PEKERJAAN PERSIAPAN
Panjang = 12 m
Lebar = 12.5 m
Volume = ( 12 + 2 ) x 2 +( 12.5 + 2 )x 2
= 57 m
panjang tiang = 1 m
jarak tiang ke tiang = 2 m
banyak tiang = 57 / 2
= 28.5
= + 25 buah
ukuran papan = ( 3 x 25 x 4 cm
= ( 0.03 x 0.25 x 4 ) m
ukuran tiang = ( 5 x 7 x 1.00 ) cm
= ( 0.05 x 0.07 x 1 ) m
volume papan = 57 x 0.03 x 0.25 = 0.428 m³
volume tiang = 29 x 1 x 0.05 x 0.05 = 0.071 m³
jumlah = 0.499 m³
kayu terbuang 10 = 0.05 m³
volume = 0.005 m³
penampang galian
Tinggi galian = 1.50 m
lebar galian atas = 1.20 m
Panjang Galian = 1.20 m
luas penampang = 1.50 x 1.20 x 1.20
= 2.16
penampang galian
Tinggi galian = 0.53 m
lebar galian atas = 0.76 m
luas penampang = 0.53 x 0.76
= 0.40 m²
2. pondasi teras
panjang = 17.42 m
penampang = 0.30 + 0.30 x 0.90 = 0.27 m²
2
volume = 17.42 x 0.27 = 4.70 m³
Tulangan Beugel Ø 10
Panjang tulangan beugel per buah = 25 + 15 + 25 + 15 + 5 + 5
= 90 cm = 0.9 m
Jumlah tulangan beugel panjang 67,10 m dengan jarak 0,15 = 447 buah
Total Panjang Tulangan = 447 x 0.9 = 402.6 m
Panjang Besi = 11 m = 402.6 / 11 = 37 buah
Berat Besi per Kg Ø10 pada tabel adalah = 1 Kg/m
= 1 x 402.6 = 248.4 Kg
Tulangan Beugel Ø 8
Panjang tulangan beugel per buah = 15 + 10 + 15 + 10 + 5 + 5
= 60 cm = 0.6 m
Jumlah tulangan beugel panjang 26,17 m dengan jarak 0,15 = 174 buah
Total Panjang Tulangan = 174 x 0.6 = 104.7 m
Panjang Besi = 11 m = 104.7 / 11 = 10 buah
Berat Besi per Kg Ø 8 pada tabel adalah = 0.40 Kg/m
= 0.40 x 105 = 41.35 Kg
Tulangan Beugel Ø 12
Panjang tulangan beugel per buah = 25 + 30 + 25 + 30 + 5 + 5
= 120 cm = 1.2 m
Jumlah tulangan beugel panjang 4,00 m dengan jarak 0,15 m = 27 buah
Total Panjang Tulangan = 27 x 1.2 = 32 m
Panjang Besi = 11 m = 32 / 11 = 3 buah
Berat Besi per Kg Ø 12 pada tabel adalah = 0.89 Kg/m
= 0.89 x 32 = 28.42 Kg
Tulangan Beugel Ø 12
Panjang tulangan beugel per buah = 25 + 25 + 25 + 25 + 5 + 5
= 110 cm = 1.1 m
Jumlah tulangan beugel panjang 4,00 m dengan ja = 27 buah
Total Panjang Tulan = 27 x 1.1 = 29.33 m
Panjang Be= 11 m = 29.33 / 11 = 3 buah
Berat Besi per Kg Ø 12 pada tabel adalah
= 0.89 Kg/m
= 0.89 x 29.33 = 26.05 Kg
Tulangan Beugel Ø 10
Panjang tulangan beugel per buah = 15 + 15 + 15 + 15 + 5 + 5
= 70 cm = 0.7 m
Jumlah tulangan beugel panjang 4,00 m dengan jarak 0,15 m = 27 buah
Total Panjang Tulangan = 27 x 0.7 = 18.67 m
Panjang Besi = 11 m = 18.67 / 11 = 1.70 buah
Berat Besi per Kg Ø 10 pada tabel adalah = 0.62 Kg/m
= 0.62 x 18.67 = 11.52 Kg
Tulangan Beugel Ø 8
Panjang tulangan beugel per buah = 7 + 7 + 7 + 7 + 5 + 5
= 38 cm = 0.38 m
Jumlah tulangan beugel panjang 4,00 m dengan jarak 0,15 m = 27 buah
Total Panjang Tulangan = 26.67 x 0.38 = 10.13 m
Panjang Besi = 11 m = 10.13 / 11 = 0.92 buah
Berat Besi per Kg Ø 8 pada tabel adalah = 0.40 Kg/m
= 0.40 x 10.13 = 4.00 Kg
Dari perhitungan di atas maka kebutuhan besi penulangannya adalah :
● Besi Ø 10 = 29 Buah = 197.4 Kg
● Besi Ø 8 = 18 Buah = 80.05 Kg
Tulangan Beugel Ø 12
Panjang tulangan beugel per buah = 25 + 15 + 25 + 15 + 5 + 5
= 90 cm = 0.9 m
Jumlah tulangan beugel panjang 83,32 m dengan jarak 0,10 = 833 buah
Total Panjang Tulangan = 833 x 0.9 = 749.9 m
Panjang Besi = 11 m = 749.9 / 11 = 68 buah
Berat Besi per Kg Ø12 pada tabel adalah = 0.89 Kg/m
= 0.89 x 749.9 = 665.9 Kg
Tulangan Beugel Ø 10
Panjang tulangan beugel per buah = 15 + 10 + 15 + 10 + 5 + 5
= 60 cm = 0.6 m
Jumlah tulangan beugel panjang 27,95 m dengan jarak 0,10 = 280 buah
Total Panjang Tulangan = 280 x 0.6 = 167.7 m
Panjang Besi = 11 m = 167.7 / 11 = 15 buah
Berat Besi per Kg Ø10 pada tabel adalah = 0.17 Kg/m
= 0.17 x 167.7 = 28.51 Kg
Tulangan Beugel Ø 8
Panjang tulangan beugel per buah = 10 + 12 + 10 + 12 + 5 + 5
= 54 cm = 1 m
Jumlah tulangan beugel panjang 27,95 m dengan jarak 0,10 = 818 buah
Total Panjang Tulangan = 818 x 0.54 = 441.8 m
Panjang Besi = 11 m = 441.8 / 11 = 40 buah
Berat Besi per Kg Ø 8 pada tabel adalah = 0.40 Kg/m
= 0.40 x 441.8 = 174.5 Kg
● Pelat 1 = 3 Petak
panjang = 4.00 m
Lebar = 4.00 m
Tinggi = 0.12 m
Volume = 4.00 x 4.00 x 0.12 = 1.920
= 3.00 x 1.92 = 5.76 m³
● Pelat 2 = 1 Petak
panjang = 2.30 m
Lebar = 5.00 m
Tinggi = 0.12 m
Volume = 2.30 x 5.00 x 0.12 = 1.380
= 1.00 x 1.38 = 1.38 m³
● Pelat 3 = 1 Petak
panjang = 2.00 m
Lebar = 3.50 m
Tinggi = 0.12 m
Volume = 2.00 x 3.50 x 0.12 = 0.840
= 1.00 x 0.84 = 0.84 m³
● Pelat 4 = 1 Petak
panjang = 3.00 m
Lebar = 5.00 m
Tinggi = 0.12 m
Volume = 3.00 x 5.00 x 0.12 = 1.800
= 1.00 x 1.80 = 1.80 m³
● Pelat 5 = 1 Petak
panjang = 3.50 m
Lebar = 5.00 m
Tinggi = 0.12 m
Volume = 3.50 x 5.00 x 0.12 = 2.100
= 1.00 x 2.10 = 2.10 m³
● Pelat 6 = 1 Petak
panjang = 1.50 m
Lebar = 2.00 m
Tinggi = 0.12 m
Volume = 1.50 x 2.00 x 0.12 = 0.360
= 1.00 x 0.36 = 0.36 m³
Volume Plat Keseluruhan = 5.76 + 1.38 + 0.84 + 1.80
+ 2.10 + 0.36
= 12.24 m³
Volume Vertikal
Panjang = 4.00 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg
Volume Vertikal
Panjang = 5.00 m
Diameter Besi = 12 mm
Jarak = 0.2 buah
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.89 kg
Volume Vertikal
Panjang = 3.50 m
Diameter Besi = 12 mm
Jarak = 0.2 buah
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg
Volume Vertikal
Panjang = 5.00 m
Diameter Besi = 12 mm
Jarak = 0.2 buah
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg
Pembesian Plat 5 = 1
Volume Horizontal
Panjang = 3.50 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg
Volume Vertikal
Panjang = 5.00 m
Diameter Besi = 12 mm
Jarak = 0.2 buah
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg
Pembesian Plat 6= 1
Volume Horizontal
Panjang = 1.50 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg
Volume Vertikal
Panjang = 2.00 m
Diameter Besi = 12 mm
Jarak = 0.2 buah
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg
● Pelat 1 = 1 Petak
panjang = 4.00 m
Lebar = 4.00 m
Tinggi = 0.12 m
Volume = 4.00 x 4.00 x 0.12 = 1.920
= 3.00 x 1.92 = 5.76 m³
● Pelat 2 = 1 Petak
panjang = 2.00 m
Lebar = 3.00 m
Tinggi = 0.12 m
Volume = 2.00 x 3.00 x 0.12 = 0.720
= 1.00 x 0.72 = 0.72 m³
Volume Vertikal
Panjang = 4.24 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg
Volume Vertikal
Panjang = 3.10 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg
■ Anak Tangga
Anak Tangga yang direncanakan sebanyak 19 anak tangga
● Bentuk Segitiga
Alas = 0.36
Tinggi = 0.18
Panjang = 0.91
Volume = 1/2 0.36 x 0.18 x 0.91
= 0.0295 m³
= 0.0295 x 19.00 = 0.56 m³
● Jajaran Genjang
Alas = 3.46
Tinggi = 0.12
Volume = 3.46 x 0.12
= 0.42 x 2.00
= 0.8304 m³
■ Bordes
● Persegi Panjang
Panjang = 1.88
Lebar = 1.09
Tinggi = 0.12
Volume = 1.88 x 1.09 x 0.12
= 0.25 m³
● Segitiga 1
a = 7.1 m
t = 3.62 m
Luas = 1/2 a x t
= 12.85 m²
● Segitiga 2
a = 11.12 m
t = 5.6 m
Luas = 1/2 a x t
= 31.30 m²
= 2 x 31.30 = 62.61 m²
● Jajaran Genjang :
t = 3.55
a = 5.5
Luas = a x t
= 19.67 m²
= 2 x 19.67
= 39.33 m²
● Segitiga 3
a = 7.86 m
t = 3.9 m
Luas = 1/2 a x t
= 15.33 m²
= 2 x 15.33 = 30.65 m²
● Persegi Panjang
P = 5.5
L = 3.5
Luas = p x l
= 19.03 m²
● Segitiga 4
a = 3.96 m
t = 1.8 m
Luas = 1/2 a x t
= 3.48 m²
= 2 x 3.48 = 6.97 m²
● Persegi Panjang
P = 5.08
L = 2.72
Luas = p x l
= 13.82 m²
● Segitiga 5
a = 3.46 m
t = 1.9 m
Luas = 1/2 a x t
= 3.36 m²
Panjang = 62.56
Lebar = 0.03
Tinggi = 0.25
Volume = 62.56 x 0.03 x 0.25
= 0.47 m³
V. PEKERJAAN ARSITEKTUR
2. Luas P 2 = 2 buah
Tinggi = 2.40 m
Lebar = 0.90 m
= 2.40 x 0.9 = 2.16 m²
Luas = 2.00 x 2.16 = 4.32 m²
3. Luas P 3 = 5 buah
Tinggi = 2.40 m
Lebar = 0.80 m
= 2.40 x 0.8 = 1.92 m²
Luas = 5.00 x 1.92 = 9.60 m²
4. Luas P 4 = 4 buah
Tinggi = 2.00 m
Lebar = 0.70 m
= 2.00 x 0.70 = 1.40 m²
Luas = 4.00 x 1.40 = 5.60 m²
5. Luas J 1 = 8 buah
Tinggi = 1.97 m
Lebar = 0.72 m
= 1.97 x 0.72 = 1.42 m²
Luas = 8.00 x 1.42 = 11.35 m²
6. Luas J 2 = 11 buah
Tinggi = 1.52 m
Lebar = 0.72 m
= 1.52 x 0.72 = 1.09 m²
Luas = 11.00 x 1.09 = 12.04 m²
7. Luas V = 34 buah
Tinggi = 0.30 m
Lebar = 0.25 m
= 0.30 x 0.25 = 0.08 m²
Luas = 34.00 x 0.08 = 2.55 m²
8. Luas BA = 15 buah
Tinggi = 0.20 m
Lebar = 0.20 m
= 0.20 x 0.2 = 0.04 m²
Luas = 15.00 x 0.04 = 0.60 m²
1. P 1 = 8.64 m²
2. P 2 = 4.32 m²
3. P 3 = 9.60 m²
4. P 4 = 5.60 m²
5. J 1 = 11.35 m²
6. J 2 = 12.04 m²
7. V = 2.55 m²
8. BA = 0.60 m²
= 54.70 m²
panjang = 175 m
tinggi = 0.2 m
luas = 175 x 0.2 = 34.95 m²
Volume = 34.95 m²
panjang = 175 m
tinggi = 3.5 m
luas = 175 x 3.5 = 557.00 m²
Volume = 557 m²
V.I.3. Plesteran Dinding 1 : 3
luas plesteran dinding 1 := luas pasangan dinding x 2
= 34.95 x 2
jadi volume plesteran = 69.91 m²
● Keramik Bordes
Luas = 1.88 x 1.19 = 2.24 m²
1). P 1. = 3 Buah
panjang = ( 2 x 2.4 ) + 1.2
= 4.8 + 1.2 = 6.00 m
Panjang P 1 = 3.00 x 6.00 = 18.00 m
2). P 2 = 2 Buah
panjang = ( 2 x 2.4 ) + 0.9
= 4.8 + 0.9 = 5.70 m
Panjang P 2 = 2.00 x 5.70 = 11.40 m
3). P 3 = 5 Buah
panjang = ( 2 x 2.4 ) + 0.8
= 4.8 + 0.8 = 5.60 m
Panjang P 3 = 5.00 x 5.60 = 28.00 m
4). P 4 = 4 Buah
panjang = ( 2 x 2.00 ) + 0.7
= 4 + 0.7 = 4.70 m
Panjang P 4 = 4.00 x 4.70 = 18.80 m
5). J 1 = 8 Buah
panjang = ( 2 x 1.97 ) + ( 2 x 0.72 )
= 3.94 + 1.44 = 5.38 m
Panjang J 2 = 8.00 x 5.38 = 43.04 m
6). J 2 = 11 Buah
panjang = ( 2 x 1.52 ) + ( 2 x 0.72 )
= 3.04 + 1.44 = 4.48 m
Panjang J 2 = 11.00 x 4.48 = 49.28 m
7). V = 34 Buah
panjang = ( 2 x 0.30 ) + ( 2 x 0.25 )
= 0.6 + 0.5 = 1.1 m
Panjang J 2 = 34.00 x 1.1 = 37.4 m
Panajang Kayu Kusen
1). Tipe P 1 = 18.00 m
2). Tipe P 2 = 11.40 m
3). Tipe P 3 = 28.00 m
4). Tipe P 4 = 18.80 m
5). Tipe J 1 = 43.04 m
6). Tipe J 2 = 49.28 m
7). Tipe V = 37.4 m
205.92 m
●Tipe P 1 = 3 Buah
Tinggi = 2.40 m
Lebar = 1.20 m
Luas = 2.40 x 1.20 = 2.88 m²
Volume = 3.00 x 2.88 = 8.64 m²
●Tipe P 2 = 2 Buah
Tinggi = 2.40 m
Lebar = 0.90 m
Luas = 2.40 x 0.90 = 2.16 m²
Volume = 2.00 x 2.16 = 4.32 m²
●Tipe P 3 = 2 Buah
Tinggi = 2.40 m
Lebar = 0.80 m
Luas = 2.40 x 0.80 = 1.92 m²
Volume = 2.00 x 1.92 = 3.84 m²
●Tipe P 4 = 2 Buah
Tinggi = 2.40 m
Lebar = 0.70 m
Luas = 2.40 x 0.70 = 1.68 m²
Volume = 2.00 x 1.68 = 3.36 m²
● Tipe J 1 = 8 Buah
Tinggi = 1.97 m
Lebar = 0.72 m
Luas Jendela = 1.97 x 0.72 = 1.418 m²
Luas Jendela - luas Kaca = 1.418 - 0.744 = 0.675
Volume Jendela = 8.00 x 0.67 = 5.40 m²
● Tipe J 2 = 11 Buah
Tinggi = 1.52 m
Lebar = 0.72 m
Luas Jendela = 1.52 x 0.72 = 1.094 m²
Luas Jendela - luas Kaca = 1.094 - 0.546 = 0.549
Volume Jendela = 11.00 x 0.55 = 6.04 m²
I. Kaca Tebal 5 mm
a. Kaca P1 = 12 Buah
Tinggi = 0.96 m
Lebar = 0.10 m
Luas = 0.10 x 0.96 x 12 buah = 1.15 m²
b. Kaca P2 = 5 Buah
Tinggi = 0.21 m
Lebar = 0.16 m
Luas = 0.16 x 0.21 x 10 buah = 0.34 m²
c. Kaca J1 = 6 Buah
Tinggi = 1.75 m
Lebar = 0.49 m
Luas = 0.49 x 1.75 x 8 buah = 0.86 m²
d. Kaca J2 = 5 Buah
Tinggi = 1.3 m
Lebar = 0.49 m
Luas = 0.49 x 1.3 x 10 buah = 6.37 m²
Volume = 8.72 m²
V.3.8. Grendel
●Tipe P 1 = 6 buah
●Tipe P 2 = 2 buah
●Tipe P 3 = 5 buah
●Tipe P 4 = 4 buah
●Tipe J 1 = 8 buah
●Tipe J 2 = 11 buah
Volume = 36 buah
● Lantai 1
● Rangka Plafond Dalam
Penjelasan ( 1 )
5/10…… 4.89 x 2 = 9.78 m
5/5….…. ( 9 x 2.44 ) + 4 x 4.89 ) = 41.52 m
Penjelasan ( 2 )
5/10…… 4.89 x 2 = 9.78 m
5/5….…. ( 6 x 3.88 ) + 4 x 4.89 ) = 42.84 m
Penjelasan ( 3 )
5/10…… 4.89 x 2 = 9.78 m
5/5….…. ( 8 x 3.84 ) + 6 x 3.88 ) = 54 m
Penjelasan ( 4 )
5/10…… 12.38 x 2 = 24.76 m
5/5….…. ( 7 x 3.84 ) + 9 x 2.76 ) + 6 x 1.86 )
+ ( 4 x 1.3 ) + 5 x 4.80 ) + 6 x 3.98 )
