Tips for ensuring smooth construction progress

Only one component is required for all connections.


The TRIO BFD alignment coupler makes the formwork • Spray formwork on all sides with PERI Bio Clean before
in a single operation: flush
aligned every use.
tight

• Spray back of formwork with water immediately after


concreting. This reduces the amount of cleaning work.
9. Shafts • Always start from a corner or difficult area.
The TRIO TSE shaft panel allows com-
plete shaft formwork units to be
Pay attention to the wall thickness. See corners.
moved as one unit.

TRIO
Shaft Panel TSE 270,
Item no. 105523
• Only use as many ties as are necessary. Unused tie holes
must be sealed with plugs Ø 20/24, item no. 030300.

• More information can be found in the TRIO Assembly


Instructions.

WDA 10
Shaft Panel TSE 120,
Item no. 105524

The panel formwork with the BFD coupler system Without exception, all current safety regulations must be observed
in those countries where our products are used.

GSV
Since production began, TRIO has always fulfilled the
highest requirements regarding the formwork evenness.

2.70 m steel panels have been certified according to


GSV guidelines (German Formwork Association).
geprüft 81 kN/m² Uniform area load, DIN 18202, Tab. 3, Line 6.
durch neutrales Prüfinstitut 67.5 kN/m² Triangular load, DIN 18202, Tab. 3, Line 7.
Güteschutzverband Permissible fresh concrete pressure for aluminium panels
Betonschalungen 60 kN/m² Uniform area load, DIN 18202, Table 3, Line 7.
60 kN/m2 h = 2.70 m, DIN 18202, Table 3, Line 6.

BFD – for standard panel joints – on external corners – with filler timber up to 100 mm – for timber extensions TRIO shaft panel TSE in a When striking, lever crowbar For rectangular shafts, shorten Test report available
raised position. upwards. the chains on the longitudinal on request.
sides. This ensures that all shaft
panels are evenly loaded.
Filler timber
6. T-Junctions 8. Wall Connections 1. Panel Connections 4. Oblique Angles
1. With 270 x 240

72
Basic rules for T-Junctions TRIO articulated corner TGE – Internal formwork: External formwork:

M
Wall thicknesses 180 – 400 mm and for internal and external corners alike. with TR 60 or TR 30 panels and with multi-panel TRM 72 and

TR
TAR 85 TAR 85
600 mm 270 x 240 articulated corners articulated corners TRM 72 TGE TAR
85 TRM 72 TGE

60
E
TRM
TG
7 2
External formwork: with panel TR 90 Internal panel connection: External panel connection:

E
TG
Internal formwork: with TRIO Corner TE 4 BFD couplers 2 compensation walers TAR 85, 60 TGE 30 TGE
Tie details

85
270 x 240 6 BFD couplers 60

72
165°

TAR
75°
2,70 m

Adapting to wall thicknesses using Filler timber Filler timber

TRM
Articulated Corner ø 24

30
wall thickness compensation WDA 5, 2. With WDA or timber TGE 270
WDA 6 or timber infills.
TRM 72

Item no. 023200


WDA 5/6
TAR 85
60

30 30 TRM 72 TGE
TA
30 30 R
Filler timber TR 85
M
72
60 TGE

150° 60
Filler timber

Filler timber
2 pc. Alignment Coupler BFD
TE 3. With TRM 72 Item no. 023500 ≥ 75°
TE
WDA 5 (6) for 2.70 m panel heights. TAR 85
TRM 72 TGE
(18)
(36)

TAR 85
20

WDA 5 (6)
35
90

90

TRM 72 Filler timber TRM 72 TGE


TE Articulated

TA TR
R M
TE Corner TGE 120 60 TGE

85 7
Item no. 023300

TA TRM
60 TGE

R8 7
2
TRM 72 135°

5 2
120°

60

60
1. With 270 x 240 2. With TRM 72 3. With TR 30 4. With WDA or timber infills

WDA 5/6
TRM 72

TRM 72

2. Length Compensation
30

30

WDA 5 (6)
TRIO Column
TAR 85

TAR 85
270 x 240

270 x 240

Simple and fast solution. Cost-effective solution. Optimal visible surface solution. With panels for walls and columns
TE
With timber, or timber and formlining, With filler plates from 60 – 360 mm. With formlining and filler support. Can be used as column panels for
TE and BFD alignment coupler up to LA 270, Item no. 023170 TPP, Alu 270, Item no. 101813 cross-sections of up to 750 x 750 mm.
100 mm. LA 120, Item no. 023270 TPP, Alu 120, Item no. 101823 Used in the wall as “standard”
(24)
90

25

WDA 5
40

900 mm formwork panel.


