Professional Documents
Culture Documents
SA-D-GE-TR-1212-0 Site Material Laboratory Report No. 25 - May 2011 PDF
SA-D-GE-TR-1212-0 Site Material Laboratory Report No. 25 - May 2011 PDF
SA-D-GE-TR-1212-0 Site Material Laboratory Report No. 25 - May 2011 PDF
Table of Contents
SA-D-GE-TR-1212
Page 2
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report
1. LIST OF STANDARDS
10 August 1999
ASTM C 40 Test Method for Organic Impurities in Fine Aggregates
10 February 1999
ASTM C 42 Test Method for Testing of Drilled cores samples
15 March 1995
ASTM C 117 Test Method for materials finer than 75mm (No.200) Sieve
ASTM C 123 Test Method for Light weight pieces in aggregates 31 October 1988
ASTM C 131 Test Method for Abrasion and Impact by LA Machine 10 July 1988
10 June 2001
ASTM C 136 Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C 142 Test Method for Clay Lumps and Friable Particles 10 August 1997
10 November 1998
ASTM C 143 Test Method for Slump test of freshly mixed concrete
Test Method for Specific Gravity and Absorption of Coarse 31 October 1988
ASTM C 127
Aggregates
ASTM C 231 Test Method for Air Content of Freshly Mixed Concrete 10 January 1997
SA-D-GE-TR-1212
Page 3
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report
ASTM C 289 Test Method for Alkali Reactivity of Concrete aggregates 15 April 1994
ASTM C 188
Test Method for Density of Hydraulic Cement1 10 September 1995
10 December 1996
ASTM C430 Fineness of Hydraulic Cement by the 45-μm (No. 325) Sieve1
SA-D-GE-TR-1212
Page 4
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report
2. WEATHER
SA-D-GE-TR-1212
Page 5
WEATHER REPORT BUJAGALI HYDROELECTRIC POWER PROJECT
35 100
90
30
80
Humidity (%)
25 70
Temp. ( deg. C)
60
20
50
15
40
Rain (mm)
10 30
20
5
10
0 0
01/Apr
02/Apr
03/Apr
04/Apr
05/Apr
06/Apr
07/Apr
08/Apr
09/Apr
10/Apr
11/Apr
12/Apr
13/Apr
14/Apr
15/Apr
16/Apr
17/Apr
18/Apr
19/Apr
20/Apr
21/Apr
22/Apr
23/Apr
24/Apr
25/Apr
26/Apr
27/Apr
28/Apr
29/Apr
30/Apr
RAIN mm TEMPERATURE MIN (OC) TEMPERATURE MAX (OC) HUMIDITY (%) Max HUMIDITY (%)
Page 6
WEATHER REPORT BUJAGALI HYDROELECTRIC POWER PROJECT
1000 30
900
25
800
Wind Speed (m/s)
Atmo Pressure. ( mBar)
700
20
600
500 15
400
10
300
200
5
100
0 0
01/May
02/May
03/May
04/May
05/May
06/May
07/May
08/May
09/May
10/May
11/May
12/May
13/May
14/May
15/May
16/May
17/May
18/May
19/May
20/May
21/May
22/May
23/May
24/May
25/May
26/May
27/May
28/May
29/May
30/May
31/May
ATMOSPHERIC PRESSURE mBar(max) ATMOSPHERIC PRESSURE mBar(min) WIND SPEED(m/sec) Max WIND SPEED(m/sec)
Page 7
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report
SA-D-GE-TR-1212
Page 8
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5
Page 9
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5
Page 10
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5
Page 11
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5
Page 12
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5
Page 13
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5
Page 14
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5
Page 15
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5
Page 16
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT
AGGREGATE SIZE
25 - 37.5 4.75mm
Page 17
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT
AGGREGATE SIZE
Page 18
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT
AGGREGATE SIZE
25 - 37.5 4.75mm
Page 19
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT
AGGREGATE SIZE
Page 20
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT
AGGREGATE SIZE
25 - 37.5 4.75mm
Page 21
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT
AGGREGATE SIZE
Page 22
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT
AGGREGATE SIZE
25 - 37.5 4.75mm
Page 23
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT
AGGREGATE SIZE
Page 24
LOS ANGELES ABRASION TEST BUJAGALI HYDROPOWER PROJECT,
SITE MATERIALS ASTM-C131 UGANDA
LABORATORY IN-1012-2-7
IN 1012 2 7
Number of Spheres
p 12 11 8 6
Page 25
SPECIFIC GRAVITY and ABSORPTION BUJAGALI HYDROELECTRIC POWER PROJECT
SITE MATERIALS FINE AGGREGATES BUJAGALI ENERGY LIMITED
LABORATORY ASTM : C 128 Rev. 0 IN-1012-2-4
Page 26
SPECIFIC GRAVITY and ABSORPTION BUJAGALI HYDROELECTRIC POWER PROJECT
Page 27
SPECIFIC GRAVITY and ABSORPTION BUJAGALI HYDROELECTRIC POWER PROJECT
SITE MATERIALS FINE AGGREGATES BUJAGALI ENERGY LIMITED
LABORATORY ASTM : C 128 Rev. 0 IN-1012-2-4
Page 28
Soundness of Aggregate BUJAGALI HYDROPOWER PROJECT,
SITE MATERIALS by use of Sodium Sulfate UGANDA
LABORATORY ASTM C - 88 IN-1012-2-8
FINE AGGREGATE
Sieve Size Grading of Mass of test Fraction Passing Sieve Corrected Average
Original used to determine Weighted Loss
Passing Retained Sample Before After Loss
mm mm % Retained gr gr gr % %
9.5 4.75 26.44 1007 990 17 1.69 0.45
4.75 2.36 19.74 752 719 33 4.39 0.87
2.36 1.18 16.07 612 597 15 2.45 0.39
1.18 0.6 20.69 788 748 40 5.08 1.05
0.6 0.3 17.06 650 608 42 6.46 1.10
Total 100 3809 3662 147 3.86 3.86
SOUNDNESS LOSS% = 3 86
3.86
COARSE AGGREGATE
Grading of Passing Sieve
Sieve Size Mass of test Fraction Corrected Average
Original used to determine Weighted Loss
Passing Retained Sample Before After Loss
mm mm % Retained gr gr gr % %
63.5 37.5
Page 29
BUJAGALI HYDROPOWER PROJECT
FLAKINESS & ELONGATION
38 - 25 mm
Size Retained Weight Flaky Elongated
mm gr. gr. gr.
37,5 - 28
28 - 20
20 - 14
14 - 10
Total A B C
25 - 19 mm
28 - 20 838 172 85
20 - 14 1506 276 301
14 - 10 1324 135 123
Total 3668 A 583 B 509 C
19 - 5 mm
20 - 14 1489 376 343
14- 10 1072 187 97
10 - 6.3 1388 160 183
Total 3949 A 723 B 623 C
Aggregate size 38 - 25 mm 25 - 19 mm 19 - 5 mm
B
Flakiness Index 15.89 18.31 %
A
T.S LIMIT <20% by weight
C
Elongation Index 13.88 15.78 %
A
T.S LIMIT <35% by weight
Page 30
BUJAGALI HYDROPOWER PROJECT
ACV, AIV
Average % 9.32
BS LIMIT <30% by weight
Average % 7.3
BS LIMIT <30% by weight
Page 31
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report
SA-D-GE-TR-1112
Page 32
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev.0 IN-1012-2-2
Sample Ref. 261 AGGREGATE TYPE BUJAGALI AMPHIBOLITE DAT E SAMPLED 23/5/2011
90
80
Crushed F. Sand 0-1.5mm
70 Initial Dry Weight (g) 9351.0
Sieve SizCumulativ e Retained Passing
60
% Passing
Metric Retained
50 (mm) (g) % %
6.3 0 - 100.0
40
4.75 0 - 100.0
30 2.36 206 2.2 97.8
Page 33
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev .0 IN-1012-2-2
Sample Ref . 261 AGGREGATE TYPE: DATE SAMPLED 23/5/2011
0.01 0.1
0.1 Sieve
Sieve Metric
Metric
11 Size
Size (mm)
(mm) 10
10
100
100
90
90
80
80
Natural. Sand 0-6mm
70
70 Initial Dry Weight (g) 9263.0
60
60 Sieve Size Cumulativ e Retained Passing
% Passing
Metric Retained
50
50
(mm) (g) % %
40
40 6.3 0 - 100.0
4.75 59 0.6 99.4
30
30
2.36 218 2.4 97.6
20
20 1.18 607 6.6 93.4
10
10 0.6 1766 19.1 80.9
0.3 4593 49.6 50.4
00
0.15 6760 73.0 27.0
0.075 0.15 0.3 0.6 1.18 2.36
2.36 4.75
4.75 9.5
9.5 19 25
25 38 50
50
0.075 8615 93.0 7.0
FM =
Page 34
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev.0 IN-1012-2-2
Sample Ref. 260 AGGREGATE TYPE BUJAGALI AMPHIBOLITE DAT E SAMPLED 19/5/2011
90
80
Crushed F. Sand 0-1.5mm
70 Initial Dry Weight (g) 9145.0
Sieve SizCumulativ e Retained Passing
60
% Passing
Metric Retained
50 (mm) (g) % %
6.3 0 - 100.0
40
4.75 0 - 100.0
30 2.36 206 2.3 97.7
Page 35
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev .0 IN-1012-2-2
Sample Ref . 260 AGGREGATE TYPE: DATE SAMPLED 19/5/2011
0.01 0.1
0.1 Sieve
Sieve Metric
Metric
11 Size
Size (mm)
(mm) 10
10
100
100
90
90
80
80
Natural. Sand 0-6mm
70
70 Initial Dry Weight (g) 9877.5
60
60 Sieve Size Cumulativ e Retained Passing
% Passing
Metric Retained
50
50
(mm) (g) % %
40
40 6.3 0 - 100.0
4.75 98 1.0 99.0
30
30
2.36 236 2.4 97.6
20
20 1.18 1275 12.9 87.1
10
10 0.6 3549 35.9 64.1
0.3 7662 77.6 22.4
00
0.15 8840 89.5 10.5
0.075 0.15 0.3 0.6 1.18 2.36
2.36 4.75
4.75 9.5
9.5 19 25
25 38 50
50
0.075 9734 98.5 1.5
FM =
Page 36
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev.0 IN-1012-2-2
Sample Ref. 259 AGGREGATE TYPE BUJAGALI AMPHIBOLITE DAT E SAMPLED ########
90
80
Crushed F. Sand 0-1.5mm
70 Initial Dry Weight (g) 10493.0
Sieve SizCumulativ e Retained Passing
60
% Passing
Metric Retained
50 (mm) (g) % %
6.3 0 - 100.0
40
4.75 0 - 100.0
30 2.36 140 1.3 98.7
Page 37
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev .0 IN-1012-2-2
Sample Ref . 259 AGGREGATE TYPE: DATE SAMPLED 12/5/2011
0.01 0.1
0.1 Sieve
Sieve Metric
Metric
11 Size
Size (mm)
(mm) 10
10
100
100
90
90
80
80
Natural. Sand 0-6mm
70
70 Initial Dry Weight (g) 5691.0
60
60 Sieve Size Cumulativ e Retained Passing
% Passing
Metric Retained
50
50
(mm) (g) % %
40
40 6.3 0 - 100.0
4.75 93 1.6 98.4
30
30
2.36 260 4.6 95.4
20
20 1.18 449 7.9 92.1
10
10 0.6 1146 20.1 79.9
0.3 3957 69.5 30.5
00
0.15 5059 88.9 11.1
0.075 0.15 0.3 0.6 1.18 2.36
2.36 4.75
4.75 9.5
9.5 19 25
25 38 50
50
0.075 5595 98.3 1.7
FM =
Page 38
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev.0 IN-1012-2-2
Sample Ref. 258 AGGREGATE TYPE BUJAGALI AMPHIBOLITE DAT E SAMPLED 7/5/2011
90
80
Crushed F. Sand 0-1.5mm
70 Initial Dry Weight (g) 7755.0
Sieve SizCumulativ e Retained Passing
60
% Passing
Metric Retained
50 (mm) (g) % %
6.3 0 - 100.0
40
4.75 0 - 100.0
30 2.36 170 2.2 97.8
Page 39
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev .0 IN-1012-2-2
Sample Ref . 258 AGGREGATE TYPE: DATE SAMPLED 9/5/2011
0.01 0.1
0.1 Sieve
Sieve Metric
Metric
11 Size
Size (mm)
(mm) 10
10
100
100
90
90
80
80
Natural. Sand 0-6mm
70
70 Initial Dry Weight (g) 10545.0
60
60 Sieve Size Cumulativ e Retained Passing
% Passing
Metric Retained
50
50
(mm) (g) % %
40
40 6.3 0 - 100.0
4.75 130 1.2 98.8
30
30
2.36 237 2.2 97.8
20
20 1.18 464 4.4 95.6
10
10 0.6 1659 15.7 84.3
0.3 7297 69.2 30.8
00
0.15 9469 89.8 10.2
0.075 0.15 0.3 0.6 1.18 2.36
2.36 4.75
4.75 9.5
9.5 19 25
25 38 50
50
0.075 10334 98.0 2.0
FM =
Page 40
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report
SA-D-GE-TR-1212
Page 41
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report
SA-D-GE-TR-1212
Page 42
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK ROOF SLAB PARAPET
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N/C40 Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 2/5/2011 FC-IB-2 300 0.54 3.00 4:02 PM 96 80 85 32.7 21.8 22.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2nd PHASE FIXED WHEEL GATE
1 20/5/2011 FC-M6 380 0.42 380+2.7 10:46 AM 99 95 _ 25.4 21.6 22.5
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DRAINAGE DUCT
1 20/5/2011 FC-JC 310 0.54 3.10 4:33 PM 99 70 _ 27.4 21.7 22.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK DRAINAGE DUCT BLINDING
1 21/5/2011 FC-R 250 0.70 2.50 8:28 AM 97 50 55 21.2 20.5 20.6
2 21/5/2011 FC-R 250 0.70 2.50 9:36 AM 97 55 _ 23.8 21.0 21.2
3 21/5/2011 FC-R 250 0.70 2.50 10:05 AM 97 55 _ 24.3 21.4 21.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2nd PHASE FIXED WHEEL GATE
1 21/5/2011 FC-M6 380 0.42 380+2.7 7:47 AM 100 95 100 21.2 21.4 21.6
2 21/5/2011 FC-M6 380 0.42 380+2.7 9:19 AM 100 100 _ 24.6 21.6 21.9
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DRAINAGE CHANNEL
1 21/5/2011 FC-R 250 0.70 2.50 3:54 PM 101 55 _ 26.2 22.5 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK
1 21/5/2011 FC-IB 330 0.54 3.30 8:28 AM 97 75 _ 21.4 22.6 22.7
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT 62 WALL BETWEEN AXIS 2 & 4
1 21/5/2011 FC-JC 310 0.54 3.10 2:43 PM 97 70 _ 28.5 21.6 _
2 21/5/2011 FC-JC 310 0.54 3.10 3:05 PM 101 80 _ 25.5 21.8 _
3 21/5/2011 FC-JC 310 0.54 3.10 3:19 PM 101 85 _ 27.2 21.4 _
For the contractor;
Page 43
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: PH ACCESS AREA DUCT CHANNEL
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N/C40 Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 30/5/2011 FC-JC 310 0.54 3.10 8:33 AM 100 55 60 22.5 21.4 21.6
2 30/5/2011 FC-JC 310 0.54 3.10 9:12 AM 100 50 _ 23.9 21.6 21.8
3 30/5/2011 FC-JC 310 0.54 3.10 9:49 AM 100 60 _ 25.2 21.8 22.0
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT B 2 PHASE WHEEL GATE CON.
1 30/5/2011 FC-M6 380 0.42 380+2.7 1:49 PM 101 90 _ 31.7 21.4 22.5
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT B 2 PHASE WHEEL GATE CON.
1 30/5/2011 FC-M6 380 0.42 380+2.7 8:09 AM 97 95 _ 25.5 22.4 22.8
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT B 2 PHASE WHEEL GATE CON.
1 31/5/2011 FC-M6 380 0.42 380+2.7 7:17 AM 100 95 100 21.6 20.5 21.0
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING DRAINAGE CHANNEL PRECAST
1 31/5/2011 FC-R 250 0.70 2.50 11:28 AM 101 50 55 27.2 22.3 22.4
2 31/5/2011 FC-R 250 0.70 2.50 11:33 AM 100 55 _ 29.4 22.5 22.6
3 31/5/2011 FC-R 250 0.70 2.50 12:36 PM 100 60 _ 31.0 22.8 22.9
Page 44
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD FENCE POST FOUNDATION
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 27/5/2011 FC-R 250 0.70 2.50 10:53 AM 99 60 _ 27.6 22.4 22.7
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD FENCE POST FOUNDATION
1 27/5/2011 FC-R 250 0.70 2.50 8:01 AM 101 60 _ 24.7 22.0 22.4
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD FENCE POST FOUNDATION
1 28/5/2011 FC-R 250 0.70 2.50 10:10 AM 97 50 _ 27.4 22.3 22.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 28/8/2011 FC-JC 310 0.54 3.10 9:49 AM 101 60 _ 26.8 22.4 22.7
2 28/5/2011 FC-JC 310 0.54 3.10 10:34 AM 101 55 _ 28.9 22.6 22.9
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD VARIOUS BLINDING
1 30/5/2011 FC-R 250 0.70 2.50 9:01 AM 101 45 50 24.8 22.6 22.8
2 30/5/2011 FC-R 250 0.70 2.50 1:56 PM 97 50 _ 29.9 22.7 22.9
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 30/5/2011 FC-JC 310 0.54 3.10 1:41 PM 100 60 65 28.7 21.7 21.9
2 30/5/2011 FC-JC 310 0.54 3.10 2:27 PM 100 65 _ 27.0 21.8 21.9
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: CARPENTRY WORKSHOP PRECAST
1 31/5/2011 FC-JC 310 0.54 3.10 2:26 PM 101 60 65 34.6 21.8 21.9
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD VARIOUS BLINDING
1 31/5/2011 FC-R 250 0.70 2.50 1:28 PM 100 55 _ 33.2 21.6 22.2
Page 45
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DUCT CHANNEL
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N/C40 Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 26/5/2011 FC-R 250 0.70 2.50 2:41 PM 101 80 _ 34.1 22.5 _
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DUCT CHANNEL
1 27/5/2011 FC-JC 310 0.54 3.10 4:37 PM 99 60 _ 30.5 21.7 22.6
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT B 2 PHASE FIXED WHEEL GATE
1 27/5/2011 FC-M6 380 0.42 380+2.7 7:17 AM 97 95 100 23.8 21.7 22.6
2 27/5/2011 FC-M6 380 0.42 380+2.7 9:16 AM 97 100 _ 24.6 22.0 22.4
3 27/5/2011 FC-M6 380 0.42 380+2.7 10:10 AM 97 105 _ 26.7 21.8 22.5
4 27/5/2011 FC-M6 380 0.42 380+2.7 3:44 PM 101 100 _ 30.5 21.7 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DUCT CHANNEL
1 28/5/2011 FC-JC 310 0.54 3.10 1:54 PM 101 60 65 31.0 22.6 22.7
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT B 2 PHASE FIXED WHEEL GATE
1 28/5/2011 FC-M6 380 0.42 380+2.7 7:35 AM 97 95 _ 20.8 21.2 21.4
2 28/5/2011 FC-M6 380 0.42 380+2.7 1:30 PM 99 90 _ 31.5 22.4 22.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK DRAINAGE DUCT BLINDING
1 28/5/2011 FC-R 250 0.70 2.50 7:22 AM 101 55 60 20.9 21.5 21.6
2 28/5/2011 FC-R 250 0.70 2.50 8:18 AM 101 60 _ 21.4 22.6 22.7
3 28/5/2011 FC-R 250 0.70 2.50 4:48 PM 101 60 _ 31.5 22.8 22.9
Page 46
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY APRON SR 1.1
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 23/5/2011 FC-IB-2 300 0.54 3.00 4:23 PM 97 75 _ 32.7 22.6 22.8
2 23/5/2011 FC-IB-2 300 0.54 3.00 5:12 PM 97 80 _ 2566 2.6 30.2 22.7 22.7
3 23/5/2011 FC-IB-2 300 0.54 3.00 5:15 PM 97 85 _ 29.8 22.4 22.5
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY APRON SR 1.1
1 24/5/2011 FC-IB-2 300 0.54 3.00 11:05 AM 101 80 85 27.0 21.7 21.8
2 24/5/2011 FC-IB-2 300 0.54 3.00 11:47 AM 101 75 _ 27.5 21.8 21.9
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY BARRELS 15 & 16 LIFT 13
1 25/5/2011 FC-IB-2 300 0.54 3.00 8:42 AM 101 80 85 22.0 20.5 20.6
2 25/5/2011 FC-IB-2 300 0.54 3.00 9:50 AM 101 75 _ 2519 2.5 25.4 21.6 21.8
Page 47
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD FENCE POST FOUNDATION
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 23/5/2011 FC-R 250 0.70 2.50 7:48 AM 100 60 65 23.4 22.3 22.4
2 23/5/2011 FC-R 250 0.70 2.50 9:11 AM 100 65 _ 24.5 22.4 22.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 23/5/2011 FC-JC 310 0.54 3.10 10:31 AM 100 60 65 27.4 22.8 22.9
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 23/5/2011 FC-R 250 0.70 2.50 7:59 AM 99 55 60 21.8 22.9 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 24/5/2011 FC-JC 310 0.54 3.10 11:17 AM 97 60 65 26.4 21.6 21.7
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 25/5/2011 FC-R 250 0.70 2.50 2:48 PM 100 50 _ 25.6 22.0 22.4
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 25/5/2011 FC-JC 310 0.54 3.10 1:26 PM 101 55 60 29.9 21.6 21.7
2 25/5/2011 FC-JC 310 0.54 3.10 2:31 PM 101 50 _ 30.0 21.4 21.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD FENCE POST FOUNDATION
1 25/5/2011 FC-R 250 0.70 2.50 8:53 AM 100 55 60 21.9 22.1 22.4
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 26/5/2011 FC-JC 310 0.54 3.10 1:25 PM 101 60 65 33.0 21.6 21.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 27/5/2011 FC-JC 310 0.54 3.10 11:08 AM 101 65 _ 28.5 21.6 22.8
Page 48
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 3 LIFT P6B FLOOR
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 21/5/2011 FC-IB 330 0.54 3.30 1:17 PM 100 80 _ 25.9 21.2 22.5
2 21/5/2011 FC-IB 330 0.54 3.30 3:42 PM 100 80 _ 2546 2.5 26.2 21.4 22.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK
1 23/5/2011 FC-IB 330 0.54 3.30 2:19 PM 97 80 85 29.1 21.4 21.5
2 23/5/2011 FC-IB 330 0.54 3.30 2:52 PM 97 75 _ 30.0 21.6 21.8
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2 PHASE FIXED WHEEL GATE
1 23/5/2011 FC-M6 380 0.42 380+2.7 7:36 AM 101 90 _ 21.8 21.4 22.5
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2 PHASE FIXED WHEEL GATE
1 24/5/2011 FC-M6 380 0.42 380+2.7 7:21 AM 101 100 105 20.5 21.2 21.4
2 24/5/2011 FC-M6 380 0.42 380+2.7 8:55 AM 101 95 _ 23.0 21.4 21.6
3 24/5/2011 FC-M6 380 0.42 380+2.7 4:21 PM 101 90 _ 31.8 21.6 21.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK DRAINAGE DUCT BLINDING
1 24/5/2011 FC-R 250 0.70 2.50 2:23 PM 100 60 65 31.0 22.1 22.2
2 24/5/2011 FC-JC 310 0.54 3.10 3:31 PM 100 65 _ 32.4 22.4 22.6
3 24/5/2011 FC-R 250 0.70 2.50 4:41 PM 100 60 _ 33.0 22.6 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT 6 WALL BETWEEN AXIS 2 & 4
1 25/5/2011 FC-JC 310 0.54 3.10 11:09 AM 101 80 85 28.4 22.5 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK DRAINAGE DUCT BLINDING
1 25/5/2011 FC-R 250 0.70 2.50 2:43 PM 97 60 65 31.2 22.6 22.8
2 25/5/2011 FC-JC 310 0.54 3.10 3:50 PM 97 70 _ 30.3 22.8 22.9
For the contractor;
Page 49
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. SPILLWAY RETAINING WALL LIFTS 14A & 14B
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 18/5/2011 FC-JC 310 0.54 3.10 1:38 PM 101 80 _ 31.8 21.5 22.2
2 18/5/2011 FC-JC 310 0.54 3.10 2:15 PM 101 85 _ 30.2 21.4 22.3
3 18/5/2011 FC-JC 310 0.54 3.10 2:50 PM 101 80 _ 30.3 21.5 22.7
4 18/5/2011 FC-JC 310 0.54 3.10 3:26 PM 101 80 _ 2561 2.6 31.2 21.6 22.6
5 18/5/2011 FC-JC 310 0.54 3.10 4:43 PM 101 75 _ 33.0 21.8 22.3
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY BARRELS 15 & 16 LIFT 13
1 19/5/2011 FC-IB-2 300 0.54 3.00 8:51 AM 97 80 85 24.6 21.5 21.6
2 19/5/2011 FC-IB-2 300 0.54 3.00 10:01 AM 101 75 _ 30.4 21.6 21.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY SS20 1, 2, 3 & 4
1 20/5/2011 FC-IB-2 300 0.54 3.00 7:46 AM 97 80 _ 19.5 20.4 22.0
2 20/5/2011 FC-IB-2 300 0.54 3.00 7:56 AM 101 80 _ 19.8 21.0 22.0
3 20/5/2011 FC-IB-2 300 0.54 3.00 8:55 AM 97 75 _ 22.7 21.2 22.1
4 20/5/2011 FC-IB-2 300 0.54 3.00 9:18 AM 99 75 _ 23.8 21.4 22.1
5 20/5/2011 FC-IB-2 300 0.54 3.00 10:03 AM 100 80 _ 25.8 21.6 _
6 20/5/2011 FC-IB-2 300 0.54 3.00 11:51 AM 97 80 _ 27.0 21.8 22.7
7 20/5/2011 FC-IB-2 300 0.54 3.00 12:34 PM 101 75 _ 30.1 22.0 22.6
8 20/5/2011 FC-IB-2 300 0.54 3.00 1:59 PM 97 75 _ 20.9 21.9 22.7
9 20/5/2011 FC-IB-2 300 0.54 3.00 2:36 PM 99 75 _ 2519 2.6 21.0 21.8 22.4
10 20/5/2011 FC-IB-2 300 0.54 3.00 3:30 PM 99 80 _ 24.6 22.0 22.4
11 20/5/2011 FC-IB-2 300 0.54 3.00 4:49 PM 101 75 _ 26.8 22.4 22.5
For the contractor;
Page 50
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 17/5/2011 FC-R 250 0.70 2.50 7:25 AM 100 55 60 20.3 22.4 22.6
2 17/5/2011 FC-R 250 0.70 2.50 1:47 PM 101 60 _ 28.5 21.6 21.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 18/5/2011 FC-JC 310 0.54 3.10 2:58 PM 99 50 60 31.6 22.6 22.7
2 18/5/2011 FC-JC 310 0.54 3.10 4:51 PM 99 55 _ 33.9 22.7 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 19/5/2011 FC-JC 310 0.54 3.10 1:51 PM 97 60 _ 33.2 22.3 22.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD FENCE POST FOUNDATION
1 19/5/2011 FC-R 250 0.70 2.50 2:58 PM 101 60 _ 32.4 22.9 22.9
2 19/5/2011 FC-R 250 0.70 2.50 3:01 PM 101 65 _ 31.8 22.5 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD BLINDING
1 19/5/2011 FC-R 250 0.70 2.50 8:09 AM 100 55 60 21.2 20.5 21.0
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 20/5/2011 FC-R 250 0.70 2.50 4:59 PM 100 50 _ 26.3 22.7 22.7
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 20/5/2011 FC-JC 310 0.54 3.10 3:35 PM 97 55 _ 27.5 22.5 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 21/5/2011 FC-R 250 0.70 2.50 3:15 PM 97 50 _ 30.4 22.8 22.9
Page 51
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DUCT
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N/C40 Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 14/5/2011 FC-JC 310 0.54 3.10 2:03 PM 97 70 75 32.6 21.4 21.5
2 14/5/2011 FC-JC 310 0.54 3.10 3:26 PM 100 65 _ 28.5 21.6 21.7
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2 PHASE FIXED WHEEL GATE
1 16/5/2011 FC-M6 380 0.42 380+2.7 1:51 PM 97 90 _ 26.5 21.4 22.7
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING DIESEL GENERATOR
1 17/5/2011 FC-JC 310 0.54 3.10 10:12 AM 97 70 75 26.0 21.3 21.4
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2nd PHASE FIXED WHEEL GATE
1 17/5/2011 FC-M6 380 0.42 380+2.7 4:10 PM 97 95 100 26.2 21.5 21.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA SMALL CHANNEL
1 17/5/2011 FC-R 250 0.70 2.50 6:18 PM 100 65 _ 27.8 22.4 22.4
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2 PHASE FIXED WHEEL GATE
1 18/5/2011 FC-M6 380 0.42 380+2.7 1:11 PM 97 100 105 31.9 22.0 22.3
2 18/5/2011 FC-M6 380 0.42 380+2.7 3:47 PM 97 90 _ 33.7 22.4 22.6
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2 PHASE FIXED WHEEL GATE
1 19/5/2011 FC-M6 380 0.42 380+2.7 10:38 AM 97 95 100 28.6 21.4 21.6
2 19/5/2011 FC-M6 380 0.42 380+2.7 3:51 PM 99 100 _ 32.3 21.6 21.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA FIRE FIGHTING TANK DRAINAGE
1 19/5/2011 FC-R 250 0.70 2.50 2:33 PM 100 55 60 31.6 22.8 22.9
2 19/5/2011 FC-R 250 0.70 2.50 4:11 PM 100 60 _ 32.2 22.9 22.9
3 19/5/2011 FC-R 250 0.70 2.50 4:38 PM 100 65 _ 31.2 22.9 23.0
For the contractor;
Page 52
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY BARRELS 14, 15 & 16 LIFT 12
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 13/5/2011 FC-IB-2 300 0.54 3.00 8:21 AM 97 80 _ 24.5 21.2 22.1
2 13/5/2011 FC-IB-2 300 0.54 3.00 8:38 AM 100 80 _ 25.0 21.2 22.2
3 13/5/2011 FC-IB-2 300 0.54 3.00 9:15 AM 99 75 _ 28.5 21.4 22.5
4 13/5/2011 FC-IB-2 300 0.54 3.00 10:28 AM 96 80 _ 29.0 21.6 22.4
5 13/5/2011 FC-IB-2 300 0.54 3.00 11:04 AM 99 75 _ 2519 2.5 29.4 21.8 22.7
6 13/5/2011 FC-IB-2 300 0.54 3.00 12:40 PM 100 75 _ 31.6 22.0 22.5
7 13/5/2011 FC-IB-2 300 0.54 3.00 1:41 PM 99 80 _ 31.9 22.2 22.6
8 13/5/2011 FC-IB-2 300 0.54 3.00 2:34 PM 100 80 _ 32.0 22.0 22.3
9 13/5/2011 FC-IB-2 300 0.54 3.00 3:42 PM 100 75 _ 30.0 22.0 22.3
10 13/5/2011 FC-IB-2 300 0.54 3.00 4:14 PM 99 75 _ 29.6 22.6 22.5
11 13/5/2011 FC-IB-2 300 0.54 3.00 5:14 PM 100 80 _ 28.8 22.0 22.3
12 13/5/2011 FC-IB-2 300 0.54 3.00 6:39 PM 101 80 _ 26.4 22.9 _
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY SR 1.1 & 2.1 FOUNDATION
1 17/5/2011 FC-IB-2 300 0.54 3.00 1:37 PM 97 75 _ 28.9 21.6 22.1
2 17/5/2011 FC-IB-2 300 0.54 3.00 2:02 PM 100 75 _ 29.3 21.8 22.2
3 17/5/2011 FC-IB-2 300 0.54 3.00 2:12 PM 97 80 _ 29.9 22.0 22.2
4 17/5/2011 FC-IB-2 300 0.54 3.00 3:07 PM 100 75 _ 27.0 22.2 22.3
5 17/5/2011 FC-IB-2 300 0.54 3.00 3:18 PM 97 80 _ 29.5 22.0 22.2
6 17/5/2011 FC-IB-2 300 0.54 3.00 3:47 PM 100 85 _ 28.6 22.1 22.1
Page 53
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD CABLE DUCT
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio 3 (%) (°C)
Lt./m at the BP at site (gm/cm3) at the BP at site
No.