Panjang = 26.88 + 24.84 + 11.16 + 5.2 + 24 +
23.88
= 115.96 m
Penjelasan ( 5 )
5/10…… 3.80 x 2 = 7.6 m
5/5….…. ( 6 x 3.30 ) + 7 x 3.80 ) = 46.4 m
Penjelasan ( 6 )
5/10…… 2.84 x 2 = 5.68 m
5/5….…. ( 5 x 2.80 ) + 6 x 2.84 ) = 31.04 m
Penjelasan ( 7 )
5/5….…. ( 6 x 1.88 ) + 3 x 3.84 ) = 22.8 m
Penjelasan ( 8 )
5/5….…. ( 2 x 1.84 ) + 4 x 0.84 ) = 7.04 m
Penjelasan ( 9 )
5/5….…. ( 4 x 1.39 ) + 4 x 1.84 ) = 12.92 m
● Lantai 2
Penjelasan ( 1 )
5/10…… 4.89 x 2 = 9.78 m
5/5….…. ( 9 x 2.44 ) + 4 x 4.89 ) = 41.52 m
Penjelasan ( 2 )
5/10…… 4.93 x 2 = 9.86 m
5/5….…. ( 8 x 3.88 ) + 8 x 4.93 ) = 70.48 m
Penjelasan ( 3 )
5/10…… 3.88 x 2 = 7.76 m
5/5….…. ( 6 x 3.88 ) + 8 x 3.88 ) = 54.32 m
Penjelasan ( 4 )
5/10…… 10.78 x 2 = 21.56 m
5/5….…. ( 9 x 4 )+ 9 x 5 )+ 4 x 7 )
+ ( 13 x 2.9 ) + 6 x 4.86 ) + 9 x 4.8 )+ ( 4 x 3
+ ( 5 x 2.00 )
Panjang = 36.72 + 43.92 + 27.56 + 37.7 + 29.16 + 43.2
+ 10.56 + 10
= 238.82 m
Penjelasan ( 5 )
5/10…… 4.88 x 2 = 9.76 m
5/5….…. ( 6 x 3.88 ) + 7 x 3.80 ) = 49.88 m
Penjelasan ( 6 )
5/5….…. ( 5 x 1.88 ) + 6 x 2.85 ) = 26.5 m
Penjelasan ( 7 )
5/5….…. ( 6 x 1.38 ) + 4 x 3.88 ) = 23.8 m
Penjelasan ( 1 )
5/5….…. 21.58 + ( 0.90 x 16 ) = 35.98 m
Penjelasan ( 2 )
5/5….…. 22.24 + ( 0.90 x 16 ) = 36.64 m
Penjelasan ( 3 )
5/5….…. 16.14 + ( 0.90 x 16 ) = 30.54 m
Penjelasan ( 4 )
5/5….…. 28.62 + ( 0.90 x 5 )+ 1.9 x 12 ) = 55.92 m
● Lantai 1
Memasang Plafond dalam dengan tripleks tebal 4 mm
● Lantai 2
● Memasang Plafond dalam dengan tripleks tebal 4 mm
● Lantai 1
List plafond menggunakan kayu profil
● Lantai 2
Volume = 7 Buah
VI.4. Westafel
Volume = 2 Buah
Volume = 4 Buah
Volume = 4 Buah
VI.7. Floordrain
Volume = 4 Buah
Volume = 1 Buah
Volume = 2 Unit
Volume = 1 Ls
Volume = 14 Buah
Volume = 11 Buah
Volume = 7 Buah
Volume = 24 Buah
Volume = 20 Buah
Volume = 4 Buah
Volume = 1 Ls
NOMOR
NO URAIAN JENIS PEKERJAAN
ANALISA
1 2 3 4
I PEKERJAAN PERSIAPAN
V PEKERJAAN ARSITEKTUR
VI PEKERJAAN MEKANIKAL
JUMLAH 54,792,269.51
REKAPITULASI
(ENGINEERING ESTIMATE)
JUMLAH 982,426,347.23
PPN 10 % 98,242,634.72
JUMLAH TERMASUK PPN 10 % 1,080,668,981.95
DIBULATKAN 1,080,669,000.00
Terbilang : Satu Milyar Delapan Puluh Juta Enam Ratus Enam Puluh Sembilan Ribu Rupiah
Keterangan :
pelaksanaan proyek
125,000.00
160,000.00
175,000.00
225,000.00
250,000.00
275,000.00
300,000.00
225,000.00
150,000.00
125,000.00
50,000.00
200,000.00
250,000.00
55,000.00
TABEL DURASI PEKERJAAN
Durasi Kegiatan
No Kegiatan
Hari Minggu
I PEKERJAAN PERSIAPAN
1 m2 Pembersihan Lapangan 6 1
1 m1 Pengukuran dan Pemasangan Bowplank 2
1 m2 Gudang Semen Dan Alat-Alat 6 1
14 2
II PEKERJAAN GALIAN TANAH
1 m3 Galian Tanah Pondasi Telapak 4
1 m3 Galian Tanah Pondasi Batu Kali 5
1 m3 Urugan Kembali 1/4 Galian 1
10 2
III PEKERJAAN STRUKTUR BAWAH
1 m3 Pekerjaan Pondasi Telapak 3
Pekerjaan Pondasi Bantu Kali
1 m3 Urugan Pasir Bawah Pondasi 1
1 m3 Anstampang Batu Kali 3
1 m3 Pasangan Pondasi Batu Kali 9
Pekerjaan Sloof Utama dan Praktis
1 m3 Beton Sloof (S1) Bertulang 20 x 30 3
1 m3 Beton Sloof (S1) Bertulang 15x 20
19
IV PEKERJAAN STRUKTUR ATAS
Pekerjaan Kolom Utama dan Praktis
1 m3 Beton Kolom (K1) Bertulang 30 x 35 5
1 m3 Beton Kolom (K2) Bertulang 30 x 30 5
1 m3 Beton Kolom (K3) Bertulang 20 x 20 4
1 m3 Kolom Praktis (KP) Bertulang 12 x 12 3
Durasi Kegiatan
No Kode Kegiatan
Hari Minggu
1 A Pekerjaan Persiapan 14 2
2 B Pekerjaan Galian Tanah Pondasi 13 2
4 C Pekerjaan Struktur Bawah (Pondasi) 12 2
D Pekerjaan Sloof Utama dan Praktis 7 1
PEKERJAAN STRUKTUR ATAS LT.I
5 E Pekerjaan Kolom Utama dan Praktis 7 1
PEKERJAAN STRUKTUR ATAS LT.II
6 F Pekerjaan Kolom Utama dan Praktis 7 1
7 G Pekerjaan Balok Utama dan Balok Anak 15 2
8 H Pekerjaan Plat Lantai 32 5
9 I Pekerjaan Balok Utama, Anak dan Ring Balok 14 2
10 J Pekerjaan Plat Atap 32 5
11 K Pekerjaan tangga beton bertulang 7 1
12 L Pekerjaan Atap 7 1
PEKERJAAN ARSITEKTUR LT. I
13 M Pekerjaan Dinding + Kusen 10 1
14 N Pekerjaan Pasangan Keramik 7 1
15 O Pekerjaan Pintu dan Jendela 7 1
16 P Pekerjaan Plafond 8 1
PEKERJAAN MEKANIKAL
22 V Pekerjaan Mekanikal LT. I 14 2
23 W Pekerjaan Mekanikal LT. II 7 1
PEKERJAAN ELEKTRIKAL
24 X Pekerjaan Elektrikal LT. I 7 1
25 Y Pekerjaan Elektrikal LT. II 7 1
25 Z PEKERJAAN FINISHING 21 3
DAFTAR KETERGANTUNGAN ANTAR K
PADA PROYEK RUMAH TINGGAL 2 L
No Kode Kegiatan
1 A Pekerjaan Persiapan
2 B Pekerjaan Galian Tanah Pondasi
4 C Pekerjaan Struktur Bawah (Pondasi)
D Pekerjaan Sloof Utama dan Praktis
PEKERJAAN STRUKTUR ATAS LT.I
5 E Pekerjaan Kolom Utama dan Praktis
PEKERJAAN STRUKTUR ATAS LT.II
6 F Pekerjaan Kolom Utama dan Praktis
7 G Pekerjaan Balok Utama dan Balok Anak
8 H Pekerjaan Plat Lantai
9 I Pekerjaan Balok Utama, Anak dan Ring Balok
10 J Pekerjaan Plat Atap
11 K Pekerjaan tangga beton bertulang
12 L Pekerjaan Atap
PEKERJAAN ARSITEKTUR LT. I
13 M Pekerjaan Dinding + Kusen
14 N Pekerjaan Pasangan Keramik
15 O Pekerjaan Pintu dan Jendela
16 P Pekerjaan Plafond
PEKERJAAN MEKANIKAL
22 V Pekerjaan Mekanikal LT. I
23 W Pekerjaan Mekanikal LT. II
PEKERJAAN ELEKTRIKAL
24 X Pekerjaan Elektrikal LT. I
25 Y Pekerjaan Elektrikal LT. II
25 Z PEKERJAAN FINISHING
NTUNGAN ANTAR KEGIATAN
UMAH TINGGAL 2 LANTAI
- B
A C
B D
C E
D G,H
G,H I,J
E K
E F
F J
I Q,Y
G M,X,
I Z
K N
M O
N W,P
O,V Z
J R,L
Q S
R T
S U
T V
O Z
T Z
K Z
J Z
L,P,V,W,X,Y
JADWAL PROYE
0 A 2 B 4 C 6 D 7 E
1 2 3 4 5
0 2 2 2 4 2 5 1 6 1
Maka Jalur Kritis Pada Proyek Pembangunan Rumah Tinggal 2 Lantai adalah :
A, B, C,H, F, J, Q, R, S, T, U, V, dan Z.
JADWAL PROYEK MENGGUNAKAN DIAGRAM JALUR KRITIS ( CRITICAL PATH METHOD - CPM )
15.2
14
29
W
1
12.2 N 13.2 O 14.2
10 12 13
25 1 26 1 27
M P
1 1
10 K 10.8 15.4
