I.

PEKERJAAN PERSIAPAN

I.1. Pembersihan Lapangan

Luas Tanah yang dibersihkan


Panjang = 25 m
Lebar = 15 m
Luas = panjang x lebar
= 25 x 15
Volume = 375 m²

I.2. Pemasangan Bowplank

Panjang = 12 m
Lebar = 12.5 m
Volume = ( 12 + 2 ) x 2 +( 12.5 + 2 )x 2
= 57 m

panjang tiang = 1 m
jarak tiang ke tiang = 2 m
banyak tiang = 57 / 2
= 28.5
= + 25 buah
ukuran papan = ( 3 x 25 x 4 cm
= ( 0.03 x 0.25 x 4 ) m
ukuran tiang = ( 5 x 7 x 1.00 ) cm
= ( 0.05 x 0.07 x 1 ) m
volume papan = 57 x 0.03 x 0.25 = 0.428 m³
volume tiang = 29 x 1 x 0.05 x 0.05 = 0.071 m³
jumlah = 0.499 m³
kayu terbuang 10 = 0.05 m³
volume = 0.005 m³

I.3. Gudang Semen Dan Alat-Alat


Panjang = 4.50 m
Lebar = 4.00 m
Luas = panjang x lebar
= 4.50 x 4.00
Volume = 18.00 m²

II. PEKERJAAN GALIAN TANAH

II.1. Galian Tanah Pondasi Telapak


Banyaknya galian pondasi Telapak = 17 galian

penampang galian
Tinggi galian = 1.50 m
lebar galian atas = 1.20 m
Panjang Galian = 1.20 m
luas penampang = 1.50 x 1.20 x 1.20
= 2.16

volume galian = 17.00 x 2.16


= 37 m³

II.2. Galian Tanah Pondasi Batu Kali


Panjang Galian Pondasi Batu Kali = 91.35 m

penampang galian
Tinggi galian = 0.53 m
lebar galian atas = 0.76 m
luas penampang = 0.53 x 0.76
= 0.40 m²

Volume galian = 91.35 x 0.40


= 36.80 m³

II.3. Galian Tanah Pondasi Teras


Panjang galian pondasi t= 17.42 m
Tinggi = 0.3 m
Lebar galian Pondasi = 0.3 m

Penampang galian = 0.3 x 0.3


= 0.09

Volume galian teras = 17.42 x 0.09


= 1.57 m³

II.4. Urugan Kembali 1/4 Galian


Volume galian = 38.36 m³
Urugan kembali = 1/4 x galian
Volume urugan = 0.25 x 38.36 = 9.59 m²

III. PEKERJAAN STRUKTUR BAWAH

III.1. Pekerjaan Pondasi Telapak


Jumlah pondasi Telapak = 17 Tiang
Volume dasar Telapak
Panjang = 1.30 m
Lebar = 1.30 m
Tinggi = 0.20 m
Volume = Panjang x Lebar x Tinggi
= 1.30 x 1.30 x 0.20
= 0.34 m³

Volume tiang Pondasi Telapak


Panjang = 1.32 m
Lebar = 0.30 m
Tinggi = 0.30 m
Volume = Panjang x Lebar x Tinggi
= 1.32 x 0.30 x 0.30
= 0.1188 m³

Volume Pondasi Telapak adalah = 0.338 + 0.119


= 0.457 x 17
= 7.77 m³

Tulangan Pondasi Telapak


Volume Besi Utama
Tinggi Kolom = 1.62 m
Diameter Besi = 16 mm
Jumlah = 8 buah
panjang Besi Perlonjar = 11 m
Berat besi Ф 16 per m' = 1.58 kg

* Volume Besi Diameter = 8 x 1.62


= 12.96 m
* Kebutuhan Besi = 12.96
11
= 1.18 x 17 = 20.03 buah
* Berat Besi yang Diperl = 1.58 x 12.96
= 20.48 x 17 = 348 Kg

Menghitung Kebutuhan Besi Tulangan Sengkang


Tinggi kolom = 1.62 m
Jarak = 0.15 m
Diameter Besi = 10 mm
panjang Besi Per Staff = 11 m
Berat besi Ф 10 per m' = 0.617 kg

* Panjang Tulangan sengkang perbuah = 25 + 25 + 25 + 25 + 5 + 5


= 110 cm = 1.1 m
* Jumlah tulangan sengkang = 1.62
0.15
= 10.8 buah
* Total panjang besi tulangan sengkang = 10.8 x 1.1
= 11.88 m
* Kebutuhan Besi tulangan sengkang = 11.88
11
= 1.08 x 17 = 18 buah
* Berat Besi yang Diperlukan = 0.62 x 11.88
= 7.33 x 17 = 125 Kg

Dari perhitungan diatas maka kebutuhan besi tulangannya adalah


● Besi Ø 16 = 21 Buah = 348 Kg
● Besi Ø 10 = 19 Buah = 125 Kg

III.2. Pekerjaan Pondasi Batu Kali

III.2.1. Urugan Pasir Bawah Pondasi


panjang pondasi = 91.35 m
tinggi = 0.1 m
lebar bawah = 1.00 m
luas = 1.00 x 0.1 x 91.35
volume = 9.14 m³

III.2. 2. Anstampang batu kali


Anstampang Pondasi Jalur
panjang = 91.35 m
penampang = 0.15 x 1.00 = 0.15 m²
volume = 91.35 x 0.15 = 13.70 m³

III.2.3. Pasangan Pondasi Batu Kali


1.Pondasi Batu Kali
panjang = 91.35 m
penampang = 0.85 + 0.35 x 0.90 = 0.54 m²
2
volume = 91 x 0.45 = 41.11 m³

2. pondasi teras
panjang = 17.42 m
penampang = 0.30 + 0.30 x 0.90 = 0.27 m²
2
volume = 17.42 x 0.27 = 4.70 m³

Jadi Volume Pondasi Batu Kali = 41.11 + 4.70 = 45.81 m³

III.3. Pekerjaan Sloof Utama dan Praktis

III.3.1. Beton Sloof (S1) Bertulang ( 20 x 30 )


Panjang Sloof = 67.10
Penampang Sloof = 0.20 x 0.30 = 0.06 m²
volume sloof = 67.10 x 0.06 = 4.03 m³
Besi Tulangan Utama Ø 14
Banyak Besi = 6 Buah
Volume Besi = 6 x 67.10
= 402.6 m
Panjang Besi = 11 m
Maka Kebutuhan Besi = 402.6 / 11
= 37 buah
Berat per m Besi Ø14 = 1.21 Kg
= 1.21 x 402.6
= 486.7 Kg

Tulangan Beugel Ø 10
Panjang tulangan beugel per buah = 25 + 15 + 25 + 15 + 5 + 5
= 90 cm = 0.9 m

Jumlah tulangan beugel panjang 67,10 m dengan jarak 0,15 = 447 buah
Total Panjang Tulangan = 447 x 0.9 = 402.6 m
Panjang Besi = 11 m = 402.6 / 11 = 37 buah
Berat Besi per Kg Ø10 pada tabel adalah = 1 Kg/m
= 1 x 402.6 = 248.4 Kg

Dari perhitungan di atas maka kebutuhan besi penulangannya adalah :


● Besi Ø 14 = 37 Buah = 487 Kg
● Besi Ø 10 = 37 Buah = 248 Kg

III.2.2. Beton Sloof (S2) Bertulang ( 15 x 20 )


Panjang Sloof = 26.17
Penampang Sloof = 0.15 x 0.20 = 0.03 m²
volume sloof = 26.17 x 0.03 = 0.79 m³

Besi Tulangan Utama Ø 12


Banyak Besi = 4 Buah
Volume Besi = 4.00 x 26.17
= 104.68 m
Panjang Besi = 11 m
Maka Kebutuhan Besi = 104.7 / 11
= 10 buah
Berat per m Besi Ø 12 = 0.89 Kg
= 0.89 x 104.7
= 92.96 Kg

Tulangan Beugel Ø 8
Panjang tulangan beugel per buah = 15 + 10 + 15 + 10 + 5 + 5
= 60 cm = 0.6 m

Jumlah tulangan beugel panjang 26,17 m dengan jarak 0,15 = 174 buah
Total Panjang Tulangan = 174 x 0.6 = 104.7 m
Panjang Besi = 11 m = 104.7 / 11 = 10 buah
Berat Besi per Kg Ø 8 pada tabel adalah = 0.40 Kg/m
= 0.40 x 105 = 41.35 Kg

Dari perhitungan di atas maka kebutuhan besi penulangannya adalah :


● Besi Ø 12 = 10 Buah = 92.96 Kg
● Besi Ø 8 = 10 Buah = 41.35 Kg

IV. PEKERJAAN STRUKTUR ATAS

IV.1. PEKERJAAN KOLOM UTAMA DAN PRAKTIS

IV.1.1. Beton Kolom (K1) Bertulang ( 30 x 35 )


Tinggi Kolom = 4.00
Penampang Kolom = 0.30 x 0.35 = 0.105 m²
Volume = 4.00 x 0.105 = 0.42 m³
Jumlah Kolom = 2.00 buah

Volume 4 buah Kolom = 4.00 x 0.42 = 2 m³

Besi Tulangan Utama Ø 16


Banyak Besi = 8 Buah
Volume Besi = 8 x 4.00
= 32 m
Panjang Besi = 11 m
Maka Kebutuhan Besi = 32 / 11
= 3 buah
Berat per m Besi Ø 16 = 1.58 Kg
= 1.58 x 32
= 50.53 Kg

Tulangan Beugel Ø 12
Panjang tulangan beugel per buah = 25 + 30 + 25 + 30 + 5 + 5
= 120 cm = 1.2 m
Jumlah tulangan beugel panjang 4,00 m dengan jarak 0,15 m = 27 buah
Total Panjang Tulangan = 27 x 1.2 = 32 m
Panjang Besi = 11 m = 32 / 11 = 3 buah
Berat Besi per Kg Ø 12 pada tabel adalah = 0.89 Kg/m
= 0.89 x 32 = 28.42 Kg

Dari perhitungan di atas maka kebutuhan besi penulangannya adalah :


● Besi Ø 16 = 12 Buah = 202 Kg
● Besi Ø 12 = 12 Buah = 114 Kg
IV.1.2. Beton Kolom (K2) Bertulang ( 30 x 30)
Tinggi Kolom = 4.00
Penampang Kolom = 0.30 x 0.30 = 0.09 m²
Volume = 4.00 x 0.09 = 0.36 m³
Jumlah Kolom = 15.00 buah

Volume 15 buah Kolom = 15.00 x 0.36 = 5.4 m³

Besi Tulangan Utama Ø 16


Banyak Besi = 8 Buah
Volume Besi = 8 x 4.00
= 32 m
Panjang Besi = 11 m
Maka Kebutuhan Besi = 32 / 11
= 2.91 buah
Berat per m Besi Ø 16
= 1.58 Kg
= 1.58 x 32
= 50.53 Kg

Tulangan Beugel Ø 12
Panjang tulangan beugel per buah = 25 + 25 + 25 + 25 + 5 + 5
= 110 cm = 1.1 m
Jumlah tulangan beugel panjang 4,00 m dengan ja = 27 buah
Total Panjang Tulan = 27 x 1.1 = 29.33 m
Panjang Be= 11 m = 29.33 / 11 = 3 buah
Berat Besi per Kg Ø 12 pada tabel adalah
= 0.89 Kg/m
= 0.89 x 29.33 = 26.05 Kg

Dari perhitungan di atas maka kebutuhan besi penulangannya adalah :


● Besi Ø 16 = 44 Buah = 758 Kg
● Besi Ø 12 = 40 Buah = 391 Kg

IV.1.3. Beton Kolom (K3) Bertulang ( 20 x 20)


Tinggi Kolom = 4.00
Penampang Kolom = 0.20 x 0.20 = 0.04 m²
Volume = 4.00 x 0 = 0.16 m³
Jumlah Kolom = 10.00 buah

Volume 10 buah Kolom = 10.00 x 0.16 = 1.6 m³

Besi Tulangan Utama Ø 12


Banyak Besi = 4 Buah
Volume Besi = 4 x 4.00
= 16 m
Panjang Besi = 11 m
Maka Kebutuhan Besi = 16 / 11
= 1.45 buah
Berat per m Besi Ø 12 = 0.89 Kg
= 0.89 x 16
= 14.21 Kg

Tulangan Beugel Ø 10
Panjang tulangan beugel per buah = 15 + 15 + 15 + 15 + 5 + 5
= 70 cm = 0.7 m
Jumlah tulangan beugel panjang 4,00 m dengan jarak 0,15 m = 27 buah
Total Panjang Tulangan = 27 x 0.7 = 18.67 m
Panjang Besi = 11 m = 18.67 / 11 = 1.70 buah
Berat Besi per Kg Ø 10 pada tabel adalah = 0.62 Kg/m
= 0.62 x 18.67 = 11.52 Kg

Dari perhitungan di atas maka kebutuhan besi penulangannya adalah :


● Besi Ø 12 = 15 Buah = 142.1 Kg
● Besi Ø 10 = 17.0 Buah = 115.2 Kg

IV.1.4. Beton Kolom Praktis (KP) Bertulang ( 12 x 12)


Tinggi Kolom = 4.00
Penampang Kolom = 0.20 x 0.20 = 0.04 m²
Volume = 4.00 x 0.04 = 0.16 m³
Jumlah Kolom = 20.00 buah

Volume 12 buah Kolom = 20.00 x 0.16 = 3.20 m³

Besi Tulangan Utama Ø 10


Banyak Besi = 4 Buah
Volume Besi = 4 x 4.00
= 16 m
Panjang Besi = 11 m
Maka Kebutuhan Besi = 16 / 11
= 1.45 buah
Berat per m Besi Ø 10 = 0.62 Kg
= 0.62 x 16
= 9.87 Kg

Tulangan Beugel Ø 8
Panjang tulangan beugel per buah = 7 + 7 + 7 + 7 + 5 + 5
= 38 cm = 0.38 m
Jumlah tulangan beugel panjang 4,00 m dengan jarak 0,15 m = 27 buah
Total Panjang Tulangan = 26.67 x 0.38 = 10.13 m
Panjang Besi = 11 m = 10.13 / 11 = 0.92 buah
Berat Besi per Kg Ø 8 pada tabel adalah = 0.40 Kg/m
= 0.40 x 10.13 = 4.00 Kg
Dari perhitungan di atas maka kebutuhan besi penulangannya adalah :
● Besi Ø 10 = 29 Buah = 197.4 Kg
● Besi Ø 8 = 18 Buah = 80.05 Kg

IV.2. PEKERJAAN BALOK UTAMA, BALOK ANAK DAN RING BALOK

IV.2.1. Beton Balok (B1) Bertulang ( 20 x 30 )


Panjang Balok = 83.32
Penampang Balok = 0.20 x 0.30 = 0.06 m²
Volume Balok = 83.32 x 0.06 = 5.00 m³

Besi Tulangan Utama Ø 16


Banyak Besi = 10 Buah
Volume Besi = 10 x 83.32
= 833.2 m
Panjang Besi = 11 m
Maka Kebutuhan Besi = 833.2 / 11
= 76 buah
Berat per m Besi Ø16 = 1.58 Kg
= 1.58 x 833.2
= 1316 Kg

Tulangan Beugel Ø 12
Panjang tulangan beugel per buah = 25 + 15 + 25 + 15 + 5 + 5
= 90 cm = 0.9 m
Jumlah tulangan beugel panjang 83,32 m dengan jarak 0,10 = 833 buah
Total Panjang Tulangan = 833 x 0.9 = 749.9 m
Panjang Besi = 11 m = 749.9 / 11 = 68 buah
Berat Besi per Kg Ø12 pada tabel adalah = 0.89 Kg/m
= 0.89 x 749.9 = 665.9 Kg

Dari perhitungan di atas maka kebutuhan besi penulangannya adalah :


● Besi Ø 14 = 76 Buah = 1316 Kg
● Besi Ø 10 = 68 Buah = 666 Kg

IV.2.2. Beton Balok (B2) Bertulang ( 15 x 20 )


Panjang Balok = 27.95
Penampang Balok = 0.15 x 0.20 = 0.03 m²
Volume Balok = 27.95 x 0.03 = 0.84 m³

Besi Tulangan Utama Ø 14


Banyak Besi = 4 Buah
Volume Besi = 4 x 27.95
= 111.8 m
Panjang Besi = 11 m
Maka Kebutuhan Besi = 111.8 / 11
= 10 buah
Berat per m Besi Ø14 = 1.21 Kg
= 1.21 x 111.8
= 135 Kg

Tulangan Beugel Ø 10
Panjang tulangan beugel per buah = 15 + 10 + 15 + 10 + 5 + 5
= 60 cm = 0.6 m
Jumlah tulangan beugel panjang 27,95 m dengan jarak 0,10 = 280 buah
Total Panjang Tulangan = 280 x 0.6 = 167.7 m
Panjang Besi = 11 m = 167.7 / 11 = 15 buah
Berat Besi per Kg Ø10 pada tabel adalah = 0.17 Kg/m
= 0.17 x 167.7 = 28.51 Kg

Dari perhitungan di atas maka kebutuhan besi penulangannya adalah :


● Besi Ø 14 = 10 Buah = 135 Kg
● Besi Ø 10 = 15 Buah = 28.51 Kg

IV.2.3. Rink Balok (RB) Bertulang ( 12 x 15 )


Panjang Balok = 81.82 m
Penampang Balok = 0.12 x 0.15 = 0.018 m²
Volume Balok = 81.82 x 0.018 = 1.47 m³

Besi Tulangan Utama Ø 14


Banyak Besi = 4 Buah
Volume Besi = 4 x 81.82
= 327.28 m
Panjang Besi = 11 m
Maka Kebutuhan Besi = 327.3 / 11
= 30 buah
Berat per m Besi Ø12 = 0.89 Kg
= 0.89 x 327.3
= 291 Kg

Tulangan Beugel Ø 8
Panjang tulangan beugel per buah = 10 + 12 + 10 + 12 + 5 + 5
= 54 cm = 1 m
Jumlah tulangan beugel panjang 27,95 m dengan jarak 0,10 = 818 buah
Total Panjang Tulangan = 818 x 0.54 = 441.8 m
Panjang Besi = 11 m = 441.8 / 11 = 40 buah
Berat Besi per Kg Ø 8 pada tabel adalah = 0.40 Kg/m
= 0.40 x 441.8 = 174.5 Kg

Dari perhitungan di atas maka kebutuhan besi penulangannya adalah :


● Besi Ø 12 = 30 Buah = 290.6 Kg
● Besi Ø 8 = 40 Buah = 174.5 Kg
IV.3. PEKERJAAN PLAT LANTAI DAN PLAT ATAP

IV.3.1. Pelat Lantai

● Pelat 1 = 3 Petak
panjang = 4.00 m
Lebar = 4.00 m
Tinggi = 0.12 m
Volume = 4.00 x 4.00 x 0.12 = 1.920
= 3.00 x 1.92 = 5.76 m³

● Pelat 2 = 1 Petak
panjang = 2.30 m
Lebar = 5.00 m
Tinggi = 0.12 m
Volume = 2.30 x 5.00 x 0.12 = 1.380
= 1.00 x 1.38 = 1.38 m³

● Pelat 3 = 1 Petak
panjang = 2.00 m
Lebar = 3.50 m
Tinggi = 0.12 m
Volume = 2.00 x 3.50 x 0.12 = 0.840
= 1.00 x 0.84 = 0.84 m³

● Pelat 4 = 1 Petak
panjang = 3.00 m
Lebar = 5.00 m
Tinggi = 0.12 m
Volume = 3.00 x 5.00 x 0.12 = 1.800
= 1.00 x 1.80 = 1.80 m³

● Pelat 5 = 1 Petak
panjang = 3.50 m
Lebar = 5.00 m
Tinggi = 0.12 m
Volume = 3.50 x 5.00 x 0.12 = 2.100
= 1.00 x 2.10 = 2.10 m³

● Pelat 6 = 1 Petak
panjang = 1.50 m
Lebar = 2.00 m
Tinggi = 0.12 m
Volume = 1.50 x 2.00 x 0.12 = 0.360
= 1.00 x 0.36 = 0.36 m³
Volume Plat Keseluruhan = 5.76 + 1.38 + 0.84 + 1.80
+ 2.10 + 0.36
= 12.24 m³

Pembesian Plat 1 = 3 petak


Volume Horizontal
Panjang = 4.00 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaff = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 4.00


0.2
= 20 Buah
* Total panjang besi tulangan = 20 x 4
= 80 m
* Kebutuhan Besi tulangan = 80
11
= 7.27 = 7 Buah
* Berat Besi yang Diperlukan = 0.89 x 80
= 71.04 kg

Volume Vertikal
Panjang = 4.00 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 4.00


0.2
= 20 Buah
* Total panjang besi tulangan = 20.0 x 4
= 80 m
* Kebutuhan Besi tulangan = 80
11
= 7.27 = 7 Buah
* Berat Besi yang Diperlukan = 0.89 x 80
= 71.04 kg

Maka Jumlah Besinya = 7.27 + 7.27 = 15 x 2 = 29.09 Buah


Berat Besinya = 71.04 + 71.04 = 142.1 x 2 = 284.2 Kg

Karna Jumlah Plat ada 3 petak maka,


Jumlah = 3 x 29.09 = 87 Buah
= 3 x 284.16 = 852.5 Kg

Pembesian Plat 2 = 1 petak


Volume Horizontal
Panjang = 2.30 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 2.30


0.2
= 11.5 Buah
* Total panjang besi tulangan = 12 x 2.3
= 26.45 m
* Kebutuhan Besi tulangan = 26.45
11
= 2.40 = 3 Buah
* Berat Besi yang Diperlukan = 0.89 x 26
= 23.49 kg

Volume Vertikal
Panjang = 5.00 m
Diameter Besi = 12 mm
Jarak = 0.2 buah
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.89 kg

* Jumlah Tulangan Pada Plat = 5.00


0.2
= 25 Buah
* Total panjang besi tulangan = 25 x 5
= 125 m
* Kebutuhan Besi tulangan = 125
11
= 11.36 = 11 Buah
* Berat Besi yang Diperlukan = 0.89 x 125
= 111 kg

Maka Jumlah Besinya = 2.40 + 11.36 = 13.77 x 2 = 27.54 Buah


Berat Besinya = 23.49 + 111 = 134.5 x 2 = 269 Kg

Pembesian Plat 3 = 1 Petak


Volume Horizontal
Panjang = 2.00 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 2.00


0.2
= 10 Buah
* Total panjang besi tulangan = 10 x 2
= 20 m
* Kebutuhan Besi tulangan = 20
11
= 1.82 = 2 Buah
* Berat Besi yang Diperlukan = 0.888 x 20
= 17.76 kg

