DATE : OKTOBER 7, 2019

65.00 180.00

LINE BALANCING (TIME CHECK) - PID#


LINE - 2
60.00 DATE : 11/05/2019
160.00

55.00

140.00
50.00

45.00
120.00

40.00

100.00
35.00

30.00
Time 80.00
(Second) Target Avg Waktu per 1pc
Time Check
25.00 +Loss Time

60.00
20.00

15.00 40.00

10.00
20.00

5.00

0.00 0.00
I
AH I.A ENI OM NA
H H
KA ARO
H N H IH AH IYAT OH AH NAH LIA H
SA ERS
IH
AY SAN TI AA SYIA ARS SIT MIN NI
M J UN
KOK SAP S W A W SAM SM A SI R H
U RU NA SU AR KU TI M KA KAM A SU
U IS
M

( Operator Name )

REMARK : PENGECEKAN / TIME STUDY KE 1


1. ABSEN : ROMLAH (CM)

2. 5:30'' OUTPUT 427 PCS

3. 8:00'' 13 ORANG JARUM 1 (10 ORANG) & OBRAS (3 ORANG) - OUTPUT 33 PCS

REMAKS : ( MASIH 86 % DARI TARGET QTY PER 30 MENIT )

PROSES JAHIT DASAR GABUNG BRA KE LINING MEMBUTUHKAN WAKTU LAMA PROSES
DATE : OKTOBER 7, 2019

65.00 180.00
LINE BALANCING (TIME CHECK) - PID#
LINE - 2
60.00 DATE : 11/06/2019
160.00

55.00

140.00
50.00

45.00
120.00

40.00

100.00
35.00

30.00
80.00
Time
(Second) Target Avg Waktu per 1pc
Time Check
25.00 +Loss Time

60.00
20.00

15.00 40.00

10.00
20.00

5.00

0.00 0.00
I I
AH I.A ENI M SIT OH AH ROH N H IH AH IYAT TOH NAH NAH LIA H IH
AY SAN KO AR STIK AA SYIA ARS SA ERS
N
KO
A M
SA USM
I I
AS AM MS
I NI
UM JU AW U AW
A W R AR SU
H
UN
R
UN SU A K IM K KA
IS T
IM M
SIT

( Operator Name )

REMARK : PENGECEKAN / TIME STUDY KE 2


1. NO ABSEN

2. 5:30'' OUTPUT 514 PCS

3. 8:00'' 13 ORANG JARUM 1 (5 ORANG), OBRAS (7 ORANG) & KAMPUT (1 ORANG) - OUTPUT 26 PCS

REMAKS : ( MASIH 72 % DARI TARGET QTY PER 30 MENIT )

PROSES JAHIT DASAR GABUNG BRA KE LINING MEMBUTUHKAN WAKTU LAMA PROSES
DATE : OKTOBER 7, 2019

65.00 180.00
LINE BALANCING (TIME CHECK) - PID#
LINE - 2
60.00 DATE : 11/08/2019
160.00

55.00

140.00
50.00

45.00
120.00

40.00

100.00
35.00

30.00
80.00
Time
(Second) Target Avg Waktu per 1pc
Time Check
25.00 +Loss Time

60.00

20.00

15.00 40.00

10.00
20.00

5.00

0.00 0.00
I I
AH I.A ENI SIT OH AH ROH N H IH AH AT OH NAH NAH LIA H IH
AY SAN AR STIK AA SYIA ARS M MIY SIT SA ERS
N A SA
I SI NI
UM JU AW U AW
A W R S A M
KA KAM AR SUH
R SU A KU TI M
UN UN SI
IM M
SIT

( Operator Name )

REMARK : PENGECEKAN / TIME STUDY KE 4

1. ABSEN : HABIBAH/OP (IZIN), ROMLAH/OP (SAKIT), SUHAERIYAH/HELPER (SAKIT), SUPRIYAH/HELPER (A).

2. 5:30'' OUTPUT 680 PCS

3. 8:00'' 15 ORANG JARUM 1 (7 ORANG), OBRAS (6 ORANG) & KAMPUT (2 ORANG) ---> PROSES ONLY

REMAKS : ( MASIH 67 % DARI TARGET QTY PER 30 MENIT )

PROSES JAHIT DASAR GABUNG BRA KE LINING MEMBUTUHKAN WAKTU LAMA PROSES
DATE : OKTOBER 7, 2019

65.00 180.00
LINE BALANCING (TIME CHECK) - PID#
LINE - 2
60.00 DATE : 11/11/2019
160.00

55.00

140.00
50.00

45.00
120.00

40.00

100.00
35.00

Time 30.00
80.00
(Second) Target Avg Waktu per 1pc
Time Check
+Loss Time
25.00

60.00

20.00

15.00 40.00

10.00
20.00

5.00

0.00 0.00

AH I.A ENI YAH AH


E H H H RI IH H H H H LIA H IH
AY SAN AD NA RIA IBA SA ON LA TO INA INA SA ERS
N A
JU OKH SA
PN AR SU HAB NA M ASI S NI
UM M RO AM M AR UH
R LIA TI
M K KA S
YU SI

( Operator Name )

REMARK : PENGECEKAN / TIME STUDY KE 5

1. ABSEN : KOMSATI/OP©

2. 5:30'' OUTPUT 620 PCS

3. 8:00'' 16 ORANG JARUM 1 (7 ORANG), OBRAS (7 ORANG) & KAMPUT (2 ORANG) 30 PCS

REMAKS : ( MASIH 67 % DARI TARGET QTY PER 30 MENIT )

PROSES JAHIT DASAR GABUNG BRA KE LINING MEMBUTUHKAN WAKTU LAMA PROSES
DATE : OKTOBER 7, 2019

65.00 160.00
LINE BALANCING (TIME CHECK) - PID#
LINE - 2
60.00 DATE : 11/11/2019
140.00

55.00

50.00
120.00

45.00

100.00
40.00

35.00
80.00

Time 30.00
(Second) Target Avg Waktu per 1pc
Time Check
+Loss Time
25.00 60.00

20.00

40.00
15.00

10.00
20.00

5.00

0.00 0.00

AH I.A ENI AH NAH KAH ROH N H IH E H H H


AD AYA ITO INA INA
H LIA H IH
AY SAN AA SYIA ARS SA RS
M J UN
SAM AP I
ST WA A K H AS AM MS RNI HE
S W
U AR RU NA SU RO ITI M K KA
A SU
U S
M

( Operator Name )

REMARK : PENGECEKAN / TIME STUDY KE 6

1. ABSEN : KOMSATI/OP

2. 5:30'' OUTPUT 565 PCS

3. 8:00'' 14 ORANG JARUM 1 (5 ORANG), OBRAS (4 ORANG) & KAMPUT (5 ORANG) 30 PCS

REMAKS : ( MASIH 69 % DARI TARGET QTY PER 30 MENIT )

PROSES JAHIT DASAR GABUNG BRA KE LINING MEMBUTUHKAN WAKTU LAMA PROSES
PT. SEJIN GLOBAL

DATE November 13, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER BJ'S SLIM SWIM 2020.SJ20-3-0024
STYLE # 5532906/07/14/15 LINE# :2 GD 1

ORDER Q'TY 10.608 PCS


Ex-factory 5.929 (12/13) / 5.016 (2/7)
total output 4.888 PCS
hari / output 9 Hari / 625 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ UMAYAH 23.12 22.56 22.84 5.71 28.55 36.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 28.17 30.66 29.42 7.35 36.77 36.00

3 OBRAS NECI KELILING O SANI.A 22.16 23.18 22.67 5.67 28.34 36.00

4 PANTEK SOOM DEPAN c JULEHA 29.40 30.78 30.09 7.52 37.61 36.00

5 JAHIT TUTUP SOOM


- JUNENI 28.77 32.17 30.47 7.62 38.09 36.00

6 JAHIT TUTUP SOOM


- NUNUNG 60.66 51.06 55.86 13.97 69.83 36.00

7 JAHIT SHIRING c ARSAMAH 30.29 28.44 29.37 7.34 36.71 36.00

8 JAHIT DASAR GABUNG BODY LAPISAN BELAKANG c SITI 33.25 40.85 37.05 9.26 46.31 36.00

9 OBRAS CROTCH + OBRAS PANTY BELAKANG O SAPNAH 33.21 34.85 34.03 8.51 42.54 36.00

10 JAHIT DASAR TUTUP CROTCH c SITI MUNAWAROH 22.17 20.84 21.51 5.38 26.88 36.00

11 JAHIT DASAR GABUNG BRA KE LINING c RUSTIKAH 98.70 99.88 99.29 24.82 124.11 36.00

12 JAHIT DASAR GABUNG BRA KE LINING c MARNAH 104.55 102.33 103.44 25.86 129.30 36.00

13 OBRAS ROK BELAKANG + OBRAS SHOULDER O MUNAWAROH 22.26 23.25 22.76 5.69 28.44 36.00

14 RESING BACK SCOOP (KELILING) O SURIAH 48.82 59.16 53.99 13.50 67.49 36.00

15 RESING BACK SCOOP (KELILING) O AAN 66.56 67.50 67.03 16.76 83.79 36.00

16 KAMPUT BACK SCOOP (KELILING) ◊ HABIBAH 30.21 26.03 28.12 7.03 35.15 36.00

17 OBRAS SAMPING ROK O ASYIAH 33.21 31.62 32.42 8.10 40.52 36.00

18 OBRAS NECI BUTTOM O YULIANA SARI 24.22 22.47 23.35 5.84 29.18 36.00

19 KAMPUT BUTTOM ◊ SUWARSIH 29.31 20.41 24.86 6.22 31.08 36.00 MESIN CODE TOTAL
20 JAHIT DASAR GABUNG CELANA KE ROK c ONIH 80.60 65.00 72.80 18.20 91.00 36.00 NEEDLE 1 / JR 1 c 13

21 JAHIT DASAR GABUNG CELANA KE ROK c ADE 70.63 77.12 73.88 18.47 92.34 36.00 NEEDLE 1 W/KNIFE
GABUNG BRA KE BODY BELAKANG + PANTEK CENTER
22 BRA c ROMLAH 57.94 56.97 57.46 14.36 71.82 36.00 OVERLOCK / OBRAS 4 BNG O 12

23 GABUNG BRA KE BODY BELAKANG c ROKHAYAH 40.47 39.16 39.82 9.95 49.77 36.00

24 RESING EMPIRE O JASMAH 32.44 33.00 32.72 8.18 40.90 36.00 OVERLOCK / OBRAS 3 BNG

25 KAMPUT DASAR EMPIRE ◊ SITI MASITOH 20.50 20.28 20.39 5.10 25.49 36.00 COVERSTITCH/OVERDEK 2N ∆
26 KAMPUT LUAR EMPIRE ◊ SUMIYATI 25.32 24.28 24.80 6.20 31.00 36.00 OVERDEK JR 1

27 OBRAS BACK EMPIRE O KAMINAH 43.81 45.56 44.69 11.17 55.86 36.00 COVERSTITCH CYLINDER / KAMPUT ◊ 8

28 TEMPEL KERUT KE BODY c WATI 33.66 34.41 34.04 8.51 42.54 36.00 NEEDLE 2 / JR 2 ▨
29 PANTEK SAMPING CELANA c KAMSINAH 28.10 23.18 25.64 6.41 32.05 36.00 ZIG-ZAG Z
30 PASANG LABEL c AYANAH 13.72 16.66 15.19 3.80 18.99 36.00 BUTTON HOLE y
31 OBRAS SAMPING O LIA 30.17 31.35 30.76 7.69 38.45 36.00 ATTACHED BUTTON x
32 RESING ARMHOLE O SOPIAH 51.62 54.31 52.97 13.24 66.21 36.00 EYELET ⌂
33 RESING KAKI O ARNISAH 52.06 50.37 51.22 12.80 64.02 36.00 KANSAI ▩
34 KAMPUT KAKI ◊ SANI.B 39.63 41.31 40.47 10.12 50.59 36.00 BARTACK +
35 KAMPUT ARMHOLE ◊ SUHERSIH 36.90 37.75 37.33 9.33 46.66 36.00 SOOM - 2
TOTAL 35

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 35

HELPER 4

TOTAL 41

TOTAL Waktu 1778.35

Rata-Rata Waktu per 1pc 50.81

Output per 30 menit (1800 detik) 35

Output per 1 jam (3600 detik) 71

Output per hari (9 jam) (32400 detik) 638

% Hasil Produksi 71%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 36.00 Target Output per 30 menit (1800 detik) 50 (3600 detik) 100 (32400 detik) 900
PT. SEJIN GLOBAL

DATE November 14, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER BJ'S SLIM SWIM 2020.SJ20-3-0024
STYLE # 5532906/07/14/15 LINE# :2 GD 1

ORDER Q'TY 10.608 PCS


Ex-factory 5.929 (12/13) / 5.016 (2/7)
total output 5.609 PCS
hari / output 10 Hari / 721 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ UMAYAH 46.16 32.43 39.30 9.82 49.12 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 46.43 39.97 43.20 10.80 54.00 30.00

3 OBRAS NECI KELILING O SANI.A 26.75 21.75 24.25 6.06 30.31 30.00

4 PANTEK SOOM DEPAN c JULEHA 31.50 25.93 28.72 7.18 35.89 30.00

5 JAHIT TUTUP SOOM


- JUNENI 46.50 41.84 44.17 11.04 55.21 30.00

6 JAHIT TUTUP SOOM


- NUNUNG 49.41 50.25 49.83 12.46 62.29 30.00

7 JAHIT SHIRING c ARSAMAH 19.47 16.32 17.90 4.47 22.37 30.00

8 JAHIT DASAR GABUNG BODY LAPISAN BELAKANG c SITI 55.91 38.19 47.05 11.76 58.81 30.00

9 OBRAS CROTCH + OBRAS PANTY BELAKANG O SAPNAH 60.50 65.25 62.88 15.72 78.59 30.00

10 JAHIT DASAR TUTUP CROTCH c SITI MUNAWAROH 91.78 22.24 57.01 14.25 71.26 30.00

11 JAHIT DASAR GABUNG BRA KE LINING c MARNAH 149.16 114.87 132.02 33.00 165.02 30.00

12 JAHIT DASAR GABUNG BRA KE LINING c RUSTIKAH 113.06 116.84 114.95 28.74 143.69 30.00

13 JAHIT DASAR GABUNG BRA KE LINING c KOKOM 146.03 163.18 154.61 38.65 193.26 30.00

14 OBRAS ROK BELAKANG + OBRAS SHOULDER O MUNAWAROH 25.03 20.18 22.61 5.65 28.26 30.00

15 RESING BACK SCOOP (KELILING) O SURIAH 65.89 68.40 67.15 16.79 83.93 30.00

16 RESING BACK SCOOP (KELILING) O AAN 74.34 77.97 76.16 19.04 95.19 30.00

17 KAMPUT BACK SCOOP (KELILING) ◊ HABIBAH 33.91 33.25 33.58 8.40 41.98 30.00

18 OBRAS SAMPING ROK O ASYIAH 24.75 25.57 25.16 6.29 31.45 30.00

19 OBRAS NECI BUTTOM O YULIANA SARI 29.52 20.62 25.07 6.27 31.34 30.00 MESIN CODE TOTAL
20 KAMPUT BUTTOM ◊ SUWARSIH 27.63 24.90 26.27 6.57 32.83 30.00 NEEDLE 1 / JR 1 c 13

21 JAHIT DASAR GABUNG CELANA KE ROK c ONIH 81.90 63.47 72.69 18.17 90.86 30.00 NEEDLE 1 W/KNIFE

22 JAHIT DASAR GABUNG CELANA KE ROK c ADE 73.16 72.00 72.58 18.15 90.73 30.00 OVERLOCK / OBRAS 4 BNG O 13

23 GABUNG BRA KE BODY BELAKANG + PANTEK CENTER ROMLAH 84.91 50.62 67.77 16.94 84.71 30.00
BRA c

24 GABUNG BRA KE BODY BELAKANG c ROKHAYAH 52.44 64.79 58.62 14.65 73.27 30.00 OVERLOCK / OBRAS 3 BNG

25 RESING EMPIRE O JASMAH 48.53 35.31 41.92 10.48 52.40 30.00 COVERSTITCH/OVERDEK 2N ∆
26 KAMPUT DASAR EMPIRE ◊ SITI MASITOH 20.75 19.28 20.02 5.00 25.02 30.00 OVERDEK JR 1

27 KAMPUT LUAR EMPIRE ◊ SUMIYATI 27.09 25.09 26.09 6.52 32.61 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 8

28 OBRAS BACK EMPIRE O KAMINAH 27.44 25.88 26.66 6.67 33.33 30.00 NEEDLE 2 / JR 2 ▨
29 TEMPEL KERUT KE BODY c WATI 36.78 33.51 35.15 8.79 43.93 30.00 ZIG-ZAG Z
30 PANTEK SAMPING CELANA c KAMSINAH 31.59 32.06 31.83 7.96 39.78 30.00 BUTTON HOLE y
31 PASANG LABEL c AYANAH 12.16 10.62 11.39 2.85 14.24 30.00 ATTACHED BUTTON x
32 OBRAS SAMPING O LIA 32.53 31.87 32.20 8.05 40.25 30.00 EYELET ⌂
33 RESING ARMHOLE O SOPIAH 37.12 41.97 39.55 9.89 49.43 30.00 KANSAI ▩
34 RESING KAKI O ARNISAH 50.68 54.10 52.39 13.10 65.49 30.00 BARTACK +
35 KAMPUT KAKI ◊ SANI.B 38.41 39.13 38.77 9.69 48.46 30.00 SOOM - 2
36 KAMPUT ARMHOLE ◊ SUHERSIH 36.00 35.44 35.72 8.93 44.65 TOTAL 36

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 36

HELPER 4

TOTAL 42

TOTAL Waktu 2193.94

Rata-Rata Waktu per 1pc 60.94

Output per 30 menit (1800 detik) 30

Output per 1 jam (3600 detik) 59

Output per hari (9 jam) (32400 detik) 532

% Hasil Produksi 49%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE November 15, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER
CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER BJ'S SLIM SWIM 2020.SJ20-3-0024
STYLE # 5532906/07/14/15 LINE# :2 GD 1

ORDER Q'TY 10.608 PCS


Ex-factory 5.929 (12/13) / 5.016 (2/7)

total output 5,609 PCS


hari / output 11 Hari / 721 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES Folder MESIN NAMA OPERATOR Target Avg
Loss Time Time Check Waktu per
1st 2nd Average (25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ UMAYAH 23.00 17.12 20.06 5.02 25.08 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 36.75 25.15 30.95 7.74 38.69 30.00