1 12/5/2011 FC-R 250 0.70 2.50 1:39 PM 100 55 60 31.8 22.4 22.6
2 12/5/2011 FC-R 250 0.70 2.50 4:16 PM 97 60 _ 32.0 22.6 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH YARD MANHOLE
1 12/5/2011 FC-JC 310 0.54 3.10 1:46 PM 97 60 65 33.4 21.9 22.0
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 13/5/2011 FC-R 250 0.70 2.50 8:52 AM 97 50 55 22.8 23.5 23.6
2 13/5/2011 FC-R 250 0.70 2.50 4:06 PM 97 55 _ 29.2 24.0 24.2
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH YARD MANHOLE
1 14/5/2011 FC-JC 310 0.54 3.10 2:55 PM 101 60 _ 33.2 21.8 22.5
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 14/5/2011 FC-R 250 0.70 2.50 11:19 AM 96 55 _ 26.5 22.6 22.8
2 14/5/2011 FC-R 250 0.70 2.50 3:39 PM 97 50 _ 30.7 22.8 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 16/5/2011 FC-JC 310 0.54 3.10 2:19 PM 101 50 _ 31.5 24.0 24.5
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD BLINDING
1 16/5/2011 FC-R 250 0.70 2.50 7:42 AM 100 60 65 21.5 22.6 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 17/5/2011 FC-JC 310 0.54 3.10 2:43 PM 96 55 60 27.9 22.6 22.7
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 18/5/2011 FC-JC 310 0.54 3.10 3:04 PM 100 70 _ 30.8 21.8 22.6
For the contractor;
Page 54
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD FENCE CONTROL BUILDING WALK WAY
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 7/5/2011 FC-R 250 0.70 2.50 10:48 AM 99 65 70 25.4 24.2 24.4
2 7/5/2011 FC-R 250 0.70 2.50 3:57 PM 100 60 _ 32.6 24.4 24.8
3 7/5/2011 FC-R 250 0.70 2.50 5:23 PM 100 60 _ 29.8 23.8 24.0
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: S. YARD PRECAST WASTE WATER MANHOLE
1 10/5/2011 FC-JC 310 0.54 3.10 10:02 AM 97 55 60 28.8 22.8 22.9
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD VARIOUS BLINDING
1 11/5/2011 FC-R 250 0.70 2.50 3:28 PM 97 50 55 27.7 24.5 25.0
2 11/5/2011 FC-R 250 0.70 2.50 4:04 PM 97 55 _ 28.0 26.0 26.2
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: S. YARD PRECAST WASTE WATER MANHOLE
1 11/5/2011 FC-JC 310 0.54 3.10 1:37 PM 97 55 60 31.2 21.8 21.9
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: S. YARD PRECAST WASTE WATER MANHOLE
1 13/5/2011 FC-JC 310 0.54 3.10 1:39 PM 97 60 65 31.2 22.4 22.6
For the contractor;
Page 55
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY APRON SLAB SS17 & SS19
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 6/5/2011 FC-IB-2 300 0.54 3.00 5:52 PM 100 75 _ 28.6 22.5 22.5
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. SPILLWAY APRON ROCK RECONSTRUCTION
1 10/5/2011 FC-R 250 0.70 2.50 9:40 AM 101 70 _ 26.2 21.5 _
2 10/5/2011 FC-R 250 0.70 2.50 10:25 AM 101 75 _ 2460 2.6 31.0 21.2 22.4
3 10/5/2011 FC-R 250 0.70 2.50 11:23 AM 96 80 _ 31.4 21.6 22.4
4 10/5/2011 FC-R 250 0.70 2.50 12:55 PM 96 80 _ 31.8 21.4 22.5
5 10/5/2011 FC-R 250 0.70 2.50 1:29 PM 101 75 _ 32.0 21.3 22.5
6 10/5/2011 FC-R 250 0.70 2.50 2:20 PM 96 80 _ 33.8 21.2 22.7
7 10/5/2011 FC-R 250 0.70 2.50 3:57 PM 100 75 _ 33.4 21.0 22.5
8 10/5/2011 FC-R 250 0.70 2.50 4:20 PM 96 75 _ 33.0 21.8 22.7
9 10/5/2011 FC-R 250 0.70 2.50 5:21 PM 101 80 _ 30.1 21.4 _
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY ROCK RECONSTRUCTION CON.
1 14/5/2011 FC-R 250 0.70 2.50 6:15 PM 100 65 _ 27.9 22.0 22.5
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. SPILLWAY APRON RIGHT WALL RRC
1 14/5/2011 FC-R 250 0.70 2.50 8:51 AM 97 70 _ 23.3 22.4 22.4
2 14/5/2011 FC-R 250 0.70 2.50 10:00 AM 97 75 _ 2508 2.5 26.0 22.6 22.3
3 14/5/2011 FC-R 250 0.70 2.50 11:47 AM 97 80 _ 27.5 22.8 _
4 14/5/2011 FC-R 250 0.70 2.50 12:55 PM 97 80 _ 31.2 22.8 22.6
5 14/5/2011 FC-R 250 0.70 2.50 1:48 PM 97 80 _ 34.5 22.9 22.7
6 14/5/2011 FC-R 250 0.70 2.50 2:40 PM 97 75 _ 33.2 22.8 22.8
For the contractor;
Page 56
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT P11
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N/C40 Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 3/5/2011 FC-M6 380 0.42 380+2.7 8:25 AM 96 90 _ 21.7 20.6 22.4
2 3/5/2011 FC-M6 380 0.42 380+2.7 9:09 AM 99 85 _ 22.0 20.5 22.5
3 3/5/2011 FC-M6 380 0.42 380+2.7 9:52 AM 96 90 _ 21.8 20.4 22.3
4 3/5/2011 FC-M6 380 0.42 380+2.7 10:24 AM 96 95 _ 2543 2.6 20.7 19.8 22.4
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT 64A PARAPET
1 4/5/2011 FC-JC 300 0.54 3.00 10:05 AM 97 70 75 26.8 21.5 21.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT 64A PARAPET
1 5/5/2011 FC-JC 300 0.54 3.00 7:51 AM 100 70 75 21.6 20.5 21.0
2 5/5/2011 FC-JC 300 0.54 3.00 8:53 AM 100 75 _ 23.0 21.4 21.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT 64A PARAPET
1 7/5/2011 FC-JC 300 0.54 3.00 4:40 PM 101 70 _ 30.4 21.7 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA PRECAST DUCT
1 10/5/2011 FC-R 250 0.70 2.50 2:24 PM 101 70 75 29.9 24.6 24.7
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA SMALL CHANNEL
1 17/5/2011 FC-JC 300 0.54 3.00 3:25 PM 99 60 65 27.0 22.3 22.4
For the contractor;
Page 57
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD FENCE POST FOUNDATION
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 2/5/2011 FC-R 250 0.70 2.50 3:16 PM 97 65 _ 28.9 22.5 _
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD FENCE POST FOUNDATION
1 3/5/2011 FC-R 250 0.70 2.50 7:40 AM 101 65 _ 20.8 19.5 21.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD CONTROL BUILDING OFFICE ROOM
1 4/5/2011 FC-R 250 0.70 2.50 3:08 PM 96 70 75 31.0 22.6 22.7
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD WASTE WATER PRECAST MANHOLE
1 4/5/2011 FC-JC 310 0.54 3.10 7:53 AM 96 60 _ 23.8 21.2 22.7
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD FENCE POST FOUNDATION
1 5/5/2011 FC-R 250 0.70 2.50 1:44 PM 100 60 65 28.0 24.2 24.3
1 5/5/2011 FC-R 250 0.70 2.50 5:15 PM 101 55 _ 26.4 24.4 24.4
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD WASTE WATER PRECAST MANHOLE
1 5/5/2011 FC-JC 310 0.54 3.10 3:53 PM 101 55 60 26.5 22.6 22.7
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD WASTE WATER PRECAST MANHOLE
1 6/5/2011 FC-JC 310 0.54 3.10 10:25 AM 97 75 _ 27.4 21.8 22.6
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD FENCE POST FOUNDATION
1 9/5/2011 FC-R 250 0.70 2.50 2:34 PM 101 60 65 31.0 21.7 21.8
For the contractor;
Page 58
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY BARRELS 15 & 16 LIFT 8(VIII)
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 2/5/2011 FC-IB-2 300 0.54 3.00 4:58 PM 96 85 90 32.8 22.0 22.7
2 2/5/2011 FC-IB-2 300 0.54 3.00 5:38 PM 96 80 _ 31.5 22.4 22.8
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY BARRELS 15 & 16 LIFT 8A
1 4/5/2011 FC-IB-2 300 0.54 3.00 3:48 PM 101 80 85 31.4 21.6 21.8
2 4/5/2011 FC-IB-2 300 0.54 3.00 4:16 PM 99 75 _ 2561 2.5 31.6 21.7 21.9
3 4/5/2011 FC-IB-2 300 0.54 3.00 4:43 PM 99 80 _ 32.9 21.8 22.1
4 4/5/2011 FC-IB-2 300 0.54 3.00 5:14 PM 99 80 _ 31.3 22.0 22.2
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY APRON SLAB SS17 & SS19
1 6/5/2011 FC-IB-2 300 0.54 3.00 7:07 AM 97 70 _ 19.0 19.5 22.0
2 6/5/2011 FC-IB-2 300 0.54 3.00 7:23 AM 96 65 _ 19.5 20.4 22.0
3 6/5/2011 FC-IB-2 300 0.54 3.00 7:49 AM 99 60 _ 20.5 21.0 22.1
4 6/5/2011 FC-IB-2 300 0.54 3.00 8:00 AM 96 60 _ 20.6 21.0 22.1
5 6/5/2011 FC-IB-2 300 0.54 3.00 8:56 AM 100 65 _ 21.8 21.2 22.2
6 6/5/2011 FC-IB-2 300 0.54 3.00 9:14 AM 97 70 _ 23.7 21.4 22.2
7 6/5/2011 FC-IB-2 300 0.54 3.00 10:58 AM 99 70 _ 2570 2.5 25.8 21.6 22.6
8 6/5/2011 FC-R 250 0.70 2.50 11:26 AM 100 75 _ 26.0 23.8 22.7
9 6/5/2011 FC-IB-2 300 0.54 3.00 12:09 PM 100 70 _ 26.4 21.8 22.5
10 6/5/2011 FC-IB-2 300 0.54 3.00 1:15 PM 101 65 _ 28.2 22.0 22.4
11 6/5/2011 FC-IB-2 300 0.54 3.00 3:26 PM 101 70 _ 22.2 22.4 22.5
12 6/5/2011 FC-IB-2 300 0.54 3.00 4:18 PM 101 70 _ 23.7 22.6 22.6
For the contractor;
Page 59
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report
SA-D-GE-TR-1212
Page 60
MOISTURE CONTENT BUJAGALI HYDROPOWER PROJECT
Tare N° BAG SK
H. Humidity % C/F
Tare N°
D. Weight of tare g
H. Humidity % C/F
Page 61
MOISTURE CONTENT BUJAGALI HYDROPOWER PROJECT
H. Humidity % C/F
Tare N°
D. Weight of tare g
H. Humidity % C/F
Page 62
MOISTURE CONTENT BUJAGALI HYDROPOWER PROJECT
Tare N° LS JJ
H. Humidity % C/F
Tare N°
D. Weight of tare g
H. Humidity % C/F
Page 63
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report
SA-D-GE-TR-1212
Page 64
Summary of BUJAGALI HYDROELECTRIC POWER
Page 65
Summary of BUJAGALI HYDROELECTRIC POWER
31-07-08 Day 189 FC 15 C 15 42.5N 250 16.5 19.95 24.1 PH Unit 1 & 2
01-08-08 D 191 FC 15 C 15 42.5N 250 14.4 22.4 27.3 PH Unit 2
05-08-08 D 193 FC 15I C 15 42.5N 250 10.0 19.4 25.3 PH Unit 3
08-08-08 D 202 FC 15H C 15 42.5N 250 10.7 19.8 25.3 28.9 PH Unit 4
11-08-08 D 210 FC 15H C 15 42.5N 250 12.2 22.3 28.3 32.9 PH Unit 1
16-08-08 D 220 FC D1 C 15 42.5N 250 11.6 18.5 25.4 29.8 PH Unit 4
30-08-08 D 258 FC D2 C 15 42.5N 250 9.6 17.1 24.3 28.1 PH Unit 5
10-09-08 D 279 FC G C 25 42.5N 310 16.8 30.6 41.7 47.1 PH Unit 1 Lift 1
10-09-08 D 280 FC G C 25 42.5N 310 18.1 32.4 42.6 48.2 PH Unit 1 Lift 1
17-09-08 D 288 FC D2 C 15 42.5N 250 18.6 25.2 31.1 36.4 PH Unit 1 Lift 2 TAIL R.
20-09-08 D 289 FC A C 25 42.5N 300 10.6 22.6 32.2 33.0 PH Unit 3 Lift 1
20-09-08 N 290 FC JC C 25 42.5N 300 13.3 27.1 36.1 38.9 PH Unit 3 Lift 1
02-10-08 N 298 FC 15 C 15 42.5N 250 20.2 26.2 31.6 40.2 PH Unit 1 & U2 TAIL R.
03-10-08 D 299 FC S C 15 42.5N 250 11.0 24.7 30.9 37.2 PH Unit 5 Lift 2 TAIL R.
04-10-08 N 300 FC S C 15 42.5N 250 17.9 25.7 32.6 38.0 PH Unit 5 Lift TAIL R.
07-10-08 D 302 FC 15 C 15 42.5N 250 13.6 19.7 25.9 30.1 PH Unit 1 & U2 TAIL R.
08-10-08 N 305 FC 15 C 15 42.5N 250 12.1 17.9 24.0 27.1 PH Unit 4 Lift 2, 6, 7
08-10-08 N 306 FC JC C 25 42.5N 300 16.7 27.1 34.2 38.5 PH Unit 1 Lift 3
09-10-08 D 307 FC JC C 25 42.5N 300 18.8 28.3 35.8 39.5 PH Unit 1 Lift 3
11-10-08 N 309 FC S C 15 42.5N 250 13.4 27.1 29.5 33.9 PH Unit 3 Lift 2, 6, 7
11-10-08 D 310 FC S C 15 42.5N 250 14.4 27.1 34.2 36.7 PH Unit 3 Lift 2, 6, 7
13-10-08 D 311 FC IB C 25 42.5N 300 18.5 33.5 41.4 46.0 PH Unit 3 Lift 3
13-10-08 N 312 FC IB C 25 42.5N 300 14.8 31.0 39.3 45.3 PH Unit 3 Lift 3
16-10-08 D/N 314 FC 15 C 15 42.5N 250 10.2 17.1 21.6 27.5 PH Unit 4 & 5 Ele. 1073
17-10-08 N 315 FC S C 15 42.5N 250 12.7 17.9 26.4 30.1 PH Unit 1 Lift 6
18-10-08 N 316 FC 15 C 15 42.5N 250 11.4 21.3 28.6 33.0 PH Unit 5 Ele. 1073
20-10-08 N 317 FC S C 15 42.5N 250 10.6 19.4 27.4 31.9 PH Unit 2 Lift 2, 6, 7
21-10-08 D 318 FC S C 15 42.5N 250 13.2 22.3 28.6 32.5 PH Unit 2 Lift 2, 6, 7
27-10-08 D 323 FC JC - C 25 42.5N 300 10.3 26.8 32.1 36.8 PH UNIT 3 SUMP
B
31-10-08 D 328 FC IB - B C 25 42.5N 300 20.1 27.8 38.2 38.7 PH UNIT 3 Lift 3
31-10-08 D 327 FC JC - C 25 42.5N 300 21.0 28.6 38.3 40.6 PH UNIT 3 Lift 2
B
04-11-08 D 330 FC IB - B C 25 42.5N 300 13.9 30.3 37.9 46.4 PH UNIT 1 Lift 2
04-11-08 N 329 FC JC - C 25 42.5N 300 13.4 26.2 37.7 41.8 PH UNIT 1 Lift 2
B
06-11-08 N 331 FC IB - B C 25 42.5N 300 11.4 27.9 37.3 42.1 PH UNIT 3 Lift 4
07-11-08 N 332 FC IB - B C 25 42.5N 300 17.3 26.8 39.9 44.6 PH UNIT 3 Lift 4
10-11-08 D 334 FC IB - B C 25 42.5N 300 14.2 32.3 41.6 48.8 PH UNIT 5 Lift 1
11-11-08 D 335 FC IB - B C 25 42.5N 300 24.5 35.5 41.0 45.5 PH UNIT 5 Lift 1
12-11-08 N 336 FC IB - B C 25 42.5N 300 18.5 30.3 42.5 45.4 PH UNIT 1 Lift 4
Page 66
Summary of BUJAGALI HYDROELECTRIC POWER
12-11-08 D 337 FC IB - B C 25 42.5N 300 18.8 37.7 44.4 48.6 PH UNIT 1 Lift 4
13-11-08 N 338 FC S - B C 15 42.5N 250 16.6 26.3 31.7 32.3 PH Unit 1 Lift 6, 7
13-11-08 D 339 FC S - B C 15 42.5N 250 10.9 25.6 27.7 30.3 PH Unit 1 Lift 6, 7
18-11-08 D 342 FC IB C 25 42.5N 300 21.6 32.4 47.4 51.1 PH UNIT 3 Lift 6
18-11-08 N 343 FC IB - B C 25 42.5N 300 14.0 28.5 41.6 47.3 PH UNIT 3 Lift 6
20-11-08 D 345 FC IB C 25 42.5N 300 22.2 32.1 43.0 46.8 PH UNIT 5 Lift 3
20-11-08 N 346 FC IB C 25 42.5N 300 23.0 36.3 42.0 44.9 PH UNIT 5 Lift 3
24-11-08 N 349 FC IB C 25 42.5N 300 21.8 34.3 41.9 44.7 PH UNIT 1 Lift 6
25-11-08 D 350 FC IB C 25 42.5N 300 27.6 36.9 42.5 49.2 PH UNIT 1 Lift 6
28-11-08 D 353 FC IB - B C 25 42.5N 300 23.1 30.0 37.5 42.5 PH UNIT 3 Lift 5
28-11-08 N 354 FC IB - B C 25 42.5N 300 20.9 29.7 37.5 44.8 PH UNIT 3 Lift 5
02-12-08 D 355 FC IB C 25 42.5N 300 20.0 30.5 38.3 46.1 PH UNIT 5 Lift 2
02-12-08 N 356 FC IB C 25 42.5N 300 18.5 28.7 37.9 44.8 PH UNIT 5 Lift 2
02-12-08 D 357 FC IB C 25 42.5N 300 18.5 32.1 40.7 45.7 PH UNIT 3 Lift 5
04-12-08 N 358 FC IB - B C 25 42.5N 300 14.5 26.7 36.4 40.5 PH UNIT 1 Lift 5
05-12-08 D 359 FC IB - B C 25 42.5N 300 16.9 27.0 36.6 41.0 PH UNIT 1 Lift 5
06-12-08 D 360 FC IB C 25 42.5N 300 18.6 29.4 37.1 42.8 PH UNIT 3 Lift 8
09-12-08 N 363 FC IB C 25 42.5N 300 12.2 24.4 32.5 43.4 PH UNIT 1 Lift 5(F 2)
10-12-08 D 365 FC IB C 25 42.5N 300 11.9 30.6 39.1 47.2 PH UNIT 3 Lift 5(FS 2)
11-12-08 D 366 FC IB C 25 42.5N 300 17.7 31.1 42.1 45.5 PH UNIT 5 Lift 4
11-12-08 N 367 FC IB C 25 42.5N 300 13.8 25.4 41.1 46.1 PH UNIT 5 Lift 4
12-12-08 N 368 FC IB - B C 25 42.5N 300 13.6 30.9 40.8 48.4 PH UNIT 3 Lift 7
13-12-08 D 369 FC IB - B C 25 42.5N 300 23.6 37.3 43.0 49.9 PH UNIT 3 Lift 7
16-12-08 D 370 FC IB C 25 42.5N 300 20.2 28.9 37.4 45.5 PH UNIT 1 Lift 8
17-12-08 D 371 FC IB C 25 42.5N 300 20.4 32.1 40.4 44.8 PH UNIT 1 Lift 7
17-12-08 N 372 FC IB C 25 42.5N 300 16.7 28.6 38.5 45.4 PH UNIT 1 Lift 7
18-12-08 D 374 FC IB C 25 42.5N 300 21.2 32.1 45.3 49.5 PH UNIT 5 Lift 6
18-12-08 N 375 FC IB C 25 42.5N 300 19.9 35.5 41.9 49.5 PH UNIT 5 Lift 6
06-01-09 N 384 FC IB C 25 42.5N 300 19.2 31.4 36.6 40.7 PH UNIT 2 Lift 1
06-01-09 D 385 FC IB C 25 42.5N 300 15.3 29.7 34.7 39.8 PH UNIT 2 Lift 1
08-01-09 N 387 FC IB C 25 42.5N 300 18.3 27.7 36.4 40.9 PH UNIT 1 Lift 5
09-01-09 D 388 FC IB C 25 42.5N 300 18.0 32.3 39.0 45.6 PH UNIT 5 Lift 5
09-01-09 N 389 FC IB C 25 42.5N 300 16.3 34.3 42.7 45.4 PH UNIT 5 Lift 5
09-01-09 N 390 FC IB C 25 42.5N 300 14.7 36.4 42.9 51.4 PH UNIT 1 Lift 9
14-01-09 D 397 FC IB C 25 42.5N 300 16.8 31.7 36.1 44.8 PH UNIT 5 Lift 7
14-01-09 N 398 FC IB C 25 42.5N 300 14.9 32.2 41.9 44.0 PH UNIT 5 Lift 7
16-01-09 N 399 FC IB C 25 42.5N 300 24.6 35.4 47.1 52.0 PH UNIT 1 Lift 8
16-01-09 N 400 FC IB C 25 42.5N 300 20.8 31.1 42.0 46.0 PH UNIT 1 Lift 8
Page 67
Summary of BUJAGALI HYDROELECTRIC POWER
17-01-09 D 402 FC IB C 25 42.5N 300 16.3 29.5 36.1 42.6 PH UNIT 3 Lift 9
18-01-09 N 405 FC IB C 25 42.5N 300 24.4 34.6 45.5 51.5 PH UNIT 5 Lift 5b
20-01-09 N 406 FC IB-1 C 25 42.5N 270 19.0 31.1 38.2 40.6 PH UNIT 2 Lift 3
20-01-09 D 407 FC IB-1 C 25 42.5N 270 15.6 29.3 36.9 38.5 PH UNIT 2 Lift 3
21-01-09 N 408 FC IB-2 C 25 42.5N 270 14.6 24.6 31.8 35.1 PH UNIT 1 Wall 1
22-01-09 D 412 FC IB C 25 42.5N 300 14.6 28.3 37.2 40.9 PH UNIT 3 Lift 50
24-01-09 D 413 FC IB-1 C 25 42.5N 270 12.2 29.3 37.1 39.4 PH UNIT 5 Lift 8
27-01-09 D 414 FC IB-1 C 25 42.5N 270 19.2 34.3 42.2 48.3 PH UNIT 1 Lift 10
28-01-09 D 418 FC IB-2 C 25 42.5N 270 15.7 26.7 35.3 38.8 PH UNIT 1 Wall 2
29-01-09 N 419 FC IB-1 C 25 42.5N 270 18.7 29.9 35.0 39.8 PH UNIT 3 Lift 80
29-01-09 D 420 FC IB-2 C 25 42.5N 270 15.4 24.2 30.0 33.6 PH UNIT 3 Lift 80
30-01-09 D 423 FC IB C 25 42.5N 300 14.5 28.3 38.1 42.4 PH UNIT 2 Lift 7
30-01-09 N 424 FC IB-1 C 25 42.5N 270 20.7 26.7 34.9 43.7 PH UNIT 5 Lift 9
30-01-09 D 422 FC IB-2 C 25 42.5N 270 17.2 26.6 32.0 36.4 PH UNIT 2 Lift 7
03-02-09 N 425 FC IB-2 C 25 42.5N 270 14.8 25.0 32.8 37.4 PH UNIT 1 Lift 80
04-02-09 N 427 FC IB-2 C 25 42.5N 270 14.0 27.1 35.0 39.5 PH UNIT 1 Lift 80
07-02-09 D 431 FC IB-2 C 25 42.5N 270 12.0 23.8 31.5 35.7 PH UNIT 3 Lift 80
09-02-09 D 433 FC IB-2 C 25 42.5N 270 13.1 25.3 32.1 38.2 PH UNIT 1 Lift W3
10-02-09 N 436 FC IB-1 C 25 42.5N 270 19.2 29.4 36.7 40.2 PH UNIT 1 Lift 11
11-02-09 N 439 FC IB-1 C 25 42.5N 270 20.0 29.9 37.4 41.8 PH UNIT 5 Lift 50
11-02-09 D 439 FC IB-2 C 25 42.5N 270 14.3 26.0 34.5 39.9 PH UNIT 1 Lift 50/51A
12-02-09 N 442 FC IB-2 C 25 42.5N 270 12.5 25.9 32.9 35.6 PH UNIT 4 Lift 7
12-02-09 N 441 FC IB-7 C 25 42.5N 270 20.1 29.6 38.7 45.1 PH UNIT 4 Lift 7
14-02-09 N 447 FC IB-2 C 25 42.5N 270 10.6 26.3 32.1 35.3 PH UNIT 5 Lift 80
14-02-09 N 448 FC IB-7 C 25 42.5N 270 19.1 30.3 39.9 45.7 PH UNIT 5 Lift 80
17-02-09 N 449 FC IB-7 C 25 42.5N 270 20.1 30.8 40.1 45.8 PH UNIT 3 Lift 10
17-02-09 D 450 FC IB-7 C 25 42.5N 270 21.0 30.2 40.0 45.7 PH UNIT 3 Lift 10
20-02-09 D 452 FC IB-7 C 25 42.5N 270 19.3 31.9 40.2 45.3 PH UNIT 3 Lift 11
21-02-09 D 456 FC IB-2 C 25 42.5N 270 12.3 26.4 34.3 39.6 PH UNIT 1 Lift 51B
21-02-09 D 455 FC IB-7 C 25 42.5N 270 23.0 30.7 40.7 44.9 PH UNIT 1 Lift 51B
25-02-09 N 457 FC IB-2 C 25 42.5N 270 15.3 22.7 31.0 34.0 PH UNIT 2 Lift 5
26-02-09 N 459 FC IB-2 C 25 42.5N 270 14.0 23.3 32.3 34.1 PH UNIT 1 Lift 12
26-02-09 N 458 FC IB-7 C 25 42.5N 270 19.4 31.3 36.7 44.7 PH UNIT 1 Lift 12
28-02-09 N 464 FC IB-7 C 25 42.5N 270 18.6 30.0 38.8 44.1 PH UNIT 2 Lift 2
28-02-09 D 465 FC IB-7 C 25 42.5N 270 17.5 28.1 38.0 44.7 PH UNIT 2 Lift 2
02-03-09 N 466 FC IB-7 C 25 42.5N 270 17.6 30.8 40.7 47.3 PH UNIT 5 Lift 10A
02-03-09 N 467 FC IB-7 C 25 42.5N 270 18.9 34.0 40.1 45.5 PH UNIT 2 Lift 5B
05-03-09 N 475 FC IB-7 C 25 42.5N 270 16.5 36.1 40.9 46.4 PH UNIT 3 Lift 12
Page 68
Summary of BUJAGALI HYDROELECTRIC POWER
06-03-09 N 477 FC IB-7 C 25 42.5N 270 13.7 29.6 38.2 43.6 PH UNIT 2 Lift 4
07-03-09 D 482 FC IB-7 C 25 42.5N 270 18.2 27.5 37.6 41.8 PH UNIT 4 Lift 1
10-03-09 D 483 FC IB C 25 42.5N 300 15.6 22.2 31.3 36.9 PH UNIT 3 Lift 50/51A
10-03-09 N 484 FC IB C 25 42.5N 300 14.7 24.0 31.0 36.2 PH UNIT 3 Lift 50/51A
10-03-09 D 485 FC IB-2 C 25 42.5N 270 12.6 22.4 32.1 35.4 PH UNIT 1 WALL 4
10-03-09 D 486 FC IB-7 C 25 42.5N 270 17.4 31.7 39.8 45.2 PH UNIT 1 WALL 4
11-03-09 N 487 FC IB-7 C 25 42.5N 270 17.6 27.3 35.0 40.1 PH UNIT 2 Lift 11
12-03-09 N 489 FC IB-7 C 25 42.5N 270 19.6 29.9 38.3 42.2 PH UNIT 2 Lift 6
13-03-09 D 491 FC IB-2 C 25 42.5N 270 10.9 21.5 31.0 36.0 PH UNIT 5 Lift 6
13-03-09 N 490 FC IB-7 C 25 42.5N 270 21.1 32.7 39.8 47.1 PH UNIT 2 Lift 8
