2-8
LE1-13
USTA ARMSTRONG
STADIUM
LC2-35 LC1-2 LC2-14

LD2-7 LC2-57 LC1-5 LC2-58 LD2-8


G.4 LG2-10 LG1-4 LG2-5

LE1-12 LD2-6 LD1-2 LD2-2 LE1-15

LE1-13 LE1-18 LE1-2 LE1-5 LE3-2


Project

LE1-19 LE1-20 LE4-2 LOWER BOWL


G.7
Pics repeat in seq. 10_200
L-C-48-S
ASSEMBLY
These 5 LC pieces LC1-2 of south
L-C-49-S
L-C-50-S
COMPLETION
RECORD
Pics repeat in seq. 11_300 lower bowl are same as shown in west L-C-51-S
L-C-48-S lower bowl pieces LC1-2 (L-C-46-S). L-C-52-S Drawing
L-C-49-S Should we prepare CS-24 and put L-C-53-S
L-C-50-S note as we did in CS-23. L-C-54-S Commissio Checke Dat
L-C-51-S Please review and advise.
160842 12/23/16
L-C-52-S Draw Approve Scal
L-C-53-S GF xxxx 3/32" = 1'-0"
L-C-54-S Drawing
6/20/2017 8:23:17 PM

S.1