3 OBRAS NECI KELILING O SANI.A 22.19 21.15 21.67 5.42 27.09 30.00

4 PANTEK SOOM DEPAN c JULEHA 26.16 30.31 28.24 7.06 35.29 30.00

5 JAHIT TUTUP SOOM


- JUNENI 32.47 32.38 32.43 8.11 40.53 30.00

6 JAHIT TUTUP SOOM


- NUNUNG 34.41 32.69 33.55 8.39 41.94 30.00

7 JAHIT SHIRING c ARSAMAH 22.91 25.03 23.97 5.99 29.96 30.00

8 JAHIT DASAR GABUNG BODY LAPISAN BELAKANG c SITI 44.57 39.44 42.01 10.50 52.51 30.00

9 OBRAS CROTCH + OBRAS PANTY BELAKANG c SAPNAH 30.97 37.90 34.44 8.61 43.04 30.00

10 JAHIT DASAR TUTUP CROTCH c SITI MUNAWAROH 26.40 21.96 24.18 6.05 30.23 30.00

11 JAHIT DASAR GABUNG BRA KE LINING c KOKOM 146.65 183.72 165.19 41.30 206.48 30.00

12 JAHIT DASAR GABUNG BRA KE LINING c RUSTIKAH 113.75 93.28 103.52 25.88 129.39 30.00

13 JAHIT DASAR GABUNG BRA KE LINING c MARNAH 89.34 95.91 92.63 23.16 115.78 30.00

14 OBRAS ROK BELAKANG O MUNAWAROH 40.35 32.35 36.35 9.09 45.44 30.00

15 RESING BACK SCOOP (KELILING) O SURIAH 64.06 61.65 62.86 15.71 78.57 30.00

16 RESING BACK SCOOP (KELILING) O AAN 57.38 71.28 64.33 16.08 80.41 30.00

17 KAMPUT BACK SCOOP (KELILING) ◊ HABIBAH 43.88 29.00 36.44 9.11 45.55 30.00

18 OBRAS SAMPING ROK O ASYIAH 25.88 22.53 24.21 6.05 30.26 30.00

19 OBRAS NECI BUTTOM O YULIANA SARI 20.23 19.09 19.66 4.92 24.58 30.00 MESIN CODE TOTAL
20 KAMPUT BUTTOM ◊ SUWARSIH 22.00 26.10 24.05 6.01 30.06 30.00 NEEDLE 1 / JR 1 c 13

21 JAHIT DASAR GABUNG CELANA KE ROK c ONIH 58.28 60.72 59.50 14.88 74.38 30.00 NEEDLE 1 W/KNIFE

22 JAHIT DASAR GABUNG CELANA KE ROK c ADE 56.09 41.81 48.95 12.24 61.19 30.00 OVERLOCK / OBRAS 4 BNG O 13

23 GABUNG BRA KE BODY BELAKANG c ROMLAH 49.13 38.09 43.61 10.90 54.51 30.00

24 GABUNG BRA KE BODY BELAKANG c ROKHAYAH 55.69 46.19 50.94 12.74 63.68 30.00 OVERLOCK / OBRAS 3 BNG

25 RESING EMPIRE O JASMAH 34.62 27.25 30.94 7.73 38.67 30.00 COVERSTITCH/OVERDEK 2N ∆
26 KAMPUT DASAR EMPIRE ◊ SITI MASITOH 16.91 16.47 16.69 4.17 20.86 30.00 OVERDEK JR 1

27 KAMPUT LUAR EMPIRE ◊ SUMIYATI 20.63 16.35 18.49 4.62 23.11 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 8

28 OBRAS BACK EMPIRE O KAMINAH 38.25 33.56 35.91 8.98 44.88 30.00 NEEDLE 2 / JR 2 ▨
29 TEMPEL KERUT KE BODY c WATI 41.22 35.25 38.24 9.56 47.79 30.00 ZIG-ZAG Z
30 PANTEK SAMPING CELANA c KAMSINAH 20.28 26.41 23.35 5.84 29.18 30.00 BUTTON HOLE y
31 PASANG LABEL c AYANAH 13.28 12.11 12.70 3.17 15.87 30.00 ATTACHED BUTTON x
32 OBRAS SAMPING O LIA 23.87 21.69 22.78 5.70 28.48 30.00 EYELET ⌂
33 RESING ARMHOLE O SOPIAH 40.53 40.87 40.70 10.18 50.88 30.00 KANSAI ▩
34 RESING KAKI O ARNISAH 40.22 42.75 41.49 10.37 51.86 30.00 BARTACK +
35 KAMPUT KAKI ◊ SANI.B 29.44 31.44 30.44 7.61 38.05 30.00 SOOM - 2
36 KAMPUT ARMHOLE ◊ SUHERSIH 33.53 34.31 33.92 8.48 42.40 TOTAL 36

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 36

HELPER 4

TOTAL 42

TOTAL Waktu 1836.64

Rata-Rata Waktu per 1pc 51.02

Output per 30 menit (1800 detik) 35

Output per 1 jam (3600 detik) 71

Output per hari (9 jam) (32400 detik) 635

% Hasil Produksi 59%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE November 18, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER
CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER BJ'S SLIM SWIM 2020.SJ20-3-0024
STYLE # 5532906/07/14/15 LINE# :2 GD 1

ORDER Q'TY 10.608 PCS


Ex-factory 5.592 (12/13) / 5.016 (2/7)

total output 7,234 PCS


hari / output 12 Hari / 835
ACTUAL TIME CHECK (detik) SKETCH

NO NAMA PROSES Tools/ KODE NAMA OPERATOR


Folder MESIN Target Avg
1st 2nd Average Loss
(25%)
Time Time Check Waktu per
+Loss Time
1pc

1 KAMPUT DASAR BRACUP ◊ UMAYAH 18.69 17.90 18.30 4.57 22.87 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 23.53 21.90 22.72 5.68 28.39 30.00

3 OBRAS NECI KELILING O SANI.A 24.57 20.31 22.44 5.61 28.05 30.00

4 PANTEK SOOM DEPAN c JULEHA 21.72 24.59 23.16 5.79 28.94 30.00

5 JAHIT TUTUP SOOM


- JUNENI 25.10 29.59 27.35 6.84 34.18 30.00

6 JAHIT SHIRING c ARSAMAH 16.41 17.44 16.93 4.23 21.16 30.00

7 JAHIT DASAR GABUNG BODY LAPISAN BELAKANG c SITI ROMSAH 38.97 35.87 37.42 9.36 46.78 30.00

8 OBRAS CROTCH + OBRAS PANTY BELAKANG c SAPNAH 19.82 31.10 25.46 6.37 31.83 30.00

9 JAHIT DASAR TUTUP CROTCH c SITI MUNAWAROH 14.93 22.81 18.87 4.72 23.59 30.00

10 JAHIT DASAR GABUNG BRA KE LINING c KOKOM 115.19 115.60 115.40 28.85 144.24 30.00

11 JAHIT DASAR GABUNG BRA KE LINING c RUSTIKAH 98.78 87.32 93.05 23.26 116.31 30.00

12 JAHIT DASAR GABUNG BRA KE LINING c MARNAH 72.47 82.19 77.33 19.33 96.66 30.00

13 OBRAS ROK BELAKANG O MUNAWAROH 22.09 25.44 23.77 5.94 29.71 30.00

14 RESING BACK SCOOP (KELILING) O SURIAH 53.03 49.66 51.35 12.84 64.18 30.00

15 RESING BACK SCOOP (KELILING) O AAN 68.50 54.18 61.34 15.34 76.68 30.00

16 KAMPUT BACK SCOOP (KELILING) ◊ HABIBAH 24.10 23.78 23.94 5.99 29.93 30.00

17 OBRAS SAMPING ROK O ASYIAH 24.60 24.19 24.40 6.10 30.49 30.00

18 OBRAS NECI BUTTOM O YULIANA SARI 18.12 20.06 19.09 4.77 23.86 30.00

19 KAMPUT BUTTOM ◊ SUWARSIH 23.43 20.44 21.94 5.48 27.42 30.00 MESIN CODE TOTAL
20 JAHIT DASAR GABUNG CELANA KE ROK c ONIH 62.19 45.87 54.03 13.51 67.54 30.00 NEEDLE 1 / JR 1 c 15

21 JAHIT DASAR GABUNG CELANA KE ROK c ADE 48.90 41.69 45.30 11.32 56.62 30.00 NEEDLE 1 W/KNIFE

22 GABUNG BRA KE BODY BELAKANG c ROMLAH 32.00 34.78 33.39 8.35 41.74 30.00 OVERLOCK / OBRAS 4 BNG O 11

23 GABUNG BRA KE BODY BELAKANG c ROKHAYAH 33.47 36.53 35.00 8.75 43.75 30.00

24 RESING EMPIRE O JASMAH 20.25 26.81 23.53 5.88 29.41 30.00 OVERLOCK / OBRAS 3 BNG

25 KAMPUT DASAR EMPIRE ◊ NUNUNG 13.91 18.13 16.02 4.01 20.03 30.00 COVERSTITCH/OVERDEK 2N ∆
26 KAMPUT LUAR EMPIRE ◊ SUMIYATI 12.78 17.87 15.33 3.83 19.16 30.00 OVERDEK JR 1

27 OBRAS BACK EMPIRE O KAMINAH 32.88 22.75 27.82 6.95 34.77 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 8

28 TEMPEL KERUT KE BODY c WATI 33.53 25.13 29.33 7.33 36.66 30.00 NEEDLE 2 / JR 2 ▨
29 PANTEK SAMPING CELANA c KAMSINAH 21.81 19.71 20.76 5.19 25.95 30.00 ZIG-ZAG Z
30 PASANG LABEL c AYANAH 7.47 5.53 6.50 1.63 8.13 30.00 BUTTON HOLE y
31 OBRAS SAMPING O LIA 23.25 18.87 21.06 5.27 26.33 30.00 ATTACHED BUTTON x
32 RESING ARMHOLE O SOPIAH 40.63 34.50 37.57 9.39 46.96 30.00 EYELET ⌂
33 RESING KAKI O SITI MASITOH 56.28 47.03 51.66 12.91 64.57 30.00 KANSAI ▩
34 KAMPUT KAKI ◊ SANI.B 36.65 29.03 32.84 8.21 41.05 30.00 BARTACK +
35 KAMPUT ARMHOLE ◊ SUHERSIH 39.28 31.85 35.57 8.89 44.46 30.00 SOOM - 1
TOTAL 35

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 35

HELPER 3

TOTAL 40

TOTAL Waktu 1512.36

Rata-Rata Waktu per 1pc 43.21

Output per 30 menit (1800 detik) 42

Output per 1 jam (3600 detik) 83

Output per hari (9 jam) (32400 detik) 750

% Hasil Produksi 69%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE November 19, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER
CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER BJ'S SLIM SWIM 2020.SJ20-3-0024
STYLE # 5532906/07/14/15 LINE# :2 GD 1

ORDER Q'TY 10.608 PCS


Ex-factory 5.592 (12/13) / 5.016 (2/7)

total output 8,095 PCS


hari / output 13 Hari / 861
ACTUAL TIME CHECK (detik) SKETCH

NO NAMA PROSES Tools/ KODE NAMA OPERATOR


Folder MESIN Target Avg
1st 2nd Average Loss
(25%)
Time Time Check Waktu per
+Loss Time
1pc

1 KAMPUT DASAR BRACUP ◊ SRI 18.32 18.30 18.31 4.58 22.89 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 24.84 23.10 23.97 5.99 29.96 30.00

3 OBRAS NECI KELILING O SANI.A 19.81 18.37 19.09 4.77 23.86 30.00

4 PANTEK SOOM DEPAN c JULEHA 23.84 23.84 23.84 5.96 29.80 30.00

5 JAHIT TUTUP SOOM


- JUNENI 25.88 25.88 25.88 6.47 32.35 30.00

6 JAHIT TUTUP SOOM


- NUNUNG 33.31 33.31 33.31 8.33 41.64 30.00

7 JAHIT SHIRING c ARSAMAH 19.41 19.41 19.41 4.85 24.26 30.00

8 JAHIT DASAR GABUNG BODY LAPISAN BELAKANG c UMAYAH 54.25 42.69 48.47 12.12 60.59 30.00

9 JAHIT DASAR GABUNG BODY LAPISAN BELAKANG c SITI ROMSIYAH 37.53 37.09 37.31 9.33 46.64 30.00

10 OBRAS CROCTH + OBRAS PANTY BELAKANG O SAPNAH 36.19 36.19 36.19 9.05 45.24 30.00

11 JAHIT DASAR TUTUP CROCTH c SITI MUNAWAROH 12.28 12.28 12.28 3.07 15.35 30.00

12 JAHIT DASAR GABUNG BRA KE LINING c KOKOM 90.60 90.60 90.60 22.65 113.25 30.00

13 JAHIT DASAR GABUNG BRA KE LINING c RUSTIKAH 70.97 70.97 70.97 17.74 88.71 30.00

14 JAHIT DASAR GABUNG BRA KE LINING c MARNAH 70.72 70.72 70.72 17.68 88.40 30.00

15 OBRAS ROK BELAKANG O MUNAWAROH 31.38 31.38 31.38 7.85 39.23 30.00

16 RESING BACK SCOOP (KELILING) O SURIAH 53.32 53.32 53.32 13.33 66.65 30.00

17 RESING BACK SCOOP (KELILING) O AAN 63.00 63.00 63.00 15.75 78.75 30.00

18 KAMPUT BACK SCOOP KELILING ◊ HABIBAH 20.87 20.87 20.87 5.22 26.09 30.00

19 OBRAS SAMPING ROK O ASYIAH 26.97 26.97 26.97 6.74 33.71 30.00 MESIN CODE TOTAL
20 OBRAS NECI BOTTOM O YULIANA SARI 15.53 15.53 15.53 3.88 19.41 30.00 NEEDLE 1 / JR 1 c 15

21 KAMPUT BOTTOM ◊ SUWARSIH 18.84 18.84 18.84 4.71 23.55 30.00 NEEDLE 1 W/KNIFE

22 JAHIT DASAR GABUNG CELANA KE ROK c ONIH 47.09 47.09 47.09 11.77 58.86 30.00 OVERLOCK / OBRAS 4 BNG O 12

23 JAHIT DASAR GABUNG CELANA KE ROK c ADE 36.88 36.88 36.88 9.22 46.10 30.00

24 GABUNG BRA KE BODY BELAKANG c ROMLAH 26.22 26.22 26.22 6.56 32.78 30.00 OVERLOCK / OBRAS 3 BNG

25 GABUNG BRA KE BODY BELAKANG c ROKHAYAH 26.91 26.91 26.91 6.73 33.64 30.00 COVERSTITCH/OVERDEK 2N ∆
26 RESING EMPIRE O JASMAH 24.00 24.00 24.00 6.00 30.00 30.00 OVERDEK JR 1

27 KAMPUT DASAR EMPIRE ◊ SITI MUSIROH 14.03 14.03 14.03 3.51 17.54 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 8

28 KAMPUT LUAR EMPIRE ◊ SUMIYATI 13.82 13.82 13.82 3.46 17.28 30.00 NEEDLE 2 / JR 2 ▨
29 OBRAS BACK EMPIRE O KAMINAH 24.56 24.56 24.56 6.14 30.70 30.00 ZIG-ZAG Z
30 TEMPEL KERUT KE BODY c WATI 25.56 25.53 25.55 6.39 31.93 30.00 BUTTON HOLE y
31 PANTEK SAMPING CELANA c KAMSINAH 16.53 16.53 16.53 4.13 20.66 30.00 ATTACHED BUTTON x
32 PASANG LABEL c AYANAH 9.56 9.56 9.56 2.39 11.95 30.00 EYELET ⌂
33 OBRAS SAMPING O LIA 23.84 23.84 23.84 5.96 29.80 30.00 KANSAI ▩
34 RESING ARMHOLE O SOPIAH 38.93 38.93 38.93 9.73 48.66 30.00 BARTACK +
35 RESING KAKI O ANISAH 41.75 41.75 41.75 10.44 52.19 30.00 SOOM - 2
36 KAMPUT KAKI ◊ SANI.B 31.10 31.1 31.10 7.78 38.88 30.00 TOTAL 37

37 KAMPUT ARMHOLE ◊ SUHERSIH 33.06 33.06 33.06 8.27 41.33 30.00

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 37

HELPER 3

TOTAL 42

TOTAL Waktu 1492.61

Rata-Rata Waktu per 1pc 40.34

Output per 30 menit (1800 detik) 45

Output per 1 jam (3600 detik) 89

Output per hari (9 jam) (32400 detik) 803

% Hasil Produksi 74%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE November 20, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER
CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER BJ'S SLIM SWIM 2020.SJ20-3-0024
STYLE # 5532906/07/14/15 LINE# :2 GD 1

ORDER Q'TY 10.608 PCS


Ex-factory 5.592 (12/13) / 5.016 (2/7)

total output 8,989 PCS


hari / output 14 Hari / 894
ACTUAL TIME CHECK (detik) SKETCH

NO NAMA PROSES Tools/ KODE NAMA OPERATOR


Folder MESIN Target Avg
1st 2nd Average Loss
(25%)
Time Time Check Waktu per
+Loss Time
1pc

1 KAMPUT DASAR BRACUP ◊ SRI 17.69 17.03 17.36 4.34 21.70 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 26.06 21.75 23.91 5.98 29.88 30.00

3 OBRAS NECI KELILING O SANI.A 18.09 16.57 17.33 4.33 21.66 30.00

4 PANTEK SOOM DEPAN c JULEHA 20.50 20.56 20.53 5.13 25.66 30.00

5 JAHIT TUTUP SOOM


- JUNENI 24.04 28.50 26.27 6.57 32.84 30.00

6 JAHIT TUTUP SOOM


- NUNUNG 28.09 27.34 27.72 6.93 34.64 30.00

7 JAHIT SHIRING c ARSAMAH 21.29 18.03 19.66 4.92 24.58 30.00

8 JAHIT DASAR GABUNG BODY LAPISAN BELAKANG c UMAYAH 40.28 48.91 44.60 11.15 55.74 30.00

9 JAHIT DASAR GABUNG BODY LAPISAN BELAKANG c SITI ROMSIYAH 35.09 35.84 35.47 8.87 44.33 30.00

10 OBRAS CROCTH + OBRAS PANTY BELAKANG O SAPNAH 25.62 31.35 28.49 7.12 35.61 30.00

11 JAHIT DASAR TUTUP CROCTH c SITI MUNAWAROH 15.06 13.84 14.45 3.61 18.06 30.00

12 JAHIT DASAR GABUNG BRA KE LINING c KOKOM 65.78 78.44 72.11 18.03 90.14 30.00

13 JAHIT DASAR GABUNG BRA KE LINING c RUSTIKAH 56.91 55.03 55.97 13.99 69.96 30.00

14 JAHIT DASAR GABUNG BRA KE LINING c MARNAH 37.18 48.75 42.97 10.74 53.71 30.00

15 OBRAS ROK BELAKANG + PUNDAK O MUNAWAROH 23.10 22.63 22.87 5.72 28.58 30.00

16 RESING BACK SCOOP (KELILING) O SURIAH 49.97 44.90 47.44 11.86 59.29 30.00

17 RESING BACK SCOOP (KELILING) O AAN 55.03 45.34 50.19 12.55 62.73 30.00

18 KAMPUT BACK SCOOP KELILING ◊ HABIBAH 25.05 21.12 23.09 5.77 28.86 30.00

19 OBRAS SAMPING ROK O ASYIAH 23.85 30.06 26.96 6.74 33.69 30.00 MESIN CODE TOTAL
20 OBRAS NECI BOTTOM O YULIANA SARI 18.10 14.91 16.51 4.13 20.63 30.00 NEEDLE 1 / JR 1 c 15

21 KAMPUT BOTTOM ◊ SUWARSIH 20.72 19.53 20.13 5.03 25.16 30.00 NEEDLE 1 W/KNIFE

22 JAHIT DASAR GABUNG CELANA KE ROK c ONIH 50.44 40.47 45.46 11.36 56.82 30.00 OVERLOCK / OBRAS 4 BNG O 13

23 JAHIT DASAR GABUNG CELANA KE ROK c ADE 38.13 29.16 33.65 8.41 42.06 30.00

24 GABUNG BRA KE BODY BELAKANG c ROMLAH 32.66 25.19 28.93 7.23 36.16 30.00 OVERLOCK / OBRAS 3 BNG

25 GABUNG BRA KE BODY BELAKANG c ROKHAYAH 42.47 25.03 33.75 8.44 42.19 30.00 COVERSTITCH/OVERDEK 2N ∆
26 RESING EMPIRE O JASMAH 24.56 19.68 22.12 5.53 27.65 30.00 OVERDEK JR 1