Volume Vertikal
Panjang = 3.50 m
Diameter Besi = 12 mm
Jarak = 0.2 buah
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 3.50


0.2
= 17.5 Buah
* Total panjang besi tulangan = 17.5 x 3.5
= 61.25 m
* Kebutuhan Besi tulangan = 61.25
11
= 5.57 = 6 Buah
* Berat Besi yang Diperlukan = 0.888 x 61
= 54.39 kg

Maka Jumlah Besinya = 1.82 + 5.57 = 7.386 x 2 = 14.77 Buah


Berat Besinya = 17.76 + 54.39 = 72.15 x 2 = 144.3 Kg

Pembesian Plat 4 = 1 Petak


Volume Horizontal
Panjang = 3.00 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 3.00


0.2
= 15 Buah
* Total panjang besi tulangan = 15 x 3
= 45 m
* Kebutuhan Besi tulangan = 45
11
= 4.09 = 4 Buah
* Berat Besi yang Diperlukan = 0.888 x 45
= 39.96 kg

Volume Vertikal
Panjang = 5.00 m
Diameter Besi = 12 mm
Jarak = 0.2 buah
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 5.00


0.2
= 25 Buah
* Total panjang besi tulangan = 25 x 5
= 125 m
* Kebutuhan Besi tulangan = 125
11
= 11.36 = 11 Buah
* Berat Besi yang Diperlukan = 0.888 x 125
= 111 kg

Maka Jumlah Besinya = 4.09 + 11.36 = 15.45 x 2 = 30.91 Buah


Berat Besinya = 39.96 + 111 = 151 x 2 = 302 Kg

Pembesian Plat 5 = 1
Volume Horizontal
Panjang = 3.50 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 3.50


0.2
= 17.5 Buah
* Total panjang besi tulangan = 18 x 3.5
= 61.25 m
* Kebutuhan Besi tulangan = 61.25
11
= 5.57 = 6 Buah
* Berat Besi yang Diperlukan = 0.888 x 61
= 54.39 kg

Volume Vertikal
Panjang = 5.00 m
Diameter Besi = 12 mm
Jarak = 0.2 buah
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 5.00


0.2
= 25 Buah
* Total panjang besi tulangan = 25 x 5
= 125 m
* Kebutuhan Besi tulangan = 125
11
= 11.36 = 11 Buah
* Berat Besi yang Diperlukan = 0.888 x 125
= 111 kg

Maka Jumlah Besinya = 5.57 + 11.36 = 16.93 x 2 = 33.86 Buah


Berat Besinya = 54.39 + 111 = 165 x 2 = 331 Kg

Pembesian Plat 6= 1
Volume Horizontal
Panjang = 1.50 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 1.50


0.2
= 7.5 Buah
* Total panjang besi tulangan = 8 x 1.5
= 11.25 m
* Kebutuhan Besi tulangan = 11.25
11
= 1.02 = 1 Buah
* Berat Besi yang Diperlukan = 0.888 x 11
= 9.99 kg

Volume Vertikal
Panjang = 2.00 m
Diameter Besi = 12 mm
Jarak = 0.2 buah
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

* Jumlah Tulangan Pada Plat = 2.00


0.2
= 10 Buah
* Total panjang besi tulangan = 10.0 x 2
= 20 m
* Kebutuhan Besi tulangan = 20
11
= 1.82 = 2 Buah
* Berat Besi yang Diperlukan = 1 x 20
= 17.76 kg
Maka Jumlah Besinya = 1.02 + 1.82 = 3 x 2 = 5.68 Buah
Berat Besinya = 9.99 + 17.76 = 27.75 x 2 = 55.5 Kg

Jadi Jumlah total Besi = 87 + 27.54 + 14.77 + 30.91 + 33.86 +


5.682 = 200 Buah

Total Berat Besi = 852.5 + 269 + 144.3 + 301.9 + 330.8 +


55.5 = 1954 Kg

IV.3.2. Pelat Atap

● Pelat 1 = 1 Petak
panjang = 4.00 m
Lebar = 4.00 m
Tinggi = 0.12 m
Volume = 4.00 x 4.00 x 0.12 = 1.920
= 3.00 x 1.92 = 5.76 m³

● Pelat 2 = 1 Petak
panjang = 2.00 m
Lebar = 3.00 m
Tinggi = 0.12 m
Volume = 2.00 x 3.00 x 0.12 = 0.720
= 1.00 x 0.72 = 0.72 m³

Volume Plat Keseluruhan = 5.76 + 5.76 = 11.52 Kg/m

Pembesian Plat 1 = 1 Petak


Volume Horizontal
Panjang = 4.24 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

Jumlah Tulangan Pada Plat = 4.24


0.2
= 21.2 Buah
Total panjang besi tulangan = 21 x 4
= 89.89 m
Kebutuhan Besi tulangan = 89.89
11
= 8.17 = 8 Buah
Berat Besi yang Diperlukan = 0.888 x 90
= 79.82 kg

Volume Vertikal
Panjang = 4.24 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

Jumlah Tulangan Pada Plat = 4.24


0.2
= 21.2 Buah
Total panjang besi tulangan = 21.2 x 4
= 89.89 m
Kebutuhan Besi tulangan = 89.89
11
= 8.17 = 8 Buah
Berat Besi yang Diperlukan = 0.888 x 90
= 79.82 kg

Maka Jumlah Besinya = 8.00 + 8.00 = 16 x 2 = 32.00 Buah


Berat Besinya = 79.82 + 79.82 = 160 x 2 = 319.3 Kg

Pembesian Plat 2 = 1 Petak


Volume Horizontal
Panjang = 2.10 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

Jumlah Tulangan Pada Plat = 2.10


0.2
= 10.5 Buah
Total panjang besi tulangan = 11 x 2.1
= 22.05 m
Kebutuhan Besi tulangan = 22.05
11
= 2.00 = 2 Buah
Berat Besi yang Diperlukan = 0.888 x 22
= 19.58 kg

Volume Vertikal
Panjang = 3.10 m
Diameter Besi = 12 mm
Jarak = 0.2 m
panjang Besi Perstaf = 11 m
Berat besi Ф 12 per m' = 0.888 kg

Jumlah Tulangan Pada Plat = 3.10


0.2
= 15.5 Buah
Total panjang besi tulangan = 15.5 x 3.1
= 48.05 m
Kebutuhan Besi tulangan = 48.05
11
= 4.37 = 4 Buah
Berat Besi yang Diperlukan = 0.888 x 48
= 42.67 kg

Maka Jumlah Besinya = 2.00 + 4.37 = 6 x 2 = 12.74 Buah


Berat Besinya = 19.58 + 42.67 = 62.25 x 2 = 124.5 Kg

Jadi Jumlah total Besi = 32.00 + 12.74 = 44.74 Buah

Total Berat Besi = 319.3 + 124.5 = 443.8 Kg

IV.4. PEKERJAAN TANGGA

■ Anak Tangga
Anak Tangga yang direncanakan sebanyak 19 anak tangga
● Bentuk Segitiga
Alas = 0.36
Tinggi = 0.18
Panjang = 0.91
Volume = 1/2 0.36 x 0.18 x 0.91
= 0.0295 m³
= 0.0295 x 19.00 = 0.56 m³

● Jajaran Genjang
Alas = 3.46
Tinggi = 0.12
Volume = 3.46 x 0.12
= 0.42 x 2.00
= 0.8304 m³

■ Bordes
● Persegi Panjang
Panjang = 1.88
Lebar = 1.09
Tinggi = 0.12
Volume = 1.88 x 1.09 x 0.12
= 0.25 m³

Volume Tangga = 0.56 + 0.83 + 0.25


= 1.64 m³

IV.5. PEKERJAAN ATAP

IV.5.1. Pekerjaan Kuda - Kuda

● Kuda-kuda 1 Ukuran 8/12 = 2 buah Kuda - kuda


balok tarik = 2 x 5.91 = 17.73 m
Kaki kuda-kuda = 2 x 8.36 = 16.72 m
Balok gapit = 2 x 2.20 = 5.70 m
Skoor angin = 2 x 2.98 = 7.77 m
47.92 m
K1 = 0.12 x 0.08 x 47.92
Volume = 0.46 m³

● Kuda-kuda 1 Ukuran 8/12 = 2 buah Kuda - kuda


balok tarik = 2 x 19.86 = 39.72 m
Kaki kuda-kuda = 2 x 19.77 = 39.54 m
Balok gapit = 2 x 5.61 = 11.22 m
Skoor angin = 2 x 8.10 = 16.20 m
107 m
K1 = 0.12 x 0.08 x 107
Volume = 1.02 m³

Volume Keseluruhan = 0.46 + 1.02 = 1.48 m³

IV.5.2. Pekerjaan Gording


Gording menggunakan kayu 5/10
60.54 + 44.64 + 66.88 + 130 = 302 m

Jumlah Gording Keseluruhan = 302 x 0.05 x 0.10 = 1.51 m³

Volume Gording = 1.51 m³

IV.5.3. Pekerjaan Kasau

Kasau menggunakan kayu 5/7


9.95 + 30.04 + 27.89 + 35.61 + 49.14 = 152.6 m

Jumlah Kasau Keseluruhan 152.6 x 0.05 x 0.07 = 0.53 m³

Volume Kasau = 0.53 m³

IV.5.4. Pekerjaan Reng

Reng menggunakan kayu 3/4


140.7 + 104.7 + 132.4 + 166.8 = 544.6 m

Jumlah Kasau Keseluruhan 544.6 x 0.03 x 0.04 = 0.65 m³

Volume Reng = 0.65 m³

IV.5.5. Pekerjaan Genteng

● Segitiga 1
a = 7.1 m
t = 3.62 m
Luas = 1/2 a x t
= 12.85 m²

● Segitiga 2
a = 11.12 m
t = 5.6 m
Luas = 1/2 a x t
= 31.30 m²
= 2 x 31.30 = 62.61 m²

● Jajaran Genjang :
t = 3.55
a = 5.5
Luas = a x t
= 19.67 m²
= 2 x 19.67
= 39.33 m²

● Segitiga 3
a = 7.86 m
t = 3.9 m
Luas = 1/2 a x t
= 15.33 m²
= 2 x 15.33 = 30.65 m²

● Persegi Panjang
P = 5.5
L = 3.5
Luas = p x l
= 19.03 m²

● Segitiga 4
a = 3.96 m
t = 1.8 m
Luas = 1/2 a x t
= 3.48 m²
= 2 x 3.48 = 6.97 m²

● Persegi Panjang
P = 5.08
L = 2.72
Luas = p x l
= 13.82 m²

● Segitiga 5
a = 3.46 m
t = 1.9 m
Luas = 1/2 a x t
= 3.36 m²

Luas Genteng Keseluruhan = 12.85 + 62.61 + 39.33 + 30.65 + 19.03


6.97 + 13.82 + 3.36
= 189 m²

IV.5.6. Pekerjaan Bubungan Genteng

Panjang = 50.84 m'


Volume = 51 m'

IV.5.7. Pekerjaan Lisplank

Panjang = 62.56
Lebar = 0.03
Tinggi = 0.25
Volume = 62.56 x 0.03 x 0.25
= 0.47 m³

V. PEKERJAAN ARSITEKTUR

V.1. PEKERJAAN DINDING

a. Luas Ruang Kusen


1. Luas P 1 = 3 buah
Tinggi = 2.40 m
Lebar = 1.20 m
= 2.40 x 1.20 = 2.88 m²
Luas = 3.00 x 2.88 = 8.64 m²

2. Luas P 2 = 2 buah
Tinggi = 2.40 m
Lebar = 0.90 m
= 2.40 x 0.9 = 2.16 m²
Luas = 2.00 x 2.16 = 4.32 m²

3. Luas P 3 = 5 buah
Tinggi = 2.40 m
Lebar = 0.80 m
= 2.40 x 0.8 = 1.92 m²
Luas = 5.00 x 1.92 = 9.60 m²

4. Luas P 4 = 4 buah
Tinggi = 2.00 m
Lebar = 0.70 m
= 2.00 x 0.70 = 1.40 m²
Luas = 4.00 x 1.40 = 5.60 m²

5. Luas J 1 = 8 buah
Tinggi = 1.97 m
Lebar = 0.72 m
= 1.97 x 0.72 = 1.42 m²
Luas = 8.00 x 1.42 = 11.35 m²

6. Luas J 2 = 11 buah
Tinggi = 1.52 m
Lebar = 0.72 m
= 1.52 x 0.72 = 1.09 m²
Luas = 11.00 x 1.09 = 12.04 m²
7. Luas V = 34 buah
Tinggi = 0.30 m
Lebar = 0.25 m
= 0.30 x 0.25 = 0.08 m²
Luas = 34.00 x 0.08 = 2.55 m²

8. Luas BA = 15 buah
Tinggi = 0.20 m
Lebar = 0.20 m
= 0.20 x 0.2 = 0.04 m²
Luas = 15.00 x 0.04 = 0.60 m²

Luas Keseluruhan ruang Kusen

1. P 1 = 8.64 m²
2. P 2 = 4.32 m²
3. P 3 = 9.60 m²
4. P 4 = 5.60 m²
5. J 1 = 11.35 m²
6. J 2 = 12.04 m²
7. V = 2.55 m²
8. BA = 0.60 m²
= 54.70 m²

luas Pasangan Bata keseluruhan


panjang = 174.77 m
tinggi = 3.70 m
luas = 174.77 x 3.70 = 647 m²

Luas Tembok - Luas Kusen = 646.6 - 54.70


Volume = 592 m²

V.1.1. Pekerjaan Transram 1 : 3

panjang = 175 m
tinggi = 0.2 m
luas = 175 x 0.2 = 34.95 m²
Volume = 34.95 m²

V.1.2. Pasangan Dinding 1 : 6

panjang = 175 m
tinggi = 3.5 m
luas = 175 x 3.5 = 557.00 m²
Volume = 557 m²
V.I.3. Plesteran Dinding 1 : 3
luas plesteran dinding 1 := luas pasangan dinding x 2
= 34.95 x 2
jadi volume plesteran = 69.91 m²

V.I.4. Plesteran Dinding 1 : 6


luas plesteran dinding 1 := luas pasangan dinding x 2
= 557 x 2
Jadi Volume Plesteran = 1114 m²

V.1.5. Acian dinding


Luas acian dindi = luas plesteran
= 1184 m²

V.2. PEKERJAAN PASANGAN KERAMIK

V.2.1. Rabat Beton Bawah Lantai 1 : 3 : 5


Luas bangunan = 270.8 m
Tinggi rabat beton = 0.05 m
Volume = 0.05 x 270.8 = 13.54 m³

V.2.2. Lantai Tegel Keramik 60/60


Luas bangunan = 270.8 - 23.61 = 247.2 m²
Volume total keramik 60/60 = 247 m²

V.2.3. Lantai Tegel Keramik KM/WC 30/30


Luas KM/WC = 1.96 + 3.00 + 9.65 + 9.00 m²
Volume total keramik 2= 24 m²

V.2.4. Keramik Dinding KM/WC 30/30


Luas Dinding KM/WC = 27.57 m²
Tinggi Keramik di Dinding = 2.00 m²
Luas keramik dinding = 27.57 x 2.00 = 55.14 m²
Luas pintu KM/WC = 0.7 m
Luas dinding keramik = 55.14 - 0.7 = 54.44 m²
Volume = 54 m²

V.2.5. Keramik Tangga 40/40


● Tampak Atas anak Tangga
Luas = 0.3 x 0.91 = 0.27 x 19.00
= 5.19 m²

● Tampak Depan anak Tangga


Luas = 0.2 x 0.91 = 0.18 x 19.00
= 3.46 m²
Volume Keramik anak tangga = 8.65 m²

● Keramik Bordes
Luas = 1.88 x 1.19 = 2.24 m²

Volume Total Keramik Tangga = 10.88 m²

V.3. PEKERJAAN PINTU DAN JENDELA

V.3.1. Pekerjaan Kusen

1). P 1. = 3 Buah
panjang = ( 2 x 2.4 ) + 1.2
= 4.8 + 1.2 = 6.00 m
Panjang P 1 = 3.00 x 6.00 = 18.00 m

2). P 2 = 2 Buah
panjang = ( 2 x 2.4 ) + 0.9
= 4.8 + 0.9 = 5.70 m
Panjang P 2 = 2.00 x 5.70 = 11.40 m

3). P 3 = 5 Buah
panjang = ( 2 x 2.4 ) + 0.8
= 4.8 + 0.8 = 5.60 m
Panjang P 3 = 5.00 x 5.60 = 28.00 m

4). P 4 = 4 Buah
panjang = ( 2 x 2.00 ) + 0.7
= 4 + 0.7 = 4.70 m
Panjang P 4 = 4.00 x 4.70 = 18.80 m

5). J 1 = 8 Buah
panjang = ( 2 x 1.97 ) + ( 2 x 0.72 )
= 3.94 + 1.44 = 5.38 m
Panjang J 2 = 8.00 x 5.38 = 43.04 m

6). J 2 = 11 Buah
panjang = ( 2 x 1.52 ) + ( 2 x 0.72 )
= 3.04 + 1.44 = 4.48 m
Panjang J 2 = 11.00 x 4.48 = 49.28 m

7). V = 34 Buah
panjang = ( 2 x 0.30 ) + ( 2 x 0.25 )
= 0.6 + 0.5 = 1.1 m
Panjang J 2 = 34.00 x 1.1 = 37.4 m
Panajang Kayu Kusen
1). Tipe P 1 = 18.00 m
2). Tipe P 2 = 11.40 m
3). Tipe P 3 = 28.00 m
4). Tipe P 4 = 18.80 m
5). Tipe J 1 = 43.04 m
6). Tipe J 2 = 49.28 m
7). Tipe V = 37.4 m
205.92 m

Volume = 205.92 x 0.08 x 0.12 = 2 m³

V.3.2. Pekerjaan Daun Pintu

●Tipe P 1 = 3 Buah
Tinggi = 2.40 m
Lebar = 1.20 m
Luas = 2.40 x 1.20 = 2.88 m²
Volume = 3.00 x 2.88 = 8.64 m²

●Tipe P 2 = 2 Buah
Tinggi = 2.40 m
Lebar = 0.90 m
Luas = 2.40 x 0.90 = 2.16 m²
Volume = 2.00 x 2.16 = 4.32 m²

●Tipe P 3 = 2 Buah
Tinggi = 2.40 m
Lebar = 0.80 m
Luas = 2.40 x 0.80 = 1.92 m²
Volume = 2.00 x 1.92 = 3.84 m²

●Tipe P 4 = 2 Buah
Tinggi = 2.40 m
Lebar = 0.70 m
Luas = 2.40 x 0.70 = 1.68 m²
Volume = 2.00 x 1.68 = 3.36 m²

Volume keseluruhan Daun Pintu = 20.16 m²

V.3.3. Pekerjaan Daun Jendela

● Tipe J 1 = 8 Buah
Tinggi = 1.97 m
Lebar = 0.72 m
Luas Jendela = 1.97 x 0.72 = 1.418 m²
Luas Jendela - luas Kaca = 1.418 - 0.744 = 0.675
Volume Jendela = 8.00 x 0.67 = 5.40 m²

● Tipe J 2 = 11 Buah
Tinggi = 1.52 m
Lebar = 0.72 m
Luas Jendela = 1.52 x 0.72 = 1.094 m²
Luas Jendela - luas Kaca = 1.094 - 0.546 = 0.549
Volume Jendela = 11.00 x 0.55 = 6.04 m²

Volume keseluruhan Daun Pintu = 11.44 m²

V.3.4. Pemasangan Kaca

I. Kaca Tebal 5 mm

a. Kaca P1 = 12 Buah
Tinggi = 0.96 m
Lebar = 0.10 m
Luas = 0.10 x 0.96 x 12 buah = 1.15 m²

b. Kaca P2 = 5 Buah
Tinggi = 0.21 m
Lebar = 0.16 m
Luas = 0.16 x 0.21 x 10 buah = 0.34 m²

c. Kaca J1 = 6 Buah
Tinggi = 1.75 m
Lebar = 0.49 m
Luas = 0.49 x 1.75 x 8 buah = 0.86 m²

d. Kaca J2 = 5 Buah
Tinggi = 1.3 m
Lebar = 0.49 m
Luas = 0.49 x 1.3 x 10 buah = 6.37 m²

Volume = 8.72 m²

V.3.5. Kunci Tanam


●Tipe P 1 = 3 buah
●Tipe P 2 = 2 buah
●Tipe P 3 = 5 buah
●Tipe P 4 = 4 buah
Volume = 14 buah

V.3.6. Engsel Pintu


●Tipe P 1 = 9 buah
●Tipe P 2 = 6 buah
●Tipe P 3 = 10 buah
●Tipe P 4 = 8 buah
Volume = 33 buah

V.3.7. Engsel Jendela


●Tipe J 1 = 16 buah
●Tipe J 2 = 22 buah
Volume = 38 buah

V.3.8. Grendel
●Tipe P 1 = 6 buah
●Tipe P 2 = 2 buah
●Tipe P 3 = 5 buah
●Tipe P 4 = 4 buah
●Tipe J 1 = 8 buah
●Tipe J 2 = 11 buah
Volume = 36 buah

V.3.9. Kait Angin


●Tipe J 1 = 16 buah
●Tipe J 2 = 22 buah
Volume = 38 buah

V.4. PEKERJAAN PLAFOND

V.4.1. Pekerjaan Rangka Plafond

● Lantai 1
● Rangka Plafond Dalam
Penjelasan ( 1 )
5/10…… 4.89 x 2 = 9.78 m
5/5….…. ( 9 x 2.44 ) + 4 x 4.89 ) = 41.52 m

Penjelasan ( 2 )
5/10…… 4.89 x 2 = 9.78 m
5/5….…. ( 6 x 3.88 ) + 4 x 4.89 ) = 42.84 m
Penjelasan ( 3 )
5/10…… 4.89 x 2 = 9.78 m
5/5….…. ( 8 x 3.84 ) + 6 x 3.88 ) = 54 m

Penjelasan ( 4 )
5/10…… 12.38 x 2 = 24.76 m
5/5….…. ( 7 x 3.84 ) + 9 x 2.76 ) + 6 x 1.86 )
+ ( 4 x 1.3 ) + 5 x 4.80 ) + 6 x 3.98 )
Panjang = 26.88 + 24.84 + 11.16 + 5.2 + 24 +
23.88
= 115.96 m

Penjelasan ( 5 )
5/10…… 3.80 x 2 = 7.6 m
5/5….…. ( 6 x 3.30 ) + 7 x 3.80 ) = 46.4 m

Penjelasan ( 6 )
5/10…… 2.84 x 2 = 5.68 m
5/5….…. ( 5 x 2.80 ) + 6 x 2.84 ) = 31.04 m

