Bujagali Energy Limited Salini Costruttori

Bujagali Hydro-Electric Power Project Site Material Laboratory Report

Table of Contents

1.  LIST OF STANDARDS .................................................... 3 


2.  WEATHER ........................................................................ 5 
3.  AGGREGATE QUALITY TEST SUMMARY .............. 8 
3.1 MATERIAL FINER THAN 0.075 MM…………………………………………………………………………………….9 
3.2 CLAY LUMPS AND FRIABLE PARTICLES................................................................................... 17
3.3 LOS ANGELES ABRASION TEST................................................................................................ 25 
3.4 SPECIFIC GRAVITY AND ABSORPTION...................................................................................... 26 
3.5 SOUNDNESS................................................................................................................................ 29
3.6 FLAKINESS AND ELONGATION................................................................................................... 30
3.7 AGGREGATE CRUCHING VALUE ACV AND AGGREGATE IMPATC VALUE AIV. .31

4.  GRADING OF AGGREGATE ...................................... 32

5.  CONCRETE TESTS ....................................................... 41 


5.1 SUMMARY OF RESULTS...............................................................................................................42 
5.1.1      Test on fresh concrete.....................................................................................................42
5.1.2 Test on moisture content of aggregates.........................................................................60
5.1.3    Test on normal Compressive strength of Cylinder samples………. 64  

5.2 SUMMARYOF APPLIED DESIGN MIXES............................................... 147

SA-D-GE-TR-1212

Page 2
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report

1. LIST OF STANDARDS

NUMBER TITLE YEAR OF ISSUE


10 July 1999
ASTM C 39 Test Method for Compressive Strength of Concrete samples

10 August 1999
ASTM C 40 Test Method for Organic Impurities in Fine Aggregates

10 February 1999
ASTM C 42 Test Method for Testing of Drilled cores samples

ASTM C 556 Test Method for Moisture Content of Aggregates


10 January 1997

Test Method for Soundness of Aggregates by Use of Sodium 10 March 1999


ASTM C 88
Sulfate or Magnesium Sulfate

15 March 1995
ASTM C 117 Test Method for materials finer than 75mm (No.200) Sieve

ASTM C 123 Test Method for Light weight pieces in aggregates 31 October 1988

ASTM C 131 Test Method for Abrasion and Impact by LA Machine 10 July 1988

10 June 2001
ASTM C 136 Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM C 142 Test Method for Clay Lumps and Friable Particles 10 August 1997

10 November 1998
ASTM C 143 Test Method for Slump test of freshly mixed concrete

Test Method for Specific Gravity and Absorption of Coarse 31 October 1988
ASTM C 127
Aggregates

Test Method for Specific Gravity and Absorption of Fine


ASTM C 128 10 November 1997
Aggregates

Test Method for Time of Setting of Hydraulic Cement By Vicat


ASTM C 191 10 January 1999
Needle

ASTM C 231 Test Method for Air Content of Freshly Mixed Concrete 10 January 1997

SA-D-GE-TR-1212

Page 3
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report

NUMBER TITLE YEAR OF ISSUE

ASTM C 289 Test Method for Alkali Reactivity of Concrete aggregates 15 April 1994

ASTM C 232 Test Method for Bleeding of Concrete1 10 July 1999

ASTM C 188
Test Method for Density of Hydraulic Cement1 10 September 1995

10 December 1996
ASTM C430 Fineness of Hydraulic Cement by the 45-μm (No. 325) Sieve1

SA-D-GE-TR-1212

Page 4
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report

2. WEATHER

SA-D-GE-TR-1212

Page 5
WEATHER REPORT BUJAGALI HYDROELECTRIC POWER PROJECT

SITE MATERIALS BUJAGALI STATION BUJAGALI ENERGY LIMITED


LABORATORY May-11 Rev. 0

TEMPERATURE HUMIDITY (%) RAIN


O O
DATE MIN ( C) MAX ( C) Max Min mm
01/05/11 17.2 31 100.0 68 0.8
02/05/11 19 33 100.0 60 6.2
03/05/11 19 31.1 100.0 46 7.8
04/05/11 19 32 100.0 39 0
05/05/11 18.9 31.2 100.0 40 4.4
06/05/11 18.7 32.7 100.0 45 25
07/05/11 18.9 32.5 100.0 40 0.2
08/05/11 17.7 30.3 100.0 52 1.6
09/05/11 18.7 32.7 100.0 55 0
10/05/11 18.9 30.3 100.0 55 0
11/05/11 18.9 32.5 100.0 52 0.2
12/05/11 18.7 31 100.0 73 0
13/05/11 19 33 100.0 52 0
14/05/11 18.9 31.7 100.0 57 0
15/05/11 18.8 32.3 100.0 57 0
16/05/11 19 32 100.0 52 1.6
17/05/11 19 33 100.0 56 4.8
18/05/11 18.7 32 100.0 53 1.6
19/05/11 17.2 31 100.0 59 9
20/05/11 18.5 30.3 100.0 58 37.8
21/05/11 18.7 32.3 100.0 57 0
22/05/11 17.5 31.7 100.0 48 0
23/05/11 18.1 31 100.0 52 0
24/05/11 18.7 30.3 100.0 50 0
25/05/11 19 33.1 100.0 48 0.2
26/05/11 18.9 30.7 100.0 68 20.2
27/05/11 18.3 31 100.0 62 3.8
28/05/11 18.2 32 100.0 51 0
29/05/11 19 32.9 100.0 72 0
30/05/11 18.1 32.2 100.0 50 0
31/05/11 18.4 32.5 100.0 49.0 0.0
TOTAL TO DATE 125.2

35 100
90
30
80
Humidity (%)

25 70
Temp. ( deg. C)

60
20
50
15
40
Rain (mm)

10 30
20
5
10
0 0
01/Apr

02/Apr

03/Apr

04/Apr

05/Apr

06/Apr

07/Apr

08/Apr

09/Apr

10/Apr

11/Apr

12/Apr

13/Apr

14/Apr

15/Apr

16/Apr

17/Apr

18/Apr

19/Apr

20/Apr

21/Apr

22/Apr

23/Apr

24/Apr

25/Apr

26/Apr

27/Apr

28/Apr

29/Apr

30/Apr

RAIN mm TEMPERATURE MIN (OC) TEMPERATURE MAX (OC) HUMIDITY (%) Max HUMIDITY (%)

Page 6
WEATHER REPORT BUJAGALI HYDROELECTRIC POWER PROJECT

SITE MATERIALS BUJAGALI STATION BUJAGALI ENERGY LIMITED


LABORATORY May-11 Rev. 0
ATMOSPHERIC WIND
PRESSURE WIND SPEED(m/sec) DIRECTION
DATE mBar(max) mBar(min) Max Min FROM(0°) N
01/05/11 895 700 5 0 217 0°N
02/05/11 895 700 9 0 281
03/05/11 895 700 8 0 218
04/05/11 895 700 6 0 253
05/05/11 895 700 9 0 245
06/05/11 895 700 7 0 194
07/05/11 895 700 6 0 142 270°W 90°E
08/05/11 895 700 7 0 257
09/05/11 895 700 14 0 159
10/05/11 895 700 14 0 129
11/05/11 895 700 11 0 175 180°S
12/05/11 895 700 7 0 132
13/05/11 895 700 6 0 250
14/05/11 895 700 7 0 194
15/05/11 895 700 7 0 258
16/05/11 895 700 13 0 253
17/05/11 895 700 8 0 256
18/05/11 895 700 4 0 274
19/05/11 895 700 9 0 228
20/05/11 895 700 9 0 255
21/05/11 895 700 7 0 256
22/05/11 895 700 10 0 141
23/05/11 895 700 7 0 220
24/05/11 895 700 5 0 231
25/05/11 895 700 11 0 257
26/05/11 895 700 9 0 142
27/05/11 895 700 8 0 194
28/05/11 895 700 7 0 229
29/05/11 895 700 11 0 226
30/05/11 895 700 6 0 213
31/05/11 895 700 10 0 202

1000 30
900
25
800
Wind Speed (m/s)
Atmo Pressure. ( mBar)

700
20
600
500 15
400
10
300
200
5
100
0 0
01/May

02/May

03/May

04/May

05/May

06/May

07/May

08/May

09/May

10/May

11/May

12/May

13/May

14/May

15/May

16/May

17/May

18/May

19/May

20/May

21/May

22/May

23/May

24/May

25/May

26/May

27/May

28/May

29/May

30/May

31/May

ATMOSPHERIC PRESSURE mBar(max) ATMOSPHERIC PRESSURE mBar(min) WIND SPEED(m/sec) Max WIND SPEED(m/sec)

Page 7
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report

3.  AGGREGATE QUALITY TEST SUMMARY 


3.1 MATERIAL FINER THAN 0.075 MM............................................................................ 9 
3.2 CLAY LUMPS AND FRIABLE PARTICLES.................................................................... 17 
3.3 LOS ANGELES ABRASION TEST.................................................................................. 25 
3.4 SPECIFIC GRAVITY AND ABSORPTION....................................................................... 26 
3.5 SOUNDNESS................................................................................................................. 29 
3.6 FLAKINESS AND ELONGATION..................................................................................... 30
3.7 AGGREGATE CRUCHING VALUE ACV AND AGGREGATE IMPATC VALUE AIV .. 31

SA-D-GE-TR-1212

Page 8
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5

Site Bujagali Hydropower Project Sampling Date 23/5/2011


Sampling Location CRUSHING PLANT Tasting Date 24/5/2011
Material source AMPHIBOLITE ROCK LAB. Ref. No. 251

AGGREGATE SIZE (mm) 25 - 38


Original dry mass of Sample B g
Dry mass of Sample after washing C g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 %
WASHING

AGGREGATE SIZE ((mm)) 19 - 25


Original dry mass of Sample B 3636 g
Dry mass of Sample after washing C 3631 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.14 %
WASHING

AGGREGATE SIZE (mm) 5 - 19


Original dry mass of Sample B 3442 g
Dry mass of Sample after washing C 3439 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.09 %
WASHING

AGGREGATE SIZE (mm) 1.5


1 5 - 5 ((wet)
et)
Original dry mass of Sample B 2678 g
Dry mass of Sample after washing C 2666 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.45 %
WASHING

AGGREGATE SIZE (mm) 0 - 1.5 (dry)


Original dry mass of Sample B 2201 g
Dry mass of Sample after washing C 2095 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 4.82 %
WASHING
COARSE AGG FINE AGG
T.S. LIMIT 3.00%
SPEC. LIMIT 8%

For the contractor: Mesfin A.

Page 9
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5

Site Bujagali Hydropower Project Sampling Date 23/5/2011


Sampling Location Stock Pile Tasting Date 24/5/2011
Material source River Natural Sand LAB. Ref. No. 244

AGGREGATE SIZE (mm) 0-5


Original dry mass of Sample B 1755 g
Dry mass of Sample after washing C 1675 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 4.56 %
WASHING
COARSE AGG FINE AGG
T.S.
T S LIMIT 3.00%
3 00%
SPEC. LIMIT 8%

For the contractor: Mesfin A.

Page 10
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5

Site Bujagali Hydropower Project Sampling Date 19/5/2011


Sampling Location CRUSHING PLANT Tasting Date 21/5/2011
Material source AMPHIBOLITE ROCK LAB. Ref. No. 250

AGGREGATE SIZE (mm) 25 - 38


Original dry mass of Sample B g
Dry mass of Sample after washing C g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 %
WASHING

AGGREGATE SIZE ((mm)) 19 - 25


Original dry mass of Sample B 3841 g
Dry mass of Sample after washing C 3836 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.13 %
WASHING

AGGREGATE SIZE (mm) 5 - 19


Original dry mass of Sample B 3799 g
Dry mass of Sample after washing C 3796 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.08 %
WASHING

AGGREGATE SIZE (mm) 1.5


1 5 - 5 ((wet)
et)
Original dry mass of Sample B 2847 g
Dry mass of Sample after washing C 2838 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.32 %
WASHING

AGGREGATE SIZE (mm) 0 - 1.5 (dry)


Original dry mass of Sample B 1976 g
Dry mass of Sample after washing C 1892 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 4.25 %
WASHING
COARSE AGG FINE AGG
T.S. LIMIT 3.00%
SPEC. LIMIT 8%

For the contractor: Mesfin A.

Page 11
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5

Site Bujagali Hydropower Project Sampling Date 19/5/2011


Sampling Location Stock Pile Tasting Date 21/5/2011
Material source River Natural Sand LAB. Ref. No. 243

AGGREGATE SIZE (mm) 0-5


Original dry mass of Sample B 1839 g
Dry mass of Sample after washing C 1758 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 4.40 %
WASHING
COARSE AGG FINE AGG
T.S.
T S LIMIT 3.00%
3 00%
SPEC. LIMIT 8%

For the contractor: Mesfin A.

Page 12
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5

Site Bujagali Hydropower Project Sampling Date 12/5/2011


Sampling Location CRUSHING PLANT Tasting Date 13/5/2011
Material source AMPHIBOLITE ROCK LAB. Ref. No. 249

AGGREGATE SIZE (mm) 25 - 38


Original dry mass of Sample B g
Dry mass of Sample after washing C g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 %
WASHING

AGGREGATE SIZE ((mm)) 19 - 25


Original dry mass of Sample B 3723 g
Dry mass of Sample after washing C 3721 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.05 %
WASHING

AGGREGATE SIZE (mm) 5 - 19


Original dry mass of Sample B 3522 g
Dry mass of Sample after washing C 3519 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.09 %
WASHING

AGGREGATE SIZE (mm) 1.5


1 5 - 5 ((wet)
et)
Original dry mass of Sample B 1981 g
Dry mass of Sample after washing C 1975 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.30 %
WASHING

AGGREGATE SIZE (mm) 0 - 1.5 (dry)


Original dry mass of Sample B 1829 g
Dry mass of Sample after washing C 1767 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 3.39 %
WASHING
COARSE AGG FINE AGG
T.S. LIMIT 3.00%
SPEC. LIMIT 8%

For the contractor: Mesfin A.

Page 13
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5

Site Bujagali Hydropower Project Sampling Date 12/5/2011


Sampling Location Stock Pile Tasting Date 13/5/2011
Material source River Natural Sand LAB. Ref. No. 242

AGGREGATE SIZE (mm) 0-5


Original dry mass of Sample B 1931 g
Dry mass of Sample after washing C 1869 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 3.21 %
WASHING
COARSE AGG FINE AGG
T.S.
T S LIMIT 3.00%
3 00%
SPEC. LIMIT 8%

For the contractor: Mesfin A.

Page 14
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5

Site Bujagali Hydropower Project Sampling Date 7/5/2011


Sampling Location CRUSHING PLANT Tasting Date 9/5/2011
Material source AMPHIBOLITE ROCK LAB. Ref. No. 248

AGGREGATE SIZE (mm) 25 - 38


Original dry mass of Sample B g
Dry mass of Sample after washing C g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 %
WASHING

AGGREGATE SIZE ((mm)) 19 - 25


Original dry mass of Sample B 3797 g
Dry mass of Sample after washing C 3796 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.03 %
WASHING

AGGREGATE SIZE (mm) 5 - 19


Original dry mass of Sample B 3272 g
Dry mass of Sample after washing C 3269 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.09 %
WASHING

AGGREGATE SIZE (mm) 1.5


1 5 - 5 ((wet)
et)
Original dry mass of Sample B 2742 g
Dry mass of Sample after washing C 2732 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 0.36 %
WASHING

AGGREGATE SIZE (mm) 0 - 1.5 (dry)


Original dry mass of Sample B 2240 g
Dry mass of Sample after washing C 2164 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 3.39 %
WASHING
COARSE AGG FINE AGG
T.S. LIMIT 3.00%
SPEC. LIMIT 8%

For the contractor: Mesfin A.

Page 15
MATERIAL FINER THAN 75μm BUJAGALI HYDROPOWER PROJECT
SITE MATERIALS ASTM - C117-C33 UGANDA
LABORATORY Rev. 0 IN-1012-2-5

Site Bujagali Hydropower Project Sampling Date 9/5/2011


Sampling Location Stock Pile Tasting Date 10/5/2011
Material source River Natural Sand LAB. Ref. No. 241

AGGREGATE SIZE (mm) 0-5


Original dry mass of Sample B 1891.5 g
Dry mass of Sample after washing C 1848.5 g
PERCENTAGE OF MATERIAL
FINER THAN 75μm SIEVE BY A=[(B-C)/B] x 100 2.27 %
WASHING
COARSE AGG FINE AGG
T.S.
T S LIMIT 3.00%
3 00%
SPEC. LIMIT 8%

For the contractor: Mesfin A.

Page 16
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS PARTICLES IN AGGREGATES UGANDA


LABORATORY ASTM - C142 Rev.0 IN-1012-2-6

Site Bujagali Hydropower Project Sampling Date 23/5/2011


Sampling Location Cruching Plant Tasting Date 24/5/2011
Material source Bujagali Amphybolite LAB Ref.
LAB. Ref No.
No 251

AGGREGATE SIZE

SIZE OF SIEVE FOR MASS OF PARTICLE PERCENT OF CLAY LAMPS AND


SIZE OF PARTICLES MASS OF TEST SAMPLE
REMOLDING RESIDUM RETAINED FRIABLE PARTICLES

(mm) Opening size M (g) R (g) P=[(M-R)/M]x100 (%)

0-1.5 1.18 - 4.75 850μm 1783 1780 0.17

1.5-5 1.18 - 4.75 850μm 2634 2629 0.19

4.75 -9.5 2.36mm 2976 2974 0.07

9.5 - 19 4.75mm 3886 3884 0.05

19 - 25 4.75mm 3805 3804 0.03

25 - 37.5 4.75mm

COARSE AGG FINE AGG


T.S LIMIT < 1% < 3%

For the contractor: Mesfin A.

Page 17
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS PARTICLES IN AGGREGATES UGANDA


LABORATORY ASTM - C142 Rev.0 IN-1012-2-6

Site Bujagali Hydropower Project Sampling Date 23/5/2011


Sampling Location Stock Pile Tasting Date 24/5/2011
Material source River Natural Sand LAB Ref.
LAB. Ref No.
No 243

AGGREGATE SIZE

SIZE OF SIEVE FOR MASS OF PARTICLE PERCENT OF CLAY LAMPS AND


SIZE OF PARTICLES MASS OF TEST SAMPLE
REMOLDING RESIDUM RETAINED FRIABLE PARTICLES

(mm) Opening size M (g) R (g) P=[(M-R)/M]x100 (%)

0-5 1.18 - 4.75 850μm 1749 1723 1.46

COARSE AGG FINE AGG


T.S LIMIT < 1% < 3%

For the contractor: Mesfin A.

Page 18
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS PARTICLES IN AGGREGATES UGANDA


LABORATORY ASTM - C142 Rev.0 IN-1012-2-6

Site Bujagali Hydropower Project Sampling Date 19/5/2011


Sampling Location Cruching Plant Tasting Date 21/5/2011
Material source Bujagali Amphybolite LAB Ref.
LAB. Ref No.
No 250

AGGREGATE SIZE

SIZE OF SIEVE FOR MASS OF PARTICLE PERCENT OF CLAY LAMPS AND


SIZE OF PARTICLES MASS OF TEST SAMPLE
REMOLDING RESIDUM RETAINED FRIABLE PARTICLES

(mm) Opening size M (g) R (g) P=[(M-R)/M]x100 (%)

0-1.5 1.18 - 4.75 850μm 1855 1851 0.19

1.5-5 1.18 - 4.75 850μm 2397 2393 0.17

4.75 -9.5 2.36mm 2702 2700 0.07

9.5 - 19 4.75mm 3860 3858 0.04

19 - 25 4.75mm 3297 3296 0.03

25 - 37.5 4.75mm

COARSE AGG FINE AGG


T.S LIMIT < 1% < 3%

For the contractor: Mesfin A.

Page 19
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS PARTICLES IN AGGREGATES UGANDA


LABORATORY ASTM - C142 Rev.0 IN-1012-2-6

Site Bujagali Hydropower Project Sampling Date 19/5/2011


Sampling Location Stock Pile Tasting Date 21/5/2011
Material source River Natural Sand LAB Ref.
LAB. Ref No.
No 242

AGGREGATE SIZE

SIZE OF SIEVE FOR MASS OF PARTICLE PERCENT OF CLAY LAMPS AND


SIZE OF PARTICLES MASS OF TEST SAMPLE
REMOLDING RESIDUM RETAINED FRIABLE PARTICLES

(mm) Opening size M (g) R (g) P=[(M-R)/M]x100 (%)

0-5 1.18 - 4.75 850μm 1937 1912 1.29

COARSE AGG FINE AGG


T.S LIMIT < 1% < 3%

For the contractor: Mesfin A.

Page 20
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS PARTICLES IN AGGREGATES UGANDA


LABORATORY ASTM - C142 Rev.0 IN-1012-2-6

Site Bujagali Hydropower Project Sampling Date 12/5/2011


Sampling Location Cruching Plant Tasting Date 13/5/2011
Material source Bujagali Amphybolite LAB Ref.
LAB. Ref No.
No 249

AGGREGATE SIZE

SIZE OF SIEVE FOR MASS OF PARTICLE PERCENT OF CLAY LAMPS AND


SIZE OF PARTICLES MASS OF TEST SAMPLE
REMOLDING RESIDUM RETAINED FRIABLE PARTICLES

(mm) Opening size M (g) R (g) P=[(M-R)/M]x100 (%)

0-1.5 1.18 - 4.75 850μm 2289 2285 0.17

1.5-5 1.18 - 4.75 850μm 2716 2711 0.18

4.75 -9.5 2.36mm 3522 3520 0.06

9.5 - 19 4.75mm 3078 3077 0.03

19 - 25 4.75mm 3622 3621 0.03

25 - 37.5 4.75mm

COARSE AGG FINE AGG


T.S LIMIT < 1% < 3%

For the contractor: Mesfin A.

Page 21
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS PARTICLES IN AGGREGATES UGANDA


LABORATORY ASTM - C142 Rev.0 IN-1012-2-6

Site Bujagali Hydropower Project Sampling Date 9/5/2011


Sampling Location Stock Pile Tasting Date 10/5/2011
Material source River Natural Sand LAB Ref.
LAB. Ref No.
No 241

AGGREGATE SIZE

SIZE OF SIEVE FOR MASS OF PARTICLE PERCENT OF CLAY LAMPS AND


SIZE OF PARTICLES MASS OF TEST SAMPLE
REMOLDING RESIDUM RETAINED FRIABLE PARTICLES

(mm) Opening size M (g) R (g) P=[(M-R)/M]x100 (%)

0-5 1.18 - 4.75 850μm 1975 1950 1.27

COARSE AGG FINE AGG


T.S LIMIT < 1% < 3%

For the contractor: Mesfin A.

Page 22
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS PARTICLES IN AGGREGATES UGANDA


LABORATORY ASTM - C142 Rev.0 IN-1012-2-6

Site Bujagali Hydropower Project Sampling Date 9/5/2011


Sampling Location Cruching Plant Tasting Date 10/5/2011
Material source Bujagali Amphybolite LAB Ref.
LAB. Ref No.
No 248

AGGREGATE SIZE

SIZE OF SIEVE FOR MASS OF PARTICLE PERCENT OF CLAY LAMPS AND


SIZE OF PARTICLES MASS OF TEST SAMPLE
REMOLDING RESIDUM RETAINED FRIABLE PARTICLES

(mm) Opening size M (g) R (g) P=[(M-R)/M]x100 (%)

0-1.5 1.18 - 4.75 850μm 1745 1742 0.17

1.5-5 1.18 - 4.75 850μm 2240 2238 0.09

4.75 -9.5 2.36mm 3102 3100 0.06

9.5 - 19 4.75mm 2458 2457 0.04

19 - 25 4.75mm 3684 3683 0.03

25 - 37.5 4.75mm

COARSE AGG FINE AGG


T.S LIMIT < 1% < 3%

For the contractor: Mesfin A.

Page 23
CLAY LUMPS AND FRIABLE BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS PARTICLES IN AGGREGATES UGANDA


LABORATORY ASTM - C142 Rev.0 IN-1012-2-6

Site Bujagali Hydropower Project Sampling Date 9/5/2011


Sampling Location Stock Pile Tasting Date 10/5/2011
Material source River Natural Sand LAB Ref.
LAB. Ref No.
No 240

AGGREGATE SIZE

SIZE OF SIEVE FOR MASS OF PARTICLE PERCENT OF CLAY LAMPS AND


SIZE OF PARTICLES MASS OF TEST SAMPLE
REMOLDING RESIDUM RETAINED FRIABLE PARTICLES

(mm) Opening size M (g) R (g) P=[(M-R)/M]x100 (%)

0-5 1.18 - 4.75 850μm 1183 1166 1.40

COARSE AGG FINE AGG


T.S LIMIT < 1% < 3%

For the contractor: Mesfin A.

Page 24
LOS ANGELES ABRASION TEST BUJAGALI HYDROPOWER PROJECT,
SITE MATERIALS ASTM-C131 UGANDA
LABORATORY IN-1012-2-7
IN 1012 2 7

Material Type Concrete Aggregate Sampling Date 19/05/2011


Sampling Location Crushing Plant stock pile Tasting Date 24/05/2011
Material source Bujagali Amphibolite rock LAB. REF. No.: 33

Grading of test samples


Mass of indicated size - % Grading and
Si
Sieve Si
Size T
Type
Passing Retained on A B C D
mm
76,2(3") 63,5(2 1/2") - - - -
63,5(2 1/2") 50,8(2") - - - -
50 8(2")
50,8(2") 37 5(1 1/2")
37,5(1 - - - -
37,5(1 1/2") 25,0(1") 1250+- 25 - - -
25,0(1") 19,0(3/4") 1250+- 25 - - -
19,0(3/4") 12,5(1/2") 1250+- 10 2500+- 10 - -
12,5(1/2") 9,5(3/8") 1250+- 10 2500+- 10 - -
9,5(3/8
9,5(3/8")) 6,3(1/4"))
6,3(1/4 - - 2500+- 10 -
6,3(1/4") 4,75(no.4) - - 2500+- 10 -
4,75(no.4) 2,36(no.8) - - - 5000+- 10

Total 5000+- 10 5000+- 10 5000+- 10 5000+- 10

Number of Spheres
p 12 11 8 6

Number of Revolution 500 500 500 500


Grading TYPE A B C D
Initial Weight gm 5000 5000 5000 5000
Retained Weight on
1,70mm (no.12 Sieve) gm
after test 4421 4473 4237 4211
% by weight passing
%
1,70mm (no.12) sieve
11.58 10.54 15.26 15.78
T.S Limit 40%
Test result
AVERAGE % 13.3

For the Contractor Mesfin A.

Page 25
SPECIFIC GRAVITY and ABSORPTION BUJAGALI HYDROELECTRIC POWER PROJECT
SITE MATERIALS FINE AGGREGATES BUJAGALI ENERGY LIMITED
LABORATORY ASTM : C 128 Rev. 0 IN-1012-2-4

Site : BUJAGALI HPP Sampling Date : 19/5/2011


Location : Aggregate stock Testing Date : 23/05/2011
Material Source : BUJAGALI CRUSHING PLANT LAB. Ref. No. 35

FINE SAND Temperature °C 25.6 25.6


AGGREGATE SIZE (mm) 015
0-1.5 Pycnometer n° 18 18
a Weight of Pycnometer 499.0 499.0 gr
b Weight of Pycnometer + saturated surface-dry sample 1056.3 1053.4 gr
S Weight of saturated surface-dry sample in air 557.3 554.4 gr
C Weight of Pycnometer + sample + water 2158.8 2157.7 gr
A Weight of oven-dry sample 554.9 551.9 gr
B Weight of Pycnometer + Water 1789.0 1789.0 gr
A
Apparent specific gravity A.s.g. 2.998 3.013 gr/cm3
A+B-C
S Bulk specific gravity
B.s.g. ssdb 2.972 2.985 gr/cm3
S+B-C (Saturated Surface-Dry Basis)
A
Bulk specific gravity B.s.g. 2.959 2.972 gr/cm3
S+B-C
(S-A).100
Absorption Abs. 0.43 0.45 %
A
A.s.g. = 3.005 gr/cm3 B.s.g. ssdb = 2.979 gr/cm3
AVERAGE
B.s.g. = 2.966 gr/cm3 Abs. = 0.44 %

COARSE SAND Temperature °C 25.6 25.6


AGGREGATE SIZE (mm) 1.5-5 Pycnometer n° 18 18
a Weight of Pycnometer 499.0 499.0 gr
b Wt of Pycnometer + saturated surface-dry sample 1067.5 1063.1 gr
S Weight of saturated surface-dry sample in air 568.5 564.1 gr
C Weight of Pycnometer + sample + water 2167.1 2164.3 gr
A Weight of oven-dry sample 567.0 563.0 gr
B Weight of Pycnometer + Water 1789.0 1789.0 gr
A
Apparent specific gravity Asg
A.s.g. 3 002
3.002 2 999
2.999 gr/cm3
A+B-C
S Bulk specific gravity
B.s.g. ssdb 2.986 2.988 gr/cm3
S+B-C (Saturated Surface-Dry Basis)
A Bulk specific gravity
B.s.g. 2.978 2.982 gr/cm3
S+B-C
(S-A).100
Absorption Abs. 0.265 0.195
A
3 001 gr/cm3 3
AVERAGE
A
A.s.g. = 3.001 B
B.s.g. db =
ssdb 2 98
2.987 gr/cm3
B.s.g. = 2.980 gr/cm3 Abs. = 0.23 %

For the Contractor : Mesfin A.

Page 26
SPECIFIC GRAVITY and ABSORPTION BUJAGALI HYDROELECTRIC POWER PROJECT

SITE MATERIALS COARSE AGGREGATES BUJAGALI ENERGY LIMITED


LABORATORY ASTM : C 127 Rev. 0 IN-1012-2-3

Site : BUJAGALI HPP


Sampling Date : 19/5/2011
Location : Aggregate stock
Testing Date : 23/05/2011
Material Source : BUJAGALI CRUSHING PLANT
LAB. Ref. No. 35

AGGREGATE SIZE (mm) 5 - 19 Sample 1 2


B Weight of saturated surface-dry sample in air 1557.6 1555.2 gr
C Weight of saturated sample in water 1036.4 1034.3 gr
A Weight of oven-dry sample in air 1553.1 1551.7 gr
k Correction factor at t° ((°C)) g/cm3
3
A . k g/cm
Apparent specific gravity A.s.g. 3.006 2.999
A-C
3
B . k Bulk specific gravity g/cm
B.s.g. ssdb 2.988 2.986
B - C (Saturated Surface-Dry Basis)
3
A . k g/cm
Bulk specific gravity B.s.g. 2.980 2.979
B-C
(B-A).100 %
Absorption Abs. 0.29 0.23
A
3
A.s.g. = 3.002 gr/cm B.s.g. ssdb = 2.987 gr/cm3
AVERAGE 3
B.s.g. = 2.979 gr/cm Abs. = 0.26 %
LIMIT B.s.g. ssdb > 2.6
Abs. < 2.5
AGGREGATE SIZE (mm) 19 - 25 Sample 1 2
B Weight of saturated surface-dry sample in air 1569.4 1568.2 gr
C Weight of saturated sample in water 1044.4 1045.0 gr
A Weight of oven-dry sample in air 1566.5 1565.5 gr
3
k Correction factor at t° (°C) gr/cm
A . k
Apparent specific gravity A.s.g. 3.000 3.008 gr/cm3
A-C
B . k Bulk specific gravity 3
B.s.g. ssdb 2.989 2.997 gr/cm
B - C (Saturated Surface-Dry Basis)
A . k
Bulk specific gravity B.s.g. 2.984 2.992 gr/cm3
B-C
(B-A).100
Absorption Abs. 0.19 0.17 %
A
A.s.g. = 3.004 gr/cm3 B.s.g. ssdb = 2.993 gr/cm3
AVERAGE 3
B.s.g. = 2.988 gr/cm Abs. = 0.18 %
LIMIT B.s.g. ssdb > 2.6
Abs. < 2.5

For the Contractor : Mesfin A.

Page 27
SPECIFIC GRAVITY and ABSORPTION BUJAGALI HYDROELECTRIC POWER PROJECT
SITE MATERIALS FINE AGGREGATES BUJAGALI ENERGY LIMITED
LABORATORY ASTM : C 128 Rev. 0 IN-1012-2-4

Site : BUJAGALI HPP Sampling Date : 19/5/2011


Location : Natural Sand stock pile Testing Date : 23/05/2011
Material Source : KIGAYA NATURAL SAND LAB. Ref. No. 33

NATURAL SAND Temperature °C 26 26


AGGREGATE SIZE (mm) 05
0-5 Pycnometer n° 18 18
a Weight of Pycnometer 499.0 499.0 gr
b Weight of Pycnometer + saturated surface-dry sample 1013.4 1015.6 gr
S Weight of saturated surface-dry sample in air 514.4 516.6 gr
C Weight of Pycnometer + sample + water 2108.1 2109.6 gr
A Weight of oven-dry sample 511.7 514.2 gr
B Weight of Pycnometer + Water 1789.0 1789.0 gr
A
Apparent specific gravity A.s.g. 2.657 2.656 gr/cm3
A+B-C
S Bulk specific gravity
B.s.g. ssdb 2.634 2.636 gr/cm3
S+B-C (Saturated Surface-Dry Basis)
A
Bulk specific gravity B.s.g. 2.620 2.623 gr/cm3
S+B-C
(S-A).100
Absorption Abs. 0.53 0.47 %
A
A.s.g. = 2.656 gr/cm3 B.s.g. ssdb = 2.635 gr/cm3
AVERAGE
B.s.g. = 2.622 gr/cm3 Abs. = 0.50 %

For the Contractor : Mesfin A.

Page 28
Soundness of Aggregate BUJAGALI HYDROPOWER PROJECT,
SITE MATERIALS by use of Sodium Sulfate UGANDA
LABORATORY ASTM C - 88 IN-1012-2-8

Site : Bujagali Dam Site Sampling Date : 19/5/2011


Location : Crushing Plant Testing Date : 22/05/2011
Material Source : Bujagali Amphibolite LAB. Ref. No. SA - 012

FINE AGGREGATE

Sieve Size Grading of Mass of test Fraction Passing Sieve Corrected Average
Original used to determine Weighted Loss
Passing Retained Sample Before After Loss
mm mm % Retained gr gr gr % %
9.5 4.75 26.44 1007 990 17 1.69 0.45
4.75 2.36 19.74 752 719 33 4.39 0.87
2.36 1.18 16.07 612 597 15 2.45 0.39
1.18 0.6 20.69 788 748 40 5.08 1.05
0.6 0.3 17.06 650 608 42 6.46 1.10
Total 100 3809 3662 147 3.86 3.86

SOUNDNESS LOSS% = 3 86
3.86

COARSE AGGREGATE
Grading of Passing Sieve
Sieve Size Mass of test Fraction Corrected Average
Original used to determine Weighted Loss
Passing Retained Sample Before After Loss
mm mm % Retained gr gr gr % %
63.5 37.5

37.5 19.5 25.43 685 664 21 3.07 0.78

19.5 9.5 37.42 1008 990 18 1.79 0.67

9.5 4.75 37.16 1001 985 16 1.60 0.59


Total 100.00 2694 2639 55 2.04 2.04

SOUNDNESS LOSS = 2.04


T.S.Limit 12%

1st Cycle started on 22/05/2011


2nd Cycle started on 24/05/2011
3rd Cycle started on 26/05/2011
4th Cycle started on 28/05/2011
5th Cycle started on 30/05/2011

For the Contractor: Mesfin A.

Page 29
BUJAGALI HYDROPOWER PROJECT
FLAKINESS & ELONGATION

SITE MATERIALS B.S. 812 UGANDA

LABORATORY Rev. 0 IN-1012-2-9

Site : Bujagali Hydropower project Sampling Date : 19/5/2011

Sample Location : Crushing Plant


Testing Date : 20/5/2011

Sample Description Aggregate Lab. Ref. N° 37

38 - 25 mm
Size Retained Weight Flaky Elongated
mm gr. gr. gr.
37,5 - 28
28 - 20
20 - 14
14 - 10
Total A B C
25 - 19 mm
28 - 20 838 172 85
20 - 14 1506 276 301
14 - 10 1324 135 123
Total 3668 A 583 B 509 C
19 - 5 mm
20 - 14 1489 376 343
14- 10 1072 187 97
10 - 6.3 1388 160 183
Total 3949 A 723 B 623 C

Aggregate size 38 - 25 mm 25 - 19 mm 19 - 5 mm

B
Flakiness Index 15.89 18.31 %
A
T.S LIMIT <20% by weight

C
Elongation Index 13.88 15.78 %
A
T.S LIMIT <35% by weight

For the Contractor: Mesfin A.

Page 30
BUJAGALI HYDROPOWER PROJECT
ACV, AIV

SITE MATERIALS B.S. 812 PART 110:1990 UGANDA

LABORATORY Rev. 0 IN-1012-2-14

Site : Bujagali Hydropower project Sampling Date : 19/5/2011

Sample Location : Crushing Plant Testing Date : 21/05/2011

Sample Description Soaked Aggregate Lab. Ref. N° 30

Aggregate Crushing Value (ACV)


Size Weight Test Test Test
mm gr. 1 2 3
14 - 10 Initial mass. 3184 3180 3176

Passing sieve 2.36 mass. 286 297 306


Retained on sieve 2.36 mass. 2898 2883 2870

ACV % 9.0 9.3 9.6

Average % 9.32
BS LIMIT <30% by weight

Aggregate Impact Value (AIV)


Size Weight Test Test Test
mm gr. 1 2 3
14 - 10 Initial mass. (M1) 382 378 380

Passing sieve 2.36 mass.(M2) 26 26 31


Retained on sieve 2.36 mass. 356 352 349

AIV % 6.8 6.9 8.2

Average % 7.3
BS LIMIT <30% by weight

For the Contractor: Mesfin A.

Page 31
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report

4.  GRADING OF AGGREGATE ..........................................  

SA-D-GE-TR-1112

Page 32
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev.0 IN-1012-2-2
Sample Ref. 261 AGGREGATE TYPE BUJAGALI AMPHIBOLITE DAT E SAMPLED 23/5/2011

25-38mm 19-25mm 5-19mm Crushed C.Sand 1.5-5mm


Initial Dry Weight (g) Initial Dry Weight (g) 13826.0 Initial Dry Weight (g) 12046.0 Initial Dry Weight (g) 11293.0
Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing
Metric Retained Metric Retained Metric Retained Metric Retained
(mm) (g) % % (mm) (g) % % (mm) (g) % % (mm) (g) % %
50 37.5 0 - 100.0 25 0 - 100.0 6.3 0 - 100.0
37.5 25 238 1.7 98.3 19 960 8.0 92.0 4.75 1346 11.9 88.1
25 19 9637 69.7 30.3 12.5 4235 35.2 64.8 2.36 7182 63.6 36.4
19 12.5 13731 99.3 0.7 9.5 6143 51.0 49.0 1.18 10808 95.7 4.3
12.5 9.5 13760 99.5 0.5 6.3 9914 82.3 17.7 0.6 10808 95.7 4.3
9.5 6.3 13760 99.5 0.5 4.75 11863 98.5 1.5 0.3 10808 95.7 4.3
4.75 4.75 13760 99.5 0.5 2.36 11863 98.5 1.5 0.15 10808 95.7 4.3
2.36 3.36 13760 99.5 0.5 1.18 11863 98.5 1.5 0.075 10808 95.7 4.3
2.55
0.01 0.1 Siev e Metric
1 Size (mm) 10
100

90

80
Crushed F. Sand 0-1.5mm
70 Initial Dry Weight (g) 9351.0
Sieve SizCumulativ e Retained Passing
60
% Passing

Metric Retained
50 (mm) (g) % %
6.3 0 - 100.0
40
4.75 0 - 100.0
30 2.36 206 2.2 97.8

20 1.18 2091 22.4 77.6


0.6 5470 58.5 41.5
10 0.3 7836 83.8 16.2
0 0.15 8958 95.8 4.2
0.075 0.15 0.3 0.6 1.18 2.36 4.75 9.5 19 25 38 50 0.075 9220 98.6 1.4
FM = 2.63

For the contractor: Mesfin A.

Page 33
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev .0 IN-1012-2-2
Sample Ref . 261 AGGREGATE TYPE: DATE SAMPLED 23/5/2011

0.01 0.1
0.1 Sieve
Sieve Metric
Metric
11 Size
Size (mm)
(mm) 10
10
100
100

90
90

80
80
Natural. Sand 0-6mm
70
70 Initial Dry Weight (g) 9263.0

60
60 Sieve Size Cumulativ e Retained Passing
% Passing

Metric Retained
50
50
(mm) (g) % %
40
40 6.3 0 - 100.0
4.75 59 0.6 99.4
30
30
2.36 218 2.4 97.6
20
20 1.18 607 6.6 93.4
10
10 0.6 1766 19.1 80.9
0.3 4593 49.6 50.4
00
0.15 6760 73.0 27.0
0.075 0.15 0.3 0.6 1.18 2.36
2.36 4.75
4.75 9.5
9.5 19 25
25 38 50
50
0.075 8615 93.0 7.0
FM =

For the contractor: Mesf in A..

Page 34
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev.0 IN-1012-2-2
Sample Ref. 260 AGGREGATE TYPE BUJAGALI AMPHIBOLITE DAT E SAMPLED 19/5/2011

25-38mm 19-25mm 5-19mm Crushed C.Sand 1.5-5mm


Initial Dry Weight (g) Initial Dry Weight (g) 15860.0 Initial Dry Weight (g) 16819.0 Initial Dry Weight (g) 15616.0
Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing
Metric Retained Metric Retained Metric Retained Metric Retained
(mm) (g) % % (mm) (g) % % (mm) (g) % % (mm) (g) % %
50 37.5 0 - 100.0 25 0 - 100.0 6.3 0 - 100.0
37.5 25 78 0.5 99.5 19 83 0.5 99.5 4.75 1249 8.0 92.0
25 19 10081 63.6 36.4 12.5 5709 33.9 66.1 2.36 9682 62.0 38.0
19 12.5 15802 99.6 0.4 9.5 9541 56.7 43.3 1.18 15356 98.3 1.7
12.5 9.5 15820 99.7 0.3 6.3 15137 90.0 10.0 0.6 15525 99.4 0.6
9.5 6.3 15820 99.7 0.3 4.75 16712 99.4 0.6 0.3 15525 99.4 0.6
4.75 4.75 15820 99.7 0.3 2.36 16712 99.4 0.6 0.15 15525 99.4 0.6
2.36 3.36 15820 99.7 0.3 1.18 16712 99.4 0.6 0.075 15525 99.4 0.6
2.60
0.01 0.1 Siev e Metric
1 Size (mm) 10
100

90

80
Crushed F. Sand 0-1.5mm
70 Initial Dry Weight (g) 9145.0
Sieve SizCumulativ e Retained Passing
60
% Passing

Metric Retained
50 (mm) (g) % %
6.3 0 - 100.0
40
4.75 0 - 100.0
30 2.36 206 2.3 97.7

20 1.18 2091 22.9 77.1


0.6 5578 61.0 39.0
10 0.3 7499 82.0 18.0
0 0.15 8596 94.0 6.0
0.075 0.15 0.3 0.6 1.18 2.36 4.75 9.5 19 25 38 50 0.075 8980 98.2 1.8
FM = 2.62

For the contractor: Mesfin A.

Page 35
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev .0 IN-1012-2-2
Sample Ref . 260 AGGREGATE TYPE: DATE SAMPLED 19/5/2011

0.01 0.1
0.1 Sieve
Sieve Metric
Metric
11 Size
Size (mm)
(mm) 10
10
100
100

90
90

80
80
Natural. Sand 0-6mm
70
70 Initial Dry Weight (g) 9877.5

60
60 Sieve Size Cumulativ e Retained Passing
% Passing

Metric Retained
50
50
(mm) (g) % %
40
40 6.3 0 - 100.0
4.75 98 1.0 99.0
30
30
2.36 236 2.4 97.6
20
20 1.18 1275 12.9 87.1
10
10 0.6 3549 35.9 64.1
0.3 7662 77.6 22.4
00
0.15 8840 89.5 10.5
0.075 0.15 0.3 0.6 1.18 2.36
2.36 4.75
4.75 9.5
9.5 19 25
25 38 50
50
0.075 9734 98.5 1.5
FM =

For the contractor: Mesf in A..

Page 36
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev.0 IN-1012-2-2
Sample Ref. 259 AGGREGATE TYPE BUJAGALI AMPHIBOLITE DAT E SAMPLED ########

25-38mm 19-25mm 5-19mm Crushed C.Sand 1.5-5mm


Initial Dry Weight (g) Initial Dry Weight (g) 10690.0 Initial Dry Weight (g) 13124.0 Initial Dry Weight (g) 11481.0
Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing
Metric Retained Metric Retained Metric Retained Metric Retained
(mm) (g) % % (mm) (g) % % (mm) (g) % % (mm) (g) % %
50 37.5 0 - 100.0 25 0 - 100.0 6.3 0 - 100.0
37.5 25 380 3.6 96.4 19 85 0.6 99.4 4.75 1378 12.0 88.0
25 19 6820 63.8 36.2 12.5 5326 40.6 59.4 2.36 7577 66.0 34.0
19 12.5 10297 96.3 3.7 9.5 8860 67.5 32.5 1.18 10832 94.3 5.7
12.5 9.5 10332 96.7 3.3 6.3 11646 88.7 11.3 0.6 11097 96.7 3.3
9.5 6.3 10332 96.7 3.3 4.75 12993 99.0 1.0 0.3 11097 96.7 3.3
4.75 4.75 10332 96.7 3.3 2.36 12993 99.0 1.0 0.15 11097 96.7 3.3
2.36 3.36 10332 96.7 3.3 1.18 13045 99.4 0.6 0.075 11097 96.7 3.3
2.57
0.01 0.1 Siev e Metric
1 Size (mm) 10
100

90

80
Crushed F. Sand 0-1.5mm
70 Initial Dry Weight (g) 10493.0
Sieve SizCumulativ e Retained Passing
60
% Passing

Metric Retained
50 (mm) (g) % %
6.3 0 - 100.0
40
4.75 0 - 100.0
30 2.36 140 1.3 98.7

20 1.18 2043 19.5 80.5


0.6 6506 62.0 38.0
10 0.3 8185 78.0 22.0
0 0.15 10073 96.0 4.0
0.075 0.15 0.3 0.6 1.18 2.36 4.75 9.5 19 25 38 50 0.075 10149 96.7 3.3
FM = 2.57

For the contractor: Mesfin A.

Page 37
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev .0 IN-1012-2-2
Sample Ref . 259 AGGREGATE TYPE: DATE SAMPLED 12/5/2011

0.01 0.1
0.1 Sieve
Sieve Metric
Metric
11 Size
Size (mm)
(mm) 10
10
100
100

90
90

80
80
Natural. Sand 0-6mm
70
70 Initial Dry Weight (g) 5691.0

60
60 Sieve Size Cumulativ e Retained Passing
% Passing

Metric Retained
50
50
(mm) (g) % %
40
40 6.3 0 - 100.0
4.75 93 1.6 98.4
30
30
2.36 260 4.6 95.4
20
20 1.18 449 7.9 92.1
10
10 0.6 1146 20.1 79.9
0.3 3957 69.5 30.5
00
0.15 5059 88.9 11.1
0.075 0.15 0.3 0.6 1.18 2.36
2.36 4.75
4.75 9.5
9.5 19 25
25 38 50
50
0.075 5595 98.3 1.7
FM =

For the contractor: Mesf in A..

Page 38
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev.0 IN-1012-2-2
Sample Ref. 258 AGGREGATE TYPE BUJAGALI AMPHIBOLITE DAT E SAMPLED 7/5/2011

25-38mm 19-25mm 5-19mm Crushed C.Sand 1.5-5mm


Initial Dry Weight (g) Initial Dry Weight (g) 14798.0 Initial Dry Weight (g) 13124.0 Initial Dry Weight (g) 11762.0
Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing Sieve SizCumulativ e Retained Passing
Metric Retained Metric Retained Metric Retained Metric Retained
(mm) (g) % % (mm) (g) % % (mm) (g) % % (mm) (g) % %
50 37.5 0 - 100.0 25 0 - 100.0 6.3 0 - 100.0
37.5 25 296 2.0 98.0 19 207 1.6 98.4 4.75 1411 12.0 88.0
25 19 10063 68.0 32.0 12.5 5512 42.0 58.0 2.36 7528 64.0 36.0
19 12.5 14702 99.4 0.6 9.5 9712 74.0 26.0 1.18 11629 98.9 1.1
12.5 9.5 14702 99.4 0.6 6.3 11549 88.0 12.0 0.6 11734 99.8 0.2
9.5 6.3 14702 99.4 0.6 4.75 13007 99.1 0.9 0.3 11734 99.8 0.2
4.75 4.75 14702 99.4 0.6 2.36 13007 99.1 0.9 0.15 11734 99.8 0.2
2.36 3.36 14702 99.4 0.6 1.18 13007 99.1 0.9 0.075 11734 99.8 0.2
2.63
0.01 0.1 Siev e Metric
1 Size (mm) 10
100

90

80
Crushed F. Sand 0-1.5mm
70 Initial Dry Weight (g) 7755.0
Sieve SizCumulativ e Retained Passing
60
% Passing

Metric Retained
50 (mm) (g) % %
6.3 0 - 100.0
40
4.75 0 - 100.0
30 2.36 170 2.2 97.8

20 1.18 1750 22.6 77.4


0.6 4808 62.0 38.0
10 0.3 6056 78.1 21.9
0 0.15 7251 93.5 6.5
0.075 0.15 0.3 0.6 1.18 2.36 4.75 9.5 19 25 38 50 0.075 7678 99.0 1.0
FM = 2.58

For the contractor: Mesfin A.

Page 39
SIEVE ANALYSIS DATA SHEET BUJAGALI HYDROELECTRIC POWER
SITE MATERIALS CONCRETE AGGREGATES PROJECT, UGANDA
LABORATORY ASTM C136 Rev .0 IN-1012-2-2
Sample Ref . 258 AGGREGATE TYPE: DATE SAMPLED 9/5/2011

0.01 0.1
0.1 Sieve
Sieve Metric
Metric
11 Size
Size (mm)
(mm) 10
10
100
100

90
90

80
80
Natural. Sand 0-6mm
70
70 Initial Dry Weight (g) 10545.0

60
60 Sieve Size Cumulativ e Retained Passing
% Passing

Metric Retained
50
50
(mm) (g) % %
40
40 6.3 0 - 100.0
4.75 130 1.2 98.8
30
30
2.36 237 2.2 97.8
20
20 1.18 464 4.4 95.6
10
10 0.6 1659 15.7 84.3
0.3 7297 69.2 30.8
00
0.15 9469 89.8 10.2
0.075 0.15 0.3 0.6 1.18 2.36
2.36 4.75
4.75 9.5
9.5 19 25
25 38 50
50
0.075 10334 98.0 2.0
FM =

For the contractor: Mesf in A..

