Z WAYS TECHNOLOGIES CORPORATION

# 23B Luxemburg St. Pinagbuklod P 1-A New Lower Bicutan, City of Taguig.
Email address: zwaystechcorp@gmail.com Tel no.: 09217998455

Date : DECEMBER 2, 2019

Attention To : ARCH. BINGBONG UMALI


Vice President – Imperial Homes Corp.

Thru : ENGR. TREZA D. SEVA


Civil Engineer – Imperial Homes Corp.

Subject : Construction Contract proposal (Via Verde Trece housing units)

Dear Sir,

In accordance to the proposed Via Verde project our company wishes to express our intent to
acquire the labor works needed in the construction of the subjected housing units involving the structural
civil works and utilities provision based on approved construction plans and specifications on a basic price
per unit of 113,955.00 PHP for the foundation works roughing ins up to finishing as follows.

Description No. of units Unit price Total unit Total project


price price
Labor works Super Structure Sub Structure
(Construction
of Tiarra
113,955.00 4,558,200.00
Connovate 40
95,000.00 PHP 18,955.00 PHP PHP PHP
Rowhouse )

Items inclusive of value added tax (VAT) with 20% premium on scheduled accomplishments.

Below are the scope of works for your reference.


Model House: TIARRA CONNOVATE

1. Setting-out / Lay-out;
2. Earthworks (Excavation, Backfill & Compaction)
3. Foundation Steel Works;
4. Foundation Concrete Pouring;
5. Slab on Grade Steel Works
6. Plumbing & Electrical Rough-ins;
7. Slab on Grade Concrete Pouring;
8. Toilet Wall Rebar & Concrete Pouring;
9. Electrical & Plumbing Works;
10. Truss Fabrication & Installation;
11. Canopy Fabrication & Installation;
12. Roofing Materials Installation;
13. Ceiling Framing & Board-up;
14. Wall Framing & Board-up;
15. Door Jamb Installation at 2F;
16. Door Installation at 2F;
17. Door Jamb Installation at GF;
18. Door Installation at GF;
19. Door Jamb Installation at GF CR;
20. Door Installation at GF CR;
21. Stair Wood Framing;
22. Stairs Vinyl and Nosing Installation;
23. Tiles Installation at 2F;
24. Tiles Installation at GF;
25. Tiles Installation and Wall Plastering at CR;
26. Kitchen Counter Formworks, Rebars & Concrete Pouring;
27. Plumbing & Electrical Fixtures Installation;
28. Interior Wall Paint Preparation;
29. Exterior Wall and Ceiling Paint Preparation;
30. Interior Walls and Ceiling Painting;
31. Exterior Walls and Ceiling Painting;
32. End Wall Paint Preparation;
33. End Wall Painting.

We look forward to brighter business endeavors with you. Thank you and good day.

Charles Stephen D. Aureo


ZWAYS Technologies - President

Jaime B. Robles Jr. RME


ZWAYS Technologies - Secretary