Professional Documents
Culture Documents
DBM Gupta Construction
DBM Gupta Construction
Name of
M/S Vidya InfraBuild Private Limited
Contractor
Address of
Plot no.5A Padmavati Nagar Near kunawar Petrol Pump Hinganghat Wardha-442301 Maharashtra.
Contractor
Aggregate complying with Table 500-17, Grading - 1 of MORTH Specification & Bitumen Complying with VG-30 grade
of IS 73 were used for conducting the mix design.
B. BLENDING OF AGGREGATES.
In each individual Aggregate Size sieve analysis carried out and blended by trial and errror to meet DBM specification
of MORTH for grading-1
C. SPECIFIC GRAVITY OF INDIVIDUAL INGREDIENTS.
1. Specific gravity of coarse aggregate carried out as per IS 2386 Part-3
2. Specific gravity of fine aggregate carried out as per IS 2386 Part-3
3. Specific gravity of Bitumen carried out as per IS 1202-1978
4.Maximum Specific gravity of Loose paving mixture carried out as per ASTM 2041
D. MARSHALL METHOD OF MIX DESIGN
For determining the designed Bitumen content,Specimens of compacted paving mixture were prepared as per ASTM
D6926-10. The bulk specific gravitty of compacted paving mixture were measured as per ASTM D2726. The following
graphs are plotted.
P No. 1 of 10
MIX DESIGN SUMMARY OF DENSE BITUMINOUS MACADAM (G-2)
A)
Coarse & Fine Aggregates Source :- Saoli Vagh Crusher
Bitumen Source :- HPCL
Bitumen Grade :- VG- 30
B) MIX Proportion
Aggregate Size Percentage
40mm 8.00%
20mm 25.00%
10mm 20.00%
6mm 20.00%
Stone Dust 25.00%
Cement (Filler) 2.00%
C) Physical Characteristics of Coarse
Aggregate
As per
SL NO Description Lab Test Test Method MORTH Specifications
results
1 Material Finer Than 75mic Sieve (%) Nill IS 2386 P-1 <3
2 Aggregate Impact Value (Average % ) 16.62 IS 2386 P-4 <27
P No. 2 of 10
%Blending (Grading -1)
Percentage for blending
%Passing Stone
IS SIEVE 40 mm 20 mm 10 mm 6mm Dust
(mm)
Stone Filler
40mm 20mm 10mm 6mm
Dust (cement) 8.00% 25.00% 20.00% 20.00% 25.00%
45.00 100.00 100.00 100.00 100.00 100.00 100.00 8.00 25.00 20.00 20.00 25.00
37.50 78.66 100.00 100.00 100.00 100.00 100.00 6.29 25.00 20.00 20.00 25.00
26.50 0.00 63.12 100.00 100.00 100.00 100.00 0.00 15.78 20.00 20.00 25.00
13.20 0.00 5.96 100.00 100.00 100.00 100.00 0.00 1.49 20.00 20.00 25.00
4.75 0.00 0.00 45.97 68.96 100.00 100.00 0.00 0.00 9.19 13.79 25.00
2.36 0.00 0.00 10.54 29.08 98.36 100.00 0.00 0.00 2.11 5.82 24.59
0.300 0.00 0.00 1.25 5.96 45.69 98.70 0.00 0.00 0.25 1.19 11.42
0.075 0.00 0.00 0.00 0.96 3.69 47.30 0.00 0.00 0.00 0.19 0.92
Blending Graph
100.00
90.00
80.00
70.00
60.00
% PASSING
50.00
40.00
30.00
20.00
10.00
0.00
0.01 0.10 1.00 10.00
SIEVES IN MM
P No. 3 of 10
P No. 3 of 10
(Grading -1)
Percentage for blending Total %
MORTH LIMIT
of
Filler TABLE -500-10
(cement) Passing MID
LIMIT
Lower Upper
2.00% ### Limit limit
g Graph
IN MM
1) 40 mm 8.00
2) 20 mm 25.00
3) 10 mm 20.00
4) 6 mm 20.00
5) Stone Dust 25.00
6) Cement (Filler) 2.00
Temperature +/-10 0C
100.00
90.00
80.00
70.00
60.00
% PASSING
50.00
40.00
30.00
20.00
100.00
90.00
80.00
70.00
60.00
% PASSING
50.00
40.00
30.00
20.00
10.00
0.00
0.01 0.10 1.00 10.00
SIEVES IN MM
JMF Lower Limit JMF Upper Limit MORTH Lower Limit Morth Upper Limit
P No. 4 of 10
E BITUMINOUS MACADAM (G-2)
+/-10 0C
1.00 10.00 100.00
ES IN MM
2) Proportion of materias in % :-
a) 40 mm 8.00
b) 20 mm 25.00
c) 10 mm 20.00
c) 6 mm 20.00
d) Stone Dust 25.00
e) Bitumen(Gb)* 4.52
f)Cement (Filler)
2.00
100.00
Gsb =
(8/2+25/2+20/2.856+20/2.846+25/2.829+2/3.15)
Gsb = 2.500
Gmm = 2.623
Gse = [100-4.52)/((100/2.61)-(4.52/1.028))
Gse = 2.831
P No. 5 of 10
Graphical Representation of volumetric Parameters vs binder contents for DBM mix by Marshall Method test
Bitumen % Air
Content % Density %VMA %VFB Flow Stability (Kg)
Voids
3.50 2.374 11.02 8.37 -31.58 2.7 857.87
4.00 2.474 6.50 5.01 -29.83 2.7 1509.73
4.50 2.515 4.14 3.90 -6.09 3.4 1835.13