Page 40
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report

5.  CONCRETE TESTS 


5.1 SUMMARY OF RESULTS............................................................... 42 
5.1.1  Test on fresh concrete........................................................ 42 
5.1.2  Test on moisture content of aggregates........................ 60 
5.1.3  Test on normal compressive strength of cylinder samples...... 64

5.2 Summary of applied design mixes................................ 147

SA-D-GE-TR-1212

Page 41
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report

5.1  SUMMARY OF RESULTS 


5.1.1  Test on fresh concrete.....42

SA-D-GE-TR-1212

Page 42
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK ROOF SLAB PARAPET
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N/C40 Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 2/5/2011 FC-IB-2 300 0.54 3.00 4:02 PM 96 80 85 32.7 21.8 22.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2nd PHASE FIXED WHEEL GATE
1 20/5/2011 FC-M6 380 0.42 380+2.7 10:46 AM 99 95 _ 25.4 21.6 22.5

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DRAINAGE DUCT
1 20/5/2011 FC-JC 310 0.54 3.10 4:33 PM 99 70 _ 27.4 21.7 22.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK DRAINAGE DUCT BLINDING
1 21/5/2011 FC-R 250 0.70 2.50 8:28 AM 97 50 55 21.2 20.5 20.6
2 21/5/2011 FC-R 250 0.70 2.50 9:36 AM 97 55 _ 23.8 21.0 21.2
3 21/5/2011 FC-R 250 0.70 2.50 10:05 AM 97 55 _ 24.3 21.4 21.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2nd PHASE FIXED WHEEL GATE
1 21/5/2011 FC-M6 380 0.42 380+2.7 7:47 AM 100 95 100 21.2 21.4 21.6
2 21/5/2011 FC-M6 380 0.42 380+2.7 9:19 AM 100 100 _ 24.6 21.6 21.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DRAINAGE CHANNEL
1 21/5/2011 FC-R 250 0.70 2.50 3:54 PM 101 55 _ 26.2 22.5 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK
1 21/5/2011 FC-IB 330 0.54 3.30 8:28 AM 97 75 _ 21.4 22.6 22.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT 62 WALL BETWEEN AXIS 2 & 4
1 21/5/2011 FC-JC 310 0.54 3.10 2:43 PM 97 70 _ 28.5 21.6 _
2 21/5/2011 FC-JC 310 0.54 3.10 3:05 PM 101 80 _ 25.5 21.8 _
3 21/5/2011 FC-JC 310 0.54 3.10 3:19 PM 101 85 _ 27.2 21.4 _
For the contractor;

Page 43
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: PH ACCESS AREA DUCT CHANNEL
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N/C40 Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 30/5/2011 FC-JC 310 0.54 3.10 8:33 AM 100 55 60 22.5 21.4 21.6
2 30/5/2011 FC-JC 310 0.54 3.10 9:12 AM 100 50 _ 23.9 21.6 21.8
3 30/5/2011 FC-JC 310 0.54 3.10 9:49 AM 100 60 _ 25.2 21.8 22.0
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT B 2 PHASE WHEEL GATE CON.
1 30/5/2011 FC-M6 380 0.42 380+2.7 1:49 PM 101 90 _ 31.7 21.4 22.5
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT B 2 PHASE WHEEL GATE CON.
1 30/5/2011 FC-M6 380 0.42 380+2.7 8:09 AM 97 95 _ 25.5 22.4 22.8
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT B 2 PHASE WHEEL GATE CON.
1 31/5/2011 FC-M6 380 0.42 380+2.7 7:17 AM 100 95 100 21.6 20.5 21.0

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING DRAINAGE CHANNEL PRECAST
1 31/5/2011 FC-R 250 0.70 2.50 11:28 AM 101 50 55 27.2 22.3 22.4
2 31/5/2011 FC-R 250 0.70 2.50 11:33 AM 100 55 _ 29.4 22.5 22.6
3 31/5/2011 FC-R 250 0.70 2.50 12:36 PM 100 60 _ 31.0 22.8 22.9

For the contractor;

Page 44
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD FENCE POST FOUNDATION
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 27/5/2011 FC-R 250 0.70 2.50 10:53 AM 99 60 _ 27.6 22.4 22.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD FENCE POST FOUNDATION
1 27/5/2011 FC-R 250 0.70 2.50 8:01 AM 101 60 _ 24.7 22.0 22.4

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD FENCE POST FOUNDATION
1 28/5/2011 FC-R 250 0.70 2.50 10:10 AM 97 50 _ 27.4 22.3 22.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 28/8/2011 FC-JC 310 0.54 3.10 9:49 AM 101 60 _ 26.8 22.4 22.7
2 28/5/2011 FC-JC 310 0.54 3.10 10:34 AM 101 55 _ 28.9 22.6 22.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD VARIOUS BLINDING
1 30/5/2011 FC-R 250 0.70 2.50 9:01 AM 101 45 50 24.8 22.6 22.8
2 30/5/2011 FC-R 250 0.70 2.50 1:56 PM 97 50 _ 29.9 22.7 22.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 30/5/2011 FC-JC 310 0.54 3.10 1:41 PM 100 60 65 28.7 21.7 21.9
2 30/5/2011 FC-JC 310 0.54 3.10 2:27 PM 100 65 _ 27.0 21.8 21.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: CARPENTRY WORKSHOP PRECAST
1 31/5/2011 FC-JC 310 0.54 3.10 2:26 PM 101 60 65 34.6 21.8 21.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD VARIOUS BLINDING
1 31/5/2011 FC-R 250 0.70 2.50 1:28 PM 100 55 _ 33.2 21.6 22.2

For the contractor;

Page 45
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DUCT CHANNEL
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N/C40 Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 26/5/2011 FC-R 250 0.70 2.50 2:41 PM 101 80 _ 34.1 22.5 _

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DUCT CHANNEL
1 27/5/2011 FC-JC 310 0.54 3.10 4:37 PM 99 60 _ 30.5 21.7 22.6
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT B 2 PHASE FIXED WHEEL GATE
1 27/5/2011 FC-M6 380 0.42 380+2.7 7:17 AM 97 95 100 23.8 21.7 22.6
2 27/5/2011 FC-M6 380 0.42 380+2.7 9:16 AM 97 100 _ 24.6 22.0 22.4
3 27/5/2011 FC-M6 380 0.42 380+2.7 10:10 AM 97 105 _ 26.7 21.8 22.5
4 27/5/2011 FC-M6 380 0.42 380+2.7 3:44 PM 101 100 _ 30.5 21.7 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DUCT CHANNEL
1 28/5/2011 FC-JC 310 0.54 3.10 1:54 PM 101 60 65 31.0 22.6 22.7
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT B 2 PHASE FIXED WHEEL GATE
1 28/5/2011 FC-M6 380 0.42 380+2.7 7:35 AM 97 95 _ 20.8 21.2 21.4
2 28/5/2011 FC-M6 380 0.42 380+2.7 1:30 PM 99 90 _ 31.5 22.4 22.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 WALL


1 28/5/2011 FC-JC 310 0.54 3.10 8:53 AM 101 70 75 22.7 21.4 21.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK DRAINAGE DUCT BLINDING
1 28/5/2011 FC-R 250 0.70 2.50 7:22 AM 101 55 60 20.9 21.5 21.6
2 28/5/2011 FC-R 250 0.70 2.50 8:18 AM 101 60 _ 21.4 22.6 22.7
3 28/5/2011 FC-R 250 0.70 2.50 4:48 PM 101 60 _ 31.5 22.8 22.9

For the contractor;

Page 46
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY APRON SR 1.1
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 23/5/2011 FC-IB-2 300 0.54 3.00 4:23 PM 97 75 _ 32.7 22.6 22.8
2 23/5/2011 FC-IB-2 300 0.54 3.00 5:12 PM 97 80 _ 2566 2.6 30.2 22.7 22.7
3 23/5/2011 FC-IB-2 300 0.54 3.00 5:15 PM 97 85 _ 29.8 22.4 22.5

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY APRON SR 1.1
1 24/5/2011 FC-IB-2 300 0.54 3.00 11:05 AM 101 80 85 27.0 21.7 21.8
2 24/5/2011 FC-IB-2 300 0.54 3.00 11:47 AM 101 75 _ 27.5 21.8 21.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY BARRELS 15 & 16 LIFT 13
1 25/5/2011 FC-IB-2 300 0.54 3.00 8:42 AM 101 80 85 22.0 20.5 20.6
2 25/5/2011 FC-IB-2 300 0.54 3.00 9:50 AM 101 75 _ 2519 2.5 25.4 21.6 21.8

For the contractor;

Page 47
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD FENCE POST FOUNDATION
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 23/5/2011 FC-R 250 0.70 2.50 7:48 AM 100 60 65 23.4 22.3 22.4
2 23/5/2011 FC-R 250 0.70 2.50 9:11 AM 100 65 _ 24.5 22.4 22.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 23/5/2011 FC-JC 310 0.54 3.10 10:31 AM 100 60 65 27.4 22.8 22.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 23/5/2011 FC-R 250 0.70 2.50 7:59 AM 99 55 60 21.8 22.9 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 24/5/2011 FC-JC 310 0.54 3.10 11:17 AM 97 60 65 26.4 21.6 21.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 25/5/2011 FC-R 250 0.70 2.50 2:48 PM 100 50 _ 25.6 22.0 22.4

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 25/5/2011 FC-JC 310 0.54 3.10 1:26 PM 101 55 60 29.9 21.6 21.7
2 25/5/2011 FC-JC 310 0.54 3.10 2:31 PM 101 50 _ 30.0 21.4 21.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD FENCE POST FOUNDATION
1 25/5/2011 FC-R 250 0.70 2.50 8:53 AM 100 55 60 21.9 22.1 22.4

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 26/5/2011 FC-JC 310 0.54 3.10 1:25 PM 101 60 65 33.0 21.6 21.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD PRECAST MANHOLE
1 27/5/2011 FC-JC 310 0.54 3.10 11:08 AM 101 65 _ 28.5 21.6 22.8

For the contractor;

Page 48
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 3 LIFT P6B FLOOR
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 21/5/2011 FC-IB 330 0.54 3.30 1:17 PM 100 80 _ 25.9 21.2 22.5
2 21/5/2011 FC-IB 330 0.54 3.30 3:42 PM 100 80 _ 2546 2.5 26.2 21.4 22.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK
1 23/5/2011 FC-IB 330 0.54 3.30 2:19 PM 97 80 85 29.1 21.4 21.5
2 23/5/2011 FC-IB 330 0.54 3.30 2:52 PM 97 75 _ 30.0 21.6 21.8
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2 PHASE FIXED WHEEL GATE
1 23/5/2011 FC-M6 380 0.42 380+2.7 7:36 AM 101 90 _ 21.8 21.4 22.5
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2 PHASE FIXED WHEEL GATE
1 24/5/2011 FC-M6 380 0.42 380+2.7 7:21 AM 101 100 105 20.5 21.2 21.4
2 24/5/2011 FC-M6 380 0.42 380+2.7 8:55 AM 101 95 _ 23.0 21.4 21.6
3 24/5/2011 FC-M6 380 0.42 380+2.7 4:21 PM 101 90 _ 31.8 21.6 21.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK DRAINAGE DUCT BLINDING
1 24/5/2011 FC-R 250 0.70 2.50 2:23 PM 100 60 65 31.0 22.1 22.2
2 24/5/2011 FC-JC 310 0.54 3.10 3:31 PM 100 65 _ 32.4 22.4 22.6
3 24/5/2011 FC-R 250 0.70 2.50 4:41 PM 100 60 _ 33.0 22.6 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT 6 WALL BETWEEN AXIS 2 & 4
1 25/5/2011 FC-JC 310 0.54 3.10 11:09 AM 101 80 85 28.4 22.5 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING TANK DRAINAGE DUCT BLINDING
1 25/5/2011 FC-R 250 0.70 2.50 2:43 PM 97 60 65 31.2 22.6 22.8
2 25/5/2011 FC-JC 310 0.54 3.10 3:50 PM 97 70 _ 30.3 22.8 22.9
For the contractor;

Page 49
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. SPILLWAY RETAINING WALL LIFTS 14A & 14B
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 18/5/2011 FC-JC 310 0.54 3.10 1:38 PM 101 80 _ 31.8 21.5 22.2
2 18/5/2011 FC-JC 310 0.54 3.10 2:15 PM 101 85 _ 30.2 21.4 22.3
3 18/5/2011 FC-JC 310 0.54 3.10 2:50 PM 101 80 _ 30.3 21.5 22.7
4 18/5/2011 FC-JC 310 0.54 3.10 3:26 PM 101 80 _ 2561 2.6 31.2 21.6 22.6
5 18/5/2011 FC-JC 310 0.54 3.10 4:43 PM 101 75 _ 33.0 21.8 22.3

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY BARRELS 15 & 16 LIFT 13
1 19/5/2011 FC-IB-2 300 0.54 3.00 8:51 AM 97 80 85 24.6 21.5 21.6
2 19/5/2011 FC-IB-2 300 0.54 3.00 10:01 AM 101 75 _ 30.4 21.6 21.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY SS20 1, 2, 3 & 4
1 20/5/2011 FC-IB-2 300 0.54 3.00 7:46 AM 97 80 _ 19.5 20.4 22.0
2 20/5/2011 FC-IB-2 300 0.54 3.00 7:56 AM 101 80 _ 19.8 21.0 22.0
3 20/5/2011 FC-IB-2 300 0.54 3.00 8:55 AM 97 75 _ 22.7 21.2 22.1
4 20/5/2011 FC-IB-2 300 0.54 3.00 9:18 AM 99 75 _ 23.8 21.4 22.1
5 20/5/2011 FC-IB-2 300 0.54 3.00 10:03 AM 100 80 _ 25.8 21.6 _
6 20/5/2011 FC-IB-2 300 0.54 3.00 11:51 AM 97 80 _ 27.0 21.8 22.7
7 20/5/2011 FC-IB-2 300 0.54 3.00 12:34 PM 101 75 _ 30.1 22.0 22.6
8 20/5/2011 FC-IB-2 300 0.54 3.00 1:59 PM 97 75 _ 20.9 21.9 22.7
9 20/5/2011 FC-IB-2 300 0.54 3.00 2:36 PM 99 75 _ 2519 2.6 21.0 21.8 22.4
10 20/5/2011 FC-IB-2 300 0.54 3.00 3:30 PM 99 80 _ 24.6 22.0 22.4
11 20/5/2011 FC-IB-2 300 0.54 3.00 4:49 PM 101 75 _ 26.8 22.4 22.5
For the contractor;

Page 50
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 17/5/2011 FC-R 250 0.70 2.50 7:25 AM 100 55 60 20.3 22.4 22.6
2 17/5/2011 FC-R 250 0.70 2.50 1:47 PM 101 60 _ 28.5 21.6 21.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 18/5/2011 FC-JC 310 0.54 3.10 2:58 PM 99 50 60 31.6 22.6 22.7
2 18/5/2011 FC-JC 310 0.54 3.10 4:51 PM 99 55 _ 33.9 22.7 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 19/5/2011 FC-JC 310 0.54 3.10 1:51 PM 97 60 _ 33.2 22.3 22.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD FENCE POST FOUNDATION
1 19/5/2011 FC-R 250 0.70 2.50 2:58 PM 101 60 _ 32.4 22.9 22.9
2 19/5/2011 FC-R 250 0.70 2.50 3:01 PM 101 65 _ 31.8 22.5 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD BLINDING
1 19/5/2011 FC-R 250 0.70 2.50 8:09 AM 100 55 60 21.2 20.5 21.0

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 20/5/2011 FC-R 250 0.70 2.50 4:59 PM 100 50 _ 26.3 22.7 22.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 20/5/2011 FC-JC 310 0.54 3.10 3:35 PM 97 55 _ 27.5 22.5 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 21/5/2011 FC-R 250 0.70 2.50 3:15 PM 97 50 _ 30.4 22.8 22.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:MECHANICAL WORKSHOP


1 23/5/2011 FC-JC 310 0.54 3.10 10:23 AM 101 65 _ 26.9 21.3 22.7
For the contractor;

Page 51
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA DUCT
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N/C40 Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 14/5/2011 FC-JC 310 0.54 3.10 2:03 PM 97 70 75 32.6 21.4 21.5
2 14/5/2011 FC-JC 310 0.54 3.10 3:26 PM 100 65 _ 28.5 21.6 21.7
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2 PHASE FIXED WHEEL GATE
1 16/5/2011 FC-M6 380 0.42 380+2.7 1:51 PM 97 90 _ 26.5 21.4 22.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH FIRE FIGHTING DIESEL GENERATOR
1 17/5/2011 FC-JC 310 0.54 3.10 10:12 AM 97 70 75 26.0 21.3 21.4

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2nd PHASE FIXED WHEEL GATE
1 17/5/2011 FC-M6 380 0.42 380+2.7 4:10 PM 97 95 100 26.2 21.5 21.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA SMALL CHANNEL
1 17/5/2011 FC-R 250 0.70 2.50 6:18 PM 100 65 _ 27.8 22.4 22.4
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2 PHASE FIXED WHEEL GATE
1 18/5/2011 FC-M6 380 0.42 380+2.7 1:11 PM 97 100 105 31.9 22.0 22.3
2 18/5/2011 FC-M6 380 0.42 380+2.7 3:47 PM 97 90 _ 33.7 22.4 22.6
nd
AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 1 SLOT A 2 PHASE FIXED WHEEL GATE
1 19/5/2011 FC-M6 380 0.42 380+2.7 10:38 AM 97 95 100 28.6 21.4 21.6
2 19/5/2011 FC-M6 380 0.42 380+2.7 3:51 PM 99 100 _ 32.3 21.6 21.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA FIRE FIGHTING TANK DRAINAGE
1 19/5/2011 FC-R 250 0.70 2.50 2:33 PM 100 55 60 31.6 22.8 22.9
2 19/5/2011 FC-R 250 0.70 2.50 4:11 PM 100 60 _ 32.2 22.9 22.9
3 19/5/2011 FC-R 250 0.70 2.50 4:38 PM 100 65 _ 31.2 22.9 23.0
For the contractor;

Page 52
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY BARRELS 14, 15 & 16 LIFT 12
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 13/5/2011 FC-IB-2 300 0.54 3.00 8:21 AM 97 80 _ 24.5 21.2 22.1
2 13/5/2011 FC-IB-2 300 0.54 3.00 8:38 AM 100 80 _ 25.0 21.2 22.2
3 13/5/2011 FC-IB-2 300 0.54 3.00 9:15 AM 99 75 _ 28.5 21.4 22.5
4 13/5/2011 FC-IB-2 300 0.54 3.00 10:28 AM 96 80 _ 29.0 21.6 22.4
5 13/5/2011 FC-IB-2 300 0.54 3.00 11:04 AM 99 75 _ 2519 2.5 29.4 21.8 22.7
6 13/5/2011 FC-IB-2 300 0.54 3.00 12:40 PM 100 75 _ 31.6 22.0 22.5
7 13/5/2011 FC-IB-2 300 0.54 3.00 1:41 PM 99 80 _ 31.9 22.2 22.6
8 13/5/2011 FC-IB-2 300 0.54 3.00 2:34 PM 100 80 _ 32.0 22.0 22.3
9 13/5/2011 FC-IB-2 300 0.54 3.00 3:42 PM 100 75 _ 30.0 22.0 22.3
10 13/5/2011 FC-IB-2 300 0.54 3.00 4:14 PM 99 75 _ 29.6 22.6 22.5
11 13/5/2011 FC-IB-2 300 0.54 3.00 5:14 PM 100 80 _ 28.8 22.0 22.3
12 13/5/2011 FC-IB-2 300 0.54 3.00 6:39 PM 101 80 _ 26.4 22.9 _

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY SR 1.1 & 2.1 FOUNDATION
1 17/5/2011 FC-IB-2 300 0.54 3.00 1:37 PM 97 75 _ 28.9 21.6 22.1
2 17/5/2011 FC-IB-2 300 0.54 3.00 2:02 PM 100 75 _ 29.3 21.8 22.2
3 17/5/2011 FC-IB-2 300 0.54 3.00 2:12 PM 97 80 _ 29.9 22.0 22.2
4 17/5/2011 FC-IB-2 300 0.54 3.00 3:07 PM 100 75 _ 27.0 22.2 22.3
5 17/5/2011 FC-IB-2 300 0.54 3.00 3:18 PM 97 80 _ 29.5 22.0 22.2
6 17/5/2011 FC-IB-2 300 0.54 3.00 3:47 PM 100 85 _ 28.6 22.1 22.1

For the contractor;

Page 53
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD CABLE DUCT
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio 3 (%) (°C)
Lt./m at the BP at site (gm/cm3) at the BP at site
No.
1 12/5/2011 FC-R 250 0.70 2.50 1:39 PM 100 55 60 31.8 22.4 22.6
2 12/5/2011 FC-R 250 0.70 2.50 4:16 PM 97 60 _ 32.0 22.6 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH YARD MANHOLE
1 12/5/2011 FC-JC 310 0.54 3.10 1:46 PM 97 60 65 33.4 21.9 22.0

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 13/5/2011 FC-R 250 0.70 2.50 8:52 AM 97 50 55 22.8 23.5 23.6
2 13/5/2011 FC-R 250 0.70 2.50 4:06 PM 97 55 _ 29.2 24.0 24.2

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH YARD MANHOLE
1 14/5/2011 FC-JC 310 0.54 3.10 2:55 PM 101 60 _ 33.2 21.8 22.5

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD VARIOUS BLINDING
1 14/5/2011 FC-R 250 0.70 2.50 11:19 AM 96 55 _ 26.5 22.6 22.8
2 14/5/2011 FC-R 250 0.70 2.50 3:39 PM 97 50 _ 30.7 22.8 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 16/5/2011 FC-JC 310 0.54 3.10 2:19 PM 101 50 _ 31.5 24.0 24.5

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: SWITCH YARD BLINDING
1 16/5/2011 FC-R 250 0.70 2.50 7:42 AM 100 60 65 21.5 22.6 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 17/5/2011 FC-JC 310 0.54 3.10 2:43 PM 96 55 60 27.9 22.6 22.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:CARP.WORKSHOP SWITCH Y. PRECAST MANHOLE
1 18/5/2011 FC-JC 310 0.54 3.10 3:04 PM 100 70 _ 30.8 21.8 22.6
For the contractor;

Page 54
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. YARD FENCE CONTROL BUILDING WALK WAY
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 7/5/2011 FC-R 250 0.70 2.50 10:48 AM 99 65 70 25.4 24.2 24.4
2 7/5/2011 FC-R 250 0.70 2.50 3:57 PM 100 60 _ 32.6 24.4 24.8
3 7/5/2011 FC-R 250 0.70 2.50 5:23 PM 100 60 _ 29.8 23.8 24.0

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD BLINDING


1 9/5/2011 FC-R 250 0.70 2.50 8:03 AM 101 70 75 23.4 22.6 22.7
2 9/5/2011 FC-R 250 0.70 2.50 10:06 AM 101 65 _ 24.5 22.7 22.8
3 9/5/2011 FC-R 250 0.70 2.50 11:43 AM 101 65 _ 25.0 22.8 22.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: S. YARD PRECAST WASTE WATER MANHOLE
1 10/5/2011 FC-JC 310 0.54 3.10 10:02 AM 97 55 60 28.8 22.8 22.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD BLINDING


1 10/5/2011 FC-R 250 0.70 2.50 3:21 PM 101 70 75 33.0 24.8 24.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD VARIOUS BLINDING
1 11/5/2011 FC-R 250 0.70 2.50 3:28 PM 97 50 55 27.7 24.5 25.0
2 11/5/2011 FC-R 250 0.70 2.50 4:04 PM 97 55 _ 28.0 26.0 26.2

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD BLINDING


1 11/5/2011 FC-R 250 0.70 2.50 1:16 PM 100 60 65 31.0 24.8 25.0

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: S. YARD PRECAST WASTE WATER MANHOLE
1 11/5/2011 FC-JC 310 0.54 3.10 1:37 PM 97 55 60 31.2 21.8 21.9

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION: S. YARD PRECAST WASTE WATER MANHOLE
1 13/5/2011 FC-JC 310 0.54 3.10 1:39 PM 97 60 65 31.2 22.4 22.6
For the contractor;

Page 55
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY APRON SLAB SS17 & SS19
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 6/5/2011 FC-IB-2 300 0.54 3.00 5:52 PM 100 75 _ 28.6 22.5 22.5

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. SPILLWAY APRON ROCK RECONSTRUCTION
1 10/5/2011 FC-R 250 0.70 2.50 9:40 AM 101 70 _ 26.2 21.5 _
2 10/5/2011 FC-R 250 0.70 2.50 10:25 AM 101 75 _ 2460 2.6 31.0 21.2 22.4
3 10/5/2011 FC-R 250 0.70 2.50 11:23 AM 96 80 _ 31.4 21.6 22.4
4 10/5/2011 FC-R 250 0.70 2.50 12:55 PM 96 80 _ 31.8 21.4 22.5
5 10/5/2011 FC-R 250 0.70 2.50 1:29 PM 101 75 _ 32.0 21.3 22.5
6 10/5/2011 FC-R 250 0.70 2.50 2:20 PM 96 80 _ 33.8 21.2 22.7
7 10/5/2011 FC-R 250 0.70 2.50 3:57 PM 100 75 _ 33.4 21.0 22.5
8 10/5/2011 FC-R 250 0.70 2.50 4:20 PM 96 75 _ 33.0 21.8 22.7
9 10/5/2011 FC-R 250 0.70 2.50 5:21 PM 101 80 _ 30.1 21.4 _

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY ROCK RECONSTRUCTION CON.
1 14/5/2011 FC-R 250 0.70 2.50 6:15 PM 100 65 _ 27.9 22.0 22.5

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:S. SPILLWAY APRON RIGHT WALL RRC
1 14/5/2011 FC-R 250 0.70 2.50 8:51 AM 97 70 _ 23.3 22.4 22.4
2 14/5/2011 FC-R 250 0.70 2.50 10:00 AM 97 75 _ 2508 2.5 26.0 22.6 22.3
3 14/5/2011 FC-R 250 0.70 2.50 11:47 AM 97 80 _ 27.5 22.8 _
4 14/5/2011 FC-R 250 0.70 2.50 12:55 PM 97 80 _ 31.2 22.8 22.6
5 14/5/2011 FC-R 250 0.70 2.50 1:48 PM 97 80 _ 34.5 22.9 22.7
6 14/5/2011 FC-R 250 0.70 2.50 2:40 PM 97 75 _ 33.2 22.8 22.8
For the contractor;

Page 56
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT P11
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N/C40 Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 3/5/2011 FC-M6 380 0.42 380+2.7 8:25 AM 96 90 _ 21.7 20.6 22.4
2 3/5/2011 FC-M6 380 0.42 380+2.7 9:09 AM 99 85 _ 22.0 20.5 22.5
3 3/5/2011 FC-M6 380 0.42 380+2.7 9:52 AM 96 90 _ 21.8 20.4 22.3
4 3/5/2011 FC-M6 380 0.42 380+2.7 10:24 AM 96 95 _ 2543 2.6 20.7 19.8 22.4

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT 64A PARAPET
1 4/5/2011 FC-JC 300 0.54 3.00 10:05 AM 97 70 75 26.8 21.5 21.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT 64A PARAPET
1 5/5/2011 FC-JC 300 0.54 3.00 7:51 AM 100 70 75 21.6 20.5 21.0
2 5/5/2011 FC-JC 300 0.54 3.00 8:53 AM 100 75 _ 23.0 21.4 21.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ERECTION BAY


1 7/5/2011 FC-R 250 0.70 2.50 8:09 AM 101 70 75 23.4 23.0 23.2

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH UNIT 5 LIFT 64A PARAPET
1 7/5/2011 FC-JC 300 0.54 3.00 4:40 PM 101 70 _ 30.4 21.7 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ERECTION BAY


1 10/5/2011 FC-R 250 0.70 2.50 3:05 PM 97 70 75 32.6 24.5 24.7
2 10/5/2011 FC-R 250 0.70 2.50 4:29 PM 97 70 _ 30.2 23.7 23.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA PRECAST DUCT
1 10/5/2011 FC-R 250 0.70 2.50 2:24 PM 101 70 75 29.9 24.6 24.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:PH ACCESS AREA SMALL CHANNEL
1 17/5/2011 FC-JC 300 0.54 3.00 3:25 PM 99 60 65 27.0 22.3 22.4
For the contractor;

Page 57
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD FENCE POST FOUNDATION
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 2/5/2011 FC-R 250 0.70 2.50 3:16 PM 97 65 _ 28.9 22.5 _

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD FENCE POST FOUNDATION
1 3/5/2011 FC-R 250 0.70 2.50 7:40 AM 101 65 _ 20.8 19.5 21.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD CONTROL BUILDING OFFICE ROOM
1 4/5/2011 FC-R 250 0.70 2.50 3:08 PM 96 70 75 31.0 22.6 22.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD WASTE WATER PRECAST MANHOLE
1 4/5/2011 FC-JC 310 0.54 3.10 7:53 AM 96 60 _ 23.8 21.2 22.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD BUILDING


1 4/5/2011 FC-R 250 0.70 2.50 5:00 PM 96 75 _ 28.5 21.4 22.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD FENCE POST FOUNDATION
1 5/5/2011 FC-R 250 0.70 2.50 1:44 PM 100 60 65 28.0 24.2 24.3
1 5/5/2011 FC-R 250 0.70 2.50 5:15 PM 101 55 _ 26.4 24.4 24.4

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD WASTE WATER PRECAST MANHOLE
1 5/5/2011 FC-JC 310 0.54 3.10 3:53 PM 101 55 60 26.5 22.6 22.7

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD VARIOUS


1 6/5/2011 FC-R 250 0.70 2.50 2:08 PM 97 70 _ 30.8 22.1 22.5

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD WASTE WATER PRECAST MANHOLE
1 6/5/2011 FC-JC 310 0.54 3.10 10:25 AM 97 75 _ 27.4 21.8 22.6

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SWITCH YARD FENCE POST FOUNDATION
1 9/5/2011 FC-R 250 0.70 2.50 2:34 PM 101 60 65 31.0 21.7 21.8
For the contractor;

Page 58
BUJAGALI HYDROELECTRIC POWER PROJECT,
TEST ON FRESH CONCRETE
SITE MATERIALS UGANDA
LABORATORY Rev. 1 IN-!012-2-13

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY BARRELS 15 & 16 LIFT 8(VIII)
ADMIXTURE SLUMP (mm) Fresh Unit Conc. Temp. (°C)
Cement content W:C Air Cont. Air Temp.
Date casted Mix Type. 3
Sika 110N Batch time Track no. weight
Test (Kg/m ) Ratio (%) (°C)
Lt./m3 at the BP at site (gm/cm3) at the BP at site
No.
1 2/5/2011 FC-IB-2 300 0.54 3.00 4:58 PM 96 85 90 32.8 22.0 22.7
2 2/5/2011 FC-IB-2 300 0.54 3.00 5:38 PM 96 80 _ 31.5 22.4 22.8

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY BARRELS 15 & 16 LIFT 8A
1 4/5/2011 FC-IB-2 300 0.54 3.00 3:48 PM 101 80 85 31.4 21.6 21.8
2 4/5/2011 FC-IB-2 300 0.54 3.00 4:16 PM 99 75 _ 2561 2.5 31.6 21.7 21.9
3 4/5/2011 FC-IB-2 300 0.54 3.00 4:43 PM 99 80 _ 32.9 21.8 22.1
4 4/5/2011 FC-IB-2 300 0.54 3.00 5:14 PM 99 80 _ 31.3 22.0 22.2

AGGREGATE TYPE:NS+BCA SHIFT: DAY CEMENT: 42.5N DESTINATION:SIPHON SPILLWAY APRON SLAB SS17 & SS19
1 6/5/2011 FC-IB-2 300 0.54 3.00 7:07 AM 97 70 _ 19.0 19.5 22.0
2 6/5/2011 FC-IB-2 300 0.54 3.00 7:23 AM 96 65 _ 19.5 20.4 22.0
3 6/5/2011 FC-IB-2 300 0.54 3.00 7:49 AM 99 60 _ 20.5 21.0 22.1
4 6/5/2011 FC-IB-2 300 0.54 3.00 8:00 AM 96 60 _ 20.6 21.0 22.1
5 6/5/2011 FC-IB-2 300 0.54 3.00 8:56 AM 100 65 _ 21.8 21.2 22.2
6 6/5/2011 FC-IB-2 300 0.54 3.00 9:14 AM 97 70 _ 23.7 21.4 22.2
7 6/5/2011 FC-IB-2 300 0.54 3.00 10:58 AM 99 70 _ 2570 2.5 25.8 21.6 22.6
8 6/5/2011 FC-R 250 0.70 2.50 11:26 AM 100 75 _ 26.0 23.8 22.7
9 6/5/2011 FC-IB-2 300 0.54 3.00 12:09 PM 100 70 _ 26.4 21.8 22.5
10 6/5/2011 FC-IB-2 300 0.54 3.00 1:15 PM 101 65 _ 28.2 22.0 22.4
11 6/5/2011 FC-IB-2 300 0.54 3.00 3:26 PM 101 70 _ 22.2 22.4 22.5
12 6/5/2011 FC-IB-2 300 0.54 3.00 4:18 PM 101 70 _ 23.7 22.6 22.6
For the contractor;

Page 59
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report

5.1  SUMMARY OF RESULTS 


5.1.2 TEST ON MOISTURE CONTENT OF AGGREGATE.....  

SA-D-GE-TR-1212

Page 60
MOISTURE CONTENT BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS UGANDA


ASTM : C 566
LABORATORY

Site BUJAGALI HYDRO POWER PROJECT Sample Ref No.


Location BATCHING PLANT Sampling Date 19/05/2011
Material Source BUJAGALI CRUSHING PLANT Sampling Time 8:51
Destination SIPHON SPILLWAY BARRELS 15 & 16 LIFT 13
BATCHING PLANT A BY HOT PLATE
Concrete aggregates FC-IB-2 NS 1.5 - 5 BP SENCEOR

Tare N° BAG SK

A. Weight of wet sample + tare g 1455.1 1142.5

Crushed sand 1.5 - 5


Natural Sand
B. Weight of dry sample + tare g 1417.0 1126.0

C. Weight of water g A-B 38.1 16.5

D. Weight of tare g 520.9 368.5

E. Weight of dry sample g B-C 896.1 757.5

F. Weight of wet sample g A-D 934.20 774.00

G. Moisture content % C/E 4.25 2.18 4.00 2.00

H. Humidity % C/F

BATCHING PLANT A BY HOT PLATE

Concrete aggregates NS 1.5 - 5 BP SENCEOR

Tare N°

A. Weight of wet sample + tare g

Crushed sand 1.5 - 5


Natural Sand

B. Weight of dry sample + tare g

C. Weight of water g A-B

D. Weight of tare g

E. Weight of dry sample g B-C

F. Weight of wet sample g A-D

G. Moisture content % C/E

H. Humidity % C/F

FOR THE CONTRACTOR :

Page 61
MOISTURE CONTENT BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS UGANDA


ASTM : C 566
LABORATORY

Site BUJAGALI HYDRO POWER PROJECT Sample Ref No.


Location BATCHING PLANT Sampling Date 10/5/2011
Material Source BUJAGALI CRUSHING PLANT Sampling Time 10:25
SIPHON SPILLWAY APRON ROCK RECONSTRUCTION
Destination
BATCHING PLANT A BY HOT PLATE
Concrete aggregates FC-R NS 1.5 - 5 BP SENCEOR

Tare N° BAD CNN

A. Weight of wet sample + tare g 1056.1 1311.3

Crushed sand 1.5 - 5


Natural Sand
B. Weight of dry sample + tare g 1017.0 1294.0

C. Weight of water g A-B 39.1 17.3

D. Weight of tare g 367.7 547.0

E. Weight of dry sample g B-C 649.3 747.0

F. Weight of wet sample g A-D 688.40 764.30

G. Moisture content % C/E 6.02 2.32 6.00 2.17

H. Humidity % C/F

BATCHING PLANT B BY HOT PLATE

Concrete aggregates FC-IB NS 1.5 - 5 BP SENCEOR

Tare N°

A. Weight of wet sample + tare g

Crushed sand 1.5 - 5


Natural Sand

B. Weight of dry sample + tare g

C. Weight of water g A-B

D. Weight of tare g

E. Weight of dry sample g B-C

F. Weight of wet sample g A-D

G. Moisture content % C/E

H. Humidity % C/F

FOR THE CONTRACTOR :

Page 62
MOISTURE CONTENT BUJAGALI HYDROPOWER PROJECT

SITE MATERIALS UGANDA


ASTM : C 566
LABORATORY

Site BUJAGALI HYDRO POWER PROJECT Sample Ref No.


Location BATCHING PLANT Sampling Date 4/5/2011
Material Source BUJAGALI CRUSHING PLANT Sampling Time 10:05
Destination POWER HOUSE UNIT 5 LIFT 64A PARAPET
BATCHING PLANT A BY HOT PLATE
Concrete aggregates FC-JC NS 1.5 - 5 BP SENCEOR

Tare N° LS JJ

A. Weight of wet sample + tare g 1276.0 1241.3

Crushed sand 1.5 - 5


Natural Sand
B. Weight of dry sample + tare g 1240.0 1239.0

C. Weight of water g A-B 36.0 2.3

D. Weight of tare g 544.8 370.5

E. Weight of dry sample g B-C 695.2 868.5

F. Weight of wet sample g A-D 731.20 870.80

G. Moisture content % C/E 5.18 0.26 5.00 0.00

H. Humidity % C/F

BATCHING PLANT B BY HOT PLATE

Concrete aggregates NS 1.5 - 5 BP SENCEOR

Tare N°

A. Weight of wet sample + tare g

Crushed sand 1.5 - 5


Natural Sand

B. Weight of dry sample + tare g

C. Weight of water g A-B

D. Weight of tare g

E. Weight of dry sample g B-C

F. Weight of wet sample g A-D

G. Moisture content % C/E

H. Humidity % C/F

FOR THE CONTRACTOR :

Page 63
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report

5.1  SUMMARY OF RESULTS 


5.1.3 Test on Normal Compressive strength of Cylinder Samples.....

SA-D-GE-TR-1212

Page 64
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House Rock Reconstruction


Rc, maturation at NORMAL WATER
Note
Date SHIFT Sample
Mix ID
Concrete Cement Cement CURING (MPa)
Casted Ref. class type (Kg/m3)
2 days 7 days 28 days 90 days
17-07-08 Day 169 FC 15 C 15 32.5R 250 7.9 14.6 21.8
28-07-08 D 179 FC 15 C 15 32.5R 250 10.1 15.3 22.2
29-07-08 D 181 FC 15 C 15 32.5R 250 9.9 16.3 22.0
30-07-08 D 186 FC 15 C 15 32.5R 250 8.8 15.1 21.3
06-08-08 D 196 FC 15 C 15 42.5N 250 9.6 15.8 21.0
06-08-08 N 197 FC 15 C 15 42.5N 250 10.0 17.5 23.3
12-08-08 D 212 FC 15G C 15 42.5N 250 9.5 15.3 23.1 25.7
13-08-08 D 213 FC 15G C 15 42.5N 200 7.3 16.8 21.1 24.2
07-08-08 N 199 FC 15H C 15 42.5N 250 9.6 15.8 22.8 25.0
07-08-08 N 200 FC 15H C 15 42.5N 250 10.8 19.0 24.9 29.1
07-08-08 D 198 FC 15I C 15 42.5N 250 13.9 21.0 25.5
19-07-08 Night 171 FC 8E C 25 32.5R 400 19.5 25.1 30.2
20-07-08 D 173 FC 8E C 25 32.5R 400 19.6 28.3 32.5
20-07-08 N 174 FC 8E C 25 32.5R 400 19.1 25.1 30.9
14-08-08 N 217 FC D1 C 15 32.5R 250 9.3 15.2 21.3 23.0
14-08-08 N 218 FC D1 C 15 32.5R 250 9.8 17.3 23.8 26.2
18-08-08 D 229 FC D1 C 15 42.5N 250 9.4 15.2 21.4 23.2
14-08-08 D 216 FC D2 C 15 32.5R 250 9.0 15.2 22.2 23.4
18-08-08 N 230 FC D2 C 15 42.5N 250 9.4 18.9 23.9 28.5
19-08-08 D 233 FC D2 C 15 42.5N 250 11.6 17.8 24.7 28.7
19-08-08 N 234 FC D2 C 15 42.5N 250 11.5 18.8 25.2 29.9
20-08-08 D 236 FC D2 C 15 42.5N 250 9.7 20.2 25.4 29.2
20-08-08 N 237 FC D2 C 15 42.5N 250 9.7 17.1 22.9 25.7
23-08-08 D 245 FC D2 C 15 42.5N 250 11.8 18.4 27.4 32.4
23-08-08 N 246 FC D2 C 15 42.5N 250 9.6 16.8 22.5 26.9
23-08-08 N 247 FC D2 C 15 42.5N 250 9.0 18.3 22.1 27.5
25-08-08 D 248 FC D2 C 15 42.5N 250 9.1 19.0 24.3 30.0
26-08-08 D 249 FC D2 C 15 42.5N 250 13.3 20.1 25.7 30.5
26-08-08 N 250 FC D2 C 15 42.5N 250 15.5 26.3 27.4 38.5
27-08-08 D 251 FC D2 C 15 42.5N 250 8.2 16.8 23.6 28.6
28-08-08 D 252 FC D2 C 15 42.5N 250 14.6 17.3 23.1 26.2
01-09-08 D 259 FC D2 C 15 42.5N 250 8.2 20.1 23.8 28.5
02-09-08 D 264 FC D2 C 15 42.5N 250 13.1 19.9 21.7 26.0
02-09-08 N 265 FC D2 C 15 42.5N 250 8.0 15.4 21.2 25.7
03-09-08 D 268 FC D2 C 15 42.5N 250 12.2 17.1 23.5 28.4
03-09-08 N 269 FC D2 C 15 42.5N 250 10.0 18.6 22.7 29.2
04-09-08 D 270 FC D2 C 15 42.5N 250 16.2 21.9 29.7 33.7
08-09-08 D 274 FC D2 C 15 42.5N 250 12.5 18.6 24.5 27.0
09-09-08 D 275 FC D2 C 15 42.5N 250 17.3 27.5 31.0 40.8

Page 65
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

31-07-08 Day 189 FC 15 C 15 42.5N 250 16.5 19.95 24.1 PH Unit 1 & 2
01-08-08 D 191 FC 15 C 15 42.5N 250 14.4 22.4 27.3 PH Unit 2
05-08-08 D 193 FC 15I C 15 42.5N 250 10.0 19.4 25.3 PH Unit 3
08-08-08 D 202 FC 15H C 15 42.5N 250 10.7 19.8 25.3 28.9 PH Unit 4
11-08-08 D 210 FC 15H C 15 42.5N 250 12.2 22.3 28.3 32.9 PH Unit 1
16-08-08 D 220 FC D1 C 15 42.5N 250 11.6 18.5 25.4 29.8 PH Unit 4
30-08-08 D 258 FC D2 C 15 42.5N 250 9.6 17.1 24.3 28.1 PH Unit 5
10-09-08 D 279 FC G C 25 42.5N 310 16.8 30.6 41.7 47.1 PH Unit 1 Lift 1
10-09-08 D 280 FC G C 25 42.5N 310 18.1 32.4 42.6 48.2 PH Unit 1 Lift 1
17-09-08 D 288 FC D2 C 15 42.5N 250 18.6 25.2 31.1 36.4 PH Unit 1 Lift 2 TAIL R.
20-09-08 D 289 FC A C 25 42.5N 300 10.6 22.6 32.2 33.0 PH Unit 3 Lift 1
20-09-08 N 290 FC JC C 25 42.5N 300 13.3 27.1 36.1 38.9 PH Unit 3 Lift 1
02-10-08 N 298 FC 15 C 15 42.5N 250 20.2 26.2 31.6 40.2 PH Unit 1 & U2 TAIL R.
03-10-08 D 299 FC S C 15 42.5N 250 11.0 24.7 30.9 37.2 PH Unit 5 Lift 2 TAIL R.
04-10-08 N 300 FC S C 15 42.5N 250 17.9 25.7 32.6 38.0 PH Unit 5 Lift TAIL R.
07-10-08 D 302 FC 15 C 15 42.5N 250 13.6 19.7 25.9 30.1 PH Unit 1 & U2 TAIL R.
08-10-08 N 305 FC 15 C 15 42.5N 250 12.1 17.9 24.0 27.1 PH Unit 4 Lift 2, 6, 7
08-10-08 N 306 FC JC C 25 42.5N 300 16.7 27.1 34.2 38.5 PH Unit 1 Lift 3
09-10-08 D 307 FC JC C 25 42.5N 300 18.8 28.3 35.8 39.5 PH Unit 1 Lift 3
11-10-08 N 309 FC S C 15 42.5N 250 13.4 27.1 29.5 33.9 PH Unit 3 Lift 2, 6, 7
11-10-08 D 310 FC S C 15 42.5N 250 14.4 27.1 34.2 36.7 PH Unit 3 Lift 2, 6, 7
13-10-08 D 311 FC IB C 25 42.5N 300 18.5 33.5 41.4 46.0 PH Unit 3 Lift 3
13-10-08 N 312 FC IB C 25 42.5N 300 14.8 31.0 39.3 45.3 PH Unit 3 Lift 3
16-10-08 D/N 314 FC 15 C 15 42.5N 250 10.2 17.1 21.6 27.5 PH Unit 4 & 5 Ele. 1073
17-10-08 N 315 FC S C 15 42.5N 250 12.7 17.9 26.4 30.1 PH Unit 1 Lift 6
18-10-08 N 316 FC 15 C 15 42.5N 250 11.4 21.3 28.6 33.0 PH Unit 5 Ele. 1073
20-10-08 N 317 FC S C 15 42.5N 250 10.6 19.4 27.4 31.9 PH Unit 2 Lift 2, 6, 7
21-10-08 D 318 FC S C 15 42.5N 250 13.2 22.3 28.6 32.5 PH Unit 2 Lift 2, 6, 7
27-10-08 D 323 FC JC - C 25 42.5N 300 10.3 26.8 32.1 36.8 PH UNIT 3 SUMP
B
31-10-08 D 328 FC IB - B C 25 42.5N 300 20.1 27.8 38.2 38.7 PH UNIT 3 Lift 3
31-10-08 D 327 FC JC - C 25 42.5N 300 21.0 28.6 38.3 40.6 PH UNIT 3 Lift 2
B
04-11-08 D 330 FC IB - B C 25 42.5N 300 13.9 30.3 37.9 46.4 PH UNIT 1 Lift 2
04-11-08 N 329 FC JC - C 25 42.5N 300 13.4 26.2 37.7 41.8 PH UNIT 1 Lift 2
B
06-11-08 N 331 FC IB - B C 25 42.5N 300 11.4 27.9 37.3 42.1 PH UNIT 3 Lift 4
07-11-08 N 332 FC IB - B C 25 42.5N 300 17.3 26.8 39.9 44.6 PH UNIT 3 Lift 4
10-11-08 D 334 FC IB - B C 25 42.5N 300 14.2 32.3 41.6 48.8 PH UNIT 5 Lift 1
11-11-08 D 335 FC IB - B C 25 42.5N 300 24.5 35.5 41.0 45.5 PH UNIT 5 Lift 1
12-11-08 N 336 FC IB - B C 25 42.5N 300 18.5 30.3 42.5 45.4 PH UNIT 1 Lift 4

Page 66
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

12-11-08 D 337 FC IB - B C 25 42.5N 300 18.8 37.7 44.4 48.6 PH UNIT 1 Lift 4
13-11-08 N 338 FC S - B C 15 42.5N 250 16.6 26.3 31.7 32.3 PH Unit 1 Lift 6, 7
13-11-08 D 339 FC S - B C 15 42.5N 250 10.9 25.6 27.7 30.3 PH Unit 1 Lift 6, 7
18-11-08 D 342 FC IB C 25 42.5N 300 21.6 32.4 47.4 51.1 PH UNIT 3 Lift 6
18-11-08 N 343 FC IB - B C 25 42.5N 300 14.0 28.5 41.6 47.3 PH UNIT 3 Lift 6
20-11-08 D 345 FC IB C 25 42.5N 300 22.2 32.1 43.0 46.8 PH UNIT 5 Lift 3
20-11-08 N 346 FC IB C 25 42.5N 300 23.0 36.3 42.0 44.9 PH UNIT 5 Lift 3
24-11-08 N 349 FC IB C 25 42.5N 300 21.8 34.3 41.9 44.7 PH UNIT 1 Lift 6
25-11-08 D 350 FC IB C 25 42.5N 300 27.6 36.9 42.5 49.2 PH UNIT 1 Lift 6
28-11-08 D 353 FC IB - B C 25 42.5N 300 23.1 30.0 37.5 42.5 PH UNIT 3 Lift 5
28-11-08 N 354 FC IB - B C 25 42.5N 300 20.9 29.7 37.5 44.8 PH UNIT 3 Lift 5
02-12-08 D 355 FC IB C 25 42.5N 300 20.0 30.5 38.3 46.1 PH UNIT 5 Lift 2
02-12-08 N 356 FC IB C 25 42.5N 300 18.5 28.7 37.9 44.8 PH UNIT 5 Lift 2
02-12-08 D 357 FC IB C 25 42.5N 300 18.5 32.1 40.7 45.7 PH UNIT 3 Lift 5
04-12-08 N 358 FC IB - B C 25 42.5N 300 14.5 26.7 36.4 40.5 PH UNIT 1 Lift 5
05-12-08 D 359 FC IB - B C 25 42.5N 300 16.9 27.0 36.6 41.0 PH UNIT 1 Lift 5
06-12-08 D 360 FC IB C 25 42.5N 300 18.6 29.4 37.1 42.8 PH UNIT 3 Lift 8
09-12-08 N 363 FC IB C 25 42.5N 300 12.2 24.4 32.5 43.4 PH UNIT 1 Lift 5(F 2)
10-12-08 D 365 FC IB C 25 42.5N 300 11.9 30.6 39.1 47.2 PH UNIT 3 Lift 5(FS 2)
11-12-08 D 366 FC IB C 25 42.5N 300 17.7 31.1 42.1 45.5 PH UNIT 5 Lift 4
11-12-08 N 367 FC IB C 25 42.5N 300 13.8 25.4 41.1 46.1 PH UNIT 5 Lift 4
12-12-08 N 368 FC IB - B C 25 42.5N 300 13.6 30.9 40.8 48.4 PH UNIT 3 Lift 7
13-12-08 D 369 FC IB - B C 25 42.5N 300 23.6 37.3 43.0 49.9 PH UNIT 3 Lift 7
16-12-08 D 370 FC IB C 25 42.5N 300 20.2 28.9 37.4 45.5 PH UNIT 1 Lift 8
17-12-08 D 371 FC IB C 25 42.5N 300 20.4 32.1 40.4 44.8 PH UNIT 1 Lift 7
17-12-08 N 372 FC IB C 25 42.5N 300 16.7 28.6 38.5 45.4 PH UNIT 1 Lift 7
18-12-08 D 374 FC IB C 25 42.5N 300 21.2 32.1 45.3 49.5 PH UNIT 5 Lift 6
18-12-08 N 375 FC IB C 25 42.5N 300 19.9 35.5 41.9 49.5 PH UNIT 5 Lift 6
06-01-09 N 384 FC IB C 25 42.5N 300 19.2 31.4 36.6 40.7 PH UNIT 2 Lift 1
06-01-09 D 385 FC IB C 25 42.5N 300 15.3 29.7 34.7 39.8 PH UNIT 2 Lift 1
08-01-09 N 387 FC IB C 25 42.5N 300 18.3 27.7 36.4 40.9 PH UNIT 1 Lift 5
09-01-09 D 388 FC IB C 25 42.5N 300 18.0 32.3 39.0 45.6 PH UNIT 5 Lift 5
09-01-09 N 389 FC IB C 25 42.5N 300 16.3 34.3 42.7 45.4 PH UNIT 5 Lift 5
09-01-09 N 390 FC IB C 25 42.5N 300 14.7 36.4 42.9 51.4 PH UNIT 1 Lift 9
14-01-09 D 397 FC IB C 25 42.5N 300 16.8 31.7 36.1 44.8 PH UNIT 5 Lift 7
14-01-09 N 398 FC IB C 25 42.5N 300 14.9 32.2 41.9 44.0 PH UNIT 5 Lift 7
16-01-09 N 399 FC IB C 25 42.5N 300 24.6 35.4 47.1 52.0 PH UNIT 1 Lift 8
16-01-09 N 400 FC IB C 25 42.5N 300 20.8 31.1 42.0 46.0 PH UNIT 1 Lift 8

Page 67
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

17-01-09 D 402 FC IB C 25 42.5N 300 16.3 29.5 36.1 42.6 PH UNIT 3 Lift 9
18-01-09 N 405 FC IB C 25 42.5N 300 24.4 34.6 45.5 51.5 PH UNIT 5 Lift 5b
20-01-09 N 406 FC IB-1 C 25 42.5N 270 19.0 31.1 38.2 40.6 PH UNIT 2 Lift 3
20-01-09 D 407 FC IB-1 C 25 42.5N 270 15.6 29.3 36.9 38.5 PH UNIT 2 Lift 3
21-01-09 N 408 FC IB-2 C 25 42.5N 270 14.6 24.6 31.8 35.1 PH UNIT 1 Wall 1
22-01-09 D 412 FC IB C 25 42.5N 300 14.6 28.3 37.2 40.9 PH UNIT 3 Lift 50
24-01-09 D 413 FC IB-1 C 25 42.5N 270 12.2 29.3 37.1 39.4 PH UNIT 5 Lift 8
27-01-09 D 414 FC IB-1 C 25 42.5N 270 19.2 34.3 42.2 48.3 PH UNIT 1 Lift 10
28-01-09 D 418 FC IB-2 C 25 42.5N 270 15.7 26.7 35.3 38.8 PH UNIT 1 Wall 2
29-01-09 N 419 FC IB-1 C 25 42.5N 270 18.7 29.9 35.0 39.8 PH UNIT 3 Lift 80
29-01-09 D 420 FC IB-2 C 25 42.5N 270 15.4 24.2 30.0 33.6 PH UNIT 3 Lift 80
30-01-09 D 423 FC IB C 25 42.5N 300 14.5 28.3 38.1 42.4 PH UNIT 2 Lift 7
30-01-09 N 424 FC IB-1 C 25 42.5N 270 20.7 26.7 34.9 43.7 PH UNIT 5 Lift 9
30-01-09 D 422 FC IB-2 C 25 42.5N 270 17.2 26.6 32.0 36.4 PH UNIT 2 Lift 7
03-02-09 N 425 FC IB-2 C 25 42.5N 270 14.8 25.0 32.8 37.4 PH UNIT 1 Lift 80
04-02-09 N 427 FC IB-2 C 25 42.5N 270 14.0 27.1 35.0 39.5 PH UNIT 1 Lift 80
07-02-09 D 431 FC IB-2 C 25 42.5N 270 12.0 23.8 31.5 35.7 PH UNIT 3 Lift 80
09-02-09 D 433 FC IB-2 C 25 42.5N 270 13.1 25.3 32.1 38.2 PH UNIT 1 Lift W3
10-02-09 N 436 FC IB-1 C 25 42.5N 270 19.2 29.4 36.7 40.2 PH UNIT 1 Lift 11
11-02-09 N 439 FC IB-1 C 25 42.5N 270 20.0 29.9 37.4 41.8 PH UNIT 5 Lift 50
11-02-09 D 439 FC IB-2 C 25 42.5N 270 14.3 26.0 34.5 39.9 PH UNIT 1 Lift 50/51A
12-02-09 N 442 FC IB-2 C 25 42.5N 270 12.5 25.9 32.9 35.6 PH UNIT 4 Lift 7
12-02-09 N 441 FC IB-7 C 25 42.5N 270 20.1 29.6 38.7 45.1 PH UNIT 4 Lift 7
14-02-09 N 447 FC IB-2 C 25 42.5N 270 10.6 26.3 32.1 35.3 PH UNIT 5 Lift 80
14-02-09 N 448 FC IB-7 C 25 42.5N 270 19.1 30.3 39.9 45.7 PH UNIT 5 Lift 80
17-02-09 N 449 FC IB-7 C 25 42.5N 270 20.1 30.8 40.1 45.8 PH UNIT 3 Lift 10
17-02-09 D 450 FC IB-7 C 25 42.5N 270 21.0 30.2 40.0 45.7 PH UNIT 3 Lift 10
20-02-09 D 452 FC IB-7 C 25 42.5N 270 19.3 31.9 40.2 45.3 PH UNIT 3 Lift 11
21-02-09 D 456 FC IB-2 C 25 42.5N 270 12.3 26.4 34.3 39.6 PH UNIT 1 Lift 51B
21-02-09 D 455 FC IB-7 C 25 42.5N 270 23.0 30.7 40.7 44.9 PH UNIT 1 Lift 51B
25-02-09 N 457 FC IB-2 C 25 42.5N 270 15.3 22.7 31.0 34.0 PH UNIT 2 Lift 5
26-02-09 N 459 FC IB-2 C 25 42.5N 270 14.0 23.3 32.3 34.1 PH UNIT 1 Lift 12
26-02-09 N 458 FC IB-7 C 25 42.5N 270 19.4 31.3 36.7 44.7 PH UNIT 1 Lift 12
28-02-09 N 464 FC IB-7 C 25 42.5N 270 18.6 30.0 38.8 44.1 PH UNIT 2 Lift 2
28-02-09 D 465 FC IB-7 C 25 42.5N 270 17.5 28.1 38.0 44.7 PH UNIT 2 Lift 2
02-03-09 N 466 FC IB-7 C 25 42.5N 270 17.6 30.8 40.7 47.3 PH UNIT 5 Lift 10A
02-03-09 N 467 FC IB-7 C 25 42.5N 270 18.9 34.0 40.1 45.5 PH UNIT 2 Lift 5B
05-03-09 N 475 FC IB-7 C 25 42.5N 270 16.5 36.1 40.9 46.4 PH UNIT 3 Lift 12

Page 68
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

06-03-09 N 477 FC IB-7 C 25 42.5N 270 13.7 29.6 38.2 43.6 PH UNIT 2 Lift 4
07-03-09 D 482 FC IB-7 C 25 42.5N 270 18.2 27.5 37.6 41.8 PH UNIT 4 Lift 1
10-03-09 D 483 FC IB C 25 42.5N 300 15.6 22.2 31.3 36.9 PH UNIT 3 Lift 50/51A
10-03-09 N 484 FC IB C 25 42.5N 300 14.7 24.0 31.0 36.2 PH UNIT 3 Lift 50/51A
10-03-09 D 485 FC IB-2 C 25 42.5N 270 12.6 22.4 32.1 35.4 PH UNIT 1 WALL 4
10-03-09 D 486 FC IB-7 C 25 42.5N 270 17.4 31.7 39.8 45.2 PH UNIT 1 WALL 4
11-03-09 N 487 FC IB-7 C 25 42.5N 270 17.6 27.3 35.0 40.1 PH UNIT 2 Lift 11
12-03-09 N 489 FC IB-7 C 25 42.5N 270 19.6 29.9 38.3 42.2 PH UNIT 2 Lift 6
13-03-09 D 491 FC IB-2 C 25 42.5N 270 10.9 21.5 31.0 36.0 PH UNIT 5 Lift 6
13-03-09 N 490 FC IB-7 C 25 42.5N 270 21.1 32.7 39.8 47.1 PH UNIT 2 Lift 8
18-03-09 N 495 FC IB-7 C 25 42.5N 270 23.7 33.8 42.0 44.9 PH UNIT 4 Lift 3
19-03-09 D 499 FC IB-7 C 25 42.5N 270 19.7 32.2 42.3 46.5 PH UNIT 4 Lift 11
20-03-09 D 500 FC IB-2 C 25 42.5N 270 16.8 23.0 31.5 34.8 PH UNIT 5 Lift X2
21-03-09 D 502 FC IB-2 C 25 42.5N 270 16.1 24.2 31.9 34.8 PH UNIT 1 Lift W4B
24-03-09 N 507 FC IB-7 C 25 42.5N 270 19.0 28.9 36.6 42.2 PH UNIT 2 Lift 9
25-03-09 N 510 FC IB-2 C 25 42.5N 270 11.1 22.3 31.1 35.2 PH UNIT 1 Lift 13
25-03-09 D 509 FC IB-7 C 35 42.5N 270 18.0 29.5 41.0 52.5 PH UNIT 1 Lift 13
26-03-09 N 511 FC IB-2 C 30 42.5N 270 14.7 24.2 32.0 34.5 PH UNIT 3 Lift 51B
01-04-09 N 518 FC IB-2 C 30 42.5N 270 13.8 24.5 32.4 35.8 PH UNIT 5 Lift X3
03-04-09 D 523 FC IB-7 C 35 42.5N 270 17.3 27.9 37.6 41.5 PH UNIT 2 Lift 5B
05-04-09 N 525 FC IB-7 C 35 42.5N 270 22.0 31.0 40.6 44.2 PH UNIT 4 Lift 2
06-04-09 D 529 FC IB-2 C 30 42.5N 270 11.7 23.1 32.2 35.1 PH UNIT 1 Lift 52A
06-04-09 D 528 FC IB-7 C 35 42.5N 270 13.9 25.1 31.9 37.2 PH UNIT 1 Lift 52A
08-04-09 D 534 FC IB C 35 42.5N 300 15.9 25.2 35.8 39.9 PH UNIT 5 Lift 51
09-04-09 N 537 FC IB-7 C 35 42.5N 270 17.9 31.6 43.1 49.1 PH UNIT 4 Lift 4
10-04-09 D 539 FC IB-2 C 30 42.5N 270 12.1 24.1 32.2 36.2 PH UNIT 1 Lift 52B
10-04-09 N 540 FC IB-7 C 35 42.5N 270 14.0 24.4 35.4 39.3 PH UNIT 1 Lift 52B
16-04-09 N 542 FC IB-7 C 35 42.5N 270 15.6 23.8 36.1 39.1 PH UNIT 4 Lift 6
17-04-09 N 543 FC IB-2 C 30 42.5N 270 15.2 23.9 31.2 35.1 PH UNIT 1 Lift W5
17-04-09 N 544 FC IB-7 C 35 42.5N 270 14.5 23.5 34.3 37.2 PH UNIT 1 Lift W5
21-04-09 N 548 FC IB-2 C 30 42.5N 270 13.7 25.0 34.0 37.8 PH UNIT 4 Lift 5
21-04-09 N 549 FC IB-7 C 35 42.5N 270 16.4 29.2 38.9 44.0 PH UNIT 4 Lift 5
21-04-09 D 550 FC IB-7 C 35 42.5N 270 16.4 29.0 36.1 40.2 PH UNIT 1 Lift 14A
24-04-09 N 552 FC IB-2 C 30 42.5N 270 15.1 24.2 31.1 37.1 PH UNIT 5 Lift 51B
25-04-09 D 557 FC IB-7 C 35 42.5N 270 15.3 27.1 35.5 41.0 PH UNIT 1 Lift W5
25-04-09 D 558 FC IB-2 C 30 42.5N 270 10.8 24.3 31.1 37.0 PH UNIT 1 Lift W5
26-04-09 N 559 FC IB-7 C 35 42.5N 270 24.2 27.2 36.1 38.7 PH UNIT 2 Lift 10
26-04-09 N 560 FC IB-2 C 30 42.5N 270 16.0 23.8 32.1 35.1 PH UNIT 2 Lift 10

