Professional Documents
Culture Documents
Reconcilation - July, 2019 (KGP)
Reconcilation - July, 2019 (KGP)
Reconcilation - July, 2019 (KGP)
Wastage
W.I.P. (+/-)
% of Wastage Remarks.
0.005 1.14%
0.800 0.043 0.85%
0.000
0.000
0.000
0 204.684 1.18%
220 1.549 0.63%
30.5 0.023 0.06%
2500 -686.272 -0.99%
-51.778 -16.18%
500 123.114 4.28%
Wastage
W.I.P. (+/-)
% of Wastage Remarks.
0.000 0.000
0.000 -1.265 -0.82%
-0.007 -1.90%
0.800 0.112 0.92%
0.000
0.000
0.000
0.000
0.000
0.000
2500 730 3.36%
0 -21.495 -9.51%
Site Tranfer
300 137.772 7.79% to Bld:1
Measurement Sheet (Assembly Storage Building)
Bricks
Cement
Sand
4 Inside plaster Work
(i) Long wall Side (Span Wise) SqM. 15 7.692 - 3.000
(-) Less for Window ( 2.4m. X 1.5m.) SqM. -30 2.400 - 1.500
Cement
Sand
Building)
Upto 31.07.2019
8.733 8.733
0.950 -0.950 10 m. not done
2.854 2.854
0.950 0.950
0.475 0.475
0.475 0.475
10.940 10.940
Total= 12.537 cum RCC
76
22.746 22.746 B/w bot 20.5
0.341 -1.365 Lintel 14.5
0.063 -0.189 Platform 41 38.328 -2.672
0.481 15.384
7.754 7.754
4.807 4.807
2.400 2.400
1.600 1.600
0.800 0.800
0.800 0.800
18.003 18.003
2.164 2.164
Total= 74.9 76
0.099 3.267
0.030 0.890 30 span
Total= 4.157 5
78.224 78.224
16.975 16.975
2.546 -2.546
21.735 21.735
369.990 369.990 15m. Undone 55.964 23.041
Total= 484.378 cum
Vol. in CFT= 17105 17310
17.281 17.281
Total= 17.281 cum
Add 15% for compaction 19.87 cum
WBM (75%) 23.30 MT
Dust(25%) 11.48 MT
120.622 241.243
9.325 18.649
3.900 -15.600
0.720 -4.320
0.900 -88.200
4.800 -9.600
Present entry area
9.000 -9.000
0.577 8.654
8.900 8.900
7.0 m not done
8.337 8.337
5.0 m not done
7.713 7.713
7.0 m not done
7.225 7.225
5.0 m not done
Total= 174.001 cum
Co-eff.
389 67686 Nos.
1.9 331 Bags.
11.8 2053 Cft.
23.076 346.140
3.600 -108.000
Total= 238.140 Sqm
Co-eff.
0.173 41 Bags.
0.848 202 Cft.
Measurement Sheet (Fabrication Storage Building)
Upto 03.07.2019
Total=
2 M-25 (For R.C.C. work)
2.0.1 For Fdn Mark : F-1 Cum. 4 3.500 3.500 0.600 7.350
2.0.2 For Fdn Mark : F-2 Cum. 6 4.500 3.650 0.700 11.498
2.0.3 For Fdn Mark : F-3 Cum. 6 4.100 3.650 0.700 10.476
2.0.4 For Fdn Mark : F-4 Cum. 3 4.400 3.700 0.700 11.396
2.0.5 For Fdn Mark : F-5 Cum. 3 4.200 3.600 0.700 10.584
2.0.6 For Fdn Mark : F-6 Cum. 4 2.750 2.500 0.400 2.750
For Pedestal: P1 on F1 Cum 4 1 0.5 2.6 1.300
Total=
3.0.1 TMT Bar (8mm.)
Lintel
Total=
3.0.2 TMT Bar (10mm.)
For Slab (B/w Botom) MT 6 0.099
Lintel MT 1 0.695
VDF Slab MT 1 10.033
Total=
3.0.3 TMT Bar (12mm.)
Total=
3.0.4 TMT Bar (16mm.)
Total=
3.0.5 TMT Bar (20mm.)
Total=
4 Moorum
For Building inside area Cum 0 0 0 0 0.000
Total=
Vol. in CFT=
5 W.B.M. (63-40mm grading)
For Building inside area Cum 0 0 0 0 0.000
Total=
Add 15% for compaction
WBM (75%)
Dust(25%)
Total=
Co-eff.
Bricks 389
Cement 1.9
Sand 11.8
(-) Less for Window ( 2.4m. X 1 SqM. -38 2.400 - 1.200 2.880
Total=
5.2 -
Outside Plastering work
(i) Long wall Side SqM. 2 75.982 - 3.000 227.946
(ii) Short Wall Side SqM. 2 20.158 - 3.000 60.474
(-) Less for Main Entry Gate SqM. -2 6.500 - 3.000 19.500
(-) Less for Window ( 2.4m. X 1 SqM. -38 2.400 - 1.200 2.880
Total
Remarks
Qty.
0.000 CuM.
29.400
68.985
62.853
34.188
31.752
11.000
5.200
22.500
3.640
34.192
9.296
-2.104
2.138
3.640
12.015
-0.813
Slab Curtail bar for per span
-0.438
36 1.1 39.6
144.000 36 1.7 61.2
6 7 42
7 2.500 17.5
160.3
154.765 CuM. Bar-10mm 0.617
Total= 99
0.357
0.357 MT
0.594
0.695 Lintel for 12 mtr
10.033 700 sqm 10 dia 6 12.5
11.322 MT. 10 dia 61 0.96
0.000 MT.
0.000 MT.
0.000 MT.
0.000
0.000 cum
0
0.000
0.000 cum
0.00
0.00 MT
0.00 MT
113.973
30.237
-9.750
-3.600
-34.200
-11.205
-28.973
-9.000
47.482 cum
455.892
120.948
-39.000
-14.400
-109.440
414.000 Sqm
455.892
120.948
-39.000
-14.400
-109.440
74.100
7.500
495.600 Sqm
909.600 Sqm
157 Bags.
771 Cft.
mtr
kg/m
kgs
or 12 mtr
46.30 kg
23.13 kg