27 KAMPUT DASAR EMPIRE ◊ WATI A 18.38 17.19 17.79 4.45 22.23 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 KAMPUT LUAR EMPIRE ◊ SUMIYATI 14.03 11.81 12.92 3.23 16.15 30.00 NEEDLE 2 / JR 2 ▨
29 OBRAS BACK EMPIRE O KAMINAH 22.81 25.06 23.94 5.98 29.92 30.00 ZIG-ZAG Z
30 TEMPEL KERUT KE BODY c WATI B 26.93 26.97 26.95 6.74 33.69 30.00 BUTTON HOLE y
31 PANTEK SAMPING CELANA c KAMSINAH 17.97 14.81 16.39 4.10 20.49 30.00 ATTACHED BUTTON x
32 PASANG LABEL c AYANAH 9.03 8.10 8.57 2.14 10.71 30.00 EYELET ⌂
33 OBRAS SAMPING O LIA 21.28 18.97 20.13 5.03 25.16 30.00 KANSAI ▩
34 RESING ARMHOLE O SOPIAH 33.44 34.75 34.10 8.52 42.62 30.00 BARTACK +
35 RESING ARMHOLE O ITOH 55.44 56.69 56.07 14.02 70.08 30.00 SOOM - 2
36 RESING KAKI O ANISAH 39.44 36.75 38.10 9.52 47.62 30.00 TOTAL 39

37 KAMPUT KAKI ◊ SANI.B 30.72 32.68 31.70 7.93 39.63 30.00

38 KAMPUT ARMHOLE ◊ SUHERSIH 36.43 39.62 38.03 9.51 47.53 30.00 MANPOWER

39 KAMPUT ARMHOLE ◊ NURHASANAH 38.19 37.81 38.00 9.50 47.50 30.00 SUPERVISOR 1

ADM 1

OPERATOR 39

HELPER 4

TOTAL 45

TOTAL Waktu 1475.64

Rata-Rata Waktu per 1pc 37.84

Output per 30 menit (1800 detik) 48

Output per 1 jam (3600 detik) 95

Output per hari (9 jam) (32400 detik) 856

% Hasil Produksi 79%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE November 21, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER BJ'S SLIM SWIM 2020.SJ20-3-0024
STYLE # 5532906/07/14/15 LINE# :2 GD 1

ORDER Q'TY 10.608 PCS


Ex-factory 5.592 (12/13) / 5.016 (2/7)
total output 8,989 9,899 PCS
hari / output 15 Hari / 910 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 20.94 19.84 20.39 5.10 25.49 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 22.16 19.50 20.83 5.21 26.04 30.00

3 OBRAS NECI KELILING O SANI.A 15.31 16.56 15.94 3.98 19.92 30.00

4 PANTEK SOOM DEPAN c JULEHA 23.34 22.29 22.82 5.70 28.52 30.00

5 JAHIT TUTUP SOOM


- JUNENI 25.50 22.60 24.05 6.01 30.06 30.00

6 JAHIT TUTUP SOOM


- NUNUNG 30.75 27.90 29.33 7.33 36.66 30.00

7 JAHIT SHIRING c ARSAMAH 18.53 14.25 16.39 4.10 20.49 30.00

8 JAHIT DASAR GABUNG BODY LAPISAN BELAKANG c UMAYAH 55.72 35.56 45.64 11.41 57.05 30.00

9 JAHIT DASAR GABUNG BODY LAPISAN BELAKANG c SITI ROMSIYAH 39.19 32.50 35.85 8.96 44.81 30.00

10 OBRAS CROCTH + OBRAS PANTY BELAKANG O SAPNAH 32.00 25.59 28.80 7.20 35.99 30.00

11 JAHIT DASAR TUTUP CROCTH c SITI MUNAWAROH 16.21 12.50 14.36 3.59 17.94 30.00

12 JAHIT DASAR GABUNG BRA KE LINING c KOKOM 66.38 78.31 72.35 18.09 90.43 30.00

13 JAHIT DASAR GABUNG BRA KE LINING c RUSTIKAH 49.03 56.35 52.69 13.17 65.86 30.00

14 JAHIT DASAR GABUNG BRA KE LINING c MARNAH 46.88 60.72 53.80 13.45 67.25 30.00

15 OBRAS ROK BELAKANG O MUNAWAROH 26.13 22.00 24.07 6.02 30.08 30.00

16 RESING BACK SCOOP (KELILING) O SURIAH 49.37 44.72 47.05 11.76 58.81 30.00

17 RESING BACK SCOOP (KELILING) O AAN 54.19 44.97 49.58 12.40 61.98 30.00

18 KAMPUT BACK SCOOP KELILING ◊ HABIBAH 24.94 22.85 23.90 5.97 29.87 30.00

19 OBRAS SAMPING ROK O ASYIAH 21.37 21.47 21.42 5.36 26.78 30.00 MESIN CODE TOTAL
20 OBRAS NECI BOTTOM O YULIANA SARI 16.68 20.06 18.37 4.59 22.96 30.00 NEEDLE 1 / JR 1 c 15

21 KAMPUT BOTTOM ◊ SUWARSIH 22.94 16.43 19.69 4.92 24.61 30.00 NEEDLE 1 W/KNIFE

22 JAHIT DASAR GABUNG CELANA KE ROK c ONIH 50.41 49.50 49.96 12.49 62.44 30.00 OVERLOCK / OBRAS 4 BNG O 13

23 JAHIT DASAR GABUNG CELANA KE ROK c ADE 39.75 40.50 40.13 10.03 50.16 30.00

24 GABUNG BRA KE BODY BELAKANG c ROMLAH 28.04 32.94 30.49 7.62 38.11 30.00 OVERLOCK / OBRAS 3 BNG

25 GABUNG BRA KE BODY BELAKANG c ROKHAYAH 33.06 19.60 26.33 6.58 32.91 30.00 COVERSTITCH/OVERDEK 2N ∆
26 RESING EMPIRE O JASMAH 25.60 22.16 23.88 5.97 29.85 30.00 OVERDEK JR 1

27 KAMPUT DASAR EMPIRE ◊ SITI MASITOH 12.10 10.34 11.22 2.81 14.03 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 KAMPUT LUAR EMPIRE ◊ SUMIYATI 16.44 13.22 14.83 3.71 18.54 30.00 NEEDLE 2 / JR 2 ▨
29 OBRAS BACK EMPIRE O KAMINAH 56.90 26.34 41.62 10.41 52.03 30.00 ZIG-ZAG Z
30 TEMPEL KERUT KE BODY c WATI B 27.13 25.47 26.30 6.58 32.88 30.00 BUTTON HOLE y
31 PANTEK SAMPING CELANA c KAMSINAH 14.13 15.44 14.79 3.70 18.48 30.00 ATTACHED BUTTON x
32 PASANG LABEL c AYANAH 7.84 8.54 8.19 2.05 10.24 30.00 EYELET ⌂
33 OBRAS SAMPING O LIA 16.75 19.28 18.02 4.50 22.52 30.00 KANSAI ▩
34 RESING ARMHOLE O SOPIAH 29.56 37.12 33.34 8.34 41.68 30.00 BARTACK +
35 RESING ARMHOLE O SITI MASITOH 52.96 59.60 56.28 14.07 70.35 30.00 SOOM - 2
36 RESING KAKI O ANISAH 32.22 35.56 33.89 8.47 42.36 30.00 TOTAL 39

37 KAMPUT KAKI ◊ SANI.B 34.97 29.78 32.38 8.09 40.47 30.00

38 KAMPUT ARMHOLE ◊ SUHERSIH 27.15 32.00 29.58 7.39 36.97 30.00 MANPOWER

39 KAMPUT ARMHOLE ◊ NURHASANAH 40.94 25.28 33.11 8.28 41.39 30.00 SUPERVISOR 1

ADM 1

OPERATOR 38

HELPER 4

TOTAL 44

TOTAL Waktu 1476.97

Rata-Rata Waktu per 1pc 37.87

Output per 30 menit (1800 detik) 48

Output per 1 jam (3600 detik) 95

Output per hari (9 jam) (32400 detik) 856

% Hasil Produksi 79%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE November 25, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 0 500 PCS
hari / output 2 Hari / 500 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 13.03 14.50 13.77 3.44 17.21 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 22.00 19.31 20.66 5.16 25.82 30.00

3 JAHIT DASAR LAPISAN BELAKANG O KOMSATI 35.40 38.78 37.09 9.27 46.36 30.00

4 JAHIT DASAR LAPISAN BODY DEPAN c UMAYAH 21.03 22.91 21.97 5.49 27.46 30.00

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 55.69 42.21 48.95 12.24 61.19 30.00

6 OBRAS CROCTH + SAMPING PANTY O SANI.B 45.97 43.53 44.75 11.19 55.94 30.00

7 JAHIT DASAR CROCTH + LABEL c SITI MUNAWAROH 27.38 28.93 28.16 7.04 35.19 30.00

8 JAHIT DASAR LAPISAN BODY ATAS c SITI ROMSAH 15.94 18.47 17.21 4.30 21.51 30.00

9 KERUT UNDER BRA c ARSAMAH 24.84 18.63 21.74 5.43 27.17 30.00

10 JAHIT DASAR BRA KE LAPISAN c ROKAYAH 85.25 64.20 74.73 18.68 93.41 30.00

11 JAHIT DASAR BRA KE LAPISAN c ADE 81.35 78.19 79.77 19.94 99.71 30.00

12 OBRAS SAMPING BRA O SAPNAH 21.19 19.28 20.24 5.06 25.29 30.00

13 RESING FRONT NECK O MUNAWAROH 15.47 18.03 16.75 4.19 20.94 30.00

14 RESING ARMHOLE + BACK NECK O SUMIYATI 22.31 25.40 23.86 5.96 29.82 30.00

15 RESING ARMHOLE + FRONT + BACK NECK O HABIBAH 47.03 31.84 39.44 9.86 49.29 30.00

16 OBRAS SAMPING ROK O KAMINAH 22.66 20.59 21.63 5.41 27.03 30.00

17 NECI BAWAH ROK O YULIANA SARI 15.91 15.78 15.85 3.96 19.81 30.00

18 HEMING BOTTOM ROK ◊ SADIAH 24.44 18.07 21.26 5.31 26.57 30.00

19 GABUNG BODY ROK KE BODY CELANA c ONIH 17.47 18.72 18.10 4.52 22.62 30.00 MESIN CODE TOTAL
20 GABUNG BODY ROK KE BODY CELANA c AYANAH 36.34 26.43 31.39 7.85 39.23 30.00 NEEDLE 1 / JR 1 c 15

21 PANTEK FRONT NECK + GABUNG BRA KE BODY BAWAH c RUSTIKAH 47.34 38.47 42.91 10.73 53.63 30.00 NEEDLE 1 W/KNIFE

22 PANTEK FRONT NECK + GABUNG BRA KE BODY BAWAH c LIA 26.37 25.34 25.86 6.46 32.32 30.00 OVERLOCK / OBRAS 4 BNG O 13

23 PANTEK FRONT NECK + GABUNG BRA KE BODY BAWAH c SURIAH 41.06 40.19 40.63 10.16 50.78 30.00

24 OBRAS TALI + OBRAS UJUNG FRONT NECK O SITI ASIAH 14.12 15.78 14.95 3.74 18.69 30.00 OVERLOCK / OBRAS 3 BNG

25 PASANG LOOP c MARNAH 15.60 16.72 16.16 4.04 20.20 30.00 COVERSTITCH/OVERDEK 2N ∆
26 RESING UNDERBRA FRONT/BACK NECK O AAN 39.53 27.94 33.74 8.43 42.17 30.00 OVERDEK JR 1

27 RESING UNDERBRA FRONT/BACK NECK O JASMAH 44.37 40.69 42.53 10.63 53.16 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 8

28 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ SITI MASITOH 36.15 37.50 36.83 9.21 46.03 30.00 NEEDLE 2 / JR 2 ▨
29 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ ROMLAH 25.37 24.93 25.15 6.29 31.44 30.00 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ NUNUNG 31.25 42.38 36.82 9.20 46.02 30.00 BUTTON HOLE y
31 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ JUNENI 26.91 25.72 26.32 6.58 32.89 30.00 ATTACHED BUTTON x
32 PASANG TALI c KAMSINAH 18.10 16.15 17.13 4.28 21.41 30.00 EYELET ⌂
33 PANTEK TALI SLIDER c WATI 16.25 14.72 15.49 3.87 19.36 30.00 KANSAI ▩
34 RESING KAKI O ANISAH 40.44 39.38 39.91 9.98 49.89 30.00 BARTACK +
35 RESING KAKI O SOPIAH 46.50 45.25 45.88 11.47 57.34 30.00 SOOM -
36 KAMPUT KAKI ◊ SANI 40.34 39.60 39.97 9.99 49.96 30.00 TOTAL 36

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 36

HELPER 4

TOTAL 42

TOTAL Waktu 1396.85

Rata-Rata Waktu per 1pc 38.80

Output per 30 menit (1800 detik) 46

Output per 1 jam (3600 detik) 93

Output per hari (9 jam) (32400 detik) 835

% Hasil Produksi 77%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE November 26, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 500 1,245 PCS
hari / output 3 Hari / 745 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 12.68 16.77 14.73 3.68 18.41 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 18.32 19.78 19.05 4.76 23.81 30.00

3 JAHIT DASAR LAPISAN BELAKANG c KOMSATI 45.62 45.94 45.78 11.45 57.23 30.00

4 JAHIT DASAR LAPISAN BODY DEPAN c UMAYAH 44.84 31.41 38.13 9.53 47.66 30.00

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 46.88 58.43 52.66 13.16 65.82 30.00

6 OBRAS CROCTH + SAMPING PANTY O SANI.B 36.90 33.95 35.43 8.86 44.28 30.00

7 JAHIT DASAR CROCTH + LABEL c SITI MUNAWAROH 25.97 26.19 26.08 6.52 32.60 30.00

8 JAHIT DASAR LAPISAN BODY ATAS c SITI ROMSAH 17.26 15.06 16.16 4.04 20.20 30.00

9 KERUT UNDER BRA c ARSAMAH 18.28 18.19 18.24 4.56 22.79 30.00

10 JAHIT DASAR BRA KE LAPISAN c ROKAYAH 62.38 69.59 65.99 16.50 82.48 30.00

11 JAHIT DASAR BRA KE LAPISAN c ADE 59.15 55.22 57.19 14.30 71.48 30.00

12 OBRAS SAMPING BRA O SAPNAH 19.50 19.09 19.30 4.82 24.12 30.00

13 RESING FRONT NECK O MUNAWAROH 33.78 24.18 28.98 7.25 36.23 30.00

14 RESING ARMHOLE + BACK NECK O SUMIYATI 16.94 19.50 18.22 4.56 22.78 30.00

15 RESING ARMHOLE + FRONT + BACK NECK O HABIBAH 32.47 34.93 33.70 8.43 42.13 30.00

16 OBRAS SAMPING ROK O KAMINAH 20.91 21.53 21.22 5.31 26.53 30.00

17 NECI BAWAH ROK O YULIANA SARI 18.78 14.40 16.59 4.15 20.74 30.00

18 HEMING BOTTOM ROK ◊ SADIAH 18.88 22.50 20.69 5.17 25.86 30.00

19 GABUNG BODY ROK KE BODY CELANA c ONIH 14.59 22.10 18.35 4.59 22.93 30.00 MESIN CODE TOTAL
20 GABUNG BODY ROK KE BODY CELANA c AYANAH 25.12 21.66 23.39 5.85 29.24 30.00 NEEDLE 1 / JR 1 c 15

21 PANTEK FRONT NECK + GABUNG BRA c RUSTIKAH 51.15 39.44 45.30 11.32 56.62 30.00 NEEDLE 1 W/KNIFE

22 PANTEK FRONT NECK + GABUNG BRA c LIA 29.50 25.44 27.47 6.87 34.34 30.00 OVERLOCK / OBRAS 4 BNG O 13

23 PANTEK FRONT NECK + GABUNG BRA c SURIAH 35.94 51.72 43.83 10.96 54.79 30.00

24 RESING EMPIRE KELILING O AAN 27.19 27.22 27.21 6.80 34.01 30.00 OVERLOCK / OBRAS 3 BNG

25 RESING EMPIRE KELILING O JASMAH 32.15 15.56 23.86 5.96 29.82 30.00 COVERSTITCH/OVERDEK 2N ∆
26 OBRAS TALI + OBRAS UJUNG FRONT NECK O SITI ASIAH 12.03 15.84 13.94 3.48 17.42 30.00 OVERDEK JR 1

27 PASANG LOOP O MARNAH 18.00 16.44 17.22 4.31 21.53 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ SITI MASITOH 29.59 27.16 28.38 7.09 35.47 30.00 NEEDLE 2 / JR 2 ▨
29 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ ROMLAH 20.69 21.94 21.32 5.33 26.64 30.00 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ NUNUNG 39.81 27.04 33.43 8.36 41.78 30.00 BUTTON HOLE y
31 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ JUNENI 22.25 28.47 25.36 6.34 31.70 30.00 ATTACHED BUTTON x
32 PASANG TALI c KAMSINAH 18.41 14.94 16.68 4.17 20.84 30.00 EYELET ⌂
33 PANTEK TALI SLIDER c WATI 11.28 13.40 12.34 3.09 15.43 30.00 KANSAI ▩
34 RESING KAKI O ANISAH 28.00 38.91 33.46 8.36 41.82 30.00 BARTACK +
35 RESING KAKI O SOPIAH 29.22 39.12 34.17 8.54 42.71 30.00 SOOM -
36 KAMPUT KAKI ◊ SANI 34.15 37.75 35.95 8.99 44.94 30.00 TOTAL 37

37 KAMPUT KAKI ◊ SUHERSIH 21.16 30.69 25.93 6.48 32.41 30.00

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 36

HELPER 4

TOTAL 42

TOTAL Waktu 1319.54

Rata-Rata Waktu per 1pc 35.66

Output per 30 menit (1800 detik) 50

Output per 1 jam (3600 detik) 101

Output per hari (9 jam) (32400 detik) 908

% Hasil Produksi 84%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE November 27, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 1,245 2,065 PCS
hari / output 4 Hari / 820 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 28.78 16.16 22.47 5.62 28.09 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 18.97 16.62 17.80 4.45 22.24 30.00

3 JAHIT DASAR LAPISAN BELAKANG c KOMSATI 32.66 41.19 36.93 9.23 46.16 30.00

4 JAHIT DASAR LAPISAN BODY DEPAN c UMAYAH 29.72 31.69 30.71 7.68 38.38 30.00

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 49.97 62.78 56.38 14.09 70.47 30.00