Page 69
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

27-04-09 D 561 FC IB-7 C 35 42.5N 270 14.0 24.3 36.8 40.1 PH UNIT 2 Lift 50
27-04-09 D 562 FC IB-2 C 30 42.5N 270 12.8 23.7 31.1 34.9 PH UNIT 2 Lift 50
29-04-09 D 565 FC IB-2 C 30 42.5N 270 12.7 24.4 32.3 36.2 PH UNIT 2 Lift 80
30-04-09 D 566 FC IB-2 C 30 42.5N 270 10.6 24.3 31.2 36.6 PH UNIT 1 Lift 14B
30-04-09 D 567 FC IB-7 C 35 42.5N 270 16.6 26.5 36.0 40.0 PH UNIT 1 Lift 14B
01-05-09 D 569 FC IB-2 C 30 42.5N 270 18.5 24.1 31.4 35.4 PH UNIT 3 Lift 13
01-05-09 D 570 FC IB-7 C 35 42.5N 270 22.5 29.5 37.2 43.4 PH UNIT 3 Lift 13
04-05-09 N 573 FC IB-7 C 35 42.5N 270 13.4 26.9 35.7 39.2 PH UNIT 4 Lift 5A
06-05-09 D 576 FC IB-2 C 30 42.5N 270 13.8 24.4 31.5 35.3 PH UNIT 2 Lift 12
06-05-09 N 577 FC IB-7 C 35 42.5N 270 20.2 32.9 38.4 46.7 PH UNIT 2 Lift 12
08-05-09 D 582 FC IB-2 C 30 42.5N 270 13.1 24.5 33.1 36.9 PH UNIT 1 Lift 54
09-05-09 N 585 FC IB-2 C 30 42.5N 270 13.7 24.4 32.4 35.9 PH UNIT 1 Lift 54
10-05-09 N 588 FC IB-7 C 35 42.5N 270 15.3 25.7 36.8 41.5 PH UNIT 3 Lift 52
10-05-09 N 589 FC IB-2 C 30 42.5N 270 13.4 24.3 34.4 39.0 PH UNIT 3 Lift 52
11-05-09 N 590 FC IB-2 C 30 42.5N 270 16.1 26.6 34.5 38.8 PH UNIT 3 Lift 52
11-05-09 N 592 FC IB-7 C 35 42.5N 270 16.4 31.1 40.0 45.5 PH UNIT 4 Lift 8
12-05-09 N 593 FC IB-2 C 30 42.5N 270 13.8 24.9 34.1 39.3 PH UNIT 1 Lift W6
15-05-09 N 598 FC IB-2 C 30 42.5N 270 14.3 24.8 34.4 38.3 PH UNIT 3 Lift 52B
15-05-09 D 599 FC IB-7 C 35 42.5N 270 15.6 28.6 38.2 41.0 PH UNIT 3 Lift 52B
16-05-09 N 601 FC IB-7 C 35 42.5N 270 23.0 33.1 41.1 46.5 PH UNIT 4 Lift 9
19-05-09 D 604 FC IB-7 C 35 42.5N 270 16.7 28.0 37.8 41.8 PH UNIT 4 Lift 5B
19-05-09 N 605 FC IB-7 C 35 42.5N 270 19.6 33.2 41.6 45.5 PH UNIT 2 Lift 13
19-05-09 N 606 FC IB-2 C 30 42.5N 270 13.5 24.4 33.5 37.0 PH UNIT 2 Lift 13
23-05-09 D 613 FC IB-2 C 30 42.5N 270 14.1 23.4 34.4 38.2 PH UNIT 3 Lift 54-55
24-05-09 D 615 FC IB-7 C 35 42.5N 270 15.8 26.5 39.1 41.9 PH UNIT 4 Lift 10
27-05-09 D 620 FC IB-7 C 35 42.5N 270 13.2 28.8 38.2 42.7 PH UNIT 1 Lift 15A
27-05-09 D 621 FC IB-2 C 30 42.5N 270 13.3 24.7 33.3 38.8 PH UNIT 1 Lift 15A
29-05-09 N 624 FC IB-7 C 35 42.5N 270 16.5 32.1 39.9 43.4 PH UNIT 3 Lift 14A
30-05-09 N 625 FC IB-2 C 30 42.5N 270 14.5 25.1 32.5 36.5 PH UNIT 1 Lift W11
30-05-09 D 626 FC IB-7 C 35 42.5N 270 18.4 29.9 38.4 41.3 PH UNIT 1 Lift W11
03-06-09 D 632 FC IB-2 C 30 42.5N 270 13.8 25.1 34.8 39.1 PH UNIT 3 Lift 14B
03-06-09 D 633 FC IB-7 C 35 42.5N 270 18.2 29.1 38.7 43.7 PH UNIT 3 Lift 14B
07-06-09 D 639 FC IB-2 C 30 42.5N 270 16.0 25.2 36.5 40.2 PH UNIT 4 Lift 12
08-06-09 N 641 FC IB C 35 42.5N 300 16.1 27.4 37.2 41.3 PH UNIT 5 Lift 52A
08-06-09 N 642 FC IB-7 C 35 42.5N 270 19.3 26.9 39.1 42.4 PH UNIT 5 Lift 52A
10-06-09 N 646 FC IB-7 C 35 42.5N 270 16.4 27.7 39.8 43.9 PH UNIT 2 Lift 14A
10-06-09 D 647B FC IB-7 C 35 42.5N 270 16.4 28.6 39.7 44.4 PH UNIT 1 Lift 81a&81b
12-06-09 N 650 FC IB-2 C 30 42.5N 270 14.1 27.3 34.4 40.3 PH UNIT 4 Lift 13

Page 70
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

12-06-09 N 651 FC IB-7 C 35 42.5N 270 16.2 31.7 37.5 43.3 PH UNIT 4 Lift 13
13-06-09 N 652 FC IB-2 C 30 42.5N 270 13.7 24.3 34.1 38.8 PH UNIT 2 Lift 14B
13-06-09 N 653 FC IB-7 C 35 42.5N 270 21.5 30.6 38.7 42.1 PH UNIT 2 Lift 14B
13-06-09 D 654 FC IB-7 C 35 42.5N 270 15.8 27.7 36.1 40.9 PH UNIT 5 Lift 52B
13-06-09 N 655 FC IB-2 C 30 42.5N 270 14.0 24.5 34.0 38.4 PH UNIT 5 Lift 52B
16-06-09 N 660 FC IB C 35 42.5N 300 15.3 26.7 36.1 40.6 PH UNIT 1 Lift 81A
19-06-09 D 666 FC IB C 35 42.5N 300 15.7 26.9 36.6 40.9 PH UNIT 1 Lift 80A
20-06-09 N 668 FC IB C 35 42.5N 300 21.4 30.5 38.9 43.5 PH UNIT 2 Lift 51A
21-06-09 N 671 FC IB C 35 42.5N 300 15.0 24.9 40.0 43.6 PH UNIT 4 Lift 50
22-06-09 D 673 FC IB C 35 42.5N 300 15.4 26.5 36.4 41.3 PH UNIT 5 Lift 54-55
24-06-09 D 676 FC IB C 35 42.5N 300 17.5 28.9 35.1 42.8 PH UNIT 4 Lift 80
25-06-09 N 680 FC IB C 35 42.5N 300 19.1 28.7 39.2 45.3 PH UNIT 1 Lift 81A
26-06-09 N 683 FC IB C 35 42.5N 300 16.3 27.1 37.2 41.7 PH UNIT 3 Lift 15A
26-06-09 D 684 FC IB-7 C 35 42.5N 270 16.3 28.7 37.0 41.6 PH UNIT 3 Lift 15A
27-06-09 D 688 FC IB-2 C 30 42.5N 270 15.0 26.0 34.8 38.7 PH UNIT 1 LEFT BANK
29-06-09 D 691 FC IB-2 C 30 42.5N 270 14.1 26.1 35.3 39.3 PH UNIT 1 Lift 82A
30-06-09 N 692 FC IB-7 C 35 42.5N 270 21.0 29.8 38.3 43.2 PH UNIT 5 Lift 10B
02-07-09 D 696 FC IB-2 C 30 42.5N 270 15.3 25.9 33.9 36.9 PH UNIT 1 WALL 7
03-07-09 D 698 FC IB-2 C 30 42.5N 270 14.3 26.7 39.0 44.2 PH UNIT 3 Lift 80A
04-07-09 N 699 FC IB-7 C 35 42.5N 270 19.0 30.7 38.6 43.4 PH UNIT 5 Lift 12
04-07-09 N 700 FC IB-2 C 30 42.5N 270 13.8 26.2 35.6 39.8 PH UNIT 5 Lift 12
07-07-09 D 702 FC IB C 35 42.5N 300 17.0 26.6 38.5 40.6 PH UNIT 2 Lift 51B
09-07-09 N 707 FC IB-2 C 30 42.5N 270 13.7 24.8 35.5 40.2 PH UNIT 1 Lift 82A
09-07-09 D 708 FC IB-2 C 30 42.5N 270 13.2 25.2 35.7 39.6 PH UNIT 1 WALL 2
09-07-09 D 709 FC IB-7 C 35 42.5N 270 17.3 31.0 39.4 42.0 PH UNIT 1 WALL 2
10-07-09 D 713 FC IB-7 C 35 42.5N 270 17.1 27.4 39.2 43.6 PH UNIT 4 Lift 14A
11-07-09 D 715 FC IB C 35 42.5N 300 17.0 28.7 37.1 42.3 PH UNIT 1 Lift 15B
12-07-09 N 717 FC IB C 35 42.5N 300 16.0 27.6 39.1 41.5 PH UNIT 5 Lift 53
12-07-09 D 718 FC IB C 35 42.5N 300 18.7 28.7 38.2 42.0 PH UNIT 1 Lift 56A
13-07-09 N 723 FC IB-2 C 30 42.5N 270 13.3 24.2 33.3 38.6 PH UNIT 1 Lift 82A
14-07-09 D 725 FC IB C 35 42.5N 300 19.6 33.7 41.4 45.5 PH UNIT 1 WALL 7 B
15-07-09 D 727 FC IB-7 C 35 42.5N 270 16.7 25.2 38.7 41.1 PH UNIT 5 Lift 11
15-07-09 D 728 FC IB C 35 42.5N 300 15.8 26.3 37.1 39.4 PH UNIT 5 Lift 11
17-07-09 N 735 FC IB-7 C 35 42.5N 270 17.0 27.9 38.4 43.7 PH UNIT 4 Lift 14B
18-07-09 N 736 FC IB C 35 42.5N 300 17.9 28.7 37.9 40.6 PH UNIT 4 Lift 14B
18-07-09 N 739 FC IB-7 C 35 42.5N 270 16.8 26.9 39.2 41.5 PH UNIT 1Lift W 12 B
19-07-09 N 742 FC IB C 35 42.5N 300 17.1 26.5 37.8 41.7 PH UNIT 1Lift W 12 B
19-07-09 D 743 FC IB-7 C 35 42.5N 270 17.7 26.5 38.8 39.3 PH UNIT 1Lift W 12 B

Page 71
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

21-07-09 N 749 FC IB C 35 42.5N 300 15.9 28.8 38.6 43.2 PH UNIT 3 Lift 81 LEFT
22-07-09 D 750 FC IB C 35 42.5N 300 16.0 26.5 38.4 41.4 PH UNIT 1 Lift 15B2
23-07-09 N 752 FC IB-7 C 35 42.5N 270 17.6 29.3 39.5 42.9 PH UNIT 1 Lift 2 L.R.W
24-07-09 D 760 FC IB-2 C 30 42.5N 270 14.7 24.5 36.0 38.9 PH UNIT 4 Lift 51A
25-07-09 D 763 FC IB-7 C 35 42.5N 270 19.8 31.9 57.1 51.4 PH UNIT 2 Lift 15A
26-07-09 N 765 FC IB C 35 42.5N 300 18.2 28.1 39.2 40.7 PH UNIT 2 Lift 15A
26-07-09 N 766 FC IB C 35 42.5N 300 21.6 29.5 39.1 43.7 PH UNIT 3 Lift 81
28-07-09 N 769 FC IB-7 C 35 42.5N 270 17.3 28.5 39.8 42.5 PH UNIT 5 Lift 13
28-07-09 N 770 FC IB C 35 42.5N 300 16.7 29.2 39.8 43.6 PH UNIT 5 Lift 13
29-07-09 N 773 FC IB C 35 42.5N 300 21.0 30.3 38.5 43.1 PH UNIT 3 Lift 81 RIGHT
31-07-09 D 781 FC IB-7 C 35 42.5N 270 19.0 27.5 37.9 40.7 PH UNIT 1 Lift W13
04-08-09 N 788 FC IB C 35 42.5N 300 17.4 27.5 37.0 41.2 PH UNIT 1 Lift 56B
05-08-09 D 795 FC IB C 35 42.5N 300 17.7 27.2 38.8 42.7 PH UNIT 3 Lift 56A
08-08-09 N 803 FC IB C 35 42.5N 300 17.5 26.6 35.5 41.5 PH TAIL RACE WALL Lift 3
08-08-09 D 805 FC IB C 35 42.5N 300 16.2 28.2 39.7 42.7 PH UNIT 3 L82A W AXIS 13
09-08-09 D 808 FC IB C 35 42.5N 300 15.2 28.3 37.1 42.7 PH UNIT 3 Lift 15B
10-08-09 N 815 FC IB C 35 42.5N 300 16.5 27.4 36.9 42.5 PH UNIT 1 Lift WALL 8
11-08-09 N 818 FC IB C 35 42.5N 300 17.7 29.0 41.6 44.5 PH UNIT 3 Lift 82A
12-08-09 D 819 FC IB-7 C 35 42.5N 270 18.4 30.1 40.4 43.6 PH UNIT 1 WALL13B
13-08-09 N 828 FC IB C 35 42.5N 300 17.0 28.4 40.3 43.9 PH UNIT 5 Lift 80A
15-08-09 N 831 FC IB-7 C 35 42.5N 270 20.5 32.8 43.1 45.6 PH UNIT 1 Lift 82B
15-08-09 N 832 FC IB-7 C 35 42.5N 270 18.6 28.2 43.1 47.5 PH UNIT 2 Lift 52A
15-08-09 D 833 FC IB C 35 42.5N 300 19.2 28.3 41.1 45.1 PH UNIT 2 Lift 52A
16-08-09 D 836 FC IB C 35 42.5N 300 16.7 32.8 44.4 48.2 PH UNIT 3 Lift 15B2
16-08-09 N 837 FC IB C 35 42.5N 300 18.5 27.8 41.0 45.6 PH UNIT 5 Lift 80A RIGHT
18-08-09 D 845 FC IB-2 C 30 42.5N 270 21.3 27.7 35.7 40.1 PH UNIT 3 Lift 82A
20-08-09 N 854 FC IB-2 C 30 42.5N 270 21.1 28.1 34.6 38.8 PH UNIT 2 Lift 52B
20-08-09 N 855 FC IB-7 C 35 42.5N 270 18.2 25.4 41.1 44.5 PH UNIT 2 Lift 52B
21-08-09 N 857 FC IB-7 C 35 42.5N 270 17.7 31.0 40.5 44.9 PH UNIT 5 Lift 14A
21-08-09 N 860 FC IB-2 C 30 42.5N 270 17.7 28.6 34.1 38.4 PH UNIT 1 Lift 56C
23-08-09 N 868 FC IB-2 C 30 42.5N 270 16.8 26.3 35.4 38.5 PH UNIT 5 Lift 81 LEFT
23-08-09 D 869 FC IB-2 C 30 42.5N 270 16.8 28.3 37.5 41.7 PH UNIT 3 Lift 82B
27-08-09 N 883 FC IB-2 C 30 42.5N 270 16.6 25.8 36.3 39.7 PH UNIT 3 Lift 56B
27-08-09 N 887 FC IB C 35 42.5N 300 20.4 33.5 41.6 44.3 PH UNIT 5 Lift 81C WALL
28-08-09 D 889 FC IB-2 C 30 42.5N 270 16.4 25.4 36.3 39.6 PH UNIT 1 WALL 14A
31-08-09 N 896 FC IB-2 C 30 42.5N 270 13.1 25.1 35.3 38.1 PH UNIT 2 Lift 55
02-09-09 N 901 FC IB-2 C 30 42.5N 300 14.8 25.7 35.4 39.3 PH UNIT 5 Lift 81R
02-09-09 D 902 FC IB-2 C 30 42.5N 300 15.8 25.1 35.4 39.1 PH UNIT 1 Lift WALL 9

Page 72
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

02-09-09 N 903 FC IB-7 C 35 42.5N 300 17.2 29.6 41.0 45.7 PH UNIT 2 Lift 54
04-09-09 N 907 FC IB-2 C 30 42.5N 270 13.3 25.2 36.2 40.1 PH UNIT 1 Lift 16 SLAB
07-09-09 N 922 FC IB C 35 42.5N 330 25.9 35.2 44.8 47.5 PH UNIT 2 Lift 53
08-09-09 N 926 FC IB-7 C 35 42.5N 300 21.5 31.3 40.2 44.2 PH UNIT 1 Lift 83
08-09-09 D 927 FC IB-2 C 30 42.5N 300 15.4 25.8 36.4 39.9 PH UNIT 1 Lift 83
10-09-09 D 934 FC IB-2 C 30 42.5N 300 15.5 25.5 36.9 39.1 PH UNIT 1 Lift 57
12-09-09 N 938 FC IB-7 C 35 42.5N 300 21.9 30.3 38.4 43.8 PH TAIL RACE WALL Lift 4
12-09-09 N 939 FC IB-2 C 30 42.5N 300 19.6 28.1 37.1 40.4 PH UNIT 1 Lift WALL 14B
15-09-09 D 951 FC IB C 35 42.5N 330 19.7 31.2 40.3 43.8 PH Lift WALL 9 COL.C4
15-09-09 N 952 FC IB-2 C 30 42.5N 300 14.5 27.6 35.8 39.7 PH UNIT 1 Lift 84A
16-09-09 D 954 FC IB-2 C 30 42.5N 300 15.6 26.8 34.8 38.3 PH UNIT 5 Lift 82A WALL
16-09-09 D 956 FC IB-2 C 30 42.5N 300 14.0 25.1 34.0 38.0 PH UNIT 3 Lift 56C
17-09-09 N 959 FC IB-2 C 30 42.5N 300 15.8 26.7 36.8 42.8 PH TAIL RACE WALL Lift 5
18-09-09 D 960 FC IB-2 C 30 42.5N 300 19.3 29.8 39.7 45.8 PH UNIT 3 Lift 83A
18-09-09 D 963 FC IB-2 C 30 42.5N 300 15.8 25.6 35.5 41.2 PH UNIT 1 Lift 15C
19-09-09 D 966 FC IB-2 C 30 42.5N 300 16.7 26.7 35.5 41.7 PH Lift W 10 BEAM AXIS C
20-09-09 N 970 FC IB-2 C 30 42.5N 300 21.5 30.4 40.7 44.9 PH UNIT 5 Lift 82 WALL
21-09-09 D 972 FC IB-2 C 30 42.5N 300 14.7 25.4 36.0 39.8 PH Lift WALL 30 AXIS A
23-09-09 D 978 FC IB-2 C 30 42.5N 300 15.6 26.5 35.6 41.2 PH TAIL RACE WALL Lift 6
24-09-09 D 981 FC IB-2 C 30 42.5N 300 20.5 31.8 39.9 45.7 PH UNIT 5 Lift 82 RIGHT W
24-09-09 N 983 FC IB-2 C 30 42.5N 300 19.8 30.2 39.5 44.6 PH UNIT 1 Lift 15C CENTRE
25-09-09 D 989 FC IB-2 C 30 42.5N 300 16.0 24.9 33.6 40.2 PH UNIT 3 Lift 83B
26-09-09 N 1001 FC IB-2 C 30 42.5N 300 19.2 33.6 39.3 45.9 PH UNIT 1 Lift 57B
27-09-09 D 1003 FC IB-2 C 30 42.5N 300 17.7 27.4 37.0 40.4 PH UNIT 1 Lift 1 Lift 84B
27-09-09 N 1004 FC IB-7 C 35 42.5N 300 19.9 31.0 39.9 44.6 PH UNIT 1 Lift 1 Lift 84B
29-09-09 D 1007 FC IB C 35 42.5N 330 19.8 30.5 40.0 45.7 PH UNIT 1 Lift 15C CENTRE
01-10-09 D 1017 FC M6 C 40 42.5N 380 20.6 33.5 46.0 51.0 PH COLUMN 21C EL:1103.6
01-10-09 D 1018 FC IB-2 C 30 42.5N 300 16.5 26.2 33.2 36.3 PH UNIT 3 Lift 57A
02-10-09 D 1023 FC IB-2 C 30 42.5N 300 16.4 24.9 35.5 41.9 PH UNIT 1 Lift P2
03-10-09 N 1025 FC IB-2 C 30 42.5N 300 18.3 27.6 36.9 39.6 PH UNIT 3 Lift 84A
05-10-09 D 1026 FC M6 C 40 42.5N 380 26.7 36.5 46.7 52.5 PH WALL 22C EL:1103.6
05-10-09 D 1027 FC IB-2 C 30 42.5N 300 17.0 27.1 36.8 42.3 PH LIFT WALL 31A
06-10-09 N 1030 FC IB-2 C 30 42.5N 300 14.9 24.0 34.5 38.5 PH TAILRACE WALL LIFT 9
08-10-09 D 1037 FC IB-2 C 30 42.5N 300 18.7 30.2 36.8 44.4 PH UNIT 4 Lift 51B
09-10-09 D 1044 FC M6 C 40 42.5N 380 25.9 41.8 50.7 54.3 PH LIFT WALL COLUMN 21C
09-10-09 N 1045 FC IB-2 C 30 42.5N 300 15.1 28.1 34.8 42.1 PH UNIT 5 Lift 82B
10-10-09 N 1047 FC IB-2 C 30 42.5N 300 20.2 30.2 43.4 49.1 PH UNIT 3 Lift 84B
10-10-09 N 1052 FC IB C 35 42.5N 330 20.5 29.0 40.4 45.6 PH U 1 Lift 58 COL. AXIS 19

Page 73
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

12-10-09 D 1057 FC M6 C 40 42.5N 380 31.6 45.7 49.3 57.9 PH LIFT WALL COLUMN 21C
13-10-09 D 1060 FC IB-2 C 30 42.5N 300 23.8 33.5 42.4 47.4 PH Lift WALL 31B
13-10-09 N 1063 FC IB-2 C 30 42.5N 300 18.6 31.9 37.1 46.2 PH UNIT 2 Lift 80A
14-10-09 N 1064 FC IB-2 C 30 42.5N 300 23.0 31.2 37.4 46.5 PH UNIT 1 Lift 58
15-10-09 N 1067 FC IB-7 C 35 42.5N 300 24.2 34.9 41.0 50.1 PH UNIT 1 Lift 58
15-10-09 D 1068 FC IB-2 C 30 42.5N 300 23.3 34.1 39.8 48.6 PH UNIT 1 Lift 58
15-10-09 N 1073 FC IB-2 C 30 42.5N 300 15.1 27.1 35.8 40.6 PH TAILRACE W LIFT 7-10
16-10-09 N 1076 FC IB-2 C 30 42.5N 300 15.6 25.8 36.7 39.6 PH UNIT 3 Lift 16 SLAB
17-10-09 D 1080 FC JC C 25 42.5N 300 13.5 25.9 34.5 37.9 PH UNIT 4 Lift 80A
17-10-09 D 1081 FC JC C 25 42.5N 300 13.1 25.8 34.5 37.3 PH UNIT 1 Lift 16
18-10-09 N 1082 FC JC C 25 42.5N 300 15.0 25.4 31.7 36.0 PH U 1 COL. 58 AXIS 21
18-10-09 N 1083 FC JC C 25 42.5N 300 14.7 25.0 32.2 36.0 PH UNIT 3 Lift 57B
20-10-09 N 1090 FC IB C 35 42.5N 330 23.6 32.2 40.6 44.6 PH UNIT 5 Lift 56A
21-10-09 N 1097 FC IB C 35 42.5N 330 19.9 32.0 41.3 50.1 PH RETAINING W LIFT 18
23-10-09 N 1102 FC IB C 35 42.5N 330 24.3 31.7 39.9 45.4 PH UNIT 4 Lift 15A
23-10-09 N 1103 FC IB C 35 42.5N 330 19.5 28.9 38.4 44.4 PH UNIT 4 Lift 15A
24-10-09 D 1106 FC IB C 35 42.5N 330 23.7 30.4 40.0 49.5 PH UNIT 1 Lift 16
24-10-09 D 1109 FC IB C 35 42.5N 330 21.3 30.6 40.7 46.3 PH RETAINING W LIFT 19
26-10-09 D 1116 FC IB-7 C 35 42.5N 300 21.4 30.5 39.3 49.0 PH UNIT 1 Lift 59
27-10-09 N 1118 FC IB C 35 42.5N 330 23.3 30.9 39.4 48.4 PH U 3 Lift 58 COL. AXIS 59
30-10-09 N 1127 FC IB C 35 42.5N 330 17.1 29.7 38.6 43.0 PH UNIT 3 Lift 58
30-10-09 D 1129 FC IB C 35 42.5N 330 16.3 29.9 39.3 42.8 PH UNIT 1 Lift 17
30-10-09 D 1131 FC IB C 35 42.5N 330 17.3 29.9 39.8 44.9 PH UNIT 4 Lift 52A
31-10-09 D 1132 FC IB-7 C 35 42.5N 300 16.4 28.3 39.1 43.5 PH UNIT 4 Lift 52A
31-10-09 D 1133 FC IB C 35 42.5N 330 16.3 27.7 38.1 42.5 PH UNIT 2 Lift 15B
03-11-09 N 1137 FC IB C 35 42.5N 330 17.7 29.5 39.8 43.7 PH UNIT 3 Lift 15C
03-11-09 N 1138 FC IB C 35 42.5N 330 17.4 28.2 39.4 44.1 PH UNIT 3 COLUMN 58
03-11-09 D 1140 FC IB C 35 42.5N 330 16.2 27.8 38.6 48.4 PH UNIT 5 Lift 83A
04-11-09 D 1144 FC IB-7 C 35 42.5N 300 17.5 29.6 39.4 41.8 PH UNIT 5 Lift 52B
05-11-09 N 1145 FC IB C 35 42.5N 330 22.9 30.5 40.5 50.7 PH UNIT 4 Lift 52B
05-11-09 N 1146 FC M6 C 40 42.5N 380 26.2 36.7 46.3 52.5 PH UNIT 4 Lift 52B
05-11-09 N 1147 FC IB C 35 42.5N 330 15.9 28.3 39.5 44.6 PH UNIT 5 Lift 56B
06-11-09 N 1150 FC IB C 35 42.5N 330 22.4 31.2 41.5 50.7 PH UNIT 3 Lift 85
07-11-09 N 1154 FC IB-2 C 30 42.5N 300 18.8 29.4 39.3 47.7 PH UNIT 1 Lift 17
08-11-09 D 1159 FC IB-2 C 30 42.5N 300 15.8 27.6 36.0 39.2 PH UNIT 1 Lift 17 WALL
08-11-09 D 1160 FC IB-2 C 30 42.5N 300 15.6 27.0 35.9 40.2 PH UNIT 3 Lift 15C
09-11-09 N 1161 FC IB-2 C 30 42.5N 300 15.9 26.7 35.6 39.8 PH UNIT 1 Lift 15B3
09-11-09 D 1163 FC IB-7 C 35 42.5N 300 20.8 30.5 40.7 50.9 PH UNIT 5 Lift 14B

Page 74
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

09-11-09 D 1164 FC IB-2 C 30 42.5N 300 19.1 28.1 36.3 44.8 PH UNIT 5 Lift 14B
11-11-09 N 1172 FC IB-2 C 30 42.5N 300 15.1 27.2 37.2 42.5 PH UNIT 5 Lift 83B
12-11-09 N 1174 FC IB-2 C 30 42.5N 300 18.6 28.9 36.7 40.4 PH UNIT 1 Lift 60 COLUMN
12-11-09 N 1179 FC IB-2 C 30 42.5N 300 16.6 26.6 35.0 39.9 PH UNIT 3 Lift WALL 15B
13-11-09 D 1181 FC IB-7 C 35 42.5N 300 17.6 27.3 36.9 42.2 PH UNIT 1 Lift 80
13-11-09 D 1182 FC IB-2 C 30 42.5N 300 16.2 25.6 33.6 37.5 PH UNIT 1 Lift 86
14-11-09 D 1184 FC IB-2 C 30 42.5N 300 14.3 26.4 31.9 35.7 PH UNIT 3 Lift 15B & 15C
16-11-09 D 1191 FC IB-2 C 30 42.5N 300 15.8 29.9 35.9 44.1 PH UNIT 3 L 16 CENTRE W.
17-11-09 N 1192 FC IB-2 C 30 42.5N 300 20.4 29.3 39.1 46.3 PH Lift WALL 15
17-11-09 N 1194 FC IB-2 C 30 42.5N 300 16.8 25.3 33.4 34.9 PH UNIT 1 Lift 60
17-11-09 D 1195 FC IB-2 C 30 42.5N 300 15.7 25.3 35.2 41.9 PH UNIT 2 Lift 15B4
18-11-09 N 1199 FC IB-2 C 30 42.5N 300 14.5 25.4 35.7 42.0 PH TAILRACE Lift 20
18-11-09 D 1201 FC M6 C 40 42.5N 380 24.3 37.6 51.4 59.0 PH UNIT 1 Lift 15C & 16
19-11-09 N 1203 FC IB-2 C 30 42.5N 300 16.7 24.0 33.0 37.5 PH UNIT 4 Lift 54 & 55
19-11-09 D 1204 FC IB-7 C 35 42.5N 300 18.1 28.3 38.9 45.6 PH UNIT 4 Lift 54 & 55
19-11-09 D 1205 FC IB-2 C 30 42.5N 300 14.0 26.7 35.9 42.7 PH UNIT 2 Lift 16
22-11-09 N 1209 FC IB-2 C 30 42.5N 300 13.3 25.9 33.9 40.4 PH UNIT 1 Lift 18
22-11-09 N 1210 FC IB-2 C 30 42.5N 300 15.3 26.6 35.6 39.8 PH UNIT 3 Lift 15C
22-11-09 N 1212 FC IB-2 C 30 42.5N 300 17.5 27.0 33.3 40.6 PH UNIT 5 Lift 56C
22-11-09 D 1213 FC IB-2 C 30 42.5N 300 14.7 25.6 34.6 38.9 PH UNIT 3 Lift 59
23-11-09 D 1215 FC M6 C 40 42.5N 380 20.2 36.6 44.2 51.8 PH UNIT 1 Lift P1
25-11-09 N 1220 FC IB-2 C 30 42.5N 300 16.8 26.1 37.3 47.5 PH UNIT 1 Lift 17
25-11-09 D 1221 FC IB-2 C 30 42.5N 300 17.2 27.6 38.0 45.9 PH RETAINING WALL
26-11-09 N 1222 FC IB-2 C 30 42.5N 300 14.7 25.8 37.5 41.1 PH UNIT 5 Lift 15A
26-11-09 N 1223 FC IB-7 C 35 42.5N 300 16.3 26.8 37.2 41.5 PH UNIT 5 Lift 15A
27-11-09 N 1227 FC IB-2 C 30 42.5N 300 17.5 25.2 35.3 39.2 PH UNIT 1 Lift 18
28-11-09 N 1229 FC IB-2 C 30 42.5N 300 15.1 24.8 34.1 37.7 PH UNIT 5 Lift 84
28-11-09 N 1230 FC IB-7 C 35 42.5N 300 18.4 29.5 40.2 44.6 PH UNIT 5 Lift 84
30-11-09 D 1232 FC IB-2 C 30 42.5N 300 14.9 24.7 34.9 39.0 PH UNIT 3 Lift 16
01-12-09 D 1236 FC IB-2 C 30 42.5N 300 15.3 24.2 34.7 38.5 PH UNIT 1 Lift WALL16
03-12-09 N 1240 FC IB-2 C 30 42.5N 300 16.8 28.9 36.9 40.5 PH UNIT 5 Lift 15B
04-12-09 D 1242 FC IB-2 C 30 42.5N 300 14.6 25.5 34.9 38.2 PH UNIT 3 Lift 86
04-12-09 D 1244 FC IB-2 C 30 42.5N 300 14.4 25.4 34.7 37.7 PH UNIT 2 Lift 15A
PH UNIT 2 Lift 15B CENTRE
05-12-09 D 1246 FC IB-2 C 30 42.5N 300 15.1 27.1 35.1 39.3
WALL
PH UNIT 2 Lift 15B CENTRE
05-12-09 D 1248 FC IB-2 C 30 42.5N 300 16.7 28.5 38.3 41.6
WALL
PH RETAINING WALL LIFT
06-12-09 D 1250 FC IB-2 C 30 42.5N 300 18.0 26.0 32.7 39.4
21
06-12-09 N 1254 FC IB C 35 42.5N 330 16.9 28.6 38.4 43.8 PH UNIT 4 Lift 15B4

Page 75
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

06-12-09 D 1255 FC IB-2 C 30 42.5N 300 14.7 24.0 33.3 37.7 PH UNIT 1 Lift 61
07-12-09 N 1256 FC IB-2 C 30 42.5N 300 17.4 24.8 34.2 41.2 PH UNIT 3 Lift 60
07-12-09 D 1257 FC IB-2 C 30 42.5N 300 15.2 25.7 35.4 39.6 PH UNIT 2 Lift 15C
PH UNIT 1 Lift P3, P4, P5
09-12-09 N 1264 FC IB-2 C 30 42.5N 300 14.0 25.3 34.3 37.4
AXIS 17
09-12-09 N 1267 FC IB-2 C 30 42.5N 300 14.2 24.7 34.4 36.5 PH UNIT 1 Lift 19
PH UNIT 3 Lift 60 CENTRAL
11-12-09 D 1271 FC IB-2 C 30 42.5N 300 19.0 29.4 37.3 43.1
WALL
PH UNIT 1 Lift 62 AXIS 18
11-12-09 D 1273 FC IB-2 C 30 42.5N 300 14.9 25.3 34.7 38.8
EL:1098.2-110
12-12-09 N 1275 FC IB-7 C 35 42.5N 300 19.9 30.2 37.1 45.4 PH UNIT 2 Lift 56B
12-12-09 D 1278 FC IB-2 C 30 42.5N 300 15.2 24.9 34.4 37.5 PH UNIT 1 Lift 19
12-12-09 D 1281 FC IB-2 C 30 42.5N 300 15.1 25.3 34.0 39.2 PH UNIT 1 Lift 62 AXIS 20
PH UNIT 1 RETAINING
13-12-09 N 1282 FC IB-2 C 30 42.5N 300 15.3 25.1 32.2 35.9
WALL Lift 8
14-12-09 D 1284 FC IB-2 C 30 42.5N 300 14.2 24.8 34.6 38.0 PH UNIT 3 Lift 16
15-12-09 N 1285 FC IB-2 C 30 42.5N 300 17.7 26.6 34.4 38.5 PH UNIT 1 Lift 87A & 87B
15-12-09 N 1286 FC IB-2 C 30 42.5N 300 18.1 27.1 36.3 40.8 PH UNIT 1 Lift 87A & 87B
16-12-09 D 1291 FC JC C 25 42.5N 300 13.7 24.3 32.7 36.7 PH UNIT 1 Lift 18B
17-12-09 N 1292 FC IB-2 C 30 42.5N 300 16.0 25.8 34.6 37.5 PH UNIT 4 Lift 81
18-12-09 N 1296 FC IB-2 C 30 42.5N 300 20.4 29.5 37.5 44.5 PH UNIT 1 Lift 19
18-12-09 N 1297 FC IB-2 C 30 42.5N 300 19.5 28.4 37.5 43.0 PH UNIT 1 Lift P3
18-12-09 N 1300 FC IB-2 C 30 42.5N 300 16.5 26.3 36.2 41.5 PH UNIT 5 Lift 85
19-12-09 N 1303 FC JC C 25 42.5N 310 13.6 26.4 33.3 37.8 PH UNIT 1 Lift 18B
20-12-09 N 1305 FC IB-7 C 35 42.5N 300 17.7 28.9 37.5 41.9 PH RETAINING WALL
20-12-09 D 1306 FC IB-2 C 30 42.5N 300 14.1 24.9 34.0 37.6 PH UNIT 2 Lift 65C
21-12-09 N 1309 FC IB-2 C 30 42.5N 300 19.2 28.4 34.4 39.7 PH UNIT 4 Lift 16
22-12-09 D 1313 FC IB-2 C 30 42.5N 300 17.9 27.8 37.1 40.8 PH UNIT 5 Lift 57A
22-12-09 N 1316 FC IB-2 C 30 42.5N 300 16.4 29.7 38.1 44.0 PH UNIT 2 Lift 81 RIGHT
29-12-09 N 1320 FC IB-2 C 30 42.5N 300 15.2 25.2 34.8 39.9 PH UNIT 2 Lift 81 AXIS 13
29-12-09 D 1323 FC IB-2 C 30 42.5N 300 15.1 25.3 35.1 40.6 PH UNIT 1 AXIS 18
30-12-09 N 1327 FC JC C 25 42.5N 310 14.0 23.8 31.0 34.7 PH UNIT 1 Lift 19B
02-01-10 D 1333 FC IB-2 C 30 42.5N 300 14.4 25.4 34.4 40.3 PH Unit 1 Lift P4
02-01-10 N 1334 FC M6 C 40 42.5N 380 25.4 38.6 47.8 54.8 PH Unit 1 Lift P4
03-01-10 N 1336 FC IB-2 C 30 42.5N 300 15.6 25.3 34.9 39.8 PH Unit 1 Lift 63 Column axis
20
03-01-10 D 1337 FC IB-2 C 30 42.5N 300 20.7 28.5 37.7 48.3 PH Unit 4 Lift 56A
04-01-10 D 1342 FC IB-2 C 30 42.5N 300 17.8 29.1 36.2 43.4 PH Unit 3 Lift 61
04-01-10 D 1344 FC IB-2 C 30 42.5N 300 14.8 25.1 33.4 37.9 PH Unit 2 Lift 15C
05-01-10 N 1346 FC IB-2 C 30 42.5N 300 14.3 25.8 33.2 38.1 PH Unit 5 Lift 15B/B2
05-01-10 N 1347 FC IB-2 C 30 42.5N 300 14.7 26.3 32.8 38.5 PH Unit 3 Lift 17

Page 76
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

06-01-10 N 1349 FC IB-2 C 30 42.5N 300 14.7 24.9 33.1 38.5 PH Unit 1 Lift 62 Wall Axis 20 -
21Column axis 20 -
PH Unit 1 Lift 64
07-01-10 N 1354 FC IB-2 C 30 42.5N 300 15.1 25.6 35.1 40.4
17
07-01-10 N 1355 FC IB-2 C 30 42.5N 300 14.8 25.2 34.8 39.8 PH Unit 1 Lift 20 axis 17 - 21
07-01-10 D 1356 FC IB-2 C 30 42.5N 300 14.8 25.4 33.0 36.3 PH Unit 2 Lift 57A
08-01-10 D 1361 FC IB-2 C 30 42.5N 300 14.2 24.7 32.4 36.8 PH Unit 1 Lift 81CENTER WALL
08-01-10 D 1364 FC IB-2 C 30 42.5N 300 15.4 26.7 33.1 37.5 PH Unit 2 Lift 82A LEFT SIDE
WALL
09-01-10 D 1367 FC IB-2 C 30 42.5N 300 15.2 24.6 32.4 37.4 PH Unit 1 Lift WALL 17
09-01-10 D 1368 FC IB-2 C 30 42.5N 300 14.4 25.6 33.7 39.4 PH Unit 3 Lift P2
09-01-10 N 1069 FC IB-2 C 30 42.5N 300 15.3 25.8 34.7 39.9 PH Unit 1 Lift 64 Column axis 20 -
18
10-01-10 D 1371 FC IB C 35 42.5N 330 18.8 29.3 40.8 45.6 PH Unit 1 Lift 62 Wall Axis
17 18
10-01-10 D 1372 FC IB-2 C 30 42.5N 300 15.6 26.6 34.7 40.1 PH Unit 4 Lift 81 LEFT WALL
11-01-10 N 1380 FC IB C 35 42.5N 330 18.3 29.6 38.0 45.3 PH Unit 1 Lift 64 Column axis 17
12-01-10 N 1383 FC IB-2 C 30 42.5N 300 16.8 27.4 37.8 43.7 PH Unit 5 Lift 87B
13-01-10 N 1384 FC IB C 35 42.5N 330 22.6 31.8 40.5 44.4 PH Unit 5 Lift 15 - B4
13-01-10 N 1388 FC IB-2 C 30 42.5N 300 14.5 26.6 33.4 38.3 PH Unit 1 Lift 88
14-01-10 N 1389 FC IB-2 C 30 42.5N 300 14.7 25.5 33.4 38.0 PH Unit 1 Lift 20
14-01-10 D 1392 FC IB-2 C 30 42.5N 300 15.3 25.8 33.1 37.5 PH Unit 5 Lift 81
14-01-10 N 1395 FC IB C 35 42.5N 330 17.1 29.6 39.4 44.8 PH Unit 1 Lift 64 Column axis 17
15-01-10 D 1396 FC IB C 35 42.5N 330 16.0 32.4 38.1 42.8 PH Unit 3 Lift 15B4
16-01-10 D 1400 FC IB-2 C 30 42.5N 300 14.8 25.9 33.3 38.8 PH Unit 3 Lift 17CENTER WALL
16-01-10 N 1404 FC IB-2 C 30 42.5N 300 15.1 25.9 34.6 36.6 PH UNIT 2 Lift 82H RRC Wall
18-01-10 N 1411 FC IB-2 C 30 42.5N 300 15.4 25.7 32.9 36.1 PH UNIT 1 Lift 16A
19-01-10 D 1417 FC IB-2 C 30 42.5N 300 14.7 26.2 35.5 39.6 PH UNIT 2 Lift 57B
19-01-10 N 1418 FC IB-2 C 30 42.5N 300 15.3 24.4 33.3 35.8 PH Unit 3 Lift 17CENTER WALL
PH UNIT 2 Lift 82A Center
19-01-10 N 1419 FC IB-2 C 30 42.5N 300 15.6 24.5 31.9 34.7
wall
20-01-10 N 1425 FC IB C 35 42.5N 330 13.0 27.8 25.0 40.5 PH UNIT 1 Lift 21A
22-01-10 N 1429 FC IB-2 C 30 42.5N 300 18.9 27.3 38.1 39.1 PH UNIT 2 Lift 16 Left side
PH UNIT 4 Lift 82 Wall left
22-01-10 N 1430 FC IB-2 C 30 42.5N 300 18.7 28.7 36.5 42.0
side
23-01-10 N 1436 FC IB-2 C 30 42.5N 300 17.6 27.4 36.7 39.0 PH UNIT 3 Lift 87
23-01-10 N 1441 FC IB-2 C 30 42.5N 300 14.8 25.1 34.7 40.6 PH UNIT 4 Lift 56B
PH UNIT 4 Lift 15C Center
24-01-10 N 1442 FC IB-2 C 30 42.5N 300 17.3 26.5 34.2 40.3
Wall
24-01-10 D 1446 FC IB-2 C 30 42.5N 300 15.3 24.8 33.5 39.2 PH Unit 1 Lift 88
25-01-10 N 1453 FC M6 C 40 42.5N 380 24.6 33.7 46.0 49.5 PH Unit 3 Lift P1
PH UNIT 4 Lift 82A Wall Left
26-01-10 D 1455 FC IB-2 C 30 42.5N 300 14.7 25.5 33.4 35.6
side
PH UNIT 1 Retaining wall Lift
26-01-10 N 1457 FC IB-2 C 30 42.5N 300 15.6 25.4 33.6 36.5
22-12
PH UNIT 2 Lift 82B D/Stream
29-01-10 N 1468 FC IB C 35 42.5N 330 17.6 28.7 36.6 39.8
Slab
29-01-10 N 1470 FC IB-2 C 30 42.5N 300 14.7 24.2 33.7 37.9 PH Unit 1 Lift 21B

Page 77
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
PH UNIT 4 Lift 82A Center
29-01-10 D 1473 FC IB-2 C 30 42.5N 300 15.6 25.3 34.3 37.8
wall
30-01-10 N 1475 FC IB-2 C 30 42.5N 300 13.9 25.1 33.7 37.5 PH Unit 1 Lift P5
PH Unit 2 Lift 58 Column axis
01-02-10 N 1481 FC IB-2 C 30 42.5N 300 14.7 26.0 33.8 40.9
17&13
02-02-10 N 1482 FC R C 20 42.5N 250 13.6 20.4 27.1 31.9 PH Unit 5 UPSTREAM SLAB
03-02-10 N 1491 FC IB-2 C 30 42.5N 300 14.6 24.7 32.6 36.5 PH Unit 2 Lift 16C WALL
03-02-10 N 1492 FC IB-2 C 30 42.5N 300 15.8 28.8 36.8 41.9 PH Unit 4 Lift 56C
PH Unit 4 Lift 15C CENTRE
04-02-10 N 1498 FC IB-2 C 30 42.5N 300 15.4 25.1 34.3 39.8
WALL
06-02-10 N 1504 FC IB-2 C 30 42.5N 300 20.0 29.6 36.0 43.1 PH Unit 2 Lift 58
06-02-10 N 1505 FC IB-2 C 30 42.5N 300 20.3 30.2 35.0 43.2 PH Unit 2 Lift 16 RALT SAIT
PH Unit 5 Lift 58 Column LEFT
06-02-10 N 1506 FC IB-2 C 30 42.5N 300 15.4 25.4 34.8 39.3
SIDE
07-02-10 N 1514 FC IB C 35 42.5N 330 23.6 30.1 40.6 46.6 PH Unit 1 Lift 22A&22B
08-02-10 N 1520 FC JC C 25 42.5N 310 13.6 24.5 31.2 36.5 PH Unit 5 Lift 15C Centre Wall
09-02-10 N 1522 FC IB-2 C 30 42.5N 300 18.8 27.1 34.3 37.6 PH Unit 4 Lift 15C Left WALL
09-02-10 N 1523 FC IB-2 C 30 42.5N 300 18.3 27.6 33.7 39.6 PH Unit 2 Lift P2
10-02-10 N 1529 FC IB-2 C 30 42.5N 300 18.5 28.6 37.0 41.4 PH Unit 5 Lift 58
10-02-10 N 1535 FC IB-2 C 30 42.5N 300 15.0 28.6 32.7 39.0 PH Unit 3 Lift 18A Centre Wall
11-02-10 N 1536 FC IB-2 C 30 42.5N 300 18.4 25.8 32.7 37.1 PH Unit 4 Lift 82B Slab
11-02-10 D 1539 FC IB-2 C 30 42.5N 300 15.6 24.5 31.8 36.1 PH Unit 3 Lift 18 Right Side Wall
PH Unit 4 Lift 15C Right Side
13-02-10 D 1550 FC IB-2 C 30 42.5N 300 15.1 24.7 32.9 36.3
Wall
14-02-10 D 1554 FC IB-2 C 30 42.5N 300 15.1 24.5 32.7 36.2 PH Unit 2 Lift 7 Left Wall
16-02-10 N 1558 FC IB-2 C 30 42.5N 300 18.9 30.8 38.9 45.1 PH Unit 1 Lift 23
16-02-10 N 1564 FC JC C 25 42.5N 310 13.3 24.0 30.4 38.5 PH Unit 1 Lift P7A
17-02-10 D 1568 FC IB-2 C 30 42.5N 300 15.3 24.4 32.6 35.7 PH Unit 3 Lift 18 Side Wall
18-02-10 N 1571 FC M6 C 40 42.5N 380 24.7 34.8 43.7 47.9 PH Unit 2 Lift P1
18-02-10 D 1576 FC IB-2 C 30 42.5N 300 14.2 24.0 33.2 37.8 PH Unit 2 Lift 59
18-02-10 N 1577 FC M6 C 40 42.5N 380 25.0 35.1 44.0 50.6 PH Unit 2 Lift 16 Centre Wall
19-02-10 N 1579 FC IB-2 C 30 42.5N 300 19.5 27.6 35.5 40.1 PH Unit 5 Lift 15C
20-02-10 D 1585 FC IB-7 C 35 42.5N 300 23.8 30.5 44.6 48.0 PH Unit 2 Lift 82A
20-02-10 D 1586 FC IB-2 C 30 42.5N 300 14.6 23.5 31.5 35.0 PH Unit 5 Lift 86
22-02-10 N 1593 FC IB-2 C 30 42.5N 300 15.8 24.9 32.8 36.4 PH Unit 4 Lift 16 Centre Wall
22-02-10 D 1594 FC IB-2 C 30 42.5N 300 14.9 24.1 31.4 36.2 PH Unit 1 Lift 25 Left Side Wall
24-02-10 N 1603 FC IB-2 C 30 42.5N 300 16.7 27.1 36.6 43.4 PH Unit 1 Lift 25A Centre Wall
24-02-10 N 1605 FC IB-2 C 30 42.5N 300 14.5 24.5 31.3 36.8 PH Unit 4 Lift 83A
24-02-10 D 1606 FC IB-2 C 30 42.5N 300 14.9 25.1 33.8 38.1 PH Unit 4 Lift 83A
24-02-10 N 1607 FC IB-2 C 30 42.5N 300 15.6 25.8 35.7 40.5 PH Unit 4 Lift 83A
25-02-10 N 1608 FC JC C 25 42.5N 310 16.8 25.5 30.0 36.6 PH Unit 1 Lift P8 & P9
26-02-10 D 1621 FC IB-2 C 30 42.5N 300 15.9 22.5 30.9 33.9 PH Unit 1 Lift 89
27-02-10 D 1623 FC IB-2 C 30 42.5N 300 19.0 28.1 35.7 40.8 PH Unit 2 Lift 83B
27-02-10 N 1624 FC IB-2 C 30 42.5N 300 19.0 28.9 35.9 40.5 PH Unit 1 Lift 25A Wall Axis 17
02-03-10 D 1632 FC IB-2 C 30 42.5N 300 14.5 24.1 31.4 36.2 PH Unit 2 Lift 17 Right side wall

02-03-10 N 1633 FC IB-2 C 30 42.5N 300 18.3 28.1 37.2 40.1 PH Unit 2 Lift 17 Right side wall
03-03-10 D 1641 FC IB-2 C 30 42.5N 300 14.8 32.2 31.0 35.2 PH Unit 4 Lift 57A
PH Unit 1 Lift 64 Wall axis
03-03-10 N 1643 FC IB-2 C 30 42.5N 300 15.2 24.8 33.0 37.3
20 - 21
PH Unit 1 Lift 64 Wall axis
04-03-10 N 1647 FC IB-2 C 30 42.5N 300 14.9 24.6 33.6 36.8
17 - 18

Page 78
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
05-03-10 D 1648 FC IB-2 C 30 42.5N 300 14.5 23.3 31.3 36.5 PH Unit 2 Lift 84
05-03-10 N 1652 FC IB-2 C 30 42.5N 300 14.9 25.2 33.8 37.3 PH Unit 2 Lift 84
06-03-10 N 1654 FC IB-2 C 30 42.5N 300 14.4 23.9 31.8 35.8 PH Unit 2 Lift 18 centre wall
07-03-10 N 1658 FC IB-2 C 30 42.5N 300 14.3 23.8 32.6 36.6 PH Unit 4 Lift 16 left Wall
07-03-10 N 1659 FC IB-2 C 30 42.5N 300 14.7 23.8 31.9 35.3 PH Unit 2 Lift 60
08-03-10 D 1660 FC IB-2 C 30 42.5N 300 13.7 22.2 31.8 33.5 PH Retaining wall lift 23&14
PH Unit 2 Lift 18A Left centre
10-03-10 N 1669 FC IB-2 C 30 42.5N 300 16.5 22.9 33.3 36.0
wall
11-03-10 N 1673 FC JC C 25 42.5N 310 15.8 22.3 30.8 34.5 PH Unit 2 Lift P3, P4&P5 Wall
12-03-10 N 1680 FC IB-2 C 30 42.5N 300 14.2 23.8 32.4 35.2 PH Unit 4 Lift 57B
12-03-10 N 1683 FC IB-2 C 30 42.5N 300 14.6 24.7 31.6 37.4 PH Unit 5 Lift 16 SLAB
12-03-10 N 1685 FC JC C 25 42.5N 310 13.0 22.4 24.3 30.9 PH Unit 1 Lift 90 Column axis 17

13-03-10 N 1686 FC IB-2 C 30 42.5N 300 15.1 23.1 32.4 36.7 PH Unit 2 Lift 18A Right side wall

13-03-10 D 1688 FC IB-2 C 30 42.5N 300 17.6 28.2 34.4 38.7 PH Unit 1 Lift 90 Column axis 18
14-03-10 N 1690 FC IB C 35 42.5N 330 16.4 27.7 36.8 40.3 PH Unit 2 Lift P2
14-03-10 N 1692 FC M6 C 40 42.5N 380 22.9 34.8 43.5 47.0 PH Unit 2 Lift P3
16-03-10 N 1696 FC IB-2 C 30 42.5N 300 14.1 23.9 32.4 36.6 PH Unit 5 Lift 15C centre wall
16-03-10 D 1698 FC IB-2 C 30 42.5N 300 18.8 26.0 33.3 36.1 PH Unit 4 Lift 83B
17-03-10 N 1700 FC IB-2 C 30 42.5N 300 15.9 24.7 31.0 34.1 PH Unit 1 Lift 90 Column axis 21

17-03-10 N 1705 FC IB-2 C 30 42.5N 300 13.6 23.1 32.1 34.2 PH Unit 4 Lift 58 Column left sait

18-03-10 D 1706 FC IB-2 C 30 42.5N 300 15.5 24.7 31.1 33.9 PH Unit 4 Lift 16 Right side wall
19-03-10 N 1711 FC IB-2 C 30 42.5N 300 14.7 23.8 31.8 35.9 PH Unit 5 Lift 59
19-03-10 D 1713 FC IB-2 C 30 42.5N 300 16.1 25.3 31.4 35.4 PH Unit 2 Lift P4
20-03-10 N 1716 FC IB-2 C 30 42.5N 300 14.3 22.9 32.7 34.5 PH Unit 2 Lift 61
20-03-10 D 1717 FC IB-2 C 30 42.5N 300 15.3 23.4 30.2 33.5 PH Unit 4 Lift 17 centre wall
21-03-10 N 1722 FC IB-2 C 30 42.5N 300 15.1 25.1 34.1 38.4 PH Unit 5 Lift 15C
23-03-10 N 1729 FC IB C 35 42.5N 330 17.2 29.8 38.6 43.5 PH Unit 4 Lift 58 Axis 5
23-03-10 D 1730 FC IB-2 C 30 42.5N 300 13.9 23.1 33.2 37.2 PH Unit 2 Lift 85
23-03-10 N 1731 FC IB-2 C 30 42.5N 300 14.1 23.6 32.3 36.6 PH Unit 2 Lift 85
24-03-10 N 1732 FC IB-2 C 30 42.5N 300 15.5 24.4 31.2 34.1 PH Unit 4 Lift 17 left side wall
24-03-10 D 1735 FC IB-2 C 30 42.5N 300 16.2 29.1 37.1 39.8 PH Unit 2 Lift 19A centre wall
25-03-10 D 1740 FC IB-2 C 30 42.5N 300 14.2 23.2 32.6 35.2 PH Unit 4 Lift 84
25-03-10 N 1741 FC IB C 35 42.5N 330 15.9 26.8 37.0 40.5 PH Unit 4 Lift 84
26-03-10 D 1748 FC IB C 35 42.5N 330 15.6 25.2 35.9 39.4 PH Unit 1 Lift 25B 1st Piece
27-03-10 N 1752 FC IB-2 C 30 42.5N 300 13.6 22.8 33.1 36.9 PH Unit 4 Lift 58
27-03-10 D 1753 FC IB-2 C 30 42.5N 300 14.4 23.7 33.4 36.3 PH Unit 2 Lift 19 left centre wall
27-03-10 D 1754 FC JC C 30 42.5N 310 12.9 22.4 30.1 32.3 PH Unit 1 Lift 24
29-03-10 D 1762 FC IB-2 C 30 42.5N 300 14.7 25.3 31.9 34.3 PH Unit 1 Lift 25A
31-03-10 D 1773 FC JC C 25 42.5N 310 12.9 22.4 30.1 34.3 PH Unit 2 Lift 62 Column axis
31-03-10 D 1775 FC IB-2 C 30 42.5N 300 14.3 24.8 31.9 33.4 PH Unit 2 Lift P5
01-04-10 D 1776 FC IB-2 C 30 42.5N 300 17.9 26.8 34.8 37.5 PH Unit 5 Lift 15C left side wall
01-04-10 D 1778 FC M6 C 40 42.5N 380 25.1 34.9 46.6 49.3 PH Unit 5 Lift 16C wall
PH Unit 1 Retaining wall Lift 16 &
01-04-10 D 1780 FC IB-2 C 30 42.5N 300 14.4 24.6 32.4 35.8
24
02-04-10 D 1782 FC IB-2 C 30 42.5N 300 16.1 22.6 31.1 34.3 PH Unit 4 Lift 85
02-04-10 N 1788 FC IB-2 C 30 42.5N 300 14.4 23.9 32.3 34.4 PH Unit 2 Lift 19 Right side wall