7 9 15
23 1 24 X 29
G 1 11.8 15.3
11 27
2 29 29
8
6
7 20.9
22
H 29
5 L
12.3 F 13.3 I 15.3 1
8 16 17
12 1 13 2 29 19.9 R 20.9 S
19 20
J 20 1 21 1
5 Q
17.9 2
18
18
Y
1
18.9
21
29
21.9
23
22
DURASI PEKERJAAN
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
I.1. Membersihkan 1 M² Lapangan 375.00
Tenaga
Pekerja 0.100 OH
Mandor 0.050 OH
Jumlah 0.15
Diperlukan 8 Orang Tenaga Kerja
375.00
D = 1 = 6.25 = 6 Hari
x 9
0.15
Rp 46,421
69,600 2 278,400 Rp 2,645,997.00
82,000 2 328,000
86,300 2 172,600
90,300 2 180,600
Rp 959,600 Rp 1,686,397.00
Rp 255,375
69,600 4 2,505,600 Rp 4,596,750.00
82,000 4 1,312,000
82,000 4 328,000
86,300 4 345,200
4,490,800 Rp 105,950.00
66703.5 Rp 2,449,353
69,600 4 1,948,800
90,300 4 361,200
2,310,000
Rp 2,089,185
69,600 5 1,392,000
90,300 5 451,500
1,843,500 Rp 245,685
Rp 18,149
69,600 1 69,600 Rp 174,070
90,300 1 90,300
159,900
Rp 511,340
69,600 3 1,879,200 Rp 3,970,858
82,000 3 246,000
82,000 3 738,000
82,400 3 494,400
100,000 3 300,000
90,300 3 270,900
3,928,500 Rp 42,358
Rp 21,783
69,600 1 69,600 Rp 198,988
90,300 1 90,300
159,900
Rp 168,131
69,600 3 835,200
82,000 3 492,000 Rp 2,303,808.18
86,300 3 258,900
90,300 3 270,900
Rp 2,025,131
Rp 168,131
69,600 9 4,384,800
82,000 9 1,476,000
86,300 9 776,700 Rp 7,702,209.52
90,300 9 812,700
Rp 7,618,331
69,600 3 1,252,800 Rp 657,431
82,000 3 246,000
82,000 3 246,000
82,400 3 247,200 Rp 3,162,966.28
100,000 3 300,000
90,300 3 270,900
2,562,900
Rp 892,906
69,600 2 556,800 Rp 1,500,081.91
82,000 2 164,000
82,000 2 164,000
82,400 2 164,800
100,000 2 200,000
90,300 2 180,600
1,430,200
Rp 1,077,995
69,600 5 2,784,000 Rp 5,821,173.00
82,000 5 410,000
82,000 5 410,000
82,400 5 412,000
100,000 5 500,000
90,300 5 451,500
4,967,500
Rp 1,077,995
69,600 2 556,800 Rp 1,724,792
82,000 2 164,000
82,000 2 164,000
82,400 2 164,800
100,000 2 200,000
90,300 2 180,600
1,430,200
Rp 1,077,995
69,600 3 1,670,400 Rp 3,449,584
82,000 3 246,000
82,000 3 246,000
82,400 3 247,200
100,000 3 300,000
90,300 3 270,900
2,980,500
806,785.50
69,600 6 2,088,000 4,709,771.71
82,000 6 492,000
82,000 6 492,000
82,400 6 494,400
100,000 6 600,000
90,300 6 541,800
4,708,200
806,785.50
69,600 2 417,600 1,188,201.41
82,000 2 164,000
82,000 2 164,000
82,400 2 164,800
100,000 2 200,000
1,110,400
778,467.90
69,600 8 4,454,400 9,528,447.10
82,000 8 656,000
82,000 8 1,968,000
82,400 8 659,200
100,000 8 800,000
90,300 8 722,400
9,260,000 268,447.10
778,467.90
69,600 8 3,897,600 8,967,950.21
82,000 8 656,000
82,000 8 1,968,000
82,400 8 659,200
100,000 8 800,000
90,300 8 722,400
8,703,200 264,750.21
Rp 780,601
69,600 1 637,842.24 Rp 1,277,453
82,000 1 46,967.55
82,000 1 308,643.90
82,400 1 188,786.64
100,000 1 33,057.30
90,300 1 29,850.74
1,245,148.37 Rp 32,304.51
Rp 1,384,020
69,600 2 556,800 Rp 2,054,107.12
82,000 2 820,000
86,300 2 172,600
90,300 2 180,600
1,730,000
830,412.00
69,600 2 278,400 Rp 1,254,088
82,000 2 492,000
86,300 2 172,600
90,300 2 180,600
1,123,600 Rp 130,488
32,949.00
69,600 1 69,600 Rp 39,133
82,000 1 82,000
86,300 1 86,300
90,300 1 90,300
328,200
JADWAL PROYEK RUMAH TINGGAL 2 LANT
DENGAN MENGGUNAKAN BARCHART
DURASI
NO KODE JENIS KEGIATAN 1 2 3 4 5 6 7 8 9 10 11 12
(MINGGU)
1 A Pekerjaan Persiapan 2
2 B Pekerjaan Galian Tanah Pondasi 2
4 C Pekerjaan Struktur Bawah (Pondasi) 2
D Pekerjaan Sloof Utama dan Praktis 1
PEKERJAAN STRUKTUR ATAS LT.I
5 E Pekerjaan Kolom Utama dan Praktis 1
PEKERJAAN STRUKTUR ATAS LT.II
6 F Pekerjaan Kolom Utama dan Praktis 1
7 G Pekerjaan Balok Utama dan Balok Anak 2
8 H Pekerjaan Plat Lantai 5
9 I Pekerjaan Balok Utama, Anak dan Ring Balok 2
10 J Pekerjaan Plat Atap 5
11 K Pekerjaan tangga beton bertulang 1
12 L Pekerjaan Atap 1
PEKERJAAN ARSITEKTUR LT. I
13 M Pekerjaan Dinding + Kusen 1
14 N Pekerjaan Pasangan Keramik 1
15 O Pekerjaan Pintu dan Jendela 1
16 P Pekerjaan Plafond 1
PEKERJAAN MEKANIKAL
22 V Pekerjaan Mekanikal LT. I 2
23 W Pekerjaan Mekanikal LT. II 1
PEKERJAAN ELEKTRIKAL 1
24 X Pekerjaan Elektrikal LT. I 1
25 Y Pekerjaan Elektrikal LT. II
25 Z PEKERJAAN FINISHING 3
GAL 2 LANTAI
ARCHART
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ANALISA HARGA SATUAN PEKERJAAN
1 2 3 4
I PEKERJAAN PERSIAPAN
I.1 1 m2 Pembersihan Awal Lokasi
Tenaga
Mandor Lapangan 0.050 Oh
Pekerja 0.100 Oh
Tenaga
Pekerja 0.100 Oh
Kepala Tukang 0.010 Oh
I.3 1 m2 Pembuatan Bangsal Kerja dan Gudang Semen dan Alat - alat
Bahan
Kayu 0.210 M3
Paku campur 0.300 Kg
Semen Portland 10.500 Kg
Pasir beton 0.030 M3
Papan Kayu Klas II 0.035 Lbr
Koral Beton 0.050 M3
Seng Gelombang BLJS 20 0.840 Lbr
Tenaga
Tukang Kayu 2.000 Oh
Pekerja 1.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.050 Oh
Tenaga
Pekerja 3.900 Oh
Tukang Batu 0.350 Oh
Tukang kayu 1.040 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.245 Oh
Mandor 0.165 Oh
Tenaga
Pekerja 0.300 Oh
Mandor 0.010 Oh
Tenaga
Pekerja 1.5000 Oh
Tukang Batu 0.6000 Oh
Kepala Tukang 0.0600 Oh
Mandor 0.0750 Oh
Tenaga
Pekerja 1.5000
Tukang Batu 0.6000
Kepala Tukang 0.0600
Mandor 0.0750
Tenaga
Pekerja 4.850 Oh
Tukang Batu 0.350 Oh
Tukang kayu 1.560 Oh
Tukang besi 1.400 Oh
Kepala Tukang 0.331 Oh
Mandor 0.170 Oh
III.3.2 1 m3 Beton Sloof (S1) Bertulang 15x 20 (Pembesian 150 Kg)
Bahan
Kayu Klas II 0.270 M3
Paku biasa 2" - 5" 2.000 Kg
Minyak bekisting 0.600 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 3.000 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan klas II 0.060 M3
Tenaga
Pekerja 4.850 Oh
Tukang Batu 0.350 Oh
Tukang kayu 1.560 Oh
Tukang besi 1.400 Oh
Kepala Tukang 0.331 Oh
Mandor 0.170 Oh
Tenaga
Pekerja 7.0500 OH
Tukang Batu 0.2750 OH
Tukang Kayu 1.6500 OH