Penjelasan ( 7 )
5/5….…. ( 6 x 1.88 ) + 3 x 3.84 ) = 22.8 m

Penjelasan ( 8 )
5/5….…. ( 2 x 1.84 ) + 4 x 0.84 ) = 7.04 m

Penjelasan ( 9 )
5/5….…. ( 4 x 1.39 ) + 4 x 1.84 ) = 12.92 m

Rangka Plafond Kayu 5/5

Volume = 297.08 x 0.05 x 0.05


= 0.74 m³

Rangka Plafond Kayu 5/10

Volume = 61.7 x 0.05 x 0.10


= 0.31 m³

● Lantai 2

Penjelasan ( 1 )
5/10…… 4.89 x 2 = 9.78 m
5/5….…. ( 9 x 2.44 ) + 4 x 4.89 ) = 41.52 m

Penjelasan ( 2 )
5/10…… 4.93 x 2 = 9.86 m
5/5….…. ( 8 x 3.88 ) + 8 x 4.93 ) = 70.48 m

Penjelasan ( 3 )
5/10…… 3.88 x 2 = 7.76 m
5/5….…. ( 6 x 3.88 ) + 8 x 3.88 ) = 54.32 m

Penjelasan ( 4 )
5/10…… 10.78 x 2 = 21.56 m
5/5….…. ( 9 x 4 )+ 9 x 5 )+ 4 x 7 )
+ ( 13 x 2.9 ) + 6 x 4.86 ) + 9 x 4.8 )+ ( 4 x 3
+ ( 5 x 2.00 )
Panjang = 36.72 + 43.92 + 27.56 + 37.7 + 29.16 + 43.2
+ 10.56 + 10
= 238.82 m

Penjelasan ( 5 )
5/10…… 4.88 x 2 = 9.76 m
5/5….…. ( 6 x 3.88 ) + 7 x 3.80 ) = 49.88 m

Penjelasan ( 6 )
5/5….…. ( 5 x 1.88 ) + 6 x 2.85 ) = 26.5 m

Penjelasan ( 7 )
5/5….…. ( 6 x 1.38 ) + 4 x 3.88 ) = 23.8 m

Rangka Plafond Kayu 5/5

Volume = 505.32 x 0.05 x 0.05


= 1.26 m³

Rangka Plafond Kayu 5/10

Volume = 58.72 x 0.05 x 0.1


= 0.29 m³

● Rangka Plafond Luar

Penjelasan ( 1 )
5/5….…. 21.58 + ( 0.90 x 16 ) = 35.98 m

Penjelasan ( 2 )
5/5….…. 22.24 + ( 0.90 x 16 ) = 36.64 m

Penjelasan ( 3 )
5/5….…. 16.14 + ( 0.90 x 16 ) = 30.54 m

Penjelasan ( 4 )
5/5….…. 28.62 + ( 0.90 x 5 )+ 1.9 x 12 ) = 55.92 m

Rangka Plafond Kayu 5/5

Volume = 159.08 x 0.05 x 0.05


= 0.40 m³

Volume Keseluruhan Rangka Plafond Kayu 5/ = 2.40 m³


Volume Keseluruhan Rangka Plafond Kayu 5/ = 0.60 m³
= 3.01 m³
V.4.2. Memasang Plafond

● Lantai 1
Memasang Plafond dalam dengan tripleks tebal 4 mm

Ruang 1… Luas = 2.50 x 5.00 = 12.50 m


Ruang 2… Luas = 4.00 x 5.00 = 20.00 m
Ruang 3… Luas = 4.00 x 4.00 = 16.00 m
Ruang 4… Luas = = 33.74 m
Ruang 5… Luas = 3.50 x 4.00 = 14.00 m
Ruang 6… Luas = 2.96 x 3.00 = 8.88 m
Ruang 7… Luas = 2.04 x 4.00 = 8.16 m
Ruang 8… Luas = 1.00 x 1.96 = 1.96 m
Ruang 9… Luas = 1.50 x 2.0 = 3.00 m
115 m²

● Lantai 2
● Memasang Plafond dalam dengan tripleks tebal 4 mm

Ruang 1… Luas = 2.50 x 5.00 = 12.50 m


Ruang 2… Luas = 4.00 x 5.04 = 20.16 m
Ruang 3… Luas = 4.00 x 4.00 = 16.00 m
Ruang 4… Luas = = 66.52 m
Ruang 5… Luas = 3.50 x 5.00 = 17.50 m
Ruang 6… Luas = 2.96 x 2.00 = 5.92 m
Ruang 7… Luas = 1.50 x 4.00 = 6.00 m
145 m²

● Memasang Plafond luar dengan tripleks tebal 4 mm

Ruang 1… Luas = ( 7.10 x 1.00 ) + 1.54 x 1.00 ) + 2.54 x 1.00 )


= 11.18 m²

Ruang 2… Luas = ( 11.12 x 1.00 )


= 11.12 m²

Ruang 3… Luas = ( 11.12 x 1.00 ) +( 1.55 x 1.00 )


= 12.67 m²

Ruang 4… Luas = ( 3.63 x 1.00 ) +( 1.95 x 9.00 )


= 21.18 m²
Volume = 56.15 m²

Volume Memasang Plafond = 316 m²

V.4.3. List Plafond

● Lantai 1
List plafond menggunakan kayu profil

Ruang 1… Luas = ( 2.47 x 2 ) + 5.00 x 2 ) = 14.94 m


Ruang 2… Luas = ( 5.00 x 2 ) + 5.00 x 2 ) = 20.00 m
Ruang 3… Luas = ( 4.00 x 2 ) + 4.00 x 2 ) = 16.00 m
Ruang 4… Luas = = 29.3 m
Ruang 5… Luas = ( 3.50 x 2 ) + 4.00 x 2 ) = 15.00 m
Ruang 6… Luas = ( 2.96 x 2 ) + 3.00 x 2 ) = 11.92 m
Ruang 7… Luas = = 11.04 m
Ruang 8… Luas = ( 1.00 x 2 ) + 1.96 x 2 ) = 5.92 m
Ruang 9… Luas = ( 1.50 x 2 ) + 2.00 x 2 ) = 7.00 m
131.1 m

● Lantai 2

List plafond dalam menggunakan kayu profil


Ruang 1… Luas = ( 2.47 x 2 ) + 5.00 x 2 ) = 14.94 m
Ruang 2… Luas = ( 3.89 x 2 ) + 4.88 x 2 ) = 17.54 m
Ruang 3… Luas = ( 3.88 x 2 ) + 3.88 x 2 ) = 15.52 m
Ruang 4… Luas = = 38.67 m
Ruang 5… Luas = ( 3.38 x 2 ) + 4.88 x 2 ) = 16.52 m
Ruang 6… Luas = ( 2 x 2 ) + 2.84 x 2 ) = 9.44 m
Ruang 7… Luas = ( 1 x 2 ) + 3.88 x 2 ) = 10.52 m
123.2 m
List plafond luar menggunakan kayu profil
Ruang 1… Luas = 10.89 + 13.18 = 24.07 m
Ruang 2… Luas = 11.12 + 10.02 = 21.14 m
Ruang 3… Luas = 13.62 x 11.62 = 158.3 m
Ruang 4… Luas = 11.62 + 13.67 = 25.29 m
229 m

Volume List Plafond Keseluruha = 483 m'

VI. PEKERJAAN MEKANIKAL `

VI.1. Saluran Air Kotor PVC D 4 ''

Saluran Jalur Tinja = 17.79 m'


Saluran Air Kotor = 30.39 m'
Volume = 48 m'

VI.2. Saluran Air Bersih PVC D 3/4 ''

Volume Pipa PVC 3/4" = 57.68 m'


Volume = 58 m'

VI.3. Kran Air 3/4 ''

Volume = 7 Buah

VI.4. Westafel

Volume = 2 Buah

VI.5. Klosed Jongkok

Volume = 4 Buah

VI.6. Bak Mandi Plastik

Volume = 4 Buah

VI.7. Floordrain

Volume = 4 Buah

VI.8. Memasang 1 buah bak cuci piring satinless steel

Volume = 1 Buah

VI.9. Septic Tank

Volume = 2 Unit

VI.10. Pemasangan PDAM Baru

Volume = 1 Ls

VII. PEKERJAAN ELEKTRIKAL

VII.1. Pengadaan dan Pemasangan Kabel

Volume = 141.07 m'

VII.2. Pengadaan dan Pemasangan Sekering Group


Volume = 1 Buah

VII.3. Pengadaan dan Pemasangan Stop Kontak Tanam

Volume = 14 Buah

VII.4. Pengadaan dan Pemasangan Saklar Tunggal Tanam

Volume = 11 Buah

VII.5. Pengadaan dan Pemasangan Saklar Ganda Tanam

Volume = 7 Buah

VII.6. Pengadaan dan Pemasangan Fitting Lampu

Volume = 24 Buah

VII.7. Pengadaan dan Pemasangan Lampu Jari - Jari 20 Watt

Volume = 20 Buah

VII.8. Pengadaan dan Pemasangan Lampu Jari - Jari 10 Watt

Volume = 4 Buah

VII.9. Penyambungan Aliran Listrik Baru 2500 watt

Volume = 1 Ls

VIII. PEKERJAAN FINISHING

VIII.1. Pengecatan Dinding

Volume Dinding = 1184 m²

VIII.2. Pengecatan Plafond

Volume Plafond = 316 m²

VIII.3. Pengecatan Kusen dan Daun Pintu

Volume Plafond = 1140 m²


DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN RUMAH 2 LANTAI


LO KAS I : KOTA TERNATE
T.A : 2012

NOMOR
NO URAIAN JENIS PEKERJAAN
ANALISA
1 2 3 4
I PEKERJAAN PERSIAPAN

1 I.1 1 m2 Pembersihan Lapangan


2 I.2 1 m1 Pengukuran dan Pemasangan Bowplank
3 I.3 1 m2 Gudang Semen Dan Alat-Alat

II PEKERJAAN GALIAN TANAH

4 II.1 1 m3 Galian Tanah Pondasi Telapak


5 II.2 1 m3 Galian Tanah Pondasi Batu Kali
6 II.3 1 m3 Galian Tanah Pondasi Teras
7 II.4 1 m3 Urugan Kembali 1/4 Galian

III PEKERJAAN STRUKTUR BAWAH

8 III.1 1 m3 Pekerjaan Pondasi Telapak (150 Kg + Bekesting)


9 III.2 Pekerjaan Pondasi Bantu Kali
10 III.2.1 1 m3 Urugan Pasir Bawah Pondasi
11 III.2.2 1 m3 Anstampang Batu Kali
12 III.2.3 1 m3 Pasangan Pondasi Batu Kali
13 III.3 Pekerjaan Sloof Utama dan Praktis
14 III.3.1 1 m3 Beton Sloof (S1) Bertulang 20 x 30 (Pembesian 200 Kg)
15 III.3.2 1 m3 Beton Sloof (S1) Bertulang 15x 20 (Pembesian 150 Kg)

IV PEKERJAAN STRUKTUR ATAS

16 IV.1 Pekerjaan Kolom Utama dan Praktis


17 IV.1.1 1 m3 Beton Kolom (K1) Bertulang 30 x 35 (Pembesian 300 Kg)
18 IV.1.2 1 m3 Beton Kolom (K2) Bertulang 30 x 30 (Pembesian 250 Kg)
19 IV.1.3 1 m3 Beton Kolom (K3) Bertulang 20 x 20 (Pembesian 200 Kg)
20 IV.1.4 1 m3 Kolom Praktis (KP) Bertulang 12 x 12 ( Pembesian 150 Kg)
21 IV.2 Pekerjaan Balok Utama, Anak dan Ring Balok
22 IV.2.1 1 m3 Beton Balok (B1) Bertulang 30 x 30 (Pembesian 250 Kg)
23 IV.2.2 1 m3 Beton Balok (B2) Bertulang 15 x 20 (Pembesian 150 Kg)
24 IV.2.3 1 m3 Rink Balok (RB) Bertulang 12 x 15 ( 150 Kg besi + Bekesting)
25 IV.3 Pekerjaan Plat Lantai dan Plat Atap
26 IV.3.1 1 m3 Plat Lantai beton bertulang tebal 12 cm ( 150 Kg besi + Bekestin
27 IV.3.2 1 m3 Plat Atap beton bertulang tebal 11 cm ( 150 Kg besi + Bekesting)
28 IV.4 1 m3 membuat tangga beton bertulang ( 150 Kg besi + Bekesting)
29 IV.5 Pekerjaan Atap
30 IV.5.1 1 m3 Pasang Kontruksi Kuda - Kuda Kayu Klas I
31 IV.5.2 1 m3 Pasang Gording Kayu Klas II
32 IV.5.3 1 m3 Pasang Kasau Kayu Klas II
33 IV.5.4 1 m3 Pasang Reng Kayu Klas II
34 IV.5.5 1 m2 Pemasangan Atap Genteng
35 IV.5.6 1 m' Pemasangan Bubungan atap
36 IV.5.7 1 m2 Pasang Lisplang Ukuran ( 25 x 30 cm) Kayu Klas II

V PEKERJAAN ARSITEKTUR

37 V.1 Pekerjaan Dinding


38 V.1.1 1 m2 Pasang Bata Semen Lokal Tebal 1/2 bata, 1 Pc 3 Ps
39 V.1.2 1 m2 Pasang Bata Semen Lokal Tebal 1/2 bata, 1 Pc 6 Ps
40 V.1.3 1 m2 Plesteran Tebal 1,5 Cm Camp. 1 Pc 3 Ps
41 V.1.4 1 m2 Plesteran Tebal 1,5 Cm Camp. 1 Pc 6 Ps
42 V.1.5 1 m2 Acian Dinding
43 V.2 Pekerjaan Pasangan Keramik
44 V.2.1 1 m3 Rabat Beton Bawah Lantai,1 Pc:3 Ps:5 Kr Tebal 5 cm
45 V.2.2 1 m2 Pasang Lantai Keramik Ukuran 60 x 60 cm
46 V.2.3 1 m2 Pasang Lantai Keramik Ukuran 30 x 30 cm
47 V.2.4 1 m2 Pasang Dinidng Tegel Keramik 30 x 30 cm
48 V.2.5 1 m2 Pasang TanggaTegel Keramik 40 x 40 cm
49 V.3 Pekerjaan Pintu dan Jendela
50 V.3.1 1 m3 Pekerjaan Kusen Pintu,Jendela dan Ventilasi kayu Kls.I
51 V.3.2 1 m2 Pasang Pintu Panel Kayu Kls. I
52 V.3.3 1 m2 Pasang Bingkai Jendela Kaca
53 V.3.4 1 m2 Pasang Kaca Tebal 5 mm Jendela
54 V.3.5 Pasang Kunci Tanam 2 Slag
55 V.3.6 Pasang Engsel Pintu
56 V.3.7 Pasang Ensel Jendela
57 V.3.8 Pasang grendel
58 V.3.9 Pasang Kait Angin
56 V.4 Pekerjaan Plafond
57 V.4.1 1 m3 Pasang Rangka Plafon Kayu Kelas II
58 V.4.2 1 m2 Pasang Plafon Tripleks Tebal 4 mm
59 V.4.3 1 m' Pasang List Plafon Kayu Profil
V.5 Pekerjaan Pagar Teras Lantai 2

VI PEKERJAAN MEKANIKAL

60 VI.1 Memasang 1 m' Pipa Saluran Air Kotor PVC D 4 ''


61 VI.2 Memasang 1 m' Pipa Saluran Air Bersih PVC D 3/4 ''
62 VI.3 Memasang 1 buag Kran Air 3/4 ''
63 VI.4 Memasang 1 Buah Wastafel
64 VI.5 Memasang 1 Buah Klosed Jongkok
65 VI.6 Memasang 1 Bak Mandi Plastik
66 VI.7 Memasang 1 buah Floordrain
67 VI.8 Memasang 1 buah bak cuci piring satinless steel
68 VI.9 Memasang 1 Unit Septic Tank Lengkap
69 VI.10 Pemasangan PDAM Baru

VII PEKERJAAN ELEKTRIKAL

70 VII.1 Pengadaan dan Pemasangan 1 m' Kabel


71 VII.2 Pengadaan dan Pemasangan 1 buah Sekering Group
72 VII.3 Pengadaan dan Pemasangan 1 buah Stop Kontak Tanam
73 VII.4 Pengadaan dan Pemasangan 1 buah Saklar Tunggal Tanam
74 VII.5 Pengadaan dan Pemasangan 1 buah Saklar Ganda Tanam
75 VII.6 Pengadaan dan Pemasangan 1 buah Fitting Lampu
76 VII.7 Pengadaan dan Pemasangan 1 buah Lampu Jari - Jari 20 Watt
77 VII.8 Pengadaan dan Pemasangan 1 buah Lampu Jari - Jari 10 Watt
78 VII.9 Penyambungan Aliran Listrik Baru 2500 watt

VIII PEKERJAAN FINISHING

79 VIII.1 1 m2 Pengecatan Tembok Baru ( 1 Lapis Plamir ) 1 Lapis


Cat Dasar, 2 Lapis Cat Penutup
81 VIII.2 1 m2 Pengecatan Plafon, 1 Lapis Cat Dasar, 2 Lapis Cat
Penutup
82 VIII.3 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ) 1
Lapis Cat Dasar, 2 Lapis Cat Penutup
N HARGA

SAT HARGA SATUAN JUMLAH HARGA


VOLUME
UAN (RP) (RP)
5 6 7

M2 11,475.00 375.00 4,303,125.00


M1 46,421.00 57.00 2,645,997.00
M2 903,121.40 18.00 16,256,185.20
JUMLAH 23,205,307.20

M3 66,703.50 36.72 2,449,352.52


M3 54,457.50 36.80 2,003,806.19
M3 54,457.50 1.57 85,378.47
M3 18,149.49 9.59 174,069.85
JUMLAH 4,712,607.03

M3 3,226,383.50 7.77 25,054,803.71

M3 97,383.00 9.14 889,593.71


M3 486,130.50 13.70 6,661,203.18
M3 872,370.50 45.81 39,964,077.74

M3 5,794,941.00 4.03 23,330,432.47


M3 5,124,610.00 0.79 4,023,331.31
JUMLAH 99,923,442.10

M3 8,519,386.65 1.68 14,312,569.57


M3 7,319,235.00 5.40 39,523,869.00
M3 6,733,227.00 1.60 10,773,163.20
M3 6,159,145.00 3.20 19,709,264.00

M3 6,721,060.50 5.00 33,599,925.65


M3 5,416,919.50 0.84 4,542,087.00
M3 4,556,826.50 1.47 6,711,111.80

M3 4,358,551.90 12.24 53,348,675.26


M3 4,358,551.90 11.52 50,210,517.89
M3 6,502,989.60 1.64 10,642,142.48

M3 5,571,440.00 1.48 8,268,908.39


M3 3,385,012.00 1.51 5,112,045.12
M3 1,955,074.50 0.53 1,044,410.57
M3 1,955,074.50 0.65 1,277,586.44
M2 659,183.00 188.62 124,333,779.09
M1 189,829.00 50.84 9,650,906.36
M2 46,641.10 0.47 21,884.00
JUMLAH 393,082,845.83

M2 100,756.30 34.95 3,521,835.71


M2 93,534.30 557.00 52,098,548.98
M2 48,544.70 69.91 3,393,662.89
M2 45,952.70 1114.00 51,191,252.66
M2 34,452.70 1183.91 40,788,785.81

M3 125,494.40 13.54 1,699,319.67


M2 193,443.50 247.21 47,821,167.64
M2 190,731.50 23.61 4,503,170.72
M2 190,731.50 54.44 10,383,422.86
M2 163,021.50 10.88 1,774,032.57

M3 6,555,665.00 1.98 12,959,448.35


M2 453,040.00 20.16 9,133,286.40
M2 604,740.00 11.44 6,915,322.85
M2 222,606.23 8.72 1,940,124.55
Buah 171,220.75 14.00 2,397,090.50
Buah 48,706.23 33.00 1,607,305.43
Buah 30,304.15 38.00 1,151,557.70
Buah 28,706.23 36.00 1,033,424.10
Buah 23,806.23 38.00 904,636.55

M3 78,500.00 3.01 235,955.30


M2 51,346.20 315.99 16,224,885.74
M1 95,951.50 483.03 46,347,875.23
M1 289,207.18 82.01 23,717,880.83
JUMLAH 341,743,993.02

M1 221,680.38 48.18 10,680,560.71


M1 63,440.94 57.68 3,659,273.42
Buah 57,710.50 7.00 403,973.50
Buah 1,917,235.00 2.00 3,834,470.00
Buah 609,338.00 4.00 2,437,352.00
Buah 727,715.00 4.00 2,910,860.00
Buah 26,552.50 4.00 106,210.00
Buah 764,487.45 1.00 764,487.45
Unit 9,513,679.73 2.00 19,027,359.45
Ls 1,850,000.00 1.00 1,850,000.00
JUMLAH 45,674,546.53

M1 104,356.00 141.07 14,721,500.92


Buah 309,356.00 1.00 309,356.00
Buah 209,356.00 14.00 2,930,984.00
Buah 189,356.00 11.00 2,082,916.00
Buah 209,356.00 7.00 1,465,492.00
Buah 259,356.00 24.00 6,224,544.00
Buah 226,756.00 20.00 4,535,120.00
Buah 194,356.00 4.00 777,424.00
Ls 965,500.00 1.00 965,500.00
JUMLAH 19,291,336.00

M2 21,753.55 1183.91 25,754,175.77

M2 20,003.55 315.99 6,320,921.76

M2 19,925.95 1140.08 22,717,171.97

JUMLAH 54,792,269.51
REKAPITULASI
(ENGINEERING ESTIMATE)

PEKERJAAN : RUMAH 2 LANTAI


LOKASI : KOTA TERNATE
TAHUN ANGGARAN : 2012

NO JENIS PEKERJAAN JUMLAH HARGA (RP)

I PEKERJAAN PERSIAPAN 23,205,307.20


II PEKERJAAN GALIAN TANAH 4,712,607.03
III PEKERJAAN STRUKTUR BAWAH 99,923,442.10
IV PEKERJAAN STRUKTUR ATAS 393,082,845.83
V PEKERJAAN ARSITEKTUR 341,743,993.02
VI PEKERJAAN MEKANIKAL 45,674,546.53
VII PEKERJAAN ELEKTRIKAL 19,291,336.00
VIII PEKERJAAN FINISHING 54,792,269.51

JUMLAH 982,426,347.23
PPN 10 % 98,242,634.72
JUMLAH TERMASUK PPN 10 % 1,080,668,981.95
DIBULATKAN 1,080,669,000.00

Terbilang : Satu Milyar Delapan Puluh Juta Enam Ratus Enam Puluh Sembilan Ribu Rupiah

Keterangan :