18-03-09 N 495 FC IB-7 C 25 42.5N 270 23.7 33.8 42.0 44.9 PH UNIT 4 Lift 3
19-03-09 D 499 FC IB-7 C 25 42.5N 270 19.7 32.2 42.3 46.5 PH UNIT 4 Lift 11
20-03-09 D 500 FC IB-2 C 25 42.5N 270 16.8 23.0 31.5 34.8 PH UNIT 5 Lift X2
21-03-09 D 502 FC IB-2 C 25 42.5N 270 16.1 24.2 31.9 34.8 PH UNIT 1 Lift W4B
24-03-09 N 507 FC IB-7 C 25 42.5N 270 19.0 28.9 36.6 42.2 PH UNIT 2 Lift 9
25-03-09 N 510 FC IB-2 C 25 42.5N 270 11.1 22.3 31.1 35.2 PH UNIT 1 Lift 13
25-03-09 D 509 FC IB-7 C 35 42.5N 270 18.0 29.5 41.0 52.5 PH UNIT 1 Lift 13
26-03-09 N 511 FC IB-2 C 30 42.5N 270 14.7 24.2 32.0 34.5 PH UNIT 3 Lift 51B
01-04-09 N 518 FC IB-2 C 30 42.5N 270 13.8 24.5 32.4 35.8 PH UNIT 5 Lift X3
03-04-09 D 523 FC IB-7 C 35 42.5N 270 17.3 27.9 37.6 41.5 PH UNIT 2 Lift 5B
05-04-09 N 525 FC IB-7 C 35 42.5N 270 22.0 31.0 40.6 44.2 PH UNIT 4 Lift 2
06-04-09 D 529 FC IB-2 C 30 42.5N 270 11.7 23.1 32.2 35.1 PH UNIT 1 Lift 52A
06-04-09 D 528 FC IB-7 C 35 42.5N 270 13.9 25.1 31.9 37.2 PH UNIT 1 Lift 52A
08-04-09 D 534 FC IB C 35 42.5N 300 15.9 25.2 35.8 39.9 PH UNIT 5 Lift 51
09-04-09 N 537 FC IB-7 C 35 42.5N 270 17.9 31.6 43.1 49.1 PH UNIT 4 Lift 4
10-04-09 D 539 FC IB-2 C 30 42.5N 270 12.1 24.1 32.2 36.2 PH UNIT 1 Lift 52B
10-04-09 N 540 FC IB-7 C 35 42.5N 270 14.0 24.4 35.4 39.3 PH UNIT 1 Lift 52B
16-04-09 N 542 FC IB-7 C 35 42.5N 270 15.6 23.8 36.1 39.1 PH UNIT 4 Lift 6
17-04-09 N 543 FC IB-2 C 30 42.5N 270 15.2 23.9 31.2 35.1 PH UNIT 1 Lift W5
17-04-09 N 544 FC IB-7 C 35 42.5N 270 14.5 23.5 34.3 37.2 PH UNIT 1 Lift W5
21-04-09 N 548 FC IB-2 C 30 42.5N 270 13.7 25.0 34.0 37.8 PH UNIT 4 Lift 5
21-04-09 N 549 FC IB-7 C 35 42.5N 270 16.4 29.2 38.9 44.0 PH UNIT 4 Lift 5
21-04-09 D 550 FC IB-7 C 35 42.5N 270 16.4 29.0 36.1 40.2 PH UNIT 1 Lift 14A
24-04-09 N 552 FC IB-2 C 30 42.5N 270 15.1 24.2 31.1 37.1 PH UNIT 5 Lift 51B
25-04-09 D 557 FC IB-7 C 35 42.5N 270 15.3 27.1 35.5 41.0 PH UNIT 1 Lift W5
25-04-09 D 558 FC IB-2 C 30 42.5N 270 10.8 24.3 31.1 37.0 PH UNIT 1 Lift W5
26-04-09 N 559 FC IB-7 C 35 42.5N 270 24.2 27.2 36.1 38.7 PH UNIT 2 Lift 10
26-04-09 N 560 FC IB-2 C 30 42.5N 270 16.0 23.8 32.1 35.1 PH UNIT 2 Lift 10
Page 69
Summary of BUJAGALI HYDROELECTRIC POWER
27-04-09 D 561 FC IB-7 C 35 42.5N 270 14.0 24.3 36.8 40.1 PH UNIT 2 Lift 50
27-04-09 D 562 FC IB-2 C 30 42.5N 270 12.8 23.7 31.1 34.9 PH UNIT 2 Lift 50
29-04-09 D 565 FC IB-2 C 30 42.5N 270 12.7 24.4 32.3 36.2 PH UNIT 2 Lift 80
30-04-09 D 566 FC IB-2 C 30 42.5N 270 10.6 24.3 31.2 36.6 PH UNIT 1 Lift 14B
30-04-09 D 567 FC IB-7 C 35 42.5N 270 16.6 26.5 36.0 40.0 PH UNIT 1 Lift 14B
01-05-09 D 569 FC IB-2 C 30 42.5N 270 18.5 24.1 31.4 35.4 PH UNIT 3 Lift 13
01-05-09 D 570 FC IB-7 C 35 42.5N 270 22.5 29.5 37.2 43.4 PH UNIT 3 Lift 13
04-05-09 N 573 FC IB-7 C 35 42.5N 270 13.4 26.9 35.7 39.2 PH UNIT 4 Lift 5A
06-05-09 D 576 FC IB-2 C 30 42.5N 270 13.8 24.4 31.5 35.3 PH UNIT 2 Lift 12
06-05-09 N 577 FC IB-7 C 35 42.5N 270 20.2 32.9 38.4 46.7 PH UNIT 2 Lift 12
08-05-09 D 582 FC IB-2 C 30 42.5N 270 13.1 24.5 33.1 36.9 PH UNIT 1 Lift 54
09-05-09 N 585 FC IB-2 C 30 42.5N 270 13.7 24.4 32.4 35.9 PH UNIT 1 Lift 54
10-05-09 N 588 FC IB-7 C 35 42.5N 270 15.3 25.7 36.8 41.5 PH UNIT 3 Lift 52
10-05-09 N 589 FC IB-2 C 30 42.5N 270 13.4 24.3 34.4 39.0 PH UNIT 3 Lift 52
11-05-09 N 590 FC IB-2 C 30 42.5N 270 16.1 26.6 34.5 38.8 PH UNIT 3 Lift 52
11-05-09 N 592 FC IB-7 C 35 42.5N 270 16.4 31.1 40.0 45.5 PH UNIT 4 Lift 8
12-05-09 N 593 FC IB-2 C 30 42.5N 270 13.8 24.9 34.1 39.3 PH UNIT 1 Lift W6
15-05-09 N 598 FC IB-2 C 30 42.5N 270 14.3 24.8 34.4 38.3 PH UNIT 3 Lift 52B
15-05-09 D 599 FC IB-7 C 35 42.5N 270 15.6 28.6 38.2 41.0 PH UNIT 3 Lift 52B
16-05-09 N 601 FC IB-7 C 35 42.5N 270 23.0 33.1 41.1 46.5 PH UNIT 4 Lift 9
19-05-09 D 604 FC IB-7 C 35 42.5N 270 16.7 28.0 37.8 41.8 PH UNIT 4 Lift 5B
19-05-09 N 605 FC IB-7 C 35 42.5N 270 19.6 33.2 41.6 45.5 PH UNIT 2 Lift 13
19-05-09 N 606 FC IB-2 C 30 42.5N 270 13.5 24.4 33.5 37.0 PH UNIT 2 Lift 13
23-05-09 D 613 FC IB-2 C 30 42.5N 270 14.1 23.4 34.4 38.2 PH UNIT 3 Lift 54-55
24-05-09 D 615 FC IB-7 C 35 42.5N 270 15.8 26.5 39.1 41.9 PH UNIT 4 Lift 10
27-05-09 D 620 FC IB-7 C 35 42.5N 270 13.2 28.8 38.2 42.7 PH UNIT 1 Lift 15A
27-05-09 D 621 FC IB-2 C 30 42.5N 270 13.3 24.7 33.3 38.8 PH UNIT 1 Lift 15A
29-05-09 N 624 FC IB-7 C 35 42.5N 270 16.5 32.1 39.9 43.4 PH UNIT 3 Lift 14A
30-05-09 N 625 FC IB-2 C 30 42.5N 270 14.5 25.1 32.5 36.5 PH UNIT 1 Lift W11
30-05-09 D 626 FC IB-7 C 35 42.5N 270 18.4 29.9 38.4 41.3 PH UNIT 1 Lift W11
03-06-09 D 632 FC IB-2 C 30 42.5N 270 13.8 25.1 34.8 39.1 PH UNIT 3 Lift 14B
03-06-09 D 633 FC IB-7 C 35 42.5N 270 18.2 29.1 38.7 43.7 PH UNIT 3 Lift 14B
07-06-09 D 639 FC IB-2 C 30 42.5N 270 16.0 25.2 36.5 40.2 PH UNIT 4 Lift 12
08-06-09 N 641 FC IB C 35 42.5N 300 16.1 27.4 37.2 41.3 PH UNIT 5 Lift 52A
08-06-09 N 642 FC IB-7 C 35 42.5N 270 19.3 26.9 39.1 42.4 PH UNIT 5 Lift 52A
10-06-09 N 646 FC IB-7 C 35 42.5N 270 16.4 27.7 39.8 43.9 PH UNIT 2 Lift 14A
10-06-09 D 647B FC IB-7 C 35 42.5N 270 16.4 28.6 39.7 44.4 PH UNIT 1 Lift 81a&81b
12-06-09 N 650 FC IB-2 C 30 42.5N 270 14.1 27.3 34.4 40.3 PH UNIT 4 Lift 13
Page 70
Summary of BUJAGALI HYDROELECTRIC POWER
12-06-09 N 651 FC IB-7 C 35 42.5N 270 16.2 31.7 37.5 43.3 PH UNIT 4 Lift 13
13-06-09 N 652 FC IB-2 C 30 42.5N 270 13.7 24.3 34.1 38.8 PH UNIT 2 Lift 14B
13-06-09 N 653 FC IB-7 C 35 42.5N 270 21.5 30.6 38.7 42.1 PH UNIT 2 Lift 14B
13-06-09 D 654 FC IB-7 C 35 42.5N 270 15.8 27.7 36.1 40.9 PH UNIT 5 Lift 52B
13-06-09 N 655 FC IB-2 C 30 42.5N 270 14.0 24.5 34.0 38.4 PH UNIT 5 Lift 52B
16-06-09 N 660 FC IB C 35 42.5N 300 15.3 26.7 36.1 40.6 PH UNIT 1 Lift 81A
19-06-09 D 666 FC IB C 35 42.5N 300 15.7 26.9 36.6 40.9 PH UNIT 1 Lift 80A
20-06-09 N 668 FC IB C 35 42.5N 300 21.4 30.5 38.9 43.5 PH UNIT 2 Lift 51A
21-06-09 N 671 FC IB C 35 42.5N 300 15.0 24.9 40.0 43.6 PH UNIT 4 Lift 50
22-06-09 D 673 FC IB C 35 42.5N 300 15.4 26.5 36.4 41.3 PH UNIT 5 Lift 54-55
24-06-09 D 676 FC IB C 35 42.5N 300 17.5 28.9 35.1 42.8 PH UNIT 4 Lift 80
25-06-09 N 680 FC IB C 35 42.5N 300 19.1 28.7 39.2 45.3 PH UNIT 1 Lift 81A
26-06-09 N 683 FC IB C 35 42.5N 300 16.3 27.1 37.2 41.7 PH UNIT 3 Lift 15A
26-06-09 D 684 FC IB-7 C 35 42.5N 270 16.3 28.7 37.0 41.6 PH UNIT 3 Lift 15A
27-06-09 D 688 FC IB-2 C 30 42.5N 270 15.0 26.0 34.8 38.7 PH UNIT 1 LEFT BANK
29-06-09 D 691 FC IB-2 C 30 42.5N 270 14.1 26.1 35.3 39.3 PH UNIT 1 Lift 82A
30-06-09 N 692 FC IB-7 C 35 42.5N 270 21.0 29.8 38.3 43.2 PH UNIT 5 Lift 10B
02-07-09 D 696 FC IB-2 C 30 42.5N 270 15.3 25.9 33.9 36.9 PH UNIT 1 WALL 7
03-07-09 D 698 FC IB-2 C 30 42.5N 270 14.3 26.7 39.0 44.2 PH UNIT 3 Lift 80A
04-07-09 N 699 FC IB-7 C 35 42.5N 270 19.0 30.7 38.6 43.4 PH UNIT 5 Lift 12
04-07-09 N 700 FC IB-2 C 30 42.5N 270 13.8 26.2 35.6 39.8 PH UNIT 5 Lift 12
07-07-09 D 702 FC IB C 35 42.5N 300 17.0 26.6 38.5 40.6 PH UNIT 2 Lift 51B
09-07-09 N 707 FC IB-2 C 30 42.5N 270 13.7 24.8 35.5 40.2 PH UNIT 1 Lift 82A
09-07-09 D 708 FC IB-2 C 30 42.5N 270 13.2 25.2 35.7 39.6 PH UNIT 1 WALL 2
09-07-09 D 709 FC IB-7 C 35 42.5N 270 17.3 31.0 39.4 42.0 PH UNIT 1 WALL 2
10-07-09 D 713 FC IB-7 C 35 42.5N 270 17.1 27.4 39.2 43.6 PH UNIT 4 Lift 14A
11-07-09 D 715 FC IB C 35 42.5N 300 17.0 28.7 37.1 42.3 PH UNIT 1 Lift 15B
12-07-09 N 717 FC IB C 35 42.5N 300 16.0 27.6 39.1 41.5 PH UNIT 5 Lift 53
12-07-09 D 718 FC IB C 35 42.5N 300 18.7 28.7 38.2 42.0 PH UNIT 1 Lift 56A
13-07-09 N 723 FC IB-2 C 30 42.5N 270 13.3 24.2 33.3 38.6 PH UNIT 1 Lift 82A
14-07-09 D 725 FC IB C 35 42.5N 300 19.6 33.7 41.4 45.5 PH UNIT 1 WALL 7 B
15-07-09 D 727 FC IB-7 C 35 42.5N 270 16.7 25.2 38.7 41.1 PH UNIT 5 Lift 11
15-07-09 D 728 FC IB C 35 42.5N 300 15.8 26.3 37.1 39.4 PH UNIT 5 Lift 11
17-07-09 N 735 FC IB-7 C 35 42.5N 270 17.0 27.9 38.4 43.7 PH UNIT 4 Lift 14B
18-07-09 N 736 FC IB C 35 42.5N 300 17.9 28.7 37.9 40.6 PH UNIT 4 Lift 14B
18-07-09 N 739 FC IB-7 C 35 42.5N 270 16.8 26.9 39.2 41.5 PH UNIT 1Lift W 12 B
19-07-09 N 742 FC IB C 35 42.5N 300 17.1 26.5 37.8 41.7 PH UNIT 1Lift W 12 B
19-07-09 D 743 FC IB-7 C 35 42.5N 270 17.7 26.5 38.8 39.3 PH UNIT 1Lift W 12 B
Page 71
Summary of BUJAGALI HYDROELECTRIC POWER
21-07-09 N 749 FC IB C 35 42.5N 300 15.9 28.8 38.6 43.2 PH UNIT 3 Lift 81 LEFT
22-07-09 D 750 FC IB C 35 42.5N 300 16.0 26.5 38.4 41.4 PH UNIT 1 Lift 15B2
23-07-09 N 752 FC IB-7 C 35 42.5N 270 17.6 29.3 39.5 42.9 PH UNIT 1 Lift 2 L.R.W
24-07-09 D 760 FC IB-2 C 30 42.5N 270 14.7 24.5 36.0 38.9 PH UNIT 4 Lift 51A
25-07-09 D 763 FC IB-7 C 35 42.5N 270 19.8 31.9 57.1 51.4 PH UNIT 2 Lift 15A
26-07-09 N 765 FC IB C 35 42.5N 300 18.2 28.1 39.2 40.7 PH UNIT 2 Lift 15A
26-07-09 N 766 FC IB C 35 42.5N 300 21.6 29.5 39.1 43.7 PH UNIT 3 Lift 81
28-07-09 N 769 FC IB-7 C 35 42.5N 270 17.3 28.5 39.8 42.5 PH UNIT 5 Lift 13
28-07-09 N 770 FC IB C 35 42.5N 300 16.7 29.2 39.8 43.6 PH UNIT 5 Lift 13
29-07-09 N 773 FC IB C 35 42.5N 300 21.0 30.3 38.5 43.1 PH UNIT 3 Lift 81 RIGHT
31-07-09 D 781 FC IB-7 C 35 42.5N 270 19.0 27.5 37.9 40.7 PH UNIT 1 Lift W13
04-08-09 N 788 FC IB C 35 42.5N 300 17.4 27.5 37.0 41.2 PH UNIT 1 Lift 56B
05-08-09 D 795 FC IB C 35 42.5N 300 17.7 27.2 38.8 42.7 PH UNIT 3 Lift 56A
08-08-09 N 803 FC IB C 35 42.5N 300 17.5 26.6 35.5 41.5 PH TAIL RACE WALL Lift 3
08-08-09 D 805 FC IB C 35 42.5N 300 16.2 28.2 39.7 42.7 PH UNIT 3 L82A W AXIS 13
09-08-09 D 808 FC IB C 35 42.5N 300 15.2 28.3 37.1 42.7 PH UNIT 3 Lift 15B
10-08-09 N 815 FC IB C 35 42.5N 300 16.5 27.4 36.9 42.5 PH UNIT 1 Lift WALL 8
11-08-09 N 818 FC IB C 35 42.5N 300 17.7 29.0 41.6 44.5 PH UNIT 3 Lift 82A
12-08-09 D 819 FC IB-7 C 35 42.5N 270 18.4 30.1 40.4 43.6 PH UNIT 1 WALL13B
13-08-09 N 828 FC IB C 35 42.5N 300 17.0 28.4 40.3 43.9 PH UNIT 5 Lift 80A
15-08-09 N 831 FC IB-7 C 35 42.5N 270 20.5 32.8 43.1 45.6 PH UNIT 1 Lift 82B
15-08-09 N 832 FC IB-7 C 35 42.5N 270 18.6 28.2 43.1 47.5 PH UNIT 2 Lift 52A
15-08-09 D 833 FC IB C 35 42.5N 300 19.2 28.3 41.1 45.1 PH UNIT 2 Lift 52A
16-08-09 D 836 FC IB C 35 42.5N 300 16.7 32.8 44.4 48.2 PH UNIT 3 Lift 15B2
16-08-09 N 837 FC IB C 35 42.5N 300 18.5 27.8 41.0 45.6 PH UNIT 5 Lift 80A RIGHT
18-08-09 D 845 FC IB-2 C 30 42.5N 270 21.3 27.7 35.7 40.1 PH UNIT 3 Lift 82A
20-08-09 N 854 FC IB-2 C 30 42.5N 270 21.1 28.1 34.6 38.8 PH UNIT 2 Lift 52B
20-08-09 N 855 FC IB-7 C 35 42.5N 270 18.2 25.4 41.1 44.5 PH UNIT 2 Lift 52B
21-08-09 N 857 FC IB-7 C 35 42.5N 270 17.7 31.0 40.5 44.9 PH UNIT 5 Lift 14A
21-08-09 N 860 FC IB-2 C 30 42.5N 270 17.7 28.6 34.1 38.4 PH UNIT 1 Lift 56C
23-08-09 N 868 FC IB-2 C 30 42.5N 270 16.8 26.3 35.4 38.5 PH UNIT 5 Lift 81 LEFT
23-08-09 D 869 FC IB-2 C 30 42.5N 270 16.8 28.3 37.5 41.7 PH UNIT 3 Lift 82B
27-08-09 N 883 FC IB-2 C 30 42.5N 270 16.6 25.8 36.3 39.7 PH UNIT 3 Lift 56B
27-08-09 N 887 FC IB C 35 42.5N 300 20.4 33.5 41.6 44.3 PH UNIT 5 Lift 81C WALL
28-08-09 D 889 FC IB-2 C 30 42.5N 270 16.4 25.4 36.3 39.6 PH UNIT 1 WALL 14A
31-08-09 N 896 FC IB-2 C 30 42.5N 270 13.1 25.1 35.3 38.1 PH UNIT 2 Lift 55
02-09-09 N 901 FC IB-2 C 30 42.5N 300 14.8 25.7 35.4 39.3 PH UNIT 5 Lift 81R
02-09-09 D 902 FC IB-2 C 30 42.5N 300 15.8 25.1 35.4 39.1 PH UNIT 1 Lift WALL 9
Page 72
Summary of BUJAGALI HYDROELECTRIC POWER
02-09-09 N 903 FC IB-7 C 35 42.5N 300 17.2 29.6 41.0 45.7 PH UNIT 2 Lift 54
04-09-09 N 907 FC IB-2 C 30 42.5N 270 13.3 25.2 36.2 40.1 PH UNIT 1 Lift 16 SLAB
07-09-09 N 922 FC IB C 35 42.5N 330 25.9 35.2 44.8 47.5 PH UNIT 2 Lift 53
08-09-09 N 926 FC IB-7 C 35 42.5N 300 21.5 31.3 40.2 44.2 PH UNIT 1 Lift 83
08-09-09 D 927 FC IB-2 C 30 42.5N 300 15.4 25.8 36.4 39.9 PH UNIT 1 Lift 83
10-09-09 D 934 FC IB-2 C 30 42.5N 300 15.5 25.5 36.9 39.1 PH UNIT 1 Lift 57
12-09-09 N 938 FC IB-7 C 35 42.5N 300 21.9 30.3 38.4 43.8 PH TAIL RACE WALL Lift 4
12-09-09 N 939 FC IB-2 C 30 42.5N 300 19.6 28.1 37.1 40.4 PH UNIT 1 Lift WALL 14B
15-09-09 D 951 FC IB C 35 42.5N 330 19.7 31.2 40.3 43.8 PH Lift WALL 9 COL.C4
15-09-09 N 952 FC IB-2 C 30 42.5N 300 14.5 27.6 35.8 39.7 PH UNIT 1 Lift 84A
16-09-09 D 954 FC IB-2 C 30 42.5N 300 15.6 26.8 34.8 38.3 PH UNIT 5 Lift 82A WALL
16-09-09 D 956 FC IB-2 C 30 42.5N 300 14.0 25.1 34.0 38.0 PH UNIT 3 Lift 56C
17-09-09 N 959 FC IB-2 C 30 42.5N 300 15.8 26.7 36.8 42.8 PH TAIL RACE WALL Lift 5
18-09-09 D 960 FC IB-2 C 30 42.5N 300 19.3 29.8 39.7 45.8 PH UNIT 3 Lift 83A
18-09-09 D 963 FC IB-2 C 30 42.5N 300 15.8 25.6 35.5 41.2 PH UNIT 1 Lift 15C
19-09-09 D 966 FC IB-2 C 30 42.5N 300 16.7 26.7 35.5 41.7 PH Lift W 10 BEAM AXIS C
20-09-09 N 970 FC IB-2 C 30 42.5N 300 21.5 30.4 40.7 44.9 PH UNIT 5 Lift 82 WALL
21-09-09 D 972 FC IB-2 C 30 42.5N 300 14.7 25.4 36.0 39.8 PH Lift WALL 30 AXIS A
23-09-09 D 978 FC IB-2 C 30 42.5N 300 15.6 26.5 35.6 41.2 PH TAIL RACE WALL Lift 6
24-09-09 D 981 FC IB-2 C 30 42.5N 300 20.5 31.8 39.9 45.7 PH UNIT 5 Lift 82 RIGHT W
24-09-09 N 983 FC IB-2 C 30 42.5N 300 19.8 30.2 39.5 44.6 PH UNIT 1 Lift 15C CENTRE
25-09-09 D 989 FC IB-2 C 30 42.5N 300 16.0 24.9 33.6 40.2 PH UNIT 3 Lift 83B
26-09-09 N 1001 FC IB-2 C 30 42.5N 300 19.2 33.6 39.3 45.9 PH UNIT 1 Lift 57B
27-09-09 D 1003 FC IB-2 C 30 42.5N 300 17.7 27.4 37.0 40.4 PH UNIT 1 Lift 1 Lift 84B
27-09-09 N 1004 FC IB-7 C 35 42.5N 300 19.9 31.0 39.9 44.6 PH UNIT 1 Lift 1 Lift 84B
29-09-09 D 1007 FC IB C 35 42.5N 330 19.8 30.5 40.0 45.7 PH UNIT 1 Lift 15C CENTRE
01-10-09 D 1017 FC M6 C 40 42.5N 380 20.6 33.5 46.0 51.0 PH COLUMN 21C EL:1103.6
01-10-09 D 1018 FC IB-2 C 30 42.5N 300 16.5 26.2 33.2 36.3 PH UNIT 3 Lift 57A
02-10-09 D 1023 FC IB-2 C 30 42.5N 300 16.4 24.9 35.5 41.9 PH UNIT 1 Lift P2
03-10-09 N 1025 FC IB-2 C 30 42.5N 300 18.3 27.6 36.9 39.6 PH UNIT 3 Lift 84A
05-10-09 D 1026 FC M6 C 40 42.5N 380 26.7 36.5 46.7 52.5 PH WALL 22C EL:1103.6
05-10-09 D 1027 FC IB-2 C 30 42.5N 300 17.0 27.1 36.8 42.3 PH LIFT WALL 31A
06-10-09 N 1030 FC IB-2 C 30 42.5N 300 14.9 24.0 34.5 38.5 PH TAILRACE WALL LIFT 9
08-10-09 D 1037 FC IB-2 C 30 42.5N 300 18.7 30.2 36.8 44.4 PH UNIT 4 Lift 51B
09-10-09 D 1044 FC M6 C 40 42.5N 380 25.9 41.8 50.7 54.3 PH LIFT WALL COLUMN 21C
09-10-09 N 1045 FC IB-2 C 30 42.5N 300 15.1 28.1 34.8 42.1 PH UNIT 5 Lift 82B
10-10-09 N 1047 FC IB-2 C 30 42.5N 300 20.2 30.2 43.4 49.1 PH UNIT 3 Lift 84B
10-10-09 N 1052 FC IB C 35 42.5N 330 20.5 29.0 40.4 45.6 PH U 1 Lift 58 COL. AXIS 19
Page 73
Summary of BUJAGALI HYDROELECTRIC POWER
12-10-09 D 1057 FC M6 C 40 42.5N 380 31.6 45.7 49.3 57.9 PH LIFT WALL COLUMN 21C
13-10-09 D 1060 FC IB-2 C 30 42.5N 300 23.8 33.5 42.4 47.4 PH Lift WALL 31B
13-10-09 N 1063 FC IB-2 C 30 42.5N 300 18.6 31.9 37.1 46.2 PH UNIT 2 Lift 80A
14-10-09 N 1064 FC IB-2 C 30 42.5N 300 23.0 31.2 37.4 46.5 PH UNIT 1 Lift 58
15-10-09 N 1067 FC IB-7 C 35 42.5N 300 24.2 34.9 41.0 50.1 PH UNIT 1 Lift 58
15-10-09 D 1068 FC IB-2 C 30 42.5N 300 23.3 34.1 39.8 48.6 PH UNIT 1 Lift 58
15-10-09 N 1073 FC IB-2 C 30 42.5N 300 15.1 27.1 35.8 40.6 PH TAILRACE W LIFT 7-10
16-10-09 N 1076 FC IB-2 C 30 42.5N 300 15.6 25.8 36.7 39.6 PH UNIT 3 Lift 16 SLAB
17-10-09 D 1080 FC JC C 25 42.5N 300 13.5 25.9 34.5 37.9 PH UNIT 4 Lift 80A
17-10-09 D 1081 FC JC C 25 42.5N 300 13.1 25.8 34.5 37.3 PH UNIT 1 Lift 16
18-10-09 N 1082 FC JC C 25 42.5N 300 15.0 25.4 31.7 36.0 PH U 1 COL. 58 AXIS 21
18-10-09 N 1083 FC JC C 25 42.5N 300 14.7 25.0 32.2 36.0 PH UNIT 3 Lift 57B
20-10-09 N 1090 FC IB C 35 42.5N 330 23.6 32.2 40.6 44.6 PH UNIT 5 Lift 56A
21-10-09 N 1097 FC IB C 35 42.5N 330 19.9 32.0 41.3 50.1 PH RETAINING W LIFT 18
23-10-09 N 1102 FC IB C 35 42.5N 330 24.3 31.7 39.9 45.4 PH UNIT 4 Lift 15A
23-10-09 N 1103 FC IB C 35 42.5N 330 19.5 28.9 38.4 44.4 PH UNIT 4 Lift 15A
24-10-09 D 1106 FC IB C 35 42.5N 330 23.7 30.4 40.0 49.5 PH UNIT 1 Lift 16
24-10-09 D 1109 FC IB C 35 42.5N 330 21.3 30.6 40.7 46.3 PH RETAINING W LIFT 19
26-10-09 D 1116 FC IB-7 C 35 42.5N 300 21.4 30.5 39.3 49.0 PH UNIT 1 Lift 59
27-10-09 N 1118 FC IB C 35 42.5N 330 23.3 30.9 39.4 48.4 PH U 3 Lift 58 COL. AXIS 59
30-10-09 N 1127 FC IB C 35 42.5N 330 17.1 29.7 38.6 43.0 PH UNIT 3 Lift 58
30-10-09 D 1129 FC IB C 35 42.5N 330 16.3 29.9 39.3 42.8 PH UNIT 1 Lift 17
30-10-09 D 1131 FC IB C 35 42.5N 330 17.3 29.9 39.8 44.9 PH UNIT 4 Lift 52A
31-10-09 D 1132 FC IB-7 C 35 42.5N 300 16.4 28.3 39.1 43.5 PH UNIT 4 Lift 52A
31-10-09 D 1133 FC IB C 35 42.5N 330 16.3 27.7 38.1 42.5 PH UNIT 2 Lift 15B
03-11-09 N 1137 FC IB C 35 42.5N 330 17.7 29.5 39.8 43.7 PH UNIT 3 Lift 15C
03-11-09 N 1138 FC IB C 35 42.5N 330 17.4 28.2 39.4 44.1 PH UNIT 3 COLUMN 58
03-11-09 D 1140 FC IB C 35 42.5N 330 16.2 27.8 38.6 48.4 PH UNIT 5 Lift 83A
04-11-09 D 1144 FC IB-7 C 35 42.5N 300 17.5 29.6 39.4 41.8 PH UNIT 5 Lift 52B
05-11-09 N 1145 FC IB C 35 42.5N 330 22.9 30.5 40.5 50.7 PH UNIT 4 Lift 52B
05-11-09 N 1146 FC M6 C 40 42.5N 380 26.2 36.7 46.3 52.5 PH UNIT 4 Lift 52B
05-11-09 N 1147 FC IB C 35 42.5N 330 15.9 28.3 39.5 44.6 PH UNIT 5 Lift 56B
06-11-09 N 1150 FC IB C 35 42.5N 330 22.4 31.2 41.5 50.7 PH UNIT 3 Lift 85
07-11-09 N 1154 FC IB-2 C 30 42.5N 300 18.8 29.4 39.3 47.7 PH UNIT 1 Lift 17
08-11-09 D 1159 FC IB-2 C 30 42.5N 300 15.8 27.6 36.0 39.2 PH UNIT 1 Lift 17 WALL
08-11-09 D 1160 FC IB-2 C 30 42.5N 300 15.6 27.0 35.9 40.2 PH UNIT 3 Lift 15C
09-11-09 N 1161 FC IB-2 C 30 42.5N 300 15.9 26.7 35.6 39.8 PH UNIT 1 Lift 15B3
09-11-09 D 1163 FC IB-7 C 35 42.5N 300 20.8 30.5 40.7 50.9 PH UNIT 5 Lift 14B
Page 74
Summary of BUJAGALI HYDROELECTRIC POWER
09-11-09 D 1164 FC IB-2 C 30 42.5N 300 19.1 28.1 36.3 44.8 PH UNIT 5 Lift 14B
11-11-09 N 1172 FC IB-2 C 30 42.5N 300 15.1 27.2 37.2 42.5 PH UNIT 5 Lift 83B
12-11-09 N 1174 FC IB-2 C 30 42.5N 300 18.6 28.9 36.7 40.4 PH UNIT 1 Lift 60 COLUMN
12-11-09 N 1179 FC IB-2 C 30 42.5N 300 16.6 26.6 35.0 39.9 PH UNIT 3 Lift WALL 15B
13-11-09 D 1181 FC IB-7 C 35 42.5N 300 17.6 27.3 36.9 42.2 PH UNIT 1 Lift 80
13-11-09 D 1182 FC IB-2 C 30 42.5N 300 16.2 25.6 33.6 37.5 PH UNIT 1 Lift 86
14-11-09 D 1184 FC IB-2 C 30 42.5N 300 14.3 26.4 31.9 35.7 PH UNIT 3 Lift 15B & 15C
16-11-09 D 1191 FC IB-2 C 30 42.5N 300 15.8 29.9 35.9 44.1 PH UNIT 3 L 16 CENTRE W.