Page 79
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
08-04-10 N 1794 FC IB-2 C 30 42.5N 300 14.6 23.7 31.8 35.5 PH Unit 3 Lift 88
09-04-10 D 1797 FC IB-2 C 30 42.5N 300 13.8 23.4 32.6 35.5 PH Unit 4 Lift 17 Right side wall
10-04-10 N 1803 FC IB-2 C 30 42.5N 300 13.7 24.2 31.7 35.3 PH Unit 3 Lift 19 centre wall
13-04-10 N 1814 FC JC C 25 42.5N 310 12.5 21.9 30.5 34.6 PH Unit 5 Lift 60 Column axis 5

13-04-10 N 1815 FC IB-2 C 30 42.5N 300 13.3 23.7 32.1 36.3 PH Unit 3 Lift 19 Right side wall
PH Unit 3 Lift 88 Column C/S
15-04-10 N 1822 FC JC C 25 42.5N 310 13.6 21.9 29.9 34.4
wall
PH Unit 2 Lift 62 - 63 Column
15-04-10 D 1827 FC JC C 25 42.5N 310 13.5 22.2 31.3 35.8
axis 17
16-04-10 N 1830 FC IB-2 C 30 42.5N 300 13.9 23.9 31.7 35.8 PH Unit 5 Lift 60 Centre wall
16-04-10 N 1835 FC IB C 35 42.5N 330 15.7 25.9 36.6 40.3 PH Unit 2 Lift 18B Slab
17-04-10 D 1840 FC M6 C 40 42.5N 380 22.2 32.0 43.1 46.8 PH Unit 4 Lift P1
18-04-10 D 1841 FC IB-2 C 30 42.5N 300 14.2 23.9 32.0 36.1 PH Unit 1 Lift 26
19-04-10 N 1844 FC JC C 25 42.5N 310 12.5 20.1 31.0 33.6 PH Unit 5 Lift 60
PH Unit 2 Lift 63 Column axis 14 -
20-04-10 D 1847 FC JC C 25 42.5N 310 12.4 21.9 30.8 33.8
P6
20-04-10 N 1848 FC IB C 35 42.5N 330 17.3 28.3 38.3 42.5 PH Unit 1 Lift 26
21-04-10 N 1849 FC IB-2 C 30 42.5N 300 13.9 23.8 32.4 35.3 PH Unit 3 Lift 19 left side wall
22-04-10 D 1852 FC JC C 25 42.5N 310 12.3 23.1 30.2 35.3 PH Unit 1 Lift 90
23-04-10 N 1854 FC IB-2 C 30 42.5N 300 14.8 22.6 33.1 35.1 PH Unit 5 Lift 16
PH Unit 2 Lift 63 Column axis 13 -
23-04-10 N 1857 FC JC C 25 42.5N 310 12.8 22.1 30.6 34.8
17
24-04-10 D 1863 FC IB-2 C 30 42.5N 300 14.2 22.0 32.9 35.8 PH Unit 2 Lift 86
26-04-10 N 1869 FC M6 C 40 42.5N 380 23.5 33.4 42.7 46.8 PH Unit 4 Lift 18A
26-04-10 N 1870 FC IB-2 C 30 42.5N 300 13.2 23.4 35.9 38.3 PH Unit 2 Lift 19B
27-04-10 N 1871 FC M6 C 40 42.5N 380 27.1 36.9 44.6 49.8 PH Unit 3 Lift P3
27-04-10 D 1875 FC M6 C 40 42.5N 380 21.5 33.8 41.2 43.6 PH Unit 1 Lift P6
28-04-10 D 1877 FC M6 C 40 42.5N 380 22.2 35.6 43.2 46.2 PH Unit 3 Lift 17 Centre wall
29-04-10 N 1879 FC IB-2 C 30 42.5N 300 17.0 25.0 33.2 35.3 PH Unit 5 Lift 87
30-04-10 N 1882 FC IB-2 C 30 42.5N 300 13.1 21.7 32.8 36.2 PH Unit 1 Retaining wall
03-05-10 D 1884 FC IB-2 C 30 42.5N 300 13.5 24.5 31.7 34.6 PH Unit 4 Lift 59
04-05-10 N 1887 FC IB C 35 42.5N 330 15.8 26.1 36.1 39.5 PH Unit 4 Lift 18 left side wall
PH Unit 3 Lift 62 Column axis 10 -
04-05-10 D 1889 FC JC C 25 42.5N 310 16.2 28.7 36.1 40.1
12
04-05-10 N 1891 FC IB-2 C 30 42.5N 300 13.6 23.4 30.5 34.9 PH Unit 5 Lift 16 right side wall
06-05-10 D 1894 FC IB-2 C 30 42.5N 300 13.4 23.7 31.4 34.9 PH Unit 4 Lift 86
06-05-10 N 1895 FC IB-2 C 30 42.5N 300 14.8 24.8 32.6 35.3 PH Unit 4 Lift 18
07-05-10 N 1896 FC IB-2 C 30 42.5N 300 13.7 24.3 32.9 35.8 PH Unit 1 Lift 29
07-05-10 D 1899 FC IB-2 C 30 42.5N 300 14.8 25.4 36.8 41.3 PH Unit 1 Lift 27
08-05-10 N 1902 FC IB-2 C 30 42.5N 300 14.6 24.9 32.8 36.8 PH Unit 2 Lift 20 1st Pouring
08-05-10 D 1904 FC JC C 25 42.5N 310 14.5 24.0 31.6 34.2 PH Unit 2 Lift 62 Column axis 17
10-05-10 D 1909 FC IB C 35 42.5N 330 15.3 25.7 37.5 41.7 PH Unit 3 Lift 18B
10-05-10 D 1910 FC IB C 35 42.5N 330 15.8 25.9 36.4 40.4 PH Unit 1 Lift P7B
11-05-10 N 1911 FC IB-2 C 30 42.5N 300 13.4 24.9 31.2 36.3 PH Unit 4 Lift P2
PH Unit 2 Lift 63 Column axis 14
11-05-10 D 1914 FC JC C 25 42.5N 310 15.1 24.4 30.6 34.6
& 16
12-05-10 N 1917 FC IB-2 C 30 42.5N 300 13.9 24.2 31.6 35.0 PH Unit 2 Lift 25C Wall
14-05-10 D 1921 FC IB-2 C 30 42.5N 300 14.3 24.8 33.3 36.8 PH Unit 2 Lift 25 Lift side Wall
14-05-10 N 1922 FC IB-2 C 30 42.5N 300 14.0 24.3 32.6 35.7 PH Unit 4 Lift 19 centre Wall

Page 80
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

14-05-10 D 1925 FC JC C 25 42.5N 310 15.3 24.6 33.9 39.7 PH Unit 2 Lift 63 Column axis 13
17-05-10 D 1932 FC JC C 25 42.5N 310 13.0 22.4 29.9 33.6 PH Unit 3 Lift 62 axis 10 & 12
18-05-10 N 1938 FC IB-2 C 30 42.5N 300 16.1 28.7 35.0 40.6 PH Unit 2 Lift 25A right side wall
19-05-10 D 1939 FC IB-2 C 30 42.5N 300 14.3 25.3 31.5 33.4 PH Unit 3 Lift 89
PH Unit 2 Lift 64 Column axis 17
20-05-10 D 1944 FC JC C 25 42.5N 310 13.9 22.8 30.1 35.6
& 16
22-05-10 D 1950 FC JC C 25 42.5N 310 13.8 22.3 30.3 34.2 PH Unit 1 Wall 62
23-05-10 D 1951 FC JC C 25 42.5N 310 13.4 21.0 30.8 33.3 PH Unit 2 Lift 20 & 21
23-05-10 D 1952 FC JC C 25 42.5N 310 13.3 21.1 29.9 32.1 PH Unit 2 Column Lift 64
23-05-10 D 1953 FC IB-2 C 30 42.5N 300 14.9 22.4 33.1 35.5 PH Contral building slab
24-05-10 N 1955 FC JC C 30 42.5N 310 14.9 23.1 30.1 34.8 PH Unit 2 Lift 20 & 21
25-05-10 N 1957 FC IB-2 C 30 42.5N 300 15.3 25.3 31.4 37.0 PH Unit 5 P2 slab
25-05-10 D 1959 FC JC C 25 42.5N 310 13.3 22.2 30.1 34.6 PH Unit 5 Lift 61
PH Unit 2 Lift 64 2 Column axis
25-05-10 D 1960 FC JC C 25 42.5N 310 13.6 22.9 30.2 34.6
14 & 16
26-05-10 N 1964 FC IB-2 C 30 42.5N 300 18.0 27.7 32.5 38.6 PH Unit 3 Wall 25A Right
26-05-10 N 1966 FC IB-2 C 30 42.5N 300 14.1 25.2 32.5 35.9 PH Unit 1 Lift 28 & Wall Lift 18
26-05-10 N 1968 FC IB-2 C 30 42.5N 300 14.3 24.9 33.7 37.2 PH Unit 1 Lift 28 & Wall Lift 18
27-05-10 D 1971 FC IB C 35 42.5N 330 15.1 30.2 37.9 45.2 PH Unit 2 Slab 87
28-05-10 N 1973 FC IB-2 C 30 42.5N 300 19.1 25.0 32.7 35.0 PH Unit 5 Lift 16 Left Wall
29-05-10 D 1979 FC IB C 35 42.5N 330 16.0 25.6 36.3 40.9 PH Unit 2 Lift 21B
31-05-10 D 1980 FC JC C 25 42.5N 310 13.7 22.3 30.3 35.4 PH Unit 2 Lift 63 Wall
01-06-10 N 1981 FC IB-2 C 30 42.5N 300 14.5 24.3 33.9 36.8 PH Unit 3 P4
01-06-10 D 1983 FC JC C 25 42.5N 310 13.5 25.6 33.0 37.2 PH Tailrace wall Lift 15
01-06-10 D 1985 FC M6 C 40 42.5N 380 23.8 33.6 44.4 49.8 PH Unit 3 Lift 18B
03-06-10 N 1988 FC IB-2 C 30 42.5N 300 14.8 23.2 33.5 37.1 PH Unit 5 Lift 17 Right side wall
03-06-10 D 1990 FC IB C 35 42.5N 330 15.3 26.1 37.1 39.7 PH Unit 3 Balance 18B
03-06-10 D 1991 FC M6 C 40 42.5N 380 25.8 36.7 50.6 57.2 PH Unit 1 Lift 8B
04-06-10 N 1992 FC IB-2 C 30 42.5N 300 13.6 25.1 33.5 36.7 PH Unit 3 Lift 25A Centre wall
05-06-10 N 1997 FC M6 C 40 42.5N 380 24.5 36.3 41.6 50.9 PH Unit 2 P6A Centre
06-06-10 N 1999 FC IB C 35 42.5N 330 17.6 25.3 36.1 40.5 PH Unit 2 Lift 22 A&B
06-06-10 D 2000 FC M6 C 40 42.5N 380 27.0 37.2 46.1 53.2 PH Unit 1 Lift 9B
06-06-10 N 2001 FC JC C 25 42.5N 310 14.1 23.8 30.2 34.8 PH Unit 3 Lift 90 Column axis 9

07-06-10 D 2007 FC JC C 25 42.5N 310 12.6 21.6 29.3 31.9 PH Unit 3 Lift 90 Column axis 11

08-06-10 D 2008 FC IB-2 C 30 42.5N 300 14.3 24.4 33.1 36.6 PH Unit 3 Lift 25A Left Side wall
PH Unit 3 Lift 62 Column axis 10 -
09-06-10 D 2010 FC JC C 25 42.5N 310 14.6 26.4 33.5 39.4
12
09-06-10 D 2012 FC JC C 25 42.5N 310 13.8 22.6 30.1 35.3 PH Unit 3 Lift 90 Column axis 13
PH Unit 3 Internal wall P3A, P4A
10-06-10 N 2013 FC M6 C 40 42.5N 380 24.1 33.1 42.1 50.8
& P5A
10-06-10 D 2015 FC IB C 35 42.5N 330 17.9 29.6 37.4 42.8 PH Unit 3 P5B
11-06-10 N 2018 FC IB-2 C 30 42.5N 300 15.4 24.8 32.3 36.5 PH Unit 4 Lift 19A Right side wall
11-06-10 N 2021 FC IB-2 C 30 42.5N 300 14.4 24.7 30.2 34.7 PH Unit 4 Lift 60 center
11-06-10 N 2022 FC IB C 35 42.5N 330 18.7 31.3 41.8 47.2 PH Unit 3 Lift 19B
12-06-10 N 2024 FC IB-2 C 30 42.5N 300 14.6 24.9 32.7 35.6 PH Unit 1 Lift 29 & wall lift 19
12-06-10 D 2027 FC IB-2 C 30 42.5N 300 14.8 25.1 34.3 38.8 PH Unit 1 Lift 29 & wall lift 19

Page 81
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

12-06-10 D 2029 FC IB-2 C 30 42.5N 300 14.9 24.6 33.8 36.2 PH Unit 4 Lift 19A Left side wall

13-06-10 N 2033 FC JC C 25 42.5N 310 14.8 23.6 29.8 34.3 PH Unit 4 Lift 60 Column axis 5

14-06-10 D 2034 FC JC C 25 42.5N 310 14.6 24.2 31.6 35.4 PH Unit 3 Lift 63 Column axis 13
15-06-10 D 2038 FC M6 C 40 42.5N 380 24.8 33.4 41.1 45.6 PH Unit 1 Lift P10
15-06-10 D 2039 FC JC C 25 42.5N 310 13.8 23.6 30.1 34.3 PH Unit 3 Lift 62 Column axis 9
15-06-10 D 2040 FC IB-2 C 30 42.5N 300 14.1 26.2 34.7 38.8 PH Unit 4 Lift 25A center wall
16-06-10 N 2041 FC M6 C 40 42.5N 380 25.8 37.5 47.3 55.3 PH Unit 5 P1
PH Unit 2 Lift 88 Column & small
16-06-10 D 2043 FC JC C 25 42.5N 310 15.2 22.4 29.2 31.5
wall
18-06-10 N 2045 FC IB C 35 42.5N 330 15.9 26.9 37.2 40.0 PH Unit 4 Lift 18B
18-06-10 D 2046 FC M6 C 40 42.5N 380 24.6 32.2 43.7 47.6 PH Unit 1 Lift 92
18-06-10 N 2047 FC IB-2 C 30 42.5N 300 14.4 24.3 31.2 34.4 PH Unit 1 Lift 92
19-06-10 N 2048 FC IB C 35 42.5N 330 21.9 31.0 38.8 45.4 PH Unit 2 wall P7A
19-06-10 N 2049 FC IB-2 C 30 42.5N 300 16.1 24.9 32.0 36.0 PH Unit 2 Lift 88 External wall
19-06-10 D 2051 FC JC C 25 42.5N 310 13.5 22.9 30.3 33.8 PH Unit 3 Lift 63 axis 10
20-06-10 N 2055 FC IB-2 C 30 42.5N 300 15.6 24.2 30.6 35.9 PH Unit 3 Lift 20
21-06-10 D 2058 FC JC C 25 42.5N 310 14.8 23.6 30.0 36.8 PH Unit 4 Lift 60 Column axis 9
22-06-10 N 2060 FC IB C 35 42.5N 330 17.2 25.9 35.8 40.0 PH Unit 4 Lift 87
23-06-10 N 2065 FC IB-2 C 30 42.5N 300 14.6 24.9 32.7 35.8 PH Unit 5 Lift 18A Left side wall

24-06-10 D 2069 FC IB-2 C 30 42.5N 300 15.3 24.9 32.6 36.6 PH Unit 3 Lift 63 Column axis 12
25-06-10 N 2071 FC IB C 35 42.5N 330 19.8 29.9 39.0 46.1 PH Unit 2 Lift 25B
25-06-10 N 2072 FC M6 C 40 42.5N 380 26.2 37.9 49.6 56.9 PH Unit 4 Lift P3B
PH Unit 1 Right wall Lift 28 wall
25-06-10 D 2074 FC IB-2 C 30 42.5N 300 14.1 24.5 32.3 34.8
18 & left wall
27-06-10 N 2079 FC IB C 35 42.5N 330 19.5 27.8 35.9 42.3 PH Unit 2 Lift 25B 1st Piece
27-06-10 N 2080 FC IB C 35 42.5N 330 19.7 28.1 37.0 42.5 PH Unit 2 Lift 6B
28-06-10 N 2083 FC IB-2 C 30 42.5N 300 15.0 24.5 33.7 36.2 PH Unit 4 Lift 25A left side wall

28-06-10 D 2084 FC JC C 25 42.5N 310 12.6 23.5 30.2 32.5 PH Unit 3 Lift 63 Column axis 13

28-06-10 D 2085 FC IB-2 C 30 42.5N 300 14.9 24.8 32.7 35.1 PH Unit 1 Lift wall 30 & 20 wall
PH Unit 2 Internal wall P8A, P9A,
29-06-10 D 2088 FC IB C 35 42.5N 330 20.1 32.4 39.9 45.6
P10A
29-06-10 N 2089 FC JC C 25 42.5N 310 13.3 26.6 33.4 36.3 PH Unit 3 Lift 64 Column axis 10
30-06-10 N 2091 FC IB-2 C 30 42.5N 300 14.6 24.8 32.6 36.3 PH Unit 4 Lift 19B
30-06-10 N 2092 FC IB-2 C 30 42.5N 300 14.0 23.6 32.2 36.6 PH Unit 4 Lift 25A Left side wall
PH Unit 1 Oil water seperator
30-06-10 D 2095 FC IB C 35 42.5N 330 18.7 31.5 36.2 44.9
wall
01-07-10 D 2096 FC M6 C 40 42.5N 380 25.9 36.7 51.0 60.6 PH Unit 4 P4B
02-07-10 D 2100 FC IB-2 C 30 42.5N 300 14.2 24.3 33.3 37.3 PH Unit 3 Lift 21B & 21A
03-07-10 D 2101 FC IB-2 C 30 42.5N 300 15.0 24.6 33.8 37.4 PH Unit 3 Lift 21B & 21A
05-07-10 D 2102 FC JC C 25 42.5N 310 13.6 23.3 30.1 35.3 PH Unit 1 Lift 28 wall 18 wall
06-07-10 N 2105 FC IB-2 C 30 42.5N 300 14.9 24.5 30.7 36.6 PH Unit 3 Lift 90
08-07-10 D 2106 FC IB-2 C 30 42.5N 300 14.3 24.2 33.6 36.5 PH Unit 5 Lift 18 Right side wall
08-07-10 N 2107 FC IB-2 C 30 42.5N 300 13.9 23.4 32.3 34.7 PH Unit 4 Lift 61

Page 82
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
09-07-10 D 2111 FC M6 C 40 42.5N 380 23.4 32.8 44.0 50.3 PH Unit 2 lift P6
PH Unit 3 Lift 64 Column axis 13
09-07-10 D 2112 FC JC C 25 42.5N 310 15.4 26.3 35.8 40.0
last part
10-07-10 N 2113 FC M6 C 40 42.5N 380 24.8 33.3 42.7 48.5 PH Unit 3 P6A
11-07-10 D 2116 FC IB-2 C 30 42.5N 300 14.1 24.3 33.7 36.3 PH Unit 4 Lift 20A
12-07-10 N 2118 FC IB-2 C 30 42.5N 300 14.9 24.0 33.7 36.8 PH Unit 3 Lift 21B
12-07-10 N 2119 FC IB C 35 42.5N 330 15.0 26.8 35.4 39.9 PH Unit 2 Lift 89
13-07-10 D 2124 FC JC C 30 42.5N 310 12.9 21.2 29.3 33.3 PH Unit 4 Lift 62 Column axis 6
14-07-10 N 2126 FC IB C 35 42.5N 330 16.3 26.6 35.0 37.5 PH Unit 4 P5
15-07-10 N 2127 FC IB C 35 42.5N 330 15.5 26.8 35.9 39.6 PH Unit 2 Lift 26
15-07-10 D 2128 FC JC C 30 42.5N 310 15.2 25.0 33.2 38.3 PH Unit 2 Lift 26
15-07-10 D 2130 FC JC C 25 42.5N 310 14.3 23.1 31.3 35.6 PH Unit 4 Lift 62 Column axis 5

16-07-10 D 2132 FC JC C 25 42.5N 310 13.7 24.6 32.5 36.1 PH Unit 4 Lift 62 Column axis 6
16-07-10 N 2133 FC IB C 35 42.5N 330 16.9 32.8 42.7 48.4 PH Unit 2 Lift P7B
18-07-10 D 2135 FC M6 C 40 42.5N 380 22.2 32.5 40.8 47.7 PH Unit 5 Lift 18A Centre wall
20-07-10 N 2140 FC IB-2 C 30 42.5N 300 14.5 24.8 31.3 33.6 PH Unit 5 Lift 19A Left side wall

20-07-10 D 2142 FC JC C 25 42.5N 310 13.5 23.1 29.7 33.7 PH Unit 4 Lift 62 Column axis 5
20-07-10 N 2143 FC IB C 35 42.5N 330 15.1 25.3 35.3 39.4 PH Unit 3 wall P7A
21-07-10 N 2144 FC IB-2 C 30 42.5N 300 15.3 24.3 32.2 34.9 PH Unit 4 Lift 22A & 22B
21-07-10 D 2145 FC IB-2 C 30 42.5N 300 15.3 23.9 30.6 35.7 PH Unit 5 Lift 88
21-07-10 D 2146 FC JC C 25 42.5N 310 14.4 22.8 30.6 35.8 PH Unit 4 Lift 62 Column axis 8
22-07-10 D 2148 FC IB C 35 42.5N 330 16.6 27.8 36.3 39.9 PH Unit 3 Lift 25B First Piece
23-07-10 D 2153 FC JC C 25 42.5N 310 12.9 22.5 29.1 32.7 PH Unit 4 Lift 62 Column axis 9

24-07-10 N 2155 FC IB C 35 42.5N 330 19.1 28.1 36.4 41.9 PH Unit 3 Lift 25B 2nd Piece
PH Unit 4 Lift 63 Column axis 6 &
24-07-10 N 2156 FC JC C 25 42.5N 310 14.3 23.1 31.3 35.7
5
26-07-10 D 2164 FC JC C 25 42.5N 310 13.8 22.6 30.0 35.8 PH Unit 4 Lift 63 Column axis 8

27-07-10 N 2167 FC IB-2 C 30 42.5N 300 14.1 24.0 31.6 35.6 PH Unit 5 Lift 19A Right side wall
27-07-10 D 2168 FC IB-2 C 30 42.5N 300 14.3 22.9 32.4 36.8 PH Unit 4 Lift 21B & 21A
28-07-10 N 2169 FC IB-2 C 30 42.5N 300 16.0 25.1 32.7 37.3 PH Unit 4 Lift 21B & 21A
28-07-10 D 2170 FC M6 C 40 42.5N 380 25.1 37.6 48.6 59.9 PH Unit 2 Lift P8B
30-07-10 N 2175 FC IB-2 C 30 42.5N 300 19.0 24.9 31.4 36.1 PH Unit 5 Lift 19A Centre wall
30-07-10 N 2176 FC IB-2 C 30 42.5N 300 19.2 25.1 31.1 35.7 PH Unit 2 Lift 27
30-07-10 D 2178 FC IB-2 C 30 42.5N 300 14.9 23.6 31.6 36.3 PH Unit 2 Lift 27
30-07-10 N 2180 FC M6 C 40 42.5N 380 23.9 32.1 43.3 50.4 PH Unit 1 Lift P12
31-07-10 D 2181 FC IB C 35 42.5N 330 20.9 25.3 36.8 40.6 PH Unit 1 Lift P12
03-08-10 N 2183 FC JC C 25 42.5N 310 13.7 22.1 29.6 33.8 PH Unit 4 Lift 62 wall axis 5 - 6
03-08-10 N 2185 FC IB C 35 42.5N 330 16.1 25.7 36.2 40.4 PH Unit 4 P5A Wall
04-08-10 D 2186 FC IB-2 C 30 42.5N 300 14.5 24.5 31.8 37.0 PH Unit 5 Lift 25A Left side wall
04-08-10 N 2187 FC M6 C 40 42.5N 380 23.1 35.6 47.5 53.3 PH Unit 2 P9B
04-08-10 N 2188 FC IB C 35 42.5N 330 16.8 27.3 38.4 43.6 PH Unit 2 P9B
04-08-10 N 2189 FC M6 C 40 42.5N 380 24.8 33.7 44.9 48.7 PH Unit 1 Portion of Lift 29A
05-08-10 D 2191 FC R C 25 42.5N 250 9.4 18.8 24.3 27.4 PH Unit 1 Tail race wall blinding

Page 83
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

05-08-10 D 2194 FC JC C 25 42.5N 310 14.2 22.8 30.6 34.9 PH Unit 4 Lift 63 Column axis 9
06-08-10 N 2197 FC IB-2 C 30 42.5N 300 13.9 24.6 32.7 35.8 PH Unit 4 Lift 88 Internal wall
08-08-10 N 2201 FC M6 C 40 42.5N 380 25.5 35.6 43.7 50.9 PH Unit 1 Portion of Lift 29A
08-08-10 N 2203 FC IB C 35 42.5N 330 20.0 28.1 35.2 41.5 PH Unit 3 wall P8A, P9A & P10A
09-08-10 D 2205 FC IB-2 C 30 42.5N 300 13.2 23.0 30.1 35.8 PH Unit 4 Lift 88
10-08-10 N 2206 FC IB C 35 42.5N 330 16.5 25.2 37.2 40.9 PH Unit 4 Lift 21B
11-08-10 N 2208 FC IB-2 C 30 42.5N 300 14.0 24.7 31.1 33.3 PH Unit 5 Lift 25A Right side wall
PH Unit 1 Retaining wall lift 14 -
11-08-10 D 2209 FC IB-2 C 30 42.5N 300 14.2 24.4 30.6 34.5
17 - 20 - 23
11-08-10 N 2210 FC M6 C 40 42.5N 380 23.2 36.5 45.7 51.1 PH Unit 1 Lift 30A 3rd Portion
12-08-10 N 2211 FC M6 C 40 42.5N 380 23.4 32.7 43.3 50.5 PH Unit 5 Lift P3
12-08-10 N 2212 FC IB C 35 42.5N 330 17.2 29.4 38.6 43.6 PH Unit 5 Lift P3
PH Unit 1 Lift wall 31, 32, & 20
13-08-10 N 2213 FC IB-2 C 30 42.5N 300 14.8 23.9 31.0 36.2
wall
PH Unit 1 Lift wall 31, 32, & 20
13-08-10 D 2215 FC IB C 35 42.5N 330 15.3 25.7 37.5 40.3
wall
14-08-10 N 2217 FC IB-2 C 30 42.5N 300 14.2 24.2 32.5 36.3 PH Unit 5 Central wall Lift 25A
14-08-10 N 2218 FC IB-2 C 30 42.5N 300 14.0 24.4 31.3 35.5 PH Unit 3 Lift 26
14-08-10 D 2220 FC IB-2 C 30 42.5N 300 14.9 25.3 32.8 36.5 PH Unit 3 Lift 26
PH Unit 1 C/P for Lift 25A & wall
14-08-10 N 2221 FC M6 C 40 42.5N 380 21.3 37.3 47.1 53.6
19 1st Portion
17-08-10 N 2223 FC IB C 35 42.5N 330 15.5 26.7 37.6 42.6 PH Unit 5 P5A Wall
17-08-10 D 2225 FC JC C 25 42.5N 310 13.6 22.2 29.2 33.5 PH Unit 4 Lift 64 Column axis 9
PH Rail race wall lift 15, 16, 18, &
18-08-10 N 2226 FC JC C 25 42.5N 310 16.2 26.6 33.7 39.7
19
st
18-08-10 N 2227 FC M6 C 40 42.5N 380 23.2 36.6 46.9 50.7 PH Unit 4 Lift 25A 1 Portion

PH Unit 1 2nd Stage of contriliver


19-08-10 N 2230 FC M6 C 40 42.5N 380 22.7 31.7 42.8 46.9
portion wall 18, 19 & Lift 29 - 30
20-08-10 N 2232 FC IB C 35 42.5N 330 15.7 29.4 37.7 41.1 PH Tailrace wall
20-08-10 D 2233 FC JC C 25 42.5N 310 13.0 22.4 29.9 33.5 PH Unit 4 Lift P6A
21-08-10 N 2235 FC IB C 35 42.5N 330 15.9 25.1 36.2 41.6 PH Unit 4 Lift 22A & 22B
PH Unit 1 Centre wall Lift 29
21-08-10 D 2237 FC JC C 25 42.5N 310 13.3 21.9 29.9 33.1
Partial wall
PH Tailrace Foundation lift
21-08-10 D 2238 FC IB-2 C 30 42.5N 300 14.5 24.3 33.1 36.5
26, 29, 32, & 35
21-08-10 N 2239 FC JC C 25 42.5N 310 13.2 24.1 30.3 35.6 PH Unit 1 Right wall Lift 31A
22-08-10 N 2240 FC IB C 35 42.5N 330 23.8 31.1 41.0 47.4 PH Unit 3 Lift 92
22-08-10 D 2241 FC M6 C 40 42.5N 380 25.3 36.1 44.5 51.1 PH Unit 1 Lift P13
23-08-10 N 2242 FC IB C 35 42.5N 330 21.3 32.0 39.6 43.9 PH Unit 3 Lift P6B
23-08-10 N 2243 FC IB C 35 42.5N 330 15.1 26.6 37.2 41.4 PH Unit 5 Lift 89
23-08-10 D 2245 FC JC C 25 42.5N 310 13.9 23.6 30.3 35.8 PH Unit 4 Lift 62 wall axis 8 - 9
24-08-10 D 2246 FC IB-2 C 30 42.5N 300 14.8 23.0 32.7 35.7 PH Unit 5 Lift P6A
25-08-10 D 2247A FC M6 C 40 42.5N 380 23.8 34.6 41.6 47.8 PH Unit 1 Lift 30 AXIS 21
25-08-10 N 2249 FC JC C 25 42.5N 310 14.1 22.6 29.3 34.6 PH Unit 2 Lift 90 Column axis 17
26-08-10 N 2251 FC IB C 35 42.5N 330 17.3 28.6 37.3 42.6 PH Unit 5 Lift 18B 1st Pouring

PH Unit 1 3rd Stage of contrilever


26-08-10 D 2252 FC M6 C 40 42.5N 380 21.3 31.4 41.8 49.7
portion Lift 29 & wall 19
26-08-10 D 2253 FC IB C 35 42.5N 330 16.3 26.9 36.2 40.3 PH Unit 5 Lift 18B

Page 84
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
26-08-10 N 2254 FC IB C 35 42.5N 330 19.2 33.1 41.0 47.1 PH Unit 2 Lift 28
26-08-10 D 2255 FC JC C 25 42.5N 310 13.8 24.8 34.8 39.4 PH Unit 2 Lift 90 Column axis 13
27-08-10 D 2257 FC M6 C 40 42.5N 380 25.4 38.9 49.3 55.0 PH Unit 5 Lift P4B
PH Tailrace wall lift 3, 4, 6, 7,
27-08-10 N 2258 FC JC C 25 42.5N 310 12.1 21.1 31.7 34.0
9, 10 & 13
27-08-10 D 2259 FC IB C 35 42.5N 330 19.5 30.6 45.4 51.4 PH Unit 5 Lift 18B last Pouring
PH Tailrace Foundation wall
30-08-10 D 2262 FC JC C 25 42.5N 310 14.0 25.6 33.0 37.6
lift 38, 41, 44, & 47
30-08-10 D 2263 FC JC C 25 42.5N 310 13.9 22.4 30.6 34.9 PH Unit 4 Lift 63 wall axis 5 - 6
30-08-10 D 2264 FC JC C 25 42.5N 310 13.3 23.4 31.1 35.4 PH Unit 5 Lift 90 Column axis 3
30-08-10 N 2266 FC M6 C 40 42.5N 380 22.4 31.4 40.5 46.0 PH Unit 2 Lift P10
30-08-10 N 2267 FC IB C 35 42.5N 330 15.8 26.9 37.2 44.6 PH Unit 2 Lift P10
31-08-10 D 2269 FC IB C 35 42.5N 330 17.6 28.3 39.2 43.8 PH Unit 5 Lift 90 Column axis 5
31-08-10 D 2270 FC IB C 35 42.5N 330 16.8 25.1 36.6 39.2 PH Unit 4 Lift 26
01-09-10 D 2272 FC IB C 35 42.5N 330 16.7 27.3 38.1 43.6 PH Unit 4 Lift 26
PH Tailrace wall lift 27, 28,
01-09-10 D 2273 FC IB C 35 42.5N 330 16.5 27.1 35.4 40.7
30, 31, 34, 36, & 37
PH Over gravity dam 3rd portion
02-09-10 N 2274 FC M6 C 40 42.5N 380 27.8 35.7 44.8 52.4
cantilever wall 20 & Unit 1 lift 31A
02-09-10 N 2276 FC IB C 35 42.5N 330 20.4 32.5 40.0 46.1 PH Unit 5 Lift P7A
03-09-10 D 2279 FC JC C 25 42.5N 310 14.1 22.2 30.3 35.3 PH Unit 5 Lift 62 Column axis 5
04-09-10 D 2281 FC IB C 35 42.5N 330 18.3 30.2 42.7 48.3 PH Tailrace wall Foundation
05-09-10 N 2283 FC IB C 35 42.5N 330 21.3 31.4 41.7 47.0 PH Unit 5 Lift 19B
PH Unit 1 Cantilever Portion lift
05-09-10 D 2284 FC M6 C 40 42.5N 380 24.2 34.6 43.0 49.6
31 of Middle wall
05-09-10 D 2285 FC JC C 25 42.5N 310 14.2 23.3 31.2 36.6 PH Unit 5 Lift 62 Column axis 4
PH Unit 1Over gravity dam left
06-09-10 N 2286 FC M6 C 40 42.5N 380 26.1 35.6 47.4 55.3
wall
07-09-10 N 2288 FC IB C 35 42.5N 330 19.9 31.4 38.5 43.1 PH Unit 5 Lift P5B
07-09-10 N 2290 FC IB C 35 42.5N 330 21.5 29.5 42.4 47.7 PH Unit 3 Lift 27
08-09-10 N 2291 FC IB C 35 42.5N 330 22.7 30.1 42.2 49.8 PH Unit 1 P14 Wall & 2 Columns
08-09-10 D 2293 FC JC C 25 42.5N 310 12.3 24.5 32.0 38.0 PH Unit 2 Lift 91
09-09-10 N 2296 FC IB C 35 42.5N 330 21.8 31.2 39.7 45.6 PH Unit 5 Lift P9A - P10A
09-09-10 N 2297 FC IB C 35 42.5N 330 16.5 28.8 35.8 40.0 PH Tailrace wall lift 50, 64
09-09-10 D 2298 FC JC C 25 42.5N 310 12.8 21.3 29.6 33.4 PH Unit 5 Lift 62 Column axis 4
12-09-10 N 2300 FC IB C 35 42.5N 330 19.8 28.0 36.3 41.7 PH Unit 2 Lift 29
13-09-10 N 2302 FC IB C 35 42.5N 330 22.2 30.5 43.0 48.8 PH Unit 2 Lift 23
14-09-10 N 2305 FC M6 C 40 42.5N 380 23.4 33.9 43.2 50.1 PH Unit 5 Lift 20A
14-09-10 N 2306 FC M6 C 40 42.5N 380 21.3 37.4 47.5 54.1 PH Unit 3 P6
15-09-10 D 2307 FC IB C 35 42.5N 330 18.3 32.0 43.8 49.1 PH Unit 4 Lift P7A
18-09-10 N 2314 FC IB C 35 42.5N 330 17.3 30.5 40.6 47.5 PH Unit 4 Lift 27
22-09-10 N 2321 FC IB C 35 42.5N 330 16.6 26.9 35.3 41.2 PH Unit 3 Lift 23
PH Unit 2 Lift 19A Cantilever 1st
22-09-10 D 2322 FC IB C 35 42.5N 330 16.9 27.8 38.9 43.6
Phase
23-09-10 N 2325 FC IB C 35 42.5N 330 20.9 32.4 37.6 43.0 PH Unit 1 Lift P15
PH Unit 1 W. Block Lift 32 W21,
23-09-10 D 2327 FC JC C 25 42.5N 310 14.3 23.6 32.1 36.9
U.B.W

Page 85
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
25-09-10 N 2331 FC JC C 25 42.5N 310 15.9 25.5 33.8 38.8 PH Unit 3 Lift 28
25-09-10 N 2332 FC IB C 35 42.5N 330 16.3 29.7 39.2 43.6 PH Unit 5 Lift 91
25-09-10 D 2333 FC JC C 25 42.5N 310 13.8 22.1 30.2 35.9 PH Unit 3 Lift 28
26-09-10 N 2335 FC IB C 35 42.5N 330 22.4 31.9 43.1 49.7 PH Unit 3 P7B
26-09-10 D 2336 FC JC C 25 42.5N 310 14.3 23.8 29.6 34.2 PH Unit 5 Lift 63 Column axis 4
PH Contral building slab at
26-09-10 D 2337 FC JC C 25 42.5N 310 12.2 22.9 29.6 35.5
EL:1109 - 29
st
28-09-10 D 2343 FC IB C 35 42.5N 330 18.5 30.9 39.4 46.5 PH Unit 5 Lift 25B 1 POUR
29-09-10 D 2347 FC JC C 25 42.5N 310 17.0 28.2 34.3 43.9 PH Unit 5 Lift 20B - 21A
29-09-10 N 2348 FC IB C 35 42.5N 330 16.6 31.6 41.2 45.9 PH Unit 5 Lift P8A - P9A
30-09-10 N 2349 FC JC C 25 42.5N 310 12.8 21.9 29.4 34.4 PH Unit 5 Lift 20B - 21A
PH Unit 2 Lift 29A Cantilever Lift
30-09-10 N 2350 FC M6 C 40 42.5N 380 27.0 36.2 44.9 53.9
C wall
30-09-10 D 2351 FC JC C 25 42.5N 310 12.2 22.5 30.4 35.5 PH Unit 5 Lift 64 Column axis 2
30-09-10 D 2352 FC IB C 35 42.5N 330 16.7 28.5 37.1 43.6 PH Unit 2 Lift 92
01-10-10 N 2354 FC IB C 35 42.5N 330 17.0 29.1 37.7 43.3 PH Unit 4 Lift 89
01-10-10 D 2357 FC IB C 35 42.5N 330 18.2 31.6 43.4 48.9 PH Unit 5 Lift 25B 2nd PHASE
PH Unit 2 Lift 30B & Cantilever
05-10-10 N 2360 FC JC C 25 42.5N 310 15.3 26.4 34.3 39.4
30A, C Left C wall
PH Unit 5 Lift 64 Column axis 4 &
06-10-10 D 2364 FC JC C 25 42.5N 310 13.1 24.2 30.4 36.1
5
07-10-10 N 2366 FC M6 C 40 42.5N 380 30.6 36.7 45.1 50.6 PH Unit 1 Lift 33/wall 21
07-10-10 D 2369 FC M6 C 40 42.5N 380 24.4 33.3 42.3 47.9 PH Unit 1 Lift P11
08-10-10 N 2372 FC JC C 25 42.5N 310 15.0 24.5 32.4 39.7 PH Unit 2 Lift 24
PH Unit 2 Lift 29A Cantilever 1st
09-10-10 N 2374 FC M6 C 40 42.5N 380 24.8 34.6 43.3 48.8
PHASE Right side
12-10-10 N 2377 FC IB C 35 42.5N 330 16.8 28.2 37.3 42.7 PH Unit 4 Lift 28
12-10-10 D 2379 FC IB C 35 42.5N 330 16.9 27.3 38.6 43.5 PH Unit 4 Lift 28
13-10-10 D 2380 FC JC C 25 42.5N 310 12.4 20.2 28.5 32.6 PH Unit 4 Lift 90 Column
13-10-10 N 2382 FC M6 C 40 42.5N 380 23.9 35.2 46.4 50.8 PH Unit 2 Lift 29/30 Cantilever
13-10-10 D 2385 FC JC C 25 42.5N 310 13.1 21.8 29.6 33.8 PH Unit 4 Lift 90 Column axis 7
14-10-10 N 2386 FC IB C 35 42.5N 330 20.9 31.6 40.9 47.7 PH Unit 5 Lift 21B
PH Unit 2 Lift 30A Cantilever 3rd
14-10-10 D 2387 FC M6 C 40 42.5N 380 24.4 31.1 43.3 49.7
PHASE
16-10-10 N 2391 FC IB C 35 42.5N 330 17.3 30.6 37.0 42.5 PH Unit 3 Lift 29B
18-10-10 D 2394 FC M6 C 40 42.5N 380 22.7 35.1 46.1 53.6 PH Unit 4 Pit P6B
19-10-10 D 2396 FC IB C 35 42.5N 330 21.0 30.8 40.0 48.8 PH Unit 2 Pit P12
19-10-10 N 2397 FC JC C 25 42.5N 310 13.2 21.2 30.3 34.8 PH Unit 5 Lift 63 Column axis 5
22-10-10 N 2401 FC JC C 25 42.5N 310 15.5 27.1 31.4 37.4 PH Unit 5 Lift 22A & 22B
22-10-10 D 2402 FC M6 C 40 42.5N 380 22.3 35.4 43.3 51.6 PH Unit 3 Lift P8B
23-10-10 N 2404 FC JC C 25 42.5N 310 14.3 25.3 32.2 35.6 PH Unit 4 Lift 91
PH Unit 1 Lift 64 Wall between
25-10-10 N 2408 FC JC C 25 42.5N 310 13.9 22.3 29.5 35.4
axis 18 & 20C
25-10-10 N 2409 FC M6 C 40 42.5N 380 24.1 35.3 45.3 48.2 PH Unit 2 Lift P13
PH Unit 3 Lift 29A Cantilever 2nd
25-10-10 N 2410 FC M6 C 40 42.5N 380 23.7 35.2 44.7 50.3
Pour centre wall axis 11
PH Unit 3 Lift 29A Cantilever 1st
26-10-10 N 2411 FC M6 C 40 42.5N 380 24.8 36.1 44.3 49.9
Pour right side wall axis 9
26-10-10 D 2414 FC M6 C 40 42.5N 380 23.9 36.6 45.2 57.8 PH Unit 3 Lift P9B
PH Unit 5 Lift 62 Wall between
27-10-10 N 2415 FC JC C 25 42.5N 310 14.2 24.1 31.3 37.2
axis 1 & 2 upto EL - 1100.90

Page 86
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
27-10-10 D 2416 FC JC C 25 42.5N 310 15.9 24.7 31.6 38.7 PH Unit 4 Lift 23
28-10-10 N 2418 FC JC C 25 42.5N 310 15.8 24.2 31.4 36.9 PH Unit 4 Lift P7B
28-10-10 N 2419 FC M6 C 40 42.5N 380 26.6 36.6 45.5 56.8 PH Unit 2 Lift 31A & 31B/32
28-10-10 D 2420 FC JC C 25 42.5N 310 13.7 22.8 29.1 36.6 PH Unit 2 Lift 31A & 31B/32
PH Unit 5 Lift 64 Column axis 1
29-10-10 N 2421 FC JC C 25 42.5N 310 15.3 24.0 31.4 39.9
EL:1107.86
29-10-10 N 2422 FC JC C 25 42.5N 310 15.5 23.3 31.3 38.2 PH Unit 3 Lift 24
PH Unit 1 Lift 64 Wall axis 18 &
29-10-10 D 2423 FC JC C 25 42.5N 310 13.3 22.6 29.8 34.5
20
30-10-10 D 2427 FC IB C 35 42.5N 330 16.8 28.1 35.4 39.5 PH Unit 5 Lift 26
PH Unit 5 Lift 63 Wall between
30-10-10 N 2429 FC JC C 25 42.5N 310 14.0 22.8 30.6 37.1
axis 4 & 5
30-10-10 N 2430 FC JC C 25 42.5N 310 17.6 23.9 31.2 37.5 PH Unit 2 Lift 92
PH Unit 3 Lift 30A & 30B Centre
30-10-10 D 2431 FC JC C 25 42.5N 310 14.8 23.6 32.3 37.6
right side
31-10-10 D 2432 FC JC C 25 42.5N 310 14.9 23.6 31.6 35.7 PH Unit 4 Lift 29B right side wall
PH Unit 3 Lift 30A Cantilever
02-11-10 2433 FC M6 C 40 42.5N 380 22.3 32.8 42.4 46.3
right side
PH Unit 1 & 3 STOP LOG 1 2nd
02-11-10 2435 FC M6 C 40 42.5N 380 23.8 34.3 44.8 49.6
PHASE CONCRETE
02-11-10 2436 FC JC C 25 42.5N 310 12.9 21.7 29.6 36.4 PH Control building wall axis 28
nd
PH Unit 2 bottom beam 2
03-11-10 2437 FC M6 C 40 42.5N 380 25.3 34.4 45.6 50.4
phase
PH Unit 3 Lift 20A Cantilever left
03-11-10 2439 FC M6 C 40 42.5N 380 23.8 34.1 45.2 52.3
wall 3rd stage
05-11-10 2444 FC JC C 25 42.5N 310 16.7 25.9 34.6 39.7 PH Unit 3 Lift P10
05-11-10 2445 FC M6 C 40 42.5N 380 22.8 38.2 46.1 49.5 PH Unit 3 Lift P10
07-11-10 2448 FC JC C 25 42.5N 310 15.9 26.5 31.3 41.2 PH Unit 2 Lift P14
07-11-10 2449 FC JC C 25 42.5N 310 12.0 21.2 30.2 33.9 PH Unit 5 Lift 23
PH Unit 3 Lift 29A & 30A
08-11-10 2450 FC M6 C 40 42.5N 380 22.7 35.4 46.3 52.1
Cantilever Axis 13C
PH Unit 3 Lift 30A Cantilever left
09-11-10 2454 FC M6 C 40 42.5N 380 25.8 34.5 44.3 49.4
wall 3rd stage
10-11-10 2455 FC M6 C 40 42.5N 380 28.0 36.3 47.8 55.2 PH Unit 2 Lift P11
11-11-10 2460 FC JC C 25 42.5N 310 15.6 23.3 31.2 36.6 PH Unit 4 Lift 30B
11-11-10 2461 FC JC C 25 42.5N 310 12.3 25.1 34.4 40.1 PH Unit 2 Lift P14 Column & wall
PH Control building column axis
13-11-10 2464 FC JC C 25 42.5N 310 13.4 23.1 30.4 35.3
28
13-11-10 2466 FC M6 C 40 42.5N 380 23.5 34.4 42.3 48.8 PH Unit 4 Lift P8B
15-11-10 2467 FC IB C 35 42.5N 330 15.1 30.1 39.1 44.6 PH Unit 5 Lift 27
16-11-10 2468 FC JC C 25 42.5N 310 14.1 22.3 30.6 36.3 PH Unit 5 Lift 27
17-11-10 2470 FC JC C 25 42.5N 310 11.7 21.1 28.5 31.1 PH Unit 4 Lift 92
18-11-10 2473 FC M6 C 40 42.5N 380 25.3 37.5 47.3 51.9 PH Unit 4 Lift 29A Axis 7
18-11-10 2475 FC JC C 25 42.5N 310 11.9 23.1 29.9 35.7 PH Unit 4 Lift P9B
PH Unit 4 Lift 29A Cantilever
19-11-10 2478 FC M6 C 40 42.5N 380 25.8 34.6 45.4 49.8
right side 1st phase
PH Unit 3 Lift 31A & 32
20-11-10 2479 FC JC C 25 42.5N 310 11.1 21.4 29.6 33.7
Cantilever
21-11-10 2480 FC JC C 25 42.5N 310 14.7 25.0 32.7 38.6 PH Unit 4 Lift 24
PH Unit 4 Lift 29A & 30A
22-11-10 2483 FC M6 C 40 42.5N 380 21.8 34.6 44.1 48.2 Cantilever Centre wall Axis 7 2nd
Stage

Page 87
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
PH Unit 2 Lift 83 Deck Bridge 1st
22-11-10 2484 FC IB C 35 42.5N 330 17.5 27.9 37.6 41.7
Phase
PH Unit 4 Lift 29A & 30A
23-11-10 2485 FC M6 C 40 42.5N 380 20.7 33.8 43.5 47.5
Cantilever 2nd Phase wall Axis 5

PH Unit 4 Lift 30A Cantilever 3rd


23-11-10 2487 FC M6 C 40 42.5N 380 20.9 34.0 43.5 50.3
Phase Right wall
rd
PH Unit 4 Lift 30A Cantilever 3
24-11-10 2488 FC M6 C 40 42.5N 380 22.7 36.3 42.8 49.5
Phase Centre wall
24-11-10 2489 FC JC C 25 42.5N 310 11.9 22.4 33.0 35.3 PH Unit 2 Lift P15
26-11-10 2493 FC JC C 25 42.5N 310 11.6 24.5 32.7 38.4 PH Unit 4 Lift P10B
28-11-10 2494 FC JC C 25 42.5N 310 14.9 21.6 28.3 34.1 PH Unit 5 Lift 28 1st Phase
28-11-10 2495 FC JC C 25 42.5N 310 12.9 21.6 28.9 31.2 PH Unit 5 Lift 28 2nd Phase
01-12-10 2498 FC JC C 25 42.5N 310 11.8 21.4 29.5 34.1 PH Unit 5 Lift 24
02-12-10 2500 FC JC C 25 42.5N 310 12.9 20.1 29.6 33.5 PH Unit 4 Lift 31B & 32
PH Unit 4 Lift 29A Cantilever 4th
03-12-10 2503 FC M6 C 40 42.5N 380 26.1 38.1 44.8 51.1
wall
PH Unit 4 Lift 29A/30A Cantilever
04-12-10 2506 FC M6 C 40 42.5N 380 22.0 34.1 44.3 48.6
3rd Phase Left wall
PH Unit 4 Lift 31A Cantilever
06-12-10 2507 FC M6 C 40 42.5N 380 23.1 35.4 44.9 49.7
Right wall
PH Unit 4 Lift 31A 4th Cantilever
06-12-10 2508 FC M6 C 40 42.5N 380 29.6 41.0 50.1 54.5
Left wall
06-12-10 2509 FC M6 C 40 42.5N 380 28.7 36.6 49.7 54.4 PH Unit 4 Centre wall Cantilever
PH Unit 5 Lift P10A & P12A
07-12-10 2512 FC JC C 25 42.5N 310 12.1 21.9 29.7 34.3
Partial
th
PH Unit 4 Lift 31A 4 Stage
09-12-10 2516 FC M6 C 40 42.5N 380 22.5 37.3 44.8 51.2
Cantilever Left wall
11-12-10 2519 FC JC C 25 42.5N 310 11.9 20.1 29.3 34.0 PH Unit 5 Lift 29B & 30B
11-12-10 2520 FC JC C 25 42.5N 310 13.5 23.9 33.9 38.6 PH Unit 5 Lift 29B & 30B
13-12-10 2522 FC M6 C 40 42.5N 380 22.9 38.8 48.4 53.4 PH Unit 5 P6B
PH Unit 3 Lift 92 Transformer
13-12-10 2524 FC JC C 25 42.5N 310 14.6 23.1 31.4 37.4
wall 9A
15-12-10 2528 FC M6 C 40 42.5N 380 20.4 33.0 40.4 46.7 PH Unit 3 Lift P12
15-12-10 2529 FC JC C 25 42.5N 310 11.4 20.3 27.3 NILL PH Unit 3 Lift P12
16-12-10 2534 FC JC C 25 42.5N 310 13.9 22.3 29.2 34.6 PH Unit 2 Steel Cantilever lift 24
17-12-10 2535 FC JC C 25 42.5N 310 11.0 20.8 29.6 34.6 PH Area fire fighting tank
19-12-10 2538 FC JC C 25 42.5N 310 13.1 22.5 29.9 36.0 PH Unit 5 Lift P13A - P14A
19-12-10 2539 FC JC C 25 42.5N 310 12.8 22.9 31.1 37.4 PH Unit 3 Lift P13
21-12-10 2542 FC JC C 25 42.5N 310 11.0 20.2 30.6 34.5 PH Unit 5 Lift P7B
29-12-10 2545 FC JC C 25 42.5N 310 12.5 21.2 28.8 33.1 PH Unit 5 Lift 31B & 32
30-12-10 2547 FC IB C 35 42.5N 330 15.3 27.9 36.1 41.3 PH Unit 3 Lift 33
30-12-10 2548 FC JC C 25 42.5N 310 13.2 24.2 31.2 35.9 PH Unit 3 Lift P14
30-12-10 2549 FC JC C 25 42.5N 310 12.6 22.4 29.5 34.3 PH Unit 5 Lift P15A
PH Unit 5 Lift 64 Wall between
30-12-10 2550 FC JC C 25 42.5N 310 13.2 22.4 30.0 35.6
axis 1 & 2 EL:1114.50
04-01-11 D 2555 FC IB C 35 42.5N 330 15.4 26.8 36.5 40.3 PH Unit 4 Lift 33
04-01-11 D 2556 FC M6 C 40 42.5N 380 20.9 35.5 45.1 50.7 PH Unit 5 Cantilever Lift 29A
05-01-11 D 2560 FC M6 C 40 42.5N 380 23.8 32.7 43.8 50.3 PH Unit 5 Cantilever Lift 30A
06-01-11 D 2561 FC JC C 25 42.5N 310 13.3 20.8 30.1 35.9 PH Unit 3 Steel Cantilever
07-01-11 D 2565 FC M6 C 40 42.5N 380 21.8 35.1 44.5 49.8 PH Unit 5 Cantilever Lift 29A
08-01-11 D 2567 FC IB-2 C 30 42.5N 300 13.6 23.4 34.5 34.2 PH Unit 5 Lift 62A (1/2)

Page 88
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

Power House UNITS


Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
PH Unit 4 Steel Cantilever
08-01-11 D 2566 FC JC C 25 42.5N 310 13.2 21.5 29.2 39.6
roof
10-01-11 D 2568 FC M6 C 40 42.5N 380 21.6 32.1 40.2 46.7 PH Unit 5 Lift 30A Left wall
11-01-11 D 2569 FC JC C 25 42.5N 310 12.6 23.3 31.6 36.3 PH Unit 3 Lift P14 Wall
12-01-11 D 2571 FC M6 C 40 42.5N 380 20.4 33.6 41.8 48.4 PH Unit 5 Lift 31A Cantilever wall
PH Unit 5 Lift 31A Cantilever wall
14-01-11 D 2575 FC M6 C 40 42.5N 380 19.3 31.7 43.9 48.6
4th Phase
15-01-11 D 2576 FC JC C 25 42.5N 310 12.9 21.7 29.7 33.9 PH Unit 5 Lift 62A
15-01-11 D 2577 FC JC C 25 42.5N 310 10.2 21.1 30.3 36.2 PH Unit 3 Lift P15
19-01-11 D 2583 FC M6 C 40 42.5N 380 23.2 34.6 43.5 48.1 PH Unit 5 Lift P8
22-01-11 D 2587 FC JC C 25 42.5N 310 15.3 23.8 30.3 49.4 PH Unit 4 Lift P12
22-01-11 D 2586 FC M6 C 40 42.5N 380 24.5 35.9 44.3 36.3 PH Unit 4 Lift P12
23-01-11 D 2589 FC IB-2 C 30 42.5N 300 13.6 24.5 31.7 37.7 PH Unit 5 Lift 63A
PH Unit 2 Lift 64 Wall Between
24-01-11 D 2591 FC JC C 25 42.5N 310 13.0 22.4 30.6 36.9
A14/16
26-01-11 D 2595 FC JC C 25 42.5N 310 11.8 20.5 29.4 35.6 PH Unit 4 P13
27-01-11 D 2597 FC JC C 25 42.5N 310 11.2 21.3 29.9 33.6 PH Unit 5 Lift 33
27-01-11 D 2598 FC JC C 25 42.5N 310 11.1 20.3 28.7 33.3 PH Unit 5 Lift P9B
27-01-11 D 2599 FC M6 C 40 42.5N 380 22.1 33.6 44.8 50.3 PH Unit 5 Lift P9B
03-02-11 D 2606 FC JC C 25 42.5N 310 12.6 20.5 30.3 36.9 PH Unit 4 Lift P14
PH Unit 2 Lift 32 Wall 2nd Phase
03-02-11 D 2607 FC JC C 25 42.5N 310 13.2 21.1 30.3 36.8
concrete
04-02-11 D 2610 FC IB-2 C 30 42.5N 300 14.9 24.8 32.6 36.5 PH Unit 5 Lift 63A
PH Unit 4 Lift P14 (Column &
07-02-11 D 2613 FC JC C 25 42.5N 310 13.6 21.4 30.0 35.9
Wall)
09-02-11 D 2616 FC IB-2 C 30 42.5N 300 15.7 24.5 33.7 37.5 PH Unit 5 Lift P10
13-02-11 D 2623 FC IB-2 C 30 42.5N 300 14.2 24.2 34.6 39.8 PH Unit 5 WALL
13-02-11 D 2624 FC IB-2 C 30 42.5N 300 22.2 33.1 34.6 49.3 PH UNIT 3 Lift P11
15-02-11 D 2626 FC IB-2 C 30 42.5N 300 11.0 21.2 30.8 36.4 PH UNIT 4 Lift P15
13-03-11 D 2648 FC JC C 25 42.5N 310 11.7 21.9 31.1 37.0 PH Unit 5 Lift P12