6 OBRAS CROCTH + SAMPING PANTY O SANI.B 35.97 29.63 32.80 8.20 41.00 30.00

7 JAHIT DASAR CROCTH + LABEL c SITI MUNAWAROH 29.41 26.09 27.75 6.94 34.69 30.00

8 JAHIT DASAR LAPISAN BODY ATAS c SITI ROMSAH 26.53 22.06 24.30 6.07 30.37 30.00

9 KERUT UNDER BRA c ARSAMAH 21.31 26.37 23.84 5.96 29.80 30.00

10 JAHIT DASAR BRA KE LAPISAN c ROKAYAH 74.07 53.72 63.90 15.97 79.87 30.00

11 JAHIT DASAR BRA KE LAPISAN c ADE 61.07 49.15 55.11 13.78 68.89 30.00

12 OBRAS SAMPING BRA O SAPNAH 23.25 20.06 21.66 5.41 27.07 30.00

13 RESING FRONT NECK O SURIAH 27.28 29.50 28.39 7.10 35.49 30.00

14 RESING ARMHOLE + BACK NECK O SUMIYATI 24.68 18.78 21.73 5.43 27.16 30.00

15 RESING ARMHOLE + FRONT + BACK NECK O HABIBAH 37.72 30.79 34.26 8.56 42.82 30.00

16 OBRAS SAMPING ROK O KAMINAH 19.09 14.10 16.60 4.15 20.74 30.00

17 NECI BAWAH ROK O YULIANA SARI 16.22 14.75 15.49 3.87 19.36 30.00

18 HEMING BOTTOM ROK ◊ SADIAH 22.07 17.62 19.85 4.96 24.81 30.00

19 GABUNG BODY ROK KE BODY CELANA c ONIH 27.47 26.31 26.89 6.72 33.61 30.00 MESIN CODE TOTAL
20 GABUNG BODY ROK KE BODY CELANA c AYANAH 29.19 21.56 25.38 6.34 31.72 30.00 NEEDLE 1 / JR 1 c 15

21 PANTEK FRONT NECK + GABUNG BRA c RUSTIKAH 7.78 10.71 9.25 2.31 11.56 30.00 NEEDLE 1 W/KNIFE

22 PANTEK FRONT NECK + GABUNG BRA c LIA 27.50 28.44 27.97 6.99 34.96 30.00 OVERLOCK / OBRAS 4 BNG O 13

23 PANTEK FRONT NECK + GABUNG BRA c ASIAH 33.12 25.57 29.35 7.34 36.68 30.00

24 RESING EMPIRE KELILING O AAN 31.12 23.91 27.52 6.88 34.39 30.00 OVERLOCK / OBRAS 3 BNG

25 RESING EMPIRE KELILING O JASMAH 22.81 22.90 22.86 5.71 28.57 30.00 COVERSTITCH/OVERDEK 2N ∆
26 OBRAS TALI + OBRAS UJUNG FRONT NECK O MUNAWAROH 10.06 13.81 11.94 2.98 14.92 30.00 OVERDEK JR 1

27 PASANG LOOP O MARNAH 18.84 15.06 16.95 4.24 21.19 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ SITI MASITOH 26.47 49.11 37.79 9.45 47.24 30.00 NEEDLE 2 / JR 2 ▨
29 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ ROMLAH 27.63 17.07 22.35 5.59 27.94 30.00 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ NUNUNG 26.25 24.31 25.28 6.32 31.60 30.00 BUTTON HOLE y
31 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ JUNENI 23.13 23.66 23.40 5.85 29.24 30.00 ATTACHED BUTTON x
32 PASANG TALI c KAMSINAH 17.15 12.72 14.94 3.73 18.67 30.00 EYELET ⌂
33 PANTEK TALI SLIDER c WATI 11.50 13.36 12.43 3.11 15.54 30.00 KANSAI ▩
34 RESING KAKI O ANISAH 38.88 37.41 38.15 9.54 47.68 30.00 BARTACK +
35 RESING KAKI O SOPIAH 31.50 34.40 32.95 8.24 41.19 30.00 SOOM -
36 KAMPUT KAKI ◊ SANI 36.29 31.15 33.72 8.43 42.15 30.00 TOTAL 37

37 KAMPUT KAKI ◊ SUHERSIH 41.82 39.19 40.51 10.13 50.63 30.00

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 37

HELPER 4

TOTAL 43

TOTAL Waktu 1286.87

Rata-Rata Waktu per 1pc 34.78

Output per 30 menit (1800 detik) 52

Output per 1 jam (3600 detik) 104

Output per hari (9 jam) (32400 detik) 932

% Hasil Produksi 86%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE November 28, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 2,065 2,935 PCS
hari / output 5 Hari / 870 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 12.00 13.05 12.53 3.13 15.66 36.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 16.94 16.90 16.92 4.23 21.15 36.00

3 JAHIT DASAR LAPISAN BELAKANG c KOMSATI 46.35 31.59 38.97 9.74 48.71 36.00

4 JAHIT DASAR LAPISAN BODY DEPAN c UMAYAH 20.13 28.13 24.13 6.03 30.16 36.00

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 48.09 52.88 50.49 12.62 63.11 36.00

6 OBRAS CROCTH + SAMPING PANTY O KAMINAH 19.75 22.12 20.94 5.23 26.17 36.00

7 JAHIT DASAR CROCTH + LABEL c SITI MUNAWAROH 24.64 23.78 24.21 6.05 30.26 36.00

8 JAHIT DASAR LAPISAN BODY ATAS c SITI ROMSAH 25.22 28.93 27.08 6.77 33.84 36.00

9 KERUT UNDER BRA c ARSAMAH 25.50 22.75 24.13 6.03 30.16 36.00

10 JAHIT DASAR BRA KE LAPISAN c ROKAYAH 73.75 76.09 74.92 18.73 93.65 36.00

11 JAHIT DASAR BRA KE LAPISAN c ADE 60.97 63.88 62.43 15.61 78.03 36.00

12 OBRAS SAMPING BRA O SAPNAH 17.22 16.66 16.94 4.24 21.18 36.00

13 RESING FRONT NECK O SURIAH 25.09 22.81 23.95 5.99 29.94 36.00

14 RESING ARMHOLE + BACK NECK O SUMIYATI 20.47 23.00 21.74 5.43 27.17 36.00

15 RESING ARMHOLE + FRONT + BACK NECK O HABIBAH 31.88 36.43 34.16 8.54 42.69 36.00

16 OBRAS SAMPING ROK O SANI.A 29.19 21.31 25.25 6.31 31.56 36.00

17 NECI BAWAH ROK O YULIANA SARI 15.06 16.53 15.80 3.95 19.74 36.00

18 HEMING BOTTOM ROK ◊ SADIAH 16.22 23.44 19.83 4.96 24.79 36.00

19 RESING KAKI O SOPIAH 32.94 36.75 34.85 8.71 43.56 36.00 MESIN CODE TOTAL
20 RESING KAKI O ANISAH 33.26 41.94 37.60 9.40 47.00 36.00 NEEDLE 1 / JR 1 c 15

21 GABUNG BODY ROK KE BODY CELANA c ONIH 27.34 22.66 25.00 6.25 31.25 36.00 NEEDLE 1 W/KNIFE

22 GABUNG BODY ROK KE BODY CELANA c AYANAH 25.07 27.25 26.16 6.54 32.70 36.00 OVERLOCK / OBRAS 4 BNG O 13

23 PANTEK FRONT NECK c RUSTIKAH 9.03 6.25 7.64 1.91 9.55 36.00

24 GABUNG BRA c LIA 26.91 13.81 20.36 5.09 25.45 36.00 OVERLOCK / OBRAS 3 BNG

25 GABUNG BRA c ST ASIAH 24.03 29.25 26.64 6.66 33.30 36.00 COVERSTITCH/OVERDEK 2N ∆
26 RESING EMPIRE KELILING O AAN 24.56 25.97 25.27 6.32 31.58 36.00 OVERDEK JR 1

27 RESING EMPIRE KELILING O JASMAH 34.29 25.34 29.82 7.45 37.27 36.00 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ SITI MASITOH 26.37 28.06 27.22 6.80 34.02 36.00 NEEDLE 2 / JR 2 ▨
29 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ ROMLAH 20.53 17.15 18.84 4.71 23.55 36.00 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ NUNUNG 26.85 36.19 31.52 7.88 39.40 36.00 BUTTON HOLE y
31 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ JUNENI 31.41 25.40 28.41 7.10 35.51 36.00 ATTACHED BUTTON x
32 KAMPUT KAKI ◊ SANI.B 36.72 36.37 36.55 9.14 45.68 36.00 EYELET ⌂
33 KAMPUT KAKI ◊ SUHERSIH 33.41 34.47 33.94 8.49 42.43 36.00 KANSAI ▩
34 OBRAS TALI SHOULDER O MUNAWAROH 12.65 13.03 12.84 3.21 16.05 36.00 BARTACK +
35 PASANG LOOP c MARNAH 14.44 17.11 15.78 3.94 19.72 36.00 SOOM -
36 PASANG TALI c KAMSINAH 11.91 10.78 11.35 2.84 14.18 36.00 TOTAL 37

37 PANTEK TALI SLIDER c SUPRIYAH 9.55 10.78 10.17 2.54 12.71 36.00

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 36

HELPER 3

TOTAL 41

TOTAL Waktu 1242.86

Rata-Rata Waktu per 1pc 33.59

Output per 30 menit (1800 detik) 54

Output per 1 jam (3600 detik) 107

Output per hari (9 jam) (32400 detik) 965

% Hasil Produksi 107%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 36.00 Target Output per 30 menit (1800 detik) 50 (3600 detik) 100 (32400 detik) 900
PT. SEJIN GLOBAL

DATE November 29, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 2,935 3,890 PCS
hari / output 6 Hari / 955 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 11.72 11.59 11.66 2.91 14.57 32.73

2 KAMPUT KELILING BRA CUP ◊ DIAN 18.10 20.07 19.09 4.77 23.86 32.73

3 JAHIT DASAR LAPISAN BELAKANG c KOMSATI 35.50 41.85 38.68 9.67 48.34 32.73

4 JAHIT DASAR LAPISAN BODY DEPAN c UMAYAH 24.00 25.44 24.72 6.18 30.90 32.73

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 47.69 46.47 47.08 11.77 58.85 32.73

6 OBRAS CROCTH + SAMPING PANTY O KAMINAH 22.68 21.75 22.22 5.55 27.77 32.73

7 JAHIT DASAR CROCTH + LABEL c SITI MUNAWAROH 23.18 21.44 22.31 5.58 27.89 32.73

8 JAHIT DASAR LAPISAN BODY ATAS c SITI ROMSAH 27.50 13.28 20.39 5.10 25.49 32.73

9 KERUT UNDER BRA c ARSAMAH 11.12 16.29 13.71 3.43 17.13 32.73

10 JAHIT DASAR BRA KE LAPISAN c ROKAYAH 62.32 60.56 61.44 15.36 76.80 32.73

11 JAHIT DASAR BRA KE LAPISAN c ADE 53.37 60.84 57.11 14.28 71.38 32.73

12 OBRAS SAMPING BRA O SAPNAH 19.60 17.50 18.55 4.64 23.19 32.73

13 RESING FRONT NECK O SURIAH 24.53 24.19 24.36 6.09 30.45 32.73

14 RESING ARMHOLE + BACK NECK O SUMIYATI 21.53 19.19 20.36 5.09 25.45 32.73

15 RESING ARMHOLE + FRONT + BACK NECK O HABIBAH 32.50 38.40 35.45 8.86 44.31 32.73

16 OBRAS SAMPING ROK O SANI.A 27.13 19.78 23.46 5.86 29.32 32.73

17 NECI BAWAH ROK O YULIANA SARI 16.28 14.59 15.44 3.86 19.29 32.73

18 HEMING BOTTOM ROK ◊ NUNUNG 17.66 17.13 17.40 4.35 21.74 32.73

19 RESING KAKI O SOPIAH 35.07 30.10 32.59 8.15 40.73 32.73 MESIN CODE TOTAL
20 RESING KAKI O ANISAH 30.78 31.28 31.03 7.76 38.79 32.73 NEEDLE 1 / JR 1 c 16

21 GABUNG BODY ROK KE BODY CELANA c ONIH 25.38 31.12 28.25 7.06 35.31 32.73 NEEDLE 1 W/KNIFE

22 GABUNG BODY ROK KE BODY CELANA c AYANAH 35.91 22.93 29.42 7.36 36.78 32.73 OVERLOCK / OBRAS 4 BNG O 12

23 PANTEK FRONT NECK c RUSTIKAH 5.54 7.78 6.66 1.67 8.33 32.73

24 GABUNG BRA c LIA 22.19 16.09 19.14 4.79 23.93 32.73 OVERLOCK / OBRAS 3 BNG

25 GABUNG BRA c ST ASIAH 27.28 32.15 29.72 7.43 37.14 32.73 COVERSTITCH/OVERDEK 2N ∆
26 RESING EMPIRE KELILING O AAN 23.78 23.28 23.53 5.88 29.41 32.73 OVERDEK JR 1

27 RESING EMPIRE KELILING O JASMAH 30.68 22.72 26.70 6.68 33.38 32.73 COVERSTITCH CYLINDER / KAMPUT ◊ 8

28 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ ROMLAH 12.28 23.22 17.75 4.44 22.19 32.73 NEEDLE 2 / JR 2 ▨
29 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ SITI MASITOH 49.62 34.94 42.28 10.57 52.85 32.73 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ JUNENI 20.37 19.13 19.75 4.94 24.69 32.73 BUTTON HOLE y
31 KAMPUT KAKI ◊ SANI.B 37.85 36.15 37.00 9.25 46.25 32.73 ATTACHED BUTTON x
32 KAMPUT KAKI ◊ SUHERSIH 38.84 37.97 38.41 9.60 48.01 32.73 EYELET ⌂
33 OBRAS TALI SHOULDER + OBRAS TALI ◊ MUNAWAROH 12.25 11.90 12.08 3.02 15.09 32.73 KANSAI ▩
34 PASANG LOOP c MARNAH 16.69 15.60 16.15 4.04 20.18 32.73 BARTACK +
35 PASANG TALI c KAMSINAH 9.56 11.97 10.77 2.69 13.46 32.73 SOOM -
36 PANTEK TALI SLIDER c WATI 11.75 8.94 10.35 2.59 12.93 32.73 TOTAL 36

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 37

HELPER 4

TOTAL 43

TOTAL Waktu 1156.16

Rata-Rata Waktu per 1pc 32.12

Output per 30 menit (1800 detik) 56

Output per 1 jam (3600 detik) 112

Output per hari (9 jam) (32400 detik) 1009

% Hasil Produksi 102%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 32.73 Target Output per 30 menit (1800 detik) 55 (3600 detik) 110 (32400 detik) 990
PT. SEJIN GLOBAL

DATE December 2, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 3,890 4,930 PCS
hari / output 7 Hari / 1,040 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 19.40 19.31 19.36 4.84 24.19 32.73

2 KAMPUT KELILING BRA CUP ◊ DIAN 22.40 21.50 21.95 5.49 27.44 32.73

3 JAHIT DASAR LAPISAN BELAKANG c KOMSATI 49.00 49.50 49.25 12.31 61.56 32.73

4 JAHIT DASAR LAPISAN BODY DEPAN c UMAYAH 21.25 20.61 20.93 5.23 26.16 32.73

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 35.37 34.97 35.17 8.79 43.96 32.73

6 OBRAS CROCTH + SAMPING PANTY O SANI.B 22.91 25.63 24.27 6.07 30.34 32.73

7 JAHIT DASAR CROCTH + LABEL c SITI MUNAWAROH 23.37 23.68 23.53 5.88 29.41 32.73

8 JAHIT DASAR LAPISAN BODY ATAS c SITI ROMSAH 22.28 23.15 22.72 5.68 28.39 32.73

9 KERUT UNDER BRA c ARSAMAH 29.47 28.31 28.89 7.22 36.11 32.73

10 JAHIT DASAR BRA KE LAPISAN c ROKAYAH 44.37 40.81 42.59 10.65 53.24 32.73

11 JAHIT DASAR BRA KE LAPISAN c ADE 48.70 45.70 47.20 11.80 59.00 32.73

12 OBRAS SAMPING BRA O SAPNAH 21.34 21.16 21.25 5.31 26.56 32.73

13 RESING FRONT NECK O MUNAWAROH 29.03 28.15 28.59 7.15 35.74 32.73

14 RESING ARMHOLE + BACK NECK O SUMIYATI 26.00 26.53 26.27 6.57 32.83 32.73

15 RESING ARMHOLE + FRONT + BACK NECK O HABIBAH 38.10 38.97 38.54 9.63 48.17 32.73

16 OBRAS SAMPING ROK O KAMINAH 35.69 34.44 35.07 8.77 43.83 32.73

17 NECI BAWAH ROK O YULIANA SARI 15.53 14.32 14.93 3.73 18.66 32.73

18 HEMING BOTTOM ROK ◊ SADIAH 18.22 18.50 18.36 4.59 22.95 32.73

19 RESING KAKI O SOPIAH 36.16 35.65 35.91 8.98 44.88 32.73 MESIN CODE TOTAL
20 RESING KAKI O ANISAH 37.31 36.73 37.02 9.26 46.28 32.73 NEEDLE 1 / JR 1 c 16

21 GABUNG BODY ROK KE BODY CELANA c ONIH 26.34 25.90 26.12 6.53 32.65 32.73 NEEDLE 1 W/KNIFE

22 GABUNG BODY ROK KE BODY CELANA c AYANAH 38.25 38.59 38.42 9.61 48.03 32.73 OVERLOCK / OBRAS 4 BNG O 12

23 PANTEK FRONT NECK c RUSTIKAH 19.57 20.41 19.99 5.00 24.99 32.73

24 PANTEK FRONT NECK c LIA 18.47 19.59 19.03 4.76 23.79 32.73 OVERLOCK / OBRAS 3 BNG

25 PANTEK FRONT NECK c SURIAH 17.47 16.47 16.97 4.24 21.21 32.73 COVERSTITCH/OVERDEK 2N ∆
26 RESING UNDERBRA FRONT + BACK NECK O AAN 24.65 24.10 24.38 6.09 30.47 32.73 OVERDEK JR 1

27 RESING UNDERBRA FRONT + BACK NECK O JASMAH 27.22 26.39 26.81 6.70 33.51 32.73 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 OBRAS TALI + OBRAS UJUNG FRONT NECK O SITI AISAH 21.19 21.19 21.19 5.30 26.49 32.73 NEEDLE 2 / JR 2 ▨
29 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ SITI MASITOH 49.50 48.72 49.11 12.28 61.39 32.73 ZIG-ZAG Z
30 KAMPUT DASAR UNDERBRA FRONT/BACK NECK ◊ ROMLAH 19.97 19.53 19.75 4.94 24.69 32.73 BUTTON HOLE y
31 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ NUNUNG 35.41 33.77 34.59 8.65 43.24 32.73 ATTACHED BUTTON x
32 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ JUNENI 33.50 32.51 33.01 8.25 41.26 32.73 EYELET ⌂
33 PASANG LOOP c MARNAH 15.57 14.25 14.91 3.73 18.64 32.73 KANSAI ▩
34 PASANG TALI c KAMSINAH 16.54 15.31 15.93 3.98 19.91 32.73 BARTACK +
35 PANTEK TALI SLIDER c WATI 13.78 13.28 13.53 3.38 16.91 32.73 SOOM -
36 KAMPUT KAKI ◊ SANI 34.44 35.96 35.20 8.80 44.00 32.73 TOTAL 37

37 KAMPUT KAKI ◊ SUHERSIH 28.75 31.15 29.95 7.49 37.44 32.73

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 38

HELPER 4

TOTAL 44

TOTAL Waktu 1288.29

Rata-Rata Waktu per 1pc 34.82

Output per 30 menit (1800 detik) 52

Output per 1 jam (3600 detik) 103

Output per hari (9 jam) (32400 detik) 931

% Hasil Produksi 94%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 32.73 Target Output per 30 menit (1800 detik) 55 (3600 detik) 110 (32400 detik) 990
PT. SEJIN GLOBAL

DATE December 3, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 4,930 5,925 PCS
hari / output 8 Hari / 995 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 31.13 30.12 30.63 7.66 38.28 32.73

