Ra For Transpo and Lifting
Likelihood
Likelihood
Risk Level
Residual
Severity
Severity
Accident/ Additional Risk Control
No. Work Activities Hazards Health & Persons Risk Control Measures Impelmented By Remarks
Measure
at Risk
A. Persons/Preparatory Works
1. Mobilization of Untrained Injury to - Job related training 2 2 4 -Qualified and 2 1 2(L) -Engineer
Personnel Personnel personnel and -Check for related experienced workers -Safety Officer
damage to B. Operations
certificates/licenses used for the job
2. Mobilization of Vehicular fault equipment
-injury to -Barricade
-Check worktoarea
vehicle to
ensure 4 2 8 -Check tyres for foreign 4 1 4(M) -Operators
vehicles -Tyre puncture operators prevent
tyres areuntrained
inflated object -Trailer Operator
-damage to personnel
properly to enter -Replace tires if it is Supervisor
vehicle working area worn out
-Attend Toolbox -Report to trailer
Meeting Operator supervisor if
-Attend Safety there are abnormalities
Orientation
Run over by
vehicle -injury to -Check vehicle if there 4 1 4 -Do brake test to ensure 4 1 4(M) -Operators
-Brakes Failure operators are adequate brake fluid brakes are working -Trailer Operators
Other faults -damage to -Check handbreak for -Report to ops planner if Supervisor
(alignments,engin vehicle effiency there are any
e,lighting,batterie -structure -Check if brake hose abnormalities
s) damage connected
Receiving of the Airborne dusts Injury to -Conduct TBT prior to -Conduct TBT prior to -Supervisor in
NEW Generator personnel and work work Charge
from the LCT/ High level of damage to -Obtain noise level -Obtaint work -Workers
Barge noise due to Live equipment record from customer environment
equipment -Manage time of temperature and
exposure humidity from the
customer
- Manage time of
exposure by taking
regular break
-Maintain sufficient
4. 3 2 6 hydration by regualr 2 1 2(L)
intake of water and
good ventilation
- Post safety signages for
awareness of workers
Lifting of the Dehydration and Injury to - Conduct TBT prior to -Obtain PTW for the use -Supervisor in
NEW Generator stress personnel and work of liftingequipment Charge
to the turbine hall damage to -Obtaint work -Verify that the LE/LG -Workers
equipment environment have valid test
temperature and certificate
humidity from the -Lift Plan available and
customer discussed with the crew.
-Manage time of -Follow safe rigging
exposure by taking practice
regular break -Control the lifting zone
-Maintain sufficient for any personnel not
5. hydration by regualr 4 2 8 involved with the 2 1 2(L)
intake of water activity
C. Post Operation
-Area to be cleared of
obstruction -Ensure tools are placed
-Materials, Equipment in their respective
Tripping/Slipping/ -Supervisors
7. Housekeeping Bodily Injury to be cleared 2 3 6 places 2 1 2(L)
Tidiness Engineers
- Ensure that debris, -Access and egress are
rubbish are cleared not obstructed
before leaving the area
D. Environmental
-No load should be left
-Supervisor to monitor
in mid air
Injury to the weather and call for -Supervisor to lead
Lifting during personnel and cease if necessary
8. raining Electrocution damage to -Loads are properly 5 1 5 workers (includes crane 5 1 5(M) -Supervisors
operator) to the nearest
equipment/crane unloaded before shelter until it is safe to
seeking shelter work
Catastrophic (5) 5 10 15 20 15 25