13-03-11 D 2649 FC M6 C 40 42.5N 380 23.6 34.9 46.6 51.9 PH Unit 5 Lift P12

18-03-11 D 2658 FC JC C 25 42.5N 310 13.2 21.4 32.2 37.1 PH Unit 4 Transformer room

18-03-11 D 2659 FC JC C 25 42.5N 310 12.4 22.0 30.5 35.5 PH Unit 5 Lift P13
28-03-11 D 2666 FC JC C 25 42.5N 310 11.9 20.1 32.2 35.6 PH Unit 5 Lift P14
30-03-11 D 2669 FC M6 C 40 42.5N 380 18.2 34.2 42.3 49.2 PH Unit 4 Lift P11
07-04-11 D 2678 FC JC C 25 42.5N 310 13.3 22.5 31.9 PH Unit 5 Lift 64A
12-04-11 D 2684 FC JC C 25 42.5N 310 12.8 23.2 31.1 PH Unit 5 Lift P15
19-04-11 D 2689 FC JC C 25 42.5N 310 11.8 23.5 30.4 PH Unit 5 Lift 64A
21-04-11 D 2693 FC JC C 25 42.5N 310 13.9 22.2 31.0 PH Unit 5 Lift 64A 3rd Stage
03-05-11 D 2700 FC M6 C 40 42.5N 380 19.8 32.7 47.7 PH Unit 5 Lift P11
21-05-11 D 2711 FC IB C 35 42.5N 330 19.0 29.8 39.1 PH Unit 3 Lift P6B Floor

Page 89
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

ERECTION BAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

30-06-08 D 147 FC 15 C 15 32.5R 250 10.3 16.6 21.77


04-07-08 D 152 FC 15 C 15 32.5R 250 10.3 16.86 22.08
12-09-08 D 281 FC D2 C 15 42.5N 250 13.2 27.3 34.4 38.7
13-09-08 D 282 FC D2 C 15 42.5N 250 16.5 24.9 30.2 32.4
26-09-08 D 296 FC S C 15 42.5N 250 13.0 20.8 30.2 33.1
06-10-08 D 301 FC S C 15 42.5N 250 14.2 24.6 28.8 34.6
10-10-08 D 308 FC S C 15 42.5N 250 12.2 23.7 29.5 36.1
27-10-08 N 324 FC JC - B C 25 42.5N 300 10.3 25.9 30.9 35.2

28-10-08 D 325 FC JC - B C 25 42.5N 300 17.9 26.1 34.1 37.7

30-10-08 D 326 FC IB - B C 25 42.5N 300 17.2 25.5 36.5 39.6 EB BEAM LINE 22

09-11-08 D 333 FC IB - B C 25 42.5N 300 24.1 35.3 39.4 50.3 EB BEAM LINE 24

19-11-08 N 344 FC IB - B C 25 42.5N 300 15.6 33.5 41.1 47.7 EB BEAM LINE 26

10-12-08 N 364 FC JC - B C 25 42.5N 300 19.7 31.5 40.8 47.6 EB BEAM LINE 22

19-12-08 D 378 FC IB C 25 42.5N 300 16.1 28.1 36.1 43.6 EB BEAM LINE 24 L 1

06-01-09 386 FC IB C 25 42.5N 300 11.1 24.6 31.0 36.6 EB BEAM LINE 24 L 2

12-01-09 395 FC IB C 25 42.5N 300 17.1 28.0 35.7 40.0 SB AXIS 25 1083-1086

21-01-09 409 FC IB C 25 42.5N 300 12.6 28.9 39.3 45.3 EB BEAM LINE 24 L 22

29-01-09 421 FC IB-2 C 25 42.5N 270 15.0 29.9 38.7 41.6 EB BEAM LINE 25 L 2

09-02-09 434 FC IB C 25 42.5N 300 13.1 36.3 45.4 48.5 EB BEAM LINE 26 1st WALL

18-02-09 451 FC IB C 25 42.5N 300 14.2 29.4 37.0 41.3 EB BEAM LINE 26 2ndWALL

23-03-09 506 FC IB C 35 42.5N 300 15.3 22.9 35.2 39.6 CB LINE 28 1st LIFT W

30-03-09 514 FC IB C 35 42.5N 300 11.9 22.4 31.6 34.2 CB LINE 28 2nd LIFT W

31-03-09 515 FC IB-2 C 25 42.5N 270 12.3 24.0 32.1 36.1 EB SLAB LINE 22-25

07-04-09 531 FC IB C 35 42.5N 300 13.0 21.8 31.3 34.8 CB LINE 27 1st LIFT W

14-04-09 541 FC IB C 35 42.5N 300 11.9 24.4 33.1 36.9 CB LINE 27 2nd LIFT W

23-04-09 551 FC IB C 35 42.5N 300 14.8 25.1 31.3 34.5 EB WALL LINE 22-24

28-04-09 563 FC S C 15 42.5N 250 18.2 25.8 33.6 37.9 EB BLIND. LINE 25 EL-1090

30-04-09 568 FC IB C 35 42.5N 300 15.4 25.9 32.0 36.7 EB COLUMN 5 LINE 22 EL-1090

05-05-09 575 FC IB C 35 42.5N 300 15.4 27.2 34.9 38.7 ERECTION BAY WALL

07-05-09 580 FC IB C 35 42.5N 300 14.2 28.5 35.9 40.4 EB & CONTROL BUILDING

07-05-09 581 FC IB-2 C 30 42.5N 270 12.5 25.5 34.8 39.7 EB & CONTROL BUILDING

Page 90
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

ERECTION BAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

15-05-09 600 FC IB C 35 42.5N 300 13.3 29.0 37.8 40.4 EB -C- LINE 25

22-05-09 612 FC IB C 35 42.5N 300 15.2 26.2 37.2 42.9 EB - AXIS 26 C

01-06-09 627 FC IB C 35 42.5N 300 16.5 26.0 37.0 42.9 CONTROL BUILD. WALL AXIS 25

06-06-09 638 FC JC C 25 42.5N 300 13.4 24.1 33.8 36.3 EB SLAB & BEAM AXIS 22-24

10-06-09 648 FC IB C 35 42.5N 300 16.4 26.5 37.5 41.5 EB D/STREAM WALL AXIS C

16-06-09 658 FC IB C 35 42.5N 300 14.6 26.4 36.0 41.9 EB UP/STREAM WALL AXIS A

20-06-09 669 FC IB C 35 42.5N 300 14.8 27.8 36.1 40.5 EB COLUMN C2 AXIS 2M

24-06-09 678 FC JC C 25 42.5N 300 14.7 25.4 34.8 39.7 ERECTION BAY SLAB 24 - 25

25-06-09 679 FC IB C 35 42.5N 300 17.9 26.8 37.1 42.3 EB COLUMN C5 AXIS 22

06-07-09 N 701 FC IB C 35 42.5N 300 15.4 26.9 38.8 43.2 EB COLUMN C7 AXIS 22

10-07-09 N 714 FC IB C 35 42.5N 300 16.1 27.2 38.2 42.2 EB COLUMN C2 AXIS 25

16-07-09 D 732 FC IB C 35 42.5N 300 16.6 27.5 36.6 39.5 EB SLAB A25 TO AXIS 28

18-07-09 N 740 FC IB C 35 42.5N 300 16.1 26.9 36.3 41.8 EB COLUMN C2 AXIS 24

25-07-09 N 761 FC IB-7 C 35 42.5N 270 15.3 28.6 38.8 40.5 ERECTION BAY

25-07-09 N 764 FC IB C 35 42.5N 300 16.4 29.1 38.8 41.8 ERECTION BAY
EB COLUMN C1& C2 UP TO
03-08-09 D 784 FC IB C 35 42.5N 300 16.6 28.6 39.8 44.5
TOP
EB COLUMN C1& C2 UP TO
03-08-09 D 786 FC IB C 35 42.5N 300 16.5 28.2 40.5 43.6
TOP
06-08-09 N 799 FC IB C 35 42.5N 300 19.0 27.4 38.9 44.3 ERECTION BAY

09-08-09 N 811 FC IB C 35 42.5N 300 16.1 27.7 38.7 41.7 EB COLUMN C25 LIFT 2

09-08-09 D 813 FC IB C 35 42.5N 300 15.6 28.2 46.0 50.6 EB COLUMN C26 LIFT 1

12-08-09 N 820 FC IB C 35 42.5N 300 17.7 27.4 38.9 42.4 EB COLUMN A3 TO EL:1113.5
EB COLUMN A1 TO
13-08-09 N 822 FC IB C 35 42.5N 300 16.5 30.4 37.7 41.4
EL:1107.86
15-08-09 N 834 FC IB C 35 42.5N 300 17.1 29.9 44.3 47.1 EB COLUMN C3 TO EL:1114.3

16-08-09 N 839 FC IB C 35 42.5N 300 18.1 29.6 41.0 45.6 EB COLUMN C2 - 23A

17-08-09 D 843 FC IB C 35 42.5N 300 16.2 30.6 40.5 44.8 EB COLUMN A4

ERECTION BAY WALL 5A


20-08-09 N 853 FC IB C 35 42.5N 300 20.3 29.2 41.0 44.4
24&25

21-08-09 D 859 FC IB C 35 42.5N 300 20.2 34.5 40.8 44.6 EB COLUMN A22 TO EL:1114.3

24-08-09 D 871 FC IB C 35 42.5N 300 23.7 34.0 44.3 47.0 EB COLUMN A28 TO EL:1101.5

25-08-09 D 876 FC IB C 35 42.5N 300 18.3 27.8 42.3 45.2 EB COLUMN C26 TO EL:1104.5

Page 91
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

ERECTION BAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

26-08-09 D 880 FC IB C 35 42.5N 300 16.0 27.2 42.0 44.2 EB COLUMN C28 TO EL:1101.5
EB COLUMN 26A/C TO
01-09-09 D 898 FC IB C 35 42.5N 330 15.8 27.3 41.9 45.3
EL:1107.5
EB WALL AXIS A22-24 TO
05-09-09 D 917 FC IB C 35 42.5N 330 18.8 29.6 42.6 45.1
EL:109
EB COLUMN AXIS A28 TO
06-09-09 D 921 FC IB C 35 42.5N 330 19.8 30.2 41.4 46.4
EL:1107.3
07-09-09 D 925 FC IB C 35 42.5N 330 19.0 30.5 39.8 43.9 EB COLUMN 26A TO EL:1114.3

09-09-09 D 928 FC IB C 35 42.5N 330 18.6 30.0 41.5 44.1 EB WALL 24-25 TO EL:1103.6

09-09-09 D 929 FC IB C 35 42.5N 330 18.7 31.2 40.1 44.6 EB COLUMN C26 TO EL:1114.3

09-09-09 N 931 FC IB C 35 42.5N 330 17.1 29.9 41.0 45.6 EB COLUMN C28 TO EL:1107.3

12-09-09 D 940 FC IB C 35 42.5N 330 15.4 28.7 38.9 39.6 EB COLUMN 28 TO EL:1114.3

12-09-09 N 942 FC IB C 35 42.5N 330 17.7 29.2 39.5 43.7 EB COLUMN C28 TO EL:1114.3

15-09-09 D 947 FC IB C 35 42.5N 330 21.4 34.4 43.0 45.0 EB WALL A22-24 TO EL:1103.6

15-09-09 D 949 FC IB C 35 42.5N 330 19.5 28.8 39.3 43.7 EB WALL C22-24 TO EL:1106.3

22-09-09 D 976 FC IB C 35 42.5N 330 17.3 28.5 39.1 46.4 EB WALL 25-26 TO EL:1100.9

25-09-09 N 988 FC IB C 35 42.5N 330 17.0 29.1 37.8 41.7 EB AXIS A22-24 TO EL:1107.5

26-09-09 D 998 FC IB C 35 42.5N 330 17.7 28.8 41.2 45.7 EB WALL 24-25A TO EL:1108.6

26-09-09 D 999 FC IB C 35 42.5N 330 17.9 29.3 40.9 45.7 EB WALL 25-26A TO EL:1103.6

01-10-09 D 1016 FC IB C 35 42.5N 330 17.4 30.2 38.9 42.4 EB WALL 22-24 TO EL:1110.3

07-10-09 D 1035 FC IB C 35 42.5N 330 15.8 27.7 35.4 40.6 EB WALL 22-24C TO EL:1114.3

11-10-09 D 1054 FC IB C 35 42.5N 330 16.0 27.2 37.0 40.2 EB WALL 22-24A TO EL:1114.3

15-10-09 D 1070 FC IB-2 C 30 42.5N 300 16.4 26.3 34.3 39.8 EB WALL 10 SLAB

15-10-09 D 1072 FC M6 C 40 42.5N 333 26.7 42.1 48.3 58.8 EB COLUMN AXIS 21C

16-10-09 N 1077 FC JC C 25 42.5N 300 12.9 27.8 38.4 48.2 EB AXIS 25 - 26 WALL

19-10-09 D 1088 FC JC C 25 42.5N 300 14.0 24.1 32.4 35.5 EB WALL 22

21-10-09 D 1096 FC JC C 25 42.5N 300 14.0 26.0 35.2 39.8 EB COLUMN AXIS 24 - 25

24-10-09 N 1107 FC IB C 35 42.5N 330 23.9 30.1 40.4 50.4 EB WALL 33

02-11-09 N 1136 FC IB C 35 42.5N 330 16.6 29.0 39.0 43.7 EB WALL 34

05-11-09 D 1149 FC IB C 35 42.5N 330 18.0 30.6 40.2 45.3 EB BETWEEN AXIS 22-21C
EB WALL AXIS C25-26 TO
12-11-09 D 1177 FC IB-2 C 30 42.5N 300 16.0 26.8 35.0 39.8
EL:1108.5
16-11-09 D 1190 FC IB-2 C 30 42.5N 300 15.5 25.6 35.1 40.2 EB AXIS C25-26 TO EL:1114.3
EB CONTRAL BUILDING 3
02-04-10 D 1787 FC JC C 25 42.5N 300 13.8 22.6 30.7 34.1
COLUMN

Page 92
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

ERECTION BAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
EB CONTRAL BUILDING 2
09-04-10 D 1800 FC JC C 25 42.5N 300 13.3 22.3 30.1 34.2
COLUMN
19-04-10 D 1841A FC IB-2 C 30 42.5N 300 13.9 23.5 31.8 34.5 ERECTION BAY WALL

11-07-10 D 2117 FC JC C 25 42.5N 300 13.6 22.6 29.8 34.6 ERECT BAY OIL SEPERATOR
ERECT BAY ENTRANCE SLAB
15-07-10 D 2131 FC IB-2 C 30 42.5N 300 14.9 25.6 36.9 40.6
BUILDING CONE

20-07-10 N 2139 FC IB-2 C 30 42.5N 300 14.2 23.0 33.2 36.6 ERECTION BAY SLAB

ERECT BAY SLAB CONTROL


25-07-10 D 2161 FC IB C 35 42.5N 330 15.2 26.1 37.1 40.8
BUILDING LEVEL 1103
ERECT BAY ACCESS AREA
28-07-10 N 2172 FC IB C 35 42.5N 330 15.0 29.0 36.5 39.2
SLAB AXIS 25 - 26

24-08-10 N 2247 FC IB C 35 42.5N 330 16.4 25.2 35.0 39.8 ERECT BAY ACCESS AREA

ERECT BAY AREA ALSTOM


18-09-10 D 2313 FC JC C 25 42.5N 300 13.2 22.9 32.6 36.9
TEMPORARY SLAB

Page 93
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GRAVITY DAM
Rc, maturation at NORMAL WATER
Note
SHIFT
Date Sample Concrete Cement Cement CURING (MPa)
Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

21-08-08 D 241 FC D2 C 15 42.5N 250 11.4 19.3 22.9 27.9 GRAVITY DAM
21-08-08 242 FC D2 C 15 42.5N 250 9.8 19.2 23.9 30.0 GRAVITY DAM
27-09-08 D 297 FC S C 15 42.5N 250 15.1 22.5 27.4 30.8 GRAVITY DAM
15-11-08 D 340 FC EB C 16 42.5N 190 8.6 14.7 23.3 34.0 BLOCK D
15-11-08 D 341 FC IB - B C 25 42.5N 300 19.4 33.0 43.8 48.4 BLOCK D
21-11-08 D 348 FC EB C 16 42.5N 190 14.4 19.8 33.7 46.0 BLOCK D LIFT 1
21-11-08 D 347 FC IB - B C 25 42.5N 300 27.0 33.0 41.8 47.5 BLOCK D LIFT 1
06-12-08 N 361 FC EB C 16 42.5N 190 13.2 19.6 26.8 29.4 BLOCK D LIFT 2
07-12-08 D 362 FC IB C 25 42.5N 300 19.2 28.7 37.4 38.3 BLOCK D LIFT 2
19-12-08 N 379 FC IB C 25 42.5N 300 20.6 33.0 44.5 54.1 BLOCK D LIFT 3
20-12-08 D 381 FC EB C 16 42.5N 190 9.2 16.5 22.0 31.0 BLOCK D LIFT 3
04-01-09 383 FC EB C 16 42.5N 190 10.2 14.9 22.8 25.7 BLOCK D LIFT 4
04-01-09 382 FC IB C 25 42.5N 300 21.4 33.4 43.7 45.1 BLOCK D LIFT 4
10-01-09 391 FC IB C 25 42.5N 300 15.8 31.8 41.8 46.3 BLOCK A LIFT 1& 2
11-01-09 394 FC EB C 16 42.5N 190 6.8 15.9 21.1 25.0 BLOCK D LIFT 5
11-01-09 392 FC IB C 25 42.5N 300 24.7 37.3 42.3 48.3 BLOCK D LIFT 5
11-01-09 393 FC IB C 25 42.5N 300 14.5 27.9 35.2 42.0 BLOCK D LIFT 5
13-01-09 396 FC S C 15 42.5N 250 12.3 24.2 33.3 38.0 DEN CON
17-01-09 401 FC S C 15 42.5N 250 18.8 29.5 39.0 44.8 G/DAM LEFT BANK
22-01-09 410 FC IB-1 C 25 42.5N 270 21.0 31.6 37.6 41.3 BLOCK D LIFT 6
22-01-09 411 FC EB C 16 42.5N 190 9.5 17.4 23.2 24.2 BLOCK D LIFT 6
06-02-09 429 FC EB C 16 42.5N 190 9.1 13.7 20.5 32.3 BLOCK A LIFT 1& 2
06-02-09 430 FC IB-1 C 25 42.5N 270 13.6 26.4 34.3 39.9 BLOCK A LIFT 1 & 2
13-02-09 443 FC EB C 16 42.5N 190 7.2 14.6 22.4 25.7 BLOCK D LIFT 7
13-02-09 444 FC K C 25 42.5N 250 12.3 28.8 38.4 46.2 BLOCK D LIFT 7
21-02-09 453 FC EB C 16 42.5N 190 10.7 16.2 22.5 24.6 BLOCK A LIFT 3
21-02-09 454 FC K C 25 42.5N 250 16.3 24.9 33.1 35.9 BLOCK A LIFT 3
27-02-09 460 FC EB C 16 42.5N 190 13.1 16.5 22.5 24.6 BLOCK A LIFT 4
27-02-09 461 FC K C 25 42.5N 250 24.1 30.9 39.3 45.8 BLOCK A LIFT 4
07-03-09 478 FC IB-2 C 25 42.5N 270 14.6 22.5 32.3 35.1 BLOCK A LIFT 5
07-03-09 479 FC EB C 16 42.5N 190 8.4 17.6 22.4 24.5 BLOCK A LIFT 5
07-03-09 480 FC K C 25 42.5N 250 15.3 30.2 37.7 42.0 BLOCK A LIFT 5
14-03-09 492 FC EB C 16 42.5N 190 9.2 16.8 23.0 24.5 BLOCK C LIFT 1
14-03-09 493 FC K C 25 42.5N 250 23.1 29.0 39.8 44.3 BLOCK C LIFT 1
18-03-09 496 FC EB C 16 42.5N 190 8.3 16.0 21.8 25.2 BLOCK A LIFT 6
18-03-09 497 FC IB-2 C 25 42.5N 270 11.7 23.6 31.3 33.1 BLOCK A LIFT 6
21-03-09 503 FC EB C 16 42.5N 190 9.0 16.1 22.1 25.2 BLOCK C LIFT 2
21-03-09 504 FC K C 25 42.5N 250 20.5 24.4 34.5 38.1 BLOCK C LIFT 2

Page 94
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GRAVITY DAM
Rc, maturation at NORMAL WATER
Note
SHIFT
Date Sample Concrete Cement Cement CURING (MPa)
Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

27-03-09 512 FC EB C 16 42.5N 190 9.6 16.2 22.2 24.6 BLOCK B LIFT 1
27-03-09 513 FC K C 25 42.5N 250 20.8 27.2 37.3 40.2 BLOCK B LIFT 1
01-04-09 519 FC EB C 16 42.5N 190 11.1 19.0 24.6 29.3 BLOCK B LIFT 2
01-04-09 520 FC K C 25 42.5N 250 12.7 25.0 32.6 36.5 BLOCK B LIFT 2
04-04-09 524 FC IB-2 C 30 42.5N 270 15.7 23.9 31.1 36.0 BLOCK A LIFT 7
08-04-09 532 FC EB C 16 42.5N 190 11.3 17.3 24.5 28.6 BLOCK C LIFT 3
08-04-09 533 FC K C 25 42.5N 250 15.2 23.5 33.4 39.3 BLOCK C LIFT 3
18-04-09 545 FC IB-2 C 30 42.5N 270 13.6 23.5 32.2 36.4 BLOCK D LIFT 8
25-04-09 555 FC EB C 16 42.5N 190 10.6 18.2 24.3 26.5 BLOCK C LIFT 4
25-04-09 556 FC K C 25 42.5N 250 18.9 25.9 31.8 36.5 BLOCK C LIFT 4
01-05-09 571 FC IB-2 C 30 42.5N 270 14.2 24.1 31.2 36.3 BLOCK D LIFT 9
05-05-09 574 FC EB C 16 42.5N 190 10.6 17.4 23.3 25.2 GATED SPILLWAY
07-05-09 576 FC EB C 16 42.5N 190 8.9 17.7 23.3 25.6 GATED SPILLWAY
09-05-09 583 FC K C 25 42.5N 250 16.1 26.9 35.0 41.0 BLOCK C LIFT 5
09-05-09 584 FC EB C 16 42.5N 190 10.0 17.3 24.2 27.2 BLOCK C LIFT 5
14-05-09 595 FC K C 25 42.5N 250 21.2 28.3 37.1 41.3 BLOCK B LIFT 3
14-05-09 596 FC EB C 16 42.5N 190 10.1 17.8 23.8 26.5 BLOCK B LIFT 3
20-05-09 608 FC EB C 16 42.5N 190 12.1 21.7 29.1 34.0 BLOCK B LIFT 4
20-05-09 609 FC K C 25 42.5N 250 13.6 26.8 36.7 41.7 BLOCK B LIFT 4
21-05-09 610 FC K C 25 42.5N 250 12.3 31.7 38.1 40.7 BLOCK C LIFT 6
25-05-09 616 FC IB-2 C 30 42.5N 270 13.9 24.2 34.2 38.8 BLOCK B LIFT 5
02-06-09 629 FC K C 25 42.5N 250 14.8 24.8 33.5 39.1 BLOCK C LIFT 6
02-06-09 630 FC IB-2 C 30 42.5N 270 13.4 24.2 33.8 39.2 BLOCK C LIFT 7
07-06-09 640 FC IB-2 C 30 42.5N 270 14.7 24.1 34.7 37.5 BLOCK A LIFT 8
15-06-09 657 FC IB C 35 42.5N 300 15.5 26.9 36.9 45.4 BLOCK D LIFT 10
18-06-09 664 FC IB C 35 42.5N 300 15.0 27.1 36.3 41.8 BLOCK B LIFT 6
23-06-09 674 FC IB C 35 42.5N 300 16.6 27.0 36.1 42.4 BLOCK D LIFT 11
29-06-09 690 FC IB-2 C 30 42.5N 270 15.0 27.4 34.7 39.9 BLOCK A LIFT 9
10-07-09 D 712 FC IB-2 C 30 42.5N 270 14.4 25.7 35.0 38.7 GD D/STREAM COL.
11-07-09 D 716 FC IB-2 C 30 42.5N 270 14.4 27.2 35.9 39.9 BLOCK D LIFT 12
14-07-09 N 724 FC IB C 35 42.5N 300 20.1 27.6 35.3 38.6 BLOCK C LIFT 8
18-07-09 D 737 FC IB-7 C 35 42.5N 270 17.4 31.3 40.2 44.7 BLOCK B LIFT 7
18-07-09 D 738 FC IB-2 C 30 42.5N 270 14.6 24.5 33.6 35.9 BLOCK B LIFT 7
21-07-09 D 748 FC IB-2 C 30 42.5N 270 13.2 25.1 35.7 39.1 RW GD BL G LIFT 1
23-07-09 N 753 FC IB C 35 42.5N 300 17.3 26.8 39.2 43.2 GD BLOCK F LIFT 2
23-07-09 D 755 FC IB C 35 42.5N 300 16.2 27.9 38.8 41.8 BLOCK C LIFT 9
25-07-09 D 762 FC IB-2 C 30 42.5N 270 14.3 24.5 35.4 39.0 BLOCK A LIFT 9
29-07-09 D 774 FC IB-2 C 30 42.5N 270 13.5 24.7 35.5 39.4 BLOCK C LIFT 10

Page 95
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GRAVITY DAM
Rc, maturation at NORMAL WATER
Note
SHIFT
Date Sample Concrete Cement Cement CURING (MPa)
Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

31-07-09 N 780 FC IB C 35 42.5N 300 16.5 26.3 40.2 44.5 BLOCK B LIFT 8
06-08-09 N 796 FC IB C 35 42.5N 300 18.5 28.7 42.4 42.8 BLOCK A LIFT 10
07-08-09 D 802 FC IB C 35 42.5N 300 18.2 27.8 39.0 45.5 BLOCK C LIFT 11
11-08-09 D 816 FC IB C 35 42.5N 300 16.2 27.3 38.8 42.5 BLOCK A LIFT 11
13-08-09 N 823 FC IB C 35 42.5N 300 18.1 31.0 41.0 44.3 BLOCK E LIFT 2
14-08-09 D 830 FC IB C 35 42.5N 300 16.1 32.5 41.7 44.8 BLOCK C LIFT 12
16-08-09 D 841 FC IB C 35 42.5N 300 16.8 30.5 41.1 46.2 BLOCK A LIFT 12
18-08-09 D 844 FC IB-2 C 30 42.5N 270 20.8 29.7 33.5 38.6 RW GD BL E LIFT 3
18-08-09 N 847 FC IB-2 C 30 42.5N 270 19.1 27.5 34.8 39.4 BLOCK B LIFT 9
20-08-09 D 856 FC IB-2 C 30 42.5N 270 16.2 28.4 35.4 39.3 RW GD BL E LIFT 4
22-08-09 D 864 FC IB-2 C 30 42.5N 270 16.2 27.8 35.1 38.7 BLOCK B LIFT 10
24-08-09 D 873 FC IB C 35 42.5N 300 17.8 31.7 41.6 45.5 BLOCK E LIFT 5
25-08-09 N 877 FC IB-2 C 30 42.5N 270 16.0 28.7 35.1 38.3 BLOCK B LIFT 11
27-08-09 N 888 FC IB-2 C 30 42.5N 270 17.9 24.5 36.0 39.4 BLOCK B LIFT 12
03-01-10 D 1339 FC IB-2 C 30 42.5N 300 16.2 28.9 36.7 40.6 G/DAM BLOCK "C"
G/DAM BLOCK "A" &
06-01-10 D 1352 FC IB-2 C 30 42.5N 300 14.5 24.6 33.3 39.3
"D" LIFT 13A
G/DAM BLOCK "B"
08-01-10 D 1360 FC IB-2 C 30 42.5N 300 14.5 25.1 32.0 36.5
LIFT 13A
G/DAM BLOCK "A"
23-09-10 D 2329 FC IB C 35 42.5N 330 17.7 31.6 41.8 46.2
LIFT 13
G/DAM BLOCK "B"
06-10-10 N 2363 FC IB C 35 42.5N 330 24.1 30.5 43.8 48.5
LIFT 13
G/DAM BLOCK "C"
16-10-10 D 2392 FC IB C 35 42.5N 330 15.5 27.6 35.3 41.5
LIFT 13
G/DAM BLOCK "D"
04-11-10 D 2440 FC JC C 25 42.5N 310 14.6 26.1 32.8 37.1
LIFT 13

Page 96
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

05-02-09 N 428 FC S C 15 42.5N 250 11.2 26.6 35.5 38.9 GATED SPILLWAY

07-02-09 N 432 FC S C 15 42.5N 250 9.3 23.4 30.8 35.6 GATED SPILLWAY

10-02-09 N 438 FC S C 15 42.5N 250 11.1 24.2 32.6 34.4 GATED SPILLWAY

14-02-09 D 446 FC S C 15 42.5N 250 13.6 25.0 32.8 36.9 GATED SPILLWAY

04-03-09 N 471 FC IB-7 C 25 42.5N 270 20.9 35.4 40.1 47.2 GATED SPILLWAY

04-03-09 N 472 FC IB-7 C 25 42.5N 270 17.0 26.4 37.4 40.5 GATED SPILLWAY

04-03-09 N 473 FC IB-7 C 25 42.5N 270 20.6 35.6 40.8 50.4 GATED SPILLWAY

11-03-09 D 488 FC S C 15 42.5N 250 11.6 23.1 30.6 35.5 GATED SPILLWAY

20-03-09 D 501 FC S C 15 42.5N 250 17.1 28.2 36.5 42.0 GATED SPILLWAY

21-03-09 N 505 FC S C 15 42.5N 250 18.0 23.8 28.4 32.2 GATED SPILLWAY

24-03-09 D 508 FC S C 15 42.5N 250 11.0 23.4 31.2 37.5 GATED SPILLWAY

31-03-09 N 517 FC S C 15 42.5N 250 10.2 21.1 28.0 32.0 GATED SPILLWAY

03-04-09 D 521 FC IB-7 C 25 42.5N 270 16.8 27.7 36.3 38.8 GATED SPILLWAY

03-04-09 D 522 FC IB-7 C 25 42.5N 270 17.3 28.7 39.2 43.0 GATED SPILLWAY

07-04-09 N 530 FC S C 15 42.5N 250 12.0 20.4 27.5 33.1 GATED SPILLWAY

09-04-09 D 536 FC IB-2 C 25 42.5N 270 14.7 26.5 33.3 37.1 GATED SPILLWAY

09-04-09 N 535 FC IB-7 C 25 42.5N 270 15.7 25.4 36.0 41.1 GATED SPILLWAY

15-04-09 N 541A FC S C 15 42.5N 250 13.6 21.8 27.5 32.1 GATED SPILLWAY

19-04-09 D 546 FC IB-7 C 25 42.5N 270 13.0 30.5 37.5 42.4 GATED SPILLWAY

19-04-09 N 547 FC IB-7 C 25 42.5N 270 13.4 32.8 42.9 50.1 GATED SPILLWAY

24-04-09 D 553 FC S C 15 42.5N 250 10.5 22.8 28.6 33.2 GATED SPILLWAY

24-04-09 N 554 FC IB-7 C 25 42.5N 270 19.5 28.2 34.9 39.7 GATED SPILLWAY

04-05-09 D 572 FC S C 15 42.5N 250 12.7 22.7 31.1 36.0 GATED SPILLWAY

10-05-09 D 586 FC IB C 35 42.5N 300 15.8 26.0 36.5 41.9 GATED SPILLWAY

10-05-09 N 587 FC IB C 35 42.5N 300 16.4 28.3 35.1 41.5 GATED SPILLWAY

18-05-09 N 603 FC IB-7 C 25 42.5N 270 22.3 34.2 42.5 47.6 GATED SPILLWAY

20-05-09 D 607 FC S C 15 42.5N 250 14.6 22.4 30.3 34.7 GATED SPILLWAY

22-05-09 D 611 FC IB-7 C 25 42.5N 270 17.1 32.4 39.9 42.7 GATED SPILLWAY

24-05-09 D 614 FC IB-7 C 25 42.5N 270 15.8 27.6 38.4 42.4 GATED SPILLWAY

25-05-09 D 617 FC S C 15 42.5N 250 14.3 23.7 29.5 33.7 GATED SPILLWAY

26-05-09 D 618 FC IB C 35 42.5N 300 15.0 27.6 36.9 40.4 GATED SPILLWAY

27-05-09 N 622 FC IB-7 C 25 42.5N 270 18.1 30.1 39.4 44.3 GATED SPILLWAY

28-05-09 N 623 FC IB-7 C 25 42.5N 270 17.8 25.9 37.0 41.9 GATED SPILLWAY

01-06-09 N 628 FC IB-7 C 25 42.5N 270 15.5 27.9 38.7 41.9 GATED SPILLWAY

06-06-09 N 636 FC IB C 35 42.5N 300 15.1 25.8 38.8 41.4 GATED SPILLWAY

06-06-09 N 637 FC IB-7 C 25 42.5N 270 20.7 33.1 39.1 45.1 GATED SPILLWAY

09-06-09 N 643 FC EB C 16 42.5N 190 10.4 17.5 24.9 28.1 GATED SPILLWAY

10-06-09 D 647 FC IB C 35 42.5N 300 16.4 26.3 37.3 41.2 GATED SPILLWAY

Page 97
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

11-06-09 D 649 FC S C 15 42.5N 250 12.4 20.6 27.2 32.5 GATED SPILLWAY

17-06-09 D 661 FC IB C 35 42.5N 300 15.0 27.1 37.0 43.0 GATED SPILLWAY

17-06-09 D 662 FC IB-7 C 25 42.5N 270 15.4 28.9 38.8 44.3 GATED SPILLWAY

17-06-09 N 663 FC IB C 35 42.5N 300 15.1 26.3 36.9 42.4 GATED SPILLWAY

20-06-09 D 670 FC IB C 35 42.5N 300 15.4 27.5 36.3 43.1 GATED SPILLWAY

25-06-09 N 682 FC IB C 35 42.5N 300 14.5 27.7 36.7 42.6 GATED SPILLWAY

27-06-09 N 685 FC IB C 35 42.5N 300 17.2 26.9 36.5 41.0 GATED SPILLWAY

27-06-09 N 686 FC IB-7 C 25 42.5N 270 20.8 27.8 37.4 44.1 GATED SPILLWAY

27-06-09 D 689 FC IB C 35 42.5N 300 16.0 27.7 38.2 42.8 GATED SPILLWAY

01-07-09 D 694 FC S C 15 42.5N 250 11.6 22.5 27.5 30.5 GATED SPILLWAY

02-07-09 D 695 FC IB C 35 42.5N 300 17.0 29.1 36.1 41.5 GATED SPILLWAY

07-07-09 D 703 FC IB-7 C 25 42.5N 270 18.4 30.0 37.0 42.8 GATED SPILLWAY

07-07-09 D 704 FC IB C 35 42.5N 300 21.1 33.2 40.1 42.5 GATED SPILLWAY

09-07-09 N 711 FC IB C 35 42.5N 300 16.5 27.8 37.4 42.8 GATED SPILLWAY

13-07-09 N 721 FC IB C 35 42.5N 300 17.5 26.1 38.1 42.7 GATED SPILLWAY

16-07-09 D 731 FC IB C 35 42.5N 300 16.1 28.0 37.3 39.0 GATED SPILLWAY

18-07-09 N 741 FC IB C 35 42.5N 300 16.3 27.3 36.6 42.1 GATED SPILLWAY

20-07-09 D 745 FC IB C 35 42.5N 300 16.6 26.5 37.1 41.5 GATED SPILLWAY

21-07-09 N 746 FC IB-7 C 25 42.5N 270 19.9 28.4 36.9 43.0 GATED SPILLWAY

23-07-09 N 751 FC IB C 35 42.5N 300 18.6 27.9 38.0 40.6 GATED SPILLWAY

27-07-09 D 767 FC IB C 35 42.5N 300 15.9 27.0 39.1 43.1 GATED SPILLWAY

29-07-09 N 775 FC IB C 35 42.5N 300 16.8 27.4 39.4 42.1 GATED SPILLWAY

30-07-09 N 776 FC IB C 35 42.5N 300 16.7 28.2 38.8 46.6 GATED SPILLWAY

31-07-09 N 782 FC IB C 35 42.5N 300 17.2 27.3 37.5 41.4 GATED SPILLWAY

31-07-09 D 783 FC IB C 35 42.5N 300 18.9 27.7 40.2 43.4 GATED SPILLWAY

04-08-09 D 791 FC IB-7 C 25 42.5N 270 19.1 30.0 39.5 44.1 GATED SPILLWAY SB - S6B

04-08-09 N 792 FC IB C 35 42.5N 300 18.5 29.4 39.2 43.8 GATED SPILLWAY SB - S6B

GATED SPILLWAY SWA -


05-08-09 D 793 FC IB C 35 42.5N 300 15.9 26.8 40.1 42.9 C2

06-08-09 D 797 FC IB C 35 42.5N 300 18.8 28.4 37.5 40.8 GATED SPILLWAY D3

GATED SPILLWAY SWA -


08-08-09 D 806 FC IB C 35 42.5N 300 18.2 29.2 40.4 44.9 A3

GATED SPILLWAY SWA


09-08-09 N 807 FC IB C 35 42.5N 300 15.4 28.5 37.2 44.3 EL:4

11-08-09 N 817 FC IB C 35 42.5N 300 17.6 29.5 40.8 44.6 GATED SPILLWAY B2

GATED SPILLWAY SWB -


13-08-09 D 826 FC IB C 35 42.5N 300 15.2 31.6 40.7 45.1 B2

Page 98
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SWA -
15-08-09 N 835 FC IB C 35 42.5N 300 19.3 32.0 43.1 46.6 D4

GATED SPILLWAY SWA -


16-08-09 D 838 FC IB C 35 42.5N 300 16.5 36.1 47.1 49.3 C3

19-08-09 N 850 FC IB-7 C 25 42.5N 270 16.5 32.1 40.7 44.3 GATED SPILLWAY SB - S6B

GATED SPILLWAY SWA -


19-08-09 D 851 FC IB C 35 42.5N 300 18.9 30.0 44.5 48.1 F2

GATED SPILLWAY SWA -


19-08-09 D 852 FC IB C 35 42.5N 300 22.9 34.1 44.0 47.9 D4

GATED SPILLWAY RRC


22-08-09 N 862 FC EB C 16 42.5N 190 11.2 18.8 16.1 28.1 CIZE-WALL

GATED SPILLWAY SWA -


22-08-09 D 863 FC IB C 35 42.5N 300 18.7 31.5 44.1 46.4 B3

22-08-09 D 866 FC IB C 35 42.5N 300 21.7 35.7 45.6 48.2 GATED SPILLWAY SWF - 1

GATED SPILLWAY SWA -


24-08-09 N 874 FC IB C 35 42.5N 300 21.2 34.5 42.9 46.1 F3

G.S.W RET. WALL DOWN


26-08-09 N 878 FC EB C 16 42.5N 190 10.3 21.5 30.6 34.3 STREAM RR

GATED SPILLWAY SWB -


26-08-09 D 879 FC IB C 35 42.5N 300 28.7 25.5 49.1 46.4 A1

26-08-09 D 881 FC IB-7 C 25 42.5N 270 17.7 31.2 43.1 46.8 GATED SPILLWAY SB5

26-08-09 D 882 FC IB C 35 42.5N 300 17.4 32.3 41.4 44.2 GATED SPILLWAY SB5

GATED SPILLWAY SWA -


27-08-09 N 884 FC IB C 35 42.5N 300 16.0 26.6 43.0 46.4 C4

GATED SPILLWAY SWA -


28-08-09 D 890 FC IB C 35 42.5N 300 17.8 31.3 40.2 44.2 J2

GATED SPILLWAY SWB -


28-08-09 N 892 FC IB C 35 42.5N 300 14.9 31.4 41.3 45.3 D3

GATED SPILLWAY SWA -


01-09-09 D 899 FC IB C 35 42.5N 330 16.2 27.4 42.5 46.5 B4

GATED SPILLWAY SWA -


03-09-09 N 904 FC IB C 35 42.5N 330 24.4 34.9 46.8 49.4 F4

03-09-09 D 905 FC IB C 35 42.5N 330 19.3 31.0 41.0 45.6 GATED SPILLWAY SB - S5B

G.SPILLWAY RETAINING
04-09-09 D 906 FC EB C 16 42.5N 190 10.3 17.8 25.4 28.1 WALL RRC

04-09-09 D 910 FC IB C 35 42.5N 330 17.2 29.6 41.5 45.9 GATED SPILLWAY SW - F2

05-09-09 D 916 FC IB C 35 42.5N 330 20.7 30.2 39.9 43.2 GATED SPILLWAY SWA - 3

G.SPILLWAY RET. WALL


06-09-09 D 918 FC EB C 16 42.5N 190 10.5 18.0 26.0 28.1 D/STREAM

GATED SPILLWAY SWA -


06-09-09 D 920 FC IB C 35 42.5N 330 23.7 35.2 45.1 48.9 E5

Page 99
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SWA -
07-09-09 D 924 FC IB C 35 42.5N 330 20.8 34.4 40.0 44.6 D5

GATED SPILLWAY SWB -


10-09-09 N 932 FC IB C 35 42.5N 330 21.4 29.7 40.3 42.4 B1

GATED SPILLWAY SWA -


10-09-09 N 933 FC IB C 35 42.5N 330 23.4 34.5 42.8 48.8 A5

GATED SPILLWAY SWA -


11-09-09 D 937 FC IB C 35 42.5N 330 18.5 33.6 43.0 49.8 E6

GATED SPILLWAY SWB -


12-09-09 N 941 FC IB C 35 42.5N 330 16.2 29.6 38.9 43.5 F1

GATED SPILLWAY SWF -


15-09-09 D 946 FC IB C 35 42.5N 330 23.7 36.0 44.8 47.1 F3

GATED SPILLWAY SWA -


15-09-09 D 950 FC IB C 35 42.5N 330 22.9 36.4 46.7 50.1 D6

GATED SPILLWAY SWA -


17-09-09 N 957 FC IB C 35 42.5N 330 21.2 30.3 40.3 47.5 D6

18-09-09 D 961 FC IB C 35 42.5N 330 20.4 33.0 42.5 48.8 GATED SPILLWAY SB - S10

18-09-09 D 964 FC IB-7 C 25 42.5N 300 18.2 29.6 38.9 44.0 GATED SPILLWAY SB - S10

GATED SPILLWAY SWB -


18-09-09 N 965 FC IB C 35 42.5N 330 16.7 32.2 44.3 48.3 F2

GATED SPILLWAY SWB -


19-09-09 D 967 FC IB C 35 42.5N 330 23.8 35.8 47.0 53.6 F2

GATED SPILLWAY SWA -


22-09-09 D 975 FC IB C 35 42.5N 330 19.0 29.4 37.0 43.2 J4

22-09-09 D 977 FC EB C 16 42.5N 190 10.1 19.0 24.3 28.1 GATED SPILLWAY RRC

GATED SPILLWAY F. SWE


23-09-09 D 979 FC IB-7 C 25 42.5N 300 16.4 31.2 41.4 47.6 A1-B1-C1

GATED SPILLWAY F. SWE


24-09-09 D 980 FC IB C 35 42.5N 330 31.0 40.0 43.2 48.5 A1-B1-C1

GATED SPILLWAY SB2 -


24-09-09 D 985 FC IB C 35 42.5N 330 22.7 35.5 40.3 48.8 B2

24-09-09 D 987 FC IB C 35 42.5N 330 18.2 29.8 39.2 44.6 GATED SPILLWAY SW - F2

GATED SPILLWAY SWA -


25-09-09 N 990 FC IB C 35 42.5N 330 22.0 37.3 43.4 52.3 C5

GATED SPILLWAY SWB -


25-09-09 N 993 FC IB C 35 42.5N 330 17.4 35.3 43.6 48.3 F3

26-09-09 D 995 FC EB C 16 42.5N 190 10.7 16.9 25.0 28.1 GATED SPILLWAY RRC

26-09-09 N 997 FC K C 25 42.5N 250 14.8 24.2 33.8 37.1 GATED SPILLWAY RRC

GATED SPILLWAY SWA -


28-09-09 N 1005 FC IB C 35 42.5N 330 20.3 29.9 41.6 44.2 B5

GATED SPILLWAY SWA -


30-09-09 D 1009 FC IB C 35 42.5N 330 22.5 35.0 42.5 45.6 C6

Page 100
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SWB -
01-10-09 D 1012 FC IB C 35 42.5N 330 19.9 30.6 38.6 44.4 J1

GATED SPILLWAY SWB -


01-10-09 D 1014 FC IB C 35 42.5N 330 18.3 27.4 35.7 38.1 B3

GATED SPILLWAY SWB -


02-10-09 D 1022 FC IB C 35 42.5N 330 18.8 31.2 40.4 47.2 B6

GATED SPILLWAY FROM


06-10-09 N 1029 FC IB C 35 42.5N 330 19.2 32.3 43.6 49.2 EL:1078 - 1080

GATED SPILLWAY FROM


06-10-09 N 1031 FC IB-7 C 25 42.5N 300 15.6 32.5 42.9 48.5 EL:1078 - 1080

GATED SPILLWAY SWB -


07-10-09 D 1034 FC IB C 35 42.5N 330 22.2 35.3 42.6 46.3 F4

GATED SPILLWAY SWB -


08-10-09 N 1040 FC IB C 35 42.5N 330 22.7 39.5 45.0 52.4 J2

GATED SPILLWAY SWB -


13-10-09 D 1062 FC IB C 35 42.5N 330 26.0 30.7 39.6 48.7 C1

GATED SPILLWAY SWB -


14-10-09 D 1066 FC IB C 35 42.5N 330 19.8 29.8 38.2 43.4 D4

GATED SPILLWAY SWB -


19-10-09 D 1087 FC IB C 35 42.5N 330 19.0 32.0 40.5 47.8 J3

G.SPILLWAY SWE A3, B3,


20-10-09 D 1092 FC IB C 35 42.5N 330 19.8 29.6 41.2 43.5 C3, D1 EL:1080 - 1083

G.SPILLWAY SWE A3, B3,


20-10-09 D 1093 FC IB-7 C 25 42.5N 300 18.5 31.6 40.5 43.4 C3, D1 EL:1080 - 1083

G.SPILLWAY SWE A3, B3,


21-10-09 N 1094 FC IB C 35 42.5N 330 19.6 29.8 39.6 43.6 C3, D1 EL:1080 - 1083

GATED SPILLWAY SWB -


22-10-09 D 1100 FC IB C 35 42.5N 330 17.3 28.8 39.1 41.8 C2 - A2

GATED SPILLWAY SWF


25-10-09 N 1113 FC IB C 35 42.5N 330 18.0 26.4 36.0 38.8 LIFT 5

GATED SPILLWAY SW -
28-10-09 N 1121 FC IB C 35 42.5N 330 17.6 28.9 38.8 45.1 A7, B7, C7

GATED SPILLWAY SWB C3


30-10-09 D 1130 FC IB C 35 42.5N 330 17.9 30.0 39.9 43.5 - A3

GATED SPILLWAY SWF -


04-11-09 N 1143 FC IB C 35 42.5N 330 16.8 30.2 40.0 45.6 6

GATED SPILLWAY SWA -


07-11-09 D 1156 FC IB C 35 42.5N 330 17.9 29.5 40.8 44.5 A8, B8, C8

GATED SPILLWAY SWE -


09-11-09 N 1165 FC IB C 35 42.5N 330 16.3 28.7 38.9 40.8 A4, B4, C4, E2, D2

GATED SPILLWAY SWE -


10-11-09 N 1166 FC IB-7 C 35 42.5N 300 20.6 30.4 41.4 48.3 A4, B4, C4, E2, D2

GATED SPILLWAY SWE -


10-11-09 D 1168 FC IB C 35 42.5N 330 17.7 30.5 40.6 45.5 A4, B4, C4, E2, D2

Page 101
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SWB -
11-11-09 N 1169 FC IB C 35 42.5N 330 20.9 31.2 42.5 50.5 D5

GATED SPILLWAY SWB -


15-11-09 D 1185 FC IB C 35 42.5N 330 17.6 28.2 38.5 41.5 C4, A4

GATED SPILLWAY SWB -


21-11-09 N 1207 FC IB C 35 42.5N 330 22.4 30.4 40.1 48.4 D6

GATED SPILLWAY SWB -


24-11-09 D 1217 FC IB C 35 42.5N 330 16.1 32.1 41.3 46.2 S-5A

GATED SPILLWAY SWF -


25-11-09 N 1219 FC IB C 35 42.5N 330 17.7 29.6 38.4 43.0 LIFT 7

GATED SPILLWAY SWA -


27-11-09 N 1225 FC IB C 35 42.5N 330 19.3 30.4 43.4 48.9 A9, C9, B9

GATED SPILLWAY SWE -


30-11-09 N 1233 FC IB C 35 42.5N 330 16.7 28.5 39.0 44.0 B5, D3 TO EL:1080.00

GATED SPILLWAY SWA -


03-12-09 D 1241 FC IB C 35 42.5N 330 15.8 28.7 36.3 40.0 C10, A10, B10

GATED SPILLWAY SWB -


05-12-09 D 1247 FC IB C 35 42.5N 330 15.7 25.5 37.8 40.0 A6, C6

GATED SPILLWAY SWF


06-12-09 D 1252 FC IB C 35 42.5N 330 21.4 30.6 43.1 49.0 LIFT 8

GATED SPILLWAY SWE A5


08-12-09 D 1262 FC IB C 35 42.5N 330 17.1 28.5 37.6 41.4 - C5

08-12-09 D 1263 FC IB C 35 42.5N 330 15.2 27.3 38.6 41.7 GATED SPILLWAY SWA F5

GATED SPILLWAY SWB -


10-12-09 N 1268 FC IB C 35 42.5N 330 20.8 30.3 38.8 42.1 D7

GATED SPILLWAY SWA


12-12-09 D 1277 FC IB C 35 42.5N 330 16.2 27.8 36.6 42.3 LIFT 6

GATED SPILLWAY SWF


12-12-09 D 1280 FC IB C 35 42.5N 330 16.5 28.4 39.6 44.3 LIFT 9 & 10

GATED SPILLWAY SWB A7


16-12-09 D 1290 FC IB C 35 42.5N 330 17.9 28.4 36.7 41.7 & C7 LIFT 7

17-12-09 D 1295 FC IB C 35 42.5N 330 16.9 28.6 39.9 45.3 GATED SPILLWAY SWA F7

GATED SPILLWAY SWC A1


18-12-09 D 1299 FC IB C 35 42.5N 330 15.7 28.5 37.5 42.8 & C1

19-12-09 D 1304 FC IB C 35 42.5N 330 17.8 30.1 37.0 42.9 GATED SPILLWAY SWC B1

20-12-09 D 1308 FC IB C 35 42.5N 330 16.5 27.9 38.4 44.3 GATED SPILLWAY SWA F8

21-12-09 D 1312 FC IB C 35 42.5N 330 18.6 31.0 39.3 48.2 GATED SPILLWAY SWB D8

22-12-09 D 1315 FC IB C 35 42.5N 330 16.5 28.5 36.7 44.2 GATED SPILLWAY SWA B9

23-12-09 N 1317 FC IB C 35 42.5N 330 16.8 28.5 39.7 45.6 GATED SPILLWAY A6 - C6

Page 102
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

GATED SPILLWAY SWA


29-12-09 D 1322 FC IB C 35 42.5N 330 16.2 27.2 38.8 42.3 B10

31-12-09 D 1330 FC IB C 35 42.5N 330 21.1 30.7 44.6 49.4 GATED SPILLWAY SWE B6

GATED SPILLWAY SWB -


04-01-10 D 1343 FC IB C 35 42.5N 330 17.2 30.1 39.1 44.0 A8, C8

GATED SPILLWAY SWB -


06-01-10 D 1348 FC IB C 35 42.5N 330 24.0 30.9 41.9 48.5 B2

06-01-10 N 1351 FC R C 15 42.5N 250 11.7 19.9 25.9 29.7 GATED SPILLWAY RRC

GATED SPILLWAY SB12


07-01-10 N 1353 FC R C 15 42.5N 250 13.8 21.2 26.1 32.1 RRC

GATED SPILLWAY SWE -


08-01-10 D 1362 FC IB C 35 42.5N 330 17.6 29.7 36.2 39.8 A7 - E7

GATED SPILLWAY SB - S11


08-01-10 N 1365 FC IB-2 C 30 42.5N 300 14.8 25.8 34.6 40.3 - RRC

GATED SPILLWAY SWB -


10-01-10 D 1373 FC IB C 35 42.5N 330 18.1 29.8 38.4 45.8 D10

GATED SPILLWAY SB - S11


11-01-10 D 1376 FC R C 15 42.5N 250 12.5 19.8 25.1 29.1 - RRC

GATED SPILLWAY SWE -


12-01-10 N 1379 FC IB C 35 42.5N 330 22.4 30.4 41.0 49.6 B7

GATED SPILLWAY SWC -


14-01-10 D 1391 FC IB C 35 42.5N 330 20.1 30.0 40.1 44.6 C2

GATED SPILLWAY SLAB -


14-01-10 N 1394 FC IB C 35 42.5N 330 17.7 31.3 38.8 50.1 NR.1

GATED SPILLWAY SWD -


16-01-10 D 1399 FC IB C 35 42.5N 330 18.2 29.5 40.0 45.6 C1 - A

GATED SPILLWAY SWC -


18-01-10 D 1410 FC IB C 35 42.5N 330 15.9 26.5 37.8 43.0 A2

G.SPILLWAY BLINDING
20-01-10 D 1422 FC IB C 35 42.5N 330 11.9 22.5 29.0 33.3 SLAB EXT.WALL A

G.SPILLWAY SLAB
20-01-10 N 1424 FC IB C 35 42.5N 330 17.3 26.7 38.2 40.6 UPSTREAM BTN. WALL
A&B

G.SPILLWAY SLAB
21-01-10 D 1426 FC IB C 35 42.5N 330 16.1 25.4 38.4 41.7 D/STREAM (SB - SR)

G.SPILLWAY SLAB DOWN


21-01-10 D 1427 FC IB-7 C 35 42.5N 300 16.4 28.2 36.9 40.7 STREAM (SB - 15-12)

GATED SPILLWAY SWA -


22-01-10 D 1434 FC IB C 35 42.5N 330 17.5 30.6 41.9 44.6 B11 - C11

23-01-10 N 1435 FC IB C 35 42.5N 330 20.2 28.5 38.9 41.7 GATED SPILLWAY SW - HL

Page 103
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

GATED SPILLWAY
23-01-10 D 1439 FC S C 20 42.5N 250 11.3 20.8 26.7 28.4 BLINDING EXT.WALL A

GATED SPILLWAY SWA -


23-01-10 N 1440 FC IB C 35 42.5N 330 15.7 30.3 39.9 44.4 SBG

25-01-10 N 1451 FC IB C 35 42.5N 330 17.0 28.5 37.4 42.5 GATED SPILLWAY SB - 11

GATED SPILLWAY SWA -


26-01-10 N 1458 FC IB C 35 42.5N 330 17.5 26.6 37.9 43.2 BASE

GATED SPILLWAY SWA -


27-01-10 N 1459 FC IB C 35 42.5N 330 20.6 28.6 39.8 44.9 SBH

GATED SPILLWAY SWB -


28-01-10 D 1462 FC IB C 35 42.5N 330 18.2 31.2 42.6 45.0 C9 - A9

GATED SPILLWAY SWA -


29-01-10 N 1472 FC IB C 35 42.5N 330 15.6 29.9 40.7 46.3 SBH

GATED SPILLWAY SWD -


30-01-10 N 1474 FC IB C 35 42.5N 330 20.8 31.2 40.1 44.1 B1

30-01-10 D 1476 FC IB C 35 42.5N 330 17.3 29.4 40.8 45.9 GATED SPILLWAY SWF - 7

02-02-10 N 1485 FC IB C 35 42.5N 330 17.2 29.6 40.4 45.2 GATED SPILLWAY SWH - 2

GATED SPILLWAY SWA -


02-02-10 N 1486 FC IB C 35 42.5N 330 16.5 28.4 37.1 44.9 SLAB DOWNSTREAM
GATED SPILLWAY SWB -
03-02-10 N 1487 FC IB C 35 42.5N 330 17.3 29.7 37.4 41.8 D10
GATED SPILLWAY SWA -
04-02-10 D 1493 FC IB C 35 42.5N 330 17.8 26.8 37.1 41.9 A11
GATED SPILLWAY SWH -
04-02-10 N 1494 FC S C 20 42.5N 250 12.3 19.8 25.8 29.6 PLAIN CONCRETE