90

TE
Permissible fresh concrete pressure
TE 100 kN/m2.

TRS 90

TRS 90
max.
TRM 72

TE 60 750 x 750

TRS 90
90

TE

TE
TE TE TRS 90
120

60

30
90

TE TE
72

TE
TRM 72

TE For square or rectangular columns


60 60 Formlining
Length compensation LA Filler Profile TPP up to 750 x 750 mm.
Alignment Coupler BFD
TAR 85 TAR 85

max. 100 mm 60 – 360 mm max. 360 mm


TRM 72

TRM 72

Complete TRIO column 5.40 m.


With concreting platform, ladder
access and push-pull props.

Corner construction:
7. Stopend Formwork 5. Wall Offsets 3. Corners 600 mm wall thickness
Perm. fresh concrete pressure 60 kN/m²
Using the TRIO MT/MTF stopend panel with continuous reinforcement, with or Up to max. 200 mm Basic rules for corners 20 25 30 Note:
without water bars. Wall thicknesses 180 – 400 mm Along the length L of 2.25 m,
60
Lower TAR 85 to be (18) (24)
fixed from below 3 BFD alignment couplers are
30 Adaptation to wall thickness using wall required per panel joint.
MT centre part, MTF centre part,
thickness compensation WDA 5, WDA 6
without water bar with water bar Filler timber
TAR 85

or timber infills
20 cm
max.

WDA 5 (6)
2 WDA 5 (6)
Internal formwork: External formwork:
30
With TRIO Corner TE With TR 72 panels or TRM 72 and TR 60

L
Timber Connection:
Connection: 5 BFD alignment couplers for h = 2.70 m
Additional BFD for 120 Hook tie DW 15/400 2 BFD alignment couplers for h = 2.70 m TE
60

TAR 85
mm offsets upwards TE
72

72

72

TE
270 x 240

270 x 240

Compensation
Waler TAR 85
L
TRM 72

TRM 72

Item no. 023550


60 60 60
Up to max. 860 mm
Corner construction:
TAR 85 80 cm wall thickness
60 Perm. fresh concrete pressure 60 kN/m²
TAR 85
TRM 72

Note:
86 cm
max.

35 40 x Along the length L of 3.00 m, 80


(36) 3 BFD alignment couplers are
required per panel joint.
Stopend tie TAR 85
AT MT AT AT MTF AT 60
c c c c
TAR 85

Timber supplied by
20 cm
min.

contractors for special


TE wall thicknesses
The concrete cover c is 2.5 cm TE
L

or 5 cm.
60 TE
Stopend tie TE
TAR 85
TE
72

80

WDA 5 (6) 2 WDA 5


72

72
TRM 72
TAR 85

Variable filler timber Universal Waler 245


Tie Rod Cylinder Yoke Item no. 023920
60 60 60
Item no. 022030
Waler Stop
TAR 85 L Item no. 023930

Push-Pull Props and Kicker Braces Transportation and storage Height Extensions Extension Units (Steel) Tie hole position (advancing form)
Push-pull props and kickers to brace Subsequent push-pull props according For assembly of Stacking Device TRIO, galv. Lifting Hook TRIO Lifting Gear Combi-2 TRIO Alignment couplers and all-round Extensions up to max. 8.10 m high Formwork should be assembled Compensation Waler TAR 85
the formwork and bearing the wind- to the table. The connection at the base plates. Perm. load 500 kg/piece. Maximum lifting capacity of 1.5 t, Permissible load 2.9 t at 45° spread of the lifting gear. struts ensure that extensions with (3 panels at 2.70 m) can be assembled to its full height on the ground! Alignment Coupler BFD
load are to be arranged as shown on TRIO panel takes place with the TRIO Ankerschraube PERI MMS 20 x 130
Art. Nr.: 103606 For safe stacking of 5 TRIO panels of at a crane sling angle of max. 30°. The pins are used to move stacks of panels located on the ground. TRIO are simple and easy. as one unit.
the adjacent diagram and table. prop connector. any size. Always use in pairs! TRIO lifting hooks or TRIO stacking devices are attached to the
PERI anchor bolt
Zur Befestigung von Richtstützen, Technische Daten
Abspannungen bei SKYDECK Bühnen