2 KAMPUT KELILING BRA CUP ◊ DIAN 27.20 27.19 27.20 6.80 33.99 32.73

3 JAHIT DASAR LAPISAN BELAKANG c KOMSATI 40.50 43.00 41.75 10.44 52.19 32.73

4 JAHIT DASAR LAPISAN BODY DEPAN c UMAYAH 32.94 23.38 28.16 7.04 35.20 32.73

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 26.18 27.28 26.73 6.68 33.41 32.73

6 OBRAS CROCTH + SAMPING PANTY O SANI.A 22.47 21.12 21.80 5.45 27.24 32.73

7 JAHIT DASAR CROCTH + LABEL c SITI MUNAWAROH 33.50 25.62 29.56 7.39 36.95 32.73

8 JAHIT DASAR LAPISAN BODY ATAS c SITI ROMSAH 35.06 33.97 34.52 8.63 43.14 32.73

9 KERUT UNDER BRA c ARSAMAH 28.41 25.40 26.91 6.73 33.63 32.73

10 JAHIT DASAR BRA KE LAPISAN c ROKAYAH 73.03 65.78 69.41 17.35 86.76 32.73

11 JAHIT DASAR BRA KE LAPISAN c ADE 81.82 70.57 76.20 19.05 95.24 32.73

12 OBRAS SAMPING BRA O SAPNAH 22.00 22.79 22.40 5.60 27.99 32.73

13 RESING FRONT NECK O MUNAWAROH 29.56 28.60 29.08 7.27 36.35 32.73

14 RESING ARMHOLE + BACK NECK O SUMIYATI 24.22 26.37 25.30 6.32 31.62 32.73

15 RESING ARMHOLE + FRONT + BACK NECK O HABIBAH 43.15 41.40 42.28 10.57 52.84 32.73

16 OBRAS SAMPING ROK O KAMINAH 31.72 35.50 33.61 8.40 42.01 32.73

17 NECI BAWAH ROK O YULIANA SARI 20.09 15.34 17.72 4.43 22.14 32.73

18 HEMING BOTTOM ROK ◊ SADIAH 23.41 20.75 22.08 5.52 27.60 32.73

19 RESING KAKI O SOPIAH 43.97 35.66 39.82 9.95 49.77 32.73 MESIN CODE TOTAL
20 RESING KAKI O ANISAH 35.41 35.00 35.21 8.80 44.01 32.73 NEEDLE 1 / JR 1 c 17

21 GABUNG BODY ROK KE BODY CELANA c ONIH 32.97 43.59 38.28 9.57 47.85 32.73 NEEDLE 1 W/KNIFE

22 GABUNG BODY ROK KE BODY CELANA c AYANAH 30.41 39.37 34.89 8.72 43.61 32.73 OVERLOCK / OBRAS 4 BNG O 12

23 PANTEK FRONT NECK c RUSTIKAH 10.09 10.12 10.11 2.53 12.63 32.73

24 PANTEK FRONT NECK c LIA 25.47 26.22 25.85 6.46 32.31 32.73 OVERLOCK / OBRAS 3 BNG

25 PANTEK FRONT NECK c SURIAH 33.63 33.28 33.46 8.36 41.82 32.73 COVERSTITCH/OVERDEK 2N ∆
26 RESING UNDERBRA FRONT + BACK NECK O AAN 28.13 30.41 29.27 7.32 36.59 32.73 OVERDEK JR 1

27 RESING UNDERBRA FRONT + BACK NECK O JASMAH 35.69 30.53 33.11 8.28 41.39 32.73 COVERSTITCH CYLINDER / KAMPUT ◊ 8

28 OBRAS TALI + OBRAS UJUNG FRONT NECK O SITI AISAH 28.72 24.88 26.80 6.70 33.50 32.73 NEEDLE 2 / JR 2 ▨
29 OBRAS TALI + OBRAS UJUNG FRONT NECK ◊ ROMLAH 20.40 19.16 19.78 4.95 24.73 32.73 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ NUNUNG 42.19 34.93 38.56 9.64 48.20 32.73 BUTTON HOLE y
31 KAMPUT STIK UNDERBRA FRONT/BACK NECK ◊ JUNENI 40.13 33.00 36.57 9.14 45.71 32.73 ATTACHED BUTTON x
32 PASANG LOOP c MARNAH 22.25 21.88 22.07 5.52 27.58 32.73 EYELET ⌂
33 PASANG TALI c KAMSINAH 17.10 19.75 18.43 4.61 23.03 32.73 KANSAI ▩
34 PANTEK TALI SLIDER c WATI 16.09 16.00 16.05 4.01 20.06 32.73 BARTACK +
35 KAMPUT KAKI ◊ SANI.B 38.00 40.65 39.33 9.83 49.16 32.73 SOOM -
36 KAMPUT KAKI ◊ SUHERSIH 40.06 42.65 41.36 10.34 51.69 32.73 TOTAL 37

37 JAHIT DASAR BRA KE LAPISAN c SITI MASITOH 78.73 79.90 79.32 19.83 99.14 32.73

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 38

HELPER 4

TOTAL 44

TOTAL Waktu 1529.37

Rata-Rata Waktu per 1pc 41.33

Output per 30 menit (1800 detik) 44

Output per 1 jam (3600 detik) 87

Output per hari (9 jam) (32400 detik) 784

% Hasil Produksi 79%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 32.73 Target Output per 30 menit (1800 detik) 55 (3600 detik) 110 (32400 detik) 990
PT. SEJIN GLOBAL

DATE December 4, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 5,925 6,955 PCS
hari / output 9 Hari / 1,030 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 15.16 13.82 14.49 3.62 18.11 32.73

2 KAMPUT KELILING BRA CUP ◊ DIAN 23.79 25.03 24.41 6.10 30.51 32.73

3 JAHIT DASAR LAPISAN BODY BELAKANG c KOKOM 40.87 42.78 41.83 10.46 52.28 32.73

4 JAHIT DASAR LAPISAN BODY BELAKANG c UMAYAH 31.87 39.84 35.86 8.96 44.82 32.73

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 34.16 33.38 33.77 8.44 42.21 32.73

6 OBRAS CROCTH + SAMPING PANTY O KAMINAH 26.56 27.03 26.80 6.70 33.49 32.73

7 JAHIT DASAR CROCTH + LABEL c SITI MUNAWAROH 26.46 21.53 24.00 6.00 29.99 32.73

8 JAHIT LAPISAN ATAS BODY BELAKANG c SITI ROMSAH 21.46 20.47 20.97 5.24 26.21 32.73

9 JAHIT KERUT BRA c ARSAMAH 23.41 22.03 22.72 5.68 28.40 32.73

10 JAHIT DASAR GABUNG BRA KE LAPISAN c SITI MASITOH 108.09 88.10 98.10 24.52 122.62 32.73

11 JAHIT DASAR GABUNG BRA KE LAPISAN c ROKAYAH 59.65 62.97 61.31 15.33 76.64 32.73

12 JAHIT DASAR GABUNG BRA KE LAPISAN c ADE 58.08 54.66 56.37 14.09 70.46 32.73

13 OBRAS SAMPING BRA O SAPNAH 19.51 20.60 20.06 5.01 25.07 32.73

14 RESING FRONT/BACK NECK + ARMHOLE O SURIAH 23.25 27.32 25.29 6.32 31.61 32.73

15 RESING FRONT/BACK NECK + ARMHOLE O SUMIATI 27.16 25.51 26.34 6.58 32.92 32.73

16 KAMPUT FRONT/BACK NECK + ARMHOLE ◊ HABIBAH 38.72 38.18 38.45 9.61 48.06 32.73

17 OBRAS SAMPING ROK O SANI.A 28.75 28.38 28.57 7.14 35.71 32.73

18 OBRAS NECI BOTTOM O YULIANA SARI 18.62 17.06 17.84 4.46 22.30 32.73

19 KAMPUT HEMING ◊ SUWARSIH 21.04 21.10 21.07 5.27 26.34 32.73 MESIN CODE TOTAL
20 RESING KAKI O SOPIAH 35.43 31.21 33.32 8.33 41.65 32.73 NEEDLE 1 / JR 1 c 17

21 RESING KAKI O ANISAH 35.19 33.85 34.52 8.63 43.15 32.73 NEEDLE 1 W/KNIFE

22 GABUNG ROK KE CELANA c ONIH 30.45 39.81 35.13 8.78 43.91 32.73 OVERLOCK / OBRAS 4 BNG O 11

23 GABUNG ROK KE CELANA c AYANAH 38.53 33.40 35.97 8.99 44.96 32.73

24 PANTEK FRONT NECK c RUSTIKA 8.28 9.15 8.72 2.18 10.89 32.73 OVERLOCK / OBRAS 3 BNG

25 GABUNG BODY ATAS KE BAWAH c LIA 25.85 28.47 27.16 6.79 33.95 32.73 COVERSTITCH/OVERDEK 2N ∆
26 GABUNG BODY ATAS KE BAWAH c ASIAH 24.79 23.15 23.97 5.99 29.96 32.73 OVERDEK JR 1

27 RESING UNDER BRA KELILING O IWAT 29.06 28.63 28.85 7.21 36.06 32.73 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 RESING UNDER BRA KELILING O JASMAH 33.84 32.50 33.17 8.29 41.46 32.73 NEEDLE 2 / JR 2 ▨
29 KAMPUT DASAR UNDERBRA KELILING ◊ ROMLAH 15.32 16.71 16.02 4.00 20.02 32.73 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA KELILING ◊ NUNUNG 35.50 36.09 35.80 8.95 44.74 32.73 BUTTON HOLE y
31 KAMPUT STIK UNDERBRA KELILING ◊ JUNENI 33.16 33.02 33.09 8.27 41.36 32.73 ATTACHED BUTTON x
32 KAMPUT KAKI ◊ SANI.B 41.93 40.31 41.12 10.28 51.40 32.73 EYELET ⌂
33 KAMPUT KAKI ◊ SUHERSIH 39.62 38.63 39.13 9.78 48.91 32.73 KANSAI ▩
34 OBRAS TALI + UJUNG FRONT NECK O MUNAWAROH 20.97 19.71 20.34 5.09 25.43 32.73 BARTACK +
35 PANTEK UJUNG FRONT NECK c MARNAH 19.12 19.11 19.12 4.78 23.89 32.73 SOOM -
36 PASANG TALI KE BODY c KAMSINAH 15.85 16.39 16.12 4.03 20.15 32.73 TOTAL 37

37 PANTEK TALI c WATI 17.22 16.38 16.80 4.20 21.00 32.73

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 38

HELPER 4

TOTAL 44

TOTAL Waktu 1420.64

Rata-Rata Waktu per 1pc 38.40

Output per 30 menit (1800 detik) 47

Output per 1 jam (3600 detik) 94

Output per hari (9 jam) (32400 detik) 844

% Hasil Produksi 85%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 32.73 Target Output per 30 menit (1800 detik) 55 (3600 detik) 110 (32400 detik) 990
PT. SEJIN GLOBAL

DATE December 5, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 6,955 7,893 PCS
hari / output 10 Hari / 938 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 17.53 16.60 17.07 4.27 21.33 32.73

2 KAMPUT KELILING BRA CUP ◊ DIAN 23.09 25.72 24.41 6.10 30.51 32.73

3 JAHIT DASAR LAPISAN BODY BELAKANG c KOKOM 51.88 37.22 44.55 11.14 55.69 32.73

4 JAHIT DASAR LAPISAN BODY BELAKANG c UMAYAH 36.88 31.38 34.13 8.53 42.66 32.73

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 28.50 34.06 31.28 7.82 39.10 32.73

6 OBRAS CROCTH + SAMPING PANTY O KAMINAH 26.68 23.44 25.06 6.27 31.33 32.73

7 JAHIT LINING CROCTH + LABEL c SITI MUNAWAROH 24.13 20.94 22.54 5.63 28.17 32.73

8 JAHIT LAPISAN ATAS BODY BELAKANG c SITI ROMSAH 27.31 18.37 22.84 5.71 28.55 32.73

9 JAHIT KERUT BRA c ARSAMAH 30.28 29.09 29.69 7.42 37.11 32.73

10 JAHIT DASAR GABUNG BRA KE LAPISAN c SITI MASITOH 84.84 87.04 85.94 21.49 107.43 32.73

11 JAHIT DASAR GABUNG BRA KE LAPISAN c ROKAYAH 71.47 65.45 68.46 17.12 85.58 32.73

12 JAHIT DASAR GABUNG BRA KE LAPISAN c ADE 66.18 55.63 60.91 15.23 76.13 32.73

13 OBRAS SAMPING BRA O SAPNAH 25.50 21.81 23.66 5.91 29.57 32.73

14 RESING ARMHOLE O SURIAH 27.87 27.28 27.58 6.89 34.47 32.73

15 RESING ARMHOLE O SUMIATI 34.78 29.22 32.00 8.00 40.00 32.73

16 KAMPUT FRONT/BACK NECK + ARMHOLE ◊ HABIBAH 34.47 28.16 31.32 7.83 39.14 32.73

17 OBRAS SAMPING ROK O SANI.A 30.88 28.22 29.55 7.39 36.94 32.73

18 OBRAS NECI BOTTOM O YULIANA SARI 14.81 14.65 14.73 3.68 18.41 32.73

19 KAMPUT HEMING ◊ SUWARSIH 19.13 15.06 17.10 4.27 21.37 32.73 MESIN CODE TOTAL
20 RESING KAKI O SOPIAH 31.84 30.69 31.27 7.82 39.08 32.73 NEEDLE 1 / JR 1 c 17

21 RESING KAKI O ANISAH 32.66 34.10 33.38 8.35 41.73 32.73 NEEDLE 1 W/KNIFE

22 GABUNG ROK KE CELANA c ONIH 38.13 20.97 29.55 7.39 36.94 32.73 OVERLOCK / OBRAS 4 BNG O 11

23 GABUNG ROK KE CELANA c AYANAH 37.09 28.06 32.58 8.14 40.72 32.73

24 PANTEK FRONT NECK c RUSTIKA 7.90 7.62 7.76 1.94 9.70 32.73 OVERLOCK / OBRAS 3 BNG

25 GABUNG BODY ATAS KE BAWAH c LIA 28.25 17.31 22.78 5.70 28.48 32.73 COVERSTITCH/OVERDEK 2N ∆
26 GABUNG BODY ATAS KE BAWAH c ASIAH 36.06 27.00 31.53 7.88 39.41 32.73 OVERDEK JR 1

27 RESING UNDER BRA KELILING O IWAT 26.50 22.66 24.58 6.15 30.73 32.73 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 RESING UNDER BRA KELILING O JASMAH 36.31 32.19 34.25 8.56 42.81 32.73 NEEDLE 2 / JR 2 ▨
29 KAMPUT DASAR UNDERBRA KELILING ◊ ROMLAH 20.00 19.37 19.69 4.92 24.61 32.73 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA KELILING ◊ NUNUNG 30.72 33.94 32.33 8.08 40.41 32.73 BUTTON HOLE y
31 KAMPUT STIK UNDERBRA KELILING ◊ JUNENI 37.24 35.33 36.29 9.07 45.36 32.73 ATTACHED BUTTON x
32 KAMPUT KAKI ◊ SANI.B 41.10 36.59 38.85 9.71 48.56 32.73 EYELET ⌂
33 KAMPUT KAKI ◊ SUHERSIH 36.81 36.40 36.61 9.15 45.76 32.73 KANSAI ▩
34 OBRAS TALI + UJUNG FRONT NECK O MUNAWAROH 28.16 25.58 26.87 6.72 33.59 32.73 BARTACK +
35 PANTEK UJUNG FRONT NECK c MARNAH 18.57 18.37 18.47 4.62 23.09 32.73 SOOM -
36 PASANG TALI KE BODY c KAMSINAH 15.94 14.72 15.33 3.83 19.16 32.73 TOTAL 37

37 PANTEK TALI c WATI 25.00 20.28 22.64 5.66 28.30 32.73

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 37

HELPER 4

TOTAL 43

TOTAL Waktu 1421.88

Rata-Rata Waktu per 1pc 38.43

Output per 30 menit (1800 detik) 47

Output per 1 jam (3600 detik) 94

Output per hari (9 jam) (32400 detik) 843

% Hasil Produksi 85%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 32.73 Target Output per 30 menit (1800 detik) 55 (3600 detik) 110 (32400 detik) 990
PT. SEJIN GLOBAL

DATE December 6, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 7,893 8,853 PCS
hari / output 11 Hari / 960 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 16.90 16.72 16.81 4.20 21.01 32.73

2 KAMPUT KELILING BRA CUP ◊ DIAN 21.78 20.15 20.97 5.24 26.21 32.73

3 JAHIT DASAR LAPISAN BODY BELAKANG c KOKOM 38.12 35.25 36.69 9.17 45.86 32.73

4 JAHIT DASAR LAPISAN BODY BELAKANG c UMAYAH 30.25 24.56 27.41 6.85 34.26 32.73

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 37.95 35.56 36.76 9.19 45.94 32.73

6 OBRAS CROCTH + SAMPING PANTY O KAMINAH 21.97 21.50 21.74 5.43 27.17 32.73

7 JAHIT LINING CROCTH + LABEL c SITI MUNAWAROH 25.72 25.65 25.69 6.42 32.11 32.73

8 JAHIT LAPISAN ATAS BODY BELAKANG c SITI ROMSAH 29.75 23.84 26.80 6.70 33.49 32.73

9 JAHIT KERUT BRA c ARSAMAH 26.12 23.54 24.83 6.21 31.04 32.73

10 JAHIT DASAR GABUNG BRA KE LAPISAN c SITI MASITOH 74.91 80.60 77.76 19.44 97.19 32.73

11 JAHIT DASAR GABUNG BRA KE LAPISAN c ROKAYAH 74.11 73.34 73.73 18.43 92.16 32.73

12 JAHIT DASAR GABUNG BRA KE LAPISAN c ADE 58.62 69.66 64.14 16.04 80.18 32.73

13 OBRAS SAMPING BRA O SAPNAH 20.65 19.68 20.17 5.04 25.21 32.73

14 RESING ARMHOLE O SURIAH 29.44 27.57 28.51 7.13 35.63 32.73

15 RESING ARMHOLE O SUMIATI 25.34 28.43 26.89 6.72 33.61 32.73

16 KAMPUT FRONT/BACK NECK + ARMHOLE ◊ HABIBAH 32.72 28.10 30.41 7.60 38.01 32.73

17 OBRAS SAMPING ROK O SANI.A 29.90 38.18 34.04 8.51 42.55 32.73

18 OBRAS NECI BOTTOM O YULIANA SARI 18.38 15.72 17.05 4.26 21.31 32.73

19 KAMPUT HEMING ◊ SUWARSIH 24.78 23.94 24.36 6.09 30.45 32.73 MESIN CODE TOTAL
20 RESING KAKI O SOPIAH 30.44 32.87 31.66 7.91 39.57 32.73 NEEDLE 1 / JR 1 c 17

21 RESING KAKI O ANISAH 35.19 30.56 32.88 8.22 41.09 32.73 NEEDLE 1 W/KNIFE

22 GABUNG ROK KE CELANA c ONIH 43.75 38.25 41.00 10.25 51.25 32.73 OVERLOCK / OBRAS 4 BNG O 11

23 GABUNG ROK KE CELANA c AYANAH 35.38 32.19 33.79 8.45 42.23 32.73

24 PANTEK FRONT NECK c RUSTIKA 8.75 7.53 8.14 2.04 10.18 32.73 OVERLOCK / OBRAS 3 BNG

25 GABUNG BODY ATAS KE BAWAH c LIA 17.62 26.43 22.03 5.51 27.53 32.73 COVERSTITCH/OVERDEK 2N ∆
26 GABUNG BODY ATAS KE BAWAH c ASIAH 25.53 29.00 27.27 6.82 34.08 32.73 OVERDEK JR 1

