Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

PRODI TEKNIK EKONOMI KONSTRUKSI

Fakultas Teknik Sipil dan Perencanaan


Universitas Bung Hatta
Jalan Sumatera Ulak Karang Padang, 25133 Telp.(0751) 51678-52096 Ext.432
=============================================================================================================

RENCANA PEMBELAJARAN SEMESTER

Nama Program Studi : Teknik Ekonomi Konstruksi Semester : IV


Nama Matakuliah : Teknologi Konstruksi IV Beban sks : 3 sks
Kode Matakuliah : 541124319 Dosen Pengampu : Dr Dwifitra Jumas, S.T.,
Prasyarat Matakuliah : Prinsip Rekayasa Struktur, PTM dan Alat Berat, Tekon III, MSCE dan Ir Dahler M.Sc
Material dan Spesifikasi
Capaian Mampu mengidentifikasi dan menyelesaikan konstruksi pekerjaan sipil (civil work)
Pembelajaran Pengetahuan:
 Explain the construction process of various engineering structures;
 organise and manage engineering construction projects
 explain the term retaining wall, various types and where they are being used.
 enumerate road pavement materials, pavement classifications, road profiles etc
 itemise the bridge types based on materials, load carrying methods and method of construction.
 list and explain bridge accessories.
 describe airport construction types, run way, lighting, etc.
 give details of the railway track, materials used, constructional methods and accessories.
 explain the construction process of tunnel, safety precautions required, lining and installation of services.
 enumerate various plant and equipment required for various engineering construction works.

Keterampilan:
1. Sketch various engineering structures such as retaining walls, road pavement profile, bridges, airport layout, railway track
and tunnel lining.
2. Sketch various plant and equipment for engineering construction.
3. Prepare various construction methods
4. Prepare work schedule
5. Make appropriate choice of construction plant and equipment based on site conditions and tasks involved
6. Handle from inception to completion any engineering construction projects
CapaianPembelajaran
PRODI TEKNIK EKONOMI KONSTRUKSI
Fakultas Teknik Sipil dan Perencanaan
Universitas Bung Hatta
Jalan Sumatera Ulak Karang Padang, 25133 Telp.(0751) 51678-52096 Ext.432
=============================================================================================================

KKNI Sikap:
1. Jujur
2. Kreatif dan mandiri
3. Kerjasama tim

Penilaian
: Generik Level 5
: Kemampuan kerja : mampu menyelesaikan pekerjaan berlingkup luas, memilih metode yang sesuai dari beragam pilihan
yang sudah maupun belum baku dengan menganalisa data serta mampu menunjukkan kinerja dengan mutu kuantitas
terukur .
: Penguasaan pengetahuan: menguasai konsep teoritis bidang pengetahuan tertentu secara umum serta mampu
memformulasikan penyelesaian secara prosedural.
: UAS = 30 %, UAS = 30 % , Tugas individu = 20% dan Tugas kelompok = 20%.
Deskripsi Matakuliah : Matakuliah ini bertujuan untuk Introduce the students to the construction process of various civil engineering
structures; Explain in details the component parts of the civil engineering structures, Explain the methods of construction
of each of the engineering structures contained in the course outline. Explore various materials available for the
construction of each engineering structures and provide students with the knowledge required to effectively write
specifications, prepare bills of quantities and valuation of building and civil engineering works, 2. Materi ajar yang
disampaikan meliputi :retaining walls which embrace gravity and reinforced concrete diaphragm walls, road pavement
construction (types, grade, sub-base, base course, wearing course including materials used in construction), bridges (types and
suitability, methods of construction, use and construction of caissons and cofferdam in bridges), airport construction (types,
accessories such as run way, lighting, wind indicator, layout), railway track (materials used and constructional methods, rails,
sleepers, cross ties, switches, crossings, terminal etc), tunnel construction (excavation, safety precautions, linings, installation of
services etc), construction plant and equipment. Field trip (optional). 3. Metode pembelajaran yang diterapkan adalah
cooperative learning. Mahasiswa bekerjasama dengan anggota kelompoknya dalam mengerjakan tugas, membuat
rancangan proses dan bentuk penilaian berdasarkan consensus kelompoknya sendiri. Kegiatan belajar dilakukan dengan
cara mengerjakan tugas dari dosen yang bersifat open ended dan dosen bertugas sebagai fasilitator dan motivator.
PRODI TEKNIK EKONOMI KONSTRUKSI
Fakultas Teknik Sipil dan Perencanaan
Universitas Bung Hatta
Jalan Sumatera Ulak Karang Padang, 25133 Telp.(0751) 51678-52096 Ext.432
=============================================================================================================

Pertemuan Kemampuan Akhir Bahan Kajian Metode Waktu Kriteria Bobot


ke Yang Diharapkan Pembelajaran yang Penilaian Referensi Nilai
disedia (Indikator) Test
kan
1 Mampu mengenal Introduction and Ceramah, 3 X 50’ Dokumen
konstruksi Course Overview diskusi laporan
pekerjaan sipil (civil tentang civil
works) works 5%
2 Mampu Retaining walls: Ceramah, 3 X 50 ‘ Dokumen
menjelaskan diskusi, tugas laporan
metode - terminologies tentang
pelaksanaan - base-height retaining wall
retaining wall relationship
- gravity retaining
walls
- cantilever retaining
wall
- design
- construction
process
- diaphragm walls
3-4 Mampu Road Pavement: Ceramah, 6 X 50’ Dokumen
menjelaskan - Preceding diskusi, tugas konsep biaya
metode activities to road proyek dan
pelaksanaan road pavement sumber
construction
pavement pembelanja
- Terminologies types
an proyek
of pavement (flexible,
rigid and composite)
- earth works
PRODI TEKNIK EKONOMI KONSTRUKSI
Fakultas Teknik Sipil dan Perencanaan
Universitas Bung Hatta
Jalan Sumatera Ulak Karang Padang, 25133 Telp.(0751) 51678-52096 Ext.432
=============================================================================================================