Tukang Besi 2.1000 OH
Kepala Tukang 0.4030 OH
Mandor 0.3530 OH
IV.1.2 1 m3 Beton Kolom (K2) Bertulang 30 x 30 (Pembesian 250 Kg)
Bahan
Kayu Klas II 0.400 M3
Paku biasa 2" - 5" 4.000 Kg
Minyak bekisting 2.000 Lt
Besi Beton Polos 250.000 Kg
Kawat Beton 3.000 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan Klas II 0.150 M3
Tenaga
Pekerja 7.300 Oh
Tukang Batu 0.350 Oh
Tukang kayu 3.300 Oh
Tukang besi 2.100 Oh
Kepala Tukang 0.750 Oh
Mandor 0.250 Oh
Tenaga
Pekerja 7.300 Oh
Tukang Batu 0.350 Oh
Tukang kayu 3.300 Oh
Tukang besi 2.100 Oh
Kepala Tukang 0.750 Oh
Mandor 0.250 Oh
Tenaga
Pekerja 7.300 Oh
Tukang Batu 0.350 Oh
Tukang kayu 3.300 Oh
Tukang besi 2.100 Oh
Kepala Tukang 0.750 Oh
Mandor 0.250 Oh
Tenaga
Pekerja 5.800 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.800 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.420 Oh
Mandor 0.185 Oh
Tenaga
Pekerja 5.800 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.800 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.420 Oh
Mandor 0.185 Oh
Tenaga
Pekerja 5.800 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.800 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.420 Oh
Mandor 0.185 Oh
Tenaga
Pekerja 5.600 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.640 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.400 Oh
Mandor 0.193 Oh
Tenaga
Pekerja 5.600 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.640 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.400 Oh
Mandor 0.193 Oh
Tenaga
Pekerja 5.600 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.300 Oh
Tukang besi 1.400 Oh
Kepala Tukang 0.405 Oh
Mandor 0.202 Oh
Tenaga
pekerja 4.000 Oh
Tukang kayu 12.000 Oh
Kepala Tukang 1.200 Oh
Mandor 0.200 Oh
Tenaga
pekerja 2.4000 Oh
Tukang kayu 7.2000 Oh
Kepala Tukang 0.7200 Oh
Mandor 0.1200 Oh
Tenaga
pekerja 0.100 Oh
Tukang kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh
Tenaga
Pekerja 0.200 Oh
Tukang kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.010 Oh
Tenaga
Pekerja 0.4000 OH
Tukang Kayu 0.2000 OH
Kepala Tukang 0.0200 OH
Mandor 0.0200 OH
IV.5.7 1 m2 pasang lisplang ukuran (25 x 30) cm, kayu klas II
Bahan
kayu klas II, papan 0.011 m3
paku biasa 2" - 5" 0.050 kg
Tenaga
pekerja 0.110 Oh
Tukang kayu 0.220 Oh
Kepala Tukang 0.022 Oh
Mandor 0.005 Oh
V PEKERJAAN ARSITEKTUR
V.1 Pekerjaan Dinding
V.1.1 1 M2 Pasang Bata Semen Lokal Tebal 1/2 Bata, 1 Pc : 3 Ps
Bahan
Batu Bata 25.000 Bh
Semen Portland 14.370 Kg
Pasir pasang 0.040 M3
Tenaga
Pekerja 0.320 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.015 Oh
Tenaga
Pekerja 0.320 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.015 Oh
Tenaga
Pekerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh
Tenaga
Pekerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh
Tenaga
Pekerja 1.1500 OH
Tukang Batu 0.0200 OH
Kepala Tukang 0.0020 OH
Mandor 0.0060 OH
Tenaga
Pekerja 0.2500 OH
Tukang Batu 0.1200 OH
Kepala Tukang 0.0120 OH
Mandor 0.0130 OH
Tenaga
Pekerja 0.6200 OH
Tukang Batu 0.3500 OH
Kepala Tukang 0.0350 OH
Mandor 0.0300 OH
Tenaga
Pekerja 0.6200 OH
Tukang Batu 0.3500 OH
Kepala Tukang 0.0350 OH
Mandor 0.0300 OH
Tenaga
Pekerja 6.0000 OH
Tukang Kayu 18.0000 OH
Kepala Tukang 2.0000 OH
Mandor 0.3000 OH
Tenaga
Pekerja 1.0000 OH
Tukang Kayu 2.5000 OH
Kepala Tukang 0.2500 OH
Mandor 0.0500 OH
Tenaga
Pekerja 0.8000 OH
Tukang Kayu 2.0000 OH
Kepala Tukang 0.2000 OH
Mandor 0.0400 OH
V.3.4 1 m2 Pasang Bingkai Jendela Kaca
Bahan
kayu klas I, papan 0.064 m3
Tenaga
Pekerja 1.000 Oh
Tukang kayu 3.000 Oh
Kepala Tukang 0.300 Oh
Mandor 0.300 Oh
Tenaga
Pekerja 0.0150 OH
Tukang Kayu 0.1500 OH
Kepala Tukang 0.0150 OH
Mandor 0.0008 OH
Tenaga
Pekerja 0.0500 OH
Tukang Kayu 0.5000 OH
Kepala Tukang 0.0500 OH
Mandor 0.0025 OH
Tenaga
Pekerja 0.0150 OH
Tukang Kayu 0.1500 OH
Kepala Tukang 0.0150 OH
Mandor 0.0008 OH
V.3.8 Pasang Ensel Jendela
Bahan
Engsel Jendela 1.0000 bh
Tenaga
Pekerja 0.0100 OH
Tukang Kayu 0.1000 OH
Kepala Tukang 0.0100 OH
Mandor 0.0005 OH
Tenaga
Pekerja 0.0150 OH
Tukang Kayu 0.1500 OH
Kepala Tukang 0.0150 OH
Mandor 0.0008 OH
Tenaga
Pekerja 0.0150 OH
Tukang Kayu 0.1500 OH
Kepala Tukang 0.0150 OH
Mandor 0.0008 OH
Tenaga
Pekerja 0.1500 OH
Tukang Kayu 0.2500 OH
Kepala Tukang 0.0250 OH
Mandor 0.0750 OH
V.4.2 1 m2 Pasang Plafon Tripleks Tebal 4 mm
Bahan
Tripleks 0.3750 lembar
Paku Triplek 0.0300 kg
Tenaga
Pekerja 0.0700 OH
Tukang Kayu 0.1000 OH
Kepala Tukang 0.0100 OH
Mandor 0.0040 OH
Tenaga
Pekerja 0.0210 OH
Tukang Kayu 0.0210 OH
Kepala Tukang 0.0020 OH
Mandor 0.0010 OH
Tenaga
Tukang Besi Konstruksi 1.200 Oh
Pekerja 1.200 Oh
Kepala Tukang 0.012 Oh
Mandor 0.001 Oh
VI PEKERJAAN MEKANIKAL
VI.1 Memasang 1 m' Pipa Saluran Air Kotor PVC D 4 ''
Bahan
Pipa PVC 1.2000 m'
Perlengkapan 35% harga pipa
Tenaga
Pekerja 0.0810 OH
Tukang Batu 0.1350 OH
Kepala Tukang 0.0135 OH
Mandor 0.0041 OH
VI.2 Memasang 1 m' Pipa Saluran Air Bersih PVC D 3/4 ''
Bahan
Pipa PVC 1.2000 m'
Perlengkapan 35% harga pipa
Tenaga
Pekerja 0.0360 OH
Tukang Batu 0.0600 OH
Kepala Tukang 0.0060 OH
Mandor 0.0018 OH
Tenaga
Pekerja 0.0100 OH
Tukang Batu 0.1000 OH
Kepala Tukang 0.0100 OH
Mandor 0.0050 OH
Tenaga
Pekerja 1.2000 OH
Tukang Batu 1.4500 OH
Kepala Tukang 0.1500 OH
Mandor 0.1000 OH
Tenaga
Pekerja 1.8000 OH
Tukang Batu 2.7000 OH
Kepala Tukang 0.5400 OH
Mandor 0.1100 OH
Tenaga
Pekerja 0.0100 OH
Tukang Batu 0.1000 OH
Kepala Tukang 0.0100 OH
Mandor 0.0050 OH
Tenaga
Pekerja 0.0300 OH
Tukang Batu 0.3000 OH
Kepala Tukang 0.0300 OH
Mandor 0.0015 OH
Tenaga
Pekerja 1.200 Oh
Mandor 0.120 Oh
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Tenaga
Pekerja 0.020 Oh