27 RESING UNDER BRA KELILING O IWAT 25.71 28.84 27.28 6.82 34.09 32.73 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 RESING UNDER BRA KELILING O JASMAH 26.72 32.69 29.71 7.43 37.13 32.73 NEEDLE 2 / JR 2 ▨
29 KAMPUT DASAR UNDERBRA KELILING ◊ ROMLAH 17.91 18.91 18.41 4.60 23.01 32.73 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA KELILING ◊ NUNUNG 42.04 41.13 41.59 10.40 51.98 32.73 BUTTON HOLE y
31 KAMPUT STIK UNDERBRA KELILING ◊ JUNENI 32.81 30.94 31.88 7.97 39.84 32.73 ATTACHED BUTTON x
32 KAMPUT KAKI ◊ SANI.B 35.63 35.19 35.41 8.85 44.26 32.73 EYELET ⌂
33 KAMPUT KAKI ◊ SUHERSIH 35.00 34.44 34.72 8.68 43.40 32.73 KANSAI ▩
34 OBRAS TALI + UJUNG FRONT NECK O MUNAWAROH 27.28 25.90 26.59 6.65 33.24 32.73 BARTACK +
35 PANTEK UJUNG FRONT NECK c MARNAH 18.12 16.75 17.44 4.36 21.79 32.73 SOOM -
36 PASANG TALI KE BODY c KAMSINAH 16.31 14.91 15.61 3.90 19.51 32.73 TOTAL 37

37 PANTEK TALI c WATI 14.85 16.40 15.63 3.91 19.53 32.73

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 37

HELPER 4

TOTAL 43

TOTAL Waktu 1407.11

Rata-Rata Waktu per 1pc 38.03

Output per 30 menit (1800 detik) 47

Output per 1 jam (3600 detik) 95

Output per hari (9 jam) (32400 detik) 852

% Hasil Produksi 86%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 32.73 Target Output per 30 menit (1800 detik) 55 (3600 detik) 110 (32400 detik) 990
PT. SEJIN GLOBAL

DATE December 9, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 8,853 9,808 PCS
hari / output 12 Hari / 955 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 25.28 15.50 20.39 5.10 25.49 32.73

2 KAMPUT KELILING BRA CUP ◊ DIAN 23.66 19.28 21.47 5.37 26.84 32.73

3 JAHIT DASAR LAPISAN BODY BELAKANG c KOKOM 36.13 33.56 34.85 8.71 43.56 32.73

4 JAHIT DASAR LAPISAN BODY BELAKANG c UMAYAH 34.57 35.37 34.97 8.74 43.71 32.73

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 29.50 38.00 33.75 8.44 42.19 32.73

6 OBRAS CROCTH + SAMPING PANTY O KAMINAH 25.59 26.62 26.11 6.53 32.63 32.73

7 JAHIT LINING CROCTH + LABEL c SITI MUNAWAROH 24.59 21.81 23.20 5.80 29.00 32.73

8 RESING KAKI O SOPIAH 32.50 32.68 32.59 8.15 40.74 32.73

9 RESING KAKI O ANISAH 37.29 40.00 38.65 9.66 48.31 32.73

10 OBRAS SAMPING ROK O SANIA 31.91 32.00 31.96 7.99 39.94 32.73

11 OBRAS NECI BOTTOM O YULIANA SARI 16.12 19.03 17.58 4.39 21.97 32.73

12 KAMPUT HEMING ◊ SUWARSIH 22.04 24.09 23.07 5.77 28.83 32.73

13 GABUNG ROK KE CELANA c ONIH 35.16 43.16 39.16 9.79 48.95 32.73

14 GABUNG ROK KE CELANA c AYANAH 34.47 43.47 38.97 9.74 48.71 32.73

15 JAHIT LAPISAN ATAS BODY BELAKANG c SITI ROMSAH 22.97 18.78 20.88 5.22 26.09 32.73

16 JAHIT KERUT BRA c ARSAMAH 21.56 32.40 26.98 6.75 33.73 32.73

17 JAHIT DASAR GABUNG BRA KE LAPISAN c SITI MASITOH 74.25 76.38 75.32 18.83 94.14 32.73

18 JAHIT DASAR GABUNG BRA KE LAPISAN c ROKAYAH 66.85 67.28 67.07 16.77 83.83 32.73

19 JAHIT DASAR GABUNG BRA KE LAPISAN c ADE 59.81 55.04 57.43 14.36 71.78 32.73 MESIN CODE TOTAL
20 OBRAS SAMPING BRA O SAPNAH 18.94 22.82 20.88 5.22 26.10 32.73 NEEDLE 1 / JR 1 c 17

21 RESING ARMHOLE O SURIAH 28.00 29.16 28.58 7.15 35.73 32.73 NEEDLE 1 W/KNIFE

22 RESING FRONT BACK NECK O SUMIATI 23.12 27.69 25.41 6.35 31.76 32.73 OVERLOCK / OBRAS 4 BNG O 10

23 KAMPUT FRONT BACK NECK + ARMHOLE ◊ HABIBAH 28.85 35.34 32.10 8.02 40.12 32.73

24 PANTEK FRONT NECK c RUSTIKA 7.41 9.00 8.21 2.05 10.26 32.73 OVERLOCK / OBRAS 3 BNG

25 GABUNG BODY ATAS KE BAWAH c LIA 18.18 26.07 22.13 5.53 27.66 32.73 COVERSTITCH/OVERDEK 2N ∆
26 GABUNG BODY ATAS KE BAWAH c ASIAH 21.97 28.88 25.43 6.36 31.78 32.73 OVERDEK JR 1

27 RESING UNDER BRA KELILING O IWAT 30.75 26.37 28.56 7.14 35.70 32.73 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 KAMPUT DASAR UNDERBRA KELILING ◊ ROMLAH 15.53 17.22 16.38 4.09 20.47 32.73 NEEDLE 2 / JR 2 ▨
29 KAMPUT STIK UNDERBRA KELILING ◊ NUNUNG 42.69 35.78 39.24 9.81 49.04 32.73 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA KELILING ◊ JUNENI 34.18 37.44 35.81 8.95 44.76 32.73 BUTTON HOLE y
31 KAMPUT KAKI ◊ SANI.B 38.44 43.78 41.11 10.28 51.39 32.73 ATTACHED BUTTON x
32 KAMPUT KAKI ◊ SUHERSIH 36.66 42.84 39.75 9.94 49.69 32.73 EYELET ⌂
33 OBRAS TALI + UJUNG FRONT NECK O MUNAWAROH 25.47 23.19 24.33 6.08 30.41 32.73 KANSAI ▩
34 PANTEK UJUNG FRONT NECK c MARNAH 17.32 19.03 18.18 4.54 22.72 32.73 BARTACK +
35 PASANG TALI KE BODY c KAMSINAH 22.29 14.34 18.32 4.58 22.89 32.73 SOOM -
36 PANTEK TALI c WATI 15.13 15.97 15.55 3.89 19.44 32.73 TOTAL 36

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 37

HELPER 4

TOTAL 43

TOTAL Waktu 1380.34

Rata-Rata Waktu per 1pc 38.34

Output per 30 menit (1800 detik) 47

Output per 1 jam (3600 detik) 94

Output per hari (9 jam) (32400 detik) 845

% Hasil Produksi 85%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 32.73 Target Output per 30 menit (1800 detik) 55 (3600 detik) 110 (32400 detik) 990
PT. SEJIN GLOBAL

DATE December 10, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 9,808 10,678 PCS
hari / output 13 Hari / 870 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 16.39 15.57 15.98 4.00 19.98 31.03

2 KAMPUT KELILING BRA CUP ◊ DIAN 26.28 29.88 28.08 7.02 35.10 31.03

3 JAHIT DASAR LAPISAN BODY BELAKANG c KOKOM 54.28 36.97 45.63 11.41 57.03 31.03

4 JAHIT DASAR LAPISAN BODY BELAKANG c UMAYAH 38.06 35.06 36.56 9.14 45.70 31.03

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 33.28 26.63 29.96 7.49 37.44 31.03

6 OBRAS CROCTH + SAMPING PANTY O KAMINAH 27.93 38.63 33.28 8.32 41.60 31.03

7 JAHIT LINING CROCTH + LABEL c SITI MUNAWAROH 31.41 29.25 30.33 7.58 37.91 31.03

8 RESING KAKI O SOPIAH 35.59 38.41 37.00 9.25 46.25 31.03

9 RESING KAKI O ANISAH 40.15 40.63 40.39 10.10 50.49 31.03

10 OBRAS SAMPING ROK O SANI.A 27.13 33.16 30.15 7.54 37.68 31.03

11 OBRAS NECI BOTTOM O YULIANA SARI 16.68 17.90 17.29 4.32 21.61 31.03

12 KAMPUT HEMING ◊ SUWARSIH 27.37 20.15 23.76 5.94 29.70 31.03

13 GABUNG ROK KE CELANA c ONIH 38.25 35.19 36.72 9.18 45.90 31.03

14 GABUNG ROK KE CELANA c AYANAH 35.03 34.70 34.87 8.72 43.58 31.03

15 JAHIT LAPISAN ATAS BODY BELAKANG c SITI ROMSAH 26.10 16.59 21.35 5.34 26.68 31.03

16 JAHIT KERUT BRA c ARSAMAH 25.32 26.84 26.08 6.52 32.60 31.03

17 JAHIT DASAR GABUNG BRA KE LAPISAN c SITI MASITOH 87.90 120.28 104.09 26.02 130.11 31.03

18 JAHIT DASAR GABUNG BRA KE LAPISAN c ROKAYAH 71.85 72.91 72.38 18.10 90.48 31.03

19 JAHIT DASAR GABUNG BRA KE LAPISAN c ADE 58.60 69.44 64.02 16.01 80.03 31.03 MESIN CODE TOTAL
20 OBRAS SAMPING BRA O SAPNAH 22.22 17.31 19.77 4.94 24.71 31.03 NEEDLE 1 / JR 1 c 17

21 RESING ARMHOLE O SURIAH 35.12 34.56 34.84 8.71 43.55 31.03 NEEDLE 1 W/KNIFE

22 RESING FRONT BACK NECK O SUMIATI 22.25 34.03 28.14 7.04 35.18 31.03 OVERLOCK / OBRAS 4 BNG O 10

23 KAMPUT FRONT BACK NECK + ARMHOLE ◊ HABIBAH 32.72 32.40 32.56 8.14 40.70 31.03

24 PANTEK FRONT NECK c RUSTIKA 10.03 8.93 9.48 2.37 11.85 31.03 OVERLOCK / OBRAS 3 BNG

25 GABUNG BODY ATAS KE BAWAH c LIA 25.44 20.13 22.79 5.70 28.48 31.03 COVERSTITCH/OVERDEK 2N ∆
26 GABUNG BODY ATAS KE BAWAH c ASIAH 24.66 37.54 31.10 7.78 38.88 31.03 OVERDEK JR 1

27 RESING UNDER BRA KELILING O IWAT 26.22 25.70 25.96 6.49 32.45 31.03 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 KAMPUT DASAR UNDERBRA KELILING ◊ ROMLAH 21.19 19.03 20.11 5.03 25.14 31.03 NEEDLE 2 / JR 2 ▨
29 KAMPUT STIK UNDERBRA KELILING ◊ NUNUNG 37.90 36.48 37.19 9.30 46.49 31.03 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA KELILING ◊ JUNENI 30.50 34.38 32.44 8.11 40.55 31.03 BUTTON HOLE y
31 KAMPUT KAKI ◊ SANI.B 34.66 35.50 35.08 8.77 43.85 31.03 ATTACHED BUTTON x
32 KAMPUT KAKI ◊ SUHERSIH 39.69 42.13 40.91 10.23 51.14 31.03 EYELET ⌂
33 OBRAS TALI + UJUNG FRONT NECK O MUNAWAROH 34.91 28.50 31.71 7.93 39.63 31.03 KANSAI ▩
34 PANTEK UJUNG FRONT NECK c MARNAH 18.94 22.03 20.49 5.12 25.61 31.03 BARTACK +
35 PASANG TALI KE BODY c KAMSINAH 15.09 15.44 15.27 3.82 19.08 31.03 SOOM -
36 PANTEK TALI c WATI 15.84 15.66 15.75 3.94 19.69 31.03 TOTAL 36

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 37

HELPER 4

TOTAL 43

TOTAL Waktu 1476.83

Rata-Rata Waktu per 1pc 41.02

Output per 30 menit (1800 detik) 44

Output per 1 jam (3600 detik) 88

Output per hari (9 jam) (32400 detik) 790

% Hasil Produksi 76%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 31.03 Target Output per 30 menit (1800 detik) 58 (3600 detik) 116 (32400 detik) 1044
PT. SEJIN GLOBAL

DATE December 11, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 10,678 11,293 PCS
hari / output 14 Hari / 615 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 24.61 22.15 23.38 5.85 29.23 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 19.41 23.97 21.69 5.42 27.11 30.00

3 JAHIT DASAR LAPISAN BODY BELAKANG c KOKOM 37.03 31.37 34.20 8.55 42.75 30.00

4 JAHIT DASAR LAPISAN BODY BELAKANG c UMAYAH 41.78 36.72 39.25 9.81 49.06 30.00

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 31.31 29.56 30.44 7.61 38.04 30.00

6 OBRAS CROCTH + SAMPING PANTY O KAMINAH 36.00 36.05 36.03 9.01 45.03 30.00

7 JAHIT LINING CROCTH + LABEL c SITI MUNAWAROH 25.90 24.72 25.31 6.33 31.64 30.00

8 RESING KAKI O SOPIAH 37.69 32.91 35.30 8.83 44.13 30.00

9 RESING KAKI O ANISAH 38.21 39.47 38.84 9.71 48.55 30.00

10 OBRAS SAMPING ROK O SANI.A 30.31 32.87 31.59 7.90 39.49 30.00

11 OBRAS NECI BOTTOM O YULIANA SARI 18.62 17.82 18.22 4.56 22.78 30.00

12 KAMPUT HEMING ◊ SUWARSIH 35.56 31.06 33.31 8.33 41.64 30.00

13 GABUNG ROK KE CELANA c ONIH 38.94 36.97 37.96 9.49 47.44 30.00

14 GABUNG ROK KE CELANA c AYANAH 32.41 37.28 34.85 8.71 43.56 30.00

15 JAHIT LAPISAN ATAS BODY BELAKANG c SITI ROMSAH 17.44 21.03 19.24 4.81 24.04 30.00

16 JAHIT KERUT BRA c ARSAMAH 31.31 30.50 30.91 7.73 38.63 30.00

17 JAHIT DASAR GABUNG BRA KE LAPISAN c SITI MASITOH 120.69 100.05 110.37 27.59 137.96 30.00

18 JAHIT DASAR GABUNG BRA KE LAPISAN c ROKAYAH 84.03 72.38 78.21 19.55 97.76 30.00

19 JAHIT DASAR GABUNG BRA KE LAPISAN c ADE 65.66 72.85 69.26 17.31 86.57 30.00 MESIN CODE TOTAL
20 OBRAS SAMPING BRA O SAPNAH 23.65 20.63 22.14 5.54 27.68 30.00 NEEDLE 1 / JR 1 c 17

21 RESING ARMHOLE O SURIAH 31.72 30.18 30.95 7.74 38.69 30.00 NEEDLE 1 W/KNIFE

22 RESING FRONT BACK NECK O SUMIATI 29.59 29.31 29.45 7.36 36.81 30.00 OVERLOCK / OBRAS 4 BNG O 10

23 KAMPUT FRONT BACK NECK + ARMHOLE ◊ HABIBAH 33.35 32.50 32.93 8.23 41.16 30.00

24 PANTEK FRONT NECK c RUSTIKA 7.97 7.56 7.77 1.94 9.71 30.00 OVERLOCK / OBRAS 3 BNG

25 GABUNG BODY ATAS KE BAWAH c LIA 16.56 17.09 16.83 4.21 21.03 30.00 COVERSTITCH/OVERDEK 2N ∆
26 GABUNG BODY ATAS KE BAWAH c ASIAH 24.78 24.19 24.49 6.12 30.61 30.00 OVERDEK JR 1

27 RESING UNDER BRA KELILING O IWAT 23.44 25.72 24.58 6.15 30.73 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 8

28 KAMPUT DASAR UNDERBRA KELILING ◊ SUHERSIH 23.40 24.40 23.90 5.98 29.88 30.00 NEEDLE 2 / JR 2 ▨
29 KAMPUT STIK UNDERBRA KELILING ◊ NUNUNG 39.40 38.70 39.05 9.76 48.81 30.00 ZIG-ZAG Z
30 KAMPUT STIK UNDERBRA KELILING ◊ JUNENI 28.34 27.72 28.03 7.01 35.04 30.00 BUTTON HOLE y
31 KAMPUT KAKI ◊ SANI.B 35.16 35.46 35.31 8.83 44.14 30.00 ATTACHED BUTTON x
32 OBRAS TALI + UJUNG FRONT NECK O MUNAWAROH 31.63 30.59 31.11 7.78 38.89 30.00 EYELET ⌂
33 PANTEK UJUNG FRONT NECK c MARNAH 16.44 15.32 15.88 3.97 19.85 30.00 KANSAI ▩
34 PASANG TALI KE BODY c KAMSINAH 18.09 18.03 18.06 4.52 22.58 30.00 BARTACK +
35 PANTEK TALI c WATI 20.50 19.72 20.11 5.03 25.14 30.00 SOOM -
TOTAL 35

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 37

HELPER 4

TOTAL 43

TOTAL Waktu 1436.11

Rata-Rata Waktu per 1pc 41.03

Output per 30 menit (1800 detik) 44

Output per 1 jam (3600 detik) 88

Output per hari (9 jam) (32400 detik) 790

% Hasil Produksi 73%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE December 12, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 11,293 12,053 PCS
hari / output 15 Hari / 760 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 16.63 13.28 14.96 3.74 18.69 30.00

2 KAMPUT KELILING BRA CUP ◊ DIAN 24.47 23.91 24.19 6.05 30.24 30.00

3 JAHIT DASAR LAPISAN BODY BELAKANG c KOKOM 43.87 41.40 42.64 10.66 53.29 30.00

4 JAHIT DASAR LAPISAN BODY BELAKANG c UMAYAH 37.44 37.43 37.44 9.36 46.79 30.00

5 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 36.69 35.07 35.88 8.97 44.85 30.00