05-02-10 D 1500 FC IB C 35 42.5N 330 19.5 30.7 40.7 45.2 GATED SPILLWAY SWF - 8

GATED SPILLWAY SWA -


05-02-10 D 1502 FC IB C 35 42.5N 330 16.5 27.9 36.5 40.6 SB1
GATED SPILLWAY SWE -
06-02-10 D 1508 FC IB C 35 42.5N 330 17.4 27.3 36.6 42.9 A7 - C7
GATED SPILLWAY SWF - 9-
08-02-10 D 1519 FC IB C 35 42.5N 330 15.9 26.6 36.1 39.4 10
GATED SPILLWAY SWE -
09-02-10 N 1526 FC IB C 35 42.5N 330 16.3 28.0 36.3 41.8 B8
GATED SPILLWAY SWA -
10-02-10 N 1531 FC IB C 35 42.5N 330 16.8 27.2 38.0 44.6 J5
GATED SPILLWAY SWA -
11-02-10 N 1537 FC IB C 35 42.5N 330 18.1 27.0 35.5 41.6 SBJ
GATED SPILLWAY SWB -
11-02-10 N 1543 FC IB C 35 42.5N 330 16.6 27.3 36.3 41.9 A10-C10
GATED SPILLWAY SWH -
12-02-10 N 1544 FC IB C 35 42.5N 330 18.6 26.9 36.4 41.1 H2
GATED SPILLWAY SWE -
13-02-10 N 1547 FC IB C 35 42.5N 330 23.2 32.3 41.6 47.1 A9-C9
GATED SPILLWAY SWA G -
14-02-10 N 1555 FC IB C 35 42.5N 330 16.0 28.9 37.1 41.3 H1 WALL
GATED SPILLWAY SWC -
16-02-10 N 1560 FC IB C 35 42.5N 330 23.4 32.2 43.0 48.4 A3-C3 WALL

Page 104
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SWA -
17-02-10 N 1565 FC IB C 35 42.5N 330 17.0 28.3 38.6 43.4 H1
GATED SPILLWAY SWA -
17-02-10 D 1567 FC IB C 35 42.5N 330 17.9 27.1 37.7 41.6 D7-E7
GATED SPILLWAY SWE -
18-02-10 N 1572 FC IB C 35 42.5N 330 23.4 32.3 42.8 49.7 B9-1
GATED SPILLWAY SWA -
19-02-10 N 1580 FC IB C 35 42.5N 330 17.0 28.8 39.6 44.4 C12
GATED SPILLWAY SB9
19-02-10 N 1584 FC R C 15 42.5N 250 12.8 22.8 31.3 37.3 BLINDING DOWNSTREAM
GATED SPILLWAY SWE -
21-02-10 1590 FC IB C 35 42.5N 330 18.7 28.2 37.6 44.6 D92
GATED SPILLWAY SWB -
21-02-10 D 1591 FC IB C 35 42.5N 330 17.8 27.7 36.2 42.5 C11
GATED SPILLWAY SWA -
22-02-10 N 1592 FC IB C 35 42.5N 330 18.4 28.9 36.2 45.2 E&D LIFT 8
GATED SPILLWAY SWA -
22-02-10 D 1595 FC IB C 35 42.5N 330 16.5 27.3 37.4 40.3 K2
GATED SPILLWAY SWA -
23-02-10 N 1597 FC IB C 35 42.5N 330 17.4 30.5 39.5 45.3 H1
GATED SPILLWAY SWE - A
23-02-10 D 1599 FC IB C 35 42.5N 330 16.8 29.2 35.8 42.4 & C10
GATED SPILLWAY SB-SB9 (
23-02-10 D 1600 FC S C 15 42.5N 250 9.8 16.6 21.2 24.0 PART 2)
GATED SPILLWAY
25-02-10 N 1609 FC R C 15 42.5N 250 11.6 17.3 24.8 28.2 BLINDING SB - S8
GATED SPILLWAY SWD -
25-02-10 D 1611 FC R C 15 42.5N 250 10.1 16.9 24.2 27.8 FH-1
GATED SPILLWAY SWA -
26-02-10 N 1618 FC IB C 35 42.5N 330 16.3 27.8 36.2 41.2 D9 - E9
GATED SPILLWAY SWA -
26-02-10 D 1619 FC IB C 35 42.5N 330 17.5 26.0 38.3 41.1 G3
GATED SPILLWAY
01-03-10 D 1627 FC R C 15 42.5N 250 11.6 18.3 24.9 28.4 BLINDING SB - S9
GATED SPILLWAY SWC -
02-03-10 N 1629 FC IB C 35 42.5N 330 20.7 29.2 41.3 45.6 F1
GATED SPILLWAY SWC -
02-03-10 N 1637 FC IB C 35 42.5N 330 16.1 26.4 36.5 40.3 A4 - C4
GATED SPILLWAY SWC -
03-03-10 D 1638 FC M6 C 40 42.5N 380 22.2 34.6 44.0 51.4 A4 - C4
GATED SPILLWAY SWE -
03-03-10 D 1639 FC IB C 35 42.5N 330 17.3 28.9 39.2 44.3 B10
GATED SPILLWAY SWA -
05-03-10 D 1651 FC IB C 35 42.5N 330 16.6 27.5 36.9 39.4 D10
GATED SPILLWAY SWA -
06-03-10 N 1655 FC IB C 35 42.5N 330 16.8 27.6 38.4 43.6 K3
GATED SPILLWAY SWA -
06-03-10 D 1657 FC IB C 35 42.5N 330 16.8 27.1 37.6 42.2 F1
GATED SPILLWAY SWC -
09-03-10 N 1664 FC IB C 35 42.5N 330 17.3 27.3 36.9 39.3 B3
GATED SPILLWAY G4
10-03-10 N 1668 FC IB C 35 42.5N 330 20.3 27.8 36.2 39.9 WALL
GATED SPILLWAY SB - S9
11-03-10 N 1674 FC IB C 35 42.5N 330 16.7 28.0 37.6 40.7 SLAB
GATED SPILLWAY SB - S9
11-03-10 D 1676 FC IB C 35 42.5N 330 17.3 28.8 38.2 45.6 SLAB
GATED SPILLWAY SWE - A -
12-03-10 N 1681 FC IB C 35 42.5N 330 16.2 27.3 37.1 40.6 C11 WALL
GATED SPILLWAY SWB - A -
16-03-10 D 1697 FC IB C 35 42.5N 330 18.0 27.0 36.7 38.7 11

Page 105
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SWB -
17-03-10 N 1699 FC IB C 35 42.5N 330 20.7 28.1 36.3 39.1 B4
GATED SPILLWAY SWA -
19-03-10 N 1710 FC IB C 35 42.5N 330 20.4 31.3 38.6 41.6 D11 - E11
GATED SPILLWAY SWC -
20-03-10 D 1718 FC IB C 35 42.5N 330 21.5 32.8 40.8 44.8 D1
GATED SPILLWAY SWA -
20-03-10 N 1721 FC IB C 35 42.5N 330 15.8 26.6 36.1 39.9 H2
GATED SPILLWAY SWB -
21-03-10 N 1723 FC IB C 35 42.5N 330 16.9 28.4 37.2 41.6 B11

22-03-10 D 1727 FC S C 20 42.5N 250 10.7 20.9 29.3 32.7 GATED SPILLWAY SB - S8

GATED SPILLWAY SWD -


24-03-10 D 1734 FC IB C 35 42.5N 330 18.5 28.9 37.4 39.0 J1

25-03-10 D 1737 FC IB-7 C 35 42.5N 300 17.3 29.3 38.8 42.4 GATED SPILLWAY SB - S8

25-03-10 N 1738 FC IB C 35 42.5N 330 20.3 27.2 41.6 46.2 GATED SPILLWAY SB - S8

GATED SPILLWAY SWD -


25-03-10 D 1743 FC IB C 35 42.5N 330 16.0 28.7 38.2 41.9 A2 - C2
GATED SPILLWAY SWA -
27-03-10 N 1750 FC IB C 35 42.5N 330 17.8 28.3 37.6 41.4 HA
GATED SPILLWAY SWD - F
27-03-10 D 1755 FC IB C 35 42.5N 330 16.4 26.9 36.2 39.2 -E-O
GATED SPILLWAY SWC -
29-03-10 D 1761 FC IB C 35 42.5N 330 17.9 26.4 36.4 40.1 A5

30-03-10 N 1764 FC IB C 35 42.5N 330 16.2 28.7 36.4 40.0 GATED SPILLWAY SB - S8

30-03-10 N 1765 FC IB-7 C 35 42.5N 300 16.7 27.0 37.3 40.1 GATED SPILLWAY SB - S8

30-03-10 D 1767 FC IB C 35 42.5N 330 16.2 27.1 36.8 40.3 GATED SPILLWAY SB - S8

GATED SPILLWAY SWA -


30-03-10 D 1770 FC IB C 35 42.5N 330 16.3 26.9 35.2 38.7 H3
GATED SPILLWAY SWD-
01-04-10 D 1777 FC IB C 35 42.5N 330 20.3 29.8 40.3 44.5 B2
GATED SPILLWAY SWA- K5
01-04-10 N 1779 FC IB C 35 42.5N 330 19.8 29.9 38.2 42.2 WALL
GATED SPILLWAY SWE-
07-04-10 N 1791 FC IB C 35 42.5N 330 15.5 27.1 36.6 39.1 B11 WALL
GATED SPILLWAY SWE- 1 -
07-04-10 N 1792 FC IB C 35 42.5N 330 16.3 26.8 36.4 39.2 2 WALL
GATED SPILLWAY SWA- 11
09-04-10 D 1796 FC IB C 35 42.5N 330 14.5 26.1 35.5 39.5 WALL
GATED SPILLWAY SWA- A3
10-04-10 N 1807 FC IB C 35 42.5N 330 15.7 27.5 36.1 40.0 - C3

11-04-10 N 1808 FC IB C 35 42.5N 330 16.0 27.1 36.6 39.4 GATED SPILLWAY SWA- H4

GATED SPILLWAY SWB-


12-04-10 D 1810 FC IB C 35 42.5N 330 15.7 28.0 38.8 43.5 D11 (STAGE 1)
GATED SPILLWAY SWC-
14-04-10 N 1817 FC IB C 35 42.5N 330 17.6 25.9 35.8 37.6 B4 WALL (STAGE 1)
GATED SPILLWAY SWE- A
14-04-10 D 1820 FC IB C 35 42.5N 330 16.0 26.4 36.3 39.8 & C)
GATED SPILLWAY SWD-
15-04-10 N 1823 FC IB C 35 42.5N 330 16.8 27.3 37.1 41.3 B3 WALL
GATED SPILLWAY SWE- A
15-04-10 D 1824 FC IB C 35 42.5N 330 15.6 25.7 36.1 39.6 & C) WALL
GATED SPILLWAY SWD-
15-04-10 N 1826 FC IB C 35 42.5N 330 16.9 25.7 37.1 40.3 FE2 & F2 WALL

Page 106
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

16-04-10 D 1831 FC IB C 35 42.5N 330 15.5 25.3 37.1 41.0 GATED SPILLWAY SWA- L3

GATED SPILLWAY SWD-


16-04-10 D 1834 FC IB C 35 42.5N 330 16.3 27.7 40.1 44.6 B3 WALL
GATED SPILLWAY SWA- H5
19-04-10 N 1843 FC IB C 35 42.5N 330 15.0 26.7 38.1 43.1 WALL
GATED SPILLWAY SWE-
22-04-10 N 1853 FC IB C 35 42.5N 330 15.5 26.0 36.8 42.7 B12 WALL
GATED SPILLWAY SWB- J4
23-04-10 D 1856 FC IB C 35 42.5N 330 15.1 26.2 36.5 39.3 WALL
GATED SPILLWAY SWD-
24-04-10 N 1858 FC IB C 35 42.5N 330 15.9 25.1 37.2 41.1 A4 - C4
GATED SPILLWAY SWE-E
24-04-10 N 1859 FC IB C 35 42.5N 330 15.2 26.2 37.8 41.1 & FF3
GATED SPILLWAY SWB-B4
24-04-10 D 1860 FC IB C 35 42.5N 330 16.3 27.1 36.9 40.6 (2 POLE) WALL
GATED SPILLWAY SB- S8
24-04-10 D 1862 FC IB C 35 42.5N 330 15.8 26.0 36.5 40.8 SLAB
GATED SPILLWAY SB- S8
25-04-10 N 1865 FC IB-7 C 35 42.5N 300 24.2 32.4 45.0 49.2 SLAB
GATED SPILLWAY SB- S8
25-04-10 D 1867 FC IB C 35 42.5N 330 16.1 30.3 42.4 45.4 SLAB
GATED SPILLWAY SWE- A
27-04-10 N 1872 FC IB C 35 42.5N 330 20.7 31.5 38.1 41.2 & C 13 WALL
GATED SPILLWAY SWC- J2
27-04-10 N 1873 FC IB C 35 42.5N 330 19.7 29.5 35.7 41.7 WALL
GATED SPILLWAY SWD-
28-04-10 N 1876 FC IB C 35 42.5N 330 18.4 30.4 36.8 41.8 B4 1 POUR WALL
GATED SPILLWAY SWE- A6
30-04-10 N 1881 FC IB C 35 42.5N 330 17.6 27.1 36.5 37.8 - C6 WALL
GATED SPILLWAY SWE-
30-04-10 D 1883 FC IB C 35 42.5N 330 16.8 26.6 35.6 39.8 B13 WALL
GATED SPILLWAY SWD-
02-05-10 D 1885 FC IB C 35 42.5N 330 15.8 26.1 36.0 39.8 FF4 - FE4
GATED SPILLWAY SWC-
05-05-10 N 1892 FC IB C 35 42.5N 330 15.8 25.9 36.2 40.3 D1 WALL
GATED SPILLWAY SWC- J3
07-05-10 D 1898 FC IB C 35 42.5N 330 19.6 29.1 39.0 42.6 WALL
GATED SPILLWAY SWE-
08-05-10 D 1905 FC IB C 35 42.5N 330 15.4 25.2 35.8 37.9 A14 - C14 WALL
GATED SPILLWAY SB- S1.2
08-05-10 N 1906 FC IB C 35 42.5N 330 16.3 29.4 35.9 40.0 SLAB WALL
GATED SPILLWAY SWA- I3
11-05-10 N 1912 FC IB C 35 42.5N 330 16.4 27.3 36.8 39.3 WALL
GATED SPILLWAY SWD-
11-05-10 D 1913 FC IB C 35 42.5N 330 17.8 27.1 37.5 41.2 A5 - C5 WALL

11-05-10 N 1915 FC IB C 35 42.5N 330 15.9 26.2 35.9 40.7 GATED SPILLWAY SWB- J5

11-05-10 N 1916 FC IB C 35 42.5N 330 16.1 26.9 35.9 40.5 GATED SPILLWAY SWB- B5

GATED SPILLWAY SWE-


13-05-10 N 1920 FC IB C 35 42.5N 330 14.7 26.3 37.0 42.8 B14 WALL
GATED SPILLWAY SWC- F2
15-05-10 N 1926 FC IB C 35 42.5N 330 19.2 27.5 35.7 38.8 WALL
GATED SPILLWAY SWC-
15-05-10 D 1927 FC IB C 35 42.5N 330 21.8 30.7 38.2 41.7 A7 - C7 WALL
GATED SPILLWAY SWC- J4
16-05-10 N 1929 FC IB C 35 42.5N 330 14.5 26.9 36.2 40.7 WALL
GATED SPILLWAY SWD- J2
18-05-10 N 1935 FC IB C 35 42.5N 330 20.6 31.0 43.8 51.7 - F2 WALL

Page 107
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SWA- L4
20-05-10 D 1941 FC IB C 35 42.5N 330 20.1 30.2 43.5 46.9 - 14 WALL
GATED SPILLWAY SWB- B6
20-05-10 D 1943 FC IB C 35 42.5N 330 15.0 25.1 36.7 40.5 - WALL
GATED SPILLWAY SWC- F3
21-05-10 N 1945 FC IB C 35 42.5N 330 15.9 25.8 35.8 39.5 - WALL
GATED SPILLWAY SWD-
22-05-10 N 1947 FC IB C 35 42.5N 330 20.5 27.5 36.4 40.4 A6 - C6 WALL
GATED SPILLWAY SWD-
23-05-10 N 1954 FC IB C 35 42.5N 330 16.4 27.2 37.4 42.8 FG1
GATED SPILLWAY SWD- J3
24-05-10 N 1956 FC IB C 35 42.5N 330 20.7 29.9 37.7 42.3 - F3 WALL
GATED SPILLWAY SWB- F5
25-05-10 D 1958 FC IB C 35 42.5N 330 15.5 26.8 37.0 40.6 - WALL
GATED SPILLWAY SWC-
26-05-10 N 1967 FC IB C 35 42.5N 330 15.3 27.2 37.2 41.6 B4 - WALL
GATED SPILLWAY SWC-
27-05-10 D 1969 FC IB C 35 42.5N 330 18.8 30.1 37.6 39.6 D2 - WALL
GATED SPILLWAY SWC- F4
28-05-10 N 1972 FC IB C 35 42.5N 330 20.0 30.9 39.2 46.5 - WALL
GATED SPILLWAY SWD-
28-05-10 D 1974 FC IB C 35 42.5N 330 20.3 30.9 37.5 42.4 FG2 - FH1
GATED SPILLWAY SWC-
29-05-10 D 1976 FC IB C 35 42.5N 330 16.3 25.9 35.9 40.5 A8 - C8 WALL
GATED SPILLWAY SWC-
29-05-10 N 1977 FC IB C 35 42.5N 330 20.8 29.7 36.3 41.6 G1 - WALL
GATED SPILLWAY SWC-
01-06-10 D 1982 FC IB C 35 42.5N 330 18.5 27.1 35.3 43.5 G2 - WALL
GATED SPILLWAY SWC- J5
02-06-10 N 1986 FC IB C 35 42.5N 330 15.1 26.8 33.4 36.2 - WALL

02-06-10 N 1987 FC IB C 35 42.5N 330 15.4 28.3 36.9 39.9 GATED SPILLWAY SWB- F6

GATED SPILLWAY SWD- J4


04-06-10 D 1994 FC IB C 35 42.5N 330 16.9 36.1 37.4 43.8 - F4 WALL
GATED SPILLWAY SWD-
04-06-10 D 1995 FC IB C 35 42.5N 330 20.3 32.0 40.7 44.0 A7 - C7 WALL
GATED SPILLWAY SWC- F5
06-06-10 N 2002 FC IB C 35 42.5N 330 20.6 28.2 35.1 41.0 WALL
GATED SPILLWAY SWA- L5
07-06-10 N 2004 FC IB C 35 42.5N 330 17.0 25.3 35.8 40.2 - I 5 WALL
GATED SPILLWAY SWB- B7
07-06-10 D 2005 FC IB C 35 42.5N 330 16.4 25.3 35.5 38.2 - F7 WALL
GATED SPILLWAY SWC-
09-06-10 N 2009 FC IB C 35 42.5N 330 20.2 29.1 36.3 41.2 D3 WALL
GATED SPILLWAY SWD-
09-06-10 D 2011 FC IB C 35 42.5N 330 17.6 29.3 38.6 44.1 SB - S11 SLAB
GATED SPILLWAY SWC-
10-06-10 N 2014 FC IB C 35 42.5N 330 18.0 28.1 35.5 43.2 A9 - C9 WALL
GATED SPILLWAY SWC-
10-06-10 N 2017 FC IB C 35 42.5N 330 15.8 27.7 35.9 40.7 K1 WALL
GATED SPILLWAY SWD- F5
11-06-10 D 2020 FC IB C 35 42.5N 330 15.4 27.6 35.9 42.0 WALL
GATED SPILLWAY SWC-
12-06-10 D 2026 FC IB C 35 42.5N 330 17.4 27.2 37.9 40.1 B5 WALL
GATED SPILLWAY SWD-
12-06-10 N 2030 FC IB C 35 42.5N 330 15.1 25.5 36.4 39.2
B4 2nd POURING WALL
GATED SPILLWAY SWC-
13-06-10 N 2032 FC IB C 35 42.5N 330 16.5 26.5 35.5 40.0 K2
GATED SPILLWAY SWB- B8
15-06-10 N 2035 FC IB C 35 42.5N 330 21.9 31.1 40.0 45.4 - F8

Page 108
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SWD-
15-06-10 D 2037 FC IB C 35 42.5N 330 15.2 26.0 37.6 41.4 A8 - C8 WALL
GATED SPILLWAY SWD- J5
17-06-10 N 2044 FC IB C 35 42.5N 330 23.8 31.0 39.9 46.3 WALL
GATED SPILLWAY SWB- G -
19-06-10 D 2050 FC IB C 35 42.5N 330 17.8 28.8 36.8 42.3 1
GATED SPILLWAY SWD-
19-06-10 D 2054 FC M6 C 40 42.5N 380 21.0 33.6 45.9 54.2 D1 WALL
GATED SPILLWAY SWC-
21-06-10 D 2056 FC IB C 35 42.5N 330 16.9 28.4 37.0 41.8 H1, L1, J1 WALL
GATED SPILLWAY SWB-
22-06-10 N 2059 FC IB C 35 42.5N 330 18.7 26.5 35.4 41.6 G2 WALL
GATED SPILLWAY SWC-
22-06-10 D 2061 FC IB C 35 42.5N 330 15.9 25.7 37.4 39.9 G3 - K3
GATED SPILLWAY SWC-
22-06-10 N 2063 FC IB C 35 42.5N 330 19.2 33.0 40.6 46.7 A10 - C10 WALL
GATED SPILLWAY SWC-
23-06-10 N 2066 FC IB C 35 42.5N 330 15.3 28.1 35.6 40.0 H2 - L2 - I 2
GATED SPILLWAY SWB- L1
26-06-10 D 2075 FC IB C 35 42.5N 330 16.3 25.6 38.0 41.2 - J1
GATED SPILLWAY SWC-
27-06-10 D 2077 FC IB C 35 42.5N 330 20.9 29.7 37.9 44.2 A4
GATED SPILLWAY SWC-
27-06-10 N 2078 FC IB C 35 42.5N 330 20.7 29.7 37.8 42.4 B6 WALL
GATED SPILLWAY SWD-
28-06-10 N 2081 FC IB C 35 42.5N 330 16.2 26.6 37.5 40.1 A9 - C9 WALL
GATED SPILLWAY SWC-
28-06-10 N 2082 FC IB C 35 42.5N 330 16.8 26.8 35.1 39.9 G4 - K4
GATED SPILLWAY SWB- J2
29-06-10 D 2086 FC IB C 35 42.5N 330 17.4 26.4 35.1 41.5 -I2

29-06-10 N 2087 FC IB C 35 42.5N 330 17.8 29.8 37.4 43.2 GATED SPILLWAY SWC- F6

30-06-10 N 2094 FC IB C 35 42.5N 330 16.2 27.0 35.6 39.6 GATED SPILLWAY SWB- B9

GATED SPILLWAY SWD-


02-07-10 N 2097 FC IB C 35 42.5N 330 17.9 28.2 36.1 41.4 B5
GATED SPILLWAY SWC-
02-07-10 D 2098 FC IB C 35 42.5N 330 15.4 25.9 35.2 40.1 H3 - L3 - I 3
GATED SPILLWAY SWD-
06-07-10 N 2104 FC IB C 35 42.5N 330 17.2 25.3 36.8 39.3 D2
GATED SPILLWAY SWC-
08-07-10 N 2108 FC IB C 35 42.5N 330 16.0 25.9 35.4 40.7 D5 WALL
GATED SPILLWAY SWC-
08-07-10 D 2109 FC IB C 35 42.5N 330 16.6 26.8 38.4 42.8 G5 - K5
GATED SPILLWAY SWC-
10-07-10 D 2114 FC IB C 35 42.5N 330 19.4 31.9 39.6 47.5 H4 - L4 - I 4
GATED SPILLWAY SWD-
13-07-10 N 2121 FC IB C 35 42.5N 330 20.5 28.0 38.0 42.4 B6 - F6
GATED SPILLWAY SWB-
13-07-10 D 2122 FC IB C 35 42.5N 330 17.7 29.5 35.2 38.9 G3
GATED SPILLWAY SWD-
13-07-10 D 2123 FC IB C 35 42.5N 330 16.8 29.3 38.4 43.1 A10 - C10
GATED SPILLWAY SWB- L3
14-07-10 N 2125 FC IB C 35 42.5N 330 17.5 25.5 38.2 41.7 - J3
GATED SPILLWAY SWC-
15-07-10 D 2129 FC IB C 35 42.5N 330 18.3 31.2 39.9 44.5 B7 - F7
GATED SPILLWAY SWC-
17-07-10 D 2134 FC IB C 35 42.5N 330 15.0 27.2 35.4 40.8 H5 - L5 - I 5
GATED SPILLWAY SWC-
19-07-10 D 2137 FC IB C 35 42.5N 330 16.7 25.5 35.5 37.6 A11 - C11 WALL

Page 109
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SWB-
20-07-10 D 2141 FC IB C 35 42.5N 330 18.2 29.2 36.9 40.9 G4 WALL SLAB
GATED SPILLWAY SWB-
21-07-10 N 2147 FC IB C 35 42.5N 330 15.9 25.3 38.7 41.2 B10
GATED SPILLWAY SWB- L4
22-07-10 D 2149 FC IB C 35 42.5N 330 16.6 27.5 37.2 41.4 -I4
GATED SPILLWAY SWD-
23-07-10 N 2152 FC IB C 35 42.5N 330 18.5 26.7 35.4 37.6 B7 - F7 WALL
GATED SPILLWAY SWB-
24-07-10 N 2154 FC IB C 35 42.5N 330 18.9 27.9 36.0 40.5 G5 WALL
GATED SPILLWAY SWD-
25-07-10 N 2157 FC IB C 35 42.5N 330 18.0 37.2 35.8 39.4 G1 - K1
GATED SPILLWAY SWC-
25-07-10 D 2158 FC IB C 35 42.5N 330 18.2 26.0 36.7 39.6 D6 WALL
GATED SPILLWAY SWB- L5
27-07-10 N 2165 FC IB C 35 42.5N 330 16.1 25.8 37.4 41.3 -I5
GATED SPILLWAY SWC-
27-07-10 N 2166 FC IB C 35 42.5N 330 16.0 26.9 38.2 41.8 B5 - F8
GATED SPILLWAY SWD-
28-07-10 N 2171 FC IB C 35 42.5N 330 15.2 29.2 36.1 40.5 G2 - K2
GATED SPILLWAY SWD- F8
30-07-10 D 2177 FC IB C 35 42.5N 330 19.5 27.3 35.1 40.5 - B8
GATED SPILLWAY SWD-
03-08-10 N 2182 FC IB C 35 42.5N 330 16.4 26.7 36.3 38.9 D3 WALL
GATED SPILLWAY SWD-
03-08-10 N 2184 FC IB C 35 42.5N 330 15.9 25.6 35.4 39.3 B11
GATED SPILLWAY SWC-
05-08-10 N 2190 FC IB C 35 42.5N 330 15.3 26.5 35.7 40.6 B9
GATED SPILLWAY SWD-
05-08-10 N 2192 FC IB C 35 42.5N 330 15.7 26.9 37.6 44.9 H1 - I 1 - J1
GATED SPILLWAY SWD-
06-08-10 D 2199 FC IB C 35 42.5N 330 16.8 30.1 36.9 45.6 B9 WALL
GATED SPILLWAY SWD-
06-08-10 N 2200 FC IB C 35 42.5N 330 15.9 26.5 35.8 40.9 H2 - L2 - I 2
GATED SPILLWAY SWD-
08-08-10 N 2202 FC IB C 35 42.5N 330 19.2 27.4 35.1 40.4 D7 WALL
GATED SPILLWAY SWC-
09-08-10 D 2204 FC M6 C 40 42.5N 380 24.3 37.1 48.0 55.9 WHEEL GATE A4
GATED SPILLWAY SWC-
10-08-10 D 2207 FC IB C 35 42.5N 330 19.9 25.4 37.6 41.6 B10
GATED SPILLWAY SWD-
13-08-10 N 2214 FC IB C 35 42.5N 330 15.6 25.8 36.5 39.6 B10
GATED SPILLWAY
13-08-10 D 2216 FC R C 25 42.5N 250 11.8 18.4 24.6 27.8 BLINDING GRANTRY
CRANE
G. SPILLWAY SWC- AS
16-08-10 D 2222 FC M6 C 40 42.5N 380 23.8 34.6 42.6 48.9 EMERGENCY WHEEL
GATE
GATED SPILLWAY SWC-
17-08-10 D 2224 FC IB C 35 42.5N 330 16.8 31.5 36.7 46.3 D8
G. SPILLWAY SEW- 1 - 5
19-08-10 N 2228 FC M6 C 40 42.5N 380 25.7 37.3 47.0 53.0 EMERGENCY WHEEL
GATE
GATED SPILLWAY SWD-
20-08-10 N 2231 FC IB C 35 42.5N 330 16.1 27.5 35.6 39.0 D4
G. SPILLWAY EXTENSION
21-08-10 N 2234 FC S C 20 42.5N 250 9.8 18.3 24.8 27.8 OF GRANTRY BLINDING
GATED SPILLWAY SWC-
21-08-10 N 2236 FC IB C 35 42.5N 330 19.7 26.3 40.4 45.9 B11

Page 110
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SWD-
23-08-10 D 2244 FC IB C 35 42.5N 330 15.7 27.2 36.2 40.7 K3 - H3
GATED SPILLWAY SWC-
26-08-10 D 2256 FC IB C 35 42.5N 330 16.5 29.5 36.2 41.7 D9
GATED SPILLWAY SWD- L3
28-08-10 N 2261 FC IB C 35 42.5N 330 16.5 27.2 35.1 39.9 - J3
GATED SPILLWAY SWD -
31-08-10 N 2268 FC IB C 35 42.5N 330 18.5 27.9 35.8 39.5 D5
GATED SPILLWAY SFW- 2 -
31-08-10 D 2271 FC IB C 35 42.5N 330 18.4 26.9 36.8 40.8 4
G. SPILLWAY SFW- (1 - 6)
02-09-10 N 2275 FC IB C 35 42.5N 330 21.3 33.9 39.7 45.3 EMERGENCY WHEEL
GATE
G. SPILLWAY SWD - A11 -
02-09-10 D 2277 FC IB C 35 42.5N 330 16.7 25.1 37.7 41.6 B11 - C11
G. SPILLWAY SWD - A11 -
02-09-10 N 2278 FC M6 C 40 42.5N 380 24.8 33.6 44.6 48.8 B11 - C11
GATED SPILLWAY SFW- 2 -
03-09-10 N 2280 FC IB C 35 42.5N 330 15.3 29.9 39.6 44.7 5
G. SPILLWAY SWD- K4 - H4
05-09-10 N 2282 FC IB C 35 42.5N 330 21.6 29.5 42.3 47.0 - L4 - J4 WALL
GATED SPILLWAY SWD -
07-09-10 N 2289 FC IB C 35 42.5N 330 22.7 30.7 41.0 45.6 D10
GATED SPILLWAY SWD -
08-09-10 D 2292 FC IB C 35 42.5N 330 23.1 31.0 41.8 47.1 L4 - I 4
GATED SPILLWAY SFW- 1 -
08-09-10 N 2294 FC IB C 35 42.5N 330 16.5 27.6 35.5 39.7 7
GATED SPILLWAY SWD -
09-09-10 N 2295 FC IB C 35 42.5N 330 21.7 30.6 41.4 46.5 D6
G. SPILLWAY GRANTRY
11-09-10 D 2299 FC IB C 35 42.5N 330 22.2 30.8 42.9 52.2 CRANE RAIL EXT. SLAB
CENTRAL EMBANKMENT
GATED SPILLWAY SFW- 2 -
13-09-10 N 2303 FC IB C 35 42.5N 330 22.1 30.8 44.3 49.1 6
GATED SPILLWAY SWD- K -
13-09-10 D 2304 FC IB C 35 42.5N 330 16.8 27.5 38.7 41.4 G-L-I-5
GATED SPILLWAY SFW- 1 -
15-09-10 D 2310 FC IB C 35 42.5N 330 17.0 26.2 37.3 41.3 7
GATED SPILLWAY SWD -
18-09-10 N 2315 FC IB C 35 42.5N 330 18.0 31.8 43.9 47.7 D7
G. SPILLWAY SFW- 2 - 7
20-09-10 D 2318 FC IB C 35 42.5N 330 16.8 30.1 41.1 48.7 FRONT WALL
GATED SPILLWAY GANTRY
21-09-10 N 2320 FC IB C 35 42.5N 330 16.1 25.7 37.8 42.3 RAIL EXTENTION
GATED SPILLWAY SWC -
22-09-10 D 2323 FC IB C 35 42.5N 330 17.4 30.6 41.9 48.5 D11
G. SPILLWAY SFW- 1 - 7 &
23-09-10 N 2326 FC IB C 35 42.5N 330 21.0 30.6 37.2 43.9 8 PARTIAL
GATED SPILLWAY
23-09-10 N 2328 FC IB C 35 42.5N 330 15.1 27.4 37.4 40.4 EXTENTION APRON
GATED SPILLWAY SWD -
25-09-10 N 2330 FC IB C 35 42.5N 330 18.8 26.3 35.1 38.7 D8
GATED SPILLWAY
26-09-10 N 2334 FC IB C 35 42.5N 330 16.3 28.3 37.5 43.1 GRANTRY EXTENTION 2nd
PHASE
G. SPILLWAY SWD - Z1 -
26-09-10 N 2338 FC IB C 35 42.5N 330 15.2 31.3 40.2 47.0 U1 APRON
GATED SPILLWAY SFW- 1 -
27-09-10 N 2340 FC IB C 35 42.5N 330 21.4 30.6 42.1 46.7 10

Page 111
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

GATED SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
GATED SPILLWAY SFW- 2 -
28-09-10 N 2341 FC IB C 35 42.5N 330 15.3 25.1 35.8 37.4 8
GATED SPILLWAY SWD -
28-09-10 D 2342 FC IB C 35 42.5N 330 18.4 31.2 40.2 47.1 G3
G. SPILLWAY PRECAST
28-09-10 D 2344 FC IB C 35 42.5N 330 16.6 25.2 37.8 38.3 DOWN STREAM BRIDGE
GATED SPILLWAY SWD -
01-10-10 N 2353 FC IB C 35 42.5N 330 17.5 29.7 37.3 44.1 D9
GATED SPILLWAY SFW- 1 -
01-10-10 N 2355 FC IB C 35 42.5N 330 18.6 31.4 37.6 47.0 10
GATED SPILLWAY SWD -
02-10-10 N 2359 FC IB C 35 42.5N 330 20.4 30.2 38.0 43.5 G4
GATED SPILLWAY SWD -
07-10-10 N 2367 FC IB C 35 42.5N 330 17.4 30.8 38.3 44.5 G5
GATED SPILLWAY SFW- 2 -
07-10-10 N 2368 FC IB C 35 42.5N 330 16.8 29.3 36.8 44.1 9
GATED SPILLWAY SFW- 1 -
08-10-10 N 2370 FC IB C 35 42.5N 330 21.1 31.2 37.5 43.9 11
GATED SPILLWAY SWD -
11-10-10 D 2375 FC IB C 35 42.5N 330 15.8 26.6 37.0 42.5 D10
G. SPILLWAY HOIST
12-10-10 D 2378 FC M6 C 40 42.5N 380 24.5 35.0 43.5 49.5 BETWEEN SWB & SWC
GATED SPILLWAY SFW- 2 -
13-10-10 N 2383 FC IB C 35 42.5N 330 22.5 31.0 40.2 46.7 10
GATED SPILLWAY HOIST
15-10-10 D 2389 FC M6 C 40 42.5N 380 22.2 34.8 46.0 53.9 BEAM RADIAL GATE 2
GATED SPILLWAY APRON
16-10-10 N 2393 FC IB C 35 42.5N 330 16.6 28.8 37.5 43.3 AWD - Z2
GATED SPILLWAY SFW- 2 -
20-10-10 N 2398 FC IB C 35 42.5N 330 17.9 26.2 35.2 42.4 10
GATED SPILLWAY APRON
20-10-10 D 2399 FC IB C 35 42.5N 330 21.4 30.6 40.2 48.5 LIFT B4 - V4
GATED SPILLWAY SWD -
23-10-10 N 2403 FC IB C 35 42.5N 330 21.7 30.5 41.2 47.4 D11
GATED SPILLWAY APRON
24-10-10 N 2406 FC IB C 35 42.5N 330 23.8 31.8 40.9 46.3 AWA - T2 - V2
GATED SPILLWAY SFW- 11
24-10-10 D 2407 FC IB C 35 42.5N 330 19.9 32.7 39.9 43.1 - 12
GATED SPILLWAY
30-10-10 N 2428 FC IB C 35 42.5N 330 15.9 26.7 36.0 39.4 EXTENDED APRON AWA -
Y3 - V3
GATED SPILLWAY
19-11-10 2477 FC IB C 35 42.5N 330 15.5 25.5 36.8 39.9 PRECAST BEAM FOR
BRIDGE AT CREST
GATED SPILLWAY SWD -
17-12-10 2536 FC IB C 35 42.5N 330 16.7 26.1 36.2 40.1 K2 & H2 PARTIAL
GATED SPILLWAY SWB
31-12-10 2551 FC IB C 35 42.5N 330 15.3 26.6 35.5 40.6 LIFT - K3 & H3 PARTIAL
G. SPILLWAY STEEL BEAM
04-01-11 D 2557 FC M6 C 40 42.5N 380 22.4 34.8 44.1
2nd PHASE CAST
G. SPILLWAY SWB LIFT K4
12-01-11 D 2570 FC IB C 35 42.5N 330 15.4 26.6 36.4 & H4 PARTIAL
G. SPILLWAY SWD LIFT
23-01-11 D 2588 FC IB-2 C 30 42.5N 300 13.2 25.3 32.5 H5 - K5

Page 112
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

03-02-09 N 426 FC S C 15 42.5N 250 9.7 24.9 34.1 40.7 SIPHONE SPILLWAY

10-02-09 D 437 FC IB-2 C 25 42.5N 270 9.0 27.0 34.6 39.1 SIPHONE SPILLWAY

05-03-09 D 474 FC IB-7 C 25 42.5N 270 14.3 26.0 36.2 39.5 SIPHONE SPILLWAY

31-03-09 D 516 FC S C 15 42.5N 250 10.3 20.1 27.5 31.9 SIPHONE SPILLWAY

10-04-09 D 538 FC K C 25 42.5N 250 14.2 25.0 34.7 41.5 SIPHONE SPILLWAY

14-05-09 D 597 FC S C 15 42.5N 250 12.4 19.4 27.5 30.9 SIPHONE SPILLWAY

26-05-09 N 619 FC S C 15 42.5N 250 12.4 24.2 33.2 37.4 SIPHONE SPILLWAY

02-06-09 D 631 FC S C 15 42.5N 250 12.5 19.6 24.7 30.7 SIPHONE SPILLWAY

04-06-09 N 634 FC IB-2 C 25 42.5N 270 14.5 25.2 35.1 38.4 SIPHONE SPILLWAY

04-06-09 D 635 FC EB C 16 42.5N 190 10.0 17.3 24.6 28.0 SIPHONE SPILLWAY

14-06-09 D 656 FC IB-7 C 25 42.5N 270 16.1 28.2 36.0 41.2 SIPHONE SPILLWAY

19-06-09 N 667 FC S C 15 42.5N 250 11.5 22.2 29.7 36.3 SIPHONE SPILLWAY

21-06-09 D 672 FC IB-7 C 25 42.5N 270 15.1 27.4 41.3 44.6 SIPHONE SPILLWAY

23-06-09 D 675 FC S C 15 42.5N 250 12.0 22.1 30.6 34.1 SIPHONE SPILLWAY

27-06-09 D 687 FC IB-7 C 25 42.5N 270 17.0 28.5 38.5 42.5 SIPHONE SPILLWAY

03-07-09 D 697 FC IB-7 C 25 42.5N 270 19.6 28.5 37.0 42.5 SIPHONE SPILLWAY

09-07-09 N 710 FC IB-7 C 25 42.5N 270 17.3 27.9 38.4 41.5 SIPHONE SPILLWAY

12-07-09 N 720 FC IB C 35 42.5N 300 16.8 27.3 38.4 41.8 SIPHONE SPILLWAY

17-07-09 D 734 FC IB-2 C 25 42.5N 270 13.9 24.6 35.0 38.9 SIPHONE SPILLWAY

27-07-09 N 768 FC JC C 25 42.5N 300 16.7 32.4 36.3 43.8 SIPHONE SPILLWAY

30-07-09 N 779 FC JC C 25 42.5N 300 12.5 21.4 33.6 35.7 SIPHONE SPILLWAY

SIPHONE SPILLWAY LIFT


03-08-09 N 787 FC JC C 25 42.5N 300 14.1 28.8 39.4 44.1 7&8

SIPHONE SPILLWAY LIFT


07-08-09 D 801 FC JC C 25 42.5N 300 18.1 27.3 36.0 40.3 2,8&9

SIPHONE SPILLWAY 11/12


09-08-09 D 812 FC JC C 25 42.5N 300 13.2 23.5 35.5 40.5 LIFT 2
S.S.W LIFT 3 BARREL 5&6 /
13-08-09 N 821 FC IB-7 C 25 42.5N 270 20.8 29.9 40.4 44.4 LIFT 2 13&14/LIFT 2A
6,7,8,9
S.S.W LIFT 3 BARREL 5&6 /
13-08-09 N 827 FC IB C 35 42.5N 300 15.1 32.0 44.1 48.3 LIFT 2 13&14/LIFT 2A
6,7,8,9
S.SPILLWAY BARREL 13,14
14-08-09 D 829 FC IB C 35 42.5N 300 16.5 33.3 44.9 46.9 LIFT 2

GATED SPILLWAY SWA -


15-08-09 N 835 FC IB C 35 42.5N 300 19.3 32.0 43.1 46.6 D4

S.SPILLWAY BARREL
18-08-09 D 846 FC M6 C 40 42.5N 333 18.6 33.3 44.8 51.9 10,11,12 LIFT 2A

S.SPILLWAY BARREL 3 & 4


19-08-09 D 849 FC IB-7 C 25 42.5N 270 20.0 29.0 39.4 43.3 LIFT 3

S.SPILLWAY BARREL 5 & 6


21-08-09 D 861 FC IB C 35 42.5N 300 19.5 36.7 46.6 48.1 LIFT 4

Page 113
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

S.SPILLWAY BARREL 13,14


22-08-09 D 867 FC M6 C 40 42.5N 333 24.1 32.6 41.6 44.8 LIFT 2A

S.SPILLWAY BARREL 3 & 4


24-08-09 D 872 FC IB C 35 42.5N 300 20.0 31.9 41.2 44.8 LIFT 4

S.SPILLWAY BARREL 1 & 2


27-08-09 D 885 FC IB C 35 42.5N 300 18.9 34.9 44.5 47.1 LIFT 1

S.SPILLWAY BARREL 1 & 2


27-08-09 D 886 FC IB-7 C 25 42.5N 270 19.2 31.0 42.0 45.1 LIFT 1

S.SPILLWAY BARREL 5 & 6


28-08-09 D 891 FC IB C 35 42.5N 300 16.0 34.1 43.1 46.3 LIFT 5

S.SPILLWAY BARREL 3 & 4


04-09-09 D 911 FC IB C 35 42.5N 330 20.4 34.2 42.4 46.2 LIFT 5

S.SPILLWAY BARREL 7 & 8


05-09-09 N 913 FC IB C 35 42.5N 330 22.7 33.7 41.2 45.6 LIFT 3, 2 & 1

S.SPILLWAY BARREL 5 & 6


06-09-09 N 919 FC IB C 35 42.5N 330 35.4 45.5 55.1 46.9 LIFT 6+6 / 1

S.SPILLWAY BARREL 34
11-09-09 D 936 FC IB C 35 42.5N 330 18.9 31.5 40.2 46.1 LIFT 6.6

S.SPILLWAY BARREL 15 &


12-09-09 N 943 FC IB-7 C 25 42.5N 300 19.3 34.4 44.1 47.5 16 LIFT 1

S.SPILLWAY BARREL 1/2


13-09-09 N 944 FC IB C 35 42.5N 330 17.6 29.9 40.4 44.4 LIFT 2

S.SPILLWAY CRANE
16-09-09 D 955 FC IB C 35 42.5N 330 15.2 26.0 39.0 48.1 RAILWAY

S.SPILLWAY BARREL 7 & 8


18-09-09 D 962 FC IB C 35 42.5N 330 19.5 33.9 45.1 52.1 LIFT 4

S.SPILLWAY BARREL 1/2


19-09-09 D 968 FC IB C 35 42.5N 330 19.0 29.6 38.1 45.6 LIFT 3

S.SPILLWAY BARREL 7- 8
24-09-09 N 986 FC IB C 35 42.5N 330 18.4 31.2 40.9 45.4 LIFT 5

S.SPILLWAY BARREL 1/2


25-09-09 D 991 FC IB C 35 42.5N 330 17.7 27.2 38.0 41.5 LIFT 4

S.SPILLWAY BARREL 1/2


25-09-09 N 992 FC M6 C 40 42.5N 333 19.0 33.4 45.6 51.1 LIFT 4

S.SPILLWAY BARREL
26-09-09 D 1000 FC IB C 35 42.5N 330 19.0 31.3 42.5 50.4 15&16 LIFT 2

S.SPILLWAY BARREL
30-09-09 D 1010 FC IB C 35 42.5N 330 18.2 30.9 41.0 50.1 11&12,13&14 LIFT 3

S.SPILLWAY BARREL
30-09-09 D 1011 FC IB-7 C 25 42.5N 300 18.1 32.8 42.2 45.8 11&12,13&14 LIFT 3

S.SPILLWAY BARREL 1/2


02-10-09 N 1019 FC IB C 35 42.5N 330 24.0 33.4 41.6 50.1 LIFT 5

S.SPILLWAY BARREL
08-10-09 D 1039 FC M6 C 40 42.5N 333 21.9 37.0 47.6 54.2 3&4,5&6 DEFLECTORS

Page 114
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
S.SPILLWAY BARREL 15-16
09-10-09 N 1041 FC IB C 35 42.5N 330 20.1 30.4 42.6 48.5 LIFT 3

S.SPILLWAY BARREL 15-16


09-10-09 N 1042 FC IB-7 C 25 42.5N 300 19.4 29.1 42.8 46.6 LIFT 3

S.SPILLWAY BARREL
10-10-09 D 1049 FC M6 C 40 42.5N 333 25.5 38.5 48.4 54.6 3&4,5&6 DEFLECTORS

S.SPILLWAY BARREL
10-10-09 N 1050 FC M6 C 40 42.5N 333 23.6 34.0 47.8 52.8 11&12,13&14 LIFT 4

S.SPILLWAY BARREL
10-10-09 N 1051 FC IB C 35 42.5N 330 23.8 30.6 45.1 47.4 11&12,13&14 LIFT 4

S.SPILLWAY BARREL 7-8


12-10-09 N 1058 FC IB C 35 42.5N 330 18.0 32.2 42.2 46.4 LIFT 6.6

S.SPILLWAY BARREL 1/2


16-10-09 N 1074 FC IB C 35 42.5N 330 22.1 30.1 41.2 53.4 LIFT 6/6.1

S.SPILLWAY BARREL 9-10


22-10-09 N 1098 FC IB C 35 42.5N 330 24.3 32.3 40.4 45.8 LIFT 3

S.SPILLWAY BARREL 15-16


24-10-09 D 1110 FC M6 C 40 42.5N 333 30.8 43.0 48.4 56.7 LIFT 4

S.SPILLWAY BARREL 15-16


24-10-09 D 1111 FC IB C 35 42.5N 330 21.6 28.9 38.8 44.3 LIFT 4

S.SPILLWAY BARREL 11-


29-10-09 D 1123 FC IB C 35 42.5N 330 19.1 31.0 39.1 49.3 12&13-14 LIFT 5

S.SPILLWAY BARREL 11-


29-10-09 N 1125 FC IB C 35 42.5N 330 18.2 26.3 37.6 41.4 12&13-14 LIFT 5

S.SPILLWAY BARREL 9-10


06-11-09 D 1152 FC M6 C 40 42.5N 333 21.5 38.9 48.5 53.4 LIFT 4

S.SPILLWAY BARREL 9-10


06-11-09 N 1153 FC IB C 35 42.5N 330 17.0 28.3 38.9 47.4 LIFT 4

S.SPILLWAY BARREL 15-16


12-11-09 N 1173 FC IB C 35 42.5N 330 18.7 29.0 39.5 44.3 LIFT 5

S.SPILLWAY BARREL 9-10


17-11-09 N 1197 FC IB C 35 42.5N 330 17.7 28.8 38.2 42.1 LIFT 5

S.SPILLWAY BARREL 11-12


23-11-09 N 1216 FC IB C 35 42.5N 330 18.5 29.9 36.7 48.6 LIFT 6

S.SPILLWAY BARREL 15-16


28-11-09 D 1228 FC IB C 35 42.5N 330 18.2 30.2 43.5 49.3 LIFT 6/6.1

S.SPILLWAY BARREL 9-10


05-12-09 D 1249 FC IB C 35 42.5N 330 16.4 27.2 37.4 44.3 LIFT 6/6.1

SIPHON SPILLWAY
06-12-09 D 1253 FC IB C 35 42.5N 330 16.2 27.1 36.5 38.5 PRECAST

SIPHON SPILLWAY
07-12-09 D 1259 FC IB C 35 42.5N 330 16.3 26.8 37.8 41.6 PRECAST

S.SPILLWAY BARRELS 13-


09-12-09 D 1265 FC IB C 35 42.5N 330 18.1 29.3 37.1 42.5 14 LIFT 6/6.1

Page 115
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
SIPHON SPILLWAY
09-12-09 D 1266 FC IB-7 C 35 42.5N 300 16.4 28.6 37.0 41.5 PRECAST BEAM

