Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

TECHNICAL NETWORK REPORT FEEDBACK

Please find below the technical feedback report on ENGR. AUSTIN ONYEBUCHI’s VISIT to
Akwa Ibom carried out on the 18th and 19th day of June 2019.

LOCATION: Akwa Ibom

S/ LOCATION SITE ID 3G SPEED 4G SPEED COMMENT


N (Mbps) (Mbps)
1. UNIUYO TUY061 UL: 1.15 UL: 5.15 Browsing/Streaming Experience:
TOWN DL: 2.81 DL: 8.81 Seamless & Satisfactory in the
CAMP hostel area. The lecture hall area
17/06/2019 which is supported by UYO017
was not too good due to a faulty
equipment on site which has since
been fixed.
2. ORON ROAD UYO023 UL: 0.17 N/A Browsing/streaming experience
BY DL: 0.32 was below expectation on site. This
KILIMANJA was investigated and resolved as
RO site is functioning optimally now.
17/06/2019
3. IBOM UYO025 N/A N/A New Site was down due to delays
PLAZA in supply of FUEL base tank. Tank
17/06/2019 is now supplied and site is
functioning optimally.
4. ORON ROAD UYO041 UL: 1.63 N/A Browsing/Streaming experience
ADJ. DL: 2.55 was seamless and satisfactory
CRUNCHIES
PLUS
17/06/2019
5. TIMBER UYO049 UL: 1.80 N/A Browsing/Streaming experience
MARKET, DL: 3.21 was seamless and satisfactory
ORON ROAD
17/06/2019
6. NYSC NST001 UL: 1.02 N/A Browsing/Streaming experience
ORIENTATI DL: 1.99 was seamless and satisfactory
ON CAMP
18/06/2019

Thank You.

You might also like