6 OBRAS CROCTH + SAMPING PANTY O KAMINAH 26.71 29.09 27.90 6.98 34.88 30.00

7 JAHIT LINING CROCTH + LABEL c SITI MUNAWAROH 25.88 21.04 23.46 5.87 29.33 30.00

8 RESING KAKI O SOPIAH 35.87 36.72 36.30 9.07 45.37 30.00

9 OBRAS SAMPING ROK O ANISAH 30.28 31.88 31.08 7.77 38.85 30.00

10 OBRAS NECI BOTTOM O YULIANA SARI 17.44 18.65 18.05 4.51 22.56 30.00

11 KAMPUT HEMING ◊ SUWARSIH 20.06 24.44 22.25 5.56 27.81 30.00

12 GABUNG ROK KE CELANA c ONIH 34.53 37.87 36.20 9.05 45.25 30.00

13 GABUNG ROK KE CELANA c AYANAH 34.66 39.04 36.85 9.21 46.06 30.00

14 JAHIT LAPISAN ATAS BODY BELAKANG c SITI ROMSAH 17.81 15.44 16.63 4.16 20.78 30.00

15 JAHIT KERUT BRA c ARSAMAH 30.72 20.97 25.85 6.46 32.31 30.00

16 JAHIT DASAR GABUNG BRA KE LAPISAN c SITI MASITOH 70.22 77.56 73.89 18.47 92.36 30.00

17 JAHIT DASAR GABUNG BRA KE LAPISAN c ROKAYAH 64.90 42.47 53.69 13.42 67.11 30.00

18 JAHIT DASAR GABUNG BRA KE LAPISAN c ADE 57.72 54.90 56.31 14.08 70.39 30.00

19 OBRAS SAMPING BRA O SAPNAH 20.91 23.90 22.41 5.60 28.01 30.00 MESIN CODE TOTAL
20 RESING ARMHOLE O SURIAH 32.31 33.15 32.73 8.18 40.91 30.00 NEEDLE 1 / JR 1 c 17

21 RESING FRONT BACK NECK O SUMIATI 31.31 28.88 30.10 7.52 37.62 30.00 NEEDLE 1 W/KNIFE

22 KAMPUT FRONT BACK NECK + ARMHOLE ◊ HABIBAH 34.50 32.94 33.72 8.43 42.15 30.00 OVERLOCK / OBRAS 4 BNG O 9

23 PANTEK FRONT NECK c RUSTIKA 90.00 7.75 48.88 12.22 61.09 30.00

24 GABUNG BODY ATAS KE BAWAH c LIA 20.00 23.16 21.58 5.40 26.98 30.00 OVERLOCK / OBRAS 3 BNG

25 GABUNG BODY ATAS KE BAWAH c ASIAH 31.22 34.41 32.82 8.20 41.02 30.00 COVERSTITCH/OVERDEK 2N ∆
26 RESING UNDER BRA KELILING O IWAT 28.72 28.94 28.83 7.21 36.04 30.00 OVERDEK JR 1

27 KAMPUT DASAR UNDERBRA KELILING ◊ ROMLAH 18.91 20.34 19.63 4.91 24.53 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 9

28 KAMPUT STIK UNDERBRA KELILING ◊ NUNUNG 44.87 48.94 46.91 11.73 58.63 30.00 NEEDLE 2 / JR 2 ▨
29 KAMPUT STIK UNDERBRA KELILING ◊ JUNENI 39.00 40.25 39.63 9.91 49.53 30.00 ZIG-ZAG Z
30 KAMPUT KAKI ◊ SANI.B 42.32 41.97 42.15 10.54 52.68 30.00 BUTTON HOLE y
31 KAMPUT KAKI ◊ SUHERSIH 37.65 45.66 41.66 10.41 52.07 30.00 ATTACHED BUTTON x
32 OBRAS TALI + UJUNG FRONT NECK O MUNAWAROH 20.22 22.53 21.38 5.34 26.72 30.00 EYELET ⌂
33 PANTEK UJUNG FRONT NECK c MARNAH 18.32 23.44 20.88 5.22 26.10 30.00 KANSAI ▩
34 PASANG TALI KE BODY c KAMSINAH 16.03 18.38 17.21 4.30 21.51 30.00 BARTACK +
35 PANTEK TALI c WATI 17.59 16.53 17.06 4.27 21.33 30.00 SOOM -
TOTAL 35

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 37

HELPER 4

TOTAL 43

TOTAL Waktu 1413.82

Rata-Rata Waktu per 1pc 40.39

Output per 30 menit (1800 detik) 45

Output per 1 jam (3600 detik) 89

Output per hari (9 jam) (32400 detik) 802

% Hasil Produksi 74%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE December 13, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0028
STYLE # XC910H96RS LINE# :2 GD 1

ORDER Q'TY 12.886 PCS


Ex-factory 12.886 (12/13)
total output 12,053 13,152 PCS
hari / output 16 Hari / 1,099 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 JAHIT DASAR LAPISAN BODY BELAKANG c UMAYAH 39.78 37.41 38.60 9.65 48.24 30.00

2 JAHIT DASAR LAPISAN BODY DEPAN c JULEHA 25.13 24.55 24.84 6.21 31.05 30.00

3 OBRAS CROCTH + SAMPING PANTY O KAMINAH 32.32 31.50 31.91 7.98 39.89 30.00

4 JAHIT LINING CROCTH + LABEL c SITI MUNAWAROH 25.06 25.10 25.08 6.27 31.35 30.00

5 RESING KAKI O SOPIAH 40.16 40.11 40.14 10.03 50.17 30.00

6 RESING KAKI O ANISAH 36.03 36.55 36.29 9.07 45.36 30.00

7 OBRAS SAMPING ROK O SANI.A 29.87 27.78 28.83 7.21 36.03 30.00

8 OBRAS NECI BOTTOM O YULIANA SARI 19.70 17.90 18.80 4.70 23.50 30.00

9 KAMPUT HEMING ◊ SUWARSIH 21.72 22.17 21.95 5.49 27.43 30.00

10 GABUNG ROK KE CELANA c ONIH 47.25 46.98 47.12 11.78 58.89 30.00

11 GABUNG ROK KE CELANA c AYANAH 44.31 43.44 43.88 10.97 54.84 30.00

12 JAHIT KERUT BRA c ARSAMAH 31.10 30.15 30.63 7.66 38.28 30.00

13 JAHIT DASAR GABUNG BRA KE LAPISAN c SITI MASITOH 89.70 88.97 89.34 22.33 111.67 30.00

14 JAHIT DASAR GABUNG BRA KE LAPISAN c ROKAYAH 75.97 74.78 75.38 18.84 94.22 30.00

15 JAHIT DASAR GABUNG BRA KE LAPISAN c ADE 85.72 83.66 84.69 21.17 105.86 30.00

16 OBRAS SAMPING BRA O SITI ROMSAH 28.10 27.96 28.03 7.01 35.04 30.00

17 RESING ARMHOLE O SURIAH 32.72 31.67 32.20 8.05 40.24 30.00

18 RESING FRONT BACK NECK O SUMIATI 30.46 29.55 30.01 7.50 37.51 30.00

19 KAMPUT FRONT BACK NECK + ARMHOLE ◊ HABIBAH 37.84 39.60 38.72 9.68 48.40 30.00 MESIN CODE TOTAL
20 PANTEK FRONT NECK c RUSTIKA 7.16 7.23 7.20 1.80 8.99 30.00 NEEDLE 1 / JR 1 c 15

21 GABUNG BODY ATAS KE BAWAH c LIA 27.88 26.77 27.33 6.83 34.16 30.00 NEEDLE 1 W/KNIFE

22 GABUNG BODY ATAS KE BAWAH c ASIAH 50.47 51.45 50.96 12.74 63.70 30.00 OVERLOCK / OBRAS 4 BNG O 11

23 RESING UNDERBRA KELILING O IWAT 45.41 41.93 43.67 10.92 54.59 30.00

24 RESING UNDERBRA KELILING O JASMAH 36.59 33.59 35.09 8.77 43.86 30.00 OVERLOCK / OBRAS 3 BNG

25 KAMPUT DASAR UNDERBRA KELILING ◊ ROMLAH 22.41 23.69 23.05 5.76 28.81 30.00 COVERSTITCH/OVERDEK 2N ∆
26 KAMPUT STIK UNDERBRA KELILING ◊ NUNUNG 44.34 42.80 43.57 10.89 54.46 30.00 OVERDEK JR 1

27 KAMPUT STIK UNDERBRA KELILING ◊ JUNENI 33.75 32.49 33.12 8.28 41.40 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 7

28 KAMPUT KAKI ◊ SANI.B 39.72 36.03 37.88 9.47 47.34 30.00 NEEDLE 2 / JR 2 ▨
29 KAMPUT KAKI ◊ SUHERSIH 37.62 36.23 36.93 9.23 46.16 30.00 ZIG-ZAG Z
30 OBRAS TALI + UJUNG FRONT NECK O MUNAWAROH 31.97 30.00 30.99 7.75 38.73 30.00 BUTTON HOLE y
31 PANTEK UJUNG FRONT NECK c MARNAH 25.40 23.64 24.52 6.13 30.65 30.00 ATTACHED BUTTON x
32 PASANG TALI KE BODY c KAMSINAH 18.12 18.71 18.42 4.60 23.02 30.00 EYELET ⌂
33 PANTEK TALI c WATI 17.15 16.95 17.05 4.26 21.31 30.00 KANSAI ▩
BARTACK +
SOOM -
TOTAL 33

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 37

HELPER 5

TOTAL 44

TOTAL Waktu 1495.17

Rata-Rata Waktu per 1pc 45.31

Output per 30 menit (1800 detik) 40

Output per 1 jam (3600 detik) 79

Output per hari (9 jam) (32400 detik) 715

% Hasil Produksi 66%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE December 16, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0050
STYLE # AFL69D LINE# :2 GD 1

ORDER Q'TY 4,176 PCS


Ex-factory 2,088 (12/27) / 2,088 (1/3)
total output 0 100 PCS
hari / output 1 Hari / 100 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT DASAR BRACUP ◊ SRI 15.65 12.15 13.90 3.48 17.38 30.00

2 KAMPUT KELILING BRACUP ◊ DIAN 27.15 26.45 26.80 6.70 33.50 30.00

3 JAHIT DASAR LAPISAN BRA c SITI ROMSAH 45.50 43.72 44.61 11.15 55.76 30.00

4 KERUT SIDE BRA c SANI.A 22.10 20.16 21.13 5.28 26.41 30.00

5 KERUT UNDERBRA c SANI.A 21.53 20.71 21.12 5.28 26.40 30.00

6 PASANG LINING FRONT NECK c ONIH 12.19 16.15 14.17 3.54 17.71 30.00

7 RESING SQUARE FRONT NECK O MUNAWAROH 25.81 24.60 25.21 6.30 31.51 30.00

8 KAMPUT SQUARE FRONT NECK ◊ SUWARSIH 19.91 18.79 19.35 4.84 24.19 30.00

9 OBRAS PRINCESS O YULIANA SARI 22.88 21.93 22.41 5.60 28.01 30.00

10 KAMPUT DASAR PRINCESS ◊ SUHERSIH 19.60 17.11 18.36 4.59 22.94 30.00

11 RESING INER NECK O SAPNAH 57.93 55.33 56.63 14.16 70.79 30.00

12 TEKING SUDUT INER NECK c LIA 22.16 21.96 22.06 5.52 27.58 30.00

13 TUTUP LINING BRA c RUSTIKA 53.47 50.96 52.22 13.05 65.27 30.00

14 PASANG LABEL + LINING BRA c AYANAH 58.37 57.63 58.00 14.50 72.50 30.00

15 OBRAS SIDE SEAM O MIMIN 27.90 28.90 28.40 7.10 35.50 30.00

16 PASANG CASING BONING c ASIAH 42.72 43.61 43.17 10.79 53.96 30.00

17 STIK CASING WIRE c ASIAH 24.47 23.56 24.02 6.00 30.02 30.00

18 RESING ARMHOLE O SOPIAH 26.62 25.70 26.16 6.54 32.70 30.00

19 PASANG STRAP c MARNAH 45.56 43.22 44.39 11.10 55.49 30.00 MESIN CODE TOTAL
20 RESING STRAP O SOPIAH 15.40 14.73 15.07 3.77 18.83 30.00 NEEDLE 1 / JR 1 c 14

21 KAMPUT ARMHOLE + INER NECK ◊ JUNENI 76.69 74.32 75.51 18.88 94.38 30.00 NEEDLE 1 W/KNIFE

22 PASANG WAIST BAND c KAMSINAH 75.88 72.50 74.19 18.55 92.74 30.00 OVERLOCK / OBRAS 4 BNG O 8

23 PASANG WAIST BAND c WATI 76.12 73.34 74.73 18.68 93.41 30.00

24 OBRAS WAIST BAND O SITI MASITOH 57.71 56.53 57.12 14.28 71.40 30.00 OVERLOCK / OBRAS 3 BNG

25 KAMPUT WAIST BAND ◊ SANI.B 81.34 78.79 80.07 20.02 100.08 30.00 COVERSTITCH/OVERDEK 2N ∆
26 ZIG-ZAG LOOP Z ARSAMAH 21.69 22.50 22.10 5.52 27.62 30.00 OVERDEK JR 1

27 JAHIT TUNEL c ROKAYAH 36.53 37.00 36.77 9.19 45.96 30.00 COVERSTITCH CYLINDER / KAMPUT ◊ 6

28 OBRAS LOOP + STRAP + SPAGETI O TITIN 26.53 24.77 25.65 6.41 32.06 30.00 NEEDLE 2 / JR 2 ▨
29 PANTEK SLIDER c ROBINGATUN 40.34 40.19 40.27 10.07 50.33 30.00 ZIG-ZAG Z 1
BUTTON HOLE y
ATTACHED BUTTON x
EYELET ⌂
KANSAI ▩
BARTACK +
SOOM -
TOTAL 29

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 26

HELPER 5

TOTAL 33

TOTAL Waktu 1354.41

Rata-Rata Waktu per 1pc 46.70

Output per 30 menit (1800 detik) 39

Output per 1 jam (3600 detik) 77

Output per hari (9 jam) (32400 detik) 694

% Hasil Produksi 64%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE December 16, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0050
STYLE # AFL70 LINE# :2 GD 1

ORDER Q'TY 6,996 PCS


Ex-factory 3,492 (12/27) / 3,504 (1/3)
total output 195 1,072 PCS
hari / output 1 Hari / 877 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 JAHIT DASAR PANTY BELAKANG c KOMSATI 33.60 30.72 32.16 8.04 40.20 30.00

2 OBRAS SAMPING + OBRAS CROCTH O KAMSINAH 21.59 20.16 20.88 5.22 26.09 30.00

3 JAHIT DASAR LINING PANTY DEPAN c UMAYAH 37.81 33.06 35.44 8.86 44.29 30.00

4 RESING VARIASI WAIST O ANISAH 5.78 5.90 5.84 1.46 7.30 30.00

5 KAMPUT VARIASI WAIST ◊ ANISAH 10.22 11.91 11.07 2.77 13.83 30.00

6 JAHIT DASAR NEMPEL VARIASI c JULEHA 32.38 25.41 28.90 7.22 36.12 30.00

7 RESING WAIST O SURIAH 24.25 25.15 24.70 6.18 30.88 30.00

8 KAMPUT DALAM WAIST ◊ ROMLAH 9.97 8.93 9.45 2.36 11.81 30.00

9 TEKING KAMPUT DALAM + LABEL c SITI MUNAWAROH 17.93 21.65 19.79 4.95 24.74 30.00

10 KAMPUT FRONT WAIST ◊ SUMIATI 13.44 15.91 14.68 3.67 18.34 30.00

11 TEKING SAMPING c ADE 12.22 12.78 12.50 3.13 15.63 30.00

12 OBRAS SAMPING KE DUA O SURYANI 15.87 13.44 14.66 3.66 18.32 30.00

13 RESING LEG O AAN 40.65 38.16 39.41 9.85 49.26 30.00

14 KAMPUT LEG + WAIST ◊ HABIBAH 49.78 46.21 48.00 12.00 59.99 30.00

15 KAMPUT LEG + WAIST ◊ NUNUNG 40.35 42.25 41.30 10.33 51.63 30.00

MESIN CODE TOTAL


NEEDLE 1 / JR 1 c 5

NEEDLE 1 W/KNIFE

OVERLOCK / OBRAS 4 BNG O 5

OVERLOCK / OBRAS 3 BNG

COVERSTITCH/OVERDEK 2N ∆
OVERDEK JR 1

COVERSTITCH CYLINDER / KAMPUT ◊ 5

NEEDLE 2 / JR 2 ▨
ZIG-ZAG Z
BUTTON HOLE y
ATTACHED BUTTON x
EYELET ⌂
KANSAI ▩
BARTACK +
SOOM -
TOTAL 15

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 14

HELPER 5

TOTAL 21

TOTAL Waktu 448.43

Rata-Rata Waktu per 1pc 29.90

Output per 30 menit (1800 detik) 60

Output per 1 jam (3600 detik) 120

Output per hari (9 jam) (32400 detik) 1084

% Hasil Produksi 100%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE December 17, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0050
STYLE # AFL69D LINE# :2 GD 1

ORDER Q'TY 4,176 PCS


Ex-factory 2,088 (12/27) / 2,088 (1/3)
total output 100 558 PCS
hari / output 2 Hari / 458 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT KELILING BRACUP ◊ DIAN 21.22 23.07 22.15 5.54 27.68 32.73

2 JAHIT DASAR LAPISAN BRA c SITI ROMSAH 34.75 35.13 34.94 8.74 43.68 32.73

3 KERUT SIDE BRA c SANI.A 13.19 14.82 14.01 3.50 17.51 32.73

4 KERUT UNDERBRA c SANI.A 20.45 20.21 20.33 5.08 25.41 32.73

5 PASANG LINING FRONT NECK c ONIH 22.04 12.65 17.35 4.34 21.68 32.73

6 RESING SQUARE FRONT NECK O MUNAWAROH 31.00 23.28 27.14 6.79 33.93 32.73

7 KAMPUT SQUARE FRONT NECK ◊ SADIAH 27.25 24.93 26.09 6.52 32.61 32.73

8 OBRAS PRINCESS O YULIANA SARI 24.03 24.53 24.28 6.07 30.35 32.73

9 KAMPUT DASAR PRINCESS ◊ SUHERSIH 24.03 21.63 22.83 5.71 28.54 32.73

10 RESING INER NECK O SAPNAH 55.96 53.87 54.92 13.73 68.64 32.73

11 TEKING SUDUT INER NECK c LIA 26.90 23.41 25.16 6.29 31.44 32.73

12 TUTUP LINING BRA c RUSTIKA 39.41 46.12 42.77 10.69 53.46 32.73

13 PASANG LABEL + LINING BRA c AYANAH 60.85 60.19 60.52 15.13 75.65 32.73

14 OBRAS SIDE SEAM O MIMIN 25.94 42.78 34.36 8.59 42.95 32.73

15 PASANG CASING BONING c ASIAH 24.97 21.15 23.06 5.77 28.83 32.73

16 STIK CASING WIRE c ASIAH 18.56 16.50 17.53 4.38 21.91 32.73

17 RESING ARMHOLE O SOPIAH 33.25 33.00 33.13 8.28 41.41 32.73

18 PASANG STRAP c MARNAH 61.56 35.34 48.45 12.11 60.56 32.73

19 KAMPUT ARMHOLE + INER NECK ◊ JUNENI 54.63 41.65 48.14 12.04 60.18 32.73 MESIN CODE TOTAL
20 PASANG WAIST BAND c KAMSINAH 70.46 69.50 69.98 17.50 87.48 32.73 NEEDLE 1 / JR 1 c 14

21 PASANG WAIST BAND c WATI 70.19 65.90 68.05 17.01 85.06 32.73 NEEDLE 1 W/KNIFE

22 OBRAS WAIST BAND O SITI MASITOH 45.09 33.28 39.19 9.80 48.98 32.73 OVERLOCK / OBRAS 4 BNG O 7

23 KAMPUT WAIST BAND ◊ SANI.B 35.50 34.81 35.16 8.79 43.94 32.73

24 ZIG-ZAG LOOP Z ARSAMAH 30.25 28.35 29.30 7.33 36.63 32.73 OVERLOCK / OBRAS 3 BNG

25 JAHIT TUNEL c ROKAYAH 52.50 51.03 51.77 12.94 64.71 32.73 COVERSTITCH/OVERDEK 2N ∆
26 OBRAS LOOP + STRAP + SPAGETI O TITIN 33.28 23.35 28.32 7.08 35.39 32.73 OVERDEK JR 1