SIPHON SPILLWAY
10-12-09 D 1270 FC IB C 35 42.5N 330 17.4 27.5 36.5 40.8 PRECAST BEAM

SIPHON SPILLWAY
11-12-09 N 1274 FC IB C 35 42.5N 330 17.3 27.9 39.0 43.5 PRECAST

SIPHON SPILLWAY
12-12-09 D 1279 FC IB-7 C 35 42.5N 300 16.4 26.8 36.3 38.7 PRECAST BEAM

S.SPILLWAY BARRELS 1-2


15-12-09 D 1288 FC IB C 35 42.5N 330 16.3 25.8 39.3 44.6 LIFT 2A

S.SPILLWAY BARRELS 3, 4,
17-12-09 D 1294 FC M6 C 40 42.5N 333 25.4 37.7 46.2 53.8 5, 6 LIFT 7

S.SPILLWAY BARRELS 1,2


10-01-10 D 1374 FC IB C 35 42.5N 330 17.7 30.5 41.8 46.7 LIFT 4A

S.SPILLWAY BARRELS 1,2


12-01-10 D 1382 FC M6 C 40 42.5N 380 26.3 38.8 48.2 55.4 LINING

S.S. BARRELS 1,2 LIFT 4A -


13-01-10 D 1387 FC IB C 35 42.5N 330 16.9 28.9 39.6 45.3 5A

S.SPILLWAY BARRELS 7,8


15-01-10 D 1398 FC M6 C 40 42.5N 380 22.9 37.2 46.6 51.7 LIFT 7

16-01-10 D 1402 FC IB C 35 42.5N 330 20.0 30.8 41.8 48.4 S.S. BARREL 1 Lift 4A WALL

S.SPILLWAY BARRELS 3,4


16-01-10 N 1403 FC IB C 35 42.5N 330 19.0 32.2 44.5 49.5 LIFT 4B

S.SPILLWAY BARRELS 9,10


18-01-10 D 1409 FC M6 C 40 42.5N 380 23.6 39.2 50.9 58.3 LIFT 7

S.SPILLWAY BARRELS
19-01-10 D 1415 FC M6 C 40 42.5N 380 21.1 34.4 46.4 49.5 11,12 LIFT 7

S.SPILLWAY BARRELS 3,4


19-01-10 N 1420 FC IB C 35 42.5N 330 16.8 28.3 40.6 46.3 LIFT 4A WALL

S.SPILLWAY BARRELS
20-01-10 D 1423 FC M6 C 40 42.5N 380 24.0 38.6 47.4 52.6 13,14 LIFT 7

S.SPILLWAY BARRELS
21-01-10 D 1428 FC M6 C 40 42.5N 380 25.2 38.2 48.5 57.0 15,16 LIFT 7

S.SPILLWAY BARRELS 1-2-


23-01-10 D 1438 FC IB C 35 42.5N 330 16.7 30.3 41.4 46.3 5, 6, 2, 3 - 3, 4 LIFT 4A & 4B

S.SPILLWAY PRECAST
25-01-10 D 1448 FC M6 C 40 42.5N 380 21.7 30.4 46.9 50.0 BEAM

S.SPILLWAY BARRELS 7 - 8
25-01-10 D 1449 FC IB C 35 42.5N 330 17.4 29.1 40.6 46.2 LIFT 4A & 5A

S.SPILLWAY BARRELS 4 - 5
26-01-10 D 1456 FC IB C 35 42.5N 330 18.9 31.1 39.1 44.8 & 9 - 10 LIFT 4A & 5A

Page 116
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

S.SPILLWAY BARRELS 5 -
27-01-10 D 1461 FC IB C 35 42.5N 330 15.7 27.5 36.3 41.3 6 - 7, 7 - 8 LIFT 4B

S.SPILLWAY BARRELS 1,2


01-02-10 D 1478 FC IB C 35 42.5N 330 18.2 27.3 37.3 43.1 LIFT 6A

S.SPILLWAY BARRELS 11 -
01-02-10 D 1480 FC IB C 35 42.5N 330 17.4 28.6 37.1 42.1 12 LIFT 4A & 5A WALL

S.SPILLWAY BARRELS 9 -
02-02-10 D 1484 FC IB C 35 42.5N 330 16.7 28.6 38.6 43.3 10, 10 - 11 LIFT 4B

S.SPILLWAY BARRELS 2 -
04-02-10 D 1496 FC IB C 35 42.5N 330 16.5 27.7 38.6 43.5 3, 11 - 12 LIFT 4A

S.SPILLWAY BARRELS 3-5


06-02-10 D 1510 FC IB C 35 42.5N 330 18.6 28.3 39.3 45.4 LIFT 6A

S.SPILLWAY BARREL 1
07-02-10 N 1515 FC IB C 35 42.5N 330 17.8 29.6 40.8 47.3 LIFT 4B

S.SPILLWAY BARRELS 11 -
07-02-10 D 1517 FC IB C 35 42.5N 330 17.5 28.9 38.6 43.7 12, 12 - 13 LIFT 4B

S.SPILLWAY BARRELS 1 - 2
08-02-10 D 1521 FC IB C 35 42.5N 330 17.3 29.4 40.8 46.1 LIFT 6B BAR. 7 - 5 LIFT 5

S.SPILLWAY BARRELS 12 -
09-02-10 D 1527 FC IB C 35 42.5N 330 16.9 29.6 39.9 45.1 13, 14 - 15 LIFT 4A, 5A&4B

S.SPILLWAY BARRELS 12 -
10-02-10 D 1533 FC IB C 35 42.5N 330 17.0 30.1 42.6 48.1 13 LIFT 4A & 5A

S.SPILLWAY BARRELS 4 - 5
10-02-10 N 1534 FC IB C 35 42.5N 330 18.2 30.6 43.2 46.8 LIFT 6A

S.SPILLWAY BARRELS 2 -
11-02-10 D 1541 FC IB C 35 42.5N 330 16.2 28.9 37.0 41.2 3, 3 - 4 LIFT 6B

S.SPILLWAY BARREL 1
12-02-10 N 1546 FC IB C 35 42.5N 330 16.6 28.3 37.8 41.9 LIFT 5A

S.SPILLWAY BARRELS 1 -
13-02-10 D 1553 FC IB C 35 42.5N 330 17.8 28.6 38.7 44.9 2, 3 - 4 LIFT 7A

S. SPILLWAY BARRELS 13 -
15-02-10 D 1557 FC IB C 35 42.5N 330 17.3 28.1 39.6 45.2 14 LIFT 4A&5A

16-02-10 N 1559 FC S C 15 42.5N 250 12.6 20.8 26.0 30.6 SIPHON SPILLWAY RRC

S.SPILLWAY BARRELS 4 -
16-02-10 D 1562 FC IB C 35 42.5N 330 15.7 26.6 36.6 41.3 5, 5 - 6 LIFT 6B

S.SPILLWAY BARREL 1
17-02-10 D 1569 FC IB C 35 42.5N 330 17.3 29.2 40.8 45.1 LIFT 5B

S.SPILLWAY BARRELS 9 -
18-02-10 N 1573 FC IB C 35 42.5N 330 17.1 28.3 37.8 40.8 10, 10 - 11 LIFT 5B

Page 117
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

S.SPILLWAY BARRELS 2 - 3
19-02-10 D 1582 FC IB C 35 42.5N 330 16.0 26.4 38.4 42.1 LIFT 6A

S.SPILLWAY BARRELS 4C -
21-02-10 N 1588 FC IB C 35 42.5N 330 20.4 32.9 43.3 50.8 1 BAR. 1 - 2 LIFT 3C

S.SPILLWAY BARRELS 11 -
22-02-10 D 1596 FC IB C 35 42.5N 330 16.3 28.1 38.4 41.2 12, 13 - 14 LIFT 6A

S.SPILLWAY BARRELS 13 -
24-02-10 D 1604 FC IB C 35 42.5N 330 17.0 28.8 37.5 43.4 15 LIFT 5B

SIPHON SPILLWAY AXIS 13


25-02-10 D 1615 FC IB C 35 42.5N 330 16.7 28.8 37.8 42.6 LIFT 6A

SIPHON SPILLWAY SS 1 - 4
26-02-10 N 1622 FC IB C 35 42.5N 330 17.3 30.1 40.6 45.3 C2

SIPHON SPILLWAY AXIS 15


01-03-10 D 1628 FC IB C 35 42.5N 330 17.7 28.2 37.8 41.5 LIFT 6A

SIPHON SPILLWAY AXIS 21


02-03-10 D 1634 FC IB C 35 42.5N 330 16.7 27.3 36.9 40.8 LIFT 6A

SIPHON SPILLWAY AXIS 23


02-03-10 D 1635 FC IB C 35 42.5N 330 17.2 28.4 38.6 43.4 LIFT 5B

SIPHON SPILLWAY AXIS 27


02-03-10 N 1636 FC IB C 35 42.5N 330 16.3 27.1 36.8 39.9 LIFT 5B

S.SPILLWAY BARRELS 3 - 4
03-03-10 N 1642 FC IB C 35 42.5N 330 16.6 27.6 37.2 41.3 LIFT 3C

SIPHON SPILLWAY AXIS 27


04-03-10 D 1645 FC IB C 35 42.5N 330 17.0 29.1 40.6 44.8 LIFT 6A

SIPHON SPILLWAY SS - 1
05-03-10 N 1653 FC IB C 35 42.5N 330 15.9 28.6 39.2 42.7 LIFT 5C

SIPHON SPILLWAY AXIS 21


08-03-10 D 1662 FC IB C 35 42.5N 330 17.3 28.3 37.8 43.1 LIFT 7A

SIPHON SPILLWAY AXIS 25


09-03-10 D 1667 FC IB C 35 42.5N 330 16.2 28.1 38.8 41.1 LIFT 6A

SIPHON SPILLWAY AXIS 13


10-03-10 D 1671 FC IB C 35 42.5N 330 16.2 27.8 37.3 41.4 LIFT 6A

SIPHON SPILLWAY AXIS 27


11-03-10 N 1679 FC IB C 35 42.5N 330 15.6 28.7 38.6 41.4 LIFT 6B

SIPHON SPILLWAY AXIS 3


12-03-10 N 1684 FC IB C 35 42.5N 330 16.6 27.3 39.4 43.8 LIFT 7B - 10B

SIPHON SPILLWAY SS - 1
14-03-10 N 1691 FC IB C 35 42.5N 330 15.3 27.2 37.6 41.8 LIFT 6A

S.SPILLWAY BARRELS 1 - 4
15-03-10 D 1695 FC M6 C 40 42.5N 380 26.5 39.6 47.7 51.6 LIFT 8

SIPHON SPILLWAY AXIS 13


17-03-10 D 1702 FC IB C 35 42.5N 330 16.8 27.1 39.2 44.3 LIFT 7A

Page 118
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

SIPHON SPILLWAY SS - 1
18-03-10 D 1707 FC IB C 35 42.5N 330 17.0 26.4 36.1 39.9 LIFT 6B - 6C

SIPHON SPILLWAY AXIS 25


20-03-10 D 1719 FC IB C 35 42.5N 330 17.0 28.3 36.9 40.3 LIFT 6B

SIPHON SPILLWAY AXIS 27


20-03-10 D 1720 FC IB C 35 42.5N 330 19.0 30.9 36.9 41.2 LIFT 7A

S.SPILLWAY BARRELS 4 - 5
23-03-10 N 1728 FC R C 20 42.5N 250 11.9 19.2 25.3 29.4 -6

SIPHON SPILLWAY AXIS 29


24-03-10 D 1736 FC IB C 35 42.5N 330 16.6 27.3 36.9 39.8 LIFT 2A

S.SPILLWAY BARRELS 5 - 6
25-03-10 D 1742 FC M6 C 40 42.5N 380 22.2 36.3 42.5 48.8 - 7 LIFT 8

S.SPILLWAY BARRELS 5 - 6
26-03-10 D 1749 FC IB C 35 42.5N 330 18.2 30.1 39.2 41.8 - 7 LIFT 3C

S.SPILLWAY BARRELS 10 -
27-03-10 N 1751 FC S C 20 42.5N 250 11.5 18.7 25.3 28.1 11 - 12 PLAIN CONCRETE

SIPHON SPILLWAY AXIS 7


27-03-10 N 1756 FC IB C 35 42.5N 330 17.2 28.3 39.8 44.1 LIFT 7B - 10B

SIPHON SPILLWAY AXIS 31


30-03-10 D 1766 FC IB C 35 42.5N 330 16.9 27.3 36.8 39.9 LIFT 2A

S.SPILLWAY BARRELS 10 -
31-03-10 D 1774 FC IB C 35 42.5N 330 14.6 26.8 35.7 39.7 11 - 12 LIFT 3C

SIPHON SPILLWAY AXIS 19


02-04-10 N 1781 FC IB C 35 42.5N 330 17.3 28.8 36.8 40.3 LIFT 6B

SIPHON SPILLWAY AXIS 11


02-04-10 N 1783 FC IB C 35 42.5N 330 16.9 27.4 36.2 40.1 LIFT 7B - 10

S.SPILLWAY BARRELS 13 -
02-04-10 D 1786 FC S C 20 42.5N 250 12.1 19.9 26.3 30.6 14 - 15

SIPHON SPILLWAY SS 1
06-04-10 D 1789 FC IB C 35 42.5N 330 17.3 28.5 35.9 39.2 LIFT 7A

S.SPILLWAY BARRELS 7 - 8
08-04-10 D 1795 FC IB C 35 42.5N 330 17.2 27.8 35.8 39.9 SLAB

SIPHON SPILLWAY SS 1
09-04-10 D 1798 FC R C 20 42.5N 250 11.7 19.8 24.9 27.8 RRC

S.SPILLWAY BARRELS 13 -
09-04-10 D 1801 FC IB C 35 42.5N 330 15.0 28.5 35.4 39.8 14 - 15, 3C SLAB

SIPHON SPILLWAY AXIS 31


12-04-10 D 1812 FC IB C 35 42.5N 330 16.3 27.9 36.3 40.3 LIFT 4A - 5A

S.SPILLWAY BARRELS 9
13-04-10 N 1816 FC IB C 35 42.5N 330 16.4 27.7 35.9 40.6 LIFT 3C

14-04-10 N 1821 FC R C 20 42.5N 250 10.1 18.3 24.9 27.5 SIPHON SPILLWAY RRC

Page 119
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

SIPHON SPILLWAY AXIS 3


15-04-10 D 1825 FC IB C 35 42.5N 330 16.8 27.8 38.8 42.3 LIFT 7B - 10B

SIPHON SPILLWAY SS 1
15-04-10 N 1828 FC IB C 35 42.5N 330 16.8 28.9 39.1 43.3 LIFT 14A

SIPHON SPILLWAY SS 1
16-04-10 N 1829 FC R C 20 42.5N 250 9.6 16.9 23.4 25.9 RRC

SIPHON SPILLWAY AXIS 29


17-04-10 D 1839 FC IB C 35 42.5N 330 15.3 26.2 38.6 41.4 - 31 LIFT 5B - 6B

SIPHON SPILLWAY AXIS 13


19-04-10 D 1842 FC IB C 35 42.5N 330 17.4 26.8 38.1 42.3 LIFT 7B - 10B

SIPHON SPILLWAY AXIS 29


20-04-10 D 1845 FC IB C 35 42.5N 330 16.1 26.0 38.6 42.9 LIFT 17A

SIPHON SPILLWAY SS 1
20-04-10 N 1846 FC IB C 35 42.5N 330 16.7 25.6 38.5 43.3 LIFT 14C

SIPHON SPILLWAY SWB -


21-04-10 N 1850 FC IB C 35 42.5N 330 16.8 27.8 35.9 39.6
D11 2nd PART WALL

SIPHON SPILLWAY SS 1
23-04-10 D 1855 FC IB C 35 42.5N 330 15.9 25.9 36.8 39.6 LIFT 4D

SIPHON SPILLWAY SS 1
24-04-10 D 1861 FC IB C 35 42.5N 330 16.6 27.8 38.7 41.6 LIFT 14B

SIPHON SPILLWAY SS 1
24-04-10 N 1864 FC IB C 35 42.5N 330 16.3 28.3 39.3 43.8 LIFT 10C - 7B - 10B

SIPHON SPILLWAY SS 1
27-04-10 D 1874 FC IB C 35 42.5N 330 17.8 27.0 35.4 39.9 LIFT 14D

SIPHON SPILLWAY SS 1
28-04-10 D 1878 FC IB C 35 42.5N 330 18.0 30.0 37.7 41.8 LIFT 5D

SIPHON SPILLWAY
04-05-10 D 1888 FC M6 C 40 42.5N 380 24.7 35.6 45.0 49.5 BARRELS 10, 11, 12, 13
LIFT 8

SIPHON SPILLWAY AXIS 13


04-05-10 D 1890 FC IB C 35 42.5N 330 17.3 28.0 39.2 43.4 LIFT 10 - 1

SIPHON SPILLWAY
05-05-10 N 1893 FC IB C 35 42.5N 330 15.1 25.8 36.3 38.5 BARREL 1 SS 1 LIFT 14E,
14F, 14H

SIPHON SPILLWAY
07-05-10 N 1897 FC IB C 35 42.5N 330 18.8 27.1 35.9 41.4 BARREL SS 1-2 LIFT 6D

SIPHON SPILLWAY AXIS 31


09-05-10 D 1907 FC IB C 35 42.5N 330 16.8 27.7 36.9 40.4 LIFT 5A & 6A

SIPHON SPILLWAY
10-05-10 N 1908 FC IB C 35 42.5N 330 17.5 27.5 35.5 39.5 BARRELS 7 - 8 LIFT 4B &
5B
SIPHON SPILLWAY AXIS 17
12-05-10 D 1919 FC IB C 35 42.5N 330 15.8 26.9 37.1 43.2 BARRELS 9 - 10 LIFT 4A &
5A

SIPHON SPILLWAY
14-05-10 N 1924 FC IB C 35 42.5N 330 15.6 28.3 36.7 38.7 BARREL 1 SS 1 LIFT 7D

Page 120
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
SIPHON SPILLWAY AXIS 17
15-05-10 D 1928 FC IB C 35 42.5N 330 18.5 27.1 39.2 44.8 BARRELS 9 - 10 LIFT 4B &
5B
SIPHON SPILLWAY AXIS 17
17-05-10 N 1933 FC IB C 35 42.5N 330 18.8 32.7 40.1 45.6 BARRELS 7 - 8 LIFT 4A &
5A

SIPHON SPILLWAY AXIS 21


18-05-10 N 1934 FC IB C 35 42.5N 330 16.8 27.1 38.3 42.8 LIFT 10

SIPHON SPILLWAY AXIS 17


25-05-10 D 1961 FC IB C 35 42.5N 330 15.8 26.8 37.3 41.8 LIFT 6A

SIPHON SPILLWAY SS 1
25-05-10 N 1963 FC IB C 35 42.5N 330 18.2 33.3 40.6 46.9 LIFT 12C

SIPHON SPILLWAY AXIS SS


27-05-10 N 1970 FC IB C 35 42.5N 330 17.3 28.8 37.9 42.4 1 LIFT 12C

SIPHON SPILLWAY SS 1
29-05-10 N 1978 FC IB C 35 42.5N 330 16.8 27.6 39.5 44.6 LIFT 8A & 10

SIPHON SPILLWAY SS 1
05-06-10 D 1998 FC IB C 35 42.5N 330 16.3 26.9 36.8 40.3 LIFT 8D

SIPHON SPILLWAY
19-06-10 N 2053 FC IB C 35 42.5N 330 17.9 28.8 39.1 44.6 BARRELS 7 - 8 LIFT 6A

SIPHON SPILLWAY
21-06-10 N 2057 FC M6 C 40 42.5N 380 22.7 37.0 46.3 52.7 BARRELS 1 - 2 - 3 LIFT 18

SIPHON SPILLWAY
22-06-10 D 2062 FC IB C 35 42.5N 330 18.3 29.5 38.8 44.5 BARREL 8 LIFT 6B

SIPHON SPILLWAY
26-10-10 D 2412 FC IB C 35 42.5N 330 18.3 27.6 38.4 43.3 BARRELS 2 - 3 LIFT 9A

SIPHON SPILLWAY
26-10-10 D 2413 FC S C 20 42.5N 250 10.0 16.4 21.5 26.1 BARRELS 15 - 16 LIFT 3C -
4C

SIPHON SPILLWAY
27-10-10 D 2417 FC IB C 35 42.5N 330 17.8 32.2 39.5 44.8 BARRELS 1 - 2 LIFT 8 - 4

SIPHON SPILLWAY
29-10-10 N 2424 FC M6 C 40 42.5N 380 24.7 35.8 46.1 52.6 BARREL 9 LIFT 6B AXIS 17

30-10-10 N 2425 FC S C 20 42.5N 250 13.8 20.9 26.4 30.9 SIPHON SPILLWAY RRC

SIPHON SPILLWAY
30-10-10 D 2426 FC IB C 35 42.5N 330 16.2 26.0 35.8 37.9 BARRELS 9 & 6B AXIS 17

SIPHON SPILLWAY
02-11-10 2434 FC IB C 35 42.5N 330 15.5 26.1 35.7 40.2 BARRELS 4 & 5 LIFT 8 - 1 -
18
SIPHON SPILLWAY
03-11-10 2438 FC IB-2 C 30 42.5N 300 14.2 24.5 33.6 37.0 BARRELS 15 - 16 LIFT 3C &
4C

SIPHON SPILLWAY
04-11-10 2441 FC IB C 35 42.5N 330 16.4 28.1 37.9 42.1 BARRELS 8 LIFT 8

SIPHON SPILLWAY RIGHT


04-11-10 2442 FC R C 20 42.5N 250 8.3 14.3 18.1 21.2 CURVE RETAINING WALL
BLINDING

Page 121
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
SIPHON SPILLWAY
04-11-10 2443 FC IB C 35 42.5N 330 17.3 29.6 38.3 43.2 BARRELS 4 & 5 LIFT 8 - 1 -
1

SIPHON SPILLWAY
06-11-10 2446 FC IB C 35 42.5N 330 15.1 25.5 35.7 37.5 BARRELS 9 LIFT 8

SIPHON SPILLWAY
06-11-10 2447 FC IB C 35 42.5N 330 15.4 28.0 36.8 40.5 BARRELS 4 & 5 LIFT 8(III)

SIPHON SPILLWAY
08-11-10 2451 FC IB C 35 42.5N 330 17.7 31.5 41.8 48.9 BARRELS 6 LIFT 8(II)

SIPHON SPILLWAY
08-11-10 2452 FC IB C 35 42.5N 330 18.2 31.6 41.7 46.7 BARRELS 3 LIFT 8(III)

08-11-10 2453 FC IB C 35 42.5N 330 16.3 27.6 37.4 41.4 SIPHON SPILLWAY 4B & 4C

SIPHON SPILLWAY
10-11-10 2456 FC IB C 35 42.5N 330 15.0 26.7 35.6 41.8 BARRELS 14 LIFT 8(I)

SIPHON SPILLWAY
10-11-10 2457 FC IB C 35 42.5N 330 15.1 25.8 35.5 41.2 BARRELS 3 LIFT 8(III)

SIPHON SPILLWAY
10-11-10 2458 FC IB C 35 42.5N 330 15.2 26.9 36.5 40.8 BARRELS 6 LIFT 8(II)

SIPHON SPILLWAY
11-11-10 2459 FC IB C 35 42.5N 330 18.3 29.1 38.6 43.2 BARREL 1 LIFT 9B

SIPHON SPILLWAY
12-11-10 2462 FC IB C 35 42.5N 330 15.8 30.6 38.8 43.5 BARRELS 3 LIFT 8(V)

SIPHON SPILLWAY
12-11-10 2463 FC IB C 35 42.5N 330 16.3 28.3 39.6 44.2 BARRELS 6 LIFT 8(III)

SIPHON SPILLWAY
13-11-10 2465 FC IB C 35 42.5N 330 16.6 31.8 39.9 45.7 RETAINING WALL 4DA,
4DB, 4DC, 4DD, 4DE
SIPHON SPILLWAY
16-11-10 2469 FC IB C 35 42.5N 330 15.2 25.6 35.7 38.4
BARRELS 7 & 8 2nd LEVEL

SIPHON SPILLWAY
17-11-10 2471 FC IB C 35 42.5N 330 15.1 29.3 39.7 46.2 BARRELS 2 LIFT 9

SIPHON SPILLWAY
17-11-10 2472 FC IB C 35 42.5N 330 16.3 27.6 38.8 43.6 PRECAST SLAB

SIPHON SPILLWAY
18-11-10 2474 FC IB C 35 42.5N 330 15.0 26.8 36.6 40.6 BARRELS 16 LIFT 5B, 5D -
A TO 5D - E

SIPHON SPILLWAY
19-11-10 2476 FC IB C 35 42.5N 330 15.4 25.3 36.8 40.0 BARRELS 7 - 8 LIFT 8(III)

SIPHON SPILLWAY
21-11-10 2481 FC IB C 35 42.5N 330 17.3 28.6 39.1 44.6 BARRELS 1/2 LIFT 8 6th
PHASE
SIPHON SPILLWAY
21-11-10 2482 FC IB C 35 42.5N 330 16.9 25.7 35.5 41.5 BARRELS 3 LIFT 9B

S.SPILLWAY RIGHT CURVE


23-11-10 2486 FC IB C 35 42.5N 330 17.3 25.3 36.4 41.7 RETAINING WALL SDA,
SDB, SDC, SDE

Page 122
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

SIPHON SPILLWAY UNIT 4


25-11-10 2491 FC IB C 35 42.5N 330 17.2 30.3 38.8 45.5 LIFT 9B

SIPHON SPILLWAY
25-11-10 2492 FC IB C 35 42.5N 330 16.4 27.9 36.6 40.2 BARRELS 1 & 2 LIFT 8(VIII)

SIPHON SPILLWAY
29-11-10 2496 FC IB C 35 42.5N 330 15.3 30.7 38.5 45.4 BARRELS 15 & 16 LIFT 5B -
5C

SIPHON SPILLWAY
30-11-10 2497 FC IB C 35 42.5N 330 17.1 30.6 35.6 43.6 BARRELS 1 & 2 LIFT 8(VIII)

SIPHON SPILLWAY
01-12-10 2499 FC IB C 35 42.5N 330 15.3 28.6 35.3 40.4 BARRELS 7 & 8 LIFT 10B

SIPHON SPILLWAY
02-12-10 2502 FC IB C 35 42.5N 330 15.8 25.3 36.0 40.8 BARRELS 4 & 5 LIFT 8(V)

SIPHON SPILLWAY UNIT 5


03-12-10 2504 FC IB C 35 42.5N 330 18.9 28.3 39.6 44.4 LIFT 9B

SIPHON SPILLWAY RIGHT


04-12-10 2505 FC IB C 35 42.5N 330 15.7 28.2 36.3 40.9 RETAINING WALL 6DA -
6DE

SIPHON SPILLWAY 1 & 2


06-12-10 2510 FC IB C 35 42.5N 330 16.8 27.6 36.6 42.3 LIFT 8 - 8 COMPLETING

SIPHON SPILLWAY
07-12-10 2511 FC IB C 35 42.5N 330 15.4 26.7 36.5 39.8 BARRELS 5 LIFT 9A

SIPHON SPILLWAY
08-12-10 2513 FC IB C 35 42.5N 330 15.7 25.2 36.3 41.2 BARRELS 4 & 5 LIFT 8(V)

SIPHON SPILLWAY
08-12-10 2514 FC IB C 35 42.5N 330 15.5 25.3 35.8 40.5 BARRELS 8 LIFT 7B

SIPHON SPILLWAY LIFTS


09-12-10 2515 FC IB C 35 42.5N 330 16.6 27.3 35.3 39.9 K1 & H1 PARTIAL

SIPHON SPILLWAY
10-12-10 2518 FC IB C 35 42.5N 330 15.9 26.4 35.1 39.7 BARRELS 15 & 16 LIFTS
7C & 10C

SIPHON SPILLWAY
11-12-10 2521 FC IB C 35 42.5N 330 16.3 26.5 36.0 40.4 BARRELS 7 & 8 LIFT 8(V)

SIPHON SPILLWAY
13-12-10 2523 FC IB C 35 42.5N 330 15.1 26.8 37.5 43.8 BARRELS 1 & 2 LIFT 8A

SIPHON SPILLWAY
14-12-10 2525 FC IB C 35 42.5N 330 17.3 29.6 38.8 43.4 BARRELS 4 & 5 LIFT 13

SIPHON SPILLWAY
15-12-10 2526 FC IB C 35 42.5N 330 19.6 29.7 38.4 43.2 BARRELS 9 LIFT 7B

SIPHON SPILLWAY
15-12-10 2527 FC IB C 35 42.5N 330 15.9 26.4 35.1 40.5 BARRELS 16 LIFT 2A

SIPHON SPILLWAY
15-12-10 2530 FC IB C 35 42.5N 330 16.6 28.3 39.6 45.7 BARRELS 1 & 2 LIFT 13

SIPHON SPILLWAY
16-12-10 2531 FC IB C 35 42.5N 330 15.4 26.0 36.3 40.7 BARRELS 11 LIFT 9A

Page 123
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

SIPHON SPILLWAY
16-12-10 2532 FC IB C 35 42.5N 330 16.6 27.4 36.6 42.9 BARRELS 6 & 7 LIFT 8(V)

SIPHON SPILLWAY
16-12-10 2533 FC IB C 35 42.5N 330 15.3 26.2 35.6 39.6 RETAINING WALL 7DA,
7DE

SIPHON SPILLWAY
18-12-10 2537 FC IB C 35 42.5N 330 16.3 27.9 39.1 44.9 BARRELS 8 LIFT 8/4

SIPHON SPILLWAY
20-12-10 2540 FC IB C 35 42.5N 330 15.2 26.8 37.9 42.1 BARRELS 10 LIFTS 7B &
10B

SIPHON SPILLWAY
20-12-10 2541 FC IB C 35 42.5N 330 17.3 29.1 37.6 43.6 BARRELS 4 & 5 LIFT 8

SIPHON SPILLWAY
22-12-10 2543 FC JC C 25 42.5N 310 13.1 22.9 29.2 35.9 BARRELS 16 LIFT 12C

SIPHON SPILLWAY
27-12-10 2544 FC IB C 35 42.5N 330 16.6 27.1 36.6 42.8 BARRELS 3 LIFT 8(VIII)

SIPHON SPILLWAY
29-12-10 2546 FC IB C 35 42.5N 330 15.2 29.3 35.9 39.9 BARRELS 4 & 5 LIFT 8(VIII)

SIPHON SPILLWAY
31-12-10 2552 FC IB C 35 42.5N 330 15.3 26.8 36.6 41.5 BARRELS 8 LIFT 9B

SIPHON SPILLWAY
31-12-10 2553 FC IB C 35 42.5N 330 16.9 27.3 38.6 44.9 BARRELS 8 LIFT 7A

S.SPILLWAY BARRELS 6,7


04-01-11 D 2554 FC IB C 35 42.5N 330 15.3 26.3 36.0 41.3 LIFT 8

S.SPILLWAY RIGHT
05-01-11 D 2558 FC JC C 25 42.5N 300 10.4 21.9 29.6 34.9 CURVED RETAINING WALL
8A - 8E

S.S. BARRELS 12,13 LIFT


06-01-11 D 2562 FC IB-2 C 30 42.5N 300 13.8 24.1 32.8 36.1 7B

S.SPILLWAY BARRELS 3,4


07-01-11 D 2563 FC IB C 35 42.5N 330 16.6 26.1 36.8 40.7 & 5 LIFT 8A

07-01-11 D 2564 FC IB-2 C 30 42.5N 300 15.3 24.1 34.6 38.7 S.S. BARREL 8 Lift 8/5

S.SPILLWAY BARRELS 16
13-01-11 D 2572 FC IB C 35 42.5N 330 15.9 26.6 36.1 40.1 LIFT 4A

S.SPILLWAY BARRELS 9,10


13-01-11 D 2573 FC IB C 35 42.5N 330 15.4 26.8 35.4 40.2 LIFT 8(II)

S.SPILLWAY BARRELS
13-01-11 D 2574 FC IB C 35 42.5N 330 17.6 26.2 37.3 44.2 13&14 LIFT 7B

S.SPILLWAY BARRELS 9
17-01-11 D 2578 FC IB C 35 42.5N 330 15.0 26.4 39.1 43.8 LIFT 9B

S.SPILLWAY BARRELS 8
17-01-11 D 2579 FC IB C 35 42.5N 330 15.6 26.1 39.7 44.8 LIFT 7/8

S.SPILLWAY RIGHT
18-01-11 D 2581 FC JC C 25 42.5N 300 11.9 20.3 30.1 35.1 CURVED SIDE WALL

Page 124
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

19-01-11 D 2582 FC IB C 35 42.5N 330 16.3 26.5 37.1 43.3 S.SPILLWAY 9 - 10 LIFT 7

S.SPILLWAY BARRELS 10
21-01-11 D 2584 FC IB C 35 42.5N 330 15.8 25.7 36.7 40.8 LIFT 9B

S.SPILLWAY BARRELS 14 -
21-01-11 D 2585 FC IB C 35 42.5N 330 16.4 24.3 32.1 38.9 15 LIFT 7B

S.SPILLWAY BARRELS 7 - 8
24-01-11 D 2590 FC IB C 35 42.5N 330 16.8 26.1 38.2 43.4 LIFT 8(VIII)

S.SPILLWAY BARRELS 13
24-01-11 D 2592 FC IB C 35 42.5N 330 16.5 27.4 39.3 45.5 LIFT 9A

S.SPILLWAY BARRELS 1 &


25-01-11 D 2593 FC IB C 35 42.5N 330 15.7 26.8 35.6 41.4 2, 3 & 4, 12 - 12C

S.SPILLWAY BARRELS &


26-01-11 D 2596 FC IB C 35 42.5N 330 17.3 26.9 35.3 42.2 LIFT 8(VIII)

S.SPILLWAY BARRELS 13
27-01-11 D 2600 FC IB C 35 42.5N 330 16.9 28.3 38.1 44.2 LIFT 9B

S.SPILLWAY BARRELS 10 -
31-01-11 D 2601 FC IB-2 C 30 42.5N 300 13.7 24.5 33.5 39.1 11 LIFT 8 (2/8)

S.SPILLWAY BARRELS 6 - 7
31-01-11 D 2602 FC IB-2 C 30 42.5N 300 14.2 34.0 34.0 40.5 LIFT 7A

S.SPILLWAY BARRELS 16
01-02-11 D 2603 FC IB-2 C 30 42.5N 300 14.2 25.3 33.6 37.3 LIFT 7B

S.SPILLWAY BARRELS 13 -
03-02-11 D 2604 FC IB-2 C 30 42.5N 300 15.0 24.6 33.3 37.6 14 LIFT 8 (3/8)

S.SPILLWAY BARRELS 14
03-02-11 D 2605 FC IB-2 C 30 42.5N 300 14.6 24.8 34.0 37.8 LIFT 9A

S.SPILLWAY BARRELS 8
04-02-11 D 2609 FC IB-2 C 30 42.5N 300 14.0 24.3 35.1 39.8 LIFT 8A

S.SPILLWAY BARRELS 12 -
05-02-11 D 2611 FC IB-2 C 30 42.5N 300 14.0 25.2 32.6 36.7 13 LIFT 8 (3/8)

S.SPILLWAY ROCK
06-02-11 D 2612 FC R C 20 42.5N 250 8.9 15.2 24.7 28.0 RECONSTRUCTION
CONCRETE

S.SPILLWAY BARRELS 13 -
08-02-11 D 2614 FC IB-2 C 30 42.5N 300 14.3 25.6 31.5 37.3 14 LIFT 8 (1&8)

S.SPILLWAY BARRELS 9
08-02-11 D 2615 FC IB-2 C 30 42.5N 300 14.5 25.5 32.5 37.7 LIFT 10

S.SPILLWAY BARRELS 9 -
10-02-11 D 2618 FC IB-2 C 30 42.5N 300 15.3 26.0 34.6 39.3 10 LIFT 8 (5&8)

S.SPILLWAY BARRELS 9
10-02-11 D 2619 FC IB-2 C 30 42.5N 300 14.1 26.6 33.7 37.6 LIFT 7

S.SPILLWAY BARRELS 16
11-02-11 D 2620 FC IB-2 C 30 42.5N 300 15.6 25.0 32.4 36.0 LIFT 4A

Page 125
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
S.SPILLWAY RRC,
12-02-11 D 2621 FC R C 20 42.5N 250 9.1 15.4 24.8 37.0 BLINDING & TAILRACE
SLAB
S.SPILLWAY BARRELS 9 -
14-02-11 D 2625 FC IB-2 C 30 42.5N 300 15.3 25.8 34.9 40.6 10 LIFT 8 (4&8)

S.SPILLWAY BARRELS 9 -
17-02-11 D 2628 FC IB-2 C 30 42.5N 300 14.6 25.2 33.8 29.8 10 LIFT 8 (7&8)
S.SPILLWAY ROCK
17-02-11 D 2627 FC R C 20 42.5N 250 10.1 15.0 26.6 38.6 RECONSTRUCTION
CONCRETE
S.SPILLWAY ROCK
20-02-11 D 2629 FC R C 20 42.5N 250 8.9 13.9 23.8 27.4 RECONSTRUCTION
CONCRETE
S.SPILLWAY BARRELS 5 -
21-02-11 D 2630 FC IB-2 C 30 42.5N 300 14.1 24.0 34.7 38.5 6, 7 - 8 LIFT 12

S.SPILLWAY BARRELS 11 -
21-02-11 D 2631 FC IB-2 C 30 42.5N 300 13.9 23.8 35.6 40.8 12 LIFT 8
S.SPILLWAY ROCK
22-02-11 D 2632 FC R C 20 42.5N 250 8.6 13.6 24.2 29.1 RECONSTRUCTION
CONCRETE
S.SPILLWAY RCC TAIL
23-02-11 D 2633 FC R C 20 42.5N 250 8.9 14.9 24.0 29.6 RACE CHANNEL

S.SPILLWAY RCC TAIL


24-02-11 D 2634 FC IB-2 C 30 42.5N 300 14.0 24.0 33.9 38.1 RACE CHANNEL & SLAB

S.SPILLWAY BARRELS 11 -
25-02-11 D 2635 FC IB-2 C 30 42.5N 300 16.3 28.3 36.6 40.6 12 LIFT 8(5/8)

S.SPILLWAY BARRELS 6 -
26-02-11 D 2636 FC IB-2 C 30 42.5N 300 16.7 27.5 36.7 42.9 7&8 LIFT 13

S.SPILLWAY RCC TAIL


28-02-11 D 2637 FC IB-2 C 30 42.5N 300 13.5 25.6 35.9 41.6 RACE & SLAB

S.SPILLWAY BARRELS 9
01-03-11 D 2638 FC IB-2 C 30 42.5N 300 14.1 24.4 34.7 39.3 LIFT 10

S.SPILLWAY TAIL RACE


01-03-11 D 2639 FC IB-2 C 30 42.5N 300 14.0 24.6 33.5 38.5 CHANNEL SLAB

S.SPILLWAY BLINDING
03-03-11 D 2640 FC R C 20 42.5N 250 8.3 13.5 16.7 23.3 RIGHT BANK GRANTING

S.SPILLWAY TAIL RACE


04-03-11 D 2641 FC IB-2 C 30 42.5N 300 14.6 24.5 32.9 37.2 CHANNEL SLAB

S.SPILLWAY RIGHT BANK


07-03-11 D 2642 FC IB C 35 42.5N 330 15.7 26.0 39.0 43.2 RETAINING WALL LIFT 5A

S.SPILLWAY BARRELS 15 -
07-03-11 D 2643 FC IB C 35 42.5N 330 17.1 29.3 38.8 44.6 16 LIFT 7B

S.SPILLWAY BARRELS 9 -
09-03-11 D 2644 FC IB C 35 42.5N 330 16.9 28.7 37.7 43.5 10 LIFT 8(VII)

S.SPILLWAY BARRELS 15 -
09-03-11 D 2645 FC IB C 35 42.5N 330 16.5 28.0 39.2 44.9 16 LIFT 9A

Page 126
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

S.SPILLWAY RIGHT BANK


10-03-11 D 2646 FC JC C 25 42.5N 300 13.7 22.0 31.5 37.2 DAM LEFT ABUTMENT

S.SPILLWAY APRON SL 1.1


10-03-11 D 2647 FC IB C 35 42.5N 330 17.2 27.2 37.8 44.5 & 1.2

S.SPILLWAY BARRELS 9 -
14-03-11 D 2650 FC IB C 35 42.5N 330 16.2 26.4 40.6 47.5 10 LIFT 8(V)

S.SPILLWAY BARRELS 13 -
14-03-11 D 2652 FC IB C 35 42.5N 330 16.7 26.2 39.9 46.5 14 LIFT 8(VI)
S.SPILLWAY APRON &
15-03-11 D 2653 FC IB-2 C 30 42.5N 300 13.5 24.1 34.2 39.2 TAIL RACE CHANNEL &
SLAB
S.SPILLWAY BARRELS 11 -
16-03-11 D 2654 FC IB C 35 42.5N 330 16.8 27.5 37.4 43.1 12 LIFT 8(VII)

S.SPILLWAY RRC TAIL


16-03-11 D 2655 FC R C 20 42.5N 250 9.3 16.2 24.8 29.9 RACE CHANNEL

S.SPILLWAY TAIL RACE


17-03-11 D 2656 FC IB-2 C 30 42.5N 300 15.0 23.8 35.6 40.4 CHANNEL & SLAB

S.SPILLWAY BARRELS 13 -
18-03-11 D 2657 FC IB C 35 42.5N 330 15.0 26.7 38.2 45.6 14 LIFT 8(VI)

S.SPILLWAY BARRELS 9 -
19-03-11 D 2660 FC IB C 35 42.5N 330 16.0 27.5 39.2 45.6 10 LIFT 8(VIII)

S.SPILLWAY TAIL RACE


19-03-11 D 2661 FC IB-2 C 30 42.5N 300 14.6 23.5 34.4 39.3 CHANNEL & SLAB

S.SPILLWAY BARRELS 16
22-03-11 D 2662 FC IB C 35 42.5N 330 16.0 28.1 40.5 46.8 LIFT 6A

S.SPILLWAY APRON SLAB


22-03-11 D 2663 FC R C 20 42.5N 250 10.7 17.2 23.1 29.8 RRC

S.SPILLWAY BARRELS 11 -
23-03-11 D 2664 FC IB C 35 42.5N 330 17.5 29.9 37.7 43.2 12 LIFT 8(VIII)

S.SPILLWAY APRON SLAB


23-03-11 D 2665 FC IB C 35 42.5N 330 17.4 29.4 38.0 44.3 SS10 & SS12

S.SPILLWAY BARRELS 15
31-03-11 D 2670 FC IB C 35 42.5N 330 18.0 26.7 39.6 45.5 LIFT 9B

S.SPILLWAY BARRELS 9 -
31-03-11 D 2671 FC IB C 35 42.5N 330 16.3 26.5 38.9 44.8 10 LIFT 8A

S.SPILLWAY BARRELS 15 -
31-03-11 D 2672 FC IB C 35 42.5N 330 18.4 29.2 40.6 46.9 16 LIFT 8(I)

S.SPILLWAY TAIL RACE


01-04-11 D 2673 FC IB-2 C 30 42.5N 300 14.3 25.8 34.6 38.9 CHANNEL SLAB &
BLINDING
S.SPILLWAY BARRELS 16
01-04-11 D 2674 FC IB-2 C 30 42.5N 300 13.9 25.7 32.8 38.6 LIFT 10
S.SPILLWAY BARRELS 16
01-04-11 D 2675 FC IB-2 C 30 42.5N 300 14.1 26.0 34.5 40.0 LIFT 7A
S.SPILLWAY APRON SLAB
04-04-11 D 2676 FC IB C 35 42.5N 330 17.4 29.9 37.7 42.7 SS10 & SS14

Page 127
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SIPHON SPILLWAY
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
S.SPILLWAY BARRELS 13 -
07-04-11 D 2677 FC IB C 35 42.5N 330 16.7 28.7 39.3 14 LIFT 8A

08-04-11 D 2679 FC IB C 35 42.5N 330 16.6 27.4 36.7 S.SPILLWAY APRON SLAB

S.SPILLWAY APRON SLAB


09-04-11 D 2680 FC IB C 35 42.5N 330 16.2 26.3 39.5 SS9 & SS11 PART
S.SPILLWAY APRON SLAB
11-04-11 D 2681 FC R C 20 42.5N 250 11.6 18.8 23.5 SS15
S.SPILLWAY APRON SLAB
11-04-11 D 2682 FC IB C 35 42.5N 330 16.3 27.5 39.4 SS15
S.SPILLWAY 1.1, 2.1, 3.1,
12-04-11 D 2683 FC IB C 35 42.5N 330 16.6 27.6 39.4 4.1, 4.2
S.SPILLWAY BARRELS 16
12-04-11 D 2685 FC IB C 35 42.5N 330 18.8 30.0 40.5 LIFT 9B
S.SPILLWAY BARRELS 9 -
15-04-11 D 2686 FC IB C 35 42.5N 330 17.6 29.5 39.2 10 LIFT 12
S.SPILLWAY BARRELS 16
18-04-11 D 2687 FC IB C 35 42.5N 330 19.3 30.6 42.3 LIFT 12
S.SPILLWAY APRON SLAB
18-04-11 D 2688 FC IB C 35 42.5N 330 16.1 28.7 39.2 SS17 - SS18

19-04-11 D 2690 FC IB-2 C 30 42.5N 300 14.0 25.3 34.4 S.SPILLWAY APRON SS16

S.SPILLWAY BARRELS 9 -
21-04-11 D 2692 FC IB-2 C 30 42.5N 300 14.7 25.6 32.3 10 LIFT 13
S.SPILLWAY BARRELS 11 -
26-04-11 D 2695 FC IB-2 C 30 42.5N 300 14.4 25.3 34.4 12 LIFT 13
S.SPILLWAY APRON SS15 -
27-04-11 D 2696 FC IB-2 C 30 42.5N 300 15.3 25.6 34.1 SS16
S.SPILLWAY APRON SLAB
28-04-11 D 2697 FC R C 20 42.5N 250 9.6 15.5 24.3 SS17 - SS19
S.SPILLWAY BARRELS 15 -
28-04-11 D 2698 FC IB-2 C 30 42.5N 300 14.6 25.8 33.7 16 LIFT 8(VIII)
S.SPILLWAY BARRELS 11 -
29-04-11 D 2699 FC IB-2 C 30 42.5N 300 14.4 24.0 33.8 12 LIFT 13
S.SPILLWAY BARRELS
04-05-11 D 2701 FC IB-2 C 30 42.5N 300 14.8 24.4 33.2
15 - 16 LIFT 8A
S.SPILLWAY APRON
06-05-11 D 2702 FC IB-2 C 30 42.5N 300 18.4 24.1 33.5
SLAB SS17 - SS19
S.SPILLWAY APRON RR
10-05-11 D 2703 FC R C 20 42.5N 250 9.3 17.1 23.3
CONCRETE
S.SPILLWAY BARRELS
13-05-11 D 2704 FC IB-2 C 30 42.5N 300 14.0 24.5 35.3
14 - 15 & 16 LIFT 12
S.SPILLWAY APRON
RIGHT WALL ROCK
14-05-11 D 2705 FC R C 20 42.5N 250 8.9 18.3 24.9
RECONSTRUCTION
CONCRETE
S.SPILLWAY SRI 1 & 2
17-05-11 D 2706 FC IB-2 C 30 42.5N 300 15.1 25.0 35.4
FOUNDATION
S.SPILLWAY
18-05-11 D 2707 FC JC C 25 42.5N 300 13.3 23.0 31.1 RETAINING WALL LIFTS
14A & 14B
S.SPILLWAY BARRELS
19-05-11 D 2708 FC IB-2 C 30 42.5N 300 15.7 25.7 34.2
15 & 16 LIFT 13
S.SPILLWAY SS20 1, 2,
20-05-11 D 2709 FC IB-2 C 30 42.5N 300 17.5 24.5 34.2
3&4
S.SPILLWAY APRON SR
23-05-11 D 2712 FC IB-2 C 30 42.5N 300 15.0 24.9 35.1
1-1
S.SPILLWAY BARRELS
25-05-11 D 2713 FC IB-2 C 30 42.5N 300 15.8 25.5 35.0
15 & 16 LIFT 13

Page 128
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SWITCH YARD
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

28-04-09 D 564 FC JC C 25 42.5N 300 15.5 25.7 32.3 37.1 SWITCH YARD F.P14-1

07-05-09 D 578 FC JC C 25 42.5N 300 14.5 27.9 36.5 38.7 S.Y.D.F.P10-1 2nd LIFT

11-05-09 D 591 FC JC C 25 42.5N 300 14.2 25.3 31.2 36.4 S.Y.D.F.P10-5 1st POUR

13-05-09 D 594 FC JC C 25 42.5N 300 14.8 24.8 33.5 37.1 S.Y.D.F.P14-1 (2) 2nd POUR

16-05-09 D 602 FC JC C 25 42.5N 300 13.1 24.3 31.6 34.5 S.Y.DEEP FOUND. P10-5

06-06-09 D 638 FC JC C 25 42.5N 300 13.4 24.1 33.8 36.3 ERECTION BAY & BEAM AXIS 22-24

09-06-09 D 644 FC JC C 25 42.5N 300 14.7 26.4 34.6 38.7 S.Y.D.F.P10-2 2nd POUR

16-06-09 D 659 FC JC C 25 42.5N 300 12.6 23.4 32.6 36.0 S.Y.D.F.P10-1(Q-1) 2nd POUR

18-06-09 D 665 FC JC C 25 42.5N 300 14.1 26.7 34.0 38.6 S.Y.D.F.P10-1(Q3-4) 2nd POUR

24-06-09 D 677 FC JC C 25 42.5N 300 13.7 24.4 35.1 41.4 S.Y.D.F. P10-5 (A-4)

24-06-09 D 678 FC JC C 25 42.5N 300 14.7 25.4 34.8 39.7 E / BAY SLAB 24-25

25-06-09 D 681 FC JC C 25 42.5N 300 16.4 25.7 35.4 42.3 S.Y.D.F. P10-1 (R-4)

01-07-09 D 693 FC JC C 25 42.5N 300 16.0 30.7 37.8 40.1 S.Y.D.F. P10-1 (P-4)

08-07-09 D 705 FC JC C 25 42.5N 300 16.2 28.9 34.4 41.8 S.Y.D.F. P13-1 (C-2)

S.Y.D.F.AREA 6 AXIS M3 P10-1 2nd


13-07-09 D 722 FC JC C 25 42.5N 300 17.9 30.0 38.1 40.4
POUR
S.Y.D.F.AREA 5 AXIS M2 P10-1 2nd
15-07-09 D 726 FC JC C 25 42.5N 300 15.4 28.3 36.5 38.9
POUR

20-07-09 D 744 FC JC C 25 42.5N 300 14.8 24.8 32.5 37.7 S.Y.D.F. AXIS R3 P14-1 2nd POUR

21-07-09 D 747 FC JC C 25 42.5N 300 12.2 23.4 33.8 36.0 S.Y.D.F. AXIS D2 P13-1 2nd POUR

23-07-09 D 754 FC JC C 25 42.5N 300 16.9 27.2 36.8 39.8 S.Y.D.F. AXIS 14 P14-1 1st POUR

28-07-09 D 771 FC JC C 25 42.5N 300 13.1 24.5 34.5 38.5 S.Y.D.F. AXIS D3 P10-3 2nd POUR

28-07-09 D 772 FC JC C 25 42.5N 300 12.9 23.3 34.4 38.0 S.Y.D.F. AXIS H2 P14-1 1st POUR

30-07-09 D 777 FC JC C 25 42.5N 300 12.3 23.0 32.8 39.1 S.Y.D.F. AXIS 14 P14-1 2nd POUR

30-07-09 D 778 FC JC C 25 42.5N 300 13.2 12.9 33.9 39.9 S.Y.D.F. AXIS F4 P14-1 1st POUR

03-08-09 D 785 FC JC C 25 42.5N 300 16.7 23.8 33.6 40.7 S.Y.D.F.P14-1(R-1)

04-08-09 D 789 FC JC C 25 42.5N 300 13.4 25.2 34.7 38.6 S.Y.D.F.P14-1(O-3)

05-08-09 D 794 FC JC C 25 42.5N 300 13.7 24.8 33.6 40.4 S.Y.D.F.P14-1(H-2)

06-08-09 D 798 FC JC C 25 42.5N 300 15.3 23.8 34.3 38.2 S.Y.D.F.P14-1(H-2)2nd POUR

08-08-09 D 804 FC JC C 25 42.5N 300 16.0 27.2 37.0 41.3 S.Y.D.F.P14-1(F-4)2nd POUR

10-08-09 D 814 FC JC C 25 42.5N 300 13.2 24.5 33.4 37.1 S.Y.D.F.P14-1(O-5)2nd POUR

13-08-09 D 824 FC JC C 25 42.5N 300 12.5 25.6 35.6 38.3 S.Y.D.F.P12-2(D-5)2nd POUR

13-08-09 D 825 FC JC C 25 42.5N 300 12.7 24.9 34.0 38.0 S.Y.D.F. P14-1 C - 3

16-08-09 D 840 FC JC C 25 42.5N 300 19.4 27.7 38.5 41.4 S.Y.D.F.P12-1(C-5)1st POUR

17-08-09 D 842 FC JC C 25 42.5N 300 14.9 27.1 34.7 39.3 S.Y.D.F.P14-1(O-3)2nd POUR

Page 129
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SWITCH YARD
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

21-08-09 D 858 FC JC C 25 42.5N 300 17.0 29.7 36.8 39.5 S.Y.D.F. P12-1 (Q4-5)

22-08-09 D 865 FC JC C 25 42.5N 300 13.6 25.3 32.8 36.3 S.Y.D.F.P10-3(G-5)1st POUR
S.Y.D.F.RHS FULL
24-08-09 D 870 FC R C 15 42.5N 300 12.4 21.4 28.4 31.2 EL:CH:41.50/39.00/36.50

25-08-09 D 875 FC JC C 25 42.5N 300 10.1 21.0 34.8 38.0 S.Y.D.F.P10-3(G-5)2nd POUR

30-08-09 D 893 FC JC C 25 42.5N 300 15.4 26.7 36.5 39.3 S.Y.D.F.P10-3(D-5)2nd POUR

30-08-09 D 894 FC JC C 25 42.5N 300 15.1 25.5 33.4 37.0 S.Y.D.F.P10-3(G-3)1st POUR

30-08-09 D 895 FC JC C 25 42.5N 300 13.9 26.5 35.8 38.5 S.Y.D.F.P15-1 AREA 1

01-09-09 D 897 FC JC C 25 42.5N 300 14.7 24.5 34.0 38.0 S.Y.D.F.P15-2 (C-5)

01-09-09 D 900 FC JC C 25 42.5N 300 13.9 26.4 36.7 39.2 S.Y.D.F.P12-3 (R-5)

04-09-09 D 912 FC JC C 25 42.5N 300 13.0 29.4 37.7 40.4 S.Y.D.F.P10-3 (F-3)

05-09-09 D 914 FC JC C 25 42.5N 300 14.4 26.8 35.0 39.0 S.Y.D.F.P10-3 (E-3)2nd POUR

07-09-09 D 923 FC JC C 25 42.5N 300 17.5 28.4 32.1 35.7 S.Y.D.F.P14-1 (L-4)

09-09-09 D 930 FC JC C 25 42.5N 300 14.5 29.6 33.8 37.8 S.Y.D.F.P10-3(F-5)2nd POUR

10-09-09 D 935 FC JC C 25 42.5N 300 13.9 25.9 33.6 40.4 S.Y.D.F.P10-3(E-5)2nd POUR

14-09-09 D 945 FC JC C 25 42.5N 300 13.4 25.2 34.8 45.1 S.Y.D.F.P14-1 (F-2)

16-09-09 D 953 FC JC C 25 42.5N 300 14.0 24.9 34.5 38.5 S.Y.D.F.P11-2(F-3)2nd POUR

17-09-09 D 958 FC JC C 25 42.5N 300 14.8 24.3 34.5 37.5 S.Y.D.F.P11-1 (I-2)

19-09-09 N 969 FC JC C 25 42.5N 300 17.6 31.3 39.5 50.4 S.Y.D.F.P14-1 (I-3)

21-09-09 D 973 FC JC C 25 42.5N 300 13.6 24.8 32.1 35.5 S.Y.D.F.P10-3(I-5)2nd POUR

24-09-09 D 984 FC JC C 25 42.5N 300 20.2 30.8 34.3 37.8 S.Y.D.F.P15-1(I-5)2nd POUR

26-09-09 D 996 FC JC C 25 42.5N 300 17.4 27.2 35.6 41.5 S.Y.D.F.P15-1(CONTROL B)

01-10-09 D 1015 FC JC C 25 42.5N 300 15.1 24.0 32.9 38.5 S.Y.D.F.P10-2(L-2)2nd POUR

02-10-09 N 1020 FC R C 15 42.5N 300 13.4 20.1 29.1 32.7 S.Y.D.F.BLINDING P13-2

02-10-09 D 1021 FC R C 15 42.5N 300 13.0 19.5 28.7 31.7 S.Y.D.F.BLINDING P10-1

02-10-09 D 1024 FC JC C 25 42.5N 300 15.0 22.1 31.1 36.2 S.Y.D.F.P13-1(Q-2)2nd POUR

07-10-09 N 1032 FC JC C 25 42.5N 300 18.8 25.6 35.6 41.9 S.Y.D.F.P15-2(R-2)

08-10-09 D 1038 FC JC C 25 42.5N 300 13.4 25.5 33.7 35.6 S.Y.D.F.P15-1(P-Q-5)

09-10-09 D 1046 FC JC C 25 42.5N 300 17.5 32.8 36.0 41.3 S.Y.D.F.P10-1(J-1)2nd POUR

12-10-09 D 1056 FC JC C 25 42.5N 300 14.9 25.0 35.7 39.8 S.Y.D.F.AXIS 7-B, A-B-C

12-10-09 N 1059 FC JC C 25 42.5N 300 15.7 24.5 34.4 38.7 S.Y.D.F.P10-1(K-2)2nd POUR

15-10-09 D 1071 FC JC C 25 42.5N 300 22.2 30.5 35.3 39.8 S.Y.D.F.P10-3(K-5)

16-10-09 N 1078 FC JC C 25 42.5N 300 13.3 28.9 36.3 46.9 S.Y.D.F.P10-3(J-5)2nd POUR

18-10-09 D 1085 FC JC C 25 42.5N 300 15.8 25.2 33.1 38.6 S.Y.C. B. F. AXIS 8-7, B,C,D

19-10-09 N 1089 FC JC C 25 42.5N 300 14.9 25.1 33.3 36.8 S.Y.D.F.P10-1(P-5)2nd POUR

22-10-09 N 1101 FC JC C 25 42.5N 300 14.0 25.6 34.8 38.6 S.Y.D.F.P10-1(N-5)2nd POUR

23-10-09 D 1105 FC JC C 25 42.5N 300 18.1 29.4 37.2 40.2 S.Y.D.F.P10-1(K-3)

24-10-09 N 1112 FC JC C 25 42.5N 300 14.5 25.2 32.3 37.7 S.Y.D.F.P13-3(R-2)1st POUR

26-10-09 N 1117 FC JC C 25 42.5N 300 18.9 27.4 32.1 37.4 S.Y.D.F.P10-4(L-5)

Page 130
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SWITCH YARD
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

27-10-09 N 1120 FC JC C 25 42.5N 300 14.0 27.4 33.6 39.8 S.Y.D.F.P10-1(K-5)2nd POUR

29-10-09 D 1126 FC JC C 25 42.5N 300 14.2 24.1 35.8 39.6 S.Y.D.F.P10-4(M-5)

02-11-09 D 1135 FC JC C 25 42.5N 300 14.2 25.7 33.7 37.1 S.Y.D.F.P13-2(R-2)

03-11-09 N 1141 FC JC C 25 42.5N 300 13.8 26.0 34.1 36.0 S.Y.DEEP FOUNDATION

08-11-09 D 1158 FC JC C 25 42.5N 300 14.5 26.7 34.0 37.8 S.Y.D.F.P11-3(L-2)

12-11-09 D 1176 FC JC C 25 42.5N 300 14.4 24.4 32.4 36.6 S.Y.D.F.P10-3(N-3)

S.Y.(CONTROL B) F-AXIS 7, 6, 6, 5,
16-11-09 D 1188 FC JC C 25 42.5N 300 13.8 24.0 32.5 37.3 4

17-11-09 D 1196 FC JC C 25 42.5N 300 13.8 25.8 32.4 37.2 S.Y.D.F.P14-1(L-1)2nd POUR

17-11-09 N 1198 FC JC C 25 42.5N 300 16.3 26.6 32.7 36.9 S.Y.D.F.P10-2(O-5)2nd POUR

30-11-09 N 1234 FC JC C 25 42.5N 300 14.5 26.6 35.0 41.3 S.Y.D.F.P11-1(O-2)2nd POUR

01-12-09 D 1237 FC JC C 25 42.5N 300 13.5 26.5 35.8 40.6 S.Y.DEEP FONDATION P15-1

S.Y.(CONTROL B) -AXIS 4/5 3, 2A,


19-12-09 D 1302 FC JC C 25 42.5N 300 19.1 27.8 36.5 45.9 B, C, D
S.Y. FOUNDATION CD & 4-5 DE & 4-
02-01-10 N 1335 FC JC C 25 42.5N 300 14.9 23.8 31.6 36.8 5
S.Y.BASE SLAB 1-2 CONTROL
10-01-10 N 1370 FC JC C 25 42.5N 300 16.8 27.5 36.2 44.8 BUILDING
S.Y.DEEP FOUNDATION P10-1 (F -
25-01-10 D 1450 FC JC C 25 42.5N 300 14.3 24.8 32.3 36.0 G - I)