1 Harga Upah dan Bahan telah disesuaikan dengan Surat Keputusan

Gubernur Maluku Utara Nomor : 139/KPTS/MU/2012

2 Harga diatas sudah termasuk transportasi, pajak-pajak lain

Fluktuasi harga yang berlaku dan sesuai dengan peraturan

pelaksanaan proyek

Ternate, 16 Januari 2013

Dosen Pembimbing Tim Teknis Tugas Besar

Dr. M Husnullah Pangeran, MT Ryady Lahasani


125,000.00
125,000.00

125,000.00
160,000.00
175,000.00
225,000.00
250,000.00
275,000.00
300,000.00

225,000.00
150,000.00
125,000.00
50,000.00

200,000.00
250,000.00

55,000.00
TABEL DURASI PEKERJAAN

Durasi Kegiatan
No Kegiatan
Hari Minggu
I PEKERJAAN PERSIAPAN
1 m2 Pembersihan Lapangan 6 1
1 m1 Pengukuran dan Pemasangan Bowplank 2
1 m2 Gudang Semen Dan Alat-Alat 6 1
14 2
II PEKERJAAN GALIAN TANAH
1 m3 Galian Tanah Pondasi Telapak 4
1 m3 Galian Tanah Pondasi Batu Kali 5
1 m3 Urugan Kembali 1/4 Galian 1
10 2
III PEKERJAAN STRUKTUR BAWAH
1 m3 Pekerjaan Pondasi Telapak 3
Pekerjaan Pondasi Bantu Kali
1 m3 Urugan Pasir Bawah Pondasi 1
1 m3 Anstampang Batu Kali 3
1 m3 Pasangan Pondasi Batu Kali 9
Pekerjaan Sloof Utama dan Praktis
1 m3 Beton Sloof (S1) Bertulang 20 x 30 3
1 m3 Beton Sloof (S1) Bertulang 15x 20
19
IV PEKERJAAN STRUKTUR ATAS
Pekerjaan Kolom Utama dan Praktis
1 m3 Beton Kolom (K1) Bertulang 30 x 35 5
1 m3 Beton Kolom (K2) Bertulang 30 x 30 5
1 m3 Beton Kolom (K3) Bertulang 20 x 20 4
1 m3 Kolom Praktis (KP) Bertulang 12 x 12 3

Pekerjaan Balok Utama, Anak dan Ring Balok


1 m3 Beton Balok (B1) Bertulang 30 x 30 dan 15 x 20 5
1 m3 Rink Balok (RB) Bertulang 12 x 15 2
Pekerjaan Plat Lantai dan Plat Atap
1 m3 Plat Lantai beton bertulang tebal 12 cm 33
1 m3 Plat Atap beton bertulang tebal 11 cm 31
1 m3 membuat tangga beton bertulang 5
Pekerjaan Atap
1 m3 Pasang Kontruksi Kuda - Kuda Kayu Klas I 2
1 m3 Pasang Gording Kayu Klas II 2
1 m3 Rangka Atap 3
1 m2 Pemasangan Atap Genteng 4
1 m' Pemasangan Bubungan atap 2
1 m2 Pasang Lisplang Ukuran ( 25 x 30 cm) 1
107 14
V PEKERJAAN ARSITEKTUR
Pekerjaan Dinding
1 m2 Pasang Bata Semen Lokal Tebal 1/2 bata, 1 Pc 3 Ps 5
1 m2 Pasang Bata Semen Lokal Tebal 1/2 bata, 1 Pc 6 Ps 10
1 m2 Plesteran Tebal 1,5 Cm Camp. 1 Pc 3 Ps 5
1 m2 Plesteran Tebal 1,5 Cm Camp. 1 Pc 6 Ps 5
1 m2 Acian Dinding 5
Pekerjaan Pasangan Keramik
1 m3 Rabat Beton Bawah Lantai,1 Pc:3 Ps:5 Kr Tebal 5 cm 5
1 m2 Pasang Lantai Keramik Ukuran 60 x 60 cm 20
1 m2 Pasang Lantai Keramik Ukuran 30 x 30 cm 5
1 m2 Pasang Dinidng Tegel Keramik 30 x 30 cm 7
1 m2 Pasang TanggaTegel Keramik 40 x 40 cm 6
Pekerjaan Pintu dan Jendela
1 m3 Pekerjaan Kusen Pintu,Jendela dan Ventilasi kayu Kls.I 15
1 m2 Pasang Pintu Panel dan Jendela Kaca 2
1 m2 Pasang Kaca Tebal 5 mm Jendela 1
Pasang Kunci Tanam 2 Slag 1
Pasang Engsel Pintu
Pasang Ensel Jendela
Pasang grendel
Pasang Kait Angin
Pekerjaan Plafond
1 m3 Pasang Rangka Plafon Kayu Kelas II 7
1 m2 Pasang Plafon Tripleks Tebal 4 mm 6
1 m' Pasang List Plafon Kayu Profil 4
Pekerjaan Pagar Teras Lantai 2 8
117
VI PEKERJAAN MEKANIKAL
Memasang 1 m' Pipa Saluran Air Kotor PVC D 4 '' 1
Memasang 1 m' Pipa Saluran Air Bersih PVC D 3/4 '' 1
Memasang 1 buag Kran Air 3/4 '' 1
Memasang 1 Buah Wastafel 1
Memasang 1 Buah Klosed Jongkok 1
Memasang 1 Bak Mandi Plastik 1
Memasang 1 buah Floordrain 1
Memasang 1 buah bak cuci piring satinless steel 1
Memasang 1 Unit Septic Tank Lengkap 13
Pemasangan PDAM Baru 3
24
VII PEKERJAAN ELEKTRIKAL
Pengadaan dan Pemasangan 1 m' Kabel
Pengadaan dan Pemasangan 1 buah Sekering Group
Pengadaan dan Pemasangan 1 buah Stop Kontak Tanam
Pengadaan dan Pemasangan 1 buah Saklar Tunggal Tanam
Pengadaan dan Pemasangan 1 buah Saklar Ganda Tanam
Pengadaan dan Pemasangan 1 buah Fitting Lampu
Pengadaan dan Pemasangan 1 buah Lampu Jari - Jari 20 Watt
Pengadaan dan Pemasangan 1 buah Lampu Jari - Jari 10 Watt
Penyambungan Aliran Listrik Baru 2500 watt

VIII PEKERJAAN FINISHING


1 m2 Pengecatan Tembok Baru ( 1 Lapis Plamir ) 1 Lapis
Cat Dasar, 2 Lapis Cat Penutup
1 m2 Pengecatan Plafon, 1 Lapis Cat Dasar, 2 Lapis Cat
Penutup
1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ) 1
Lapis Cat Dasar, 2 Lapis Cat Penutup
DAFTAR DURASI TIAP KEGIATAN
PADA PROYEK RUMAH TINGGAL 2 LANTAI

Durasi Kegiatan
No Kode Kegiatan
Hari Minggu
1 A Pekerjaan Persiapan 14 2
2 B Pekerjaan Galian Tanah Pondasi 13 2
4 C Pekerjaan Struktur Bawah (Pondasi) 12 2
D Pekerjaan Sloof Utama dan Praktis 7 1
PEKERJAAN STRUKTUR ATAS LT.I
5 E Pekerjaan Kolom Utama dan Praktis 7 1
PEKERJAAN STRUKTUR ATAS LT.II
6 F Pekerjaan Kolom Utama dan Praktis 7 1
7 G Pekerjaan Balok Utama dan Balok Anak 15 2
8 H Pekerjaan Plat Lantai 32 5
9 I Pekerjaan Balok Utama, Anak dan Ring Balok 14 2
10 J Pekerjaan Plat Atap 32 5
11 K Pekerjaan tangga beton bertulang 7 1
12 L Pekerjaan Atap 7 1
PEKERJAAN ARSITEKTUR LT. I
13 M Pekerjaan Dinding + Kusen 10 1
14 N Pekerjaan Pasangan Keramik 7 1
15 O Pekerjaan Pintu dan Jendela 7 1
16 P Pekerjaan Plafond 8 1

PEKERJAAN ARSITEKTUR LT. II


17 Q Pekerjaan Dinding + Kusen 14 2
18 R Pekerjaan Pasangan Keramik 7 1
19 S Pekerjaan Pintu dan Jendela 7 1
20 T Pekerjaan Plafond 10 1
21 U Pekerjaan Pagar Teras Lantai 2 7 1

PEKERJAAN MEKANIKAL
22 V Pekerjaan Mekanikal LT. I 14 2
23 W Pekerjaan Mekanikal LT. II 7 1

PEKERJAAN ELEKTRIKAL
24 X Pekerjaan Elektrikal LT. I 7 1
25 Y Pekerjaan Elektrikal LT. II 7 1

25 Z PEKERJAAN FINISHING 21 3
DAFTAR KETERGANTUNGAN ANTAR K
PADA PROYEK RUMAH TINGGAL 2 L

No Kode Kegiatan

1 A Pekerjaan Persiapan
2 B Pekerjaan Galian Tanah Pondasi
4 C Pekerjaan Struktur Bawah (Pondasi)
D Pekerjaan Sloof Utama dan Praktis
PEKERJAAN STRUKTUR ATAS LT.I
5 E Pekerjaan Kolom Utama dan Praktis
PEKERJAAN STRUKTUR ATAS LT.II
6 F Pekerjaan Kolom Utama dan Praktis
7 G Pekerjaan Balok Utama dan Balok Anak
8 H Pekerjaan Plat Lantai
9 I Pekerjaan Balok Utama, Anak dan Ring Balok
10 J Pekerjaan Plat Atap
11 K Pekerjaan tangga beton bertulang
12 L Pekerjaan Atap
PEKERJAAN ARSITEKTUR LT. I
13 M Pekerjaan Dinding + Kusen
14 N Pekerjaan Pasangan Keramik
15 O Pekerjaan Pintu dan Jendela
16 P Pekerjaan Plafond

PEKERJAAN ARSITEKTUR LT. II


17 Q Pekerjaan Dinding + Kusen
18 R Pekerjaan Pasangan Keramik
19 S Pekerjaan Pintu dan Jendela
20 T Pekerjaan Plafond
21 U Pekerjaan Pagar Teras Lantai 2

PEKERJAAN MEKANIKAL
22 V Pekerjaan Mekanikal LT. I
23 W Pekerjaan Mekanikal LT. II

PEKERJAAN ELEKTRIKAL
24 X Pekerjaan Elektrikal LT. I
25 Y Pekerjaan Elektrikal LT. II

25 Z PEKERJAAN FINISHING
NTUNGAN ANTAR KEGIATAN
UMAH TINGGAL 2 LANTAI

Kegiatan Sebelum KegiatanSesudah

- B
A C
B D
C E

D G,H

G,H I,J
E K
E F
F J
I Q,Y
G M,X,
I Z

K N
M O
N W,P
O,V Z

J R,L
Q S
R T
S U
T V

O Z
T Z

K Z
J Z

L,P,V,W,X,Y
JADWAL PROYE
0 A 2 B 4 C 6 D 7 E
1 2 3 4 5
0 2 2 2 4 2 5 1 6 1

Maka Jalur Kritis Pada Proyek Pembangunan Rumah Tinggal 2 Lantai adalah :
A, B, C,H, F, J, Q, R, S, T, U, V, dan Z.
JADWAL PROYEK MENGGUNAKAN DIAGRAM JALUR KRITIS ( CRITICAL PATH METHOD - CPM )

15.2
14
29

W
1
12.2 N 13.2 O 14.2
10 12 13
25 1 26 1 27

M P
1 1
10 K 10.8 15.4
7 9 15
23 1 24 X 29
G 1 11.8 15.3
11 27
2 29 29

8
6
7 20.9
22
H 29

5 L
12.3 F 13.3 I 15.3 1
8 16 17
12 1 13 2 29 19.9 R 20.9 S
19 20
J 20 1 21 1
5 Q
17.9 2
18
18

Y
1
18.9
21
29
21.9
23
22
DURASI PEKERJAAN

No URAIAN PEKERJAAN KOEF SAT VOL

1 2 3 4 5
I. PEKERJAAN PERSIAPAN
I.1. Membersihkan 1 M² Lapangan 375.00
Tenaga
Pekerja 0.100 OH
Mandor 0.050 OH
Jumlah 0.15
Diperlukan 8 Orang Tenaga Kerja
375.00
D = 1 = 6.25 = 6 Hari
x 9
0.15

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


6.25 = 8
3.13 = 1
Jumlah 9
I.2. Mengerjakan 1 m² pengukuran dan pemasangan bouwplank 57.00
Tenaga
Pekerja 0.100 OH
Tukang Kayu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.005 OH
Jumlah 0.215
Diperlukan 6 Orang Tenaga Kerja
57.00
D = 1 = 2.04 = 2 Hari
x 6
0.22

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.85 = 2
2.85 = 2
0.29 = 1
0.14 = 1
Jumlah 6
I.3. Membuat 1 m² kantor sementara, dengan lantai plesteran 18.00
Tenaga
Pekerja 2.000 OH
Tukang Kayu 1.000 OH
Kepala Tukang 0.200 OH
Mandor 0.050 OH
Jumlah 3.250
Diperlukan 15 Orang Tenaga Kerja
18.00
D = 1 = 3.90 = 4 Hari
x 15
3.25

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


9.00 = 9
4.50 = 4
0.90 = 1
0.23 = 1
Jumlah 15
II. PEKERJAAN GALIAN TANAH
II.1. Menggali 1 m³ tanah Pondasi Telapak sedalam 1,50 meter 36.72
Tenaga
Pekerja 0.900 OH
Mandor 0.045 OH
Jumlah 0.945
Diperlukan 8 Orang Tenaga Kerja
36.72
D = 1 = 4.34 = 4 Hari
x 8
0.95

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


8.26 = 7
0.41 = 1
Jumlah 8
II.2. Menggali 1 m³ tanah biasa sedalam 0,53 meter 38.36
Tenaga
Pekerja 0.750 OH
Mandor 0.025 OH
Jumlah 0.775
Diperlukan 5 Orang Tenaga Kerja
38.36
D = 1 = 5.95 = 5 Hari
x 5
0.775

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


5.75 = 4
0.19 = 1
Jumlah 5
II.3. Mengurug Kembali 1 m3 galian 9.59
Tenaga
Pekerja 0.250 OH
Mandor 0.008 OH
Jumlah 0.258
Diperlukan 2 Orang Tenaga Kerja
9.59
D = 1 = 1.24 = 1 Hari
x 2
0.258

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.40 = 1
0.08 = 1
Jumlah 2
III. PEKERJAAN STRUKTUR BAWAH
Memasang 1 m³ pondasi beton bertulang (150 kg besi + bekisting) 7.77
Tenaga
Pekerja 5.300 OH
Tukang Batu 0.275 OH
Tukang Kayu 1.300 OH
Tukang Besi 1.050 OH
Kepala Tukang 0.262 OH
Mandor 0.265 OH
Jumlah 8.452
Diperlukan 17 Orang Tenaga Kerja
7.77
D = 1 = 3.86 = 3 Hari
x 17
8.45

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


13.72 = 9
0.71 = 1
3.37 = 3
2.72 = 2
0.68 = 1
0.69 = 1
Jumlah 17
1 m3 Urugan Pasir Bawah Pondasi 9.14
Tenaga 0.300 OH
Pekerja 0.010 OH
Mandor
Jumlah 0.310
Diperlukan 2 Orang Tenaga Kerja
9.14
D = 1 = 1.42 = 1 Hari
x 2
0.31

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.74 = 1
0.09 = 1
Jumlah 2
II.4. Memasang 1 m³ batu kosong (aanstampeeng) 13.70
Tenaga
Pekerja 0.780 OH
Tukang Batu 0.390 OH
Kepala Tukang 0.039 OH
Mandor 0.039 OH
Jumlah 1.248
Diperlukan 8 Orang Tenaga Kerja
13.70
D = 1 = 2.14 = 3 Hari
x 8
1.25

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


3.56 = 4
1.78 = 2
0.18 = 1
0.18 = 1
Jumlah 8
Memasang 1 m³ pondasi batu belah; campuran 1 PC : 5 P 45.81
Tenaga
Pekerja 1.500 OH
Tukang Batu 0.600 OH
Kepala Tukang 0.060 OH
Mandor 0.075 OH
Jumlah 2.235
Diperlukan 11 Orang Tenaga Kerja
45.81
D = 1 = 9.31 = 9 Hari
x 11
2.24

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


7.64 = 7
3.05 = 2
0.31 = 1
0.38 = 1
Jumlah 11
Memasang 1 m³ sloof beton bertulang + Bekisting (20x30 Cm & 15x20Cm) 4.81
Tenaga
Pekerja 4.850 OH
Tukang Batu 0.350 OH
Tukang Kayu 1.560 OH
Tukang Besi 1.400 OH
Kepala Tukang 0.331 OH
Mandor 0.170 OH
Jumlah 8.661
Diperlukan 11 Orang Tenaga Kerja
4.81
D = 1 = 3.79 = 3 Hari
x 11
8.661

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


7.78 = 6
0.56 = 1
2.50 = 1
2.25 = 1
0.53 = 1
0.27 = 1
Jumlah 11
IV. PEKERJAAN STRUKTUR ATAS
a. 1 m3 Beton Kolom (K1) Bertulang 30 x 35 (Pembesian 300 Kg) 1.68
Tenaga
Pekerja 7.0500 OH
Tukang Batu 0.2750 OH
Tukang Kayu 1.6500 OH
Tukang Besi 2.1000 OH
Kepala Tukang 0.4030 OH
Mandor 0.3530 OH
Jumlah 11.831
Diperlukan 9 Orang Tenaga Kerja
1.68
D = 1 = 2.21 = 2 Hari
x 9
11.83

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


5.92 = 4
0.23 = 1
1.39 = 1
1.76 = 1
0.339 = 1
0.297 = 1
Jumlah 9
b. 1 m3 Beton Kolom (K2) Bertulang 30 x 30 (Pembesian 250 Kg) 5.40
Tenaga
Pekerja 7.300 OH
Tukang Batu 0.350 OH
Tukang Kayu 3.300 OH
Tukang Besi 2.100 OH
Kepala Tukang 0.750 OH
Mandor 0.250 OH
Jumlah 14.050
Diperlukan 12 Orang Tenaga Kerja
5.40
D = 1 = 5.84 = 5 Hari
x 13
14.05

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


7.88 = 8
0.38 = 1
3.56 = 1
2.27 = 1
0.81 = 1
0.27 = 1
Jumlah 13
c. 1 m3 Beton Kolom (K3) Bertulang 20 x 20 (Pembesian 200 Kg) 1.60
Tenaga
Pekerja 7.300 OH
Tukang Batu 0.350 OH
Tukang Kayu 3.300 OH
Tukang Besi 2.100 OH
Kepala Tukang 0.750 OH
Mandor 0.250 OH
Jumlah 14.050
Diperlukan 10 Orang Tenaga Kerja
1.60
D = 1 = 2.50 = 2 30 Hari
x 9
14.05

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


5.84 = 4
0.28 = 1
2.64 = 1
1.68 = 1
0.60 = 1
0.20 = 1
Jumlah 9
d. 1 m3 Kolom Praktis (KP) Bertulang 12 x 12 ( Pembesian 150 Kg) 3.20
Tenaga
Pekerja 7.300 OH
Tukang Batu 0.350 OH
Tukang Kayu 3.300 OH
Tukang Besi 2.100 OH
Kepala Tukang 0.750 OH
Mandor 0.250 OH
Jumlah 14.050
Diperlukan 12 Orang Tenaga Kerja
3.20
D = 1 = 3.46 = 3 30 Hari
x 13
14.05

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


7.79 = 8
0.37 = 1
3.52 = 1
2.24 = 1
0.80 = 1
0.27 = 1
Jumlah 13
1 m3 Beton Balok Bertulang 30 x 30 dan 15 x 20 5.84
Tenaga
Pekerja 5.800 OH
Tukang Batu 0.350 OH
Tukang Kayu 2.800 OH
Tukang Besi 1.050 OH
Kepala Tukang 0.420 OH
Mandor 0.185 OH
Jumlah 10.605
Diperlukan 10 Orang Tenaga Kerja
5.84
D = 1 = 6.19 = 6 28 Hari
x 10
10.61

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


5.64 = 5
0.34 = 1
2.72 = 1
0.22 = 1
0.41 = 1
0.18 = 1
Jumlah 10
1 m3 Rink Balok (RB) Bertulang 12 x 15 ( 150 Kg besi + Bekesting) 1.47
Tenaga
Pekerja 5.800 OH
Tukang Batu 0.350 OH
Tukang Kayu 2.800 OH
Tukang Besi 1.050 OH
Kepala Tukang 0.420 OH
Mandor 0.185 OH
Jumlah 10.605
Diperlukan 8 Orang Tenaga Kerja
1.47
D = 1 = 1.95 = 2 5 Hari
x 8
D
x 8
10.61

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


4.27 = 3
0.26 = 1
2.06 = 1
0.31 = 1
0.31 = 1
0.14 = 1
Jumlah 8
1 m3 Plat Lantai beton bertulang tebal 12 cm ( 150 Kg besi + Bekesting) 12.24
Tenaga
Pekerja 5.600 OH
Tukang Batu 0.350 OH
Tukang Kayu 2.640 OH
Tukang Besi 1.050 OH
Kepala Tukang 0.400 OH
Mandor 0.193 OH
Jumlah 10.233
Diperlukan 15 Orang Tenaga Kerja
12.24
D = 1 = 8.35 = 8 Hari
x 15
10.23

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


8.57 = 8
0.54 = 1
4.04 = 3
1.61 = 1
0.61 = 1
0.30 = 1
Jumlah 15
1 m3 Plat Atap beton bertulang tebal 11 cm ( 150 Kg besi + Bekesting) 11.52
Tenaga
Pekerja 5.600 OH
Tukang Batu 0.350 OH
Tukang Kayu 2.640 OH
Tukang Besi 1.050 OH
Kepala Tukang 0.400 OH
Mandor 0.193 OH
Jumlah 10.233
Diperlukan 14 Orang Tenaga Kerja
11.52
D = 1 = 8.4 = 8 Hari
x 14
10.23
Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari
8.06 = 7
0.50 = 1
3.80 = 3
1.51 = 1
0.58 = 1
0.28 = 1
Jumlah 14
1 m3 membuat tangga beton bertulang ( 150 Kg besi + Bekesting) 1.64
Pekerja 5.600 OH
Tukang Kayu 0.350 OH
Tukang BAtu 2.300 OH
Tukang Besi 1.400 OH
Kepala Tukang 0.405 OH
Mandor 0.202 OH
Jumlah 10.257
Diperlukan 6 Orang Tenaga Kerja
1.64
D = 1 = 0.45 = 1 Hari
x 6
1.64

