Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Arumningtias Asmi Megarani

12010269 TP-D

Prerecorded Data Kick Data


Original mud weight = 9.5 lbm/gal PSIDP = 182 psi
Slow pump rate = 60 spm at 268 psi PSICP = 250 psi
Drillpipe volume = 110.36 bbl True vertical depth = 7000 ft
Annulus volume = 308.331 bbl
Pump output = 0.089 bbl/strokes

Drillpipe volume (bbl)


Drillpipe strokes = bbl
Pump output ( )
strokes
110.36 bbl
=
0.089 bbl/stroke
= 1240 strokes

Kill Mud Data


𝑃𝑠𝑖𝑑𝑝 x 19.23 182 𝑥 19.23
Mud weight increase = = = 0.5 lbm/gal
𝐷𝑒𝑝𝑡ℎ 7000
Kill mud weight = original weight + increase = 9.5 lbm/gal + 0.5 lbm/gal = 10 lbm/gal

Pump Pressure
Initial drillpipe pressure = PSIDP + slow pump pressure
= 182 psi + 268 psi = 450 psi

Kill mud weight x slow pump pressure


Final drillpipe pressure =
Original mud weight
10 lbm/gal x 268 psi
=
9.5 lbm/gal
= 282 psi

Pressure profile

Pressure, Strokes
500 450436 psi
450 422 408 394
380 366 450 0
Final Drillpipe Pressure, Psi

400 352 338


Drillpipe Pressure, Psi

324 310 436 100


350 296
282 282 psi 422 200
300
408 300
250
394 400
200
380 500
150
366 600
100
352 700
50
338 800
0
324 900
0 200 400 600 800 1000 1200 1400
310 1000
Strokes Pumped
296 1100
282 1200

You might also like