The first panel must always be braced Fixing to the ground slab is done with load hook. 270 240 120 90 72 60 30 TE TGE TGE TGE
oder auskragenden Deckentischen ist Ankerlänge L
W eigh

die Ankerschraube MMS eine ideale Klemmstärke t


Alternative zu bisher eingesetzten

MMS 20 x 130
Verankerungstiefe h ≥
Befestigungssystemen.
Bohrtiefe h ≥
id

Die Vorteile im Überblick

inside inside outside outside


Bohrer ø d
H

with 2 push-pull props. the appropriate base plate and PERI


Max. Anzugsdrehmoment MD
th t

Item no. 103606


Schlüsselweite SW
Abstand a ≥
Randabstand a ≥

Anchor Bolt MMS 20 x 130.


Mindestbauteildicke d ≥
Durchgangsloch im zubefestigenden Teil d

Bruchlastmitte

Betonfestigkeit
Follow Instructions for Use! Follow Instructions for Use! Follow Instructions for Use!
Table for PERI push-pull props and kicker braces
β
240 / 270

Sicherheitsbeiwert s = 4

Empfohlene Last in C20/25

Sicherheitsbeiwert s = 4

Fig. 1 Fig. 2
270

PERI GmbH
Schalung Gerüst Engineering
240

Formwork Height h [m]


3,0 4,0 5,0 6,0 7,0 8,0 9,0 10,0 11,0 12,0

max. Width of influence [m] 3,53 2,73 2,19 1,82 1,58 1,42 1,93 1,67 1,49 1,35 Lifting Gear Combi-2 TRIO
Item no. 044760
Actual prop load FRS [kN] at FRS1 9,4 11,3 11,3 11,3 Fig. 2 PERI Paletten und
Stapelrungen
TRIO Versetzhaken 1,5t
Art.-Nr. 023690
TRIO Kombigehänge-2
Art.-Nr. 044760
9,7 9,7 9,8 9,8 9,8 9,6
max. prop spacing FRS2 9,5 8,5 9,3 10,1 Bedienungsanleitung Bedienungsanleitung Bedienungsanleitung
30
60

Actual kicker brace load FAV


0,8 kN/m2

2,1 2,3 2,2 2,2 2,3 2,6 2,6 2,3 2,1 1,9
[kN] at max. prop spacing
300

x1 4,3 4,7 5,3 5,9


x = Distance of base plate [m]
270

1,2 1,6 2,0 2,4 2,9 3,5


240

from rear edge of formwork x2 2,6 2,6 2,8 3,0

y = *Top connection point [m] 2,0 2,0 y1 1,5 1,8 1,8 1,8 Fig. 1
1,0 1,2 1,5 1,8
from top of formwork y2 4,5 5,5 6,2 6,9 Ausgabe 05/2007 Ausgabe 05/2007 Ausgabe 05/2007

*If necessary, the distance from top of formwork must be


adapted to the system. Instructions for Use Pallets Instructions for Use Lifting Instructions for Use Lifting
0,5 kN/m2

60

and Stackind Devices Hook TRIO Gear-2 TRIO


or TRIO 330
90

A maximum force of 11.3 kN is to be led into the building at


330

the foot of the push-pull-prop for the given width of influence. Stacking Device TRIO Lifting Hook TRIO
60° 60°
Item no. 023390 Item no. 023690
270
240