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


9.16 = 1
0.57 = 1
3.76 = 1
2.291 = 1
0.663 = 1
0.331 = 1
Jumlah 6
Pekerjaan Atap
a. Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu Kruing 1.48
Tenaga
Pekerja 4.000 OH
Tukang Kayu 12.000 OH
Kepala Tukang 1.200 OH
Mandor 0.200 OH
Jumlah 17.400
Diperlukan 10 Orang Tenaga Kerja
1.48
D = 1 = 2.35 = 2 Hari
x 11
17.40

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.968 = 4
8.905 = 5
0.890 = 1
0.148 = 1
Jumlah 11
1 m3 pasang gording kayu klas II 1.51
Tenaga
Pekerja 2.4000 OH
Tukang Kayu 7.2000 OH
Kepala Tukang 0.7200 OH
Mandor 0.1200 OH
Jumlah 10.440
Diperlukan 10 Orang Tenaga Kerja
1.51
D = 1 = 2.25 = 2 Hari
x 7
10.44

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


1.81 = 2
5.44 = 3
0.54 = 1
0.09 = 1
Jumlah 7
c. Membuat dan memasang 1 m² rangka atap 1.19
Tenaga
Pekerja 0.100 OH
Tukang Kayu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.005 OH
Jumlah 0.215
Diperlukan 7 Orang Tenaga Kerja
1.19
D = 1 = 0.04 = 1 Hari
x 7
0.22

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.12 = 1
0.12 = 1
0.01 = 1
0.01 = 1
Jumlah 4
d. Memasang 1 m² atap genteng beton 188.62
Tenaga
Pekerja 0.200 OH
Tukang Kayu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.010 OH
Jumlah 0.320
Diperlukan 20 Orang Tenaga Kerja
188.62
D = 1 = 3.02 = 4 Hari
x 20
0.32

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


9.43 = 12
4.72 = 6
0.47 = 1
0.47 = 1
Jumlah 20
e. Memasang 1 m' nok genteng beton 50.84
Tenaga
Pekerja 0.400 OH
Tukang Kayu 0.200 OH
Kepala Tukang 0.020 OH
Mandor 0.020 OH
Jumlah 0.640
Diperlukan 5 Orang Tenaga Kerja
50.84
D = 1 = 6.508 = 1 Hari
x 5
0.64

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


20.34 = 2
10.17 = 1
1.02 = 1
1.02 = 1
Jumlah 5
f. Memasang 1 m' talang datar seng BJLS 28 10.12
Tenaga
Pekerja 0.200 OH
Tukang Kayu 0.400 OH
Kepala Tukang 0.025 OH
Mandor 0.010 OH
Jumlah 0.635
Diperlukan 5 Orang Tenaga Kerja
10.12
D = 1 = 1.285 = 5 Hari
x 5
0.64

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.40 = 2
0.81 = 1
0.05 = 1
0.02 = 1
Jumlah 5
g. Memasang 1 m' lisplank uk. (3 x 20) cm; Kruing 0.61
Tenaga
Pekerja 0.100 OH
Tukang Kayu 0.200 OH
Kepala Tukang 0.025 OH
Mandor 0.005 OH
Jumlah 0.330
Diperlukan 6 Orang Tenaga Kerja
0.61
D = 1 = 0.033 = 1 Hari
x 6
0.33

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.06 = 2
0.12 = 2
0.02 = 1
0.00 = 1
Jumlah 6
V. PEKERJAAN ARSITEKTUR
Pekerjaan Pasangan Bata
a. Memasang 1 m² dinding bata semen ; tebal 1 bata; campuran 1 PC : 3 Ps 31.01
Tenaga
Pekerja 0.650 OH
Tukang Batu 0.200 OH
Kepala Tukang 0.020 OH
Mandor 0.030 OH
Jumlah 0.900
Diperlukan 6 Orang Tenaga Kerja
31.01
D = 1 = 4.651 = 1 Hari
x 6
0.90

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


20.15 = 2
6.20 = 2
0.62 = 1
0.93 = 1
Jumlah 6
b. Memasang 1 m² dinding bata semen campuran 1 PC :6 Ps 496.10
Tenaga
Pekerja 0.600 OH
Tukang Batu 0.200 OH
Kepala Tukang 0.020 OH
Mandor 0.030 OH
Jumlah 0.850
Diperlukan 15 Orang Tenaga Kerja
496.10
D = 1 = 28.11 = 83 Hari
x 15
0.85

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


3.59 = 10
1.20 = 3
0.12 = 1
0.18 = 1
Jumlah 15
Pekerjaan Plesteran Dinding
a. Memasang 1 m² plesteran 1 PC : 3 Ps; tebal 15 mm 62.01
Tenaga
Pekerja 0.200 OH
Tukang Batu 0.150 OH
Kepala Tukang 0.015 OH
Mandor 0.010 OH
Jumlah 0.375
Diperlukan 15 Orang Tenaga Kerja
62.01
D = 1 = 1.55 = 83 Hari
x 15
0.38

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.15 = 10
0.11 = 3
0.01 = 1
0.01 = 1
Jumlah 15
b. Memasang 1 m² plesteran 1 PC : 6 Ps; tebal 15 mm 1054.20
Tenaga
Pekerja 0.200 OH
Tukang Batu 0.150 OH
Kepala Tukang 0.015 OH
Mandor 0.010 OH
Jumlah 0.375
Diperlukan 15 Orang Tenaga Kerja
1054.20
D = 1 = 26.36 = 77 Hari
x 15
0.38
Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari
2.74 = 8
2.05 = 5
0.21 = 1
0.14 = 1
Jumlah 15
c. Memasang 1 m² acian 1054.20
Tenaga
Pekerja 0.150 OH
Tukang Batu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.008 OH
Jumlah 0.268
Diperlukan 15 Orang Tenaga Kerja
1054.20
D = 1 = 18.84 = 55 Hari
x 15
0.27

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.88 = 8
1.92 = 5
0.19 = 1
0.15 = 1
Jumlah 15
Pekerjaan Pemasangan Keramik
a. 1 m3 Rabat Beton Bawah Lantai,1 Pc:3 Ps:5 Kr Tebal 5 cm 12.93
Tenaga
Pekerja 1.150 OH
Tukang Batu 0.020 OH
Kepala Tukang 0.002 OH
Mandor 0.006 OH
Jumlah 1.178
Diperlukan 10 Orang Tenaga Kerja
12.93
D = 1 = 1.52 = 2 Hari
x 10
1.18

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


7.44 = 7
0.13 = 1
0.01 = 1
0.04 = 1
Jumlah 10
b. Memasang 1 m² lantai keramik ukuran 60 x 60 cm 250.4
Tenaga
Pekerja 0.250 OH
Tukang Batu 0.120 OH
Kepala Tukang 0.012 OH
Mandor 0.013 OH
Jumlah 0.395
Diperlukan 15 Orang Tenaga Kerja
250.40
D = 1 = 6.59 = 7 Hari
x 15
0.40

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


8.94 = 9
4.29 = 4
0.43 = 1
0.47 = 1
Jumlah 15
c. Memasang 1 m² lantai keramik KM ukuran30x30 Cm 8.25
Tenaga
Pekerja 0.600 OH
Tukang Batu 0.450 OH
Kepala Tukang 0.045 OH
Mandor 0.030 OH
Jumlah 1.125
Diperlukan 6 Orang Tenaga Kerja
8.25
D = 1 = 1.55 = 2 Hari
x 6
1.13

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.48 = 2
1.86 = 2
0.19 = 1
0.12 = 1
Jumlah 6
d. Memasang 1 m² dinding keramik ukuran30 x30 cm 38.3
Tenaga
Pekerja 0.600 OH
Tukang Batu 0.450 OH
Kepala Tukang 0.045 OH
Mandor 0.030 OH
Jumlah 1.125
Diperlukan 12 Orang Tenaga Kerja
38.30
D = 1 = 3.59 = 4 Hari
x 12
1.13
Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari
5.75 = 6
4.31 = 4
0.43 = 1
0.29 = 1
Jumlah 12
e.Memasang 1 m² lantai keramik Tangga ukuran 40 x 40 cm 9.36
Tenaga
Pekerja 0.250 OH
Tukang Batu 0.120 OH
Kepala Tukang 0.012 OH
Mandor 0.013 OH
Jumlah 0.395
Diperlukan 5 Orang Tenaga Kerja
9.36
D = 1 = 0.62 = 1 Hari
x 6
0.40

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.34 = 3
1.12 = 1
0.11 = 1
0.12 = 1
Jumlah 6
Pekerjan Pintu dan Jendela
a. Membuat dan memasang 1 m³ kusen pintu dan kusen jendela 2.09
Tenaga
Pekerja 6.000 OH
Tukang Kayu 18.000 OH
Kepala Tukang 2.000 OH
Mandor 0.300 OH
Jumlah 26.300
Diperlukan 10 Orang Tenaga Kerja
2.09
D = 1 = 5.50 = 6 Hari
x 10
26.30

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.09 = 2
6.28 = 6
0.70 = 1
0.10 = 1
Jumlah 10
b. Membuat dan memasang 1 m² daun pintu dan Jendela panel 28.96
Tenaga
Pekerja 1.000 OH
Tukang Kayu 2.500 OH
Kepala Tukang 0.250 OH
Mandor 0.050 OH
Jumlah 3.800
Diperlukan 6 Orang Tenaga Kerja
28.96
D = 1 = 18.34 = 1 Hari
x 6
3.80

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


28.96 = 1
72.40 = 3
7.24 = 1
1.45 = 1
Jumlah 6
c. Memasang 1 m² kaca riben; tebal 3 mm 26.17
Tenaga
Pekerja 0.015 OH
Tukang Kayu 0.150 OH
Kepala Tukang 0.015 OH
Mandor 0.001 OH
Jumlah 0.181
Diperlukan 6 Orang Tenaga Kerja
26.17
D = 1 = 0.79 = 1 Hari
x 6
0.18

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.39 = 1
3.93 = 3
0.39 = 1
0.02 = 1
Jumlah 6
e. Memasang 1 buah Grendel 60.00
Tenaga
Pekerja 0.010 OH
Tukang Kayu 0.500 OH
Kepala Tukang 0.010 OH
Mandor 0.005 OH
Jumlah 0.525
Diperlukan 10 Orang Tenaga Kerja
60.00
D = 1 = 3.15 = 3 Hari
x 10
D
x 10
0.53

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.20 = 1
10.00 = 7
0.20 = 1
0.10 = 1
Jumlah 10
f. Memasang 1 buah engsel pintu dan Jendela 86.00
Tenaga
Pekerja 0.015 OH
Tukang Kayu 0.150 OH
Kepala Tukang 0.015 OH
Mandor 0.001 OH
Jumlah 0.181
Diperlukan 10 Orang Tenaga Kerja
86.00
D = 1 = 1.55 = 2 Hari
x 10
0.18

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.65 = 1
6.45 = 7
0.65 = 1
0.03 = 1
Jumlah 10
g. Memasang 1 buah kunci tanam biasa 10.00
Tenaga
Pekerja 0.010 OH
Tukang Kayu 0.500 OH
Kepala Tukang 0.010 OH
Mandor 0.005 OH
Jumlah 0.525
Diperlukan 10 Orang Tenaga Kerja
10.00
D = 1 = 0.53 = 1 Hari
x 10
0.53

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.10 = 1
5.00 = 7
0.10 = 1
0.05 = 1
Jumlah 10
h. Memasang 1 buah kait angin 44.00
Tenaga
Pekerja 0.015 OH
Tukang Kayu 0.150 OH
Kepala Tukang 0.015 OH
Mandor 0.001 OH
Jumlah 0.181
Diperlukan 10 Orang Tenaga Kerja
44.00
D = 1 = 0.80 = 1 Hari
x 10
0.18

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.66 = 1
6.60 = 7
0.66 = 1
0.03 = 1
Jumlah 10
Pekerjaan Plafond
a. Memasang 1 m² rangka langit-langit (100 x 100) cm; Kayu Meranti Batu 2.99
Tenaga
Pekerja 0.150 OH
Tukang Kayu 0.250 OH
Kepala Tukang 0.025 OH
Mandor 0.075 OH
Jumlah 0.500
Diperlukan 10 Orang Tenaga Kerja
2.99
D = 1 = 0.15 = 1 Hari
x 10
0.50

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.45 = 2
0.75 = 6
0.07 = 1
0.22 = 1
Jumlah 10
b. Memasang 1 m² Plafond tripleks dalam ukuran (120 x 240 ) cm; tbl. 3 mm. 259.78
Tenaga
Pekerja 0.070 OH
Tukang Kayu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.004 OH
Jumlah 0.184
Diperlukan 10 Orang Tenaga Kerja
259.78
D
D = 1 = 4.78 = 5 Hari
x 10
0.18

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


3.64 = 1
5.20 = 2
0.52 = 1
0.21 = 1
Jumlah 5
c. Memasang 1 m² Plafond luar ukuran (120 x 240 ) cm; tbl. 3 mm 70.01
Tenaga
Pekerja 0.070 OH
Tukang Kayu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.004 OH
Jumlah 0.184
Diperlukan 5 Orang Tenaga Kerja
70.01
D = 1 = 2.58 = 3 Hari
x 5
0.18

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


1.63 = 2
2.33 = 2
0.23 = 1
0.09 = 1
Jumlah 6
d. Memasang 1 m' list kayu profil 501.59
Tenaga
Pekerja 0.050 OH
Tukang Kayu 0.050 OH
Kepala Tukang 0.005 OH
Mandor 0.003 OH
Jumlah 0.108
Diperlukan 10 Orang Tenaga Kerja
501.59
D = 1 = 5.42 = 6 Hari
x 10
0.11

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


4.18 = 4
4.18 = 4
0.42 = 1
0.25 = 1
Jumlah 10
VI. PEKERJAAN MEKANIKAL
a. Memasang 1 m' pipa PVC tipe AW Ø 4" 32.60
Tenaga
Pekerja 0.081 OH
Tukang Batu 0.135 OH
Kepala Tukang 0.014 OH
Mandor 0.004 OH
Jumlah 0.234
Diperlukan 5 Orang Tenaga Kerja
32.60
D = 1 = 1.52 = 2 Hari
x 5
0.23

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


1.32 = 1
2.20 = 2
0.22 = 1
0.07 = 1
Jumlah 5
b. Memasang 1 m' pipa PVC tipe AW Ø ¾" 25.79
Tenaga
Pekerja 0.036 OH
Tukang Batu 0.060 OH
Kepala Tukang 0.006 OH
Mandor 0.002 OH
Jumlah 0.104
Diperlukan 5 Orang Tenaga Kerja
25.79
D = 1 = 0.54 = 1 Hari
x 5
0.10

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.93 = 1
1.55 = 2
0.15 = 1
0.05 = 1
Jumlah 5
c. Memasang 1 buah kran Ø ¾" atau ½" 4.00
Tenaga
Pekerja 0.010 OH
Tukang Batu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.005 OH
Jumlah 0.125
Diperlukan 4 Orang Tenaga Kerja
4.00
D = 1 = 0.13 = 1 Hari
x 4
0.13

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.04 = 1
0.40 = 1
0.04 = 1
0.02 = 1
Jumlah 4
d. Memasang 1 buah kloset duduk/monoblok 1.00
Tenaga
Pekerja 3.300 OH
Tukang Batu 1.100 OH
Kepala Tukang 0.001 OH
Mandor 0.160 OH
Jumlah 4.561
Diperlukan 5 Orang Tenaga Kerja
1.00
D = 1 = 0.91 = 1 Hari
x 5
4.56

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


3.30 = 2
1.10 = 1
0.00 = 1
0.16 = 1
Jumlah 5
e. Memasang 1 buah kloset jongkok porselen 2.00
Tenaga
Pekerja 1.000 OH
Tukang Batu 1.500 OH
Kepala Tukang 1.500 OH
Mandor 0.160 OH
Jumlah 4.160
Diperlukan 5 Orang Tenaga Kerja
2.00
D = 1 = 1.66 = 2 Hari
x 5
4.16

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


1.00 = 1
1.50 = 2
1.50 = 1
0.16 = 1
Jumlah 5
f. Memasang 1 buah bak mandi fibreglass volume 0,30 m³ 3.00
Tenaga
Pekerja 1.800 OH
Tukang Batu 2.700 OH
Kepala Tukang 0.540 OH
Mandor 0.110 OH
Jumlah 5.150
Diperlukan 6 Orang Tenaga Kerja
3.00
D = 1 = 2.58 = 3 Hari
x 6
5.15

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


1.80 = 1
2.70 = 3
0.54 = 1
0.11 = 1
Jumlah 6
g. Memasang 1 buah floordrain 3.00
Tenaga
Pekerja 0.010 OH
Tukang Batu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.005 OH
Jumlah 0.125
Diperlukan 3 Orang Tenaga Kerja
3.00
D = 1 = 0.09 = 1 Hari
x 4
0.13

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


0.03 = 1
0.30 = 1
0.03 = 1
0.02 = 1
Jumlah 4
h. Membuat 1 unit septic tank ukuran 2 x 2 x 1,5 m + rembesan (kantor tipe se 2.00
Tambahan upah 0.120 ls
Jumlah 0.120
Diperlukan 5 Orang Tenaga Kerja
2.00
D = 1 = 0.05 = 1 Hari
x 5
0.12
Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari
0.24 = 1
Jumlah 1
VII. PEKERJAAN ELEKTRIKAL
a. Pengadaan dan Pemasangan Kabel 1 m' 64.65
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Jumlah 1.970
Diperlukan 10 Orang Tenaga Kerja
64.65
D = 1 = 12.74 = 13 Hari
x 10
1.97

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


5.97 = 6
3.23 = 1
0.60 = 1
Jumlah 8
b. 1 Buah Pemasangan Sekring Group 1.00
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Jumlah 1.970
Diperlukan 4 Orang Tenaga Kerja
1.00
D = 1 = 0.49 = 1 Hari
x 4
1.97

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


1.20 = 2
0.65 = 1
0.12 = 1
Jumlah 4
c.1 Buah Stop Kontak 14.00
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Jumlah 1.970
Diperlukan 5 Orang Tenaga Kerja
14.00
D = 1 = 5.52 = 6 Hari
x 5
D
x 5
1.97

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.80 = 3
1.52 = 1
0.28 = 1
Jumlah 5
d. 1 Buah Fithing Lampu 26.00
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Jumlah 1.970
Diperlukan 5 Orang Tenaga Kerja
26.00
D = 1 = 5.12 = 4 Hari
x 10
1.97

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


7.80 = 8
4.23 = 1
0.78 = 1
Jumlah 10
e. 1 Buah Saklar Tunggal 9.00
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Jumlah 1.970
Diperlukan 5 Orang Tenaga Kerja
9.00
D = 1 = 3.55 = 4 Hari
x 5
1.97

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.70 = 1
1.46 = 1
0.27 = 1
Jumlah 3
f. 1 Buah Saklar Ganda 6.00
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Jumlah 1.970
Diperlukan 5 Orang Tenaga Kerja
6.00
D = 1 = 2.36 = 2 Hari
x 5
1.97

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


3.60 = 3
1.95 = 1
0.36 = 1
Jumlah 5
g. 1 buah lampu Pilips 26.00
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Jumlah 1.970
Diperlukan 5 Orang Tenaga Kerja
26.00
D = 1 = 10.24 = 1 Hari
x 5
1.97

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


31.20 = 3
16.90 = 1
3.12 = 1
Jumlah 5
h. Penyambungan Aliran Listrik Baru 1.00
Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh
Jumlah 1.970
Diperlukan 5 Orang Tenaga Kerja
1.00
D = 1 = 0.39 = 1 Hari
x 5
1.97

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


1.20 = 3
0.65 = 1
0.12 = 1
Jumlah 5
VIII. PEKERJAAN FINISHING
a. Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penu 1054.20
Tenaga
Pekerja 0.070 OH
Tukang Cat 0.009 OH
Kepala Tukang 0.006 OH
Mandor 0.003 OH
Jumlah 0.088
Diperlukan 20 Orang Tenaga Kerja
1054.20
D = 1 = 4.61 = 13 Hari
x 20
0.09

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


5.68 = 16
0.73 = 2
0.49 = 1
0.20 = 1
Jumlah 20
b. Mengecat 1 m² bidang plafond baru (1 lps plamir, 1 lps cat dsr, 2 lps cat pen 259.78
Tenaga
Pekerja 0.020 OH
Tukang Cat 0.063 OH
Kepala Tukang 0.006 OH
Mandor 0.003 OH
Jumlah 0.092
Diperlukan 10 Orang Tenaga Kerja
259.78
D = 1 = 2.38 = 2 Hari
x 10
0.09

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.60 = 1
8.18 = 7
0.82 = 1
0.32 = 1
Jumlah 10
c. Mengecat 1 m² bidang kayu baru (Kusend) (1 lps plamir, 1 lps cat dsr, 2 lps 2.09
Tenaga
Pekerja 0.070 OH
Tukang Cat 0.009 OH
Kepala Tukang 0.006 OH
Mandor 0.003 OH
Jumlah 0.088
Diperlukan 5 Orang Tenaga Kerja
2.09
D = 1 = 0.04 = 1 Hari
x 5
0.09
Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari
0.15 = 2
0.02 = 1
0.01 = 1
0.01 = 1
Jumlah 5
d. Mengecat 1 m² bidang kayu baru (Daun Pintu, & Jendela) (1 lps plamir, 1 lps 28.96
Tenaga
Pekerja 0.070 OH
Tukang Cat 0.009 OH
Kepala Tukang 0.006 OH
Mandor 0.003 OH
Jumlah 0.088
Diperlukan 5 Orang Tenaga Kerja
28.96
D = 1 = 0.51 = 1 Hari
x 5
0.09

Cek Kebutuhan Tenaga Kerja (Vol. x Indeks) / Hari


2.03 = 2
0.26 = 1
0.17 = 1
0.07 = 1
Jumlah 5
Rp 11,475

69,600 6 3,340,800 Rp 4,303,125


90,300 6 541,800
3,882,600 Rp 420,525

Rp 46,421
69,600 2 278,400 Rp 2,645,997.00
82,000 2 328,000
86,300 2 172,600
90,300 2 180,600
Rp 959,600 Rp 1,686,397.00
Rp 255,375
69,600 4 2,505,600 Rp 4,596,750.00
82,000 4 1,312,000
82,000 4 328,000
86,300 4 345,200
4,490,800 Rp 105,950.00

66703.5 Rp 2,449,353
69,600 4 1,948,800
90,300 4 361,200
2,310,000

Rp 2,089,185
69,600 5 1,392,000
90,300 5 451,500
1,843,500 Rp 245,685
Rp 18,149
69,600 1 69,600 Rp 174,070
90,300 1 90,300
159,900