28-01-10 D 1464 FC IB-2 C 30 42.5N 300 15.6 25.2 31.8 35.6 SWITCH YARD CABLE DUCT

S.Y.CONTROL BUILDING RECKING


06-02-10 N 1511 FC JC C 25 42.5N 300 13.6 24.7 30.6 35.1 AXIS 8-7 AB-CD
S.Y.CONTROL BUILDING WALL
11-02-10 D 1542 FC JC C 25 42.5N 300 14.3 23.7 31.7 37.3 AXIS 4-5 A-B
S.YARD P5 (O - P - 5) No.1 (Q - R -
02-03-10 N 1630 FC JC C 25 42.5N 300 13.9 22.9 30.1 35.9 2) No.4
S.Y.H.V.FOUND P5 (K - L - 4 -
04-03-10 N 1644 FC JC C 25 42.5N 300 14.4 22.9 31.2 35.2 5) No.3 P2 (P - Q - 3) No.1
S.Y.H.V.FOUND P2 (P - Q - 3 )
05-03-10 N 1649 FC JC C 25 42.5N 300 13.6 22.5 30.6 35.1 No.1 P5 (P - Q - 3) No.3
S.Y.H.V.FOUND P3 (O - P - 4 - 5
09-03-10 N 1663 FC JC C 25 42.5N 300 17.2 24.6 30.8 36.3 ) No.3 P9 (O - P - 4 - 5) NR
S.Y.CABLE DUCT CC2 AXIS G-H H9
12-03-10 N 1682 FC JC C 25 42.5N 300 13.6 21.8 31.9 35.6 AXIS (M - N - 4 - 5 ) No.2 P5 AXIS (P -
R - 4 - 5N)
S.Y.H.V.FOUND P3 (Q - R - 4 -
13-03-10 N 1687 FC JC C 25 42.5N 300 13.6 21.9 30.8 35.6 5 ) No.3 P5 (Q - R - 4 - 5) No1
S.Y. CONTROL BUILDING DECK,
18-03-10 N 1708 FC JC C 25 42.5N 300 13.7 22.8 30.1 32.6 AXIS 7 - 6 - 4 - 5 - 3, A,B,C,D
S.Y.DEEP FOUNDATION P10-1 (M -
20-03-10 N 1715 FC JC C 25 42.5N 300 13.6 22.7 30.8 34.6 W - 2)
S.Y.H.V.FOUND P2 (G - H - 1 -
25-03-10 N 1739 FC JC C 25 42.5N 300 13.1 21.8 30.7 33.9 2 ) No.3
S.Y.DEEP FOUNDATION P10-1 (N -
30-03-10 D 1769 FC JC C 25 42.5N 300 13.4 25.1 32.2 37.6 O - 2 - 3)
S.Y.H.V.FOUND B. AXIS (O - P - 5 -
06-04-10 N 1790 FC R C 20 42.5N 250 10.6 19.0 26.8 29.3 K) (L - M - 2 - 3)

Page 131
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SWITCH YARD
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
S.Y. DUCT CHANNEL CONECTION 1-
09-04-10 N 1802 FC JC C 25 42.5N 310 13.6 22.1 31.3 33.9 2 CC1
S.Y.H.V.FOUND P16 (M - N - 5
14-04-10 D 1819 FC JC C 25 42.5N 310 12.8 22.3 31.9 36.6 )No.1 (L - M - 2 - 3)
S.Y. CONTROL BUILDING AXIS S2 -
16-04-10 D 1832 FC JC C 25 42.5N 310 12.7 24.4 30.0 34.3 A,B,C,D

03-05-10 D 1886 FC JC C 25 42.5N 310 13.8 22.4 30.8 33.8 S.YARD DPF P10-1 M - O - 2

S.Y. CONTROL BUILDING WALL


08-05-10 D 1903 FC JC C 25 42.5N 310 14.2 22.3 30.7 35.3 AXIS C - 1 - 2
S.Y. CONTROL BUILDING DECK
12-05-10 D 1918 FC JC C 25 42.5N 310 14.4 22.2 30.2 34.0 4.5 - 2.3 A, B, C
S.Y. CONTROL BUILDING DECK
30-06-10 D 2093 FC M6 C 40 42.5N 380 21.6 32.2 44.5 47.6 A, B, C/1, 2, 3
S.Y. P3 INTERCONNECTION
15-09-10 N 2309 FC JC C 25 42.5N 310 12.5 23.4 30.6 35.9 FOUNDATION
S.Y. P2 INTERCONNECTION
05-10-10 D 2361 FC JC C 25 42.5N 310 14.6 28.4 33.4 40.4 TOWER FOUNDATION
S.YARD TEMPORARY GROUND
13-10-10 D 2384 FC R C 20 42.5N 250 11.6 17.3 24.8 29.6 SLAB FOR ALSTOM
S.YARD INTERCONNECTION
19-10-10 D 2397A FC JC C 25 42.5N 310 13.2 21.2 28.7 31.2 TOWER FOUNDATION
S.YARD INTERCONNECTION
25-11-10 D 2490 FC JC C 25 42.5N 310 13.7 23.7 29.6 35.5 TOWER FOUNDATION
S.YARD P5 INTERCONNECTION
10-12-10 D 2517 FC JC C 25 42.5N 310 11.5 22.2 30.3 35.2 TOWER SLAB FOUNDATION

Page 132
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

15-09-09 D 948 FC IB-7 C 35 42.5N 300 15.0 27.4 40.4 45.0 PRECAST BEAM

21-09-09 D 971 FC IB-7 C 35 42.5N 300 15.9 28.6 40.6 43.5 PRECAST BEAM

22-09-09 D 974 FC IB-7 C 35 42.5N 300 17.3 26.9 37.0 43.1 PRECAST BEAM

24-09-09 D 982 FC IB-7 C 35 42.5N 300 20.3 32.1 41.9 46.4 PRECAST BEAM

26-09-09 D 994 FC IB-7 C 35 42.5N 300 18.9 27.9 36.6 42.4 PRECAST BEAM

27-09-09 D 1002 FC IB-7 C 35 42.5N 300 18.6 32.1 41.2 47.2 PRECAST BEAM

29-09-09 D 1006 FC IB-7 C 35 42.5N 300 20.0 30.1 39.6 43.9 PRECAST BEAM

30-09-09 D 1008 FC IB-7 C 35 42.5N 300 18.9 30.6 10.7 44.6 PRECAST BEAM

01-10-09 D 1013 FC IB-7 C 35 42.5N 300 18.5 29.2 36.7 40.5 PRECAST BEAM

06-10-09 D 1028 FC IB-7 C 35 42.5N 300 15.2 29.3 37.3 42.5 PRECAST BEAM

07-10-09 D 1033 FC IB-7 C 35 42.5N 300 22.7 32.1 40.2 45.4 PRECAST BEAM

08-10-09 D 1036 FC IB-7 C 35 42.5N 300 22.4 33.6 42.5 47.7 PRECAST BEAM

09-10-09 D 1043 FC IB-7 C 35 42.5N 300 15.8 27.1 35.7 40.5 PRECAST BEAM

10-10-09 D 1048 FC IB-7 C 35 42.5N 300 16.5 27.1 36.5 40.7 PRECAST BEAM

11-10-09 D 1053 FC IB-7 C 35 42.5N 300 21.9 32.2 42.4 48.1 PRECAST BEAM

12-10-09 D 1055 FC IB-7 C 35 42.5N 300 16.5 25.8 38.2 42.5 PRECAST BEAM

13-10-09 D 1061 FC IB-7 C 35 42.5N 300 20.9 30.6 40.6 47.1 PRECAST BEAM

14-10-09 D 1065 FC IB-7 C 35 42.5N 300 19.0 28.9 38.1 43.6 PRECAST BEAM

15-10-09 D 1069 FC IB-7 C 35 42.5N 300 18.9 30.2 40.4 47.8 PRECAST BEAM

16-10-09 D 1075 FC IB-7 C 35 42.5N 300 16.0 30.0 39.0 43.7 PRECAST BEAM

17-10-09 D 1079 FC IB-7 C 35 42.5N 300 19.8 28.6 39.4 44.8 PRECAST BEAM

18-10-09 D 1084 FC IB-7 C 35 42.5N 300 17.6 27.2 38.2 42.5 PRECAST BEAM

19-10-09 D 1086 FC IB-7 C 35 42.5N 300 15.1 29.8 38.4 42.5 PRECAST BEAM

20-10-09 D 1091 FC IB-7 C 35 42.5N 300 20.4 29.9 40.6 43.3 PRECAST BEAM

21-10-09 D 1095 FC IB-7 C 35 42.5N 300 15.6 27.7 38.8 40.0 PRECAST BEAM

22-10-09 D 1099 FC IB-7 C 35 42.5N 300 23.2 32.3 40.9 43.7 PRECAST BEAM

23-10-09 D 1104 FC IB-7 C 35 42.5N 300 20.6 29.7 39.1 42.8 PRECAST BEAM

Page 133
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

24-10-09 D 1108 FC IB-7 C 35 42.5N 300 20.7 29.5 39.4 50.5 PRECAST BEAM

26-10-09 D 1115 FC IB-7 C 35 42.5N 300 21.8 31.2 39.7 48.3 PRECAST BEAM

27-10-09 D 1119 FC IB-7 C 35 42.5N 300 17.8 32.9 40.4 46.0 PRECAST BEAM

28-10-09 D 1122 FC IB-7 C 35 42.5N 300 16.8 27.9 38.0 44.4 PRECAST BEAM

29-10-09 D 1124 FC IB-7 C 35 42.5N 300 17.4 27.1 38.4 44.0 PRECAST BEAM

30-10-09 D 1128 FC IB-7 C 35 42.5N 300 16.7 26.4 38.7 42.4 PRECAST BEAM

02-11-09 D 1134 FC IB-7 C 35 42.5N 300 17.1 29.2 39.4 42.3 PRECAST BEAM

03-11-09 D 1139 FC IB-7 C 35 42.5N 300 18.0 29.3 40.6 44.6 PRECAST BEAM

04-11-09 D 1142 FC IB-7 C 35 42.5N 300 15.7 29.6 39.8 43.1 PRECAST BEAM

05-11-09 D 1148 FC IB-7 C 35 42.5N 300 17.2 29.9 39.9 43.5 PRECAST BEAM

06-11-09 D 1151 FC IB-7 C 35 42.5N 300 17.6 29.1 40.3 44.4 PRECAST BEAM

07-11-09 D 1155 FC IB-7 C 35 42.5N 300 16.7 28.2 40.2 43.2 PRECAST BEAM

08-11-09 D 1157 FC IB-7 C 35 42.5N 300 17.1 29.4 39.2 44.7 PRECAST BEAM

09-11-09 D 1162 FC IB-7 C 35 42.5N 300 21.5 30.8 41.5 48.5 PRECAST BEAM

10-11-09 D 1167 FC IB-7 C 35 42.5N 300 18.1 28.6 39.9 42.5 PRECAST BEAM

11-11-09 D 1170 FC IB-7 C 35 42.5N 300 19.8 28.5 37.8 44.5 PRECAST BEAM

12-11-09 D 1175 FC IB-7 C 35 42.5N 300 19.7 30.9 40.4 46.4 PRECAST BEAM

13-11-09 D 1180 FC IB-7 C 35 42.5N 300 18.1 30.7 40.0 46.3 PRECAST BEAM

14-11-09 D 1183 FC IB-7 C 35 42.5N 300 18.5 27.9 35.8 42.1 PRECAST BEAM

15-11-09 D 1186 FC IB-7 C 35 42.5N 300 17.2 26.6 38.1 43.1 PRECAST BEAM

16-11-09 D 1187 FC IB-7 C 35 42.5N 300 18.5 31.1 40.2 46.2 PRECAST BEAM

17-11-09 D 1193 FC IB-7 C 35 42.5N 300 20.8 32.1 41.9 46.4 PRECAST BEAM

18-11-09 D 1200 FC IB-7 C 35 42.5N 300 15.9 26.7 37.8 43.2 PRECAST BEAM

20-11-09 D 1206 FC IB-7 C 35 42.5N 300 15.2 27.0 37.7 42.6 PRECAST BEAM

21-11-09 D 1206B FC IB-7 C 35 42.5N 300 16.2 28.8 37.6 41.0 PRECAST BEAM

22-11-09 D 1211 FC IB-7 C 35 42.5N 300 18.0 29.6 39.3 43.6 PRECAST BEAM

23-11-09 D 1214 FC IB-7 C 35 42.5N 300 18.8 29.5 37.6 44.8 PRECAST BEAM

Page 134
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

25-11-09 D 1218 FC IB-7 C 35 42.5N 300 16.7 26.6 35.2 41.0 PRECAST BEAM

26-11-09 D 1224 FC IB-7 C 35 42.5N 300 17.9 28.3 38.8 43.8 PRECAST BEAM

27-11-09 D 1226 FC IB-7 C 35 42.5N 300 16.7 28.8 39.4 44.3 PRECAST BEAM

30-11-09 D 1231 FC IB-7 C 35 42.5N 300 16.1 26.1 37.1 40.3 PRECAST BEAM

01-12-09 D 1235 FC IB-7 C 35 42.5N 300 18.9 25.7 35.5 40.3 PRECAST BEAM

02-12-09 D 1238 FC IB-7 C 35 42.5N 300 17.0 26.6 36.2 40.0 PRECAST BEAM

04-12-09 D 1243 FC IB-7 C 35 42.5N 300 15.5 26.5 38.8 41.3 PRECAST BEAM

05-12-09 D 1245 FC IB-7 C 35 42.5N 300 15.9 25.5 38.2 44.0 PRECAST BEAM

06-12-09 D 1251 FC IB-7 C 35 42.5N 300 15.4 27.1 35.5 38.1 PRECAST BEAM

07-12-09 D 1258 FC IB-7 C 35 42.5N 300 18.5 29.1 37.3 40.1 PRECAST BEAM

08-12-09 D 1260 FC IB-7 C 35 42.5N 300 17.0 28.9 37.4 41.8 PRECAST BEAM

10-12-09 D 1269 FC IB-7 C 35 42.5N 300 17.2 26.8 38.3 38.5 PRECAST BEAM

11-12-09 D 1272 FC IB-7 C 35 42.5N 300 16.1 28.5 39.7 44.6 PRECAST BEAM

12-12-09 D 1276 FC IB-7 C 35 42.5N 300 15.9 26.5 37.4 40.4 PRECAST BEAM

14-12-09 D 1283 FC IB-7 C 35 42.5N 300 15.7 26.2 37.6 41.3 PRECAST BEAM

15-12-09 D 1287 FC IB-7 C 35 42.5N 300 16.8 27.8 38.7 43.1 PRECAST BEAM

16-12-09 D 1289 FC IB-7 C 35 42.5N 300 20.7 29.1 39.4 44.6 PRECAST BEAM

17-12-09 D 1293 FC IB-7 C 35 42.5N 300 15.7 27.9 36.0 39.9 PRECAST BEAM

18-12-09 D 1298 FC IB-7 C 35 42.5N 300 16.9 28.4 39.6 43.5 PRECAST BEAM

19-12-09 D 1301 FC IB-7 C 35 42.5N 300 15.7 28.7 39.8 44.9 PRECAST BEAM

20-12-09 D 1307 FC IB-7 C 35 42.5N 300 15.7 27.7 38.2 42.3 PRECAST BEAM

21-12-09 D 1310 FC IB-7 C 35 42.5N 300 15.1 27.3 37.4 41.4 PRECAST BEAM

22-12-09 D 1314 FC IB-7 C 35 42.5N 300 17.7 28.5 38.3 42.5 PRECAST BEAM

28-12-09 D 1318 FC IB-7 C 35 42.5N 300 15.8 26.6 38.8 42.2 PRECAST BEAM

29-12-09 D 1321 FC IB-7 C 35 42.5N 300 16.1 26.8 37.1 40.4 PRECAST BEAM

30-12-09 D 1326 FC IB-7 C 35 42.5N 300 16.2 26.7 38.4 43.1 PRECAST BEAM

31-12-09 D 1331 FC IB-7 C 35 42.5N 300 16.7 28.4 39.7 42.1 PRECAST BEAM

Page 135
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

02-01-10 D 1332 FC IB-7 C 35 42.5N 300 17.3 29.3 38.5 41.9 CARPENTRY WORKSHOP BEAM

03-01-10 D 1338 FC IB-7 C 35 42.5N 300 17.9 29.4 37.6 42.2 CARPENTRY WORKSHOP BEAM
CARPENTRY WORKSHOP
04-01-10 D 1341 FC IB-7 C 35 42.5N 300 15.4 29.1 37.1 41.8
PRECAST BEAM
CARP. WORKSHOP PRECAST
05-01-10 D 1345 FC IB-7 C 35 42.5N 300 15.3 26.3 38.5 43.6
BEAM & DUCT CABLE
CARPENTRY WORKSHOP
07-01-10 D 1357 FC IB-7 C 35 42.5N 300 16.8 29.2 38.1 43.0
PRECAST BEAM
CARPENTRY WORKSHOP
08-01-10 D 1363 FC IB-7 C 35 42.5N 300 16.5 28.4 37.9 43.4
PRECAST BEAM
CARPENTRY WORKSHOP
09-01-10 D 1366 FC IB-7 C 35 42.5N 300 14.6 26.5 36.9 39.2
PRECAST BEAM
CARPENTRY WORKSHOP
11-01-10 D 1375 FC IB-7 C 35 42.5N 300 15.5 27.6 38.8 44.4
PRECAST BEAM
CARPENTRY WORKSHOP
12-01-10 D 1381 FC IB-7 C 35 42.5N 300 15.7 27.8 37.4 44.1
PRECAST BEAM
CARPENTRY WORKSHOP
13-01-10 D 1385 FC IB-7 C 35 42.5N 300 16.3 28.7 37.8 43.6
PRECAST BEAM
CARPENTRY WORKSHOP
14-01-10 D 1390 FC IB-7 C 35 42.5N 300 15.8 28.3 38.4 42.8
PRECAST BEAM
CARPENTRY WORKSHOP
15-01-10 D 1397 FC IB-7 C 35 42.5N 300 17.4 29.2 37.4 40.9
PRECAST BEAM
CARPENTRY WORKSHOP
16-01-10 D 1401 FC IB-7 C 35 42.5N 300 16.8 26.7 38.5 40.2
PRECAST BEAM
CARPENTRY WORKSHOP
17-01-10 D 1407 FC IB-7 C 35 42.5N 300 17.9 26.7 38.4 41.9
PRECAST BEAM
CARPENTRY WORKSHOP
18-01-10 D 1408 FC IB-7 C 35 42.5N 300 19.7 28.0 38.3 44.8
PRECAST BEAM
CARPENTRY WORKSHOP
19-01-10 D 1414 FC IB-7 C 35 42.5N 300 15.8 27.9 35.5 39.2
PRECAST BEAM
CARPENTRY WORKSHOP
20-01-10 D 1421 FC IB-7 C 35 42.5N 300 16.3 28.4 38.5 40.8
PRECAST BEAM
CARPENTRY WORKSHOP
22-01-10 D 1431 FC IB-7 C 35 42.5N 300 17.8 28.6 39.0 44.3
PRECAST BEAM
CARPENTRY WORKSHOP
23-01-10 D 1437 FC IB-7 C 35 42.5N 300 18.7 28.5 38.1 41.9
PRECAST BEAM
CARPENTRY WORKSHOP
24-01-10 D 1443 FC IB-7 C 35 42.5N 300 16.5 27.5 37.8 43.4
PRECAST BEAM
CARPENTRY WORKSHOP
25-01-10 D 1447 FC IB-7 C 35 42.5N 300 16.5 27.9 37.0 41.8
PRECAST BEAM
CARPENTRY WORKSHOP
26-01-10 D 1454 FC IB-7 C 35 42.5N 300 18.1 28.6 39.2 48.6
PRECAST BEAM
CARPENTRY WORKSHOP
27-01-10 D 1460 FC IB-7 C 35 42.5N 300 15.9 28.4 37.3 41.1
PRECAST BEAM
CARPENTRY WORKSHOP
28-01-10 D 1463 FC IB-7 C 35 42.5N 300 16.6 27.5 37.0 40.1
PRECAST BEAM
CARPENTRY WORKSHOP
29-01-10 D 1469 FC IB-7 C 35 42.5N 300 15.3 27.9 37.2 41.6
PRECAST BEAM
CARPENTRY WORKSHOP
01-02-10 D 1477 FC IB C 35 42.5N 330 18.2 27.0 36.4 40.5 PRECAST BEAM
CARPENTRY WORKSHOP
02-02-10 D 1483 FC IB C 35 42.5N 330 16.6 28.4 35.9 40.6 PRECAST BEAM
CARPENTRY WORKSHOP
03-02-10 D 1488 FC IB C 35 42.5N 330 16.2 28.7 38.3 42.8 PRECAST BEAM
CARPENTRY WORKSHOP
04-02-10 D 1495 FC IB C 35 42.5N 330 16.5 25.7 36.4 39.8 PRECAST BEAM
CARPENTRY WORKSHOP
05-02-10 D 1499 FC IB C 35 42.5N 330 16.7 26.7 36.2 40.3 PRECAST BEAM
CARPENTRY WORKSHOP
05-02-10 D 1501 FC IB-2 C 30 42.5N 300 16.5 25.9 33.6 39.7 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
06-02-10 D 1507 FC IB C 35 42.5N 330 17.4 27.5 38.9 45.8 PRECAST BEAM
CARPENTRY WORKSHOP
07-02-10 D 1516 FC IB C 35 42.5N 330 16.9 28.8 39.6 45.4 PRECAST BEAM

Page 136
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
CARPENTRY WORKSHOP
08-02-10 D 1518 FC IB C 35 42.5N 330 16.5 27.0 36.8 41.9 PRECAST BEAM
CARPENTRY WORKSHOP
09-02-10 D 1524 FC IB-2 C 30 42.5N 300 16.9 26.3 34.6 39.8 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
10-02-10 D 1532 FC IB C 35 42.5N 330 15.5 29.1 36.8 40.8 PRECAST BEAM
CARPENTRY WORKSHOP
11-02-10 D 1538 FC IB C 35 42.5N 330 17.3 28.3 37.8 43.6 PRECAST BEAM
CARPENTRY WORKSHOP
11-02-10 D 1540 FC IB-2 C 30 42.5N 300 15.0 24.7 32.5 41.7 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
12-02-10 D 1545 FC IB C 35 42.5N 330 17.6 27.4 37.6 42.0 PRECAST BEAM
CARPENTRY WORKSHOP
13-02-10 D 1551 FC IB C 35 42.5N 330 16.5 27.1 36.6 40.8 PRECAST BEAM
CARPENTRY WORKSHOP
13-02-10 D 1552 FC IB C 35 42.5N 330 15.6 25.4 34.4 38.6 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
15-02-10 D 1556 FC IB C 35 42.5N 330 18.2 27.0 36.8 40.4 PRECAST BEAM
CARPENTRY WORKSHOP
16-02-10 D 1561 FC IB-2 C 30 42.5N 300 18.7 31.3 38.5 44.3 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
17-02-10 D 1566 FC IB C 35 42.5N 330 17.4 27.4 36.6 40.3 PRECAST BEAM
CARPENTRY WORKSHOP
18-02-10 D 1574 FC IB C 35 42.5N 330 16.9 27.6 37.1 41.6 PRECAST BEAM
CARPENTRY WORKSHOP
19-02-10 D 1581 FC IB C 35 42.5N 330 15.6 28.4 37.8 41.5 PRECAST BEAM
CARPENTRY WORKSHOP
23-02-10 D 1598 FC IB C 35 42.5N 330 15.7 28.5 36.9 40.2 PRECAST BEAM
CARPENTRY WORKSHOP
25-02-10 D 1610 FC IB C 35 42.5N 330 16.7 27.9 37.8 44.3 PRECAST BEAM
CARPENTRY WORKSHOP
25-02-10 D 1614 FC IB-2 C 30 42.5N 300 14.7 24.5 31.5 35.1 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
01-03-10 D 1626 FC IB-2 C 30 42.5N 300 13.5 22.7 32.3 37.0 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
02-03-10 D 1631 FC IB C 35 42.5N 330 15.3 27.4 38.5 41.9 PRECAST BEAM
CARPENTRY WORKSHOP
03-03-10 D 1640 FC IB-2 C 30 42.5N 300 14.9 24.8 33.6 37.1 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
06-03-10 D 1656 FC IB C 35 42.5N 330 16.7 28.5 39.4 44.1 PRECAST BEAM
CARPENTRY WORKSHOP
08-03-10 D 1661 FC IB-2 C 30 42.5N 300 14.3 24.0 33.6 36.4 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
09-03-10 D 1665 FC IB C 35 42.5N 330 17.3 27.8 37.4 40.7 PRECAST BEAM
CARPENTRY WORKSHOP
10-03-10 D 1670 FC IB-2 C 30 42.5N 300 14.8 24.3 33.8 36.2 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
15-03-10 D 1693 FC IB-2 C 30 42.5N 300 12.9 22.8 31.8 34.4 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
17-03-10 D 1703 FC IB-2 C 30 42.5N 300 13.8 24.3 33.6 36.9 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
22-03-10 D 1726 FC IB-2 C 30 42.5N 300 15.1 24.6 33.6 37.3 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
24-03-10 D 1733 FC IB-2 C 30 42.5N 300 13.5 22.2 31.4 34.9 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
26-03-10 D 1747 FC IB-2 C 30 42.5N 300 14.2 23.9 32.8 42.4 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
29-03-10 D 1759 FC IB-2 C 30 42.5N 300 14.8 22.8 32.9 35.8 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
31-03-10 D 1771 FC IB-2 C 30 42.5N 300 14.1 23.9 32.6 36.4 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
02-04-10 D 1784 FC IB-2 C 30 42.5N 300 14.6 24.8 33.3 37.8 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
07-04-10 D 1793 FC IB-2 C 30 42.5N 300 13.9 23.1 32.4 36.6 PRECAST CABLE DUCT

Page 137
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

PRECAST BEAM
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
CARPENTRY WORKSHOP
09-04-10 D 1799 FC IB-2 C 30 42.5N 300 14.6 25.2 33.6 37.1 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
12-04-10 D 1809 FC IB-2 C 30 42.5N 300 13.7 23.2 30.0 34.6 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
14-04-10 D 1818 FC IB-2 C 30 42.5N 300 14.3 23.6 34.8 38.8 PRECAST CABLE DUCT
CARPENTRY WORKSHOP
16-04-10 D 1833 FC IB-2 C 30 42.5N 300 13.8 24.1 35.3 39.8 PRECAST CABLE DUCT
CARPENTRY WORKSHOP GATED
18-05-10 D 1936 FC IB C 35 42.5N 330 19.4 27.9 35.7 38.2 SPILLWAY BEAM SWD S5
CARPENTRY WORKSHOP GATED
21-05-10 D 1946 FC IB C 35 42.5N 330 15.4 27.3 35.8 40.2 SPILLWAY BEAM D/S - 4
CARPENTRY WORKSHOP GATED
22-05-10 D 1948 FC IB C 35 42.5N 330 16.8 26.4 37.4 42.3 SPILLWAY BEAM D/S - 5
CARPENTRY WORKSHOP GATED
26-05-10 D 1965 FC IB C 35 42.5N 330 20.5 30.6 40.2 44.9 SPILLWAY BEAM D1 - S5
CARPENTRY WORKSHOP GATED
28-05-10 D 1975 FC IB C 35 42.5N 330 18.3 27.4 38.8 42.4 SPILLWAY BEAM D/S - 4
CARPENTRY WORKSHOP GATED
03-06-10 D 1989 FC IB C 35 42.5N 330 19.8 30.5 37.1 41.6 SPILLWAY BEAM D/S - 4
CARPENTRY WORKSHOP GATED
04-06-10 D 1993 FC IB C 35 42.5N 330 16.4 26.9 35.9 42.2 SPILLWAY BEAM D/S - 5
CARPENTRY WORKSHOP GATED
06-06-10 D 2003 FC IB C 35 42.5N 330 15.9 26.9 36.8 42.2 SPILLWAY BEAM D/S - 4
CARPENTRY WORKSHOP GATED
11-06-10 D 2019 FC IB C 35 42.5N 330 17.3 28.2 37.6 42.4 SPILLWAY BEAM D/S - 5
CARPENTRY WORKSHOP GATED
12-06-10 D 2025 FC IB C 35 42.5N 330 16.5 27.2 38.8 43.6 SPILLWAY BEAM D/S - 4
CARPENTRY WORKSHOP GATED
15-06-10 D 2036 FC IB C 35 42.5N 330 15.0 26.6 37.3 40.6 SPILLWAY BEAM D/S - 4

Page 138
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

APPRON
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
APPRON BLINDING G.SPILLWAY
12-11-09 D 1178 FC S C 20 42.5N 250 12.9 20.8 27.9 33.8 TAILRACE CHANNEL
APPRON BLINDING G.SPILLWAY
16-11-09 D 1189 FC S C 20 42.5N 250 11.1 19.5 26.6 30.8 TAILRACE CHANNEL
APPRON BLINDING G.SPILLWAY
21-11-09 D 1208 FC S C 20 42.5N 250 11.7 21.0 26.3 30.7 TAILRACE CHANNEL

02-12-09 D 1239 FC S C 20 42.5N 250 11.4 18.1 25.5 28.1 APPRON BLINDIND

21-12-09 D 1311 FC IB-7 C 35 42.5N 300 16.3 26.4 37.8 42.0 APPRON BLINDIND

28-12-09 N 1319 FC IB-2 C 30 42.5N 300 14.8 25.9 34.3 40.6 APPRON SLAB

30-12-09 D 1324 FC IB-2 C 30 42.5N 300 15.3 24.9 34.3 36.5 APRON

30-12-09 N 1325 FC IB-2 C 30 42.5N 300 15.0 25.4 34.0 37.1 APPRON SLAB

31-12-09 D 1328 FC IB-2 C 30 42.5N 300 14.7 26.1 33.5 36.5 APPRON SLAB

31-12-09 D 1329 FC IB-2 C 30 42.5N 300 14.3 24.8 38.5 40.9 APPRON SLAB

06-01-10 N 1350 FC IB-2 C 30 42.5N 300 14.5 25.6 33.7 38.3 APPRON SLAB

07-01-10 D 1358 FC IB-2 C 30 42.5N 300 14.5 25.5 33.6 36.8 APPRON SLAB

08-01-10 D 1359 FC IB-2 C 30 42.5N 300 14.6 25.2 33.7 38.8 APPRON SLAB

12-01-10 D 1378 FC IB C 35 42.5N 330 23.3 31.3 43.0 51.4 APPRON SLAB

14-01-10 D 1393 FC IB C 35 42.5N 330 17.3 29.6 40.6 45.6 APPRON SLAB

16-01-10 N 1405 FC IB-2 C 30 42.5N 300 14.2 29.6 38.0 43.6 APPRON SLAB

17-01-10 D 1406 FC IB C 35 42.5N 330 20.8 31.0 43.8 50.5 APPRON SLAB

18-01-10 N 1412 FC IB-2 C 30 42.5N 300 15.7 24.3 35.0 38.3 APPRON SLAB

19-01-10 D 1413 FC IB-7 C 35 42.5N 300 16.8 28.8 39.6 44.9 APPRON SLAB

22-01-10 D 1432 FC IB-7 C 35 42.5N 300 16.6 30.1 39.7 43.8 APPRON SLAB

22-01-10 D 1433 FC IB C 35 42.5N 330 16.3 31.3 42.0 44.0 APPRON SLAB

24-01-10 D 1444 FC IB-7 C 35 42.5N 300 17.2 30.6 40.8 46.5 APPRON SLAB

24-01-10 D 1445 FC IB-2 C 30 42.5N 300 14.6 24.9 35.8 40.0 APPRON SLAB

28-01-10 D 1465 FC IB-7 C 35 42.5N 300 15.7 27.7 38.0 42.7 APPRON SLAB

28-01-10 D 1467 FC IB C 35 42.5N 330 15.4 28.2 37.4 40.1 APPRON SLAB

29-01-10 N 1471 FC IB C 35 42.5N 330 16.3 27.1 37.6 43.7 APPRON SLAB

06-02-10 N 1503 FC IB-2 C 30 42.5N 300 20.3 29.9 35.7 42.9 APPRON SLAB

06-02-10 N 1509 FC IB C 35 42.5N 330 17.9 27.9 38.1 46.8 APPRON SLAB

06-02-10 D 1512 FC IB C 35 42.5N 330 17.6 27.5 36.2 39.7 APPRON SLAB

07-02-10 N 1513 FC IB-2 C 30 42.5N 300 15.9 26.4 35.3 40.3 APPRON SLAB

10-02-10 N 1528 FC IB-2 C 30 42.5N 300 19.3 28.1 36.6 42.3 APPRON SLAB

10-02-10 N 1530 FC IB C 35 42.5N 330 17.0 28.8 39.2 46.3 APPRON SLAB

Page 139
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

APPRON
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

13-02-10 N 1548 FC IB-2 C 30 42.5N 300 18.1 25.6 32.1 35.3 APPRON SLAB

13-02-10 D 1549 FC IB C 35 42.5N 330 16.9 27.2 39.3 43.9 APPRON SLAB

17-02-10 D 1570 FC IB C 35 42.5N 330 17.4 30.6 43.7 46.4 APPRON SLAB

18-02-10 N 1575 FC IB-2 C 30 42.5N 300 14.7 24.8 30.7 35.6 APPRON SLAB

18-02-10 N 1578 FC IB-2 C 30 42.5N 300 22.9 27.7 37.6 44.1 APPRON SLAB

20-02-10 N 1587 FC IB-7 C 35 42.5N 300 19.0 30.1 39.9 46.2 APPRON SLAB

21-02-10 N 1589 FC IB C 35 42.5N 330 22.8 30.4 44.0 49.6 APPRON SLAB

23-02-10 N 1601 FC IB C 35 42.5N 330 24.3 31.9 45.8 50.8 APPRON SLAB

24-02-10 N 1602 FC IB-7 C 35 42.5N 300 18.3 29.1 40.4 45.7 APPRON SLAB

25-02-10 N 1612 FC IB-7 C 35 42.5N 300 17.9 26.7 36.1 39.5 APPRON SLAB

25-02-10 D 1613 FC IB C 35 42.5N 330 16.3 29.0 40.6 44.4 APPRON SLAB

25-02-10 N 1616 FC IB-7 C 35 42.5N 300 23.4 32.7 43.0 48.1 APPRON SLAB

26-02-10 N 1617 FC IB-2 C 30 42.5N 300 14.2 23.5 31.5 34.9 APPRON SLAB

04-03-10 N 1646 FC IB-7 C 35 42.5N 300 16.9 28.9 39.3 44.9 APPRON SLAB

05-03-10 D 1650 FC IB C 35 42.5N 330 15.9 27.8 36.8 39.0 APPRON SLAB

10-03-10 N 1672 FC S C 20 42.5N 250 11.3 19.6 25.1 29.8 APPRON BLINDING

11-03-10 N 1675 FC IB-2 C 30 42.5N 300 17.5 25.8 31.7 38.8 APPRON SLAB

11-03-10 N 1677 FC IB-2 C 30 42.5N 300 15.3 24.7 34.1 39.8 APPRON SLAB

11-03-10 D 1678 FC IB C 35 42.5N 330 15.1 29.0 39.8 42.5 APPRON SLAB

13-03-10 N 1689 FC S C 20 42.5N 250 12.1 23.4 27.4 33.9 APPRON SLAB

17-03-10 N 1701 FC IB-2 C 30 42.5N 300 17.2 24.0 30.7 33.7 APPRON SLAB

17-03-10 D 1704 FC IB C 35 42.5N 330 15.4 26.0 36.6 39.4 APPRON SLAB

18-03-10 N 1709 FC IB-7 C 35 42.5N 300 20.8 33.1 43.1 46.6 APPRON SLAB

19-03-10 D 1712 FC IB-7 C 35 42.5N 300 16.9 28.8 37.6 43.8 APPRON SLAB

19-03-10 N 1714 FC IB C 35 42.5N 330 20.7 30.8 38.7 41.2 APPRON SLAB

26-03-10 N 1744 FC IB C 35 42.5N 330 19.7 30.3 38.5 40.4 APPRON SLAB

26-03-10 N 1745 FC IB-7 C 35 42.5N 300 18.2 29.6 40.3 44.4 APPRON SLAB

26-03-10 D 1746 FC IB C 35 42.5N 330 19.8 30.1 38.6 40.6 APPRON SLAB

28-03-10 D 1757 FC IB-2 C 30 42.5N 300 16.6 23.8 32.5 34.4 APPRON SLAB

28-03-10 D 1758 FC IB C 35 42.5N 330 16.6 28.6 37.0 42.4 APPRON SLAB

29-03-10 N 1763 FC S C 20 42.5N 250 10.4 18.8 24.3 29.9 APPRON SLAB

02-04-10 D 1785 FC R C 20 42.5N 250 10.8 17.9 25.2 29.3 APPRON RRC

Page 140
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

APPRON
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

10-04-10 D 1804 FC IB-7 C 35 42.5N 300 16.3 27.2 37.4 41.3 APPRON SLAB

10-04-10 D 1805 FC IB-2 C 30 42.5N 300 13.8 23.7 31.1 35.0 APPRON SLAB

10-04-10 N 1806 FC IB C 35 42.5N 330 15.9 26.7 36.0 39.2 APPRON SLAB

12-04-10 D 1811 FC IB-2 C 30 42.5N 300 13.6 23.6 33.0 37.4 APPRON SLAB

12-04-10 N 1813 FC IB C 35 42.5N 330 16.2 27.0 35.9 39.1 APPRON SLAB

17-04-10 D 1836 FC IB-7 C 35 42.5N 300 16.3 26.5 39.7 43.6 APPRON SLAB

17-04-10 D 1837 FC IB-2 C 30 42.5N 300 13.9 23.3 34.3 38.2 APPRON SLAB

17-04-10 D 1838 FC IB C 35 42.5N 330 18.2 28.8 35.8 39.0 APPRON SLAB

25-04-10 N 1866 FC IB C 35 42.5N 330 18.5 27.9 38.7 42.9 APPRON SLAB AWA - P1

29-04-10 N 1880 FC IB C 35 42.5N 330 23.6 30.9 37.1 42.6 APPRON SLAB AWA - P1

APPRON AWA - Q2 & AWA P2


08-05-10 D 1901 FC IB C 35 42.5N 330 15.1 28.9 37.4 40.7 WALL

14-05-10 D 1923 FC IB C 35 42.5N 330 14.7 25.4 36.8 40.7 APPRON AWA - O1 & N1 WALL

17-05-10 D 1930 FC IB C 35 42.5N 330 19.2 27.7 37.5 40.5 APPRON AWA - N2 & O2 WALL

19-05-10 N 1940 FC IB C 35 42.5N 330 17.2 28.5 37.0 42.1 APPRON AWA - N2 WALL

25-05-10 N 1962 FC IB C 35 42.5N 330 19.8 30.9 40.6 48.1 APPRON AWA - S1 & V1 WALL

01-06-10 D 1984 FC IB C 35 42.5N 330 19.8 31.2 43.2 47.0 APPRON AWA - A WALL

04-06-10 D 1996 FC IB C 35 42.5N 330 19.3 31.9 39.8 47.2 APPRON AWA - K2, V2, S2 WALL

10-06-10 D 2016 FC IB C 35 42.5N 330 16.0 25.6 37.4 41.3 APPRON AWA - W2, 12

12-06-10 N 2031 FC IB C 35 42.5N 330 16.5 27.8 36.1 40.6 APPRON AWA - X1, Z1

19-06-10 D 2052 FC IB C 35 42.5N 330 17.8 30.1 37.2 45.2 APPRON AWA - X2, Z2 WALL

25-06-10 D 2073 FC IB C 35 42.5N 330 16.0 26.4 36.4 40.4 APPRON AWA - Q3, P3

30-06-10 D 2090 FC IB C 35 42.5N 330 20.2 28.9 36.3 43.2 APPRON AWA - M3, O3

05-07-10 D 2103 FC IB C 35 42.5N 330 17.1 32.2 41.4 48.2 APPRON AWA - Q4, P4

09-07-10 D 2110 FC IB C 35 42.5N 330 15.9 27.5 36.1 42.6 APPRON AWA - R3, H3

12-07-10 N 2120 FC IB C 35 42.5N 330 15.9 25.7 37.8 39.0 APPRON

19-07-10 N 2138 FC IB C 35 42.5N 330 16.8 26.5 35.3 38.3 APPRON AWA - S3, V3

22-07-10 D 2150 FC IB C 35 42.5N 330 17.3 29.6 38.0 42.7 APPRON AWA - N4, O4

25-07-10 D 2160 FC IB C 35 42.5N 330 15.6 25.3 37.1 39.8 APPRON AWA - R4, V4

30-07-10 D 2179 FC IB C 35 42.5N 330 18.3 26.1 36.8 39.7 APPRON AWA - A3, W3

05-08-10 D 2193 FC IB C 35 42.5N 330 16.6 29.8 36.4 43.0 APPRON AWA - S3, Z3

06-08-10 D 2198 FC S C 25 42.5N 250 12.0 19.2 25.3 29.6 APPRON SLAB BLINDING

14-08-10 N 2219 FC IB C 35 42.5N 330 15.1 25.4 35.6 39.4 APPRON AWD - Q1, P1 WALL

Page 141
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

APPRON
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

19-08-10 N 2229 FC IB C 35 42.5N 330 15.7 27.0 37.1 41.6 APPRON AWD - Q2, P2

25-08-10 D 2248 FC IB C 35 42.5N 330 16.2 27.3 35.4 40.2 APPRON KEY PART 1

25-08-10 N 2250 FC IB-2 C 30 42.5N 300 14.7 24.1 31.8 35.1 APPRON KEY PART 1

27-08-10 N 2260 FC IB C 35 42.5N 330 19.7 30.7 45.5 48.5 APPRON KEY SLAB PART 2

30-08-10 D 2265 FC IB C 35 42.5N 330 16.2 27.4 38.1 43.6 APPRON KEY SLAB PART 2

06-09-10 D 2287 FC IB C 35 42.5N 330 15.4 31.1 38.3 45.1 APPRON AWD - M1, O1

12-09-10 N 2301 FC IB C 35 42.5N 330 19.7 29.3 37.1 42.6 APPRON AWA - M2, O2

APPRON WALL LIFT Q, R


15-09-10 D 2308 FC IB C 35 42.5N 330 18.5 28.4 36.0 43.1 FOUNDATION

16-09-10 N 2311 FC IB C 35 42.5N 330 16.7 27.7 36.6 40.0 APPRON LIFT AWD - S1, W1

APPRON LIFT AWD - R1 (PARTIAL)


18-09-10 N 2312 FC IB C 35 42.5N 330 16.5 27.1 35.7 40.3 V1

19-09-10 D 2316 FC IB C 35 42.5N 330 22.1 31.4 42.7 47.4 APPRON AWD - N2, R2

20-09-10 D 2317 FC S C 25 42.5N 250 9.3 16.7 23.0 26.3 APPRON SLAB BLINDING

20-09-10 N 2319 FC IB C 35 42.5N 330 17.1 30.5 41.2 48.3 APPRON WALL AWD

22-09-10 D 2324 FC IB C 35 42.5N 330 16.9 30.6 41.8 48.3 APPRON AWD - X2, T2

23-09-10 D 2329A FC IB C 35 42.5N 330 16.4 27.7 38.3 43.8 APPRON AWD - O3, M3

26-09-10 D 2339 FC IB C 35 42.5N 330 15.4 30.2 38.9 45.7 APPRON AWD - S2, W2

28-09-10 D 2345 FC IB C 35 42.5N 330 15.4 30.8 40.1 47.5 APPRON AWD - T1

28-09-10 D 2346 FC IB C 35 42.5N 330 16.1 30.8 41.9 49.2 APPRON AWD - M2, L3

APPRON KEY SLAB 3rd PIECE 1st


01-10-10 D 2356 FC IB C 35 42.5N 330 17.6 30.4 43.4 49.8
PHASE
APPRON KEY SLAB 3rd PIECE 1st
01-10-10 N 2358 FC IB C 35 42.5N 330 17.3 29.4 38.3 44.9
PHASE
05-10-10 D 2362 FC IB C 35 42.5N 330 15.8 31.2 43.8 48.7 APPRON AWD - X3, T3

06-10-10 N 2365 FC IB C 35 42.5N 330 20.8 30.9 43.9 48.2 APPRON AWD - Q4, P4 WALL

08-10-10 N 2371 FC IB C 35 42.5N 330 19.2 31.0 38.9 42.7 APPRON KEY SLAB

08-10-10 D 2373 FC IB C 35 42.5N 330 16.9 27.3 36.9 40.6 APPRON KEY SLAB

11-10-10 N 2376 FC IB C 35 42.5N 330 15.7 25.6 37.1 42.1 APPRON AWD - M4, O4

13-10-10 N 2381 FC IB C 35 42.5N 330 18.7 27.9 35.1 40.6 APPRON AWD - Y2, U2

15-10-10 D 2388 FC IB C 35 42.5N 330 17.6 31.5 43.5 49.0 APPRON AWA - U1

16-10-10 N 2390 FC IB C 35 42.5N 330 18.4 29.8 37.3 41.4 APPRON AWD - R3, V3

19-10-10 N 2395 FC IB C 35 42.5N 330 17.3 28.4 37.6 43.3 APPRON AWA - Y1

GATED SPILLWAY APPRON LIFT -


20-10-10 D 2399 FC IB C 35 42.5N 330 21.4 30.6 40.2 48.5 B4, V4

23-10-10 D 2405 FC IB C 35 42.5N 330 15.6 26.5 35.8 38.1 APPRON WALL LIFT - R4 - V4 - N4

GATED SPILLWAY APPRON AWA -


24-10-10 N 2406 FC IB C 35 42.5N 330 23.8 31.8 40.9 46.3 J2, V2

Page 142
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

APPRON
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
G. SPILLWAY EXTENDED APPRON
30-10-10 N 2428 FC IB C 35 42.5N 330 15.9 26.7 36.0 39.4 AWA - Y3, V3

Page 143
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

TEMPORARY BRIDGE
Rc, maturation at NORMAL
Note
SHIFT

Date Sample Concrete Cement Cement WATER CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted 28
2 days 7 days 90 days
days
TEMPORARY BRIDGE LEFT
11-11-09 D 1171 FC S C 20 42.5N 250 12.8 20.7 27.1 32.0 ABUTMENT
TEMPORARY BRIDGE LEFT
18-11-09 D 1202 FC S C 20 42.5N 250 11.9 19.5 28.0 33.4 ABUTMENT
TEMPORARY BRIDGE LEFT
08-12-09 D 1261 FC K C 30 42.5N 250 15.1 24.3 30.5 36.8 ABUTMENT
TEMPORARY BRIDGE LEFT
03-01-10 D 1340 FC R C15 42.5N 250 15.8 26.6 34.3 40.0 ABUTMENT
TEMPORARY BRIDGE LEFT
11-01-10 D 1377 FC S C 20 42.5N 250 12.6 20.9 26.5 30.3 ABUTMENT

TEMPORARY BRIDGE 1st STAGE OF


25-01-10 D 1452 FC IB-2 C 30 42.5N 300 15.2 25.4 34.2 39.8
WALL ON LEFT ABUTMENT
TEMPORARY BRIDGE MIDDLE PIER
28-01-10 D 1466 FC IB-2 C 30 42.5N 300 16.9 26.2 32.9 34.4 (P1)

TEMPORARY BRIDGE 2nd STAGE OF


09-02-10 D 1525 FC IB-2 C 30 42.5N 300 15.1 25.9 33.9 38.4
WALL ON LEFT ABUTMENT
TEMPORARY BRIDGE LIFT 1
19-02-10 D 1583 FC IB-2 C 30 42.5N 300 16.0 24.7 31.0 34.6 MIDDLE PIER
TEMPORARY BRIDGE FOUND.
01-03-10 D 1625 FC IB-2 C 30 42.5N 300 14.8 24.9 31.6 37.3 RIGHT ABUTMENT

TEMPORARY BRIDGE 1st WALL


15-03-10 D 1694 FC IB-2 C 30 42.5N 300 12.0 22.5 33.1 36.8
ABUTMENT
TEMPORARY BRIDGE 2nd STAGE OF
21-03-10 D 1725 FC IB-2 C 30 42.5N 300 14.3 22.8 32.4 36.8
WALL ON RIGHT ABUTMENT
SLAB TEMPORARY BRIDGE 1st
19-07-10 D 2136 FC IB C 35 42.5N 330 15.4 27.0 35.7 42.9
POUR
SLAB TEMPORARY BRIDGE 2nd
25-07-10 D 2159 FC IB C 35 42.5N 330 15.2 25.0 35.5 38.6
POUR

Page 144
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

SPILLWAY PRECAST
Rc, maturation at NORMAL WATER
Note
SHIFT

Date Sample Concrete Cement Cement CURING (MPa)


Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days
SIPHON SPILLWAY
06-12-09 D 1253 FC IB C 35 42.5N 330 16.2 27.1 36.5 38.5 PRECAST

SIPHON SPILLWAY
07-12-09 D 1259 FC IB C 35 42.5N 330 16.3 26.8 37.8 41.6 PRECAST

SIPHON SPILLWAY
09-12-09 D 1266 FC IB-7 C 35 42.5N 300 16.4 28.6 37.0 41.5 PRECAST BEAM

SIPHON SPILLWAY
10-12-09 D 1270 FC IB C 35 42.5N 330 17.4 27.5 36.5 40.8 PRECAST BEAM

SIPHON SPILLWAY
11-12-09 D 1274 FC IB C 35 42.5N 330 17.3 27.9 39.0 43.5 PRECAST

SIPHON SPILLWAY
12-12-09 D 1279 FC IB-7 C 35 42.5N 300 16.4 26.8 36.3 38.7 PRECAST BEAM

SIPHON SPILLWAY
01-02-10 D 1479 FC M6 C 40 42.5N 380 22.9 31.6 44.7 48.7 PRECAST BEAM

SIPHON SPILLWAY
03-02-10 D 1490 FC IB C 35 42.5N 330 16.5 28.8 38.8 43.8 PRECAST BEAM

S. SPILLWAY NEW
16-02-10 D 1563 FC R C 20 42.5N 250 12.5 19.0 24.0 26.4 PRECAST SLAB

SIPHON SPILLWAY
26-02-10 D 1620 FC IB C 35 42.5N 330 18.5 26.8 35.8 38.5 PRECAST BEAM

S. SPILLWAY PRECAST
30-03-10 D 1768 FC IB C 35 42.5N 330 16.1 27.1 35.2 39.2 CLASS A

S. SPILLWAY PRECAST
31-03-10 D 1772 FC IB C 35 42.5N 330 16.9 28.3 35.6 40.4 TYPE B

25-04-10 D 1868 FC IB C 35 42.5N 330 15.3 26.3 36.7 39.4 S. SPILLWAY PRECAST

S. SPILLWAY PRECAST B2 -
18-05-10 D 1937 FC IB C 35 42.5N 330 15.1 25.5 37.5 41.9 2PQ

S. SPILLWAY PRECAST
23-06-10 D 2067 FC IB C 35 42.5N 330 16.8 27.3 37.8 42.6 TYPE A 2

S. SPILLWAY PRECAST
26-06-10 D 2076 FC IB C 35 42.5N 330 16.6 27.2 38.7 42.5 TYPE B

S. SPILLWAY PRECAST
02-07-10 D 2099 FC IB C 35 42.5N 330 18.9 29.3 38.6 42.9 TYPE B

Page 145
Summary of BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS Cylinder Compressive Strengh Results PROJECT, UGANDA


LABORATORY REV. 0

POWER HOUSE FIRE FIGHTING TANK


Rc, maturation at NORMAL WATER
Note
SHIFT
Date Sample Concrete Cement Cement CURING (MPa)
Mix Type
Ref. class type (Kg/m3)
Casted
2 days 7 days 28 days 90 days

05-01-11 D 2559 FC IB-2 C 30 42.5N 300 14.0 24.9 32.9 37.4 Fire Fighting System wall

17-01-11 D 2580 FC JC C 25 42.5N 310 12.6 23.3 30.1 35.6 Fire Fighting System wall

Fire Fighting System Tank


25-01-11 D 2594 FC JC C 25 42.5N 310 11.1 20.9 31.4 37.1 wall EL:1099.5

04-02-11 D 2608 FC IB-2 C 30 42.5N 300 13.9 24.8 33.4 37.6 Fire Fighting System wall

10-02-11 D 2617 FC IB-2 C 30 42.5N 300 14.4 25.9 33.5 37.4 Fire Fighting System wall

14-03-11 D 2651 FC IB-2 C 30 42.5N 300 15.1 24.4 34.7 40.1 PH Fire Fighting Tank

30-03-11 D 2668 FC IB-2 C 30 42.5N 300 14.2 25.3 34.8 39.5 PH Fire Fighting Tank

PH Fire Fighting Tank Roof


20-04-11 D 2691 FC IB-2 C 30 42.5N 300 15.2 25.8 35.1 & Slab

Page 146
Bujagali Energy Limited Salini Costruttori
Bujagali Hydro-Electric Power Project Site Material Laboratory Report

5.2 SUMMARY OF APPLIED DESIGN MIXES

SA-D-GE-TR-1212

Page 147
TRIAL MIXES IN LAB FOR CONCRETE BUJAGALI HYDROELECTRIC POWER PROJECT,
SITE MATERIALS SUMMARY OF RESULTS UGANDA
LABORATORY May-11 Rev. 0

Concrete Class C 25 BUJAGALI CRUSHING PLANT CEMENT TYPE 42.5N


Fresh AVERAGE
AGGREGATE PROPORTIONS IN % Cement ADDITIVE SLUMP (mm) Air Conc. Air COMPRESSIVE
W:C Unit
Date Trial Mix content Cont. Temp. Temp. STRENGTH (MPa)
Ratio weight
Casted 1.5-5mm 0-6mm (Kg/m3) 20/30mi (%) (°C) (°C)
25-38 mm 19-25 mm 5-19mm TYPE LT/m3 15 Min (Kg/m3) 3 days 7 days 28 days
C.sand N.Sand n
56 310 0.54 Sikament 3.1 120 34.1
15-08-09 FC-Jc 9 35 70 2463 2.9 24.3 23.7 19.0 27.0
110N
NB: = Applied mixs April to May 2011

Concrete Class C  BUJAGALI CRUSHING PLANT CEMENT TYPE 42.5N


AVERAGE
AGGREGATE PROPORTIONS IN % ADDITIVE SLUMP (mm) Fresh COMPRESSIVE
Cement Air Conc. Air
Date W:C Unit STRENGTH (MPa)
Trial Mix content Cont. Temp. Temp.
Casted 3 Ratio weight
1.5-5mm 0-6mm (Kg/m ) 20/30mi 3 (%) (°C) (°C)
25-38 mm 19-25 mm 5-19mm TYPE LT/m3 15 Min (Kg/m ) 3 days 7 days 28 days
C.sand N.Sand n

Plastiment
30-08-08 FC-S 8 8 36 21 27 250 0.69 2.8 80 55 2418 2.3 24 24.8 13.6 17.4 24.3
BV 40
01-09-08 FC R 52 17 31 250 0.69 Sikament 110N 2.7 145 110 2611 1.2 27.3 25.6 16.9 23.8 27.0

NB: = Applied mixs April to May 2011

Page 148
TRIAL MIXES IN LAB FOR CONCRETE BUJAGALI HYDROELECTRIC POWER PROJECT,
SITE MATERIALS SUMMARY OF RESULTS UGANDA
LABORATORY May-11 Rev. 0

Concrete Class C 35 BUJAGALI CRUSHING PLANT CEMENT TYPE 42.5N


AVERAGE
Fresh
AGGREGATE PROPORTIONS IN % Cement ADDITIVE SLUMP (mm) Air Conc. Air COMPRESSIVE
W:C Unit
Date Trial Mix content Cont. Temp. Temp. STRENGTH (MPa)
Ratio weight
Casted 1.5-5mm 0-1.5mm 0-5mm (Kg/m3) 20/30mi 3 (%) (°C) (°C)
19-25 mm 5-19mm TYPE LT/m3 15 Min (Kg/m ) 3 days 7 days 28 days
C.Sand F.Sand N.Sand n
Sikament
14-11-09 FC-IB 15 37 10 9 29 330 0.54 110N
3.3 130 80 2501 2.9 25.8 24.3 21.5 33.1 43.7

20 40 17 0 23 300 0.54 Plastiment 2.7 100


18-12-08 FC-IB -7 60 2479 3.2 25.8 28.4 24.2 30.5 41.9
BV 40
NB: = Applied mixs April to May 2011

Concrete Class C 30 BUJAGALI CRUSHING PLANT CEMENT TYPE 42.5N


Fresh AVERAGE
AGGREGATE PROPORTIONS IN % Cement ADDITIVE SLUMP (mm) Air Conc. Air COMPRESSIVE
W:C Unit
Date Trial Mix content Cont. Temp. Temp. STRENGTH (MPa)
Ratio weight
Casted 1.5-5mm 0-6mm (Kg/m3) 20/30mi (%) (°C) (°C)
25-38 mm 19-25 mm 5-19mm TYPE LT/m3 15 Min (Kg/m3) 3 days 7 days 28 days
C.sand N.Sand n
Sikament
14-11-09 FC- IB-2 15 37 10 9 29 300 0.54 110N
3.0 120 80 2463 3.2 26.1 28.3 17.1 29.5 36.1

NB: = Applied mixs April to May 2011

Concrete Class C 40 BUJAGALI CRUSHING PLANT CEMENT TYPE 42.5N


AVERAGE
ADDITIVE SLUMP (mm) Fresh COMPRESSIVE
Cement Air Conc. Air
W:C Unit STRENGTH (MPa)
Date Trial Mix content Cont. Temp. Temp.
Ratio weight
Casted 0-5mm (Kg/m3) (%) (°C) (°C)
25-38 mm 19-25 mm 5-19 mm 1.5-5mm TYPE LT/m3 15 Min 30min (Kg/m3) 3
7 days
28
Nat.Sand days days
Sikament
09-08-09 FC-M 6 56 21 23 380 0.42 110N
3.8 190 100 2545 2.7 26.8 31.4 24.2 36.1 48.9
SIKA
CONTROL 40
2.7

NB: = Applied mixs April to May 2011