TEST REPORT
CPRI
Tes t Re port Number S2 150574 Date :
o 9JUl 2015
of the cus(omcr Pl ot no . 12, Sector-I.I.D.C, I.I. F ,
Pa rt icu lal·S of sample tesled 33 kY, Outdoor, Oil Coo led CT- PT Unit
(ANUPAM AWASTIH)
JOI DIRECTOR
Sheet I of 6
CENT RAL POW ER RESEARCH I NSTITU TE
(MEMBER OF STL)
Summary of test
o 9.JUt 2015
T est conducted
'~
TI':S~~NG[NEER
Sheet 2 of6
CENT RAL POVvER RESEARCH INSTITUTE
(M EM BER OF STL )
T EST REPORT
CPRI
Date:
Test Report NUlllbe." 521 50574
o 9 JUt 2015
Ra tings assigned by manu fa cture r
Rated voltage l ] kV
I I
Ratio 100/ 1
'I
Bu rden VA 15 VA
Accuracy class 0.55
ALF -
Instrument Security fa ctor ::: 5
Knee -point voltage (m ill) Vk -
Compos it t: error (% ) -
Exciting cu rrent at Vk -
Rated short time CUtTen! 13. 1 kArms tor 1.0 second with initial pe3k of 32 .75 kA
Winding details
Primary
Number or primary turns 4T
Cross section [00 Stl . mm
Material Multi strand Copper Rope
Secondary
Number of primary turn s 400 T
Cross section 0.5191 sq. mm
Material Copper Wire
TEST EN INEER
Sheet 301'6
CENTRAL PO\ VE R RESEARCH I STITUT E
(i\1El\1BER OF STL)
TEST REPORT
T es t rcsu Its:
\\
TESTEN~~R
Sheet 4 or 6
CE NTRAL PO \VI!.R RESEARCH INSTITUTE
TEST Rf:PORT
The sample withsrood High voltage power frequency test on primary & secondary windings for one minute after
short-time current test as per standard.
a) T es t voltage 63.0 kVrms (I IV to earth)
b) Test vo ltage 2.70 kVrms (LV to earth 011 metering core)
C onclusion: T he test results indicate that the sample tested complies with the requirement ofcl.9.6 of tile
standard.
ShedSof6
sWIre . (JeAn TFSllr IG & DE I F OPME ir '-' r. T ,.
GOVII'JC,PI) /I 8 ·_· rAI - ~2~)! 3 . INUIA
rJ , 'Jr._ .,..9 (J)7052S3f f3 82
CE NTRAL POW ER RESEARCH INSTITUT E
(MEIVIBER OF STL)
TEST REPORT
C PRI
b) Publication or reproduction of this ' test repo'rt/ certificate in any form other than by complete set of
the whole report and in the language \\)ritten, is not permitted withollt the written consent of CPR!.
d) The verification of the sampl e drawings by CPRI is limited to dim ensional cliccks only wherever
poss ibl e.
e) Any anoma ly/di sc repancy in the test i'eport/Certiticate should be broughr to the notice of CPR!
with in 45 days from the date of issue.
T he test repoli will contain the record of th e values ortes t parameters as obtained during testing, the
physical condition or the apparatus during testing, the physical condition of the apparatus
durin g/af"ler the testes), copy( ics) of Oscillogram(s) , record of supplementary testes) if an y
conducted but no cenification on the performance of the apparat us tested
The test ce rtifi cate is i sued, on request and payment of the presc ribed charges only when the
apparatus of particular type and rating has satisfactorily passed all the specified tests in compliance
with condition stipulated in a published National/International Standards.
g) All Documents constituting this test report/certificate are stitched toge ther with a continuous silk
threadlr ibbon, the two ends of which have been brought over tire front sheet of thi s te st
report/certificate and sealed with a CPR.! logo printed paper sticker/embosscd .
\~
\ .