Rp 511,340
69,600 3 1,879,200 Rp 3,970,858
82,000 3 246,000
82,000 3 738,000
82,400 3 494,400
100,000 3 300,000
90,300 3 270,900
3,928,500 Rp 42,358

Rp 21,783
69,600 1 69,600 Rp 198,988
90,300 1 90,300
159,900
Rp 168,131
69,600 3 835,200
82,000 3 492,000 Rp 2,303,808.18
86,300 3 258,900
90,300 3 270,900
Rp 2,025,131

Rp 168,131
69,600 9 4,384,800
82,000 9 1,476,000
86,300 9 776,700 Rp 7,702,209.52
90,300 9 812,700
Rp 7,618,331
69,600 3 1,252,800 Rp 657,431
82,000 3 246,000
82,000 3 246,000
82,400 3 247,200 Rp 3,162,966.28
100,000 3 300,000
90,300 3 270,900
2,562,900

Rp 892,906
69,600 2 556,800 Rp 1,500,081.91
82,000 2 164,000
82,000 2 164,000
82,400 2 164,800
100,000 2 200,000
90,300 2 180,600
1,430,200
Rp 1,077,995
69,600 5 2,784,000 Rp 5,821,173.00
82,000 5 410,000
82,000 5 410,000
82,400 5 412,000
100,000 5 500,000
90,300 5 451,500
4,967,500

Rp 1,077,995
69,600 2 556,800 Rp 1,724,792
82,000 2 164,000
82,000 2 164,000
82,400 2 164,800
100,000 2 200,000
90,300 2 180,600
1,430,200
Rp 1,077,995
69,600 3 1,670,400 Rp 3,449,584
82,000 3 246,000
82,000 3 246,000
82,400 3 247,200
100,000 3 300,000
90,300 3 270,900
2,980,500

806,785.50
69,600 6 2,088,000 4,709,771.71
82,000 6 492,000
82,000 6 492,000
82,400 6 494,400
100,000 6 600,000
90,300 6 541,800
4,708,200

806,785.50
69,600 2 417,600 1,188,201.41
82,000 2 164,000
82,000 2 164,000
82,400 2 164,800
100,000 2 200,000
1,110,400

778,467.90
69,600 8 4,454,400 9,528,447.10
82,000 8 656,000
82,000 8 1,968,000
82,400 8 659,200
100,000 8 800,000
90,300 8 722,400
9,260,000 268,447.10

778,467.90
69,600 8 3,897,600 8,967,950.21
82,000 8 656,000
82,000 8 1,968,000
82,400 8 659,200
100,000 8 800,000
90,300 8 722,400
8,703,200 264,750.21

Rp 780,601
69,600 1 637,842.24 Rp 1,277,453
82,000 1 46,967.55
82,000 1 308,643.90
82,400 1 188,786.64
100,000 1 33,057.30
90,300 1 29,850.74
1,245,148.37 Rp 32,304.51

Rp 1,384,020
69,600 2 556,800 Rp 2,054,107.12
82,000 2 820,000
86,300 2 172,600
90,300 2 180,600
1,730,000
830,412.00
69,600 2 278,400 Rp 1,254,088
82,000 2 492,000
86,300 2 172,600
90,300 2 180,600
1,123,600 Rp 130,488

32,949.00
69,600 1 69,600 Rp 39,133
82,000 1 82,000
86,300 1 86,300
90,300 1 90,300
328,200
JADWAL PROYEK RUMAH TINGGAL 2 LANT
DENGAN MENGGUNAKAN BARCHART

DURASI
NO KODE JENIS KEGIATAN 1 2 3 4 5 6 7 8 9 10 11 12
(MINGGU)
1 A Pekerjaan Persiapan 2
2 B Pekerjaan Galian Tanah Pondasi 2
4 C Pekerjaan Struktur Bawah (Pondasi) 2
D Pekerjaan Sloof Utama dan Praktis 1
PEKERJAAN STRUKTUR ATAS LT.I
5 E Pekerjaan Kolom Utama dan Praktis 1
PEKERJAAN STRUKTUR ATAS LT.II
6 F Pekerjaan Kolom Utama dan Praktis 1
7 G Pekerjaan Balok Utama dan Balok Anak 2
8 H Pekerjaan Plat Lantai 5
9 I Pekerjaan Balok Utama, Anak dan Ring Balok 2
10 J Pekerjaan Plat Atap 5
11 K Pekerjaan tangga beton bertulang 1
12 L Pekerjaan Atap 1
PEKERJAAN ARSITEKTUR LT. I
13 M Pekerjaan Dinding + Kusen 1
14 N Pekerjaan Pasangan Keramik 1
15 O Pekerjaan Pintu dan Jendela 1
16 P Pekerjaan Plafond 1

PEKERJAAN ARSITEKTUR LT. II


17 Q Pekerjaan Dinding + Kusen 2
18 R Pekerjaan Pasangan Keramik 1
19 S Pekerjaan Pintu dan Jendela 1
20 T Pekerjaan Plafond 1
21 U Pekerjaan Pagar Teras Lantai 2 1

PEKERJAAN MEKANIKAL
22 V Pekerjaan Mekanikal LT. I 2
23 W Pekerjaan Mekanikal LT. II 1

PEKERJAAN ELEKTRIKAL 1
24 X Pekerjaan Elektrikal LT. I 1
25 Y Pekerjaan Elektrikal LT. II

25 Z PEKERJAAN FINISHING 3
GAL 2 LANTAI
ARCHART

13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ANALISA HARGA SATUAN PEKERJAAN

NO URAIAN JENIS PEKERJAAN KOEF SAT

1 2 3 4
I PEKERJAAN PERSIAPAN
I.1 1 m2 Pembersihan Awal Lokasi
Tenaga
Mandor Lapangan 0.050 Oh
Pekerja 0.100 Oh

I.2 1 m' Pengukuran dan Pemasangan Bouwplank


Bahan
Kayu Dolken 0.012 Btg
Paku Biasa 2" - 5" 0.020 Kg
Kayu Papan Klas II 0.007 M3

Tenaga
Pekerja 0.100 Oh
Kepala Tukang 0.010 Oh

I.3 1 m2 Pembuatan Bangsal Kerja dan Gudang Semen dan Alat - alat
Bahan
Kayu 0.210 M3
Paku campur 0.300 Kg
Semen Portland 10.500 Kg
Pasir beton 0.030 M3
Papan Kayu Klas II 0.035 Lbr
Koral Beton 0.050 M3
Seng Gelombang BLJS 20 0.840 Lbr

Tenaga
Tukang Kayu 2.000 Oh
Pekerja 1.000 Oh
Kepala Tukang 0.200 Oh
Mandor 0.050 Oh

II PEKERJAAN GALIAN TANAH


II.1 1 m3 Galian Tanah Pondasi Telapak Sedalam 1,50 Meter
Tenaga
Pekerja 0.900 Oh
Mandor 0.045 Oh

II.2 1 m3 Galian Tanah Biasa Sedalam 0,53 Meter


Tenaga
Pekerja 0.750 Oh
Mandor 0.025 Oh

II.3 1 m3 Galian Tanah Biasa Sedalam 0,30 Meter


Tenaga
Pekerja 0.750 Oh
Mandor 0.025 Oh

II.4 1 m3 Urugan Bekas galian


Tenaga
Pekerja 0.250 Oh
Mandor 0.008 Oh

III PEKERJAAN STRUKTUR BAWAH


III.1 1 m3 Membuat pondasi beton bertulang ( 150 kg besi + bekisting )
Bahan
Kayu Klas II 0.200 M3
Paku biasa 2" - 5" 1.500 Kg
Minyak bekisting 0.400 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 2.250 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3

Tenaga
Pekerja 3.900 Oh
Tukang Batu 0.350 Oh
Tukang kayu 1.040 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.245 Oh
Mandor 0.165 Oh

III.2 Pekerjaan Pondasi Bantu Kali


III.2.1 1 m3 Urugan Pasir Bawah Pondasi
Bahan
Pasir Urug 0.4320 M3

Tenaga
Pekerja 0.300 Oh
Mandor 0.010 Oh

III.2.2 1 m3 Pasang Pondasi Batu Kosong


Bahan
Batu Belah 15 / 20 cm 1.2000 M3

Tenaga
Pekerja 1.5000 Oh
Tukang Batu 0.6000 Oh
Kepala Tukang 0.0600 Oh
Mandor 0.0750 Oh

III.2.3 1 m3 Pasang Pondasi Batu Kali 1 Pc : 5 Ps


Bahan
Batu Belah 15 / 20 cm 1.2000
Semen Portland 136.0000
Pasir pasang 0.544

Tenaga
Pekerja 1.5000
Tukang Batu 0.6000
Kepala Tukang 0.0600
Mandor 0.0750

III.3 Pekerjaan Sloof Utama dan Praktis


III.3.1 1 m3 Beton Sloof (S1) Bertulang 20 x 30 (Pembesian 200 Kg)
Bahan
Kayu Klas II 0.270 M3
Paku biasa 2" - 5" 2.000 Kg
Minyak bekisting 0.600 Lt
Besi Beton Polos 200.000 Kg
Kawat Beton 3.000 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan klas II 0.060 M3

Tenaga
Pekerja 4.850 Oh
Tukang Batu 0.350 Oh
Tukang kayu 1.560 Oh
Tukang besi 1.400 Oh
Kepala Tukang 0.331 Oh
Mandor 0.170 Oh
III.3.2 1 m3 Beton Sloof (S1) Bertulang 15x 20 (Pembesian 150 Kg)
Bahan
Kayu Klas II 0.270 M3
Paku biasa 2" - 5" 2.000 Kg
Minyak bekisting 0.600 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 3.000 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan klas II 0.060 M3

Tenaga
Pekerja 4.850 Oh
Tukang Batu 0.350 Oh
Tukang kayu 1.560 Oh
Tukang besi 1.400 Oh
Kepala Tukang 0.331 Oh
Mandor 0.170 Oh

IV PEKERJAAN STRUKTUR ATAS


IV.1 Pekerjaan Kolom Utama dan Praktis
IV.1.1 1 m3 Beton Kolom (K1) Bertulang 30 x 35 (Pembesian 300 Kg)
Bahan
Kayu Klas II 0.4000 m³
Paku 5 cm - 12 cm 4.0000 kg
Minyak Bekisting 2.0000 liter
Besi Beton (polos/ulir) 315.0000 kg
Kawat Beton 4.5000 kg
Portland Cement (PC) 323.0000 kg
Pasir Beton (PB) 0.5400 m³
Koral Beton (maksimum 30 mm) 0.8100 m³
Papan Kelas II 0.150 M3

Tenaga
Pekerja 7.0500 OH
Tukang Batu 0.2750 OH
Tukang Kayu 1.6500 OH
Tukang Besi 2.1000 OH
Kepala Tukang 0.4030 OH
Mandor 0.3530 OH
IV.1.2 1 m3 Beton Kolom (K2) Bertulang 30 x 30 (Pembesian 250 Kg)
Bahan
Kayu Klas II 0.400 M3
Paku biasa 2" - 5" 4.000 Kg
Minyak bekisting 2.000 Lt
Besi Beton Polos 250.000 Kg
Kawat Beton 3.000 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan Klas II 0.150 M3

Tenaga
Pekerja 7.300 Oh
Tukang Batu 0.350 Oh
Tukang kayu 3.300 Oh
Tukang besi 2.100 Oh
Kepala Tukang 0.750 Oh
Mandor 0.250 Oh

IV.1.3 1 m3 Beton Kolom (K3) Bertulang 20 x 20 (Pembesian 200 Kg)


Bahan
Kayu Klas II 0.400 M3
Paku biasa 2" - 5" 4.000 Kg
Minyak bekisting 2.000 Lt
Besi Beton Polos 200.000 Kg
Kawat Beton 7.000 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan Klas II 0.150 M3

Tenaga
Pekerja 7.300 Oh
Tukang Batu 0.350 Oh
Tukang kayu 3.300 Oh
Tukang besi 2.100 Oh
Kepala Tukang 0.750 Oh
Mandor 0.250 Oh

IV.1.4 1 m3 Kolom Praktis (KP) Bertulang 12 x 12 ( Pembesian 150 Kg)


Bahan
Kayu Klas II 0.400 M3
Paku biasa 2" - 5" 4.000 Kg
Minyak bekisting 2.000 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 3.750 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan Klas II 0.150 M3

Tenaga
Pekerja 7.300 Oh
Tukang Batu 0.350 Oh
Tukang kayu 3.300 Oh
Tukang besi 2.100 Oh
Kepala Tukang 0.750 Oh
Mandor 0.250 Oh

IV.1 Pekerjaan Balok Utama, Anak dan Ring Balok


IV.2.1 1 m3 Beton Balok (B1) Bertulang 30 x 30 (Pembesian 250 Kg)
Bahan
Kayu Klas II 0.320 M3
Paku biasa 2" - 5" 3.200 Kg
Minyak bekisting 1.600 Lt
Besi Beton Polos 250.000 Kg
Kawat Beton 2.250 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan klas II 0.060 M3

Tenaga
Pekerja 5.800 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.800 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.420 Oh
Mandor 0.185 Oh

IV.2.2 1 m3 Beton Balok (B2) Bertulang 15 x 20 (Pembesian 150 Kg)


Bahan
Kayu Klas II 0.320 M3
Paku biasa 2" - 5" 3.200 Kg
Minyak bekisting 1.600 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 2.250 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan klas II 0.060 M3

Tenaga
Pekerja 5.800 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.800 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.420 Oh
Mandor 0.185 Oh

IV.2.3 1 m3 Rink Balok (RB) Bertulang 12 x 15 ( 150 Kg besi + Bekesting)


Bahan
Kayu Klas II 0.320 M3
Paku biasa 2" - 5" 3.200 Kg
Minyak bekisting 1.600 Lt
Besi Beton Polos 100.000 Kg
Kawat Beton 2.250 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan klas II 0.060 M3

Tenaga
Pekerja 5.800 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.800 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.420 Oh
Mandor 0.185 Oh

IV.3 Pekerjaan Plat Lantai dan Plat Atap


IV.3.1 1 m3 Plat Lantai beton bertulang tebal 12 cm ( 150 Kg besi + Bekesting)
Bahan
Kayu 5/5 klas II 0.167 M3
Paku Campur 3.200 Kg
Minyak bekisting 1.600 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 2.250 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan klas II 0.140 M3
Perancah kayu klas II 0.250 M3

Tenaga
Pekerja 5.600 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.640 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.400 Oh
Mandor 0.193 Oh

IV.3.2 1 m3 Plat Atap beton bertulang tebal 11 cm ( 150 Kg besi + Bekesting)


Bahan
Kayu 5/5 klas II 0.167 M3
Paku Campur 3.200 Kg
Minyak bekisting 1.600 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 2.250 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan klas II 0.140 M3
Perancah kayu klas II 0.250 M3

Tenaga
Pekerja 5.600 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.640 Oh
Tukang besi 1.050 Oh
Kepala Tukang 0.400 Oh
Mandor 0.193 Oh

IV.4 1 m3 membuat tangga beton bertulang ( 150 Kg besi + Bekesting)


Bahan
Kayu Klas II 0.250 M3
Paku campur 3.000 Kg
Minyak bekisting 1.200 Lt
Besi Beton Polos 150.000 Kg
Kawat Beton 2.250 Kg
Semen Portland 323.000 Kg
Pasir Beton 0.520 M3
Koral Beton 0.780 M3
Papan Klas II 0.105 M3

Tenaga
Pekerja 5.600 Oh
Tukang Batu 0.350 Oh
Tukang kayu 2.300 Oh
Tukang besi 1.400 Oh
Kepala Tukang 0.405 Oh
Mandor 0.202 Oh

IV.5 Pekerjaan Atap


IV.5.1 1 m3 pasang konstruksi kuda - kuda kayu klas I
Bahan
kayu klas I, balok 1.1 m3
besi strip 15 kg
paku biasa 2" - 5" 0.8 kg

Tenaga
pekerja 4.000 Oh
Tukang kayu 12.000 Oh
Kepala Tukang 1.200 Oh
Mandor 0.200 Oh

IV.5.2 1 m3 pasang gording kayu klas II


Bahan
kayu klas II, balok 1.1 m3
paku campur 4.000 kg

Tenaga
pekerja 2.4000 Oh
Tukang kayu 7.2000 Oh
Kepala Tukang 0.7200 Oh
Mandor 0.1200 Oh

IV.5.3 1 m3 pasang Kaso kayu klas II


Bahan
kayu klas 5/7 1.1 m3
paku campur 4.000 kg
Tenaga
pekerja 0.100 Oh
Tukang kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh

IV.5.4 1 m3 pasang Reng kayu klas II


Bahan
kayu klas II, balok 1.1 m3
paku campur 4.000 kg

Tenaga
pekerja 0.100 Oh
Tukang kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh

IV.5.5 1 m2 Pemasangan Atap Genteng Beton


Bahan
Genteng 11.000 Bh
Paku 2'' - 5'' 0.030 Kg

Tenaga
Pekerja 0.200 Oh
Tukang kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.010 Oh

IV.5.6 Memasang 1 m' nok genteng beton


Bahan
Nok Genteng Beton 3.5000 bh
Paku 2" - 5" 0.0500 kg
Portland Cement (PC) 10.8000 kg
Pasir Pasang 0.0320 m³
Cement Warna 1.0000 kg

Tenaga
Pekerja 0.4000 OH
Tukang Kayu 0.2000 OH
Kepala Tukang 0.0200 OH
Mandor 0.0200 OH
IV.5.7 1 m2 pasang lisplang ukuran (25 x 30) cm, kayu klas II
Bahan
kayu klas II, papan 0.011 m3
paku biasa 2" - 5" 0.050 kg

Tenaga
pekerja 0.110 Oh
Tukang kayu 0.220 Oh
Kepala Tukang 0.022 Oh
Mandor 0.005 Oh

V PEKERJAAN ARSITEKTUR
V.1 Pekerjaan Dinding
V.1.1 1 M2 Pasang Bata Semen Lokal Tebal 1/2 Bata, 1 Pc : 3 Ps
Bahan
Batu Bata 25.000 Bh
Semen Portland 14.370 Kg
Pasir pasang 0.040 M3

Tenaga
Pekerja 0.320 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.015 Oh

V.1.2 1 m2 Pasang Bata Semen Lokal tebal 1/2 bata, 1 Pc : 6 Ps


Bahan
Batu Bata 25.000 Bh
Semen Portland 8.320 Kg
Pasir pasang 0.049 M3

Tenaga
Pekerja 0.320 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.015 Oh

V.1.3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm.


Bahan
Semen Portland 6.480 Kg
Pasir plester 0.019 M3
Tenaga
Pekerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh

V.1.4 1 m2 Plesteran 1 Pc : 6 Ps, tebal 15 mm.


Bahan
Semen Portland 3.680 Kg
Pasir plester 0.023 M3

Tenaga
Pekerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh

V.1.5 1 m2 Acian Dinding


Bahan
Semen Portland 3.680 Kg

Tenaga
Pekerja 0.200 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.010 Oh

V.2 Pekerjaan Pasangan Keramik


V.2.1 1 m3 Rabat Beton Bawah Lantai,1 Pc:3 Ps:5 Kr Tebal 5 cm
Bahan
Portland Cement (PC) 10.0000 kg
Pasir Beton (PB) 0.0260 m³
Koral Beton (maksimum 30 mm) 0.0440 m³

Tenaga
Pekerja 1.1500 OH
Tukang Batu 0.0200 OH
Kepala Tukang 0.0020 OH
Mandor 0.0060 OH

V.2.2 1 m2 Pasang Lantai Keramik Ukuran 60 x 60 cm


Bahan
Ubin Keramik 60 x 60 cm 1.0000 m²
Portland Cement (PC) 9.6000 kg
Pasir Pasang 0.0450 m³
Semen Warna 1.3000 kg

Tenaga
Pekerja 0.2500 OH
Tukang Batu 0.1200 OH
Kepala Tukang 0.0120 OH
Mandor 0.0130 OH

V.2.3 1 m2 Pasang Lantai Keramik Ukuran 30 x 30 cm


Bahan
Ubin Keramik 30 x 30 cm 1.0000 m²
Portland Cement (PC) 10.0000 kg
Pasir Pasang 0.0450 m³
Semen Warna 1.5000 kg

Tenaga
Pekerja 0.6200 OH
Tukang Batu 0.3500 OH
Kepala Tukang 0.0350 OH
Mandor 0.0300 OH

V.2.4 1 m2 Pasang Dinidng Tegel Keramik 30 x 30 cm


Bahan
Ubin Keramik 30 x 30 cm 1.0000 m²
Portland Cement (PC) 10.0000 kg
Pasir Pasang 0.0450 m³
Semen Warna 1.5000 kg

Tenaga
Pekerja 0.6200 OH
Tukang Batu 0.3500 OH
Kepala Tukang 0.0350 OH
Mandor 0.0300 OH

V.2.5 1 m2 Pasang TanggaTegel Keramik 40 x 40 cm


Bahan
Ubin Keramik Motif 40 x 40 cm 1.0000 m²
Portland Cement (PC) 9.8000 kg
Pasir Pasang 0.0450 m³
Semen Warna 1.3000 kg
Tenaga
Pekerja 0.2500 OH
Tukang Batu 0.1200 OH
Kepala Tukang 0.0120 OH
Mandor 0.0130 OH

V.3 Pekerjaan Pintu dan Jendela


V.3.1 1 m3 Pekerjaan Kusen Pintu,Jendela dan Ventilasi kayu Kls.I
Bahan
Balok Kayu Klas I 1.2000 m³
Paku 10 cm 1.2500 kg
Lem Kayu 1.0000 kg

Tenaga
Pekerja 6.0000 OH
Tukang Kayu 18.0000 OH
Kepala Tukang 2.0000 OH
Mandor 0.3000 OH

V.3.2 1 m2 Pasang Pintu Panel Kayu Kls. I


Bahan
Papan Kayu Klas I 0.0400 m³
Lem Kayu 0.5000 kg

Tenaga
Pekerja 1.0000 OH
Tukang Kayu 2.5000 OH
Kepala Tukang 0.2500 OH
Mandor 0.0500 OH

Membuat dan memasang 1 m² pintu dan jendela kaca;


V.3.3 Kayu Klas I
Bahan
Papan Kayu Klas I 0.0240 m³
Lem Kayu 0.3000 kg

Tenaga
Pekerja 0.8000 OH
Tukang Kayu 2.0000 OH
Kepala Tukang 0.2000 OH
Mandor 0.0400 OH
V.3.4 1 m2 Pasang Bingkai Jendela Kaca
Bahan
kayu klas I, papan 0.064 m3

Tenaga
Pekerja 1.000 Oh
Tukang kayu 3.000 Oh
Kepala Tukang 0.300 Oh
Mandor 0.300 Oh