- sub grade
- sub-base
- surfacing courses
- wearing coat
- base materials
- materials used in
- road pavement
construction
- joint filling
and sealing
in case of
rigid
pavement
- Methods of
construction
of each type
of pavement
- Treatment
of poor soils
- Surface water
drainage
- Functions of
hard shoulders,
median strips,
kerbs, verges and
footpaths
- plant and equipment
required
- choice of plant.
PRODI TEKNIK EKONOMI KONSTRUKSI
Fakultas Teknik Sipil dan Perencanaan
Universitas Bung Hatta
Jalan Sumatera Ulak Karang Padang, 25133 Telp.(0751) 51678-52096 Ext.432
=============================================================================================================

Dokumen
5 Mampu - types of bridge and Ceramah, 3 X 50’ tentang:
menjelaskan suitability diskusi, tugas Under water
metode - methods of blasting and
pelaksanaan construction construction
use and construction
Jembatan will be
of caissons and
cofferdam
mentioned in
course of
discussion

6&7 Mampu -types of airport Ceramah, 6X 50’ Dokumen


menjelaskan -runway and types diskusi, tugas tentang 5%
metode -hanger konstruksi
pelaksanaan -terminal bandar udara
-control tower
Bandar Udara (airport)
-lighting
(airport
-wind indicator
construction) -airport equipment
-airport layout
8&9 Mampu -terminologies Ceramah, 6 X 50’ Dokumen 5%
menjelaskan -types of rail diskusi, tugas motode
tentang metode -types of track pelaksanaan
pelaksanaan Jalur -materials used
-construction methods
PRODI TEKNIK EKONOMI KONSTRUKSI
Fakultas Teknik Sipil dan Perencanaan
Universitas Bung Hatta
Jalan Sumatera Ulak Karang Padang, 25133 Telp.(0751) 51678-52096 Ext.432
=============================================================================================================

Kereta Api -sleepers/cross ties jalur kereta


-ballasts api
-track gauge
-alignment
-grades
-switches and
crossings
-terms used for the
description of railway
10&11 Mampu -purpose Ceramah, 6X 50’ Dokumen
menjelaskan -excavation diskusi, tugas tentang 10 %
metode -safety precautions metode
pelaksanaan -lining pelaksanaan
-installation of services
terowongan konstruksi
-construction plant
(tunnel terowongan
and equipment
construction) -examples of tunnel
and purpose
12-13 Mampu -types of tower Ceramah, 6 X 50’ Dokumen
menjelaskan - desain of tower diskusi, tugas tentang
metode - part of tower metode
pelaksanaan -acessoriss pelaksanaan
konstruksi tower -finishing tower Tower
-lighting
baja
-wind indicator
-tower equipment
13-14 Mampu -haulage equipment Ceramah, 6 X 50’ Dokumen 5%
menjelaskan -handling equipment diskusi, tugas metode
Construction plant -concreting equipment pelaksanaan
and equipment -excavating equipment Tower
PRODI TEKNIK EKONOMI KONSTRUKSI
Fakultas Teknik Sipil dan Perencanaan
Universitas Bung Hatta
Jalan Sumatera Ulak Karang Padang, 25133 Telp.(0751) 51678-52096 Ext.432
=============================================================================================================

-earth moving
equipment
-finishing equipment
14 review Konsep Life Cycle Ceramah, 3 X 50’ This is the
Cost diskusi, tugas week
preceding
the end-of-
course
examination
. At this
time,
students are
expected to
be
preparing
seriously for
the end of
semester
examination
.

Referensi :
PRODI TEKNIK EKONOMI KONSTRUKSI
Fakultas Teknik Sipil dan Perencanaan
Universitas Bung Hatta
Jalan Sumatera Ulak Karang Padang, 25133 Telp.(0751) 51678-52096 Ext.432
=============================================================================================================

1. Churdley, R. & Greeno, R. (2006). Building Construction Handbook, 6th edition, ELSERVIER, USA.

2. Vazirni, V.N. & Chandola, S.P. (2004). Concise Handbook of Civil Engineering, 2n edition, S.CHAND & COMPANY LTD, New Delhi

3. Kumar, S. (2010). Building Construction. 20th edition, STANDARD PUBLISHERS, New Delhi

4. Ashcroft, R. (1992). Construction (for interior designers). 2nd edition, PEARSON LONGMAN, London

Disetujui, Diperiksa, Dibuat,


Ketua Jurusan Koord.Matakuliah/Bidang Keahlian Dosen ybs

1. Dr. Dwifitra Jumas, S.T,


MSCE
2. Ir Dahler M.Sc

Dr. Zulherman, ST, M.Sc

No: Revisi : -
PRODI TEKNIK EKONOMI KONSTRUKSI
Fakultas Teknik Sipil dan Perencanaan
Universitas Bung Hatta
Jalan Sumatera Ulak Karang Padang, 25133 Telp.(0751) 51678-52096 Ext.432
=======================================================================

You might also like