Tukang Cat 0.063 Oh
Kepala Tukang 0.0063 Oh
Mandor 0.0025 Oh
Tenaga
Pekerja 0.020 Oh
Tukang Cat 0.063 Oh
Kepala Tukang 0.0063 Oh
Mandor 0.0025 Oh
VIII.3 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ) 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
Cat Meni 0.200 Kg
Plamir 0.150 Kg
Cat dasar 0.170 Kg
Cat penutup 2 kali 0.260 Kg
Tenaga
Pekerja 0.070 Oh
Tukang Cat 0.009 Oh
Kepala Tukang 0.006 Oh
Mandor 0.0025 Oh
EKERJAAN
90,300.00 4,515.00
69,600.00 6,960.00
JUMLAH 11,475.00
2,250,000.00 27,000.00
19,900.00 398.00
1,600,000.00 11,200.00
JUMLAH (a) 38,598.00
69,600.00 6,960.00
86,300.00 863.00
JUMLAH (b) 7,823.00
JUMLAH (a) + (b) 46,421.00
2,250,000.00 472,500.00
19,900.00 5,970.00
1,640.00 17,220.00
350,000.00 10,500.00
2,250,000.00 78,750.00
400,000.00 20,000.00
50,960.00 42,806.40
JUMLAH 647,746.40
82,000.00 164,000.00
69,600.00 69,600.00
86,300.00 17,260.00
90,300.00 4,515.00
JUMLAH 255,375.00
JUMLAH (a) + (b) 903,121.40
69,600.00 62,640.00
90,300.00 4,063.50
JUMLAH 66,703.50
69,600.00 52,200.00
90,300.00 2,257.50
JUMLAH 54,457.50
69,600.00 52,200.00
90,300.00 2,257.50
JUMLAH 54,457.50
69,600.00 17,400.00
90,300.00 749.49
JUMLAH 18,149.49
2,250,000.00 450,000.00
19,900.00 29,850.00
23,300.00 9,320.00
7,679.86 1,151,979.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
JUMLAH 2,715,044.00
69,600.00 271,440.00
82,000.00 28,700.00
82,000.00 85,280.00
82,400.00 86,520.00
100,000.00 24,500.00
90,300.00 14,899.50
JUMLAH 511,339.50
JUMLAH (a) + (b) 3,226,383.50
175,000.00 75,600.00
JUMLAH 75,600.00
69,600.00 20,880.00
90,300.00 903.00
JUMLAH 21,783.00
JUMLAH (a) + (b) 97,383.00
265,000.00 318,000.00
JUMLAH 318,000.00
69,600.00 104,400.00
86,300.00 51,780.00
86,300.00 5,178.00
90,300.00 6,772.50
JUMLAH 168,130.50
JUMLAH (a) + (b) 486,130.50
265,000.00 318,000.00
1,640.00 223,040.00
300,000.00 163,200.00
JUMLAH 704,240.00
69,600.00 104,400.00
86,300.00 51,780.00
86,300.00 5,178.00
90,300.00 6,772.50
JUMLAH 168,130.50
JUMLAH (a) + (b) 872,370.50
2,250,000.00 607,500.00
19,900.00 39,800.00
23,300.00 13,980.00
16,253.05 3,250,610.00
22,300.00 66,900.00
1,640.00 529,720.00
350,000.00 182,000.00
450,000.00 351,000.00
1,600,000.00 96,000.00
JUMLAH 5,137,510.00
69,600.00 337,560.00
82,000.00 28,700.00
82,000.00 127,920.00
82,000.00 114,800.00
100,000.00 33,100.00
90,300.00 15,351.00
JUMLAH 657,431.00
JUMLAH (a) + (b) 5,794,941.00
2,250,000.00 607,500.00
19,900.00 39,800.00
23,300.00 13,980.00
17,201.86 2,580,279.00
22,300.00 66,900.00
1,640.00 529,720.00
350,000.00 182,000.00
450,000.00 351,000.00
1,600,000.00 96,000.00
JUMLAH 4,467,179.00
69,600.00 337,560.00
82,000.00 28,700.00
82,000.00 127,920.00
82,000.00 114,800.00
100,000.00 33,100.00
90,300.00 15,351.00
JUMLAH 657,431.00
JUMLAH (a) + (b) 5,124,610.00
2,250,000.00 900,000.00
19,900.00 79,600.00
23,300.00 46,600.00
16,253.05 5,119,710.75
22,300.00 100,350.00
1,640.00 529,720.00
350,000.00 189,000.00
400,000.00 324,000.00
2,250,000.00 337,500.00
JUMLAH 7,626,480.75
69,600.00 490,680.00
82,000.00 22,550.00
82,000.00 135,300.00
82,000.00 172,200.00
100,000.00 40,300.00
90,300.00 31,875.90
JUMLAH 892,905.90
JUMLAH (a) + (b) 8,519,386.65
2,250,000.00 900,000.00
19,900.00 79,600.00
23,300.00 46,600.00
15,537.68 3,884,420.00
22,300.00 66,900.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
1,600,000.00 240,000.00
JUMLAH 6,241,240.00
69,600 508,080.00
82,000 28,700.00
82,000 270,600.00
82,400 173,040.00
100,000 75,000.00
90,300 22,575.00
JUMLAH 1,077,995.00
JUMLAH (a) + (b) 7,319,235.00
2,250,000.00 900,000.00
19,900.00 79,600.00
23,300.00 46,600.00
15,558.56 3,111,712.00
22,300.00 156,100.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 337,500.00
JUMLAH 5,655,232.00
69,600.00 508,080.00
82,000.00 28,700.00
82,000.00 270,600.00
82,400.00 173,040.00
100,000.00 75,000.00
90,300.00 22,575.00
JUMLAH 1,077,995.00
JUMLAH (a) + (b) 6,733,227.00
2,250,000.00 900,000.00
19,900.00 79,600.00
23,300.00 46,600.00
17,400.70 2,610,105.00
22,300.00 83,625.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 337,500.00
JUMLAH 5,081,150.00
69,600.00 508,080.00
82,000.00 28,700.00
82,000.00 270,600.00
82,400.00 173,040.00
100,000.00 75,000.00
90,300.00 22,575.00
JUMLAH 1,077,995.00
JUMLAH (a) + (b) 6,159,145.00
2,250,000.00 720,000.00
19,900.00 63,680.00
23,300.00 37,280.00
15,537.68 3,884,420.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 135,000.00
JUMLAH 5,914,275.00
69,600.00 403,680.00
82,000.00 28,700.00
82,000.00 229,600.00
82,000.00 86,100.00
100,000.00 42,000.00
90,300.00 16,705.50
JUMLAH 806,785.50
JUMLAH (a) + (b) 6,721,060.50
2,250,000.00 720,000.00
19,900.00 63,680.00
23,300.00 37,280.00
17,201.86 2,580,279.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 135,000.00
JUMLAH 4,610,134.00
69,600.00 403,680.00
82,000.00 28,700.00
82,000.00 229,600.00
82,000.00 86,100.00
100,000.00 42,000.00
90,300.00 16,705.50
JUMLAH 806,785.50
JUMLAH (a) + (b) 5,416,919.50
2,250,000.00 720,000.00
19,900.00 63,680.00
23,300.00 37,280.00
17,201.86 1,720,186.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 135,000.00
JUMLAH 3,750,041.00
69,600.00 403,680.00
82,000.00 28,700.00
82,000.00 229,600.00
82,000.00 86,100.00
100,000.00 42,000.00
90,300.00 16,705.50
JUMLAH 806,785.50
JUMLAH (a) + (b) 4,556,826.50
2,250,000.00 375,750.00
19,900.00 63,680.00
23,300.00 37,280.00
7,679.86 1,151,979.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 315,000.00
2,250,000.00 562,500.00
JUMLAH 3,580,084.00
69,600.00 389,760.00
82,000.00 28,700.00
82,000.00 216,480.00
82,000.00 86,100.00
100,000.00 40,000.00