TEST E ". . EER
Sheet 6 of 6
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
CPRI
SIDCUL, Rudrapur-263 15 3,
SIDCUL, Rudrapur,
Particu lars of Sample(s) Tested 33kV , Outdoor, Oil cooled, CTVT Unit
No. of Oscillogram(s)
NIIL
No . of Graph(s)
NIL
No. of Photograph(s)
NIL
No . of drawing(s)
TWO
~. ROY)
;N~NEER
(A~t4dHI)
JOIN T DI RECTOR
Sheet 1 of 6
CENTRAL POWER RESEARCH IN STITUTE
(Member of STL)
TEST REPORT
SUMMARY OF TEST
REPORT
2) PSC/330DOCCTPTU /O16-A
\(~~
'I"Es~NE\GINEER
H. ROY)
- - - - - -- - - - - - - - - - - -- -- - - -- -- -
Sh.... t 2 of I>
TEST REPORT
-Secondary
Rated voltage (Volts) Primary 33000
-Seconda! y 110
Accura c y class
0.5s 0 .5
ISF/ALF
<5
Composite error %
H. ROY)
INEER
Sheet 3 of 6
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
CPRI
SCHEDULE OF TESTS
Z 6 AUG 2015
1) Test Conducted Temperature rise test on CT
Test Results
Dale of Test • 03/06/2015
Starting Time ( Hrs) : 12.30
Shut down time ( Hrs) : 16.30
Test current (A) :120
Conductor used : CUr. cabl'e, 90 sq. mm, 2 meter long
Frequency (Hz) . 50
Phase :3
Avg . ambient Temperatur~ at shut . 36 .8
dow n (degC)
Arrangement of thermocouple : As given below
locations
Thermocouple Locations Thermocouple Numbers Maximum Temperature Temperature Eise (K) -1
I
Recorded (0C) I
I
Terminal AP1 l' 42 .3 5.5
J
J
I - -- - - - - --
Terminal AP2
i
2 49 .9
I 13 .1
Terminal BP2 4 42 .9 6 .1
- --- - -
Terminal CP1 5 46.4 9.6
Body-1 7 38 .9 2.1
Body-2 8 39 .2 2.4
Observation 1) The temperature rise obtained was within the limits as specified in th E) standard
2) The temperature rise obtained on secondary winding by resistance method were found
to be as1-as2 = 2.87K, bs1-bs2 = 8.66K & cs1-cs2 = 834K, which w ere within the
limits as specified in the standard for oil immersed CT.
~~
(L B-fA '. ROY)
i7sT EN INEE.R
Sheet 4 of 6
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
2) Te,>t Conducted
Z 6 AUG Z015
Arrangement of thermocouple
: 'As given below
locations
-
Thermocouple Location s Thermocouple Numbers Maximum Temp erature Temperature Ri se (K)
Recorded (OC) !
~
37 .3 I 1.2
I
Body-2 2 37 .0 I 0.9
Observation 1) The temperature rise obtained was within the limits as specified in .the standard .
2) The temperature rise obtained on primary and secondary winding by resistance method are foun d
to be as below which was within limits as specified in the standard for oil cooled VT
-- -
After 1.2 ti mes of rated voltage cant. After 1.5 time s of rated voltage for 30 sec.
----
a-b = 2.3 1 K 2.99 K
._--
b-c = 2.89 K 3.99 K
c-a = 14.43 K 14.81 K
- .--..
AP1-BP1 := 1.49 K 2 .05 K
- - ----
BP1-CP1 = 2 .35 K 2.43 K
I
CP1-APl = 2.06 K 2.25 K
CONCLUSION The test results indicate that the sample tested complies with requirement of
CI. 9.7 of 18:2705 (Part-l),1992 and CI. 9.5 of IS : 3156 (Part-1) 1992.
\N~
~E
(L N H. ROY)
GINEER
Sheet 5 of 6
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
CPRI
NOTE
2 S AU G Z015
a) The Test results relate only to the item(s) tested.
b) Publication or reproduction of the test report /Certificate in any form other than by complete set of the whole test
~eport /Certificate and in the language written is not permitted without the written consent of CPRI .
c) Any Corrections/erasure invalidates the test ReporUCertificate .
d) NABL Ilas Accredited this laboratory as per ISO 17025-2005 standard , vide certificate no T-0011 for the tests
carried oul.
e) Any anomaly/discrepancy in the test report /Certificate should be brought to the notice Of CPRI within 45 days
from the date of issue
f) The verification ·of the sample drawings by CPRI is limited to dimensional checks only wherever possible
g) CPRI Issues two kinds of documents:
Test Report :
The test repori is issued wilen the sample is tested for specific test requ ired by the customer either in accordance
with National/International standards or as per customer's requirements but no ceriification on the performance of
the sample tested The test report will contain the record of the values of test parameters as obtained dUring
testing, the physica l condition of the apparatus during testing, the physi cal condition of th e apparatus during/after
the testis) copy(ies) of Oscillogram(s), record of supplem€ n tary ,testes) if any conducted but no certification on
the performance of the apparatus tested.