17-11-09 N 1192 FC IB-2 C 30 42.5N 300 20.4 29.3 39.1 46.3 PH Lift WALL 15
17-11-09 N 1194 FC IB-2 C 30 42.5N 300 16.8 25.3 33.4 34.9 PH UNIT 1 Lift 60
17-11-09 D 1195 FC IB-2 C 30 42.5N 300 15.7 25.3 35.2 41.9 PH UNIT 2 Lift 15B4
18-11-09 N 1199 FC IB-2 C 30 42.5N 300 14.5 25.4 35.7 42.0 PH TAILRACE Lift 20
18-11-09 D 1201 FC M6 C 40 42.5N 380 24.3 37.6 51.4 59.0 PH UNIT 1 Lift 15C & 16
19-11-09 N 1203 FC IB-2 C 30 42.5N 300 16.7 24.0 33.0 37.5 PH UNIT 4 Lift 54 & 55
19-11-09 D 1204 FC IB-7 C 35 42.5N 300 18.1 28.3 38.9 45.6 PH UNIT 4 Lift 54 & 55
19-11-09 D 1205 FC IB-2 C 30 42.5N 300 14.0 26.7 35.9 42.7 PH UNIT 2 Lift 16
22-11-09 N 1209 FC IB-2 C 30 42.5N 300 13.3 25.9 33.9 40.4 PH UNIT 1 Lift 18
22-11-09 N 1210 FC IB-2 C 30 42.5N 300 15.3 26.6 35.6 39.8 PH UNIT 3 Lift 15C
22-11-09 N 1212 FC IB-2 C 30 42.5N 300 17.5 27.0 33.3 40.6 PH UNIT 5 Lift 56C
22-11-09 D 1213 FC IB-2 C 30 42.5N 300 14.7 25.6 34.6 38.9 PH UNIT 3 Lift 59
23-11-09 D 1215 FC M6 C 40 42.5N 380 20.2 36.6 44.2 51.8 PH UNIT 1 Lift P1
25-11-09 N 1220 FC IB-2 C 30 42.5N 300 16.8 26.1 37.3 47.5 PH UNIT 1 Lift 17
25-11-09 D 1221 FC IB-2 C 30 42.5N 300 17.2 27.6 38.0 45.9 PH RETAINING WALL
26-11-09 N 1222 FC IB-2 C 30 42.5N 300 14.7 25.8 37.5 41.1 PH UNIT 5 Lift 15A
26-11-09 N 1223 FC IB-7 C 35 42.5N 300 16.3 26.8 37.2 41.5 PH UNIT 5 Lift 15A
27-11-09 N 1227 FC IB-2 C 30 42.5N 300 17.5 25.2 35.3 39.2 PH UNIT 1 Lift 18
28-11-09 N 1229 FC IB-2 C 30 42.5N 300 15.1 24.8 34.1 37.7 PH UNIT 5 Lift 84
28-11-09 N 1230 FC IB-7 C 35 42.5N 300 18.4 29.5 40.2 44.6 PH UNIT 5 Lift 84
30-11-09 D 1232 FC IB-2 C 30 42.5N 300 14.9 24.7 34.9 39.0 PH UNIT 3 Lift 16
01-12-09 D 1236 FC IB-2 C 30 42.5N 300 15.3 24.2 34.7 38.5 PH UNIT 1 Lift WALL16
03-12-09 N 1240 FC IB-2 C 30 42.5N 300 16.8 28.9 36.9 40.5 PH UNIT 5 Lift 15B
04-12-09 D 1242 FC IB-2 C 30 42.5N 300 14.6 25.5 34.9 38.2 PH UNIT 3 Lift 86
04-12-09 D 1244 FC IB-2 C 30 42.5N 300 14.4 25.4 34.7 37.7 PH UNIT 2 Lift 15A
PH UNIT 2 Lift 15B CENTRE
05-12-09 D 1246 FC IB-2 C 30 42.5N 300 15.1 27.1 35.1 39.3
WALL
PH UNIT 2 Lift 15B CENTRE
05-12-09 D 1248 FC IB-2 C 30 42.5N 300 16.7 28.5 38.3 41.6
WALL
PH RETAINING WALL LIFT
06-12-09 D 1250 FC IB-2 C 30 42.5N 300 18.0 26.0 32.7 39.4
21
06-12-09 N 1254 FC IB C 35 42.5N 330 16.9 28.6 38.4 43.8 PH UNIT 4 Lift 15B4
Page 75
Summary of BUJAGALI HYDROELECTRIC POWER
06-12-09 D 1255 FC IB-2 C 30 42.5N 300 14.7 24.0 33.3 37.7 PH UNIT 1 Lift 61
07-12-09 N 1256 FC IB-2 C 30 42.5N 300 17.4 24.8 34.2 41.2 PH UNIT 3 Lift 60
07-12-09 D 1257 FC IB-2 C 30 42.5N 300 15.2 25.7 35.4 39.6 PH UNIT 2 Lift 15C
PH UNIT 1 Lift P3, P4, P5
09-12-09 N 1264 FC IB-2 C 30 42.5N 300 14.0 25.3 34.3 37.4
AXIS 17
09-12-09 N 1267 FC IB-2 C 30 42.5N 300 14.2 24.7 34.4 36.5 PH UNIT 1 Lift 19
PH UNIT 3 Lift 60 CENTRAL
11-12-09 D 1271 FC IB-2 C 30 42.5N 300 19.0 29.4 37.3 43.1
WALL
PH UNIT 1 Lift 62 AXIS 18
11-12-09 D 1273 FC IB-2 C 30 42.5N 300 14.9 25.3 34.7 38.8
EL:1098.2-110
12-12-09 N 1275 FC IB-7 C 35 42.5N 300 19.9 30.2 37.1 45.4 PH UNIT 2 Lift 56B
12-12-09 D 1278 FC IB-2 C 30 42.5N 300 15.2 24.9 34.4 37.5 PH UNIT 1 Lift 19
12-12-09 D 1281 FC IB-2 C 30 42.5N 300 15.1 25.3 34.0 39.2 PH UNIT 1 Lift 62 AXIS 20
PH UNIT 1 RETAINING
13-12-09 N 1282 FC IB-2 C 30 42.5N 300 15.3 25.1 32.2 35.9
WALL Lift 8
14-12-09 D 1284 FC IB-2 C 30 42.5N 300 14.2 24.8 34.6 38.0 PH UNIT 3 Lift 16
15-12-09 N 1285 FC IB-2 C 30 42.5N 300 17.7 26.6 34.4 38.5 PH UNIT 1 Lift 87A & 87B
15-12-09 N 1286 FC IB-2 C 30 42.5N 300 18.1 27.1 36.3 40.8 PH UNIT 1 Lift 87A & 87B
16-12-09 D 1291 FC JC C 25 42.5N 300 13.7 24.3 32.7 36.7 PH UNIT 1 Lift 18B
17-12-09 N 1292 FC IB-2 C 30 42.5N 300 16.0 25.8 34.6 37.5 PH UNIT 4 Lift 81
18-12-09 N 1296 FC IB-2 C 30 42.5N 300 20.4 29.5 37.5 44.5 PH UNIT 1 Lift 19
18-12-09 N 1297 FC IB-2 C 30 42.5N 300 19.5 28.4 37.5 43.0 PH UNIT 1 Lift P3
18-12-09 N 1300 FC IB-2 C 30 42.5N 300 16.5 26.3 36.2 41.5 PH UNIT 5 Lift 85
19-12-09 N 1303 FC JC C 25 42.5N 310 13.6 26.4 33.3 37.8 PH UNIT 1 Lift 18B
20-12-09 N 1305 FC IB-7 C 35 42.5N 300 17.7 28.9 37.5 41.9 PH RETAINING WALL
20-12-09 D 1306 FC IB-2 C 30 42.5N 300 14.1 24.9 34.0 37.6 PH UNIT 2 Lift 65C
21-12-09 N 1309 FC IB-2 C 30 42.5N 300 19.2 28.4 34.4 39.7 PH UNIT 4 Lift 16
22-12-09 D 1313 FC IB-2 C 30 42.5N 300 17.9 27.8 37.1 40.8 PH UNIT 5 Lift 57A
22-12-09 N 1316 FC IB-2 C 30 42.5N 300 16.4 29.7 38.1 44.0 PH UNIT 2 Lift 81 RIGHT
29-12-09 N 1320 FC IB-2 C 30 42.5N 300 15.2 25.2 34.8 39.9 PH UNIT 2 Lift 81 AXIS 13
29-12-09 D 1323 FC IB-2 C 30 42.5N 300 15.1 25.3 35.1 40.6 PH UNIT 1 AXIS 18
30-12-09 N 1327 FC JC C 25 42.5N 310 14.0 23.8 31.0 34.7 PH UNIT 1 Lift 19B
02-01-10 D 1333 FC IB-2 C 30 42.5N 300 14.4 25.4 34.4 40.3 PH Unit 1 Lift P4
02-01-10 N 1334 FC M6 C 40 42.5N 380 25.4 38.6 47.8 54.8 PH Unit 1 Lift P4
03-01-10 N 1336 FC IB-2 C 30 42.5N 300 15.6 25.3 34.9 39.8 PH Unit 1 Lift 63 Column axis
20
03-01-10 D 1337 FC IB-2 C 30 42.5N 300 20.7 28.5 37.7 48.3 PH Unit 4 Lift 56A
04-01-10 D 1342 FC IB-2 C 30 42.5N 300 17.8 29.1 36.2 43.4 PH Unit 3 Lift 61
04-01-10 D 1344 FC IB-2 C 30 42.5N 300 14.8 25.1 33.4 37.9 PH Unit 2 Lift 15C
05-01-10 N 1346 FC IB-2 C 30 42.5N 300 14.3 25.8 33.2 38.1 PH Unit 5 Lift 15B/B2
05-01-10 N 1347 FC IB-2 C 30 42.5N 300 14.7 26.3 32.8 38.5 PH Unit 3 Lift 17
Page 76
Summary of BUJAGALI HYDROELECTRIC POWER
06-01-10 N 1349 FC IB-2 C 30 42.5N 300 14.7 24.9 33.1 38.5 PH Unit 1 Lift 62 Wall Axis 20 -
21Column axis 20 -
PH Unit 1 Lift 64
07-01-10 N 1354 FC IB-2 C 30 42.5N 300 15.1 25.6 35.1 40.4
17
07-01-10 N 1355 FC IB-2 C 30 42.5N 300 14.8 25.2 34.8 39.8 PH Unit 1 Lift 20 axis 17 - 21
07-01-10 D 1356 FC IB-2 C 30 42.5N 300 14.8 25.4 33.0 36.3 PH Unit 2 Lift 57A
08-01-10 D 1361 FC IB-2 C 30 42.5N 300 14.2 24.7 32.4 36.8 PH Unit 1 Lift 81CENTER WALL
08-01-10 D 1364 FC IB-2 C 30 42.5N 300 15.4 26.7 33.1 37.5 PH Unit 2 Lift 82A LEFT SIDE
WALL
09-01-10 D 1367 FC IB-2 C 30 42.5N 300 15.2 24.6 32.4 37.4 PH Unit 1 Lift WALL 17
09-01-10 D 1368 FC IB-2 C 30 42.5N 300 14.4 25.6 33.7 39.4 PH Unit 3 Lift P2
09-01-10 N 1069 FC IB-2 C 30 42.5N 300 15.3 25.8 34.7 39.9 PH Unit 1 Lift 64 Column axis 20 -
18
10-01-10 D 1371 FC IB C 35 42.5N 330 18.8 29.3 40.8 45.6 PH Unit 1 Lift 62 Wall Axis
17 18
10-01-10 D 1372 FC IB-2 C 30 42.5N 300 15.6 26.6 34.7 40.1 PH Unit 4 Lift 81 LEFT WALL
11-01-10 N 1380 FC IB C 35 42.5N 330 18.3 29.6 38.0 45.3 PH Unit 1 Lift 64 Column axis 17
12-01-10 N 1383 FC IB-2 C 30 42.5N 300 16.8 27.4 37.8 43.7 PH Unit 5 Lift 87B
13-01-10 N 1384 FC IB C 35 42.5N 330 22.6 31.8 40.5 44.4 PH Unit 5 Lift 15 - B4
13-01-10 N 1388 FC IB-2 C 30 42.5N 300 14.5 26.6 33.4 38.3 PH Unit 1 Lift 88
14-01-10 N 1389 FC IB-2 C 30 42.5N 300 14.7 25.5 33.4 38.0 PH Unit 1 Lift 20
14-01-10 D 1392 FC IB-2 C 30 42.5N 300 15.3 25.8 33.1 37.5 PH Unit 5 Lift 81
14-01-10 N 1395 FC IB C 35 42.5N 330 17.1 29.6 39.4 44.8 PH Unit 1 Lift 64 Column axis 17
15-01-10 D 1396 FC IB C 35 42.5N 330 16.0 32.4 38.1 42.8 PH Unit 3 Lift 15B4
16-01-10 D 1400 FC IB-2 C 30 42.5N 300 14.8 25.9 33.3 38.8 PH Unit 3 Lift 17CENTER WALL
16-01-10 N 1404 FC IB-2 C 30 42.5N 300 15.1 25.9 34.6 36.6 PH UNIT 2 Lift 82H RRC Wall
18-01-10 N 1411 FC IB-2 C 30 42.5N 300 15.4 25.7 32.9 36.1 PH UNIT 1 Lift 16A
19-01-10 D 1417 FC IB-2 C 30 42.5N 300 14.7 26.2 35.5 39.6 PH UNIT 2 Lift 57B
19-01-10 N 1418 FC IB-2 C 30 42.5N 300 15.3 24.4 33.3 35.8 PH Unit 3 Lift 17CENTER WALL
PH UNIT 2 Lift 82A Center
19-01-10 N 1419 FC IB-2 C 30 42.5N 300 15.6 24.5 31.9 34.7
wall
20-01-10 N 1425 FC IB C 35 42.5N 330 13.0 27.8 25.0 40.5 PH UNIT 1 Lift 21A
22-01-10 N 1429 FC IB-2 C 30 42.5N 300 18.9 27.3 38.1 39.1 PH UNIT 2 Lift 16 Left side
PH UNIT 4 Lift 82 Wall left
22-01-10 N 1430 FC IB-2 C 30 42.5N 300 18.7 28.7 36.5 42.0
side
23-01-10 N 1436 FC IB-2 C 30 42.5N 300 17.6 27.4 36.7 39.0 PH UNIT 3 Lift 87
23-01-10 N 1441 FC IB-2 C 30 42.5N 300 14.8 25.1 34.7 40.6 PH UNIT 4 Lift 56B
PH UNIT 4 Lift 15C Center
24-01-10 N 1442 FC IB-2 C 30 42.5N 300 17.3 26.5 34.2 40.3
Wall
24-01-10 D 1446 FC IB-2 C 30 42.5N 300 15.3 24.8 33.5 39.2 PH Unit 1 Lift 88
25-01-10 N 1453 FC M6 C 40 42.5N 380 24.6 33.7 46.0 49.5 PH Unit 3 Lift P1
PH UNIT 4 Lift 82A Wall Left
26-01-10 D 1455 FC IB-2 C 30 42.5N 300 14.7 25.5 33.4 35.6
side
PH UNIT 1 Retaining wall Lift
26-01-10 N 1457 FC IB-2 C 30 42.5N 300 15.6 25.4 33.6 36.5
22-12
PH UNIT 2 Lift 82B D/Stream
29-01-10 N 1468 FC IB C 35 42.5N 330 17.6 28.7 36.6 39.8
Slab
29-01-10 N 1470 FC IB-2 C 30 42.5N 300 14.7 24.2 33.7 37.9 PH Unit 1 Lift 21B
Page 77
Summary of BUJAGALI HYDROELECTRIC POWER
02-03-10 N 1633 FC IB-2 C 30 42.5N 300 18.3 28.1 37.2 40.1 PH Unit 2 Lift 17 Right side wall
03-03-10 D 1641 FC IB-2 C 30 42.5N 300 14.8 32.2 31.0 35.2 PH Unit 4 Lift 57A
PH Unit 1 Lift 64 Wall axis
03-03-10 N 1643 FC IB-2 C 30 42.5N 300 15.2 24.8 33.0 37.3
20 - 21
PH Unit 1 Lift 64 Wall axis
04-03-10 N 1647 FC IB-2 C 30 42.5N 300 14.9 24.6 33.6 36.8
17 - 18
Page 78
Summary of BUJAGALI HYDROELECTRIC POWER
13-03-10 N 1686 FC IB-2 C 30 42.5N 300 15.1 23.1 32.4 36.7 PH Unit 2 Lift 18A Right side wall
13-03-10 D 1688 FC IB-2 C 30 42.5N 300 17.6 28.2 34.4 38.7 PH Unit 1 Lift 90 Column axis 18
14-03-10 N 1690 FC IB C 35 42.5N 330 16.4 27.7 36.8 40.3 PH Unit 2 Lift P2
14-03-10 N 1692 FC M6 C 40 42.5N 380 22.9 34.8 43.5 47.0 PH Unit 2 Lift P3
16-03-10 N 1696 FC IB-2 C 30 42.5N 300 14.1 23.9 32.4 36.6 PH Unit 5 Lift 15C centre wall
16-03-10 D 1698 FC IB-2 C 30 42.5N 300 18.8 26.0 33.3 36.1 PH Unit 4 Lift 83B
17-03-10 N 1700 FC IB-2 C 30 42.5N 300 15.9 24.7 31.0 34.1 PH Unit 1 Lift 90 Column axis 21
17-03-10 N 1705 FC IB-2 C 30 42.5N 300 13.6 23.1 32.1 34.2 PH Unit 4 Lift 58 Column left sait
18-03-10 D 1706 FC IB-2 C 30 42.5N 300 15.5 24.7 31.1 33.9 PH Unit 4 Lift 16 Right side wall
19-03-10 N 1711 FC IB-2 C 30 42.5N 300 14.7 23.8 31.8 35.9 PH Unit 5 Lift 59
19-03-10 D 1713 FC IB-2 C 30 42.5N 300 16.1 25.3 31.4 35.4 PH Unit 2 Lift P4
20-03-10 N 1716 FC IB-2 C 30 42.5N 300 14.3 22.9 32.7 34.5 PH Unit 2 Lift 61
20-03-10 D 1717 FC IB-2 C 30 42.5N 300 15.3 23.4 30.2 33.5 PH Unit 4 Lift 17 centre wall
21-03-10 N 1722 FC IB-2 C 30 42.5N 300 15.1 25.1 34.1 38.4 PH Unit 5 Lift 15C
23-03-10 N 1729 FC IB C 35 42.5N 330 17.2 29.8 38.6 43.5 PH Unit 4 Lift 58 Axis 5
23-03-10 D 1730 FC IB-2 C 30 42.5N 300 13.9 23.1 33.2 37.2 PH Unit 2 Lift 85
23-03-10 N 1731 FC IB-2 C 30 42.5N 300 14.1 23.6 32.3 36.6 PH Unit 2 Lift 85
24-03-10 N 1732 FC IB-2 C 30 42.5N 300 15.5 24.4 31.2 34.1 PH Unit 4 Lift 17 left side wall
24-03-10 D 1735 FC IB-2 C 30 42.5N 300 16.2 29.1 37.1 39.8 PH Unit 2 Lift 19A centre wall
25-03-10 D 1740 FC IB-2 C 30 42.5N 300 14.2 23.2 32.6 35.2 PH Unit 4 Lift 84
25-03-10 N 1741 FC IB C 35 42.5N 330 15.9 26.8 37.0 40.5 PH Unit 4 Lift 84
26-03-10 D 1748 FC IB C 35 42.5N 330 15.6 25.2 35.9 39.4 PH Unit 1 Lift 25B 1st Piece
27-03-10 N 1752 FC IB-2 C 30 42.5N 300 13.6 22.8 33.1 36.9 PH Unit 4 Lift 58
27-03-10 D 1753 FC IB-2 C 30 42.5N 300 14.4 23.7 33.4 36.3 PH Unit 2 Lift 19 left centre wall
27-03-10 D 1754 FC JC C 30 42.5N 310 12.9 22.4 30.1 32.3 PH Unit 1 Lift 24
29-03-10 D 1762 FC IB-2 C 30 42.5N 300 14.7 25.3 31.9 34.3 PH Unit 1 Lift 25A
31-03-10 D 1773 FC JC C 25 42.5N 310 12.9 22.4 30.1 34.3 PH Unit 2 Lift 62 Column axis
31-03-10 D 1775 FC IB-2 C 30 42.5N 300 14.3 24.8 31.9 33.4 PH Unit 2 Lift P5
01-04-10 D 1776 FC IB-2 C 30 42.5N 300 17.9 26.8 34.8 37.5 PH Unit 5 Lift 15C left side wall
01-04-10 D 1778 FC M6 C 40 42.5N 380 25.1 34.9 46.6 49.3 PH Unit 5 Lift 16C wall
PH Unit 1 Retaining wall Lift 16 &
01-04-10 D 1780 FC IB-2 C 30 42.5N 300 14.4 24.6 32.4 35.8
24
02-04-10 D 1782 FC IB-2 C 30 42.5N 300 16.1 22.6 31.1 34.3 PH Unit 4 Lift 85
02-04-10 N 1788 FC IB-2 C 30 42.5N 300 14.4 23.9 32.3 34.4 PH Unit 2 Lift 19 Right side wall
Page 79
Summary of BUJAGALI HYDROELECTRIC POWER
13-04-10 N 1815 FC IB-2 C 30 42.5N 300 13.3 23.7 32.1 36.3 PH Unit 3 Lift 19 Right side wall
PH Unit 3 Lift 88 Column C/S
15-04-10 N 1822 FC JC C 25 42.5N 310 13.6 21.9 29.9 34.4
wall
PH Unit 2 Lift 62 - 63 Column
15-04-10 D 1827 FC JC C 25 42.5N 310 13.5 22.2 31.3 35.8
axis 17
16-04-10 N 1830 FC IB-2 C 30 42.5N 300 13.9 23.9 31.7 35.8 PH Unit 5 Lift 60 Centre wall
16-04-10 N 1835 FC IB C 35 42.5N 330 15.7 25.9 36.6 40.3 PH Unit 2 Lift 18B Slab
17-04-10 D 1840 FC M6 C 40 42.5N 380 22.2 32.0 43.1 46.8 PH Unit 4 Lift P1
18-04-10 D 1841 FC IB-2 C 30 42.5N 300 14.2 23.9 32.0 36.1 PH Unit 1 Lift 26
19-04-10 N 1844 FC JC C 25 42.5N 310 12.5 20.1 31.0 33.6 PH Unit 5 Lift 60
PH Unit 2 Lift 63 Column axis 14 -
20-04-10 D 1847 FC JC C 25 42.5N 310 12.4 21.9 30.8 33.8
P6
20-04-10 N 1848 FC IB C 35 42.5N 330 17.3 28.3 38.3 42.5 PH Unit 1 Lift 26
21-04-10 N 1849 FC IB-2 C 30 42.5N 300 13.9 23.8 32.4 35.3 PH Unit 3 Lift 19 left side wall
22-04-10 D 1852 FC JC C 25 42.5N 310 12.3 23.1 30.2 35.3 PH Unit 1 Lift 90
23-04-10 N 1854 FC IB-2 C 30 42.5N 300 14.8 22.6 33.1 35.1 PH Unit 5 Lift 16
PH Unit 2 Lift 63 Column axis 13 -
23-04-10 N 1857 FC JC C 25 42.5N 310 12.8 22.1 30.6 34.8
17
24-04-10 D 1863 FC IB-2 C 30 42.5N 300 14.2 22.0 32.9 35.8 PH Unit 2 Lift 86
26-04-10 N 1869 FC M6 C 40 42.5N 380 23.5 33.4 42.7 46.8 PH Unit 4 Lift 18A
26-04-10 N 1870 FC IB-2 C 30 42.5N 300 13.2 23.4 35.9 38.3 PH Unit 2 Lift 19B
27-04-10 N 1871 FC M6 C 40 42.5N 380 27.1 36.9 44.6 49.8 PH Unit 3 Lift P3
27-04-10 D 1875 FC M6 C 40 42.5N 380 21.5 33.8 41.2 43.6 PH Unit 1 Lift P6
28-04-10 D 1877 FC M6 C 40 42.5N 380 22.2 35.6 43.2 46.2 PH Unit 3 Lift 17 Centre wall
29-04-10 N 1879 FC IB-2 C 30 42.5N 300 17.0 25.0 33.2 35.3 PH Unit 5 Lift 87
30-04-10 N 1882 FC IB-2 C 30 42.5N 300 13.1 21.7 32.8 36.2 PH Unit 1 Retaining wall
03-05-10 D 1884 FC IB-2 C 30 42.5N 300 13.5 24.5 31.7 34.6 PH Unit 4 Lift 59
04-05-10 N 1887 FC IB C 35 42.5N 330 15.8 26.1 36.1 39.5 PH Unit 4 Lift 18 left side wall
PH Unit 3 Lift 62 Column axis 10 -
04-05-10 D 1889 FC JC C 25 42.5N 310 16.2 28.7 36.1 40.1
12
04-05-10 N 1891 FC IB-2 C 30 42.5N 300 13.6 23.4 30.5 34.9 PH Unit 5 Lift 16 right side wall
06-05-10 D 1894 FC IB-2 C 30 42.5N 300 13.4 23.7 31.4 34.9 PH Unit 4 Lift 86
06-05-10 N 1895 FC IB-2 C 30 42.5N 300 14.8 24.8 32.6 35.3 PH Unit 4 Lift 18
07-05-10 N 1896 FC IB-2 C 30 42.5N 300 13.7 24.3 32.9 35.8 PH Unit 1 Lift 29
07-05-10 D 1899 FC IB-2 C 30 42.5N 300 14.8 25.4 36.8 41.3 PH Unit 1 Lift 27
08-05-10 N 1902 FC IB-2 C 30 42.5N 300 14.6 24.9 32.8 36.8 PH Unit 2 Lift 20 1st Pouring
08-05-10 D 1904 FC JC C 25 42.5N 310 14.5 24.0 31.6 34.2 PH Unit 2 Lift 62 Column axis 17
10-05-10 D 1909 FC IB C 35 42.5N 330 15.3 25.7 37.5 41.7 PH Unit 3 Lift 18B
10-05-10 D 1910 FC IB C 35 42.5N 330 15.8 25.9 36.4 40.4 PH Unit 1 Lift P7B
11-05-10 N 1911 FC IB-2 C 30 42.5N 300 13.4 24.9 31.2 36.3 PH Unit 4 Lift P2
PH Unit 2 Lift 63 Column axis 14
11-05-10 D 1914 FC JC C 25 42.5N 310 15.1 24.4 30.6 34.6
& 16
12-05-10 N 1917 FC IB-2 C 30 42.5N 300 13.9 24.2 31.6 35.0 PH Unit 2 Lift 25C Wall
14-05-10 D 1921 FC IB-2 C 30 42.5N 300 14.3 24.8 33.3 36.8 PH Unit 2 Lift 25 Lift side Wall
14-05-10 N 1922 FC IB-2 C 30 42.5N 300 14.0 24.3 32.6 35.7 PH Unit 4 Lift 19 centre Wall
Page 80
Summary of BUJAGALI HYDROELECTRIC POWER
14-05-10 D 1925 FC JC C 25 42.5N 310 15.3 24.6 33.9 39.7 PH Unit 2 Lift 63 Column axis 13
17-05-10 D 1932 FC JC C 25 42.5N 310 13.0 22.4 29.9 33.6 PH Unit 3 Lift 62 axis 10 & 12
18-05-10 N 1938 FC IB-2 C 30 42.5N 300 16.1 28.7 35.0 40.6 PH Unit 2 Lift 25A right side wall
19-05-10 D 1939 FC IB-2 C 30 42.5N 300 14.3 25.3 31.5 33.4 PH Unit 3 Lift 89
PH Unit 2 Lift 64 Column axis 17
20-05-10 D 1944 FC JC C 25 42.5N 310 13.9 22.8 30.1 35.6
& 16
22-05-10 D 1950 FC JC C 25 42.5N 310 13.8 22.3 30.3 34.2 PH Unit 1 Wall 62
23-05-10 D 1951 FC JC C 25 42.5N 310 13.4 21.0 30.8 33.3 PH Unit 2 Lift 20 & 21
23-05-10 D 1952 FC JC C 25 42.5N 310 13.3 21.1 29.9 32.1 PH Unit 2 Column Lift 64
23-05-10 D 1953 FC IB-2 C 30 42.5N 300 14.9 22.4 33.1 35.5 PH Contral building slab
24-05-10 N 1955 FC JC C 30 42.5N 310 14.9 23.1 30.1 34.8 PH Unit 2 Lift 20 & 21
25-05-10 N 1957 FC IB-2 C 30 42.5N 300 15.3 25.3 31.4 37.0 PH Unit 5 P2 slab
25-05-10 D 1959 FC JC C 25 42.5N 310 13.3 22.2 30.1 34.6 PH Unit 5 Lift 61
PH Unit 2 Lift 64 2 Column axis
25-05-10 D 1960 FC JC C 25 42.5N 310 13.6 22.9 30.2 34.6
14 & 16
26-05-10 N 1964 FC IB-2 C 30 42.5N 300 18.0 27.7 32.5 38.6 PH Unit 3 Wall 25A Right
26-05-10 N 1966 FC IB-2 C 30 42.5N 300 14.1 25.2 32.5 35.9 PH Unit 1 Lift 28 & Wall Lift 18
26-05-10 N 1968 FC IB-2 C 30 42.5N 300 14.3 24.9 33.7 37.2 PH Unit 1 Lift 28 & Wall Lift 18
27-05-10 D 1971 FC IB C 35 42.5N 330 15.1 30.2 37.9 45.2 PH Unit 2 Slab 87
28-05-10 N 1973 FC IB-2 C 30 42.5N 300 19.1 25.0 32.7 35.0 PH Unit 5 Lift 16 Left Wall
29-05-10 D 1979 FC IB C 35 42.5N 330 16.0 25.6 36.3 40.9 PH Unit 2 Lift 21B
31-05-10 D 1980 FC JC C 25 42.5N 310 13.7 22.3 30.3 35.4 PH Unit 2 Lift 63 Wall
01-06-10 N 1981 FC IB-2 C 30 42.5N 300 14.5 24.3 33.9 36.8 PH Unit 3 P4
01-06-10 D 1983 FC JC C 25 42.5N 310 13.5 25.6 33.0 37.2 PH Tailrace wall Lift 15
01-06-10 D 1985 FC M6 C 40 42.5N 380 23.8 33.6 44.4 49.8 PH Unit 3 Lift 18B
03-06-10 N 1988 FC IB-2 C 30 42.5N 300 14.8 23.2 33.5 37.1 PH Unit 5 Lift 17 Right side wall
03-06-10 D 1990 FC IB C 35 42.5N 330 15.3 26.1 37.1 39.7 PH Unit 3 Balance 18B
03-06-10 D 1991 FC M6 C 40 42.5N 380 25.8 36.7 50.6 57.2 PH Unit 1 Lift 8B
04-06-10 N 1992 FC IB-2 C 30 42.5N 300 13.6 25.1 33.5 36.7 PH Unit 3 Lift 25A Centre wall
05-06-10 N 1997 FC M6 C 40 42.5N 380 24.5 36.3 41.6 50.9 PH Unit 2 P6A Centre
06-06-10 N 1999 FC IB C 35 42.5N 330 17.6 25.3 36.1 40.5 PH Unit 2 Lift 22 A&B
06-06-10 D 2000 FC M6 C 40 42.5N 380 27.0 37.2 46.1 53.2 PH Unit 1 Lift 9B
06-06-10 N 2001 FC JC C 25 42.5N 310 14.1 23.8 30.2 34.8 PH Unit 3 Lift 90 Column axis 9
07-06-10 D 2007 FC JC C 25 42.5N 310 12.6 21.6 29.3 31.9 PH Unit 3 Lift 90 Column axis 11
08-06-10 D 2008 FC IB-2 C 30 42.5N 300 14.3 24.4 33.1 36.6 PH Unit 3 Lift 25A Left Side wall
PH Unit 3 Lift 62 Column axis 10 -
09-06-10 D 2010 FC JC C 25 42.5N 310 14.6 26.4 33.5 39.4
12
09-06-10 D 2012 FC JC C 25 42.5N 310 13.8 22.6 30.1 35.3 PH Unit 3 Lift 90 Column axis 13
PH Unit 3 Internal wall P3A, P4A
10-06-10 N 2013 FC M6 C 40 42.5N 380 24.1 33.1 42.1 50.8
& P5A
10-06-10 D 2015 FC IB C 35 42.5N 330 17.9 29.6 37.4 42.8 PH Unit 3 P5B
11-06-10 N 2018 FC IB-2 C 30 42.5N 300 15.4 24.8 32.3 36.5 PH Unit 4 Lift 19A Right side wall
11-06-10 N 2021 FC IB-2 C 30 42.5N 300 14.4 24.7 30.2 34.7 PH Unit 4 Lift 60 center
11-06-10 N 2022 FC IB C 35 42.5N 330 18.7 31.3 41.8 47.2 PH Unit 3 Lift 19B
12-06-10 N 2024 FC IB-2 C 30 42.5N 300 14.6 24.9 32.7 35.6 PH Unit 1 Lift 29 & wall lift 19
12-06-10 D 2027 FC IB-2 C 30 42.5N 300 14.8 25.1 34.3 38.8 PH Unit 1 Lift 29 & wall lift 19
Page 81
Summary of BUJAGALI HYDROELECTRIC POWER
12-06-10 D 2029 FC IB-2 C 30 42.5N 300 14.9 24.6 33.8 36.2 PH Unit 4 Lift 19A Left side wall
13-06-10 N 2033 FC JC C 25 42.5N 310 14.8 23.6 29.8 34.3 PH Unit 4 Lift 60 Column axis 5
14-06-10 D 2034 FC JC C 25 42.5N 310 14.6 24.2 31.6 35.4 PH Unit 3 Lift 63 Column axis 13
15-06-10 D 2038 FC M6 C 40 42.5N 380 24.8 33.4 41.1 45.6 PH Unit 1 Lift P10
15-06-10 D 2039 FC JC C 25 42.5N 310 13.8 23.6 30.1 34.3 PH Unit 3 Lift 62 Column axis 9
15-06-10 D 2040 FC IB-2 C 30 42.5N 300 14.1 26.2 34.7 38.8 PH Unit 4 Lift 25A center wall
16-06-10 N 2041 FC M6 C 40 42.5N 380 25.8 37.5 47.3 55.3 PH Unit 5 P1
PH Unit 2 Lift 88 Column & small
16-06-10 D 2043 FC JC C 25 42.5N 310 15.2 22.4 29.2 31.5
wall
18-06-10 N 2045 FC IB C 35 42.5N 330 15.9 26.9 37.2 40.0 PH Unit 4 Lift 18B
18-06-10 D 2046 FC M6 C 40 42.5N 380 24.6 32.2 43.7 47.6 PH Unit 1 Lift 92
18-06-10 N 2047 FC IB-2 C 30 42.5N 300 14.4 24.3 31.2 34.4 PH Unit 1 Lift 92
19-06-10 N 2048 FC IB C 35 42.5N 330 21.9 31.0 38.8 45.4 PH Unit 2 wall P7A