90,300.00 17,427.90
JUMLAH 778,467.90
JUMLAH (a) + (b) 4,358,551.90
2,250,000.00 375,750.00
19,900.00 63,680.00
23,300.00 37,280.00
7,679.86 1,151,979.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 315,000.00
2,250,000.00 562,500.00
JUMLAH 3,580,084.00
69,600.00 389,760.00
82,000.00 28,700.00
82,000.00 216,480.00
82,000.00 86,100.00
100,000.00 40,000.00
90,300.00 17,427.90
JUMLAH 778,467.90
JUMLAH (a) + (b) 4,358,551.90
2,250,000.00 562,500.00
19,900.00 59,700.00
23,300.00 27,960.00
25,080.56 3,762,084.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 236,250.00
JUMLAH 5,722,389.00
69,600.00 389,760.00
82,000.00 28,700.00
82,000.00 188,600.00
82,000.00 114,800.00
100,000.00 40,500.00
90,300.00 18,240.60
JUMLAH 780,600.60
JUMLAH (a) + (b) 6,502,989.60
3,690,000.00 4,059,000.00
7,500.00 112,500.00
19,900.00 15,920.00
JUMLAH 4,187,420.00
69,600.00 278,400.00
82,000.00 984,000.00
86,300.00 103,560.00
90,300.00 18,060.00
JUMLAH 1,384,020.00
JUMLAH (a) + (b) 5,571,440.00
2,250,000.00 2,475,000.00
19,900.00 79,600.00
JUMLAH 2,554,600.00
69,600.00 167,040.00
82,000.00 590,400.00
86,300.00 62,136.00
90,300.00 10,836.00
JUMLAH 830,412.00
JUMLAH (a) + (b) 3,385,012.00
1,690,000.00 1,859,000.00
19,900.00 79,600.00
JUMLAH 1,938,600.00
69,600.00 6,960.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 451.50
JUMLAH 16,474.50
JUMLAH (a) + (b) 1,955,074.50
1,690,000.00 1,859,000.00
19,900.00 79,600.00
JUMLAH 1,938,600.00
69,600.00 6,960.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 451.50
JUMLAH 16,474.50
JUMLAH (a) + (b) 1,955,074.50
57,700.00 634,700.00
19,900.00 597.00
JUMLAH 635,297.00
69,600.00 13,920.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 903.00
JUMLAH 23,886.00
JUMLAH (a) + (b) 659,183.00
32,500.00 113,750.00
19,900.00 995.00
1,640.00 17,712.00
300,000.00 9,600.00
17,500.00 17,500.00
JUMLAH 142,057.00
69,600.00 27,840.00
82,000.00 16,400.00
86,300.00 1,726.00
90,300.00 1,806.00
JUMLAH 47,772.00
JUMLAH (a) + (b) 189,829.00
1,600,000.00 17,600.00
19,900.00 995.00
JUMLAH 18,595.00
69,600.00 7,656.00
82,000.00 18,040.00
86,300.00 1,898.60
90,300.00 451.50
JUMLAH 28,046.10
JUMLAH (a) + (b) 46,641.10
1,300.00 32,500.00
1,640.00 23,566.80
300,000.00 12,000.00
JUMLAH 68,066.80
69,600.00 22,272.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 1,354.50
JUMLAH 32,689.50
JUMLAH (a) + (b) 100,756.30
1,300.00 32,500.00
1,640.00 13,644.80
300,000.00 14,700.00
JUMLAH 60,844.80
69,600.00 22,272.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 1,354.50
JUMLAH 32,689.50
JUMLAH (a) + (b) 93,534.30
1,640.00 10,627.20
500,000.00 9,500.00
JUMLAH 20,127.20
69,600.00 13,920.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 903.00
JUMLAH 28,417.50
JUMLAH (a) + (b) 48,544.70
1,640.00 6,035.20
500,000.00 11,500.00
JUMLAH 17,535.20
69,600.00 13,920.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 903.00
JUMLAH 28,417.50
JUMLAH (a) + (b) 45,952.70
1,640.00 6,035.20
JUMLAH 6,035.20
69,600.00 13,920.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 903.00
JUMLAH 28,417.50
JUMLAH (a) + (b) 34,452.70
1,640.00 16,400.00
350,000.00 9,100.00
400,000.00 17,600.00
JUMLAH 43,100.00
69,600.00 80,040.00
82,000.00 1,640.00
86,300.00 172.60
90,300.00 541.80
JUMLAH 82,394.40
JUMLAH (a) + (b) 125,494.40
112,000.00 112,000.00
1,640.00 15,744.00
300,000.00 13,500.00
17,500.00 22,750.00
JUMLAH 163,994.00
69,600.00 17,400.00
82,000.00 9,840.00
86,300.00 1,035.60
90,300.00 1,173.90
JUMLAH 29,449.50
JUMLAH (a) + (b) 193,443.50
57,000.00 57,000.00
1,640.00 16,400.00
300,000.00 13,500.00
17,500.00 26,250.00
JUMLAH 113,150.00
69,600.00 43,152.00
82,000.00 28,700.00
86,300.00 3,020.50
90,300.00 2,709.00
JUMLAH 77,581.50
JUMLAH (a) + (b) 190,731.50
57,000.00 57,000.00
1,640.00 16,400.00
300,000.00 13,500.00
17,500.00 26,250.00
JUMLAH 113,150.00
69,600.00 43,152.00
82,000.00 28,700.00
86,300.00 3,020.50
90,300.00 2,709.00
JUMLAH 77,581.50
JUMLAH (a) + (b) 190,731.50
81,250.00 81,250.00
1,640.00 16,072.00
300,000.00 13,500.00
17,500.00 22,750.00
JUMLAH 133,572.00
69,600.00 17,400.00
82,000.00 9,840.00
86,300.00 1,035.60
90,300.00 1,173.90
JUMLAH 29,449.50
JUMLAH (a) + (b) 163,021.50
3,690,000.00 4,428,000.00
19,900.00 24,875.00
9,500.00 9,500.00
JUMLAH 4,462,375.00
69,600.00 417,600.00
82,000.00 1,476,000.00
86,300.00 172,600.00
90,300.00 27,090.00
JUMLAH 2,093,290.00
JUMLAH (a) + (b) 6,555,665.00
3,690,000.00 147,600.00
9,500.00 4,750.00
JUMLAH 152,350.00
69,600.00 69,600.00
82,000.00 205,000.00
86,300.00 21,575.00
90,300.00 4,515.00
JUMLAH 300,690.00
JUMLAH (a) + (b) 453,040.00
3,690,000.00 88,560.00
9,500.00 2,850.00
JUMLAH 91,410.00
69,600.00 55,680.00
82,000.00 164,000.00
86,300.00 17,260.00
90,300.00 3,612.00
JUMLAH 240,552.00
JUMLAH (a) + (b) 331,962.00
3,690,000.00 236,160.00
JUMLAH 236,160.00
69,600.00 69,600.00
82,000.00 246,000.00
86,300.00 25,890.00
90,300.00 27,090.00
JUMLAH 368,580.00
JUMLAH (a) + (b) 604,740.00
189,000.00 207,900.00
JUMLAH 207,900.00
69,600.00 1,044.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 67.73
JUMLAH 14,706.23
JUMLAH (a) + (b) 222,606.23
61,100.00 61,100.00
61,100.00 61,100.00
JUMLAH 122,200.00
69,600.00 3,480.00
82,000.00 41,000.00
86,300.00 4,315.00
90,300.00 225.75
JUMLAH 49,020.75
JUMLAH (a) + (b) 171,220.75
34,000.00 34,000.00
JUMLAH 34,000.00
69,600.00 1,044.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 67.73
JUMLAH 14,706.23
JUMLAH (a) + (b) 48,706.23
20,500.00 20,500.00
JUMLAH 20,500.00
69,600.00 696.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 45.15
JUMLAH 9,804.15
JUMLAH (a) + (b) 30,304.15
