This document provides details of renovations for the ground floor reception area, including:
1) Removal of existing floor tiles, brickwork, doors and concrete totaling over 2000 square feet.
2) Provision of new brickwork, wood frames, plastering and other finishes totaling over 550 square feet.
3) Granite flooring and stair work including polished granite steps, raisers and landings totaling over 1380 square feet.
The renovation involves replacing flooring, doors, walls and other elements to refresh the ground floor reception area.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
This document provides details of renovations for the ground floor reception area, including:
1) Removal of existing floor tiles, brickwork, doors and concrete totaling over 2000 square feet.
2) Provision of new brickwork, wood frames, plastering and other finishes totaling over 550 square feet.
3) Granite flooring and stair work including polished granite steps, raisers and landings totaling over 1380 square feet.
The renovation involves replacing flooring, doors, walls and other elements to refresh the ground floor reception area.
This document provides details of renovations for the ground floor reception area, including:
1) Removal of existing floor tiles, brickwork, doors and concrete totaling over 2000 square feet.
2) Provision of new brickwork, wood frames, plastering and other finishes totaling over 550 square feet.
3) Granite flooring and stair work including polished granite steps, raisers and landings totaling over 1380 square feet.
The renovation involves replacing flooring, doors, walls and other elements to refresh the ground floor reception area.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
This document provides details of renovations for the ground floor reception area, including:
1) Removal of existing floor tiles, brickwork, doors and concrete totaling over 2000 square feet.
2) Provision of new brickwork, wood frames, plastering and other finishes totaling over 550 square feet.
3) Granite flooring and stair work including polished granite steps, raisers and landings totaling over 1380 square feet.
The renovation involves replacing flooring, doors, walls and other elements to refresh the ground floor reception area.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
Removal of Existing floor & Wall Tiles. Before Lab 38’-8” 20’-3” 783.06 Off Entrance 30’-6” 18’-9” 571.87 Right side of 27’ 10’-6” 283.5 Entrance Removal Stinting at 20’-3” 1’x2 no’s 40.5 stair case and opposite. Before Lab 18’-3” 1’ 18.25 Pillor’s 6’-9” 1’x2 no’s 13.5 Entrance right & Left 16’-6” 1’x2 no’s 33.00 side Corner at cables 11’-6” 1’ 11.5 Cable room front 10’-6” 1’ 10.5 side. Corridor beple 41’1” 7’-3” 1769.18 toilets Skirting 43’ 0’x1’ 297.25 2109 G/F Reception:
S.No Description L Width Area Units Remarks
10. Dismentting of Existing 4 ½” Thick brick work.
Before HR. Room 10’-6” 9’-01” 94.5
Above Door 3’9” 3’-6” 13.12 Reception out Door, 4’ 7’ 28.00 Below stair case In Reception Right 17’-9” 11’-6” 204.17 side wall Corridor Before 6’ 2’-1” 12.00 toilets She Room window 4’-6” 3’x2 no’s 18.00 at HR In Reception left 4.3” 11’x2no’s 93.5 side of Entrance For A.C Duct 2’ 2’ 4.00 467.24 Reception:
S.No Description Length Width Area Units Remarks
20. Removing Doors with Door Frames Reception out Door 7’ 6’ 42 Before HR Room 3’ 7’ 21 Before HR Window 7’-6” 4’-6” 33.75 In Reception Before 7’6”-4’ 6”x2no’s 67.5 Lab Windows 2’-6”-4’ 6”x2 no’s 22.5 188.75
S.No Description Length Width Area Units Remarks
30. Providing Brick Work Old Out Door 7’-3” 7’ 50.75 Before lab above 2’-9” 4’-6”x4no’s 49.5 windows & Ventilate Before Babble Room 5’-10” 10’-0” 58.3 corridor Bed Door 3’-3” 7’-0 (-) 22.75 135.8 S.No Description Length Width Area Units Remarks 40. Providing Q” Brick work At case Room (Stair 4’ 7’ 28 case) Before Lab in 1’-4’ 2 no’s 8 windows (6”x6”) TOTAL 36
