“In case the installation of deep pipeline > 6m is not feasible at site,
EPIC contractor to propose alternative method for the groundwater
discharge such as solid pipeline installation by HDD combined with shallower perforated pipes for ground water collection connected to the manholes or additional soakaway wells in between Manholes or other feasible methods subject to Company approval”