Professional Documents
Culture Documents
Two Col Foot
Two Col Foot
Two Col Foot
FOR DL+LL
Total load, P 1325+ 1325 = 2650 kN
Gross upward pressure 2650*1.1/(6*3.25) +6*(1+1)/(3.25*6*6)+
6*(1+1)/(6*3.25*3.25)= 150 kN/sq.m which is less than S.B.C
Netupward Presuure 2650/(6*3.25) +6*(1+1)/(3.25*6*6)+
6*(1+1)/(6*3.25*3.25)= 136 kN/sq.m
CG of load from P1 1325*(2.93/2650) = 1.47 m
Cantilever from P1 (6/2- 1.47 ) = 1.540 m
Cantilever from P2 (6 - 1.54-2.93) = 1.530 m
For DL+EL
Total load, P 1117 + 1117 = 2234 kN
CG of load from P1 1117 * 2.930 /( 2234 )= 1.465 m
CG of footing from P1 6 / 2.000 )- 1.54 = 1.460 m
Eccentricity, e 1.460 - 1.465 = -0.005
Extra moment 2234 * -0.005 = -11.170 kN.m
Total moment 11.17 + 126.00 + 126 = 263.20 kN.m
Gross upward pressure 2234*1.1/(6x3.25)+263.2*6(6x6x3.25)
+6(1+1117)/(6x3.25x3.25) = 139.71 kN/sq.m < 1.25*which is less than S.B.C
Netupward Presuure 128.25 kN/sq.m
For DL+LL+WL
Total load, P 1373 + 1373 = 2746 kN
CG of load from P1 1373x2.93/2746 = 1.465 m
CG of footing from P1 6/2-1.54 = 1.460 m
Eccentricity, e 1.46 - 1.465 = -0.005
Extra moment 2746 * -0.005 = -13.730 kN.m
Total moment 13.73 + 127.00 + 127 = 267.73 kN.m
731 kN/m
77
867 856
SF is zero at 3.02 m
Max BM at centre span= 731x3.02x3.02/2-2200.49x(3.02-1.54)= 77 kN-m Tension @ Bottom
BM at face of col 1= 731x(1.54-0.375) ²/2= 496 kN-m
BM at face of col 2= 731x(1.53-0.375) ²/2= 488 kN-m
Fck = 25 N/mm²
Fy = 415 N/mm²
Size of Beam 600 X 750 OK
Effective Depth . = 690 mm
Area of steel
Mu/bd2 pt Ast Ast min Provide
at centre span 0.27 0.08 312 mm² 848 4 Nos # 20
at Left Support 1.74 0.53 2182 mm² 848 8 Nos # 20
at Right Support 1.71 0.52 2141 mm² 848 8 Nos # 20
pt = 0.281
Max SF @ a distance of eff. Deth from face of column = 347 kN
Provide 4 Legged 8 @ 266 mm c/c