14,000.00 14,000.00
JUMLAH 14,000.00
69,600.00 1,044.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 67.73
JUMLAH 14,706.23
JUMLAH (a) + (b) 28,706.23
9,100.00 9,100.00
JUMLAH 9,100.00
69,600.00 1,044.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 67.73
JUMLAH 14,706.23
JUMLAH (a) + (b) 23,806.23
2,250,000.00 34,650.00
19,900.00 3,980.00
JUMLAH 38,630.00
69,600.00 10,440.00
82,000.00 20,500.00
86,300.00 2,157.50
90,300.00 6,772.50
JUMLAH 39,870.00
JUMLAH (a) + (b) 78,500.00
97,200.00 36,450.00
20,000.00 600.00
JUMLAH 37,050.00
69,600.00 4,872.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 361.20
JUMLAH 14,296.20
JUMLAH (a) + (b) 51,346.20
88,100.00 92,505.00
JUMLAH 92,505.00
69,600.00 1,461.60
82,000.00 1,722.00
86,300.00 172.60
90,300.00 90.30
JUMLAH 3,446.50
JUMLAH (a) + (b) 95,951.50
112,425.00 112,425.00
27,600.00 828.00
41,000.00 820.00
JUMLAH 114,073.00
75,300 90,360.00
69,600 83,520.00
100,000 1,200.00
90,300 54.18
JUMLAH 175,134.18
JUMLAH (a) + (b) 289,207.18
131,250.00 157,500.00
45,937.50 45,937.50
JUMLAH 203,437.50
69,600.00 5,637.60
82,000.00 11,070.00
86,300.00 1,165.05
90,300.00 370.23
JUMLAH 18,242.88
JUMLAH (a) + (b) 221,680.38
35,700.00 42,840.00
12,495.00 12,495.00
JUMLAH 55,335.00
69,600.00 2,505.60
82,000.00 4,920.00
86,300.00 517.80
90,300.00 162.54
JUMLAH 8,105.94
JUMLAH (a) + (b) 63,440.94
45,000.00 45,000.00
2,500.00 2,500.00
JUMLAH 47,500.00
69,600.00 696.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 451.50
JUMLAH 10,210.50
JUMLAH (a) + (b) 57,710.50
1,500,000.00 1,500,000.00
180,000.00 180,000.00
1,640.00 9,840.00
300,000.00 3,000.00
JUMLAH 1,692,840.00
69,600.00 83,520.00
82,000.00 118,900.00
86,300.00 12,945.00
90,300.00 9,030.00
JUMLAH 224,395.00
JUMLAH (a) + (b) 1,917,235.00
260,000.00 260,000.00
1,640.00 9,840.00
300,000.00 3,000.00
JUMLAH 272,840.00
69,600.00 69,600.00
82,000.00 123,000.00
86,300.00 129,450.00
90,300.00 14,448.00
JUMLAH 336,498.00
JUMLAH (a) + (b) 609,338.00
275,000.00 275,000.00
49,500.00 49,500.00
JUMLAH 324,500.00
69,600.00 125,280.00
82,000.00 221,400.00
86,300.00 46,602.00
90,300.00 9,933.00
JUMLAH 403,215.00
JUMLAH (a) + (b) 727,715.00
16,342.00 16,342.00
JUMLAH 16,342.00
69,600.00 696.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 451.50
JUMLAH 10,210.50
JUMLAH (a) + (b) 26,552.50
544,500.00 544,500.00
190,575.00 190,575.00
JUMLAH 735,075.00
69,600.00 2,088.00
82,000.00 24,600.00
86,300.00 2,589.00
90,300.00 135.45
JUMLAH 29,412.45
JUMLAH (a) + (b) 764,487.45
66,703.50 300,165.75
97,383.00 20,859.44
125,494.40 282,362.40
149,301.00 2,239,515.00
8,915,378.40 3,008,940.21
221,680.38 1,995,123.42
66,703.50 225,124.31
25,000.00 135,000.00
125,494.40 131,769.12
221,680.38 1,108,401.90
18,149.49 20,418.18
500,000.00 46,000.00
JUMLAH 9,513,679.73
10,000.00 10,000.00
JUMLAH 10,000.00
69,600.00 83,520.00
90,300.00 10,836.00
JUMLAH 94,356.00
JUMLAH (a) + (b) 104,356.00
150,000.00 150,000.00
JUMLAH 150,000.00
69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 309,356.00
50,000.00 50,000.00
JUMLAH 50,000.00
69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 209,356.00
30,000.00 30,000.00
JUMLAH 30,000.00
69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 189,356.00
50,000.00 50,000.00
JUMLAH 50,000.00
69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 209,356.00
100,000.00 100,000.00
JUMLAH 100,000.00
69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 259,356.00
67,400.00 67,400.00
JUMLAH 67,400.00
69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 226,756.00
35,000.00 35,000.00
JUMLAH 35,000.00
69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 194,356.00
r, 2 Lapis Cat Penutup
35,000.00 10,500.000
7,640.00 2,444.800
17,100.00 1,710.000
JUMLAH 14,654.800
69,600 1,392.000
77,000 4,851.000
100,000 630.000
90,300 225.750
JUMLAH 7,098.750
JUMLAH (a) + (b) 21,753.550
35,000.00 8,750.000
7,640.00 2,444.800
17,100.00 1,710.000
JUMLAH 12,904.800
69,600 1,392.000
77,000 4,851.000
100,000 630.000
90,300 225.750
JUMLAH 7,098.750
JUMLAH (a) + (b) 20,003.550
Dasar, 2 Lapis Cat Penutup
25,000.00 5,000.000
35,000.00 5,250.000
7,640.00 1,298.800
7,640.00 1,986.400
JUMLAH 13,535.200
69,600 4,872.000
77,000 693.000
100,000 600.000
90,300 225.750
JUMLAH 6,390.750
JUMLAH (a) + (b) 19,925.950
UPAH KERJA
Pasir Tanah
10 Pasir Urug M3 175,000.00
11 Pasir Pasangan M3 300,000.00
12 Pasir Beton M3 350,000.00
13 Sirtu M 3
175,000.00
14 Tanah Urug M3 150,000.00
15 Pasir Halus M3 500,000.00
KETERANGAN
BAHAN FABRIKASI
70 Solar 6,325.00
71 Bansin 6,900.00
72 Minyak Tanah 6,000.00
73 Pemulas/Oli 34,000.00
74 Gemuk / Fat 27,025.00
DURASI BOBOT
NO JENIS KEGIATAN BIAYA (Rp) 1 2 3 4 5 6 7 8
(MINGGU) (%)
A PEKERJAAN PERSIAPAN 2 23,205,307.20 2.36 1.181 1.181
RENCANA KEMAJUAN PEKERJAAN MINGGUAN 1.181 1.181 0.24 0.24 3.39 3.39 3.39 3.078
KUMULATIF RENCANA KEMAJUAN PEKERJAAN 1.18 2.36 2.60 2.84 6.23 9.62 13.01 16.09
U PELAKSANAAN "KURVA S"
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
98.14 100.00
92.87 94.42 96.28
91.32
87.84
84.37
80.89
74.33
70.85
66.39
63.31
3.078 3.078 3.078 3.078 3.078 3.078 3.078 3.07857.16
3.07860.24
3.078 3.078 3.078
54.08
3.479 3.479 3.479 3.479
45.97 3.479 3.479 3.479 3.479 3.479 3.479
39.42
32.86
1.55 1.55 1.55
25.320.982 0.982
22.25
19.17
16.09
13.01 1.859 1.859 1.8591
3.078 3.078 3.078 7.538 6.556 6.556 8.106 3.078 3.078 3.078 3.078 4.46 3.479 6.556 3.479 3.479 3.479 1.55 1.55 1.859 1.859 1.85908
19.17 22.25 25.32 32.86 39.42 45.97 54.08 57.16 60.24 63.31 66.39 70.85 74.33 80.89 84.37 87.84 91.32 92.87 94.42 96.28 98.14 100.00
.14 100.00