Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

2018/12/11

CAMBIA MC-TDIY22 51204160-175 DATASHEET

SALES@CAMBIA.CN | CAMBIA GROUP


Enhance the Value of Your Installed Automation Systems
Powerful Solution for Honeywell TDC 3000® Migration

Automation systems that leverage Often, effective vendor-supplied migration strategies and implementa-
state-of-the-art technology and training and technical support resources tion to your automation systems. Above
practices can improve the overall diminish quickly. Siemens helps all, we want to improve the productivity

n
financial performance of a manufac- manufacturers manage their migration and profitability of your company. The

.c
turing facility. However, replacing any to current automation products and end result of our migration strategy for
older process control system with a systems. As a result of such system process automation is a field-proven
newer generation system can be capital migration, Siemens customers realize: and globally accepted process control

ia
intensive. Siemens can help migrate system that leverages the latest in
your current TDC 3000 DCS and have • Improved production throughput innovative technology. Siemens works
your plant back in operation, usually in • Reduced training requirements closely with you to devise a migration

mb
less than a day, without any Improved time to market plan tailored to your needs that best
modification or rework to the field • Improved operator efficiency meets your plans, schedule, and
instrumentation wiring. • Reduced maintenance risk budget. This allows you to replace your
• Decreased cost on replacement
ca existing system in a stepwise approach
Reduce Total Cost of Ownership parts with minimal impact to your operations.
• Reduced cycle time
One common problem facing manufac- • Minimized IT support costs Honeywell
s@
turers is reliance on older systems with
diminishing installed base and Improve Return on Investment We offers migration strategies from the
inadequate technical support from the Honeywell TDC 3000 to the SIMATIC®
le

supplier. Such legacy automation We help reduce the risk to PCS 7 process control system to bring
systems rely on dated technology, and manufacturing operations while the latest control technology to your
replacement parts and components can improving your bottom line. Siemens plant while minimizing the down time
sa

be difficult, if not impossible, to obtain. applies unmatched expertise in required to change systems.

process
l:
ai
Em
To avoid lost production, the cutover or terminal blocks and mounting hole the powerful S7-400 controller and the
migration from an existing control dimensions as the old Honeywell FTA the PCS 7 Windows®-based operator
system to a new system has to be boards. The original, wired terminal station. The PCS 7 system can be
accomplished in the shortest time blocks are plugged into the new FTA quickly brought online and production
possible with minimal impact to boards which are in turn connected to resumed in usually one day.
manufacturing operations. One of the PCS 7 I/O modules in a new cabinet.
most time-consuming tasks in a typical This strategy eliminates the time and Speed Checkout and Startup
migration project is reworking the field high cost of rewiring the field devices.
instrumentation wiring over to the new Since the I/O is unchanged, the original
system. Siemens offers several Reduce Production Downtime control program and screen displays
solutions to help you manage this can be manually duplicated in the new
challenge. Replacement Field Termination system, updated, and tested prior to
Assembly (FTA) boards and interconnect the changeover. To complete the
Avoid Field Rewiring cables are available to support this migration, the original Honeywell
migration solution. The new cables plug control cabinet is replaced with the
Leaves your field wiring and original into matching PCS 7 I/O modules, PCS 7 controller and I/O cabinet. Using
Honeywell field termination assembly duplicating the original control system your proven control strategy and
(FTA) cabinets in place and simply hardware. From this point, the system undisturbed field devices, system
replaces the old FTA boards with new can now utilize all the latest process checkout and startup is efficient and

n
Siemens FTA boards. The Siemens FTA control technology from Siemens. goes quickly.

.c
boards are the same size and have the Technology such as the Siemens PCS 7
same process control system hardware, using

ia
Module Description

mb
16-Channel 8-Channel 32-Channel 32-Channel 16-Channel 16-Channel 16-Channel
Analog Input Analog Output Discrete Input Discrete Input Discrete Output Discrete Output Relay Output
Volts, mA Volts, mA 24 Vdc 120 Vac 24 Vdc 120 Vac 120 Vac

ca
s@
le

Honeywell TDC 3000 FTA – MU-TAOX01, 02


MU-TAOY22, 23 Honeywell TDC 3000 FTA – MU-TDOD11, 12, 13, 14
sa

Siemens PCS 7 FTA – 6EQ2012-1BB10-2BA0 Siemens PCS 7 FTA – 6EQ2012-1BD11-3BA0

Honeywell TDC 3000 FTA – MU-TDID12 Honeywell TDC 3000 FTA – MU-TDOA11, 12, 13
Siemens PCS 7 FTA – 6EQ2012-1BC11-4BA0 Siemens PCS 7 FTA – 6EQ2012-1BD21-3BA0

Honeywell TDC 3000 FTA – MU-TAIH01, 02, 03 Honeywell TDC 3000 FTA – MU-TDIA12 Honeywell TDC 3000 FTA – MU-TDOR12, Y23
l:

Siemens PCS 7 FTA – 6EQ2012-1BA10-3BA0 Siemens PCS 7 FTA – 6EQ2012-1BC21-4BA0 Siemens PCS 7 FTA – 6EQ2012-1BD32-3BA0

Migrating your Honeywell system to current technology can be


ai

faster, easier, and more economical than you think. Contact


now.
Em

Cambia Automation Limited

Tel: 86-13599507613

www.cambiaplc.com

You might also like