Wind loads: h < 8 m = 0,5 kN/m 2

8 m < h < 20 m = 0,8 kN/m2

TRIO Panels Four BFD couplers are required for


90
120

2.40 m or 2.70 m wide panels for


W
id
extensions up to 5.40 m.
He 240 120 90 60 30 72 TE TRM 72 TGE
360

th
ig
ht
270
240

Inner corner Multi-purpose Hinged corner


Compensation Waler TAR 85
with 30 cm panel with from 75°-285° Item no. 023550
leg length continuous for inner and
tie hole strip outer corners
TR 270

30

120
120
390

Two TAR 85 compensation walers and


270

two BFD alignment couplers are re-


240

quired for extensions up to 8.10 m.


m2 6,48
Item no. 022570
3,24
022510
2,43
022520
1,62
022550
0,81
022560
1,94
022530
1,62
022580
1,94
022540
1,62
023200 Working Platforms Guardrail Post Holder TRIO
Item no. 101592 ma
x.
2.1
0m

en
c e1
.35
m
Foundations
Weight 329,00 kg 162,00 kg 115,00 kg 87,70 kg 60,60 kg 97,60 kg 69,80 kg 103,00 kg 94,80 kg flu
Scaffold Bracket of in Single foundations with
TRG 80 Item no. 023670 dth
wi
60

Foundation Strap Item no. 023800


90

TRG 120 Item no. 023680


TR 120

Guardrail Post
120

HSGP
120

1,00
Item-no. 034580
450

Planking and guardrails


270

Working platforms are to be assembled


240

m2 2,88 1,44 1,08 0,72 0,36 0,86 0,72 0,86 0,72


Item no. 022514 022600 022610 022640 022650 022620 022660 022630 032300 according to current valid guidelines.
Weight 163,00 kg 76,30 kg 58,20 kg 43,40 kg 28,40 kg 48,60 kg 33,20 kg 56,20 kg 43,60 kg Maximum spacing of the scaffold
brackets = 1.35 m with a permissible
TR 60

load of 150 kg/m2.


> 3,00 m

1,00

90

m2 0,72 0,54 0,36 0,18 0,43 0,36


240

Item no. 022640 022790 022810 022820 022800 022840


120

Weight 43,40 kg 34,70 kg 25,90 kg 15,70 kg 29,10 kg 18,00 kg


480

TAE TAM 72
270

Foundation Strap
240

Concreting Platform 120 x 270 Scaffold Bracket TRG 100/112 Strip foundations with
TRA 270

Item no. 022950 Item no. 023590 Foundation Tie Clamp Item no. 023010 Stop rail
Perforated Foundation Tie Item no. 023020
A single platform unit is only 320 mm Top Tie Bracket-2 AH Item no. 023630
high when folded. Each additional unit
adds only 170 mm in height. 13 con-
60

creting platforms (35 m) stacked on Top tie bracket-2 AH


top of each other is equal to the load-
270

m 2
2,43 1,62 0,81 1,62 1,94
ing height of a truck.
240

Item no. 023850 023870 023880 023891 023860


Weight 70,60 kg 49,60 kg 31,70 kg 42,10 kg 60,90 kg
540
TRA 90

Foundation
270
240

Tie Clamp
17

Accessories: Perforated
32

m2 1,08 0,54 0,27 0,54 0,65


Guardrail Post Foundation Tie
Item no. 023900 023950 023960 023971 023980
HSGP
Weight 33,30 kg 18,00 kg 10,80 kg 15,20 kg 23,70 kg 1466
Item-no. 034580
Edition 02/2010
TRIO
Panel Formwork

Poster

Edition 02/2010
The optimal System for every
Project and every Requirements

Wall Formwork Column Formwork

Slab Formwork Climbing Systems Tunnel Formwork Bridge Formwork

Shoring Systems Construction Scaffold Facade Scaffold Industrial Scaffold

DE en 10 | 2011 5ma 790909 © PERI GmbH

Access Protection Scaffold System-Independent Accessories Services

PERI GmbH
Formwork Scaffolding Engineering
P.O. Box 1264
89259 Weissenhorn
Germany
Tel. +49 (0)7309.950-0
Fax +49 (0)7309.951-0
info@peri.com
www.peri.com

You might also like