“In case the installation of deep pipeline > 6m is not feasible at site,

EPIC contractor to propose alternative method for the groundwater


discharge such as solid pipeline installation by HDD combined with
shallower perforated pipes for ground water collection connected to
the manholes or additional soakaway wells in between Manholes or
other feasible methods subject to Company approval”