C o m p a c t e d o f M ix D e n s it y ( g m /c c )
100.00
90.00
%of VFB
80.00
70.00
60.00
2.550
50.00
40.00
2.500
30.00
2.450
20.00
2.400 10.00
2.350
0.00
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50
2.300
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50
10.00 6.5
Flow in mm
% Air Voids
6.0
9.00
5.5
8.00 5.0
7.00 4.5
4.0
6.00
3.5
5.00 3.0
4.00 2.5
2.0
3.00
1.5
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50
% Of Bitumen Content
% Of Bitumen Content
Stability In( kn)
17.00
2300.00
16.50
2100.00
% VMA
16.00
1900.00
15.50
15.00 1700.00
14.50 1500.00
14.00 1300.00
13.50 1100.00
13.00
900.00
12.50
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50 700.00
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50
% Of Bitumen Content % of Bitumen content
P No. 7 of 10
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagr
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
Designation Designation
lane/2-lane with paved shoulder configuration of Saptagram-Kalna -
West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Sample No-1
18662
Cumulative % Passing
100.00
100.00
100.00
99.84
16.41
1.53
0.00
0.00
0.00
Sample No-2
19434
Cumulative % Passing
100.00
100.00
100.00
99.64
15.32
0.74
0.00
0.00
0.00
Sample No-3
22642
Cumulative % Passing
100.00
100.00
100.00
99.98
15.02
0.42
0.00
0.00
0.00
lane/2-lane with paved shoulder configuration of Saptagram-Kalna -
West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Weight of Sample in
1 W1 ( gms )
Water
Average Water
11 %
Absorption
Remarks :-
Passing
Too Low
4.35% To 4.70%
3.50 3.55 3.60 3.65 3.70 3.75 3.80 3.85 3.90 3.95 4.00 4.05 4.10 4.15 4.20 4.25 4.30 4.35 4.40 4.45 4.50 4.55 4.60 4.65 4.70 4.75 4.80 4.85 4.90 4.95 5.00 5.05 5.10 5.15 5.20 5.25 5.30 5.35 5.40 5.45 5.50
% of Bitumen Content
Note:- As per graph all Passing criteria belongs on Bitumen contents 4.35% to 4.70 %
P No. 9 of 10
DBM WITH BITUMEN VG-30 (G-2)
CALCULATIONS FOR QUANTITY OF BITUMEN AND AGGREGATE PER BATCH
% by wt of
Material Size mm aggreates
20 mm 0.20 % Aggregate : 95.48 %
10 mm 0.20 % Bitumen Content : 4.52 %
6 mm & Stone Dust 0.25 %
0.02 % Total : 100 %
Cement (Filler)
2.00 %
% of
Material For 1000 kg batch For 2000 kg batch
Material*
20 mm 0.19 2 4
10 mm 0.19 2 4
6 mm 0.24 2 5
* % by wt of Total mix
Mixing Laying And Rolling Temperature Requirement in 0C As per Morth Table no 500-2
P No. 10 of 10
Analysis of DBM Compacted Paving Mixture (By Marshall Method) G-2
Sp. Gr. of 20 mm, 2.856 0.20%
Sp. Gr. of 12.5mm, 2.846 0.20% Effective Sp. Gr. Of aggt.
Gse 2.831
Sp. Gr. of 6mm & dust 2.829 0.25% Bulk Sp. Gr. Of total aggt.
Gsb 2.500
sp. Gr. Of Filler 3.150 0.02% Apperent sp Gravity Gsa 2.528
Sp. Gr. Of Bitumen, Gb 1.028 4.52%
P No. 6 of 10
Analysis of DBM Compacted Paving Mixture (By Marshall Method
Sp. Gr. of 20 mm, 2.871 31% Proving Ring Factor : 7.921 kg
Sp. Gr. of 10 mm, 2.860 24%
Sp. Gr. of 6 mm, 2.834 18%
Sp. Gr. of Stone Dust mm2.752 25%
Cement (Filler) 2.21 2%
Sp. Gr. Of Bitumen, Gb 1.028 4.52%
Max. sp.Gr.of
Bulk Sp. Avg. Sp.
Sample Effective
% of Weight in Weight in Weight in Bulk Gr. of Gr. Of Effective Sp. Asphalt
% of Agg (loose) Bitumen
Bitumen air water air SSD Volume Specime Specime Gravity of Mix Absorption
(GMM) Content
n n
Practical
Sr. No Mould No
Pba=100 x
Gse= (100-
Wa (( Gse-
Ps=100- Wssd - Pb)/ Pbe=Pb-
Pb Wa Ww Wssd (Wssd- Gmb Gmm Gsb )/
Pb Ww ((100/Gmm)- (PbaxPs)/100
Ww) (GsbxGse)x
(Pb/Gb))
Gb
P No. 8 of 10
Method) on 4.52% Bitumen Content
Effective Sp. Gr. Of aggt. Gse 2.831
Bulk Sp. Gr. Of total aggt. Gsb 2.500
Apperent sp Gravity Gsa 2.528
Asphaltic Absorption Pba 4.81
Voids in Average
Voids filled Flow Av. Flow
Mineral Air Voids Stability (kg) Stability
with Bitumen (mm) (mm)
Aggregate (kg)
Ht in (mm)
Va=100x
VMA=100- VFB= Stability =
(Gmm-
(GmbxPs )/ 100 x (VMA- ( DGR*CF*PRF
Gmb) /
Gsb Va) / VMA )
Gmm
tes
1665.2 3.4
1685.2 3.5