V.3.5 1 m2 Pasang Kaca Tebal 5 mm Jendela


Bahan
Kaca 1.1000 m²

Tenaga
Pekerja 0.0150 OH
Tukang Kayu 0.1500 OH
Kepala Tukang 0.0150 OH
Mandor 0.0008 OH

V.3.6 Pasang Kunci Tanam 2 Slag dan Pegangan Pintu


Bahan
Kunci Tanam 1.0000 bh
Pegangan Pintu 1.0000 bh

Tenaga
Pekerja 0.0500 OH
Tukang Kayu 0.5000 OH
Kepala Tukang 0.0500 OH
Mandor 0.0025 OH

V.3.7 Pasang Engsel Pintu


Bahan
Engsel Pintu 1.0000 bh

Tenaga
Pekerja 0.0150 OH
Tukang Kayu 0.1500 OH
Kepala Tukang 0.0150 OH
Mandor 0.0008 OH
V.3.8 Pasang Ensel Jendela
Bahan
Engsel Jendela 1.0000 bh

Tenaga
Pekerja 0.0100 OH
Tukang Kayu 0.1000 OH
Kepala Tukang 0.0100 OH
Mandor 0.0005 OH

V.3.9 Pasang grendel


Bahan
Grendel 1.0000 bh

Tenaga
Pekerja 0.0150 OH
Tukang Kayu 0.1500 OH
Kepala Tukang 0.0150 OH
Mandor 0.0008 OH

V.3.9 Pasang Kait Angin


Bahan
Kait Angin 1.0000 bh

Tenaga
Pekerja 0.0150 OH
Tukang Kayu 0.1500 OH
Kepala Tukang 0.0150 OH
Mandor 0.0008 OH

V.4 Pekerjaan Plafond


V.4.1 1 m3 Pasang Rangka Plafon Kayu Kelas II
Bahan
Kayu 5/5 Klas II 0.0154 m³
Paku 7 cm - 10 cm 0.2000 kg

Tenaga
Pekerja 0.1500 OH
Tukang Kayu 0.2500 OH
Kepala Tukang 0.0250 OH
Mandor 0.0750 OH
V.4.2 1 m2 Pasang Plafon Tripleks Tebal 4 mm
Bahan
Tripleks 0.3750 lembar
Paku Triplek 0.0300 kg

Tenaga
Pekerja 0.0700 OH
Tukang Kayu 0.1000 OH
Kepala Tukang 0.0100 OH
Mandor 0.0040 OH

V.4.3 1 m' Pasang List Plafon Kayu Profil


Bahan
List Kayu Profil 1.0500 m'

Tenaga
Pekerja 0.0210 OH
Tukang Kayu 0.0210 OH
Kepala Tukang 0.0020 OH
Mandor 0.0010 OH

V.5 1 m' Pasang pagar pipa galvanis 2"


Bahan
Pipa galvanis dia 2" 1.000 m1
baut 0.030 Kg
Elektroda ( Kawat las ) 0.020 kg

Tenaga
Tukang Besi Konstruksi 1.200 Oh
Pekerja 1.200 Oh
Kepala Tukang 0.012 Oh
Mandor 0.001 Oh

VI PEKERJAAN MEKANIKAL
VI.1 Memasang 1 m' Pipa Saluran Air Kotor PVC D 4 ''
Bahan
Pipa PVC 1.2000 m'
Perlengkapan 35% harga pipa

Tenaga
Pekerja 0.0810 OH
Tukang Batu 0.1350 OH
Kepala Tukang 0.0135 OH
Mandor 0.0041 OH

VI.2 Memasang 1 m' Pipa Saluran Air Bersih PVC D 3/4 ''
Bahan
Pipa PVC 1.2000 m'
Perlengkapan 35% harga pipa

Tenaga
Pekerja 0.0360 OH
Tukang Batu 0.0600 OH
Kepala Tukang 0.0060 OH
Mandor 0.0018 OH

VI.3 Memasang 1 buag Kran Air 3/4 ''


Bahan
Kran Air 1.0000 bh
Seal Tape 0.0250 bh

Tenaga
Pekerja 0.0100 OH
Tukang Batu 0.1000 OH
Kepala Tukang 0.0100 OH
Mandor 0.0050 OH

VI.4 Memasang 1 Buah Wastafel


Bahan
Wastafel 1.0000 bh
Perlengkapan 12% harga wastafel
Portland Cement (PC) 6.0000 kg
Pasir Pasang 0.0100 m³

Tenaga
Pekerja 1.2000 OH
Tukang Batu 1.4500 OH
Kepala Tukang 0.1500 OH
Mandor 0.1000 OH

VI.5 Memasang 1 Buah Klosed Jongkok


Bahan
Kloset Jongkok Porselen 1.0000 bh
Portland Cement (PC) 6.0000 kg
Pasir Pasang 0.0100 m³
Tenaga
Pekerja 1.0000 OH
Tukang Batu 1.5000 OH
Kepala Tukang 1.5000 OH
Mandor 0.1600 OH

VI.6 Memasang 1 Bak Mandi Plastik


Bahan
Bak Mandi Plastik 1.0000 bh
Perlengkapan 18% harga bak

Tenaga
Pekerja 1.8000 OH
Tukang Batu 2.7000 OH
Kepala Tukang 0.5400 OH
Mandor 0.1100 OH

VI.7 Memasang 1 buah Floordrain


Bahan
Floordrain 1.0000 bh

Tenaga
Pekerja 0.0100 OH
Tukang Batu 0.1000 OH
Kepala Tukang 0.0100 OH
Mandor 0.0050 OH

VI.8 Memasang 1 buah bak cuci piring satinless steel


Bahan
Bak Cuci Satinless Steel 1.0000 bh
Water Drain + Aksesoris 1.0000 set

Tenaga
Pekerja 0.0300 OH
Tukang Batu 0.3000 OH
Kepala Tukang 0.0300 OH
Mandor 0.0015 OH

VI.9 Memasang 1 Unit Septic Tank Lengkap


Galian Tanah 4.5000 m³
Urugan Pasir urug 0.2142 m³
Lantai kerja beton 2.2500 m²
Pas. Batu bata 1 PC : 3 PS + Plesteran 15.0000 m²
Plat beton penutup & balok 0.3375 m³
Pipa PVC 4" jenis AW + sambungan 9.0000 m³
Galian tanah untuk rembesan 3.3750 m³
Pasang Ijuk 5.4000 kg
Urugan kerikil 3-5 cm. 1.0500 m³
Pipa PVC 4" berlobang jenis AW 5.0000 m'
Urugan kembali perataan tanah 1.1250 m³
Tambahan upah 0.0920 ls

VII PEKERJAAN ELEKTRIKAL


VII.1 Pengadaan dan Pemasangan 1 m' Kabel
Bahan
Kabel NYA 2 x 2,5 1.00 m'

Tenaga
Pekerja 1.200 Oh
Mandor 0.120 Oh

VII.2 Pengadaan dan Pemasangan 1 buah Sekering Group


Bahan
Box Sekring 1.00 Bh

Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh

VII.3 Pengadaan dan Pemasangan 1 buah Stop Kontak Tanam


Bahan
Stop Kontak Tanam 1.00 Bh

Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh

VII.4 Pengadaan dan Pemasangan 1 buah Saklar Tunggal Tanam


Bahan
Saklar Tunggal Tanam 1.00 Bh

Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh

VII.5 Pengadaan dan Pemasangan 1 buah Saklar Ganda Tanam


Bahan
Saklar Ganda Tanam 1.00 Bh

Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh

VII.6 Pengadaan dan Pemasangan 1 buah Fitting Lampu


Bahan
Fitting lengkap (ttk lampu) 1.00 Bh

Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh

VII.7 Pengadaan dan Pemasangan 1 buah Lampu Jari - Jari 20 Watt


Bahan
Lampu Jari-jari Philips 20 watt 1.00 Bh

Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh

VII.8 Pengadaan dan Pemasangan 1 buah Lampu Jari - Jari 10 Watt


Bahan
Lampu Jari-jari Philips 10 watt 1.00 Bh

Tenaga
Pekerja 1.200 Oh
Kepala Tukang 0.650 Oh
Mandor 0.120 Oh

VIII PEKERJAAN FINISHING


VIII.1 1 m2 Pengecatan Tembok Baru ( 1 Lapis Plamir ) 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
Plamir 0.300 Kg
Cat penutup 2 kali 0.320 Kg
Kuas cat 0.100 Bh

Tenaga
Pekerja 0.020 Oh
Tukang Cat 0.063 Oh
Kepala Tukang 0.0063 Oh
Mandor 0.0025 Oh

VIII.2 1 m2 Pengecatan Plafon, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup


Bahan
Plamir 0.250 Kg
Cat penutup 2 kali 0.320 Kg
Kuas cat 0.100 Bh

Tenaga
Pekerja 0.020 Oh
Tukang Cat 0.063 Oh
Kepala Tukang 0.0063 Oh
Mandor 0.0025 Oh

VIII.3 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ) 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
Cat Meni 0.200 Kg
Plamir 0.150 Kg
Cat dasar 0.170 Kg
Cat penutup 2 kali 0.260 Kg

Tenaga
Pekerja 0.070 Oh
Tukang Cat 0.009 Oh
Kepala Tukang 0.006 Oh
Mandor 0.0025 Oh
EKERJAAN

HARGA SAT JUMLAH


Rp. Rp.
5 6

90,300.00 4,515.00
69,600.00 6,960.00
JUMLAH 11,475.00

2,250,000.00 27,000.00
19,900.00 398.00
1,600,000.00 11,200.00
JUMLAH (a) 38,598.00

69,600.00 6,960.00
86,300.00 863.00
JUMLAH (b) 7,823.00
JUMLAH (a) + (b) 46,421.00

2,250,000.00 472,500.00
19,900.00 5,970.00
1,640.00 17,220.00
350,000.00 10,500.00
2,250,000.00 78,750.00
400,000.00 20,000.00
50,960.00 42,806.40
JUMLAH 647,746.40

82,000.00 164,000.00
69,600.00 69,600.00
86,300.00 17,260.00
90,300.00 4,515.00
JUMLAH 255,375.00
JUMLAH (a) + (b) 903,121.40

69,600.00 62,640.00
90,300.00 4,063.50
JUMLAH 66,703.50

69,600.00 52,200.00
90,300.00 2,257.50
JUMLAH 54,457.50

69,600.00 52,200.00
90,300.00 2,257.50
JUMLAH 54,457.50

69,600.00 17,400.00
90,300.00 749.49
JUMLAH 18,149.49

2,250,000.00 450,000.00
19,900.00 29,850.00
23,300.00 9,320.00
7,679.86 1,151,979.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
JUMLAH 2,715,044.00

69,600.00 271,440.00
82,000.00 28,700.00
82,000.00 85,280.00
82,400.00 86,520.00
100,000.00 24,500.00
90,300.00 14,899.50
JUMLAH 511,339.50
JUMLAH (a) + (b) 3,226,383.50

175,000.00 75,600.00
JUMLAH 75,600.00

69,600.00 20,880.00
90,300.00 903.00
JUMLAH 21,783.00
JUMLAH (a) + (b) 97,383.00

265,000.00 318,000.00
JUMLAH 318,000.00

69,600.00 104,400.00
86,300.00 51,780.00
86,300.00 5,178.00
90,300.00 6,772.50
JUMLAH 168,130.50
JUMLAH (a) + (b) 486,130.50

265,000.00 318,000.00
1,640.00 223,040.00
300,000.00 163,200.00
JUMLAH 704,240.00

69,600.00 104,400.00
86,300.00 51,780.00
86,300.00 5,178.00
90,300.00 6,772.50
JUMLAH 168,130.50
JUMLAH (a) + (b) 872,370.50

2,250,000.00 607,500.00
19,900.00 39,800.00
23,300.00 13,980.00
16,253.05 3,250,610.00
22,300.00 66,900.00
1,640.00 529,720.00
350,000.00 182,000.00
450,000.00 351,000.00
1,600,000.00 96,000.00
JUMLAH 5,137,510.00

69,600.00 337,560.00
82,000.00 28,700.00
82,000.00 127,920.00
82,000.00 114,800.00
100,000.00 33,100.00
90,300.00 15,351.00
JUMLAH 657,431.00
JUMLAH (a) + (b) 5,794,941.00

2,250,000.00 607,500.00
19,900.00 39,800.00
23,300.00 13,980.00
17,201.86 2,580,279.00
22,300.00 66,900.00
1,640.00 529,720.00
350,000.00 182,000.00
450,000.00 351,000.00
1,600,000.00 96,000.00
JUMLAH 4,467,179.00

69,600.00 337,560.00
82,000.00 28,700.00
82,000.00 127,920.00
82,000.00 114,800.00
100,000.00 33,100.00
90,300.00 15,351.00
JUMLAH 657,431.00
JUMLAH (a) + (b) 5,124,610.00

2,250,000.00 900,000.00
19,900.00 79,600.00
23,300.00 46,600.00
16,253.05 5,119,710.75
22,300.00 100,350.00
1,640.00 529,720.00
350,000.00 189,000.00
400,000.00 324,000.00
2,250,000.00 337,500.00
JUMLAH 7,626,480.75

69,600.00 490,680.00
82,000.00 22,550.00
82,000.00 135,300.00
82,000.00 172,200.00
100,000.00 40,300.00
90,300.00 31,875.90
JUMLAH 892,905.90
JUMLAH (a) + (b) 8,519,386.65
2,250,000.00 900,000.00
19,900.00 79,600.00
23,300.00 46,600.00
15,537.68 3,884,420.00
22,300.00 66,900.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
1,600,000.00 240,000.00
JUMLAH 6,241,240.00

69,600 508,080.00
82,000 28,700.00
82,000 270,600.00
82,400 173,040.00
100,000 75,000.00
90,300 22,575.00
JUMLAH 1,077,995.00
JUMLAH (a) + (b) 7,319,235.00

2,250,000.00 900,000.00
19,900.00 79,600.00
23,300.00 46,600.00
15,558.56 3,111,712.00
22,300.00 156,100.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 337,500.00
JUMLAH 5,655,232.00

69,600.00 508,080.00
82,000.00 28,700.00
82,000.00 270,600.00
82,400.00 173,040.00
100,000.00 75,000.00
90,300.00 22,575.00
JUMLAH 1,077,995.00
JUMLAH (a) + (b) 6,733,227.00

2,250,000.00 900,000.00
19,900.00 79,600.00
23,300.00 46,600.00
17,400.70 2,610,105.00
22,300.00 83,625.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 337,500.00
JUMLAH 5,081,150.00

69,600.00 508,080.00
82,000.00 28,700.00
82,000.00 270,600.00
82,400.00 173,040.00
100,000.00 75,000.00
90,300.00 22,575.00
JUMLAH 1,077,995.00
JUMLAH (a) + (b) 6,159,145.00

2,250,000.00 720,000.00
19,900.00 63,680.00
23,300.00 37,280.00
15,537.68 3,884,420.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 135,000.00
JUMLAH 5,914,275.00

69,600.00 403,680.00
82,000.00 28,700.00
82,000.00 229,600.00
82,000.00 86,100.00
100,000.00 42,000.00
90,300.00 16,705.50
JUMLAH 806,785.50
JUMLAH (a) + (b) 6,721,060.50

2,250,000.00 720,000.00
19,900.00 63,680.00
23,300.00 37,280.00
17,201.86 2,580,279.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 135,000.00
JUMLAH 4,610,134.00

69,600.00 403,680.00
82,000.00 28,700.00
82,000.00 229,600.00
82,000.00 86,100.00
100,000.00 42,000.00
90,300.00 16,705.50
JUMLAH 806,785.50
JUMLAH (a) + (b) 5,416,919.50

2,250,000.00 720,000.00
19,900.00 63,680.00
23,300.00 37,280.00
17,201.86 1,720,186.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 135,000.00
JUMLAH 3,750,041.00

69,600.00 403,680.00
82,000.00 28,700.00
82,000.00 229,600.00
82,000.00 86,100.00
100,000.00 42,000.00
90,300.00 16,705.50
JUMLAH 806,785.50
JUMLAH (a) + (b) 4,556,826.50

2,250,000.00 375,750.00
19,900.00 63,680.00
23,300.00 37,280.00
7,679.86 1,151,979.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 315,000.00
2,250,000.00 562,500.00
JUMLAH 3,580,084.00

69,600.00 389,760.00
82,000.00 28,700.00
82,000.00 216,480.00
82,000.00 86,100.00
100,000.00 40,000.00
90,300.00 17,427.90
JUMLAH 778,467.90
JUMLAH (a) + (b) 4,358,551.90

2,250,000.00 375,750.00
19,900.00 63,680.00
23,300.00 37,280.00
7,679.86 1,151,979.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 315,000.00
2,250,000.00 562,500.00
JUMLAH 3,580,084.00

69,600.00 389,760.00
82,000.00 28,700.00
82,000.00 216,480.00
82,000.00 86,100.00
100,000.00 40,000.00
90,300.00 17,427.90
JUMLAH 778,467.90
JUMLAH (a) + (b) 4,358,551.90

2,250,000.00 562,500.00
19,900.00 59,700.00
23,300.00 27,960.00
25,080.56 3,762,084.00
22,300.00 50,175.00
1,640.00 529,720.00
350,000.00 182,000.00
400,000.00 312,000.00
2,250,000.00 236,250.00
JUMLAH 5,722,389.00

69,600.00 389,760.00
82,000.00 28,700.00
82,000.00 188,600.00
82,000.00 114,800.00
100,000.00 40,500.00
90,300.00 18,240.60
JUMLAH 780,600.60
JUMLAH (a) + (b) 6,502,989.60

3,690,000.00 4,059,000.00
7,500.00 112,500.00
19,900.00 15,920.00
JUMLAH 4,187,420.00

69,600.00 278,400.00
82,000.00 984,000.00
86,300.00 103,560.00
90,300.00 18,060.00
JUMLAH 1,384,020.00
JUMLAH (a) + (b) 5,571,440.00

2,250,000.00 2,475,000.00
19,900.00 79,600.00
JUMLAH 2,554,600.00

69,600.00 167,040.00
82,000.00 590,400.00
86,300.00 62,136.00
90,300.00 10,836.00
JUMLAH 830,412.00
JUMLAH (a) + (b) 3,385,012.00

1,690,000.00 1,859,000.00
19,900.00 79,600.00
JUMLAH 1,938,600.00
69,600.00 6,960.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 451.50
JUMLAH 16,474.50
JUMLAH (a) + (b) 1,955,074.50

1,690,000.00 1,859,000.00
19,900.00 79,600.00
JUMLAH 1,938,600.00

69,600.00 6,960.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 451.50
JUMLAH 16,474.50
JUMLAH (a) + (b) 1,955,074.50

57,700.00 634,700.00
19,900.00 597.00
JUMLAH 635,297.00

69,600.00 13,920.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 903.00
JUMLAH 23,886.00
JUMLAH (a) + (b) 659,183.00

32,500.00 113,750.00
19,900.00 995.00
1,640.00 17,712.00
300,000.00 9,600.00
17,500.00 17,500.00
JUMLAH 142,057.00

69,600.00 27,840.00
82,000.00 16,400.00
86,300.00 1,726.00
90,300.00 1,806.00
JUMLAH 47,772.00
JUMLAH (a) + (b) 189,829.00
1,600,000.00 17,600.00
19,900.00 995.00
JUMLAH 18,595.00

69,600.00 7,656.00
82,000.00 18,040.00
86,300.00 1,898.60
90,300.00 451.50
JUMLAH 28,046.10
JUMLAH (a) + (b) 46,641.10

1,300.00 32,500.00
1,640.00 23,566.80
300,000.00 12,000.00
JUMLAH 68,066.80

69,600.00 22,272.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 1,354.50
JUMLAH 32,689.50
JUMLAH (a) + (b) 100,756.30

1,300.00 32,500.00
1,640.00 13,644.80
300,000.00 14,700.00
JUMLAH 60,844.80

69,600.00 22,272.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 1,354.50
JUMLAH 32,689.50
JUMLAH (a) + (b) 93,534.30

1,640.00 10,627.20
500,000.00 9,500.00
JUMLAH 20,127.20
69,600.00 13,920.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 903.00
JUMLAH 28,417.50
JUMLAH (a) + (b) 48,544.70

1,640.00 6,035.20
500,000.00 11,500.00
JUMLAH 17,535.20

69,600.00 13,920.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 903.00
JUMLAH 28,417.50
JUMLAH (a) + (b) 45,952.70

1,640.00 6,035.20
JUMLAH 6,035.20

69,600.00 13,920.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 903.00
JUMLAH 28,417.50
JUMLAH (a) + (b) 34,452.70

1,640.00 16,400.00
350,000.00 9,100.00
400,000.00 17,600.00
JUMLAH 43,100.00

69,600.00 80,040.00
82,000.00 1,640.00
86,300.00 172.60
90,300.00 541.80
JUMLAH 82,394.40
JUMLAH (a) + (b) 125,494.40
112,000.00 112,000.00
1,640.00 15,744.00
300,000.00 13,500.00
17,500.00 22,750.00
JUMLAH 163,994.00

69,600.00 17,400.00
82,000.00 9,840.00
86,300.00 1,035.60
90,300.00 1,173.90
JUMLAH 29,449.50
JUMLAH (a) + (b) 193,443.50

57,000.00 57,000.00
1,640.00 16,400.00
300,000.00 13,500.00
17,500.00 26,250.00
JUMLAH 113,150.00

69,600.00 43,152.00
82,000.00 28,700.00
86,300.00 3,020.50
90,300.00 2,709.00
JUMLAH 77,581.50
JUMLAH (a) + (b) 190,731.50

57,000.00 57,000.00
1,640.00 16,400.00
300,000.00 13,500.00
17,500.00 26,250.00
JUMLAH 113,150.00

69,600.00 43,152.00
82,000.00 28,700.00
86,300.00 3,020.50
90,300.00 2,709.00
JUMLAH 77,581.50
JUMLAH (a) + (b) 190,731.50

81,250.00 81,250.00
1,640.00 16,072.00
300,000.00 13,500.00
17,500.00 22,750.00
JUMLAH 133,572.00

69,600.00 17,400.00
82,000.00 9,840.00
86,300.00 1,035.60
90,300.00 1,173.90
JUMLAH 29,449.50
JUMLAH (a) + (b) 163,021.50

3,690,000.00 4,428,000.00
19,900.00 24,875.00
9,500.00 9,500.00
JUMLAH 4,462,375.00

69,600.00 417,600.00
82,000.00 1,476,000.00
86,300.00 172,600.00
90,300.00 27,090.00
JUMLAH 2,093,290.00
JUMLAH (a) + (b) 6,555,665.00