19-06-10 N 2049 FC IB-2 C 30 42.5N 300 16.1 24.9 32.0 36.0 PH Unit 2 Lift 88 External wall
19-06-10 D 2051 FC JC C 25 42.5N 310 13.5 22.9 30.3 33.8 PH Unit 3 Lift 63 axis 10
20-06-10 N 2055 FC IB-2 C 30 42.5N 300 15.6 24.2 30.6 35.9 PH Unit 3 Lift 20
21-06-10 D 2058 FC JC C 25 42.5N 310 14.8 23.6 30.0 36.8 PH Unit 4 Lift 60 Column axis 9
22-06-10 N 2060 FC IB C 35 42.5N 330 17.2 25.9 35.8 40.0 PH Unit 4 Lift 87
23-06-10 N 2065 FC IB-2 C 30 42.5N 300 14.6 24.9 32.7 35.8 PH Unit 5 Lift 18A Left side wall
24-06-10 D 2069 FC IB-2 C 30 42.5N 300 15.3 24.9 32.6 36.6 PH Unit 3 Lift 63 Column axis 12
25-06-10 N 2071 FC IB C 35 42.5N 330 19.8 29.9 39.0 46.1 PH Unit 2 Lift 25B
25-06-10 N 2072 FC M6 C 40 42.5N 380 26.2 37.9 49.6 56.9 PH Unit 4 Lift P3B
PH Unit 1 Right wall Lift 28 wall
25-06-10 D 2074 FC IB-2 C 30 42.5N 300 14.1 24.5 32.3 34.8
18 & left wall
27-06-10 N 2079 FC IB C 35 42.5N 330 19.5 27.8 35.9 42.3 PH Unit 2 Lift 25B 1st Piece
27-06-10 N 2080 FC IB C 35 42.5N 330 19.7 28.1 37.0 42.5 PH Unit 2 Lift 6B
28-06-10 N 2083 FC IB-2 C 30 42.5N 300 15.0 24.5 33.7 36.2 PH Unit 4 Lift 25A left side wall
28-06-10 D 2084 FC JC C 25 42.5N 310 12.6 23.5 30.2 32.5 PH Unit 3 Lift 63 Column axis 13
28-06-10 D 2085 FC IB-2 C 30 42.5N 300 14.9 24.8 32.7 35.1 PH Unit 1 Lift wall 30 & 20 wall
PH Unit 2 Internal wall P8A, P9A,
29-06-10 D 2088 FC IB C 35 42.5N 330 20.1 32.4 39.9 45.6
P10A
29-06-10 N 2089 FC JC C 25 42.5N 310 13.3 26.6 33.4 36.3 PH Unit 3 Lift 64 Column axis 10
30-06-10 N 2091 FC IB-2 C 30 42.5N 300 14.6 24.8 32.6 36.3 PH Unit 4 Lift 19B
30-06-10 N 2092 FC IB-2 C 30 42.5N 300 14.0 23.6 32.2 36.6 PH Unit 4 Lift 25A Left side wall
PH Unit 1 Oil water seperator
30-06-10 D 2095 FC IB C 35 42.5N 330 18.7 31.5 36.2 44.9
wall
01-07-10 D 2096 FC M6 C 40 42.5N 380 25.9 36.7 51.0 60.6 PH Unit 4 P4B
02-07-10 D 2100 FC IB-2 C 30 42.5N 300 14.2 24.3 33.3 37.3 PH Unit 3 Lift 21B & 21A
03-07-10 D 2101 FC IB-2 C 30 42.5N 300 15.0 24.6 33.8 37.4 PH Unit 3 Lift 21B & 21A
05-07-10 D 2102 FC JC C 25 42.5N 310 13.6 23.3 30.1 35.3 PH Unit 1 Lift 28 wall 18 wall
06-07-10 N 2105 FC IB-2 C 30 42.5N 300 14.9 24.5 30.7 36.6 PH Unit 3 Lift 90
08-07-10 D 2106 FC IB-2 C 30 42.5N 300 14.3 24.2 33.6 36.5 PH Unit 5 Lift 18 Right side wall
08-07-10 N 2107 FC IB-2 C 30 42.5N 300 13.9 23.4 32.3 34.7 PH Unit 4 Lift 61
Page 82
Summary of BUJAGALI HYDROELECTRIC POWER
16-07-10 D 2132 FC JC C 25 42.5N 310 13.7 24.6 32.5 36.1 PH Unit 4 Lift 62 Column axis 6
16-07-10 N 2133 FC IB C 35 42.5N 330 16.9 32.8 42.7 48.4 PH Unit 2 Lift P7B
18-07-10 D 2135 FC M6 C 40 42.5N 380 22.2 32.5 40.8 47.7 PH Unit 5 Lift 18A Centre wall
20-07-10 N 2140 FC IB-2 C 30 42.5N 300 14.5 24.8 31.3 33.6 PH Unit 5 Lift 19A Left side wall
20-07-10 D 2142 FC JC C 25 42.5N 310 13.5 23.1 29.7 33.7 PH Unit 4 Lift 62 Column axis 5
20-07-10 N 2143 FC IB C 35 42.5N 330 15.1 25.3 35.3 39.4 PH Unit 3 wall P7A
21-07-10 N 2144 FC IB-2 C 30 42.5N 300 15.3 24.3 32.2 34.9 PH Unit 4 Lift 22A & 22B
21-07-10 D 2145 FC IB-2 C 30 42.5N 300 15.3 23.9 30.6 35.7 PH Unit 5 Lift 88
21-07-10 D 2146 FC JC C 25 42.5N 310 14.4 22.8 30.6 35.8 PH Unit 4 Lift 62 Column axis 8
22-07-10 D 2148 FC IB C 35 42.5N 330 16.6 27.8 36.3 39.9 PH Unit 3 Lift 25B First Piece
23-07-10 D 2153 FC JC C 25 42.5N 310 12.9 22.5 29.1 32.7 PH Unit 4 Lift 62 Column axis 9
24-07-10 N 2155 FC IB C 35 42.5N 330 19.1 28.1 36.4 41.9 PH Unit 3 Lift 25B 2nd Piece
PH Unit 4 Lift 63 Column axis 6 &
24-07-10 N 2156 FC JC C 25 42.5N 310 14.3 23.1 31.3 35.7
5
26-07-10 D 2164 FC JC C 25 42.5N 310 13.8 22.6 30.0 35.8 PH Unit 4 Lift 63 Column axis 8
27-07-10 N 2167 FC IB-2 C 30 42.5N 300 14.1 24.0 31.6 35.6 PH Unit 5 Lift 19A Right side wall
27-07-10 D 2168 FC IB-2 C 30 42.5N 300 14.3 22.9 32.4 36.8 PH Unit 4 Lift 21B & 21A
28-07-10 N 2169 FC IB-2 C 30 42.5N 300 16.0 25.1 32.7 37.3 PH Unit 4 Lift 21B & 21A
28-07-10 D 2170 FC M6 C 40 42.5N 380 25.1 37.6 48.6 59.9 PH Unit 2 Lift P8B
30-07-10 N 2175 FC IB-2 C 30 42.5N 300 19.0 24.9 31.4 36.1 PH Unit 5 Lift 19A Centre wall
30-07-10 N 2176 FC IB-2 C 30 42.5N 300 19.2 25.1 31.1 35.7 PH Unit 2 Lift 27
30-07-10 D 2178 FC IB-2 C 30 42.5N 300 14.9 23.6 31.6 36.3 PH Unit 2 Lift 27
30-07-10 N 2180 FC M6 C 40 42.5N 380 23.9 32.1 43.3 50.4 PH Unit 1 Lift P12
31-07-10 D 2181 FC IB C 35 42.5N 330 20.9 25.3 36.8 40.6 PH Unit 1 Lift P12
03-08-10 N 2183 FC JC C 25 42.5N 310 13.7 22.1 29.6 33.8 PH Unit 4 Lift 62 wall axis 5 - 6
03-08-10 N 2185 FC IB C 35 42.5N 330 16.1 25.7 36.2 40.4 PH Unit 4 P5A Wall
04-08-10 D 2186 FC IB-2 C 30 42.5N 300 14.5 24.5 31.8 37.0 PH Unit 5 Lift 25A Left side wall
04-08-10 N 2187 FC M6 C 40 42.5N 380 23.1 35.6 47.5 53.3 PH Unit 2 P9B
04-08-10 N 2188 FC IB C 35 42.5N 330 16.8 27.3 38.4 43.6 PH Unit 2 P9B
04-08-10 N 2189 FC M6 C 40 42.5N 380 24.8 33.7 44.9 48.7 PH Unit 1 Portion of Lift 29A
05-08-10 D 2191 FC R C 25 42.5N 250 9.4 18.8 24.3 27.4 PH Unit 1 Tail race wall blinding
Page 83
Summary of BUJAGALI HYDROELECTRIC POWER
05-08-10 D 2194 FC JC C 25 42.5N 310 14.2 22.8 30.6 34.9 PH Unit 4 Lift 63 Column axis 9
06-08-10 N 2197 FC IB-2 C 30 42.5N 300 13.9 24.6 32.7 35.8 PH Unit 4 Lift 88 Internal wall
08-08-10 N 2201 FC M6 C 40 42.5N 380 25.5 35.6 43.7 50.9 PH Unit 1 Portion of Lift 29A
08-08-10 N 2203 FC IB C 35 42.5N 330 20.0 28.1 35.2 41.5 PH Unit 3 wall P8A, P9A & P10A
09-08-10 D 2205 FC IB-2 C 30 42.5N 300 13.2 23.0 30.1 35.8 PH Unit 4 Lift 88
10-08-10 N 2206 FC IB C 35 42.5N 330 16.5 25.2 37.2 40.9 PH Unit 4 Lift 21B
11-08-10 N 2208 FC IB-2 C 30 42.5N 300 14.0 24.7 31.1 33.3 PH Unit 5 Lift 25A Right side wall
PH Unit 1 Retaining wall lift 14 -
11-08-10 D 2209 FC IB-2 C 30 42.5N 300 14.2 24.4 30.6 34.5
17 - 20 - 23
11-08-10 N 2210 FC M6 C 40 42.5N 380 23.2 36.5 45.7 51.1 PH Unit 1 Lift 30A 3rd Portion
12-08-10 N 2211 FC M6 C 40 42.5N 380 23.4 32.7 43.3 50.5 PH Unit 5 Lift P3
12-08-10 N 2212 FC IB C 35 42.5N 330 17.2 29.4 38.6 43.6 PH Unit 5 Lift P3
PH Unit 1 Lift wall 31, 32, & 20
13-08-10 N 2213 FC IB-2 C 30 42.5N 300 14.8 23.9 31.0 36.2
wall
PH Unit 1 Lift wall 31, 32, & 20
13-08-10 D 2215 FC IB C 35 42.5N 330 15.3 25.7 37.5 40.3
wall
14-08-10 N 2217 FC IB-2 C 30 42.5N 300 14.2 24.2 32.5 36.3 PH Unit 5 Central wall Lift 25A
14-08-10 N 2218 FC IB-2 C 30 42.5N 300 14.0 24.4 31.3 35.5 PH Unit 3 Lift 26
14-08-10 D 2220 FC IB-2 C 30 42.5N 300 14.9 25.3 32.8 36.5 PH Unit 3 Lift 26
PH Unit 1 C/P for Lift 25A & wall
14-08-10 N 2221 FC M6 C 40 42.5N 380 21.3 37.3 47.1 53.6
19 1st Portion
17-08-10 N 2223 FC IB C 35 42.5N 330 15.5 26.7 37.6 42.6 PH Unit 5 P5A Wall
17-08-10 D 2225 FC JC C 25 42.5N 310 13.6 22.2 29.2 33.5 PH Unit 4 Lift 64 Column axis 9
PH Rail race wall lift 15, 16, 18, &
18-08-10 N 2226 FC JC C 25 42.5N 310 16.2 26.6 33.7 39.7
19
st
18-08-10 N 2227 FC M6 C 40 42.5N 380 23.2 36.6 46.9 50.7 PH Unit 4 Lift 25A 1 Portion
Page 84
Summary of BUJAGALI HYDROELECTRIC POWER
Page 85
Summary of BUJAGALI HYDROELECTRIC POWER
Page 86
Summary of BUJAGALI HYDROELECTRIC POWER
Page 87
Summary of BUJAGALI HYDROELECTRIC POWER
Page 88
Summary of BUJAGALI HYDROELECTRIC POWER
13-03-11 D 2649 FC M6 C 40 42.5N 380 23.6 34.9 46.6 51.9 PH Unit 5 Lift P12
18-03-11 D 2658 FC JC C 25 42.5N 310 13.2 21.4 32.2 37.1 PH Unit 4 Transformer room
18-03-11 D 2659 FC JC C 25 42.5N 310 12.4 22.0 30.5 35.5 PH Unit 5 Lift P13
28-03-11 D 2666 FC JC C 25 42.5N 310 11.9 20.1 32.2 35.6 PH Unit 5 Lift P14
30-03-11 D 2669 FC M6 C 40 42.5N 380 18.2 34.2 42.3 49.2 PH Unit 4 Lift P11
07-04-11 D 2678 FC JC C 25 42.5N 310 13.3 22.5 31.9 PH Unit 5 Lift 64A
12-04-11 D 2684 FC JC C 25 42.5N 310 12.8 23.2 31.1 PH Unit 5 Lift P15
19-04-11 D 2689 FC JC C 25 42.5N 310 11.8 23.5 30.4 PH Unit 5 Lift 64A
21-04-11 D 2693 FC JC C 25 42.5N 310 13.9 22.2 31.0 PH Unit 5 Lift 64A 3rd Stage
03-05-11 D 2700 FC M6 C 40 42.5N 380 19.8 32.7 47.7 PH Unit 5 Lift P11
21-05-11 D 2711 FC IB C 35 42.5N 330 19.0 29.8 39.1 PH Unit 3 Lift P6B Floor
Page 89
Summary of BUJAGALI HYDROELECTRIC POWER
ERECTION BAY
Rc, maturation at NORMAL WATER
Note
SHIFT
30-10-08 D 326 FC IB - B C 25 42.5N 300 17.2 25.5 36.5 39.6 EB BEAM LINE 22
09-11-08 D 333 FC IB - B C 25 42.5N 300 24.1 35.3 39.4 50.3 EB BEAM LINE 24
19-11-08 N 344 FC IB - B C 25 42.5N 300 15.6 33.5 41.1 47.7 EB BEAM LINE 26
10-12-08 N 364 FC JC - B C 25 42.5N 300 19.7 31.5 40.8 47.6 EB BEAM LINE 22
19-12-08 D 378 FC IB C 25 42.5N 300 16.1 28.1 36.1 43.6 EB BEAM LINE 24 L 1
06-01-09 386 FC IB C 25 42.5N 300 11.1 24.6 31.0 36.6 EB BEAM LINE 24 L 2
12-01-09 395 FC IB C 25 42.5N 300 17.1 28.0 35.7 40.0 SB AXIS 25 1083-1086
21-01-09 409 FC IB C 25 42.5N 300 12.6 28.9 39.3 45.3 EB BEAM LINE 24 L 22
29-01-09 421 FC IB-2 C 25 42.5N 270 15.0 29.9 38.7 41.6 EB BEAM LINE 25 L 2
09-02-09 434 FC IB C 25 42.5N 300 13.1 36.3 45.4 48.5 EB BEAM LINE 26 1st WALL
18-02-09 451 FC IB C 25 42.5N 300 14.2 29.4 37.0 41.3 EB BEAM LINE 26 2ndWALL
23-03-09 506 FC IB C 35 42.5N 300 15.3 22.9 35.2 39.6 CB LINE 28 1st LIFT W
30-03-09 514 FC IB C 35 42.5N 300 11.9 22.4 31.6 34.2 CB LINE 28 2nd LIFT W
31-03-09 515 FC IB-2 C 25 42.5N 270 12.3 24.0 32.1 36.1 EB SLAB LINE 22-25
07-04-09 531 FC IB C 35 42.5N 300 13.0 21.8 31.3 34.8 CB LINE 27 1st LIFT W
14-04-09 541 FC IB C 35 42.5N 300 11.9 24.4 33.1 36.9 CB LINE 27 2nd LIFT W
23-04-09 551 FC IB C 35 42.5N 300 14.8 25.1 31.3 34.5 EB WALL LINE 22-24
28-04-09 563 FC S C 15 42.5N 250 18.2 25.8 33.6 37.9 EB BLIND. LINE 25 EL-1090
30-04-09 568 FC IB C 35 42.5N 300 15.4 25.9 32.0 36.7 EB COLUMN 5 LINE 22 EL-1090
05-05-09 575 FC IB C 35 42.5N 300 15.4 27.2 34.9 38.7 ERECTION BAY WALL
07-05-09 580 FC IB C 35 42.5N 300 14.2 28.5 35.9 40.4 EB & CONTROL BUILDING
07-05-09 581 FC IB-2 C 30 42.5N 270 12.5 25.5 34.8 39.7 EB & CONTROL BUILDING
Page 90
Summary of BUJAGALI HYDROELECTRIC POWER
ERECTION BAY
Rc, maturation at NORMAL WATER
Note
SHIFT
15-05-09 600 FC IB C 35 42.5N 300 13.3 29.0 37.8 40.4 EB -C- LINE 25
01-06-09 627 FC IB C 35 42.5N 300 16.5 26.0 37.0 42.9 CONTROL BUILD. WALL AXIS 25
06-06-09 638 FC JC C 25 42.5N 300 13.4 24.1 33.8 36.3 EB SLAB & BEAM AXIS 22-24
10-06-09 648 FC IB C 35 42.5N 300 16.4 26.5 37.5 41.5 EB D/STREAM WALL AXIS C
16-06-09 658 FC IB C 35 42.5N 300 14.6 26.4 36.0 41.9 EB UP/STREAM WALL AXIS A
20-06-09 669 FC IB C 35 42.5N 300 14.8 27.8 36.1 40.5 EB COLUMN C2 AXIS 2M
24-06-09 678 FC JC C 25 42.5N 300 14.7 25.4 34.8 39.7 ERECTION BAY SLAB 24 - 25
25-06-09 679 FC IB C 35 42.5N 300 17.9 26.8 37.1 42.3 EB COLUMN C5 AXIS 22
06-07-09 N 701 FC IB C 35 42.5N 300 15.4 26.9 38.8 43.2 EB COLUMN C7 AXIS 22
10-07-09 N 714 FC IB C 35 42.5N 300 16.1 27.2 38.2 42.2 EB COLUMN C2 AXIS 25
16-07-09 D 732 FC IB C 35 42.5N 300 16.6 27.5 36.6 39.5 EB SLAB A25 TO AXIS 28
18-07-09 N 740 FC IB C 35 42.5N 300 16.1 26.9 36.3 41.8 EB COLUMN C2 AXIS 24
25-07-09 N 761 FC IB-7 C 35 42.5N 270 15.3 28.6 38.8 40.5 ERECTION BAY
25-07-09 N 764 FC IB C 35 42.5N 300 16.4 29.1 38.8 41.8 ERECTION BAY
EB COLUMN C1& C2 UP TO
03-08-09 D 784 FC IB C 35 42.5N 300 16.6 28.6 39.8 44.5
TOP
EB COLUMN C1& C2 UP TO
03-08-09 D 786 FC IB C 35 42.5N 300 16.5 28.2 40.5 43.6
TOP
06-08-09 N 799 FC IB C 35 42.5N 300 19.0 27.4 38.9 44.3 ERECTION BAY
09-08-09 N 811 FC IB C 35 42.5N 300 16.1 27.7 38.7 41.7 EB COLUMN C25 LIFT 2
09-08-09 D 813 FC IB C 35 42.5N 300 15.6 28.2 46.0 50.6 EB COLUMN C26 LIFT 1
12-08-09 N 820 FC IB C 35 42.5N 300 17.7 27.4 38.9 42.4 EB COLUMN A3 TO EL:1113.5
EB COLUMN A1 TO
13-08-09 N 822 FC IB C 35 42.5N 300 16.5 30.4 37.7 41.4
EL:1107.86
15-08-09 N 834 FC IB C 35 42.5N 300 17.1 29.9 44.3 47.1 EB COLUMN C3 TO EL:1114.3
16-08-09 N 839 FC IB C 35 42.5N 300 18.1 29.6 41.0 45.6 EB COLUMN C2 - 23A
21-08-09 D 859 FC IB C 35 42.5N 300 20.2 34.5 40.8 44.6 EB COLUMN A22 TO EL:1114.3
24-08-09 D 871 FC IB C 35 42.5N 300 23.7 34.0 44.3 47.0 EB COLUMN A28 TO EL:1101.5
25-08-09 D 876 FC IB C 35 42.5N 300 18.3 27.8 42.3 45.2 EB COLUMN C26 TO EL:1104.5
Page 91
Summary of BUJAGALI HYDROELECTRIC POWER
ERECTION BAY
Rc, maturation at NORMAL WATER
Note
SHIFT
26-08-09 D 880 FC IB C 35 42.5N 300 16.0 27.2 42.0 44.2 EB COLUMN C28 TO EL:1101.5
EB COLUMN 26A/C TO
01-09-09 D 898 FC IB C 35 42.5N 330 15.8 27.3 41.9 45.3
EL:1107.5
EB WALL AXIS A22-24 TO
05-09-09 D 917 FC IB C 35 42.5N 330 18.8 29.6 42.6 45.1
EL:109
EB COLUMN AXIS A28 TO
06-09-09 D 921 FC IB C 35 42.5N 330 19.8 30.2 41.4 46.4
EL:1107.3
07-09-09 D 925 FC IB C 35 42.5N 330 19.0 30.5 39.8 43.9 EB COLUMN 26A TO EL:1114.3
09-09-09 D 928 FC IB C 35 42.5N 330 18.6 30.0 41.5 44.1 EB WALL 24-25 TO EL:1103.6
09-09-09 D 929 FC IB C 35 42.5N 330 18.7 31.2 40.1 44.6 EB COLUMN C26 TO EL:1114.3
09-09-09 N 931 FC IB C 35 42.5N 330 17.1 29.9 41.0 45.6 EB COLUMN C28 TO EL:1107.3
12-09-09 D 940 FC IB C 35 42.5N 330 15.4 28.7 38.9 39.6 EB COLUMN 28 TO EL:1114.3
12-09-09 N 942 FC IB C 35 42.5N 330 17.7 29.2 39.5 43.7 EB COLUMN C28 TO EL:1114.3
15-09-09 D 947 FC IB C 35 42.5N 330 21.4 34.4 43.0 45.0 EB WALL A22-24 TO EL:1103.6
15-09-09 D 949 FC IB C 35 42.5N 330 19.5 28.8 39.3 43.7 EB WALL C22-24 TO EL:1106.3
22-09-09 D 976 FC IB C 35 42.5N 330 17.3 28.5 39.1 46.4 EB WALL 25-26 TO EL:1100.9
25-09-09 N 988 FC IB C 35 42.5N 330 17.0 29.1 37.8 41.7 EB AXIS A22-24 TO EL:1107.5
26-09-09 D 998 FC IB C 35 42.5N 330 17.7 28.8 41.2 45.7 EB WALL 24-25A TO EL:1108.6
26-09-09 D 999 FC IB C 35 42.5N 330 17.9 29.3 40.9 45.7 EB WALL 25-26A TO EL:1103.6
01-10-09 D 1016 FC IB C 35 42.5N 330 17.4 30.2 38.9 42.4 EB WALL 22-24 TO EL:1110.3
07-10-09 D 1035 FC IB C 35 42.5N 330 15.8 27.7 35.4 40.6 EB WALL 22-24C TO EL:1114.3
11-10-09 D 1054 FC IB C 35 42.5N 330 16.0 27.2 37.0 40.2 EB WALL 22-24A TO EL:1114.3
15-10-09 D 1070 FC IB-2 C 30 42.5N 300 16.4 26.3 34.3 39.8 EB WALL 10 SLAB
15-10-09 D 1072 FC M6 C 40 42.5N 333 26.7 42.1 48.3 58.8 EB COLUMN AXIS 21C
16-10-09 N 1077 FC JC C 25 42.5N 300 12.9 27.8 38.4 48.2 EB AXIS 25 - 26 WALL
21-10-09 D 1096 FC JC C 25 42.5N 300 14.0 26.0 35.2 39.8 EB COLUMN AXIS 24 - 25
05-11-09 D 1149 FC IB C 35 42.5N 330 18.0 30.6 40.2 45.3 EB BETWEEN AXIS 22-21C
EB WALL AXIS C25-26 TO
12-11-09 D 1177 FC IB-2 C 30 42.5N 300 16.0 26.8 35.0 39.8
EL:1108.5
16-11-09 D 1190 FC IB-2 C 30 42.5N 300 15.5 25.6 35.1 40.2 EB AXIS C25-26 TO EL:1114.3
EB CONTRAL BUILDING 3
02-04-10 D 1787 FC JC C 25 42.5N 300 13.8 22.6 30.7 34.1
COLUMN
Page 92
Summary of BUJAGALI HYDROELECTRIC POWER
ERECTION BAY
Rc, maturation at NORMAL WATER
Note
SHIFT
11-07-10 D 2117 FC JC C 25 42.5N 300 13.6 22.6 29.8 34.6 ERECT BAY OIL SEPERATOR
ERECT BAY ENTRANCE SLAB
15-07-10 D 2131 FC IB-2 C 30 42.5N 300 14.9 25.6 36.9 40.6
BUILDING CONE
20-07-10 N 2139 FC IB-2 C 30 42.5N 300 14.2 23.0 33.2 36.6 ERECTION BAY SLAB
24-08-10 N 2247 FC IB C 35 42.5N 330 16.4 25.2 35.0 39.8 ERECT BAY ACCESS AREA
Page 93
Summary of BUJAGALI HYDROELECTRIC POWER
GRAVITY DAM
Rc, maturation at NORMAL WATER
Note
SHIFT
Date Sample Concrete Cement Cement CURING (MPa)
Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
21-08-08 D 241 FC D2 C 15 42.5N 250 11.4 19.3 22.9 27.9 GRAVITY DAM
21-08-08 242 FC D2 C 15 42.5N 250 9.8 19.2 23.9 30.0 GRAVITY DAM
27-09-08 D 297 FC S C 15 42.5N 250 15.1 22.5 27.4 30.8 GRAVITY DAM
15-11-08 D 340 FC EB C 16 42.5N 190 8.6 14.7 23.3 34.0 BLOCK D
15-11-08 D 341 FC IB - B C 25 42.5N 300 19.4 33.0 43.8 48.4 BLOCK D
21-11-08 D 348 FC EB C 16 42.5N 190 14.4 19.8 33.7 46.0 BLOCK D LIFT 1
21-11-08 D 347 FC IB - B C 25 42.5N 300 27.0 33.0 41.8 47.5 BLOCK D LIFT 1
06-12-08 N 361 FC EB C 16 42.5N 190 13.2 19.6 26.8 29.4 BLOCK D LIFT 2
07-12-08 D 362 FC IB C 25 42.5N 300 19.2 28.7 37.4 38.3 BLOCK D LIFT 2
19-12-08 N 379 FC IB C 25 42.5N 300 20.6 33.0 44.5 54.1 BLOCK D LIFT 3
20-12-08 D 381 FC EB C 16 42.5N 190 9.2 16.5 22.0 31.0 BLOCK D LIFT 3
04-01-09 383 FC EB C 16 42.5N 190 10.2 14.9 22.8 25.7 BLOCK D LIFT 4
04-01-09 382 FC IB C 25 42.5N 300 21.4 33.4 43.7 45.1 BLOCK D LIFT 4
10-01-09 391 FC IB C 25 42.5N 300 15.8 31.8 41.8 46.3 BLOCK A LIFT 1& 2
11-01-09 394 FC EB C 16 42.5N 190 6.8 15.9 21.1 25.0 BLOCK D LIFT 5
11-01-09 392 FC IB C 25 42.5N 300 24.7 37.3 42.3 48.3 BLOCK D LIFT 5
11-01-09 393 FC IB C 25 42.5N 300 14.5 27.9 35.2 42.0 BLOCK D LIFT 5
13-01-09 396 FC S C 15 42.5N 250 12.3 24.2 33.3 38.0 DEN CON
17-01-09 401 FC S C 15 42.5N 250 18.8 29.5 39.0 44.8 G/DAM LEFT BANK
22-01-09 410 FC IB-1 C 25 42.5N 270 21.0 31.6 37.6 41.3 BLOCK D LIFT 6
22-01-09 411 FC EB C 16 42.5N 190 9.5 17.4 23.2 24.2 BLOCK D LIFT 6
06-02-09 429 FC EB C 16 42.5N 190 9.1 13.7 20.5 32.3 BLOCK A LIFT 1& 2
06-02-09 430 FC IB-1 C 25 42.5N 270 13.6 26.4 34.3 39.9 BLOCK A LIFT 1 & 2
13-02-09 443 FC EB C 16 42.5N 190 7.2 14.6 22.4 25.7 BLOCK D LIFT 7
13-02-09 444 FC K C 25 42.5N 250 12.3 28.8 38.4 46.2 BLOCK D LIFT 7
21-02-09 453 FC EB C 16 42.5N 190 10.7 16.2 22.5 24.6 BLOCK A LIFT 3
21-02-09 454 FC K C 25 42.5N 250 16.3 24.9 33.1 35.9 BLOCK A LIFT 3
27-02-09 460 FC EB C 16 42.5N 190 13.1 16.5 22.5 24.6 BLOCK A LIFT 4
27-02-09 461 FC K C 25 42.5N 250 24.1 30.9 39.3 45.8 BLOCK A LIFT 4
07-03-09 478 FC IB-2 C 25 42.5N 270 14.6 22.5 32.3 35.1 BLOCK A LIFT 5
07-03-09 479 FC EB C 16 42.5N 190 8.4 17.6 22.4 24.5 BLOCK A LIFT 5
07-03-09 480 FC K C 25 42.5N 250 15.3 30.2 37.7 42.0 BLOCK A LIFT 5
14-03-09 492 FC EB C 16 42.5N 190 9.2 16.8 23.0 24.5 BLOCK C LIFT 1
14-03-09 493 FC K C 25 42.5N 250 23.1 29.0 39.8 44.3 BLOCK C LIFT 1
18-03-09 496 FC EB C 16 42.5N 190 8.3 16.0 21.8 25.2 BLOCK A LIFT 6
18-03-09 497 FC IB-2 C 25 42.5N 270 11.7 23.6 31.3 33.1 BLOCK A LIFT 6
21-03-09 503 FC EB C 16 42.5N 190 9.0 16.1 22.1 25.2 BLOCK C LIFT 2
21-03-09 504 FC K C 25 42.5N 250 20.5 24.4 34.5 38.1 BLOCK C LIFT 2
Page 94
Summary of BUJAGALI HYDROELECTRIC POWER
GRAVITY DAM
Rc, maturation at NORMAL WATER
Note
SHIFT
Date Sample Concrete Cement Cement CURING (MPa)
Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
27-03-09 512 FC EB C 16 42.5N 190 9.6 16.2 22.2 24.6 BLOCK B LIFT 1
27-03-09 513 FC K C 25 42.5N 250 20.8 27.2 37.3 40.2 BLOCK B LIFT 1
01-04-09 519 FC EB C 16 42.5N 190 11.1 19.0 24.6 29.3 BLOCK B LIFT 2
01-04-09 520 FC K C 25 42.5N 250 12.7 25.0 32.6 36.5 BLOCK B LIFT 2
04-04-09 524 FC IB-2 C 30 42.5N 270 15.7 23.9 31.1 36.0 BLOCK A LIFT 7
08-04-09 532 FC EB C 16 42.5N 190 11.3 17.3 24.5 28.6 BLOCK C LIFT 3
08-04-09 533 FC K C 25 42.5N 250 15.2 23.5 33.4 39.3 BLOCK C LIFT 3
18-04-09 545 FC IB-2 C 30 42.5N 270 13.6 23.5 32.2 36.4 BLOCK D LIFT 8
25-04-09 555 FC EB C 16 42.5N 190 10.6 18.2 24.3 26.5 BLOCK C LIFT 4
25-04-09 556 FC K C 25 42.5N 250 18.9 25.9 31.8 36.5 BLOCK C LIFT 4
01-05-09 571 FC IB-2 C 30 42.5N 270 14.2 24.1 31.2 36.3 BLOCK D LIFT 9
05-05-09 574 FC EB C 16 42.5N 190 10.6 17.4 23.3 25.2 GATED SPILLWAY
07-05-09 576 FC EB C 16 42.5N 190 8.9 17.7 23.3 25.6 GATED SPILLWAY
09-05-09 583 FC K C 25 42.5N 250 16.1 26.9 35.0 41.0 BLOCK C LIFT 5
09-05-09 584 FC EB C 16 42.5N 190 10.0 17.3 24.2 27.2 BLOCK C LIFT 5
14-05-09 595 FC K C 25 42.5N 250 21.2 28.3 37.1 41.3 BLOCK B LIFT 3
14-05-09 596 FC EB C 16 42.5N 190 10.1 17.8 23.8 26.5 BLOCK B LIFT 3
20-05-09 608 FC EB C 16 42.5N 190 12.1 21.7 29.1 34.0 BLOCK B LIFT 4
20-05-09 609 FC K C 25 42.5N 250 13.6 26.8 36.7 41.7 BLOCK B LIFT 4
21-05-09 610 FC K C 25 42.5N 250 12.3 31.7 38.1 40.7 BLOCK C LIFT 6
25-05-09 616 FC IB-2 C 30 42.5N 270 13.9 24.2 34.2 38.8 BLOCK B LIFT 5
02-06-09 629 FC K C 25 42.5N 250 14.8 24.8 33.5 39.1 BLOCK C LIFT 6
02-06-09 630 FC IB-2 C 30 42.5N 270 13.4 24.2 33.8 39.2 BLOCK C LIFT 7
07-06-09 640 FC IB-2 C 30 42.5N 270 14.7 24.1 34.7 37.5 BLOCK A LIFT 8
15-06-09 657 FC IB C 35 42.5N 300 15.5 26.9 36.9 45.4 BLOCK D LIFT 10
18-06-09 664 FC IB C 35 42.5N 300 15.0 27.1 36.3 41.8 BLOCK B LIFT 6
23-06-09 674 FC IB C 35 42.5N 300 16.6 27.0 36.1 42.4 BLOCK D LIFT 11
29-06-09 690 FC IB-2 C 30 42.5N 270 15.0 27.4 34.7 39.9 BLOCK A LIFT 9
10-07-09 D 712 FC IB-2 C 30 42.5N 270 14.4 25.7 35.0 38.7 GD D/STREAM COL.