Test Certificate:
The test certificate is issued on request and payment of the prescri bed charges only when the apparatus of
particular type and rating has satisfactorily passed all the specified tests in compliance with condition stipulated in
a published National/International Standards.
h) A ll Documents constituting this test report/certificate are stitched together with a Continuous silk thread/silk
ribb on, the two ends of which have been brought over the front sheet of this test report/certificate and sealed
with a CPRI logo printed paper sticker/embossed
~4~.-8'-~
T~GNEER
(LEE ROY)
Sheet 6 of 6
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
CPRI
Parti culars of Sample(s) Tested 33kV, Outdoor, Oil Cooled CT-VT Unit
Condition of sample(s) on receipt New
Type Outdoor, Oil Cooled CTVT Unit
Designation 33kV ODOC CTPT Unit
Serial Number(s) P5C/91147
Number of Sample(s) Tested One
CPR I sample code number(s) STD88TL 15R 180517
Sealing of the sample if any NIL
Particulars of test(s) conducted I) Lightning impulse voltage withstand test.
II) High Voltage Wet Power Frequency withstand test
the laboratory
No of Sheet(s) EIGHT
~rv\OIL.
(SATISH IK UMAR)
TEST ENGINEER
(A~'HI)
JOINT DH~E CI OR
- - - - - - - - - - - - - - - - - - - - - - -- - - -- - - -- - -- _._..... _-- _ . .
Sheet 1 of 8
..
TEST REPORT
SUMMARY OF TEST
. .
2) PSC/330DOCCTPTU/016 -A
~1)1)(}.1...
("SATISH KUMAR)
TES r ENGINEER
Sheet 2 of 8
•
•
CENTRAL POWER RESEARCH IN STITUTE
(Member of STL)
TEST REPORT
ISF/ALF ~5
C o mp os ite error %
Sushi 9 make
PD level
(ft\~ (Y\Q\ L
(SAitSH KUMAR)
TEST ENGINEER
Shggt 3 of 8
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
Atmospheric conditions:
-
T est on C-phase, rest 1st Application 170 20150601-0 3 20150601-01
earUled'. I
I
- ' - i
Total No. of aPP'lications 15 for negative polarity an<:! 15 for positive polarity .
(lli, fYlU' L.
(SATIt'H KUMAR)
TEST ENGINEER
- - - -- - - - - -
Sheet 4 of B
•
•
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
SCHEDULE OF TESTS
l 0 AUG 2015.
II) Type of Test : High voltage wet power frequency withstand test
Condition of Sample : As such after impulse test
Atmospheric conditions
Atm Pressure H
Test details : The CT-VT unit was subjected to wet power frequency test at 70kVrms for one minute on primary
winding of the unit. Secondary windings & frame earthed during test. The unit withstood the HV test
®~)v)C1'-
(SATI SH KUM AR)
TEST ENGINEER
Sheet 5 of 8
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
1} T esl conducted Verification of terminal marking and polarity on CT's of CT-VT unit
Test details Polarity and Terminal marking were checked as per standard
Observations Found in order.
3) Induced over voltage test on VT of CT-VT unit was conducted at 70,k Vrms, 200Hz for 30 sees
®,~Mt7'~
(SATISH IK UMAR)
TEST ENGINEER
Sheet 6 of 8
t
t
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
Observation The % ratio and phase angle error were within the limits as specified in the standard .