27 PANTEK SLIDER + SPAGETI c ROBINGATUN 69.85 60.10 64.98 16.24 81.22 32.73 COVERSTITCH CYLINDER / KAMPUT ◊ 5

NEEDLE 2 / JR 2 ▨
ZIG-ZAG Z 1
BUTTON HOLE y
ATTACHED BUTTON x
EYELET ⌂
KANSAI ▩
BARTACK +
SOOM -
TOTAL 27

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 25

HELPER 3

TOTAL 30

TOTAL Waktu 1229.81

Rata-Rata Waktu per 1pc 45.55

Output per 30 menit (1800 detik) 40

Output per 1 jam (3600 detik) 79

Output per hari (9 jam) (32400 detik) 711

% Hasil Produksi 72%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 32.73 Target Output per 30 menit (1800 detik) 55 (3600 detik) 110 (32400 detik) 990
PT. SEJIN GLOBAL

DATE December 17, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0050
STYLE # AFL70 LINE# :2 GD 1

ORDER Q'TY 6,996 PCS


Ex-factory 3,492 (12/27) / 3,504 (1/3)
total output 1,072 2,172 PCS
hari / output 2 Hari / 1,100 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 JAHIT DASAR PANTY BELAKANG c KOMSATI 30.94 22.47 26.71 6.68 33.38 30.00

2 OBRAS SAMPING + OBRAS CROCTH O KAMSINAH 23.22 19.53 21.38 5.34 26.72 30.00

3 JAHIT DASAR LINING PANTY DEPAN c UMAYAH 36.72 29.72 33.22 8.31 41.53 30.00

4 RESING VARIASI WAIST O ANISAH 10.49 9.15 9.82 2.46 12.28 30.00

5 KAMPUT VARIASI WAIST ◊ ANISAH 12.32 10.41 11.37 2.84 14.21 30.00

6 JAHIT DASAR NEMPEL VARIASI c JULEHA 24.84 24.87 24.86 6.21 31.07 30.00

7 RESING WAIST O SURIAH 25.25 29.63 27.44 6.86 34.30 30.00

8 KAMPUT DALAM WAIST ◊ ROMLAH 10.19 13.78 11.99 3.00 14.98 30.00

9 TEKING KAMPUT DALAM + LABEL c SITI MUNAWAROH 18.28 17.20 17.74 4.44 22.18 30.00

10 KAMPUT FRONT WAIST ◊ SUMIATI 17.31 13.45 15.38 3.85 19.23 30.00

11 TEKING SAMPING c ADE 13.65 13.87 13.76 3.44 17.20 30.00

12 OBRAS SAMPING KE DUA O SURYANI 14.80 12.50 13.65 3.41 17.06 30.00

13 RESING LEG O JASMAH 39.59 39.28 39.44 9.86 49.29 30.00

14 KAMPUT LEG + WAIST ◊ HABIBAH 47.13 25.91 36.52 9.13 45.65 30.00

15 KAMPUT LEG + WAIST ◊ NUNUNG 40.10 24.91 32.51 8.13 40.63 30.00

MESIN CODE TOTAL


NEEDLE 1 / JR 1 c 5

NEEDLE 1 W/KNIFE

OVERLOCK / OBRAS 4 BNG O 5

OVERLOCK / OBRAS 3 BNG

COVERSTITCH/OVERDEK 2N ∆
OVERDEK JR 1

COVERSTITCH CYLINDER / KAMPUT ◊ 5

NEEDLE 2 / JR 2 ▨
ZIG-ZAG Z
BUTTON HOLE y
ATTACHED BUTTON x
EYELET ⌂
KANSAI ▩
BARTACK +
SOOM -
TOTAL 15

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 14

HELPER 2

TOTAL 18

TOTAL Waktu 419.69

Rata-Rata Waktu per 1pc 27.98

Output per 30 menit (1800 detik) 64

Output per 1 jam (3600 detik) 129

Output per hari (9 jam) (32400 detik) 1158

% Hasil Produksi 107%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE December 18, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0050
STYLE # AFL69D LINE# :2 GD 1

ORDER Q'TY 4,176 PCS


Ex-factory 2,088 (12/27) / 2,088 (1/3)
total output 558 1,049 PCS
hari / output 3 Hari / 491 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT KELILING BRACUP ◊ DIAN 26.77 25.90 26.34 6.58 32.92 32.73

2 JAHIT DASAR LAPISAN BRA c SITI ROMSAH 40.76 34.47 37.62 9.40 47.02 32.73

3 KERUT SIDE BRA c SANI.A 11.94 12.25 12.10 3.02 15.12 32.73

4 KERUT UNDERBRA c SANI.A 14.28 20.50 17.39 4.35 21.74 32.73

5 PASANG LINING FRONT NECK c ONIH 12.75 15.71 14.23 3.56 17.79 32.73

6 RESING SQUARE FRONT NECK O MUNAWAROH 23.13 25.47 24.30 6.08 30.38 32.73

7 KAMPUT SQUARE FRONT NECK ◊ SADIAH 17.60 19.47 18.54 4.63 23.17 32.73

8 OBRAS PRINCESS O YULIANA SARI 24.15 27.28 25.72 6.43 32.14 32.73

9 KAMPUT DASAR PRINCESS ◊ SUHERSIH 38.32 20.96 29.64 7.41 37.05 32.73

10 RESING INER NECK O SAPNAH 46.28 45.93 46.11 11.53 57.63 32.73

11 TEKING SUDUT INER NECK c LIA 20.47 19.38 19.93 4.98 24.91 32.73

12 TUTUP LINING BRA c RUSTIKA 34.18 38.03 36.11 9.03 45.13 32.73

13 PASANG LABEL + LINING BRA c AYANAH 53.72 55.00 54.36 13.59 67.95 32.73

14 OBRAS SIDE SEAM O MIMIN 23.82 28.25 26.04 6.51 32.54 32.73

15 PASANG CASING BONING c ASIAH 23.90 24.00 23.95 5.99 29.94 32.73

16 STIK CASING WIRE c ARSAMAH 12.83 23.28 18.06 4.51 22.57 32.73

17 RESING ARMHOLE O SOPIAH 39.03 36.85 37.94 9.49 47.43 32.73

18 PASANG STRAP + PASANG LOOP c MARNAH 61.73 60.15 60.94 15.24 76.18 32.73

19 KAMPUT ARMHOLE + INER NECK ◊ JUNENI 40.75 45.29 43.02 10.76 53.78 32.73 MESIN CODE TOTAL
20 PASANG WAIST BAND c KAMSINAH 56.87 57.62 57.25 14.31 71.56 32.73 NEEDLE 1 / JR 1 c 14

21 PASANG WAIST BAND c WATI 58.78 64.15 61.47 15.37 76.83 32.73 NEEDLE 1 W/KNIFE

22 OBRAS WAIST BAND O JASMAH 68.04 45.40 56.72 14.18 70.90 32.73 OVERLOCK / OBRAS 4 BNG O 7

23 KAMPUT WAIST BAND ◊ SANI.B 43.72 34.80 39.26 9.82 49.08 32.73

24 JAHIT TUNEL c ROKAYAH 42.50 40.62 41.56 10.39 51.95 32.73 OVERLOCK / OBRAS 3 BNG

25 OBRAS LOOP + STRAP + SPAGETI O TITIN 35.63 33.21 34.42 8.61 43.03 32.73 COVERSTITCH/OVERDEK 2N ∆
26 PANTEK SLIDER c ROBINGATUN 63.66 62.00 62.83 15.71 78.54 32.73 OVERDEK JR 1

COVERSTITCH CYLINDER / KAMPUT ◊ 5

NEEDLE 2 / JR 2 ▨
ZIG-ZAG Z
BUTTON HOLE y
ATTACHED BUTTON x
EYELET ⌂
KANSAI ▩
BARTACK +
SOOM -
TOTAL 26

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 25

HELPER 3

TOTAL 30

TOTAL Waktu 1157.24

Rata-Rata Waktu per 1pc 44.51

Output per 30 menit (1800 detik) 40

Output per 1 jam (3600 detik) 81

Output per hari (9 jam) (32400 detik) 728

% Hasil Produksi 74%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 32.73 Target Output per 30 menit (1800 detik) 55 (3600 detik) 110 (32400 detik) 990
PT. SEJIN GLOBAL

DATE December 18, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0050
STYLE # AFL70 LINE# :2 GD 1

ORDER Q'TY 6,996 PCS


Ex-factory 3,492 (12/27) / 3,504 (1/3)
total output 2,172 3,302 PCS
hari / output 3 Hari / 1,130 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 JAHIT DASAR PANTY BELAKANG c KOMSATI 19.60 23.31 21.46 5.36 26.82 30.00

2 OBRAS SAMPING + OBRAS CROCTH O KAMSINAH 20.53 19.22 19.88 4.97 24.84 30.00

3 JAHIT DASAR LINING PANTY DEPAN c UMAYAH 38.35 35.78 37.07 9.27 46.33 30.00

4 RESING VARIASI WAIST O ANISAH 6.66 5.72 6.19 1.55 7.74 30.00

5 KAMPUT VARIASI WAIST ◊ ANISAH 14.20 12.56 13.38 3.35 16.73 30.00

6 JAHIT DASAR NEMPEL VARIASI c JULEHA 26.34 30.63 28.49 7.12 35.61 30.00

7 RESING WAIST O SURIAH 24.72 23.91 24.32 6.08 30.39 30.00

8 KAMPUT DALAM WAIST ◊ ROMLAH 11.63 10.94 11.29 2.82 14.11 30.00

9 TEKING KAMPUT DALAM + LABEL c SITI MUNAWAROH 19.37 23.00 21.19 5.30 26.48 30.00

10 KAMPUT FRONT WAIST ◊ SUMIATI 20.38 19.81 20.10 5.02 25.12 30.00

11 TEKING SAMPING c ADE 11.41 12.24 11.83 2.96 14.78 30.00

12 OBRAS SAMPING KE DUA O SURYANI 9.53 9.25 9.39 2.35 11.74 30.00

13 RESING LEG O AAN 41.25 39.72 40.49 10.12 50.61 30.00

14 KAMPUT LEG + WAIST ◊ HABIBAH 35.93 34.19 35.06 8.77 43.83 30.00

15 KAMPUT LEG + WAIST ◊ NUNUNG 35.63 33.70 34.67 8.67 43.33 30.00

MESIN CODE TOTAL


NEEDLE 1 / JR 1 c 5

NEEDLE 1 W/KNIFE

OVERLOCK / OBRAS 4 BNG O 5

OVERLOCK / OBRAS 3 BNG

COVERSTITCH/OVERDEK 2N ∆
OVERDEK JR 1

COVERSTITCH CYLINDER / KAMPUT ◊ 5

NEEDLE 2 / JR 2 ▨
ZIG-ZAG Z
BUTTON HOLE y
ATTACHED BUTTON x
EYELET ⌂
KANSAI ▩
BARTACK +
SOOM -
TOTAL 15

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 14

HELPER 2

TOTAL 18

TOTAL Waktu 418.44

Rata-Rata Waktu per 1pc 27.90

Output per 30 menit (1800 detik) 65

Output per 1 jam (3600 detik) 129

Output per hari (9 jam) (32400 detik) 1161

% Hasil Produksi 108%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080
PT. SEJIN GLOBAL

DATE December 19, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0050
STYLE # AFL69D LINE# :2 GD 1

ORDER Q'TY 4,176 PCS


Ex-factory 2,088 (12/27) / 2,088 (1/3)
total output 1,049 1,534 PCS
hari / output 4 Hari / 485 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 KAMPUT KELILING BRACUP ◊ DIAN 28.71 27.40 28.06 7.01 35.07 32.73

2 JAHIT DASAR LAPISAN BRA c SITI ROMSAH 36.03 35.96 36.00 9.00 44.99 32.73

3 KERUT SIDE BRA c SANI.A 16.81 15.71 16.26 4.07 20.33 32.73

4 KERUT UNDERBRA c SANI.A 18.72 16.00 17.36 4.34 21.70 32.73

5 PASANG LINING FRONT NECK c ONIH 12.09 11.63 11.86 2.97 14.83 32.73

6 RESING SQUARE FRONT NECK O MUNAWAROH 31.38 30.90 31.14 7.79 38.93 32.73

7 KAMPUT SQUARE FRONT NECK ◊ SADIAH 24.56 20.63 22.60 5.65 28.24 32.73

8 OBRAS PRINCESS O YULIANA SARI 23.19 21.55 22.37 5.59 27.96 32.73

9 KAMPUT DASAR PRINCESS ◊ SUHERSIH 20.80 19.63 20.22 5.05 25.27 32.73

10 RESING INER NECK O SAPNAH 48.50 47.72 48.11 12.03 60.14 32.73

11 TEKING SUDUT INER NECK c LIA 16.03 15.90 15.97 3.99 19.96 32.73

12 TUTUP LINING BRA c RUSTIKA 32.66 31.63 32.15 8.04 40.18 32.73

13 PASANG LABEL + LINING BRA c AYANAH 49.10 48.32 48.71 12.18 60.89 32.73

14 OBRAS SIDE SEAM O MIMIN 34.00 33.22 33.61 8.40 42.01 32.73

15 PASANG CASING BONING c ASIAH 21.65 20.44 21.05 5.26 26.31 32.73

16 STIK CASING WIRE c ARSAMAH 22.66 21.22 21.94 5.49 27.43 32.73

17 RESING ARMHOLE O SOPIAH 28.97 27.63 28.30 7.08 35.38 32.73

18 PASANG STRAP + PASANG LOOP c MARNAH 74.71 75.90 75.31 18.83 94.13 32.73

19 KAMPUT ARMHOLE + INER NECK ◊ JUNENI 44.57 42.60 43.59 10.90 54.48 32.73 MESIN CODE TOTAL
20 PASANG WAIST BAND c KAMSINAH 48.78 47.88 48.33 12.08 60.41 32.73 NEEDLE 1 / JR 1 c 14

21 PASANG WAIST BAND c WATI 59.06 58.05 58.56 14.64 73.19 32.73 NEEDLE 1 W/KNIFE

22 OBRAS WAIST BAND O SITI MASITOH 46.16 45.21 45.69 11.42 57.11 32.73 OVERLOCK / OBRAS 4 BNG O 7

23 KAMPUT WAIST BAND ◊ SANI.B 32.13 33.00 32.57 8.14 40.71 32.73

24 JAHIT TUNEL c ROKAYAH 39.19 39.30 39.25 9.81 49.06 32.73 OVERLOCK / OBRAS 3 BNG

25 OBRAS LOOP + STRAP + SPAGETI O TITIN 24.71 23.28 24.00 6.00 29.99 32.73 COVERSTITCH/OVERDEK 2N ∆
26 PANTEK SLIDER c ROBINGATUN 87.28 80.46 83.87 20.97 104.84 32.73 OVERDEK JR 1

COVERSTITCH CYLINDER / KAMPUT ◊ 5

NEEDLE 2 / JR 2 ▨
ZIG-ZAG Z
BUTTON HOLE y
ATTACHED BUTTON x
EYELET ⌂
KANSAI ▩
BARTACK +
SOOM -
TOTAL 26

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 25

HELPER 3

TOTAL 30

TOTAL Waktu 1133.51

Rata-Rata Waktu per 1pc 43.60

Output per 30 menit (1800 detik) 41

Output per 1 jam (3600 detik) 83

Output per hari (9 jam) (32400 detik) 743

% Hasil Produksi 75%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 32.73 Target Output per 30 menit (1800 detik) 55 (3600 detik) 110 (32400 detik) 990
PT. SEJIN GLOBAL

DATE December 19, 2019 LINE MACHINE LAYOUT MEKANIK SUPERVISOR


CHIEF
MANAGER
PROD. FACTORY
MANAGER MANAGER

CHIEF JUARTI
SUPERVISOR RAMIATI
BUYER KHOL'S SJ20-3-0050
STYLE # AFL70 LINE# :2 GD 1

ORDER Q'TY 6,996 PCS


Ex-factory 3,492 (12/27) / 3,504 (1/3)
total output 3,302 4,462 PCS
hari / output 4 Hari / 1,160 PCS
ACTUAL TIME CHECK (detik) SKETCH
Tools/ KODE
NO NAMA PROSES NAMA OPERATOR Target Avg
Folder MESIN
1st 2nd Average Loss Time Time Check Waktu per
(25%) +Loss Time 1pc

1 JAHIT DASAR PANTY BELAKANG c KOMSATI 25.75 22.25 24.00 6.00 30.00 30.00

2 OBRAS SAMPING + OBRAS CROCTH O KAMINAH 16.35 16.09 16.22 4.06 20.28 30.00

3 JAHIT DASAR LINING PANTY DEPAN c UMAYAH 36.41 30.27 33.34 8.34 41.68 30.00

4 JAHIT DASAR LINING PANTY DEPAN c ANISAH 34.44 33.75 34.10 8.52 42.62 30.00

5 RESING VARIASI WAIST O ANISAH 9.34 9.75 9.55 2.39 11.93 30.00

6 JAHIT DASAR NEMPEL VARIASI c JULEHA 16.25 20.93 18.59 4.65 23.24 30.00

7 RESING WAIST O SURIAH 22.50 17.75 20.13 5.03 25.16 30.00

8 KAMPUT DALAM WAIST + VARIASI WAIST ◊ ROMLAH 18.96 17.87 18.42 4.60 23.02 30.00

9 TEKING KAMPUT DALAM + LABEL c SITI MUNAWAROH 16.41 17.66 17.04 4.26 21.29 30.00

10 KAMPUT FRONT WAIST ◊ SUMIATI 14.21 17.32 15.77 3.94 19.71 30.00

11 TEKING SAMPING c ADE 12.75 12.47 12.61 3.15 15.76 30.00

12 OBRAS SAMPING KE DUA O SURYANI 10.16 12.25 11.21 2.80 14.01 30.00

13 RESING LEG O JASMAH 46.31 45.75 46.03 11.51 57.54 30.00

14 RESING LEG O AAN 41.28 42.69 41.99 10.50 52.48 30.00

15 KAMPUT LEG + WAIST ◊ HABIBAH 31.90 30.56 31.23 7.81 39.04 30.00

16 KAMPUT LEG + WAIST ◊ NUNUNG 35.99 31.25 33.62 8.41 42.03 30.00

MESIN CODE TOTAL


NEEDLE 1 / JR 1 c 6

NEEDLE 1 W/KNIFE

OVERLOCK / OBRAS 4 BNG O 6

OVERLOCK / OBRAS 3 BNG

COVERSTITCH/OVERDEK 2N ∆
OVERDEK JR 1

COVERSTITCH CYLINDER / KAMPUT ◊ 4

NEEDLE 2 / JR 2 ▨
ZIG-ZAG Z
BUTTON HOLE y
ATTACHED BUTTON x
EYELET ⌂
KANSAI ▩
BARTACK +
SOOM -
TOTAL 16

MANPOWER

SUPERVISOR 1

ADM 1

OPERATOR 15

HELPER 2

TOTAL 19

TOTAL Waktu 479.76

Rata-Rata Waktu per 1pc 29.99

Output per 30 menit (1800 detik) 60

Output per 1 jam (3600 detik) 120

Output per hari (9 jam) (32400 detik) 1081

% Hasil Produksi 100%

Target Rata-Rata Waktu Target Output per 1 jam Target Output per hari (9 jam)
per 1PC 30.00 Target Output per 30 menit (1800 detik) 60 (3600 detik) 120 (32400 detik) 1080