S.No Description Length Depth Area Units Remarks
50 Providing & Fixing Burma Teak wood frames New out 3’-3” 7’ 22.75 Entrance to out in reception Before cable 3’-3” 7’ 22.75 room at corridor 45.50 S.No Description Length Width Area Units Remarks 70. Providing pasting 13.0 1’ 13 Lab skirting area 7’-6” 7’x2 no’s 105 Old out area 0-6” 9’-0”x 2no’s 09.00 At old walls 4’-0 1’-0” 4.00 At H.R. Room 7’x4’ 2 sides 56.00 Window Bottom At cash office 22’-0 1’-0” 22.0 Before cab stair case 5’ 10” 4.15
Side of Stair case 19’ 2’-9” 52.25
Before lab door windows Before lab 1’ 11’ 11.00 Dismantled wall Window carries 15’-10” 2no;s 24.9 Inside of Receptions 2’-7” 4’ 10.32 Before cable room 6’-10” 2sides 120.00 corridor Entrance Bed Door 3’-3” 7”x2sides 45.5 Before cable room 7’ 1’-0” 7.00 door Main Entrance Right 1’ 1’-6” 15.00 side Main Entrance Back 5’-2” 1’-0” 5.16 of wood frame Skirting from M. 0.3” 1’-9” 0.43 entrance left to windows Bottom skirting up 30’-3” 1’-0” 30.25 to Lab wall Before cable room 4’1 3’x1’ 41.25 to old door dismenling (Skirting) Stair case Steps up 1’-5”7” 13 21.4 to filming no’sx2sides Landing to F.Floor 1’-5”-7” 8 no’sx 2 13.17 sides Sides of Landing 6’-7” 2 sides 6.96 Landing Back side 10’-7” 1 no’s 5.80 Bottom granite top 11’-6” 7” 6.67
Stair Case sides 1’-5”-3” 12x2 sides 8.52
Bottoms Stair Case sides 1’-5”-3” 8x2 sides 5.68 Bottoms 553.41 S.No Description Length Depth Area Units Remarks 80. Providing Plain cement concrete In Reception 3’ 4’x0.6” 6 cable corner S.No Description Length Depth Area Units Remarks Removal of Concrete with Floor Stair case steps 9” 5’-6” 3”-21 21.65 no’s Raiser 10” 5’-6” 3”-22 25.10 no’s Landing 6’-4” 10’ 10”x3” 17.15 S.C Beside Lab 9”x4’ 2x3” 20 no’s 15.6 Steps
Rainey 10”-4’ 2”x3” 22 no’s 18.99
Landings 3’-10” 4’-4”x4” 0.3”x2 8.29
no’s 106.76 S.No Description Length Width Area Units Remarks 130 Polished Granite (Stair case) Stair case in Reception Steps 5’-10” 21 no’s 87.15 Raisers 5’-7” 22 no’s 63.8 Landing 10’-6” 6’-0” 63.00 Stair case Beside & 4’x10” 21 no’s 69.72 AB steps Raisers 4’-7” 22 no’s 51.04 Landing 4’ 3’-6”x2 no’s 28.00 130 Polished Granite (Stair Case) Stair case Beside LAB Steps 4’-0” 1’-0”x20 80 no’s Raisers 4’-0” 0-6’x23 no’s 46 Landing 4’-2” 3’-10”x2no’s 31.86 Stair case in Reception Steps 5’-01” 0-7”x23 no’s 67.76 Raisers 5’-02 1’-0”x21 108.36 no’s Landing 1 6’-0” 5’-4” 31.98 Landing 2 5’-0” 5’-2” 25.8 391.76 S.No Description Length Depth Area Units Remarks 110 Providing Lintels Before & AB In 4’-6” 2 no’s 9 Windows Before cable 4’ 1 no’s 4 room above door 13 S.No Description Length width Depth Area Units Remarks Chipping of Cement Plaster on columns Windows 14’-0” 0.9”x2 no’s 21.00 Windows 9’-6” 0.4”x2no’s 6.27 13’-6” 0.4”x2 no’s 8.91 Piller 6’-10” 11’-0”x 2 150.26 no’s At H.R 14’-0’ 3’-6”x10” 17’-6” 10” 14.52 200.96 S.No Description Length Depth Area Units Remarks 100 Granite Flooring 20mm thick Before cable 10’-5” 26’-10” 279.56 room Deduction Wall 6’-10” 0.6” (-) 3.41 Opp Entrance 32’ 19’-9” 632.00 Ded Wall 2’ 10” (-) 1.66 Before LAB 38’-8” 19 734.54 Deduction Pillars 1’-10” 1’-3”x 2 no’s (-) 4.57 Door Bottom Lab 5’-6” 0.4” 1.81 Door Bottom 2’6” 0.4x2 no’s 1.64 Cable and corridor
Before Toilets 40’ 7’-3” 290.00
passage Gents Toilets 3’-10” 3’-8” 14.01 Opening Ladies Toilets 3’-6” 3’-0” 10.5 Opening At Main Entrance 19’-0 10” 15.77 S Grey Border 1970.19 S.No Description Length Depth Area Units Remarks 120 Skirting Raiser and Step 1’-9” 20 no’s 35 Only Step 1-10” 1 no’s 0.83 Landing up and 3’-10” 2 no’s 7.66 down Landing Up and 4’-5” 2 no’s 8.84 down Before Toilets 96’ 8” 96.66 passage Door Bottom 2’-9’ 2 no’s 5.5 patties Windier and 7’ 2 no’s x 2 28.00 Gents Toilet places Entrance 3’ 2 no’s 6.00 188.49