11-07-09 D 716 FC IB-2 C 30 42.5N 270 14.4 27.2 35.9 39.9 BLOCK D LIFT 12
14-07-09 N 724 FC IB C 35 42.5N 300 20.1 27.6 35.3 38.6 BLOCK C LIFT 8
18-07-09 D 737 FC IB-7 C 35 42.5N 270 17.4 31.3 40.2 44.7 BLOCK B LIFT 7
18-07-09 D 738 FC IB-2 C 30 42.5N 270 14.6 24.5 33.6 35.9 BLOCK B LIFT 7
21-07-09 D 748 FC IB-2 C 30 42.5N 270 13.2 25.1 35.7 39.1 RW GD BL G LIFT 1
23-07-09 N 753 FC IB C 35 42.5N 300 17.3 26.8 39.2 43.2 GD BLOCK F LIFT 2
23-07-09 D 755 FC IB C 35 42.5N 300 16.2 27.9 38.8 41.8 BLOCK C LIFT 9
25-07-09 D 762 FC IB-2 C 30 42.5N 270 14.3 24.5 35.4 39.0 BLOCK A LIFT 9
29-07-09 D 774 FC IB-2 C 30 42.5N 270 13.5 24.7 35.5 39.4 BLOCK C LIFT 10
Page 95
Summary of BUJAGALI HYDROELECTRIC POWER
GRAVITY DAM
Rc, maturation at NORMAL WATER
Note
SHIFT
Date Sample Concrete Cement Cement CURING (MPa)
Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
31-07-09 N 780 FC IB C 35 42.5N 300 16.5 26.3 40.2 44.5 BLOCK B LIFT 8
06-08-09 N 796 FC IB C 35 42.5N 300 18.5 28.7 42.4 42.8 BLOCK A LIFT 10
07-08-09 D 802 FC IB C 35 42.5N 300 18.2 27.8 39.0 45.5 BLOCK C LIFT 11
11-08-09 D 816 FC IB C 35 42.5N 300 16.2 27.3 38.8 42.5 BLOCK A LIFT 11
13-08-09 N 823 FC IB C 35 42.5N 300 18.1 31.0 41.0 44.3 BLOCK E LIFT 2
14-08-09 D 830 FC IB C 35 42.5N 300 16.1 32.5 41.7 44.8 BLOCK C LIFT 12
16-08-09 D 841 FC IB C 35 42.5N 300 16.8 30.5 41.1 46.2 BLOCK A LIFT 12
18-08-09 D 844 FC IB-2 C 30 42.5N 270 20.8 29.7 33.5 38.6 RW GD BL E LIFT 3
18-08-09 N 847 FC IB-2 C 30 42.5N 270 19.1 27.5 34.8 39.4 BLOCK B LIFT 9
20-08-09 D 856 FC IB-2 C 30 42.5N 270 16.2 28.4 35.4 39.3 RW GD BL E LIFT 4
22-08-09 D 864 FC IB-2 C 30 42.5N 270 16.2 27.8 35.1 38.7 BLOCK B LIFT 10
24-08-09 D 873 FC IB C 35 42.5N 300 17.8 31.7 41.6 45.5 BLOCK E LIFT 5
25-08-09 N 877 FC IB-2 C 30 42.5N 270 16.0 28.7 35.1 38.3 BLOCK B LIFT 11
27-08-09 N 888 FC IB-2 C 30 42.5N 270 17.9 24.5 36.0 39.4 BLOCK B LIFT 12
03-01-10 D 1339 FC IB-2 C 30 42.5N 300 16.2 28.9 36.7 40.6 G/DAM BLOCK "C"
G/DAM BLOCK "A" &
06-01-10 D 1352 FC IB-2 C 30 42.5N 300 14.5 24.6 33.3 39.3
"D" LIFT 13A
G/DAM BLOCK "B"
08-01-10 D 1360 FC IB-2 C 30 42.5N 300 14.5 25.1 32.0 36.5
LIFT 13A
G/DAM BLOCK "A"
23-09-10 D 2329 FC IB C 35 42.5N 330 17.7 31.6 41.8 46.2
LIFT 13
G/DAM BLOCK "B"
06-10-10 N 2363 FC IB C 35 42.5N 330 24.1 30.5 43.8 48.5
LIFT 13
G/DAM BLOCK "C"
16-10-10 D 2392 FC IB C 35 42.5N 330 15.5 27.6 35.3 41.5
LIFT 13
G/DAM BLOCK "D"
04-11-10 D 2440 FC JC C 25 42.5N 310 14.6 26.1 32.8 37.1
LIFT 13
Page 96
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
05-02-09 N 428 FC S C 15 42.5N 250 11.2 26.6 35.5 38.9 GATED SPILLWAY
07-02-09 N 432 FC S C 15 42.5N 250 9.3 23.4 30.8 35.6 GATED SPILLWAY
10-02-09 N 438 FC S C 15 42.5N 250 11.1 24.2 32.6 34.4 GATED SPILLWAY
14-02-09 D 446 FC S C 15 42.5N 250 13.6 25.0 32.8 36.9 GATED SPILLWAY
04-03-09 N 471 FC IB-7 C 25 42.5N 270 20.9 35.4 40.1 47.2 GATED SPILLWAY
04-03-09 N 472 FC IB-7 C 25 42.5N 270 17.0 26.4 37.4 40.5 GATED SPILLWAY
04-03-09 N 473 FC IB-7 C 25 42.5N 270 20.6 35.6 40.8 50.4 GATED SPILLWAY
11-03-09 D 488 FC S C 15 42.5N 250 11.6 23.1 30.6 35.5 GATED SPILLWAY
20-03-09 D 501 FC S C 15 42.5N 250 17.1 28.2 36.5 42.0 GATED SPILLWAY
21-03-09 N 505 FC S C 15 42.5N 250 18.0 23.8 28.4 32.2 GATED SPILLWAY
24-03-09 D 508 FC S C 15 42.5N 250 11.0 23.4 31.2 37.5 GATED SPILLWAY
31-03-09 N 517 FC S C 15 42.5N 250 10.2 21.1 28.0 32.0 GATED SPILLWAY
03-04-09 D 521 FC IB-7 C 25 42.5N 270 16.8 27.7 36.3 38.8 GATED SPILLWAY
03-04-09 D 522 FC IB-7 C 25 42.5N 270 17.3 28.7 39.2 43.0 GATED SPILLWAY
07-04-09 N 530 FC S C 15 42.5N 250 12.0 20.4 27.5 33.1 GATED SPILLWAY
09-04-09 D 536 FC IB-2 C 25 42.5N 270 14.7 26.5 33.3 37.1 GATED SPILLWAY
09-04-09 N 535 FC IB-7 C 25 42.5N 270 15.7 25.4 36.0 41.1 GATED SPILLWAY
15-04-09 N 541A FC S C 15 42.5N 250 13.6 21.8 27.5 32.1 GATED SPILLWAY
19-04-09 D 546 FC IB-7 C 25 42.5N 270 13.0 30.5 37.5 42.4 GATED SPILLWAY
19-04-09 N 547 FC IB-7 C 25 42.5N 270 13.4 32.8 42.9 50.1 GATED SPILLWAY
24-04-09 D 553 FC S C 15 42.5N 250 10.5 22.8 28.6 33.2 GATED SPILLWAY
24-04-09 N 554 FC IB-7 C 25 42.5N 270 19.5 28.2 34.9 39.7 GATED SPILLWAY
04-05-09 D 572 FC S C 15 42.5N 250 12.7 22.7 31.1 36.0 GATED SPILLWAY
10-05-09 D 586 FC IB C 35 42.5N 300 15.8 26.0 36.5 41.9 GATED SPILLWAY
10-05-09 N 587 FC IB C 35 42.5N 300 16.4 28.3 35.1 41.5 GATED SPILLWAY
18-05-09 N 603 FC IB-7 C 25 42.5N 270 22.3 34.2 42.5 47.6 GATED SPILLWAY
20-05-09 D 607 FC S C 15 42.5N 250 14.6 22.4 30.3 34.7 GATED SPILLWAY
22-05-09 D 611 FC IB-7 C 25 42.5N 270 17.1 32.4 39.9 42.7 GATED SPILLWAY
24-05-09 D 614 FC IB-7 C 25 42.5N 270 15.8 27.6 38.4 42.4 GATED SPILLWAY
25-05-09 D 617 FC S C 15 42.5N 250 14.3 23.7 29.5 33.7 GATED SPILLWAY
26-05-09 D 618 FC IB C 35 42.5N 300 15.0 27.6 36.9 40.4 GATED SPILLWAY
27-05-09 N 622 FC IB-7 C 25 42.5N 270 18.1 30.1 39.4 44.3 GATED SPILLWAY
28-05-09 N 623 FC IB-7 C 25 42.5N 270 17.8 25.9 37.0 41.9 GATED SPILLWAY
01-06-09 N 628 FC IB-7 C 25 42.5N 270 15.5 27.9 38.7 41.9 GATED SPILLWAY
06-06-09 N 636 FC IB C 35 42.5N 300 15.1 25.8 38.8 41.4 GATED SPILLWAY
06-06-09 N 637 FC IB-7 C 25 42.5N 270 20.7 33.1 39.1 45.1 GATED SPILLWAY
09-06-09 N 643 FC EB C 16 42.5N 190 10.4 17.5 24.9 28.1 GATED SPILLWAY
10-06-09 D 647 FC IB C 35 42.5N 300 16.4 26.3 37.3 41.2 GATED SPILLWAY
Page 97
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
11-06-09 D 649 FC S C 15 42.5N 250 12.4 20.6 27.2 32.5 GATED SPILLWAY
17-06-09 D 661 FC IB C 35 42.5N 300 15.0 27.1 37.0 43.0 GATED SPILLWAY
17-06-09 D 662 FC IB-7 C 25 42.5N 270 15.4 28.9 38.8 44.3 GATED SPILLWAY
17-06-09 N 663 FC IB C 35 42.5N 300 15.1 26.3 36.9 42.4 GATED SPILLWAY
20-06-09 D 670 FC IB C 35 42.5N 300 15.4 27.5 36.3 43.1 GATED SPILLWAY
25-06-09 N 682 FC IB C 35 42.5N 300 14.5 27.7 36.7 42.6 GATED SPILLWAY
27-06-09 N 685 FC IB C 35 42.5N 300 17.2 26.9 36.5 41.0 GATED SPILLWAY
27-06-09 N 686 FC IB-7 C 25 42.5N 270 20.8 27.8 37.4 44.1 GATED SPILLWAY
27-06-09 D 689 FC IB C 35 42.5N 300 16.0 27.7 38.2 42.8 GATED SPILLWAY
01-07-09 D 694 FC S C 15 42.5N 250 11.6 22.5 27.5 30.5 GATED SPILLWAY
02-07-09 D 695 FC IB C 35 42.5N 300 17.0 29.1 36.1 41.5 GATED SPILLWAY
07-07-09 D 703 FC IB-7 C 25 42.5N 270 18.4 30.0 37.0 42.8 GATED SPILLWAY
07-07-09 D 704 FC IB C 35 42.5N 300 21.1 33.2 40.1 42.5 GATED SPILLWAY
09-07-09 N 711 FC IB C 35 42.5N 300 16.5 27.8 37.4 42.8 GATED SPILLWAY
13-07-09 N 721 FC IB C 35 42.5N 300 17.5 26.1 38.1 42.7 GATED SPILLWAY
16-07-09 D 731 FC IB C 35 42.5N 300 16.1 28.0 37.3 39.0 GATED SPILLWAY
18-07-09 N 741 FC IB C 35 42.5N 300 16.3 27.3 36.6 42.1 GATED SPILLWAY
20-07-09 D 745 FC IB C 35 42.5N 300 16.6 26.5 37.1 41.5 GATED SPILLWAY
21-07-09 N 746 FC IB-7 C 25 42.5N 270 19.9 28.4 36.9 43.0 GATED SPILLWAY
23-07-09 N 751 FC IB C 35 42.5N 300 18.6 27.9 38.0 40.6 GATED SPILLWAY
27-07-09 D 767 FC IB C 35 42.5N 300 15.9 27.0 39.1 43.1 GATED SPILLWAY
29-07-09 N 775 FC IB C 35 42.5N 300 16.8 27.4 39.4 42.1 GATED SPILLWAY
30-07-09 N 776 FC IB C 35 42.5N 300 16.7 28.2 38.8 46.6 GATED SPILLWAY
31-07-09 N 782 FC IB C 35 42.5N 300 17.2 27.3 37.5 41.4 GATED SPILLWAY
31-07-09 D 783 FC IB C 35 42.5N 300 18.9 27.7 40.2 43.4 GATED SPILLWAY
04-08-09 D 791 FC IB-7 C 25 42.5N 270 19.1 30.0 39.5 44.1 GATED SPILLWAY SB - S6B
04-08-09 N 792 FC IB C 35 42.5N 300 18.5 29.4 39.2 43.8 GATED SPILLWAY SB - S6B
06-08-09 D 797 FC IB C 35 42.5N 300 18.8 28.4 37.5 40.8 GATED SPILLWAY D3
11-08-09 N 817 FC IB C 35 42.5N 300 17.6 29.5 40.8 44.6 GATED SPILLWAY B2
Page 98
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
19-08-09 N 850 FC IB-7 C 25 42.5N 270 16.5 32.1 40.7 44.3 GATED SPILLWAY SB - S6B
22-08-09 D 866 FC IB C 35 42.5N 300 21.7 35.7 45.6 48.2 GATED SPILLWAY SWF - 1
26-08-09 D 881 FC IB-7 C 25 42.5N 270 17.7 31.2 43.1 46.8 GATED SPILLWAY SB5
26-08-09 D 882 FC IB C 35 42.5N 300 17.4 32.3 41.4 44.2 GATED SPILLWAY SB5
03-09-09 D 905 FC IB C 35 42.5N 330 19.3 31.0 41.0 45.6 GATED SPILLWAY SB - S5B
G.SPILLWAY RETAINING
04-09-09 D 906 FC EB C 16 42.5N 190 10.3 17.8 25.4 28.1 WALL RRC
04-09-09 D 910 FC IB C 35 42.5N 330 17.2 29.6 41.5 45.9 GATED SPILLWAY SW - F2
05-09-09 D 916 FC IB C 35 42.5N 330 20.7 30.2 39.9 43.2 GATED SPILLWAY SWA - 3
Page 99
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
18-09-09 D 961 FC IB C 35 42.5N 330 20.4 33.0 42.5 48.8 GATED SPILLWAY SB - S10
18-09-09 D 964 FC IB-7 C 25 42.5N 300 18.2 29.6 38.9 44.0 GATED SPILLWAY SB - S10
22-09-09 D 977 FC EB C 16 42.5N 190 10.1 19.0 24.3 28.1 GATED SPILLWAY RRC
24-09-09 D 987 FC IB C 35 42.5N 330 18.2 29.8 39.2 44.6 GATED SPILLWAY SW - F2
26-09-09 D 995 FC EB C 16 42.5N 190 10.7 16.9 25.0 28.1 GATED SPILLWAY RRC
26-09-09 N 997 FC K C 25 42.5N 250 14.8 24.2 33.8 37.1 GATED SPILLWAY RRC
Page 100
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
GATED SPILLWAY SW -
28-10-09 N 1121 FC IB C 35 42.5N 330 17.6 28.9 38.8 45.1 A7, B7, C7
Page 101
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
08-12-09 D 1263 FC IB C 35 42.5N 330 15.2 27.3 38.6 41.7 GATED SPILLWAY SWA F5
17-12-09 D 1295 FC IB C 35 42.5N 330 16.9 28.6 39.9 45.3 GATED SPILLWAY SWA F7
19-12-09 D 1304 FC IB C 35 42.5N 330 17.8 30.1 37.0 42.9 GATED SPILLWAY SWC B1
20-12-09 D 1308 FC IB C 35 42.5N 330 16.5 27.9 38.4 44.3 GATED SPILLWAY SWA F8
21-12-09 D 1312 FC IB C 35 42.5N 330 18.6 31.0 39.3 48.2 GATED SPILLWAY SWB D8
22-12-09 D 1315 FC IB C 35 42.5N 330 16.5 28.5 36.7 44.2 GATED SPILLWAY SWA B9
23-12-09 N 1317 FC IB C 35 42.5N 330 16.8 28.5 39.7 45.6 GATED SPILLWAY A6 - C6
Page 102
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
31-12-09 D 1330 FC IB C 35 42.5N 330 21.1 30.7 44.6 49.4 GATED SPILLWAY SWE B6
06-01-10 N 1351 FC R C 15 42.5N 250 11.7 19.9 25.9 29.7 GATED SPILLWAY RRC
G.SPILLWAY BLINDING
20-01-10 D 1422 FC IB C 35 42.5N 330 11.9 22.5 29.0 33.3 SLAB EXT.WALL A
G.SPILLWAY SLAB
20-01-10 N 1424 FC IB C 35 42.5N 330 17.3 26.7 38.2 40.6 UPSTREAM BTN. WALL
A&B
G.SPILLWAY SLAB
21-01-10 D 1426 FC IB C 35 42.5N 330 16.1 25.4 38.4 41.7 D/STREAM (SB - SR)
23-01-10 N 1435 FC IB C 35 42.5N 330 20.2 28.5 38.9 41.7 GATED SPILLWAY SW - HL
Page 103
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
GATED SPILLWAY
23-01-10 D 1439 FC S C 20 42.5N 250 11.3 20.8 26.7 28.4 BLINDING EXT.WALL A
25-01-10 N 1451 FC IB C 35 42.5N 330 17.0 28.5 37.4 42.5 GATED SPILLWAY SB - 11
30-01-10 D 1476 FC IB C 35 42.5N 330 17.3 29.4 40.8 45.9 GATED SPILLWAY SWF - 7
02-02-10 N 1485 FC IB C 35 42.5N 330 17.2 29.6 40.4 45.2 GATED SPILLWAY SWH - 2
05-02-10 D 1500 FC IB C 35 42.5N 330 19.5 30.7 40.7 45.2 GATED SPILLWAY SWF - 8
Page 104
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
Page 105
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
22-03-10 D 1727 FC S C 20 42.5N 250 10.7 20.9 29.3 32.7 GATED SPILLWAY SB - S8
25-03-10 D 1737 FC IB-7 C 35 42.5N 300 17.3 29.3 38.8 42.4 GATED SPILLWAY SB - S8
25-03-10 N 1738 FC IB C 35 42.5N 330 20.3 27.2 41.6 46.2 GATED SPILLWAY SB - S8
30-03-10 N 1764 FC IB C 35 42.5N 330 16.2 28.7 36.4 40.0 GATED SPILLWAY SB - S8
30-03-10 N 1765 FC IB-7 C 35 42.5N 300 16.7 27.0 37.3 40.1 GATED SPILLWAY SB - S8
30-03-10 D 1767 FC IB C 35 42.5N 330 16.2 27.1 36.8 40.3 GATED SPILLWAY SB - S8
11-04-10 N 1808 FC IB C 35 42.5N 330 16.0 27.1 36.6 39.4 GATED SPILLWAY SWA- H4
Page 106
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
16-04-10 D 1831 FC IB C 35 42.5N 330 15.5 25.3 37.1 41.0 GATED SPILLWAY SWA- L3
11-05-10 N 1915 FC IB C 35 42.5N 330 15.9 26.2 35.9 40.7 GATED SPILLWAY SWB- J5
11-05-10 N 1916 FC IB C 35 42.5N 330 16.1 26.9 35.9 40.5 GATED SPILLWAY SWB- B5
Page 107
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
02-06-10 N 1987 FC IB C 35 42.5N 330 15.4 28.3 36.9 39.9 GATED SPILLWAY SWB- F6
Page 108
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
29-06-10 N 2087 FC IB C 35 42.5N 330 17.8 29.8 37.4 43.2 GATED SPILLWAY SWC- F6
30-06-10 N 2094 FC IB C 35 42.5N 330 16.2 27.0 35.6 39.6 GATED SPILLWAY SWB- B9
Page 109
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
Page 110
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
Page 111
Summary of BUJAGALI HYDROELECTRIC POWER
GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
Page 112
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
03-02-09 N 426 FC S C 15 42.5N 250 9.7 24.9 34.1 40.7 SIPHONE SPILLWAY
10-02-09 D 437 FC IB-2 C 25 42.5N 270 9.0 27.0 34.6 39.1 SIPHONE SPILLWAY
05-03-09 D 474 FC IB-7 C 25 42.5N 270 14.3 26.0 36.2 39.5 SIPHONE SPILLWAY
31-03-09 D 516 FC S C 15 42.5N 250 10.3 20.1 27.5 31.9 SIPHONE SPILLWAY
10-04-09 D 538 FC K C 25 42.5N 250 14.2 25.0 34.7 41.5 SIPHONE SPILLWAY
14-05-09 D 597 FC S C 15 42.5N 250 12.4 19.4 27.5 30.9 SIPHONE SPILLWAY
26-05-09 N 619 FC S C 15 42.5N 250 12.4 24.2 33.2 37.4 SIPHONE SPILLWAY
02-06-09 D 631 FC S C 15 42.5N 250 12.5 19.6 24.7 30.7 SIPHONE SPILLWAY
04-06-09 N 634 FC IB-2 C 25 42.5N 270 14.5 25.2 35.1 38.4 SIPHONE SPILLWAY
04-06-09 D 635 FC EB C 16 42.5N 190 10.0 17.3 24.6 28.0 SIPHONE SPILLWAY
14-06-09 D 656 FC IB-7 C 25 42.5N 270 16.1 28.2 36.0 41.2 SIPHONE SPILLWAY
19-06-09 N 667 FC S C 15 42.5N 250 11.5 22.2 29.7 36.3 SIPHONE SPILLWAY
21-06-09 D 672 FC IB-7 C 25 42.5N 270 15.1 27.4 41.3 44.6 SIPHONE SPILLWAY
23-06-09 D 675 FC S C 15 42.5N 250 12.0 22.1 30.6 34.1 SIPHONE SPILLWAY
27-06-09 D 687 FC IB-7 C 25 42.5N 270 17.0 28.5 38.5 42.5 SIPHONE SPILLWAY
03-07-09 D 697 FC IB-7 C 25 42.5N 270 19.6 28.5 37.0 42.5 SIPHONE SPILLWAY
09-07-09 N 710 FC IB-7 C 25 42.5N 270 17.3 27.9 38.4 41.5 SIPHONE SPILLWAY
12-07-09 N 720 FC IB C 35 42.5N 300 16.8 27.3 38.4 41.8 SIPHONE SPILLWAY
17-07-09 D 734 FC IB-2 C 25 42.5N 270 13.9 24.6 35.0 38.9 SIPHONE SPILLWAY
27-07-09 N 768 FC JC C 25 42.5N 300 16.7 32.4 36.3 43.8 SIPHONE SPILLWAY
30-07-09 N 779 FC JC C 25 42.5N 300 12.5 21.4 33.6 35.7 SIPHONE SPILLWAY
S.SPILLWAY BARREL
18-08-09 D 846 FC M6 C 40 42.5N 333 18.6 33.3 44.8 51.9 10,11,12 LIFT 2A
Page 113
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
S.SPILLWAY BARREL 34
11-09-09 D 936 FC IB C 35 42.5N 330 18.9 31.5 40.2 46.1 LIFT 6.6
S.SPILLWAY CRANE
16-09-09 D 955 FC IB C 35 42.5N 330 15.2 26.0 39.0 48.1 RAILWAY
S.SPILLWAY BARREL 7- 8
24-09-09 N 986 FC IB C 35 42.5N 330 18.4 31.2 40.9 45.4 LIFT 5
S.SPILLWAY BARREL
26-09-09 D 1000 FC IB C 35 42.5N 330 19.0 31.3 42.5 50.4 15&16 LIFT 2
S.SPILLWAY BARREL
30-09-09 D 1010 FC IB C 35 42.5N 330 18.2 30.9 41.0 50.1 11&12,13&14 LIFT 3
S.SPILLWAY BARREL
30-09-09 D 1011 FC IB-7 C 25 42.5N 300 18.1 32.8 42.2 45.8 11&12,13&14 LIFT 3
S.SPILLWAY BARREL
08-10-09 D 1039 FC M6 C 40 42.5N 333 21.9 37.0 47.6 54.2 3&4,5&6 DEFLECTORS
Page 114
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
S.SPILLWAY BARREL
10-10-09 D 1049 FC M6 C 40 42.5N 333 25.5 38.5 48.4 54.6 3&4,5&6 DEFLECTORS
S.SPILLWAY BARREL
10-10-09 N 1050 FC M6 C 40 42.5N 333 23.6 34.0 47.8 52.8 11&12,13&14 LIFT 4
S.SPILLWAY BARREL
10-10-09 N 1051 FC IB C 35 42.5N 330 23.8 30.6 45.1 47.4 11&12,13&14 LIFT 4
SIPHON SPILLWAY
06-12-09 D 1253 FC IB C 35 42.5N 330 16.2 27.1 36.5 38.5 PRECAST
SIPHON SPILLWAY
07-12-09 D 1259 FC IB C 35 42.5N 330 16.3 26.8 37.8 41.6 PRECAST
Page 115
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
SIPHON SPILLWAY
10-12-09 D 1270 FC IB C 35 42.5N 330 17.4 27.5 36.5 40.8 PRECAST BEAM
SIPHON SPILLWAY
11-12-09 N 1274 FC IB C 35 42.5N 330 17.3 27.9 39.0 43.5 PRECAST
SIPHON SPILLWAY
12-12-09 D 1279 FC IB-7 C 35 42.5N 300 16.4 26.8 36.3 38.7 PRECAST BEAM
S.SPILLWAY BARRELS 3, 4,
17-12-09 D 1294 FC M6 C 40 42.5N 333 25.4 37.7 46.2 53.8 5, 6 LIFT 7
16-01-10 D 1402 FC IB C 35 42.5N 330 20.0 30.8 41.8 48.4 S.S. BARREL 1 Lift 4A WALL
S.SPILLWAY BARRELS
19-01-10 D 1415 FC M6 C 40 42.5N 380 21.1 34.4 46.4 49.5 11,12 LIFT 7
S.SPILLWAY BARRELS
20-01-10 D 1423 FC M6 C 40 42.5N 380 24.0 38.6 47.4 52.6 13,14 LIFT 7
S.SPILLWAY BARRELS
21-01-10 D 1428 FC M6 C 40 42.5N 380 25.2 38.2 48.5 57.0 15,16 LIFT 7
S.SPILLWAY PRECAST
25-01-10 D 1448 FC M6 C 40 42.5N 380 21.7 30.4 46.9 50.0 BEAM
S.SPILLWAY BARRELS 7 - 8
25-01-10 D 1449 FC IB C 35 42.5N 330 17.4 29.1 40.6 46.2 LIFT 4A & 5A
S.SPILLWAY BARRELS 4 - 5
26-01-10 D 1456 FC IB C 35 42.5N 330 18.9 31.1 39.1 44.8 & 9 - 10 LIFT 4A & 5A
Page 116
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
S.SPILLWAY BARRELS 5 -
27-01-10 D 1461 FC IB C 35 42.5N 330 15.7 27.5 36.3 41.3 6 - 7, 7 - 8 LIFT 4B
S.SPILLWAY BARRELS 11 -
01-02-10 D 1480 FC IB C 35 42.5N 330 17.4 28.6 37.1 42.1 12 LIFT 4A & 5A WALL
S.SPILLWAY BARRELS 9 -
02-02-10 D 1484 FC IB C 35 42.5N 330 16.7 28.6 38.6 43.3 10, 10 - 11 LIFT 4B
S.SPILLWAY BARRELS 2 -
04-02-10 D 1496 FC IB C 35 42.5N 330 16.5 27.7 38.6 43.5 3, 11 - 12 LIFT 4A
S.SPILLWAY BARREL 1
07-02-10 N 1515 FC IB C 35 42.5N 330 17.8 29.6 40.8 47.3 LIFT 4B
S.SPILLWAY BARRELS 11 -
07-02-10 D 1517 FC IB C 35 42.5N 330 17.5 28.9 38.6 43.7 12, 12 - 13 LIFT 4B
S.SPILLWAY BARRELS 1 - 2
08-02-10 D 1521 FC IB C 35 42.5N 330 17.3 29.4 40.8 46.1 LIFT 6B BAR. 7 - 5 LIFT 5
S.SPILLWAY BARRELS 12 -
09-02-10 D 1527 FC IB C 35 42.5N 330 16.9 29.6 39.9 45.1 13, 14 - 15 LIFT 4A, 5A&4B
S.SPILLWAY BARRELS 12 -
10-02-10 D 1533 FC IB C 35 42.5N 330 17.0 30.1 42.6 48.1 13 LIFT 4A & 5A
S.SPILLWAY BARRELS 4 - 5
10-02-10 N 1534 FC IB C 35 42.5N 330 18.2 30.6 43.2 46.8 LIFT 6A
S.SPILLWAY BARRELS 2 -
11-02-10 D 1541 FC IB C 35 42.5N 330 16.2 28.9 37.0 41.2 3, 3 - 4 LIFT 6B
S.SPILLWAY BARREL 1
12-02-10 N 1546 FC IB C 35 42.5N 330 16.6 28.3 37.8 41.9 LIFT 5A
S.SPILLWAY BARRELS 1 -
13-02-10 D 1553 FC IB C 35 42.5N 330 17.8 28.6 38.7 44.9 2, 3 - 4 LIFT 7A
S. SPILLWAY BARRELS 13 -
15-02-10 D 1557 FC IB C 35 42.5N 330 17.3 28.1 39.6 45.2 14 LIFT 4A&5A
16-02-10 N 1559 FC S C 15 42.5N 250 12.6 20.8 26.0 30.6 SIPHON SPILLWAY RRC
S.SPILLWAY BARRELS 4 -
16-02-10 D 1562 FC IB C 35 42.5N 330 15.7 26.6 36.6 41.3 5, 5 - 6 LIFT 6B
S.SPILLWAY BARREL 1
17-02-10 D 1569 FC IB C 35 42.5N 330 17.3 29.2 40.8 45.1 LIFT 5B
S.SPILLWAY BARRELS 9 -
18-02-10 N 1573 FC IB C 35 42.5N 330 17.1 28.3 37.8 40.8 10, 10 - 11 LIFT 5B
Page 117
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
S.SPILLWAY BARRELS 2 - 3
19-02-10 D 1582 FC IB C 35 42.5N 330 16.0 26.4 38.4 42.1 LIFT 6A
S.SPILLWAY BARRELS 4C -
21-02-10 N 1588 FC IB C 35 42.5N 330 20.4 32.9 43.3 50.8 1 BAR. 1 - 2 LIFT 3C
S.SPILLWAY BARRELS 11 -
22-02-10 D 1596 FC IB C 35 42.5N 330 16.3 28.1 38.4 41.2 12, 13 - 14 LIFT 6A
S.SPILLWAY BARRELS 13 -
24-02-10 D 1604 FC IB C 35 42.5N 330 17.0 28.8 37.5 43.4 15 LIFT 5B
SIPHON SPILLWAY SS 1 - 4
26-02-10 N 1622 FC IB C 35 42.5N 330 17.3 30.1 40.6 45.3 C2
S.SPILLWAY BARRELS 3 - 4
03-03-10 N 1642 FC IB C 35 42.5N 330 16.6 27.6 37.2 41.3 LIFT 3C
SIPHON SPILLWAY SS - 1
05-03-10 N 1653 FC IB C 35 42.5N 330 15.9 28.6 39.2 42.7 LIFT 5C
SIPHON SPILLWAY SS - 1
14-03-10 N 1691 FC IB C 35 42.5N 330 15.3 27.2 37.6 41.8 LIFT 6A
S.SPILLWAY BARRELS 1 - 4
15-03-10 D 1695 FC M6 C 40 42.5N 380 26.5 39.6 47.7 51.6 LIFT 8
Page 118
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
SIPHON SPILLWAY SS - 1
18-03-10 D 1707 FC IB C 35 42.5N 330 17.0 26.4 36.1 39.9 LIFT 6B - 6C
S.SPILLWAY BARRELS 4 - 5
23-03-10 N 1728 FC R C 20 42.5N 250 11.9 19.2 25.3 29.4 -6
S.SPILLWAY BARRELS 5 - 6
25-03-10 D 1742 FC M6 C 40 42.5N 380 22.2 36.3 42.5 48.8 - 7 LIFT 8
S.SPILLWAY BARRELS 5 - 6
26-03-10 D 1749 FC IB C 35 42.5N 330 18.2 30.1 39.2 41.8 - 7 LIFT 3C
S.SPILLWAY BARRELS 10 -
27-03-10 N 1751 FC S C 20 42.5N 250 11.5 18.7 25.3 28.1 11 - 12 PLAIN CONCRETE
S.SPILLWAY BARRELS 10 -
31-03-10 D 1774 FC IB C 35 42.5N 330 14.6 26.8 35.7 39.7 11 - 12 LIFT 3C
S.SPILLWAY BARRELS 13 -
02-04-10 D 1786 FC S C 20 42.5N 250 12.1 19.9 26.3 30.6 14 - 15
SIPHON SPILLWAY SS 1
06-04-10 D 1789 FC IB C 35 42.5N 330 17.3 28.5 35.9 39.2 LIFT 7A
S.SPILLWAY BARRELS 7 - 8
08-04-10 D 1795 FC IB C 35 42.5N 330 17.2 27.8 35.8 39.9 SLAB
SIPHON SPILLWAY SS 1
09-04-10 D 1798 FC R C 20 42.5N 250 11.7 19.8 24.9 27.8 RRC
S.SPILLWAY BARRELS 13 -
09-04-10 D 1801 FC IB C 35 42.5N 330 15.0 28.5 35.4 39.8 14 - 15, 3C SLAB
S.SPILLWAY BARRELS 9
13-04-10 N 1816 FC IB C 35 42.5N 330 16.4 27.7 35.9 40.6 LIFT 3C
14-04-10 N 1821 FC R C 20 42.5N 250 10.1 18.3 24.9 27.5 SIPHON SPILLWAY RRC
Page 119
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
SIPHON SPILLWAY SS 1
15-04-10 N 1828 FC IB C 35 42.5N 330 16.8 28.9 39.1 43.3 LIFT 14A
SIPHON SPILLWAY SS 1
16-04-10 N 1829 FC R C 20 42.5N 250 9.6 16.9 23.4 25.9 RRC
SIPHON SPILLWAY SS 1
20-04-10 N 1846 FC IB C 35 42.5N 330 16.7 25.6 38.5 43.3 LIFT 14C
SIPHON SPILLWAY SS 1
23-04-10 D 1855 FC IB C 35 42.5N 330 15.9 25.9 36.8 39.6 LIFT 4D
SIPHON SPILLWAY SS 1