3,690,000.00 147,600.00
9,500.00 4,750.00
JUMLAH 152,350.00

69,600.00 69,600.00
82,000.00 205,000.00
86,300.00 21,575.00
90,300.00 4,515.00
JUMLAH 300,690.00
JUMLAH (a) + (b) 453,040.00

3,690,000.00 88,560.00
9,500.00 2,850.00
JUMLAH 91,410.00

69,600.00 55,680.00
82,000.00 164,000.00
86,300.00 17,260.00
90,300.00 3,612.00
JUMLAH 240,552.00
JUMLAH (a) + (b) 331,962.00

3,690,000.00 236,160.00
JUMLAH 236,160.00

69,600.00 69,600.00
82,000.00 246,000.00
86,300.00 25,890.00
90,300.00 27,090.00
JUMLAH 368,580.00
JUMLAH (a) + (b) 604,740.00

189,000.00 207,900.00
JUMLAH 207,900.00

69,600.00 1,044.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 67.73
JUMLAH 14,706.23
JUMLAH (a) + (b) 222,606.23

61,100.00 61,100.00
61,100.00 61,100.00
JUMLAH 122,200.00

69,600.00 3,480.00
82,000.00 41,000.00
86,300.00 4,315.00
90,300.00 225.75
JUMLAH 49,020.75
JUMLAH (a) + (b) 171,220.75

34,000.00 34,000.00
JUMLAH 34,000.00

69,600.00 1,044.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 67.73
JUMLAH 14,706.23
JUMLAH (a) + (b) 48,706.23
20,500.00 20,500.00
JUMLAH 20,500.00

69,600.00 696.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 45.15
JUMLAH 9,804.15
JUMLAH (a) + (b) 30,304.15

14,000.00 14,000.00
JUMLAH 14,000.00

69,600.00 1,044.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 67.73
JUMLAH 14,706.23
JUMLAH (a) + (b) 28,706.23

9,100.00 9,100.00
JUMLAH 9,100.00

69,600.00 1,044.00
82,000.00 12,300.00
86,300.00 1,294.50
90,300.00 67.73
JUMLAH 14,706.23
JUMLAH (a) + (b) 23,806.23

2,250,000.00 34,650.00
19,900.00 3,980.00
JUMLAH 38,630.00

69,600.00 10,440.00
82,000.00 20,500.00
86,300.00 2,157.50
90,300.00 6,772.50
JUMLAH 39,870.00
JUMLAH (a) + (b) 78,500.00
97,200.00 36,450.00
20,000.00 600.00
JUMLAH 37,050.00

69,600.00 4,872.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 361.20
JUMLAH 14,296.20
JUMLAH (a) + (b) 51,346.20

88,100.00 92,505.00
JUMLAH 92,505.00

69,600.00 1,461.60
82,000.00 1,722.00
86,300.00 172.60
90,300.00 90.30
JUMLAH 3,446.50
JUMLAH (a) + (b) 95,951.50

112,425.00 112,425.00
27,600.00 828.00
41,000.00 820.00
JUMLAH 114,073.00

75,300 90,360.00
69,600 83,520.00
100,000 1,200.00
90,300 54.18
JUMLAH 175,134.18
JUMLAH (a) + (b) 289,207.18

131,250.00 157,500.00
45,937.50 45,937.50
JUMLAH 203,437.50

69,600.00 5,637.60
82,000.00 11,070.00
86,300.00 1,165.05
90,300.00 370.23
JUMLAH 18,242.88
JUMLAH (a) + (b) 221,680.38

35,700.00 42,840.00
12,495.00 12,495.00
JUMLAH 55,335.00

69,600.00 2,505.60
82,000.00 4,920.00
86,300.00 517.80
90,300.00 162.54
JUMLAH 8,105.94
JUMLAH (a) + (b) 63,440.94

45,000.00 45,000.00
2,500.00 2,500.00
JUMLAH 47,500.00

69,600.00 696.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 451.50
JUMLAH 10,210.50
JUMLAH (a) + (b) 57,710.50

1,500,000.00 1,500,000.00
180,000.00 180,000.00
1,640.00 9,840.00
300,000.00 3,000.00
JUMLAH 1,692,840.00

69,600.00 83,520.00
82,000.00 118,900.00
86,300.00 12,945.00
90,300.00 9,030.00
JUMLAH 224,395.00
JUMLAH (a) + (b) 1,917,235.00

260,000.00 260,000.00
1,640.00 9,840.00
300,000.00 3,000.00
JUMLAH 272,840.00

69,600.00 69,600.00
82,000.00 123,000.00
86,300.00 129,450.00
90,300.00 14,448.00
JUMLAH 336,498.00
JUMLAH (a) + (b) 609,338.00

275,000.00 275,000.00
49,500.00 49,500.00
JUMLAH 324,500.00

69,600.00 125,280.00
82,000.00 221,400.00
86,300.00 46,602.00
90,300.00 9,933.00
JUMLAH 403,215.00
JUMLAH (a) + (b) 727,715.00

16,342.00 16,342.00
JUMLAH 16,342.00

69,600.00 696.00
82,000.00 8,200.00
86,300.00 863.00
90,300.00 451.50
JUMLAH 10,210.50
JUMLAH (a) + (b) 26,552.50

544,500.00 544,500.00
190,575.00 190,575.00
JUMLAH 735,075.00

69,600.00 2,088.00
82,000.00 24,600.00
86,300.00 2,589.00
90,300.00 135.45
JUMLAH 29,412.45
JUMLAH (a) + (b) 764,487.45

66,703.50 300,165.75
97,383.00 20,859.44
125,494.40 282,362.40
149,301.00 2,239,515.00
8,915,378.40 3,008,940.21
221,680.38 1,995,123.42
66,703.50 225,124.31
25,000.00 135,000.00
125,494.40 131,769.12
221,680.38 1,108,401.90
18,149.49 20,418.18
500,000.00 46,000.00
JUMLAH 9,513,679.73

10,000.00 10,000.00
JUMLAH 10,000.00

69,600.00 83,520.00
90,300.00 10,836.00
JUMLAH 94,356.00
JUMLAH (a) + (b) 104,356.00

150,000.00 150,000.00
JUMLAH 150,000.00

69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 309,356.00

50,000.00 50,000.00
JUMLAH 50,000.00

69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 209,356.00

30,000.00 30,000.00
JUMLAH 30,000.00
69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 189,356.00

50,000.00 50,000.00
JUMLAH 50,000.00

69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 209,356.00

100,000.00 100,000.00
JUMLAH 100,000.00

69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 259,356.00

67,400.00 67,400.00
JUMLAH 67,400.00

69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 226,756.00

35,000.00 35,000.00
JUMLAH 35,000.00

69,600.00 83,520.00
100,000.00 65,000.00
90,300.00 10,836.00
JUMLAH 159,356.00
JUMLAH (a) + (b) 194,356.00
r, 2 Lapis Cat Penutup

35,000.00 10,500.000
7,640.00 2,444.800
17,100.00 1,710.000
JUMLAH 14,654.800

69,600 1,392.000
77,000 4,851.000
100,000 630.000
90,300 225.750
JUMLAH 7,098.750
JUMLAH (a) + (b) 21,753.550

35,000.00 8,750.000
7,640.00 2,444.800
17,100.00 1,710.000
JUMLAH 12,904.800

69,600 1,392.000
77,000 4,851.000
100,000 630.000
90,300 225.750
JUMLAH 7,098.750
JUMLAH (a) + (b) 20,003.550
Dasar, 2 Lapis Cat Penutup

25,000.00 5,000.000
35,000.00 5,250.000
7,640.00 1,298.800
7,640.00 1,986.400
JUMLAH 13,535.200

69,600 4,872.000
77,000 693.000
100,000 600.000
90,300 225.750
JUMLAH 6,390.750
JUMLAH (a) + (b) 19,925.950
UPAH KERJA

LOKASI : KOTA TERNATE

NO TENAGA KERJA (Rp/Hari) UPAH KODE


1 Pekerja 69,600
2 Tukang Pipa 74,000
3 Kepala Tukang 100,000
4 Mandor 90,300
5 Tukang Kayu Setengah Trampil 77,000
6 Tukang Kayu Trampil 82,000
7 Kepala Tukang Kayu 86,300
8 Tukang Besi Beton Setengah Trampil 77,000
9 Tukang Besi Beton Trampil 82,400
10 Tukang Besi Beton IWF/Profil Setengah 77,000
11 Tukang Besi Beton IWF/Profil Trampil 82,400
12 Kepala Tukang Kbesi Beton 86,500
13 Kepala Tukang Besi Konstruksi/Profil 75,300
14 Tukang Batu Setengah Trampil 77,000
15 Tukang Batu Trampil 82,000
16 Kepala Tukang Batu 86,300
17 Tukang Cat 77,000
18 Tukang Politur 81,000
19 Operator 101,000
20 Pembantu Operator 77,400
21 Supir Truck 82,000
22 Kenek Truck 77,000
23 Penjaga Malam 79,000
KETERANGAN
BAHAN MATERIAL ALAMI

LOKASI : KOTA TERNATE

NO JENIS BAHAN SATUAN HARGA (Rp.)

Batu Kali / Batu Gunung


1 Batu Bulat M3 197,400.00
2 Batu Karang M3 150,000.00
3 batu Bulat 15 cm M3 235,000.00
4 Batu pecah 10/5 Cm M 3
265,000.00
5 Krikil Beton/ Batu pecah 7/5 Cm M3 400,000.00
6 Krikil Beton/ Batu pecah 2/3 Cm M3 450,000.00
7 Krikil Beton/ Batu pecah 1/2 Cm M3 500,000.00
8 Krikil Halus 0,5/1 Cm M 3
750,000.00
9 Krikil Kasar 3/5 Cm M3 412,000.00

Pasir Tanah
10 Pasir Urug M3 175,000.00
11 Pasir Pasangan M3 300,000.00
12 Pasir Beton M3 350,000.00
13 Sirtu M 3
175,000.00
14 Tanah Urug M3 150,000.00
15 Pasir Halus M3 500,000.00

17 Kayu balok Klas I M3 3,690,000.00


18 Papan Klas I M3 3,690,000.00
19 Kayu balok Klas II M3 2,250,000.00
20 Papan Klas II (cor) M3 1,600,000.00
21 Kayu 5/7 M 3
1,690,000.00
22 Kayu Linggua Papan M3 2,250,000.00
23 Kayu Gufasa Balok M3 2,250,000.00
24 Kayu Gufasa Papan M 3
2,250,000.00
25 Kayu Dolken (Untuk Pondasi) Btg 1,400,000.00
I

KETERANGAN
BAHAN FABRIKASI

LOKASI : KOTA TERNATE

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA (Rp.)


1 Semen (PC) Zak 50 kg 82,000.00
Kg 1,640.00
2 Semen warna Kg 17,500.00
3 Semen Putih Kg 4,700.00

4 Kawat Beton Kg 22,300.00


5 Kawat Bronjong Rool 845,600.00
6 Kawat Duri Rool 950,000.00

7 Besi Beton Dia. 4 mm Kg 13,931.10


8 Besi Beton Dia. 6 mm Kg 11,458.33
9 Besi Beton Dia. 8 mm Kg 9,522.00
10 Besi Beton Dia. 10 mm Kg 7,878.70
11 Besi Beton Dia. 12 mm Kg 7,679.86
12 Besi Beton Dia. 14 mm Kg 8,374.35
13 Besi Beton Dia. 16 mm Kg 7,857.82
14 Besi Beton Dia. 19 mm Kg 8,095.30
15 Besi Beton Dia. 22 mm Kg 9,823.46
16 Besi Beton Dia. 25 mm Kg 8,930.19

17 Paku Campuran Kg 19,900.00


18 Paku Tripleks Dos 20,000.00
19 Paku Seng Kg 26,400.00
20 Paku Beton Dos 23,000.00

21 Kapur Padam M3 225,000.00


22 Teakwood 3 mm Uk. 122 x 244 cm Lbr 100,320.00
23 Tripleks 2 mm Uk. 122 x 244 cm Lbr 54,500.00
24 Tripleks 3 mm Uk. 122 x 244 cm Lbr 67,000.00
25 Tripleks 6 mm Uk. 122 x 244 cm Lbr 97,200.00
26 Tripleks 9 mm Uk. 122 x 244 cm Lbr 158,000.00
27 Tripleks 20 mm Uk. 122 x 244 cm Lbr 257,400.00

28 Pipa Galvanis Medium B Uk. 1/2 " Staf 160,060.00


29 Pipa Galvanis Medium B Uk. 3/4 " Staf 191,000.00
30 Pipa Galvanis Medium B Uk. 1 " Staf 242,000.00
31 Pipa Galvanis Medium B Uk. 11/4 " Staf 310,000.00
Pipa Galvanis Medium B Uk. 2 " Staf 449,700.00
Kawat Las Kg 352,100.00
32 Pipa GIP Medium A Uk. 1/2 " Staf 194,000.00
33 Pipa GIP Medium A Uk. 3/4 " Staf 288,000.00
34 Pipa PVC Uk. 1/2 " Staf 32,100.00
35 Pipa PVC Uk. 3/4 " Staf 35,700.00
36 Pipa PVC Uk. 1 " Staf 47,500.00
37 Pipa PVC Uk. 11/4 " Staf 54,625.00
38 Pipa PVC Uk. 1 "
1/2
Staf 191,300.00
39 Pipa PVC Uk. 2 " Staf 109,000.00
40 Pipa PVC Uk. 3 " Staf 225,000.00
41 Pipa PVC Uk. 4 " Staff 525,000.00
42 Knee PVC Uk. 1/2 " Btg 4,000.00
43 Knee PVC Uk. 3/4 " Btg 5,000.00
44 Knee PVC Uk. 1 " Btg 10,000.00
45 Knee PVC Uk. 11/4 " Btg 25,000.00
46 Knee PVC Uk. 11/2 " Btg 27,500.00
47 Knee PVC Uk. 2 " Btg 3,600.00
48 Knee PVC Uk. 3 " Btg 35,000.00
49 Knee PVC Uk. 4 " Btg 40,000.00

50 Batu Bata Semen Lokal Bh 1,300.00


51 Batu Bata Merah Bh 2,250.00
52 Paving Stone Bh 5,400.00
53 Bowling Bh 13,700.00
54 Glass Block Bh 101,600.00

Seng Gelombang BJLS 0.20 mm Lbr 50,960.00


54 Seng Gelombang BJLS 0.25 mm Lbr 61,824.00
55 Seng Gelombang BJLS 0.30 mm Lbr 73,360.00
56 Seng Pelat Bubungan BJLS 20 mm Lbr 50,500.00
57 Atap Asbes Gelombang Lbr 71,500.00
58 Genteng Semen (Beton) Bh 57,700.00
59 Genteng Metal Roof 0,30 Lbr 61,000.00
60 Bubungan 46,000.00

61 Keramik Kualitas sedang


62 10 x 20 cm M2 52,000.00
63 20 x 20 cm M2 54,000.00
64 20 x 25 cm M2 56,000.00
65 30 x 30 cm Dos 57,000.00
66 40 x 40 cm Dos 65,000.00
67 Keramik Kualitas Baik 40 x 40 cm Dos 81,250.00
68 10 x 20 cm Dos 84,375.00
69 20 x 20 cm Dos 88,281.00
20 x 25 cm Dos 90,300.00
30 x 30 cm Dos 90,300.00
40 x 40 cm Dos 97,150.00
60 x 60 cm Dos 112,000.00

70 Solar 6,325.00
71 Bansin 6,900.00
72 Minyak Tanah 6,000.00
73 Pemulas/Oli 34,000.00
74 Gemuk / Fat 27,025.00

75 Amplas kayu/Besi LBR 4,600.00


76 Dumpul Kayu Kg 24,500.00
77 Lem Kayu Fox Kg 9,500.00
78 Spirtus BTL 15,000.00
79 Minyak Kayu Kg 23,300.00
80 politur Kg 41,250.00
81 Plamir Tembok Kg 35,000.00
82 Menie Kayu Kg 25,000.00
83 Menie Besi Kg 25,000.00
84 Cat besi Kg 35,000.00
85 Cat Tembok
86 Kualitas Sedang 5 Kg 72,000.00
87 25 Kg 263,000.00
88 Kualitas Baik (Dulux) 1 Kg 38,200.00
89 25 Kg 1,028,000.00
90 Cat Kayu Mengkilat Kg 98,700.00

90 Vernis 1 Ltr 15,000.00


91 Batu Apung 1 Kg 3,000.00
92 Kaca Rayban 3 mm M2 157,500.00
93 Kaca Rayban 5 mm M2 194,000.00
94 Kaca Bening 2 mm M2 207,000.00
95 Kaca Bening 3 mm M2 128,000.00
96 Kaca Bening 5 mm M2 189,000.00
97 Es / Kembang 3 mm M3 228,900.00

98 Kran (Kualitas Baik) Bh 45,000.00


99 Avour / Saringan Air Kotor Bh 34,000.00
100 Floor Drain Bh 16,342.00
101 Kloset Jongkok TOTO Bh 260,000.00
102 Wastafel INA / TOTO Bh 1,500,000.00
Bak Cuci Piring 2 Lubang Bh 544,500.00
103 Kunci Pintu 1 Slaag Cap Kuda Terbang Bh 13,700.00
104 Kunci Pintu 2 Slaag Cap SES Bh 61,100.00
105 Kunci Kualitas Istimewa Bh 550,000.00
106 Grendel Jendela Bh 14,000.00
107 Kait Angin Bh 9,100.00
108 Engsel Jendela Kuningan Bh 20,500.00
109 Engsel Pintu Kuningan Bh 34,000.00
110 Lis Profil 5 cm M' 88,100.00
111 Profil Baja ( Pabrikan ) Kg 15,500.00
112 Plat Eiser M2 220,500.00
113 Besi Strip Kg 7,500.00
114 Pintu Rooling Door 1 M2 330,500.00
115 Pintu Alumanium 1 M2 275,000.00
116 Fibreglass M2 67,500.00
117 Geotekstil 1 M2 35,000.00
118 Oxigen 1 Btl 110,000.00
119 Elpiji 1 Kg 9,250.00

120 Asbes Gelombang (2.5x0.92 ) 5 mm M2 55,000.00


121 Asbes Gelombang (2.25x0.92 ) 5 mm M2 48,500.00
122 Asbes Gelombang (2.0x0.92 ) 5 mm M2 44,500.00
123 Atap Steel Gelombang / Spandec M2 87,500.00
124 Nok Steel 0.92 Bh 27,500.00
125 Nok Steel 1.05 Bh 32,500.00
126 Kertas Ampelas Lbr 5,000.00

127 Mur / Baut Kg 27,600.00


128 Baut / Baugel Kg 27,600.00
129 Angker / Baut Kg 27,600.00

129 Box Sekring 1 Group Bh 150,000.00


130 MCB 2 Ampere Bh 54,300.00
131 MCB 4 Ampere Bh 11,700.00
132 MCB 6 Ampere Bh 11,700.00
133 MCB 10 Ampere Bh 30,750.00
134 MCB 25 Ampere Bh
135 Saklar Tunggal Tanam Bh 30,000.00
136 Saklar Ganda Tanam Bh 50,000.00
137 Saklar Tunggal Timbul Bh 34,000.00
138 Saklar Ganda Timbul Bh 50,000.00
139 Stop Kontak Tanam Bh 50,000.00
140 Stop Kontak Timbul Bh 47,500.00
141 Titik Lampu Titik 100,000.00
142 Lampu Pijar 5 Watt Bh 2,012.50
143 Lampu Pijar 10 Watt Bh 3,737.50
144 Lampu Pijar 15 Watt Bh 3,600.00
145 Lampu Pijar 25 Watt Bh 5,175.00
146 Lampu Pijar 40 Watt Bh 6,095.00
147 Lampu Pijar 60 Watt Bh 8,625.00
148 Lampu Pijar 75 Watt Bh 20,125.00
149 Lampu Pijar 100 Watt Bh 27,312.50
150 Lampu Jari-jari 7 Watt Philips Bh 32,500.00
151 Lampu Jari-jari 10 Watt Philips Bh 35,000.00
152 Lampu Jari-jari 18 Watt Philips Bh 50,000.00
Lampu Jari-jari 20 Watt Philips Bh 67,400.00
153 Lampu TL 40 Watt Bh 34,900.00
154 Kabel NM 3x1 1/2 mm Roll 1,543,300.00
155 Alat Bantu Khusus 1 Set 100,000.00
KET
JADWAL WAKTU PELAKSANA
PEKERJAAN : RUMAH 2 LANTAI

LOKASI : KOTA TERNATE

TAHUN ANGGARAN : 2012

DURASI BOBOT
NO JENIS KEGIATAN BIAYA (Rp) 1 2 3 4 5 6 7 8
(MINGGU) (%)
A PEKERJAAN PERSIAPAN 2 23,205,307.20 2.36 1.181 1.181

B PEKERJAAN GALIAN TANAH 2 4,712,607.03 0.48 0.24 0.24

C PEKERJAAN STRUKTUR BAWAH 3 99,923,442.10 10.17 3.39 3.39 3.39

D PEKERJAAN STRUKTUR ATAS 13 393,082,845.83 40.01 3.078

E PEKERJAAN ARSITEKTUR 10 341,743,993.02 34.79

F #REF! 3 45,674,546.53 4.65

G #REF! 2 19,291,336.00 1.96


19.17
16.09
H PEKERJAAN FINISHING 3 54,792,269.51 5.58 13.01
9.62
6.23
2.36 2.60 2.84
JUMLAH 982,426,347.23 100.00 1.18

RENCANA KEMAJUAN PEKERJAAN MINGGUAN 1.181 1.181 0.24 0.24 3.39 3.39 3.39 3.078

KUMULATIF RENCANA KEMAJUAN PEKERJAAN 1.18 2.36 2.60 2.84 6.23 9.62 13.01 16.09
U PELAKSANAAN "KURVA S"

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

98.14 100.00
92.87 94.42 96.28
91.32
87.84
84.37
80.89
74.33
70.85
66.39
63.31
3.078 3.078 3.078 3.078 3.078 3.078 3.078 3.07857.16
3.07860.24
3.078 3.078 3.078
54.08
3.479 3.479 3.479 3.479
45.97 3.479 3.479 3.479 3.479 3.479 3.479
39.42
32.86
1.55 1.55 1.55
25.320.982 0.982
22.25
19.17
16.09
13.01 1.859 1.859 1.8591

3.078 3.078 3.078 7.538 6.556 6.556 8.106 3.078 3.078 3.078 3.078 4.46 3.479 6.556 3.479 3.479 3.479 1.55 1.55 1.859 1.859 1.85908

19.17 22.25 25.32 32.86 39.42 45.97 54.08 57.16 60.24 63.31 66.39 70.85 74.33 80.89 84.37 87.84 91.32 92.87 94.42 96.28 98.14 100.00
.14 100.00

You might also like