24-04-10 D 1861 FC IB C 35 42.5N 330 16.6 27.8 38.7 41.6 LIFT 14B
SIPHON SPILLWAY SS 1
24-04-10 N 1864 FC IB C 35 42.5N 330 16.3 28.3 39.3 43.8 LIFT 10C - 7B - 10B
SIPHON SPILLWAY SS 1
27-04-10 D 1874 FC IB C 35 42.5N 330 17.8 27.0 35.4 39.9 LIFT 14D
SIPHON SPILLWAY SS 1
28-04-10 D 1878 FC IB C 35 42.5N 330 18.0 30.0 37.7 41.8 LIFT 5D
SIPHON SPILLWAY
04-05-10 D 1888 FC M6 C 40 42.5N 380 24.7 35.6 45.0 49.5 BARRELS 10, 11, 12, 13
LIFT 8
SIPHON SPILLWAY
05-05-10 N 1893 FC IB C 35 42.5N 330 15.1 25.8 36.3 38.5 BARREL 1 SS 1 LIFT 14E,
14F, 14H
SIPHON SPILLWAY
07-05-10 N 1897 FC IB C 35 42.5N 330 18.8 27.1 35.9 41.4 BARREL SS 1-2 LIFT 6D
SIPHON SPILLWAY
10-05-10 N 1908 FC IB C 35 42.5N 330 17.5 27.5 35.5 39.5 BARRELS 7 - 8 LIFT 4B &
5B
SIPHON SPILLWAY AXIS 17
12-05-10 D 1919 FC IB C 35 42.5N 330 15.8 26.9 37.1 43.2 BARRELS 9 - 10 LIFT 4A &
5A
SIPHON SPILLWAY
14-05-10 N 1924 FC IB C 35 42.5N 330 15.6 28.3 36.7 38.7 BARREL 1 SS 1 LIFT 7D
Page 120
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
SIPHON SPILLWAY SS 1
25-05-10 N 1963 FC IB C 35 42.5N 330 18.2 33.3 40.6 46.9 LIFT 12C
SIPHON SPILLWAY SS 1
29-05-10 N 1978 FC IB C 35 42.5N 330 16.8 27.6 39.5 44.6 LIFT 8A & 10
SIPHON SPILLWAY SS 1
05-06-10 D 1998 FC IB C 35 42.5N 330 16.3 26.9 36.8 40.3 LIFT 8D
SIPHON SPILLWAY
19-06-10 N 2053 FC IB C 35 42.5N 330 17.9 28.8 39.1 44.6 BARRELS 7 - 8 LIFT 6A
SIPHON SPILLWAY
21-06-10 N 2057 FC M6 C 40 42.5N 380 22.7 37.0 46.3 52.7 BARRELS 1 - 2 - 3 LIFT 18
SIPHON SPILLWAY
22-06-10 D 2062 FC IB C 35 42.5N 330 18.3 29.5 38.8 44.5 BARREL 8 LIFT 6B
SIPHON SPILLWAY
26-10-10 D 2412 FC IB C 35 42.5N 330 18.3 27.6 38.4 43.3 BARRELS 2 - 3 LIFT 9A
SIPHON SPILLWAY
26-10-10 D 2413 FC S C 20 42.5N 250 10.0 16.4 21.5 26.1 BARRELS 15 - 16 LIFT 3C -
4C
SIPHON SPILLWAY
27-10-10 D 2417 FC IB C 35 42.5N 330 17.8 32.2 39.5 44.8 BARRELS 1 - 2 LIFT 8 - 4
SIPHON SPILLWAY
29-10-10 N 2424 FC M6 C 40 42.5N 380 24.7 35.8 46.1 52.6 BARREL 9 LIFT 6B AXIS 17
30-10-10 N 2425 FC S C 20 42.5N 250 13.8 20.9 26.4 30.9 SIPHON SPILLWAY RRC
SIPHON SPILLWAY
30-10-10 D 2426 FC IB C 35 42.5N 330 16.2 26.0 35.8 37.9 BARRELS 9 & 6B AXIS 17
SIPHON SPILLWAY
02-11-10 2434 FC IB C 35 42.5N 330 15.5 26.1 35.7 40.2 BARRELS 4 & 5 LIFT 8 - 1 -
18
SIPHON SPILLWAY
03-11-10 2438 FC IB-2 C 30 42.5N 300 14.2 24.5 33.6 37.0 BARRELS 15 - 16 LIFT 3C &
4C
SIPHON SPILLWAY
04-11-10 2441 FC IB C 35 42.5N 330 16.4 28.1 37.9 42.1 BARRELS 8 LIFT 8
Page 121
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
SIPHON SPILLWAY
06-11-10 2446 FC IB C 35 42.5N 330 15.1 25.5 35.7 37.5 BARRELS 9 LIFT 8
SIPHON SPILLWAY
06-11-10 2447 FC IB C 35 42.5N 330 15.4 28.0 36.8 40.5 BARRELS 4 & 5 LIFT 8(III)
SIPHON SPILLWAY
08-11-10 2451 FC IB C 35 42.5N 330 17.7 31.5 41.8 48.9 BARRELS 6 LIFT 8(II)
SIPHON SPILLWAY
08-11-10 2452 FC IB C 35 42.5N 330 18.2 31.6 41.7 46.7 BARRELS 3 LIFT 8(III)
08-11-10 2453 FC IB C 35 42.5N 330 16.3 27.6 37.4 41.4 SIPHON SPILLWAY 4B & 4C
SIPHON SPILLWAY
10-11-10 2456 FC IB C 35 42.5N 330 15.0 26.7 35.6 41.8 BARRELS 14 LIFT 8(I)
SIPHON SPILLWAY
10-11-10 2457 FC IB C 35 42.5N 330 15.1 25.8 35.5 41.2 BARRELS 3 LIFT 8(III)
SIPHON SPILLWAY
10-11-10 2458 FC IB C 35 42.5N 330 15.2 26.9 36.5 40.8 BARRELS 6 LIFT 8(II)
SIPHON SPILLWAY
11-11-10 2459 FC IB C 35 42.5N 330 18.3 29.1 38.6 43.2 BARREL 1 LIFT 9B
SIPHON SPILLWAY
12-11-10 2462 FC IB C 35 42.5N 330 15.8 30.6 38.8 43.5 BARRELS 3 LIFT 8(V)
SIPHON SPILLWAY
12-11-10 2463 FC IB C 35 42.5N 330 16.3 28.3 39.6 44.2 BARRELS 6 LIFT 8(III)
SIPHON SPILLWAY
13-11-10 2465 FC IB C 35 42.5N 330 16.6 31.8 39.9 45.7 RETAINING WALL 4DA,
4DB, 4DC, 4DD, 4DE
SIPHON SPILLWAY
16-11-10 2469 FC IB C 35 42.5N 330 15.2 25.6 35.7 38.4
BARRELS 7 & 8 2nd LEVEL
SIPHON SPILLWAY
17-11-10 2471 FC IB C 35 42.5N 330 15.1 29.3 39.7 46.2 BARRELS 2 LIFT 9
SIPHON SPILLWAY
17-11-10 2472 FC IB C 35 42.5N 330 16.3 27.6 38.8 43.6 PRECAST SLAB
SIPHON SPILLWAY
18-11-10 2474 FC IB C 35 42.5N 330 15.0 26.8 36.6 40.6 BARRELS 16 LIFT 5B, 5D -
A TO 5D - E
SIPHON SPILLWAY
19-11-10 2476 FC IB C 35 42.5N 330 15.4 25.3 36.8 40.0 BARRELS 7 - 8 LIFT 8(III)
SIPHON SPILLWAY
21-11-10 2481 FC IB C 35 42.5N 330 17.3 28.6 39.1 44.6 BARRELS 1/2 LIFT 8 6th
PHASE
SIPHON SPILLWAY
21-11-10 2482 FC IB C 35 42.5N 330 16.9 25.7 35.5 41.5 BARRELS 3 LIFT 9B
Page 122
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
SIPHON SPILLWAY
25-11-10 2492 FC IB C 35 42.5N 330 16.4 27.9 36.6 40.2 BARRELS 1 & 2 LIFT 8(VIII)
SIPHON SPILLWAY
29-11-10 2496 FC IB C 35 42.5N 330 15.3 30.7 38.5 45.4 BARRELS 15 & 16 LIFT 5B -
5C
SIPHON SPILLWAY
30-11-10 2497 FC IB C 35 42.5N 330 17.1 30.6 35.6 43.6 BARRELS 1 & 2 LIFT 8(VIII)
SIPHON SPILLWAY
01-12-10 2499 FC IB C 35 42.5N 330 15.3 28.6 35.3 40.4 BARRELS 7 & 8 LIFT 10B
SIPHON SPILLWAY
02-12-10 2502 FC IB C 35 42.5N 330 15.8 25.3 36.0 40.8 BARRELS 4 & 5 LIFT 8(V)
SIPHON SPILLWAY
07-12-10 2511 FC IB C 35 42.5N 330 15.4 26.7 36.5 39.8 BARRELS 5 LIFT 9A
SIPHON SPILLWAY
08-12-10 2513 FC IB C 35 42.5N 330 15.7 25.2 36.3 41.2 BARRELS 4 & 5 LIFT 8(V)
SIPHON SPILLWAY
08-12-10 2514 FC IB C 35 42.5N 330 15.5 25.3 35.8 40.5 BARRELS 8 LIFT 7B
SIPHON SPILLWAY
10-12-10 2518 FC IB C 35 42.5N 330 15.9 26.4 35.1 39.7 BARRELS 15 & 16 LIFTS
7C & 10C
SIPHON SPILLWAY
11-12-10 2521 FC IB C 35 42.5N 330 16.3 26.5 36.0 40.4 BARRELS 7 & 8 LIFT 8(V)
SIPHON SPILLWAY
13-12-10 2523 FC IB C 35 42.5N 330 15.1 26.8 37.5 43.8 BARRELS 1 & 2 LIFT 8A
SIPHON SPILLWAY
14-12-10 2525 FC IB C 35 42.5N 330 17.3 29.6 38.8 43.4 BARRELS 4 & 5 LIFT 13
SIPHON SPILLWAY
15-12-10 2526 FC IB C 35 42.5N 330 19.6 29.7 38.4 43.2 BARRELS 9 LIFT 7B
SIPHON SPILLWAY
15-12-10 2527 FC IB C 35 42.5N 330 15.9 26.4 35.1 40.5 BARRELS 16 LIFT 2A
SIPHON SPILLWAY
15-12-10 2530 FC IB C 35 42.5N 330 16.6 28.3 39.6 45.7 BARRELS 1 & 2 LIFT 13
SIPHON SPILLWAY
16-12-10 2531 FC IB C 35 42.5N 330 15.4 26.0 36.3 40.7 BARRELS 11 LIFT 9A
Page 123
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
SIPHON SPILLWAY
16-12-10 2532 FC IB C 35 42.5N 330 16.6 27.4 36.6 42.9 BARRELS 6 & 7 LIFT 8(V)
SIPHON SPILLWAY
16-12-10 2533 FC IB C 35 42.5N 330 15.3 26.2 35.6 39.6 RETAINING WALL 7DA,
7DE
SIPHON SPILLWAY
18-12-10 2537 FC IB C 35 42.5N 330 16.3 27.9 39.1 44.9 BARRELS 8 LIFT 8/4
SIPHON SPILLWAY
20-12-10 2540 FC IB C 35 42.5N 330 15.2 26.8 37.9 42.1 BARRELS 10 LIFTS 7B &
10B
SIPHON SPILLWAY
20-12-10 2541 FC IB C 35 42.5N 330 17.3 29.1 37.6 43.6 BARRELS 4 & 5 LIFT 8
SIPHON SPILLWAY
22-12-10 2543 FC JC C 25 42.5N 310 13.1 22.9 29.2 35.9 BARRELS 16 LIFT 12C
SIPHON SPILLWAY
27-12-10 2544 FC IB C 35 42.5N 330 16.6 27.1 36.6 42.8 BARRELS 3 LIFT 8(VIII)
SIPHON SPILLWAY
29-12-10 2546 FC IB C 35 42.5N 330 15.2 29.3 35.9 39.9 BARRELS 4 & 5 LIFT 8(VIII)
SIPHON SPILLWAY
31-12-10 2552 FC IB C 35 42.5N 330 15.3 26.8 36.6 41.5 BARRELS 8 LIFT 9B
SIPHON SPILLWAY
31-12-10 2553 FC IB C 35 42.5N 330 16.9 27.3 38.6 44.9 BARRELS 8 LIFT 7A
S.SPILLWAY RIGHT
05-01-11 D 2558 FC JC C 25 42.5N 300 10.4 21.9 29.6 34.9 CURVED RETAINING WALL
8A - 8E
07-01-11 D 2564 FC IB-2 C 30 42.5N 300 15.3 24.1 34.6 38.7 S.S. BARREL 8 Lift 8/5
S.SPILLWAY BARRELS 16
13-01-11 D 2572 FC IB C 35 42.5N 330 15.9 26.6 36.1 40.1 LIFT 4A
S.SPILLWAY BARRELS
13-01-11 D 2574 FC IB C 35 42.5N 330 17.6 26.2 37.3 44.2 13&14 LIFT 7B
S.SPILLWAY BARRELS 9
17-01-11 D 2578 FC IB C 35 42.5N 330 15.0 26.4 39.1 43.8 LIFT 9B
S.SPILLWAY BARRELS 8
17-01-11 D 2579 FC IB C 35 42.5N 330 15.6 26.1 39.7 44.8 LIFT 7/8
S.SPILLWAY RIGHT
18-01-11 D 2581 FC JC C 25 42.5N 300 11.9 20.3 30.1 35.1 CURVED SIDE WALL
Page 124
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
19-01-11 D 2582 FC IB C 35 42.5N 330 16.3 26.5 37.1 43.3 S.SPILLWAY 9 - 10 LIFT 7
S.SPILLWAY BARRELS 10
21-01-11 D 2584 FC IB C 35 42.5N 330 15.8 25.7 36.7 40.8 LIFT 9B
S.SPILLWAY BARRELS 14 -
21-01-11 D 2585 FC IB C 35 42.5N 330 16.4 24.3 32.1 38.9 15 LIFT 7B
S.SPILLWAY BARRELS 7 - 8
24-01-11 D 2590 FC IB C 35 42.5N 330 16.8 26.1 38.2 43.4 LIFT 8(VIII)
S.SPILLWAY BARRELS 13
24-01-11 D 2592 FC IB C 35 42.5N 330 16.5 27.4 39.3 45.5 LIFT 9A
S.SPILLWAY BARRELS 13
27-01-11 D 2600 FC IB C 35 42.5N 330 16.9 28.3 38.1 44.2 LIFT 9B
S.SPILLWAY BARRELS 10 -
31-01-11 D 2601 FC IB-2 C 30 42.5N 300 13.7 24.5 33.5 39.1 11 LIFT 8 (2/8)
S.SPILLWAY BARRELS 6 - 7
31-01-11 D 2602 FC IB-2 C 30 42.5N 300 14.2 34.0 34.0 40.5 LIFT 7A
S.SPILLWAY BARRELS 16
01-02-11 D 2603 FC IB-2 C 30 42.5N 300 14.2 25.3 33.6 37.3 LIFT 7B
S.SPILLWAY BARRELS 13 -
03-02-11 D 2604 FC IB-2 C 30 42.5N 300 15.0 24.6 33.3 37.6 14 LIFT 8 (3/8)
S.SPILLWAY BARRELS 14
03-02-11 D 2605 FC IB-2 C 30 42.5N 300 14.6 24.8 34.0 37.8 LIFT 9A
S.SPILLWAY BARRELS 8
04-02-11 D 2609 FC IB-2 C 30 42.5N 300 14.0 24.3 35.1 39.8 LIFT 8A
S.SPILLWAY BARRELS 12 -
05-02-11 D 2611 FC IB-2 C 30 42.5N 300 14.0 25.2 32.6 36.7 13 LIFT 8 (3/8)
S.SPILLWAY ROCK
06-02-11 D 2612 FC R C 20 42.5N 250 8.9 15.2 24.7 28.0 RECONSTRUCTION
CONCRETE
S.SPILLWAY BARRELS 13 -
08-02-11 D 2614 FC IB-2 C 30 42.5N 300 14.3 25.6 31.5 37.3 14 LIFT 8 (1&8)
S.SPILLWAY BARRELS 9
08-02-11 D 2615 FC IB-2 C 30 42.5N 300 14.5 25.5 32.5 37.7 LIFT 10
S.SPILLWAY BARRELS 9 -
10-02-11 D 2618 FC IB-2 C 30 42.5N 300 15.3 26.0 34.6 39.3 10 LIFT 8 (5&8)
S.SPILLWAY BARRELS 9
10-02-11 D 2619 FC IB-2 C 30 42.5N 300 14.1 26.6 33.7 37.6 LIFT 7
S.SPILLWAY BARRELS 16
11-02-11 D 2620 FC IB-2 C 30 42.5N 300 15.6 25.0 32.4 36.0 LIFT 4A
Page 125
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
S.SPILLWAY BARRELS 9 -
17-02-11 D 2628 FC IB-2 C 30 42.5N 300 14.6 25.2 33.8 29.8 10 LIFT 8 (7&8)
S.SPILLWAY ROCK
17-02-11 D 2627 FC R C 20 42.5N 250 10.1 15.0 26.6 38.6 RECONSTRUCTION
CONCRETE
S.SPILLWAY ROCK
20-02-11 D 2629 FC R C 20 42.5N 250 8.9 13.9 23.8 27.4 RECONSTRUCTION
CONCRETE
S.SPILLWAY BARRELS 5 -
21-02-11 D 2630 FC IB-2 C 30 42.5N 300 14.1 24.0 34.7 38.5 6, 7 - 8 LIFT 12
S.SPILLWAY BARRELS 11 -
21-02-11 D 2631 FC IB-2 C 30 42.5N 300 13.9 23.8 35.6 40.8 12 LIFT 8
S.SPILLWAY ROCK
22-02-11 D 2632 FC R C 20 42.5N 250 8.6 13.6 24.2 29.1 RECONSTRUCTION
CONCRETE
S.SPILLWAY RCC TAIL
23-02-11 D 2633 FC R C 20 42.5N 250 8.9 14.9 24.0 29.6 RACE CHANNEL
S.SPILLWAY BARRELS 11 -
25-02-11 D 2635 FC IB-2 C 30 42.5N 300 16.3 28.3 36.6 40.6 12 LIFT 8(5/8)
S.SPILLWAY BARRELS 6 -
26-02-11 D 2636 FC IB-2 C 30 42.5N 300 16.7 27.5 36.7 42.9 7&8 LIFT 13
S.SPILLWAY BARRELS 9
01-03-11 D 2638 FC IB-2 C 30 42.5N 300 14.1 24.4 34.7 39.3 LIFT 10
S.SPILLWAY BLINDING
03-03-11 D 2640 FC R C 20 42.5N 250 8.3 13.5 16.7 23.3 RIGHT BANK GRANTING
S.SPILLWAY BARRELS 15 -
07-03-11 D 2643 FC IB C 35 42.5N 330 17.1 29.3 38.8 44.6 16 LIFT 7B
S.SPILLWAY BARRELS 9 -
09-03-11 D 2644 FC IB C 35 42.5N 330 16.9 28.7 37.7 43.5 10 LIFT 8(VII)
S.SPILLWAY BARRELS 15 -
09-03-11 D 2645 FC IB C 35 42.5N 330 16.5 28.0 39.2 44.9 16 LIFT 9A
Page 126
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
S.SPILLWAY BARRELS 9 -
14-03-11 D 2650 FC IB C 35 42.5N 330 16.2 26.4 40.6 47.5 10 LIFT 8(V)
S.SPILLWAY BARRELS 13 -
14-03-11 D 2652 FC IB C 35 42.5N 330 16.7 26.2 39.9 46.5 14 LIFT 8(VI)
S.SPILLWAY APRON &
15-03-11 D 2653 FC IB-2 C 30 42.5N 300 13.5 24.1 34.2 39.2 TAIL RACE CHANNEL &
SLAB
S.SPILLWAY BARRELS 11 -
16-03-11 D 2654 FC IB C 35 42.5N 330 16.8 27.5 37.4 43.1 12 LIFT 8(VII)
S.SPILLWAY BARRELS 13 -
18-03-11 D 2657 FC IB C 35 42.5N 330 15.0 26.7 38.2 45.6 14 LIFT 8(VI)
S.SPILLWAY BARRELS 9 -
19-03-11 D 2660 FC IB C 35 42.5N 330 16.0 27.5 39.2 45.6 10 LIFT 8(VIII)
S.SPILLWAY BARRELS 16
22-03-11 D 2662 FC IB C 35 42.5N 330 16.0 28.1 40.5 46.8 LIFT 6A
S.SPILLWAY BARRELS 11 -
23-03-11 D 2664 FC IB C 35 42.5N 330 17.5 29.9 37.7 43.2 12 LIFT 8(VIII)
S.SPILLWAY BARRELS 15
31-03-11 D 2670 FC IB C 35 42.5N 330 18.0 26.7 39.6 45.5 LIFT 9B
S.SPILLWAY BARRELS 9 -
31-03-11 D 2671 FC IB C 35 42.5N 330 16.3 26.5 38.9 44.8 10 LIFT 8A
S.SPILLWAY BARRELS 15 -
31-03-11 D 2672 FC IB C 35 42.5N 330 18.4 29.2 40.6 46.9 16 LIFT 8(I)
Page 127
Summary of BUJAGALI HYDROELECTRIC POWER
SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT
08-04-11 D 2679 FC IB C 35 42.5N 330 16.6 27.4 36.7 S.SPILLWAY APRON SLAB
19-04-11 D 2690 FC IB-2 C 30 42.5N 300 14.0 25.3 34.4 S.SPILLWAY APRON SS16
S.SPILLWAY BARRELS 9 -
21-04-11 D 2692 FC IB-2 C 30 42.5N 300 14.7 25.6 32.3 10 LIFT 13
S.SPILLWAY BARRELS 11 -
26-04-11 D 2695 FC IB-2 C 30 42.5N 300 14.4 25.3 34.4 12 LIFT 13
S.SPILLWAY APRON SS15 -
27-04-11 D 2696 FC IB-2 C 30 42.5N 300 15.3 25.6 34.1 SS16
S.SPILLWAY APRON SLAB
28-04-11 D 2697 FC R C 20 42.5N 250 9.6 15.5 24.3 SS17 - SS19
S.SPILLWAY BARRELS 15 -
28-04-11 D 2698 FC IB-2 C 30 42.5N 300 14.6 25.8 33.7 16 LIFT 8(VIII)
S.SPILLWAY BARRELS 11 -
29-04-11 D 2699 FC IB-2 C 30 42.5N 300 14.4 24.0 33.8 12 LIFT 13
S.SPILLWAY BARRELS
04-05-11 D 2701 FC IB-2 C 30 42.5N 300 14.8 24.4 33.2
15 - 16 LIFT 8A
S.SPILLWAY APRON
06-05-11 D 2702 FC IB-2 C 30 42.5N 300 18.4 24.1 33.5
SLAB SS17 - SS19
S.SPILLWAY APRON RR
10-05-11 D 2703 FC R C 20 42.5N 250 9.3 17.1 23.3
CONCRETE
S.SPILLWAY BARRELS
13-05-11 D 2704 FC IB-2 C 30 42.5N 300 14.0 24.5 35.3
14 - 15 & 16 LIFT 12
S.SPILLWAY APRON
RIGHT WALL ROCK
14-05-11 D 2705 FC R C 20 42.5N 250 8.9 18.3 24.9
RECONSTRUCTION
CONCRETE
S.SPILLWAY SRI 1 & 2
17-05-11 D 2706 FC IB-2 C 30 42.5N 300 15.1 25.0 35.4
FOUNDATION
S.SPILLWAY
18-05-11 D 2707 FC JC C 25 42.5N 300 13.3 23.0 31.1 RETAINING WALL LIFTS
14A & 14B
S.SPILLWAY BARRELS
19-05-11 D 2708 FC IB-2 C 30 42.5N 300 15.7 25.7 34.2
15 & 16 LIFT 13
S.SPILLWAY SS20 1, 2,
20-05-11 D 2709 FC IB-2 C 30 42.5N 300 17.5 24.5 34.2
3&4
S.SPILLWAY APRON SR
23-05-11 D 2712 FC IB-2 C 30 42.5N 300 15.0 24.9 35.1
1-1
S.SPILLWAY BARRELS
25-05-11 D 2713 FC IB-2 C 30 42.5N 300 15.8 25.5 35.0
15 & 16 LIFT 13
Page 128
Summary of BUJAGALI HYDROELECTRIC POWER
SWITCH YARD
Rc, maturation at NORMAL
Note
SHIFT
28-04-09 D 564 FC JC C 25 42.5N 300 15.5 25.7 32.3 37.1 SWITCH YARD F.P14-1
07-05-09 D 578 FC JC C 25 42.5N 300 14.5 27.9 36.5 38.7 S.Y.D.F.P10-1 2nd LIFT
11-05-09 D 591 FC JC C 25 42.5N 300 14.2 25.3 31.2 36.4 S.Y.D.F.P10-5 1st POUR
13-05-09 D 594 FC JC C 25 42.5N 300 14.8 24.8 33.5 37.1 S.Y.D.F.P14-1 (2) 2nd POUR
16-05-09 D 602 FC JC C 25 42.5N 300 13.1 24.3 31.6 34.5 S.Y.DEEP FOUND. P10-5
06-06-09 D 638 FC JC C 25 42.5N 300 13.4 24.1 33.8 36.3 ERECTION BAY & BEAM AXIS 22-24
09-06-09 D 644 FC JC C 25 42.5N 300 14.7 26.4 34.6 38.7 S.Y.D.F.P10-2 2nd POUR
16-06-09 D 659 FC JC C 25 42.5N 300 12.6 23.4 32.6 36.0 S.Y.D.F.P10-1(Q-1) 2nd POUR
18-06-09 D 665 FC JC C 25 42.5N 300 14.1 26.7 34.0 38.6 S.Y.D.F.P10-1(Q3-4) 2nd POUR
24-06-09 D 677 FC JC C 25 42.5N 300 13.7 24.4 35.1 41.4 S.Y.D.F. P10-5 (A-4)
24-06-09 D 678 FC JC C 25 42.5N 300 14.7 25.4 34.8 39.7 E / BAY SLAB 24-25
25-06-09 D 681 FC JC C 25 42.5N 300 16.4 25.7 35.4 42.3 S.Y.D.F. P10-1 (R-4)
01-07-09 D 693 FC JC C 25 42.5N 300 16.0 30.7 37.8 40.1 S.Y.D.F. P10-1 (P-4)
08-07-09 D 705 FC JC C 25 42.5N 300 16.2 28.9 34.4 41.8 S.Y.D.F. P13-1 (C-2)
20-07-09 D 744 FC JC C 25 42.5N 300 14.8 24.8 32.5 37.7 S.Y.D.F. AXIS R3 P14-1 2nd POUR
21-07-09 D 747 FC JC C 25 42.5N 300 12.2 23.4 33.8 36.0 S.Y.D.F. AXIS D2 P13-1 2nd POUR
23-07-09 D 754 FC JC C 25 42.5N 300 16.9 27.2 36.8 39.8 S.Y.D.F. AXIS 14 P14-1 1st POUR
28-07-09 D 771 FC JC C 25 42.5N 300 13.1 24.5 34.5 38.5 S.Y.D.F. AXIS D3 P10-3 2nd POUR
28-07-09 D 772 FC JC C 25 42.5N 300 12.9 23.3 34.4 38.0 S.Y.D.F. AXIS H2 P14-1 1st POUR
30-07-09 D 777 FC JC C 25 42.5N 300 12.3 23.0 32.8 39.1 S.Y.D.F. AXIS 14 P14-1 2nd POUR
30-07-09 D 778 FC JC C 25 42.5N 300 13.2 12.9 33.9 39.9 S.Y.D.F. AXIS F4 P14-1 1st POUR
06-08-09 D 798 FC JC C 25 42.5N 300 15.3 23.8 34.3 38.2 S.Y.D.F.P14-1(H-2)2nd POUR
08-08-09 D 804 FC JC C 25 42.5N 300 16.0 27.2 37.0 41.3 S.Y.D.F.P14-1(F-4)2nd POUR
10-08-09 D 814 FC JC C 25 42.5N 300 13.2 24.5 33.4 37.1 S.Y.D.F.P14-1(O-5)2nd POUR
13-08-09 D 824 FC JC C 25 42.5N 300 12.5 25.6 35.6 38.3 S.Y.D.F.P12-2(D-5)2nd POUR
13-08-09 D 825 FC JC C 25 42.5N 300 12.7 24.9 34.0 38.0 S.Y.D.F. P14-1 C - 3
16-08-09 D 840 FC JC C 25 42.5N 300 19.4 27.7 38.5 41.4 S.Y.D.F.P12-1(C-5)1st POUR
17-08-09 D 842 FC JC C 25 42.5N 300 14.9 27.1 34.7 39.3 S.Y.D.F.P14-1(O-3)2nd POUR
Page 129
Summary of BUJAGALI HYDROELECTRIC POWER
SWITCH YARD
Rc, maturation at NORMAL
Note
SHIFT
21-08-09 D 858 FC JC C 25 42.5N 300 17.0 29.7 36.8 39.5 S.Y.D.F. P12-1 (Q4-5)
22-08-09 D 865 FC JC C 25 42.5N 300 13.6 25.3 32.8 36.3 S.Y.D.F.P10-3(G-5)1st POUR
S.Y.D.F.RHS FULL
24-08-09 D 870 FC R C 15 42.5N 300 12.4 21.4 28.4 31.2 EL:CH:41.50/39.00/36.50
25-08-09 D 875 FC JC C 25 42.5N 300 10.1 21.0 34.8 38.0 S.Y.D.F.P10-3(G-5)2nd POUR
30-08-09 D 893 FC JC C 25 42.5N 300 15.4 26.7 36.5 39.3 S.Y.D.F.P10-3(D-5)2nd POUR
30-08-09 D 894 FC JC C 25 42.5N 300 15.1 25.5 33.4 37.0 S.Y.D.F.P10-3(G-3)1st POUR
30-08-09 D 895 FC JC C 25 42.5N 300 13.9 26.5 35.8 38.5 S.Y.D.F.P15-1 AREA 1
01-09-09 D 897 FC JC C 25 42.5N 300 14.7 24.5 34.0 38.0 S.Y.D.F.P15-2 (C-5)
01-09-09 D 900 FC JC C 25 42.5N 300 13.9 26.4 36.7 39.2 S.Y.D.F.P12-3 (R-5)
04-09-09 D 912 FC JC C 25 42.5N 300 13.0 29.4 37.7 40.4 S.Y.D.F.P10-3 (F-3)
05-09-09 D 914 FC JC C 25 42.5N 300 14.4 26.8 35.0 39.0 S.Y.D.F.P10-3 (E-3)2nd POUR
07-09-09 D 923 FC JC C 25 42.5N 300 17.5 28.4 32.1 35.7 S.Y.D.F.P14-1 (L-4)
09-09-09 D 930 FC JC C 25 42.5N 300 14.5 29.6 33.8 37.8 S.Y.D.F.P10-3(F-5)2nd POUR
10-09-09 D 935 FC JC C 25 42.5N 300 13.9 25.9 33.6 40.4 S.Y.D.F.P10-3(E-5)2nd POUR
14-09-09 D 945 FC JC C 25 42.5N 300 13.4 25.2 34.8 45.1 S.Y.D.F.P14-1 (F-2)
16-09-09 D 953 FC JC C 25 42.5N 300 14.0 24.9 34.5 38.5 S.Y.D.F.P11-2(F-3)2nd POUR
17-09-09 D 958 FC JC C 25 42.5N 300 14.8 24.3 34.5 37.5 S.Y.D.F.P11-1 (I-2)
19-09-09 N 969 FC JC C 25 42.5N 300 17.6 31.3 39.5 50.4 S.Y.D.F.P14-1 (I-3)
21-09-09 D 973 FC JC C 25 42.5N 300 13.6 24.8 32.1 35.5 S.Y.D.F.P10-3(I-5)2nd POUR
24-09-09 D 984 FC JC C 25 42.5N 300 20.2 30.8 34.3 37.8 S.Y.D.F.P15-1(I-5)2nd POUR
01-10-09 D 1015 FC JC C 25 42.5N 300 15.1 24.0 32.9 38.5 S.Y.D.F.P10-2(L-2)2nd POUR
02-10-09 N 1020 FC R C 15 42.5N 300 13.4 20.1 29.1 32.7 S.Y.D.F.BLINDING P13-2
02-10-09 D 1021 FC R C 15 42.5N 300 13.0 19.5 28.7 31.7 S.Y.D.F.BLINDING P10-1
02-10-09 D 1024 FC JC C 25 42.5N 300 15.0 22.1 31.1 36.2 S.Y.D.F.P13-1(Q-2)2nd POUR
09-10-09 D 1046 FC JC C 25 42.5N 300 17.5 32.8 36.0 41.3 S.Y.D.F.P10-1(J-1)2nd POUR
12-10-09 D 1056 FC JC C 25 42.5N 300 14.9 25.0 35.7 39.8 S.Y.D.F.AXIS 7-B, A-B-C
12-10-09 N 1059 FC JC C 25 42.5N 300 15.7 24.5 34.4 38.7 S.Y.D.F.P10-1(K-2)2nd POUR
16-10-09 N 1078 FC JC C 25 42.5N 300 13.3 28.9 36.3 46.9 S.Y.D.F.P10-3(J-5)2nd POUR
18-10-09 D 1085 FC JC C 25 42.5N 300 15.8 25.2 33.1 38.6 S.Y.C. B. F. AXIS 8-7, B,C,D
19-10-09 N 1089 FC JC C 25 42.5N 300 14.9 25.1 33.3 36.8 S.Y.D.F.P10-1(P-5)2nd POUR
22-10-09 N 1101 FC JC C 25 42.5N 300 14.0 25.6 34.8 38.6 S.Y.D.F.P10-1(N-5)2nd POUR
24-10-09 N 1112 FC JC C 25 42.5N 300 14.5 25.2 32.3 37.7 S.Y.D.F.P13-3(R-2)1st POUR
Page 130
Summary of BUJAGALI HYDROELECTRIC POWER
SWITCH YARD
Rc, maturation at NORMAL
Note
SHIFT
27-10-09 N 1120 FC JC C 25 42.5N 300 14.0 27.4 33.6 39.8 S.Y.D.F.P10-1(K-5)2nd POUR
03-11-09 N 1141 FC JC C 25 42.5N 300 13.8 26.0 34.1 36.0 S.Y.DEEP FOUNDATION
S.Y.(CONTROL B) F-AXIS 7, 6, 6, 5,
16-11-09 D 1188 FC JC C 25 42.5N 300 13.8 24.0 32.5 37.3 4
17-11-09 D 1196 FC JC C 25 42.5N 300 13.8 25.8 32.4 37.2 S.Y.D.F.P14-1(L-1)2nd POUR
17-11-09 N 1198 FC JC C 25 42.5N 300 16.3 26.6 32.7 36.9 S.Y.D.F.P10-2(O-5)2nd POUR
30-11-09 N 1234 FC JC C 25 42.5N 300 14.5 26.6 35.0 41.3 S.Y.D.F.P11-1(O-2)2nd POUR
01-12-09 D 1237 FC JC C 25 42.5N 300 13.5 26.5 35.8 40.6 S.Y.DEEP FONDATION P15-1
28-01-10 D 1464 FC IB-2 C 30 42.5N 300 15.6 25.2 31.8 35.6 SWITCH YARD CABLE DUCT
Page 131
Summary of BUJAGALI HYDROELECTRIC POWER
SWITCH YARD
Rc, maturation at NORMAL
Note
SHIFT
03-05-10 D 1886 FC JC C 25 42.5N 310 13.8 22.4 30.8 33.8 S.YARD DPF P10-1 M - O - 2
Page 132
Summary of BUJAGALI HYDROELECTRIC POWER
PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT
15-09-09 D 948 FC IB-7 C 35 42.5N 300 15.0 27.4 40.4 45.0 PRECAST BEAM
21-09-09 D 971 FC IB-7 C 35 42.5N 300 15.9 28.6 40.6 43.5 PRECAST BEAM
22-09-09 D 974 FC IB-7 C 35 42.5N 300 17.3 26.9 37.0 43.1 PRECAST BEAM
24-09-09 D 982 FC IB-7 C 35 42.5N 300 20.3 32.1 41.9 46.4 PRECAST BEAM
26-09-09 D 994 FC IB-7 C 35 42.5N 300 18.9 27.9 36.6 42.4 PRECAST BEAM
27-09-09 D 1002 FC IB-7 C 35 42.5N 300 18.6 32.1 41.2 47.2 PRECAST BEAM
29-09-09 D 1006 FC IB-7 C 35 42.5N 300 20.0 30.1 39.6 43.9 PRECAST BEAM
30-09-09 D 1008 FC IB-7 C 35 42.5N 300 18.9 30.6 10.7 44.6 PRECAST BEAM
01-10-09 D 1013 FC IB-7 C 35 42.5N 300 18.5 29.2 36.7 40.5 PRECAST BEAM
06-10-09 D 1028 FC IB-7 C 35 42.5N 300 15.2 29.3 37.3 42.5 PRECAST BEAM
07-10-09 D 1033 FC IB-7 C 35 42.5N 300 22.7 32.1 40.2 45.4 PRECAST BEAM
08-10-09 D 1036 FC IB-7 C 35 42.5N 300 22.4 33.6 42.5 47.7 PRECAST BEAM
09-10-09 D 1043 FC IB-7 C 35 42.5N 300 15.8 27.1 35.7 40.5 PRECAST BEAM
10-10-09 D 1048 FC IB-7 C 35 42.5N 300 16.5 27.1 36.5 40.7 PRECAST BEAM
11-10-09 D 1053 FC IB-7 C 35 42.5N 300 21.9 32.2 42.4 48.1 PRECAST BEAM
12-10-09 D 1055 FC IB-7 C 35 42.5N 300 16.5 25.8 38.2 42.5 PRECAST BEAM
13-10-09 D 1061 FC IB-7 C 35 42.5N 300 20.9 30.6 40.6 47.1 PRECAST BEAM
14-10-09 D 1065 FC IB-7 C 35 42.5N 300 19.0 28.9 38.1 43.6 PRECAST BEAM
15-10-09 D 1069 FC IB-7 C 35 42.5N 300 18.9 30.2 40.4 47.8 PRECAST BEAM
16-10-09 D 1075 FC IB-7 C 35 42.5N 300 16.0 30.0 39.0 43.7 PRECAST BEAM
17-10-09 D 1079 FC IB-7 C 35 42.5N 300 19.8 28.6 39.4 44.8 PRECAST BEAM
18-10-09 D 1084 FC IB-7 C 35 42.5N 300 17.6 27.2 38.2 42.5 PRECAST BEAM
19-10-09 D 1086 FC IB-7 C 35 42.5N 300 15.1 29.8 38.4 42.5 PRECAST BEAM
20-10-09 D 1091 FC IB-7 C 35 42.5N 300 20.4 29.9 40.6 43.3 PRECAST BEAM
21-10-09 D 1095 FC IB-7 C 35 42.5N 300 15.6 27.7 38.8 40.0 PRECAST BEAM
22-10-09 D 1099 FC IB-7 C 35 42.5N 300 23.2 32.3 40.9 43.7 PRECAST BEAM
23-10-09 D 1104 FC IB-7 C 35 42.5N 300 20.6 29.7 39.1 42.8 PRECAST BEAM
Page 133
Summary of BUJAGALI HYDROELECTRIC POWER
PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT
24-10-09 D 1108 FC IB-7 C 35 42.5N 300 20.7 29.5 39.4 50.5 PRECAST BEAM
26-10-09 D 1115 FC IB-7 C 35 42.5N 300 21.8 31.2 39.7 48.3 PRECAST BEAM
27-10-09 D 1119 FC IB-7 C 35 42.5N 300 17.8 32.9 40.4 46.0 PRECAST BEAM
28-10-09 D 1122 FC IB-7 C 35 42.5N 300 16.8 27.9 38.0 44.4 PRECAST BEAM
29-10-09 D 1124 FC IB-7 C 35 42.5N 300 17.4 27.1 38.4 44.0 PRECAST BEAM
30-10-09 D 1128 FC IB-7 C 35 42.5N 300 16.7 26.4 38.7 42.4 PRECAST BEAM
02-11-09 D 1134 FC IB-7 C 35 42.5N 300 17.1 29.2 39.4 42.3 PRECAST BEAM
03-11-09 D 1139 FC IB-7 C 35 42.5N 300 18.0 29.3 40.6 44.6 PRECAST BEAM
04-11-09 D 1142 FC IB-7 C 35 42.5N 300 15.7 29.6 39.8 43.1 PRECAST BEAM
05-11-09 D 1148 FC IB-7 C 35 42.5N 300 17.2 29.9 39.9 43.5 PRECAST BEAM
06-11-09 D 1151 FC IB-7 C 35 42.5N 300 17.6 29.1 40.3 44.4 PRECAST BEAM
07-11-09 D 1155 FC IB-7 C 35 42.5N 300 16.7 28.2 40.2 43.2 PRECAST BEAM
08-11-09 D 1157 FC IB-7 C 35 42.5N 300 17.1 29.4 39.2 44.7 PRECAST BEAM
09-11-09 D 1162 FC IB-7 C 35 42.5N 300 21.5 30.8 41.5 48.5 PRECAST BEAM
10-11-09 D 1167 FC IB-7 C 35 42.5N 300 18.1 28.6 39.9 42.5 PRECAST BEAM
11-11-09 D 1170 FC IB-7 C 35 42.5N 300 19.8 28.5 37.8 44.5 PRECAST BEAM
12-11-09 D 1175 FC IB-7 C 35 42.5N 300 19.7 30.9 40.4 46.4 PRECAST BEAM
13-11-09 D 1180 FC IB-7 C 35 42.5N 300 18.1 30.7 40.0 46.3 PRECAST BEAM
14-11-09 D 1183 FC IB-7 C 35 42.5N 300 18.5 27.9 35.8 42.1 PRECAST BEAM
15-11-09 D 1186 FC IB-7 C 35 42.5N 300 17.2 26.6 38.1 43.1 PRECAST BEAM
16-11-09 D 1187 FC IB-7 C 35 42.5N 300 18.5 31.1 40.2 46.2 PRECAST BEAM
17-11-09 D 1193 FC IB-7 C 35 42.5N 300 20.8 32.1 41.9 46.4 PRECAST BEAM
18-11-09 D 1200 FC IB-7 C 35 42.5N 300 15.9 26.7 37.8 43.2 PRECAST BEAM
20-11-09 D 1206 FC IB-7 C 35 42.5N 300 15.2 27.0 37.7 42.6 PRECAST BEAM
21-11-09 D 1206B FC IB-7 C 35 42.5N 300 16.2 28.8 37.6 41.0 PRECAST BEAM
22-11-09 D 1211 FC IB-7 C 35 42.5N 300 18.0 29.6 39.3 43.6 PRECAST BEAM
23-11-09 D 1214 FC IB-7 C 35 42.5N 300 18.8 29.5 37.6 44.8 PRECAST BEAM
Page 134
Summary of BUJAGALI HYDROELECTRIC POWER
PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT
25-11-09 D 1218 FC IB-7 C 35 42.5N 300 16.7 26.6 35.2 41.0 PRECAST BEAM
26-11-09 D 1224 FC IB-7 C 35 42.5N 300 17.9 28.3 38.8 43.8 PRECAST BEAM
27-11-09 D 1226 FC IB-7 C 35 42.5N 300 16.7 28.8 39.4 44.3 PRECAST BEAM
30-11-09 D 1231 FC IB-7 C 35 42.5N 300 16.1 26.1 37.1 40.3 PRECAST BEAM
01-12-09 D 1235 FC IB-7 C 35 42.5N 300 18.9 25.7 35.5 40.3 PRECAST BEAM
02-12-09 D 1238 FC IB-7 C 35 42.5N 300 17.0 26.6 36.2 40.0 PRECAST BEAM
04-12-09 D 1243 FC IB-7 C 35 42.5N 300 15.5 26.5 38.8 41.3 PRECAST BEAM
05-12-09 D 1245 FC IB-7 C 35 42.5N 300 15.9 25.5 38.2 44.0 PRECAST BEAM
06-12-09 D 1251 FC IB-7 C 35 42.5N 300 15.4 27.1 35.5 38.1 PRECAST BEAM
07-12-09 D 1258 FC IB-7 C 35 42.5N 300 18.5 29.1 37.3 40.1 PRECAST BEAM
08-12-09 D 1260 FC IB-7 C 35 42.5N 300 17.0 28.9 37.4 41.8 PRECAST BEAM
10-12-09 D 1269 FC IB-7 C 35 42.5N 300 17.2 26.8 38.3 38.5 PRECAST BEAM
11-12-09 D 1272 FC IB-7 C 35 42.5N 300 16.1 28.5 39.7 44.6 PRECAST BEAM
12-12-09 D 1276 FC IB-7 C 35 42.5N 300 15.9 26.5 37.4 40.4 PRECAST BEAM
14-12-09 D 1283 FC IB-7 C 35 42.5N 300 15.7 26.2 37.6 41.3 PRECAST BEAM
15-12-09 D 1287 FC IB-7 C 35 42.5N 300 16.8 27.8 38.7 43.1 PRECAST BEAM
16-12-09 D 1289 FC IB-7 C 35 42.5N 300 20.7 29.1 39.4 44.6 PRECAST BEAM
17-12-09 D 1293 FC IB-7 C 35 42.5N 300 15.7 27.9 36.0 39.9 PRECAST BEAM
18-12-09 D 1298 FC IB-7 C 35 42.5N 300 16.9 28.4 39.6 43.5 PRECAST BEAM
19-12-09 D 1301 FC IB-7 C 35 42.5N 300 15.7 28.7 39.8 44.9 PRECAST BEAM
20-12-09 D 1307 FC IB-7 C 35 42.5N 300 15.7 27.7 38.2 42.3 PRECAST BEAM
21-12-09 D 1310 FC IB-7 C 35 42.5N 300 15.1 27.3 37.4 41.4 PRECAST BEAM
22-12-09 D 1314 FC IB-7 C 35 42.5N 300 17.7 28.5 38.3 42.5 PRECAST BEAM
28-12-09 D 1318 FC IB-7 C 35 42.5N 300 15.8 26.6 38.8 42.2 PRECAST BEAM
29-12-09 D 1321 FC IB-7 C 35 42.5N 300 16.1 26.8 37.1 40.4 PRECAST BEAM
30-12-09 D 1326 FC IB-7 C 35 42.5N 300 16.2 26.7 38.4 43.1 PRECAST BEAM
31-12-09 D 1331 FC IB-7 C 35 42.5N 300 16.7 28.4 39.7 42.1 PRECAST BEAM
Page 135
Summary of BUJAGALI HYDROELECTRIC POWER
PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT
02-01-10 D 1332 FC IB-7 C 35 42.5N 300 17.3 29.3 38.5 41.9 CARPENTRY WORKSHOP BEAM
03-01-10 D 1338 FC IB-7 C 35 42.5N 300 17.9 29.4 37.6 42.2 CARPENTRY WORKSHOP BEAM
CARPENTRY WORKSHOP
04-01-10 D 1341 FC IB-7 C 35 42.5N 300 15.4 29.1 37.1 41.8
PRECAST BEAM
CARP. WORKSHOP PRECAST
05-01-10 D 1345 FC IB-7 C 35 42.5N 300 15.3 26.3 38.5 43.6
BEAM & DUCT CABLE
CARPENTRY WORKSHOP
07-01-10 D 1357 FC IB-7 C 35 42.5N 300 16.8 29.2 38.1 43.0
PRECAST BEAM
CARPENTRY WORKSHOP
08-01-10 D 1363 FC IB-7 C 35 42.5N 300 16.5 28.4 37.9 43.4
PRECAST BEAM
CARPENTRY WORKSHOP
09-01-10 D 1366 FC IB-7 C 35 42.5N 300 14.6 26.5 36.9 39.2
PRECAST BEAM
CARPENTRY WORKSHOP
11-01-10 D 1375 FC IB-7 C 35 42.5N 300 15.5 27.6 38.8 44.4
PRECAST BEAM
CARPENTRY WORKSHOP
12-01-10 D 1381 FC IB-7 C 35 42.5N 300 15.7 27.8 37.4 44.1
PRECAST BEAM
CARPENTRY WORKSHOP
13-01-10 D 1385 FC IB-7 C 35 42.5N 300 16.3 28.7 37.8 43.6
PRECAST BEAM
CARPENTRY WORKSHOP
14-01-10 D 1390 FC IB-7 C 35 42.5N 300 15.8 28.3 38.4 42.8
PRECAST BEAM
CARPENTRY WORKSHOP
15-01-10 D 1397 FC IB-7 C 35 42.5N 300 17.4 29.2 37.4 40.9
PRECAST BEAM
CARPENTRY WORKSHOP
16-01-10 D 1401 FC IB-7 C 35 42.5N 300 16.8 26.7 38.5 40.2
PRECAST BEAM
CARPENTRY WORKSHOP
17-01-10 D 1407 FC IB-7 C 35 42.5N 300 17.9 26.7 38.4 41.9
PRECAST BEAM
CARPENTRY WORKSHOP
18-01-10 D 1408 FC IB-7 C 35 42.5N 300 19.7 28.0 38.3 44.8
PRECAST BEAM
CARPENTRY WORKSHOP
19-01-10 D 1414 FC IB-7 C 35 42.5N 300 15.8 27.9 35.5 39.2
PRECAST BEAM
CARPENTRY WORKSHOP
20-01-10 D 1421 FC IB-7 C 35 42.5N 300 16.3 28.4 38.5 40.8
PRECAST BEAM
CARPENTRY WORKSHOP
22-01-10 D 1431 FC IB-7 C 35 42.5N 300 17.8 28.6 39.0 44.3
PRECAST BEAM
CARPENTRY WORKSHOP
23-01-10 D 1437 FC IB-7 C 35 42.5N 300 18.7 28.5 38.1 41.9
PRECAST BEAM
CARPENTRY WORKSHOP
24-01-10 D 1443 FC IB-7 C 35 42.5N 300 16.5 27.5 37.8 43.4
PRECAST BEAM
CARPENTRY WORKSHOP
25-01-10 D 1447 FC IB-7 C 35 42.5N 300 16.5 27.9 37.0 41.8
PRECAST BEAM
CARPENTRY WORKSHOP
26-01-10 D 1454 FC IB-7 C 35 42.5N 300 18.1 28.6 39.2 48.6
PRECAST BEAM
CARPENTRY WORKSHOP
27-01-10 D 1460 FC IB-7 C 35 42.5N 300 15.9 28.4 37.3 41.1
PRECAST BEAM
CARPENTRY WORKSHOP
28-01-10 D 1463 FC IB-7 C 35 42.5N 300 16.6 27.5 37.0 40.1
PRECAST BEAM
CARPENTRY WORKSHOP
29-01-10 D 1469 FC IB-7 C 35 42.5N 300 15.3 27.9 37.2 41.6
PRECAST BEAM
CARPENTRY WORKSHOP
01-02-10 D 1477 FC IB C 35 42.5N 330 18.2 27.0 36.4 40.5 PRECAST BEAM
CARPENTRY WORKSHOP
02-02-10 D 1483 FC IB C 35 42.5N 330 16.6 28.4 35.9 40.6 PRECAST BEAM
CARPENTRY WORKSHOP
03-02-10 D 1488 FC IB C 35 42.5N 330 16.2 28.7 38.3 42.8 PRECAST BEAM
CARPENTRY WORKSHOP
04-02-10 D 1495 FC IB C 35 42.5N 330 16.5 25.7 36.4 39.8 PRECAST BEAM
CARPENTRY WORKSHOP
05-02-10 D 1499 FC IB C 35 42.5N 330 16.7 26.7 36.2 40.3 PRECAST BEAM
CARPENTRY WORKSHOP
05-02-10 D 1501 FC IB-2 C 30 42.5N 300 16.5 25.9 33.6 39.7 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
06-02-10 D 1507 FC IB C 35 42.5N 330 17.4 27.5 38.9 45.8 PRECAST BEAM
CARPENTRY WORKSHOP
07-02-10 D 1516 FC IB C 35 42.5N 330 16.9 28.8 39.6 45.4 PRECAST BEAM
Page 136
Summary of BUJAGALI HYDROELECTRIC POWER
PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT
Page 137
Summary of BUJAGALI HYDROELECTRIC POWER
PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT
Page 138
Summary of BUJAGALI HYDROELECTRIC POWER
APPRON
Rc, maturation at NORMAL
Note
SHIFT
02-12-09 D 1239 FC S C 20 42.5N 250 11.4 18.1 25.5 28.1 APPRON BLINDIND
21-12-09 D 1311 FC IB-7 C 35 42.5N 300 16.3 26.4 37.8 42.0 APPRON BLINDIND
28-12-09 N 1319 FC IB-2 C 30 42.5N 300 14.8 25.9 34.3 40.6 APPRON SLAB
30-12-09 D 1324 FC IB-2 C 30 42.5N 300 15.3 24.9 34.3 36.5 APRON
30-12-09 N 1325 FC IB-2 C 30 42.5N 300 15.0 25.4 34.0 37.1 APPRON SLAB
31-12-09 D 1328 FC IB-2 C 30 42.5N 300 14.7 26.1 33.5 36.5 APPRON SLAB
31-12-09 D 1329 FC IB-2 C 30 42.5N 300 14.3 24.8 38.5 40.9 APPRON SLAB
06-01-10 N 1350 FC IB-2 C 30 42.5N 300 14.5 25.6 33.7 38.3 APPRON SLAB
07-01-10 D 1358 FC IB-2 C 30 42.5N 300 14.5 25.5 33.6 36.8 APPRON SLAB
08-01-10 D 1359 FC IB-2 C 30 42.5N 300 14.6 25.2 33.7 38.8 APPRON SLAB
12-01-10 D 1378 FC IB C 35 42.5N 330 23.3 31.3 43.0 51.4 APPRON SLAB
14-01-10 D 1393 FC IB C 35 42.5N 330 17.3 29.6 40.6 45.6 APPRON SLAB
16-01-10 N 1405 FC IB-2 C 30 42.5N 300 14.2 29.6 38.0 43.6 APPRON SLAB
17-01-10 D 1406 FC IB C 35 42.5N 330 20.8 31.0 43.8 50.5 APPRON SLAB
18-01-10 N 1412 FC IB-2 C 30 42.5N 300 15.7 24.3 35.0 38.3 APPRON SLAB
19-01-10 D 1413 FC IB-7 C 35 42.5N 300 16.8 28.8 39.6 44.9 APPRON SLAB
22-01-10 D 1432 FC IB-7 C 35 42.5N 300 16.6 30.1 39.7 43.8 APPRON SLAB
22-01-10 D 1433 FC IB C 35 42.5N 330 16.3 31.3 42.0 44.0 APPRON SLAB
24-01-10 D 1444 FC IB-7 C 35 42.5N 300 17.2 30.6 40.8 46.5 APPRON SLAB
24-01-10 D 1445 FC IB-2 C 30 42.5N 300 14.6 24.9 35.8 40.0 APPRON SLAB
28-01-10 D 1465 FC IB-7 C 35 42.5N 300 15.7 27.7 38.0 42.7 APPRON SLAB
28-01-10 D 1467 FC IB C 35 42.5N 330 15.4 28.2 37.4 40.1 APPRON SLAB
29-01-10 N 1471 FC IB C 35 42.5N 330 16.3 27.1 37.6 43.7 APPRON SLAB
06-02-10 N 1503 FC IB-2 C 30 42.5N 300 20.3 29.9 35.7 42.9 APPRON SLAB
06-02-10 N 1509 FC IB C 35 42.5N 330 17.9 27.9 38.1 46.8 APPRON SLAB
06-02-10 D 1512 FC IB C 35 42.5N 330 17.6 27.5 36.2 39.7 APPRON SLAB
07-02-10 N 1513 FC IB-2 C 30 42.5N 300 15.9 26.4 35.3 40.3 APPRON SLAB
10-02-10 N 1528 FC IB-2 C 30 42.5N 300 19.3 28.1 36.6 42.3 APPRON SLAB
10-02-10 N 1530 FC IB C 35 42.5N 330 17.0 28.8 39.2 46.3 APPRON SLAB
Page 139
Summary of BUJAGALI HYDROELECTRIC POWER
APPRON
Rc, maturation at NORMAL
Note
SHIFT
13-02-10 N 1548 FC IB-2 C 30 42.5N 300 18.1 25.6 32.1 35.3 APPRON SLAB
13-02-10 D 1549 FC IB C 35 42.5N 330 16.9 27.2 39.3 43.9 APPRON SLAB
17-02-10 D 1570 FC IB C 35 42.5N 330 17.4 30.6 43.7 46.4 APPRON SLAB
18-02-10 N 1575 FC IB-2 C 30 42.5N 300 14.7 24.8 30.7 35.6 APPRON SLAB
18-02-10 N 1578 FC IB-2 C 30 42.5N 300 22.9 27.7 37.6 44.1 APPRON SLAB
20-02-10 N 1587 FC IB-7 C 35 42.5N 300 19.0 30.1 39.9 46.2 APPRON SLAB
21-02-10 N 1589 FC IB C 35 42.5N 330 22.8 30.4 44.0 49.6 APPRON SLAB
23-02-10 N 1601 FC IB C 35 42.5N 330 24.3 31.9 45.8 50.8 APPRON SLAB
24-02-10 N 1602 FC IB-7 C 35 42.5N 300 18.3 29.1 40.4 45.7 APPRON SLAB
25-02-10 N 1612 FC IB-7 C 35 42.5N 300 17.9 26.7 36.1 39.5 APPRON SLAB
25-02-10 D 1613 FC IB C 35 42.5N 330 16.3 29.0 40.6 44.4 APPRON SLAB
25-02-10 N 1616 FC IB-7 C 35 42.5N 300 23.4 32.7 43.0 48.1 APPRON SLAB
26-02-10 N 1617 FC IB-2 C 30 42.5N 300 14.2 23.5 31.5 34.9 APPRON SLAB
04-03-10 N 1646 FC IB-7 C 35 42.5N 300 16.9 28.9 39.3 44.9 APPRON SLAB
05-03-10 D 1650 FC IB C 35 42.5N 330 15.9 27.8 36.8 39.0 APPRON SLAB
10-03-10 N 1672 FC S C 20 42.5N 250 11.3 19.6 25.1 29.8 APPRON BLINDING
11-03-10 N 1675 FC IB-2 C 30 42.5N 300 17.5 25.8 31.7 38.8 APPRON SLAB
11-03-10 N 1677 FC IB-2 C 30 42.5N 300 15.3 24.7 34.1 39.8 APPRON SLAB
11-03-10 D 1678 FC IB C 35 42.5N 330 15.1 29.0 39.8 42.5 APPRON SLAB
13-03-10 N 1689 FC S C 20 42.5N 250 12.1 23.4 27.4 33.9 APPRON SLAB
17-03-10 N 1701 FC IB-2 C 30 42.5N 300 17.2 24.0 30.7 33.7 APPRON SLAB
17-03-10 D 1704 FC IB C 35 42.5N 330 15.4 26.0 36.6 39.4 APPRON SLAB
18-03-10 N 1709 FC IB-7 C 35 42.5N 300 20.8 33.1 43.1 46.6 APPRON SLAB
19-03-10 D 1712 FC IB-7 C 35 42.5N 300 16.9 28.8 37.6 43.8 APPRON SLAB
19-03-10 N 1714 FC IB C 35 42.5N 330 20.7 30.8 38.7 41.2 APPRON SLAB
26-03-10 N 1744 FC IB C 35 42.5N 330 19.7 30.3 38.5 40.4 APPRON SLAB
26-03-10 N 1745 FC IB-7 C 35 42.5N 300 18.2 29.6 40.3 44.4 APPRON SLAB
26-03-10 D 1746 FC IB C 35 42.5N 330 19.8 30.1 38.6 40.6 APPRON SLAB
28-03-10 D 1757 FC IB-2 C 30 42.5N 300 16.6 23.8 32.5 34.4 APPRON SLAB
28-03-10 D 1758 FC IB C 35 42.5N 330 16.6 28.6 37.0 42.4 APPRON SLAB
29-03-10 N 1763 FC S C 20 42.5N 250 10.4 18.8 24.3 29.9 APPRON SLAB
02-04-10 D 1785 FC R C 20 42.5N 250 10.8 17.9 25.2 29.3 APPRON RRC
Page 140
Summary of BUJAGALI HYDROELECTRIC POWER
APPRON
Rc, maturation at NORMAL
Note
SHIFT
10-04-10 D 1804 FC IB-7 C 35 42.5N 300 16.3 27.2 37.4 41.3 APPRON SLAB
10-04-10 D 1805 FC IB-2 C 30 42.5N 300 13.8 23.7 31.1 35.0 APPRON SLAB
10-04-10 N 1806 FC IB C 35 42.5N 330 15.9 26.7 36.0 39.2 APPRON SLAB
12-04-10 D 1811 FC IB-2 C 30 42.5N 300 13.6 23.6 33.0 37.4 APPRON SLAB
12-04-10 N 1813 FC IB C 35 42.5N 330 16.2 27.0 35.9 39.1 APPRON SLAB
17-04-10 D 1836 FC IB-7 C 35 42.5N 300 16.3 26.5 39.7 43.6 APPRON SLAB
17-04-10 D 1837 FC IB-2 C 30 42.5N 300 13.9 23.3 34.3 38.2 APPRON SLAB
17-04-10 D 1838 FC IB C 35 42.5N 330 18.2 28.8 35.8 39.0 APPRON SLAB
25-04-10 N 1866 FC IB C 35 42.5N 330 18.5 27.9 38.7 42.9 APPRON SLAB AWA - P1
29-04-10 N 1880 FC IB C 35 42.5N 330 23.6 30.9 37.1 42.6 APPRON SLAB AWA - P1
14-05-10 D 1923 FC IB C 35 42.5N 330 14.7 25.4 36.8 40.7 APPRON AWA - O1 & N1 WALL
17-05-10 D 1930 FC IB C 35 42.5N 330 19.2 27.7 37.5 40.5 APPRON AWA - N2 & O2 WALL
19-05-10 N 1940 FC IB C 35 42.5N 330 17.2 28.5 37.0 42.1 APPRON AWA - N2 WALL
25-05-10 N 1962 FC IB C 35 42.5N 330 19.8 30.9 40.6 48.1 APPRON AWA - S1 & V1 WALL
01-06-10 D 1984 FC IB C 35 42.5N 330 19.8 31.2 43.2 47.0 APPRON AWA - A WALL
04-06-10 D 1996 FC IB C 35 42.5N 330 19.3 31.9 39.8 47.2 APPRON AWA - K2, V2, S2 WALL
10-06-10 D 2016 FC IB C 35 42.5N 330 16.0 25.6 37.4 41.3 APPRON AWA - W2, 12
12-06-10 N 2031 FC IB C 35 42.5N 330 16.5 27.8 36.1 40.6 APPRON AWA - X1, Z1
19-06-10 D 2052 FC IB C 35 42.5N 330 17.8 30.1 37.2 45.2 APPRON AWA - X2, Z2 WALL
25-06-10 D 2073 FC IB C 35 42.5N 330 16.0 26.4 36.4 40.4 APPRON AWA - Q3, P3
30-06-10 D 2090 FC IB C 35 42.5N 330 20.2 28.9 36.3 43.2 APPRON AWA - M3, O3
05-07-10 D 2103 FC IB C 35 42.5N 330 17.1 32.2 41.4 48.2 APPRON AWA - Q4, P4
09-07-10 D 2110 FC IB C 35 42.5N 330 15.9 27.5 36.1 42.6 APPRON AWA - R3, H3
19-07-10 N 2138 FC IB C 35 42.5N 330 16.8 26.5 35.3 38.3 APPRON AWA - S3, V3
22-07-10 D 2150 FC IB C 35 42.5N 330 17.3 29.6 38.0 42.7 APPRON AWA - N4, O4
25-07-10 D 2160 FC IB C 35 42.5N 330 15.6 25.3 37.1 39.8 APPRON AWA - R4, V4
30-07-10 D 2179 FC IB C 35 42.5N 330 18.3 26.1 36.8 39.7 APPRON AWA - A3, W3
05-08-10 D 2193 FC IB C 35 42.5N 330 16.6 29.8 36.4 43.0 APPRON AWA - S3, Z3
06-08-10 D 2198 FC S C 25 42.5N 250 12.0 19.2 25.3 29.6 APPRON SLAB BLINDING
14-08-10 N 2219 FC IB C 35 42.5N 330 15.1 25.4 35.6 39.4 APPRON AWD - Q1, P1 WALL
Page 141
Summary of BUJAGALI HYDROELECTRIC POWER
APPRON
Rc, maturation at NORMAL
Note
SHIFT
19-08-10 N 2229 FC IB C 35 42.5N 330 15.7 27.0 37.1 41.6 APPRON AWD - Q2, P2
25-08-10 D 2248 FC IB C 35 42.5N 330 16.2 27.3 35.4 40.2 APPRON KEY PART 1
25-08-10 N 2250 FC IB-2 C 30 42.5N 300 14.7 24.1 31.8 35.1 APPRON KEY PART 1
27-08-10 N 2260 FC IB C 35 42.5N 330 19.7 30.7 45.5 48.5 APPRON KEY SLAB PART 2
30-08-10 D 2265 FC IB C 35 42.5N 330 16.2 27.4 38.1 43.6 APPRON KEY SLAB PART 2
06-09-10 D 2287 FC IB C 35 42.5N 330 15.4 31.1 38.3 45.1 APPRON AWD - M1, O1
12-09-10 N 2301 FC IB C 35 42.5N 330 19.7 29.3 37.1 42.6 APPRON AWA - M2, O2
16-09-10 N 2311 FC IB C 35 42.5N 330 16.7 27.7 36.6 40.0 APPRON LIFT AWD - S1, W1
19-09-10 D 2316 FC IB C 35 42.5N 330 22.1 31.4 42.7 47.4 APPRON AWD - N2, R2
20-09-10 D 2317 FC S C 25 42.5N 250 9.3 16.7 23.0 26.3 APPRON SLAB BLINDING
20-09-10 N 2319 FC IB C 35 42.5N 330 17.1 30.5 41.2 48.3 APPRON WALL AWD
22-09-10 D 2324 FC IB C 35 42.5N 330 16.9 30.6 41.8 48.3 APPRON AWD - X2, T2
23-09-10 D 2329A FC IB C 35 42.5N 330 16.4 27.7 38.3 43.8 APPRON AWD - O3, M3
26-09-10 D 2339 FC IB C 35 42.5N 330 15.4 30.2 38.9 45.7 APPRON AWD - S2, W2
28-09-10 D 2345 FC IB C 35 42.5N 330 15.4 30.8 40.1 47.5 APPRON AWD - T1
28-09-10 D 2346 FC IB C 35 42.5N 330 16.1 30.8 41.9 49.2 APPRON AWD - M2, L3
06-10-10 N 2365 FC IB C 35 42.5N 330 20.8 30.9 43.9 48.2 APPRON AWD - Q4, P4 WALL
08-10-10 N 2371 FC IB C 35 42.5N 330 19.2 31.0 38.9 42.7 APPRON KEY SLAB
08-10-10 D 2373 FC IB C 35 42.5N 330 16.9 27.3 36.9 40.6 APPRON KEY SLAB
11-10-10 N 2376 FC IB C 35 42.5N 330 15.7 25.6 37.1 42.1 APPRON AWD - M4, O4
13-10-10 N 2381 FC IB C 35 42.5N 330 18.7 27.9 35.1 40.6 APPRON AWD - Y2, U2
15-10-10 D 2388 FC IB C 35 42.5N 330 17.6 31.5 43.5 49.0 APPRON AWA - U1
16-10-10 N 2390 FC IB C 35 42.5N 330 18.4 29.8 37.3 41.4 APPRON AWD - R3, V3
19-10-10 N 2395 FC IB C 35 42.5N 330 17.3 28.4 37.6 43.3 APPRON AWA - Y1
23-10-10 D 2405 FC IB C 35 42.5N 330 15.6 26.5 35.8 38.1 APPRON WALL LIFT - R4 - V4 - N4
Page 142
Summary of BUJAGALI HYDROELECTRIC POWER
APPRON
Rc, maturation at NORMAL
Note
SHIFT
Page 143
Summary of BUJAGALI HYDROELECTRIC POWER
TEMPORARY BRIDGE
Rc, maturation at NORMAL
Note
SHIFT
Page 144
Summary of BUJAGALI HYDROELECTRIC POWER
SPILLWAY PRECAST
Rc, maturation at NORMAL WATER
Note
SHIFT
SIPHON SPILLWAY
07-12-09 D 1259 FC IB C 35 42.5N 330 16.3 26.8 37.8 41.6 PRECAST
SIPHON SPILLWAY
09-12-09 D 1266 FC IB-7 C 35 42.5N 300 16.4 28.6 37.0 41.5 PRECAST BEAM
SIPHON SPILLWAY
10-12-09 D 1270 FC IB C 35 42.5N 330 17.4 27.5 36.5 40.8 PRECAST BEAM
SIPHON SPILLWAY
11-12-09 D 1274 FC IB C 35 42.5N 330 17.3 27.9 39.0 43.5 PRECAST
SIPHON SPILLWAY
12-12-09 D 1279 FC IB-7 C 35 42.5N 300 16.4 26.8 36.3 38.7 PRECAST BEAM
SIPHON SPILLWAY
01-02-10 D 1479 FC M6 C 40 42.5N 380 22.9 31.6 44.7 48.7 PRECAST BEAM
SIPHON SPILLWAY
03-02-10 D 1490 FC IB C 35 42.5N 330 16.5 28.8 38.8 43.8 PRECAST BEAM
S. SPILLWAY NEW
16-02-10 D 1563 FC R C 20 42.5N 250 12.5 19.0 24.0 26.4 PRECAST SLAB
SIPHON SPILLWAY
26-02-10 D 1620 FC IB C 35 42.5N 330 18.5 26.8 35.8 38.5 PRECAST BEAM
S. SPILLWAY PRECAST
30-03-10 D 1768 FC IB C 35 42.5N 330 16.1 27.1 35.2 39.2 CLASS A
S. SPILLWAY PRECAST
31-03-10 D 1772 FC IB C 35 42.5N 330 16.9 28.3 35.6 40.4 TYPE B
25-04-10 D 1868 FC IB C 35 42.5N 330 15.3 26.3 36.7 39.4 S. SPILLWAY PRECAST
S. SPILLWAY PRECAST B2 -
18-05-10 D 1937 FC IB C 35 42.5N 330 15.1 25.5 37.5 41.9 2PQ
S. SPILLWAY PRECAST
23-06-10 D 2067 FC IB C 35 42.5N 330 16.8 27.3 37.8 42.6 TYPE A 2
S. SPILLWAY PRECAST
26-06-10 D 2076 FC IB C 35 42.5N 330 16.6 27.2 38.7 42.5 TYPE B
S. SPILLWAY PRECAST
02-07-10 D 2099 FC IB C 35 42.5N 330 18.9 29.3 38.6 42.9 TYPE B
Page 145
Summary of BUJAGALI HYDROELECTRIC POWER
05-01-11 D 2559 FC IB-2 C 30 42.5N 300 14.0 24.9 32.9 37.4 Fire Fighting System wall
17-01-11 D 2580 FC JC C 25 42.5N 310 12.6 23.3 30.1 35.6 Fire Fighting System wall
04-02-11 D 2608 FC IB-2 C 30 42.5N 300 13.9 24.8 33.4 37.6 Fire Fighting System wall
10-02-11 D 2617 FC IB-2 C 30 42.5N 300 14.4 25.9 33.5 37.4 Fire Fighting System wall
14-03-11 D 2651 FC IB-2 C 30 42.5N 300 15.1 24.4 34.7 40.1 PH Fire Fighting Tank
30-03-11 D 2668 FC IB-2 C 30 42.5N 300 14.2 25.3 34.8 39.5 PH Fire Fighting Tank
Page 146
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report
SA-D-GE-TR-1212
Page 147
TRIAL MIXES IN LAB FOR CONCRETE BUJAGALI HYDROELECTRIC POWER PROJECT,
SITE MATERIALS SUMMARY OF RESULTS UGANDA
LABORATORY May-11 Rev. 0
Plastiment
30-08-08 FC-S 8 8 36 21 27 250 0.69 2.8 80 55 2418 2.3 24 24.8 13.6 17.4 24.3
BV 40
01-09-08 FC R 52 17 31 250 0.69 Sikament 110N 2.7 145 110 2611 1.2 27.3 25.6 16.9 23.8 27.0
Page 148
TRIAL MIXES IN LAB FOR CONCRETE BUJAGALI HYDROELECTRIC POWER PROJECT,
SITE MATERIALS SUMMARY OF RESULTS UGANDA
LABORATORY May-11 Rev. 0