Co nnection
Connection class % rated (VA) Factor error Angle
voltage Error
(Min)
AP1-BP1
a-b 33000/110 0.5 100 30 0.8pf laq -0.293 +4 .92
AP1-BPl
a--b 33000/110 0 .5 100 30 O.Bpf laq -00924 +4 .12
BP1-CP1 b-c 33000/110 0.5 100 30 0.8pf laq -0.266 -0620--
--
BP1- CPl
~1 -A P 1
CP1 -AP 1
b-c
c-a
c-a
33000/1 10
33000/110
33000/11 0
0.5
0.5
0.5
100
10Q
100
7 .5
7.5
7.5
0.8pf laq
0.801 lao
0.8pf laq
-00839.._ ~..!.:~lg
-0 .1387
+0059 3
+3 .30
+1745
1
Observation : The percentage ratio and I1h ase angle error were within the limits as spe cified in th.e standard .
CONCLUSION : The test results indicate that the sample tested complies with the requirements of the
CI. 9.8 & 9.9 of IS:2705 (Part-l),1992 & CI. 9.6 & C1.9 .7 of IS3156 (Part-1 ),1992
~ty)o-L
(SATIS H KUMAR)
TEST ENGIN EER
Sheet 7 of 8
TEST REPORT
NOTE
Test Report
The test report is issued when the sample is tested for specific test required by the customer either in accordance
with National/I nternational standards or as per customer's requirements but no certification on the performance of
the sample tested. The test report will contain the record of the values of test parameters as obtained during
testing, the physical condition of the apparatus during testing , the physical condition of the apparatus during/after
the test(s), copy(ies) of Oscillogram(s), record of supplementary test(s) if any conducted but no cef1ification on
the performance of ttle apparatus tested .
T est Certificate
The test certificate is issued on request and payment of the prescribed charges only when the apparatus of
paf1icular type and rating has satisfactorily passed all the specified tests in compliance with condition stipulated in
a published National/International Standards.
h) All Documents constituting this test report/certificate are stitched together with a Continuous silk thread/silk
ribbon, the two ends of which have been brought over the front sheet of this test report/certificate and sealed
with a CPRI logo printed paper sticker/embossed .
---------------------------------------------------------------------------------
Sheet 8 of 8
CENTRAL POW ER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
Particulars of testes) con ducted 1) Polarity & Terminal Marking of CTs & VT.
T
(A4t:~'J
JOINT DIRECTOR
- - - - - -_ .._ - -- -
Sheet 1 of 7
CEN TRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
SUMMARY OF TEST
11 SEP Z015
,
3.4 Test circuit drawing No(s). NIL
:)
J
)
)
,
)
,
,
)
;)
Sheet 2 of 7
"J
~
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
-Second::Jry 1
Rated voltage (Volts) Primary 33000
-Secondary 110
Core no.
CT VT
Rated burden (VA)
15 30/ph
Ratio
100/1 33000/110
Accuracy class
0.55 0.5
ISFIALF
::;5
Composite error %
Class of insulation :A
,
)
,
, . ROY)
,
INEER
,
Sheet 3 of 7
)
CENTRAL POWER RESEARCH INSTITUTE
(Member of STL)
TEST REPORT
T est .description
Primary winding to earth
Secondary wind ing to ·earth
Voltage (kVrms)
70.0
3.0
Duration (minutesl
1.0
1.0
Frequency (Hz)
50
50
Observations
Withstood
Withstood
j
Observation The ISF on metering core within the limits as declared by the customer.
t, j
/(E~tNGINEER
H. RO YI
Sheet 4 of 7
T
TEST REPORT
Primary
Conn ection
Secondary
Connection
Ratio Accuracy
class
Test at %
rated I Burden
(VA)
Power
Factor
% Ratio
error
Phase
Angle Error
current jMin}
A P1 -AP 2 as 1-as2 100/1 0. 55 120 15 0. 8pf lag -00947 +231 .
--- -
AP1-A P2 as 1-as2 100/1 -. 0 ,5s 100 15 0. 8pf lag -0 .115 +3
- ---_. 09
AP1-AP 2 as1-as2 100/1 0.55 20 15 0.8pf lag -0 .281 +809
-
AP1-AP 2 as 1-as2 100/ 1 0 .5s 5 15 0.8pf lag -0.486 +12.64
AP1-AP 2 as1-as2 100/1 0 .55 1 15 0.8PJ lag -1.002 +18.96
AP 1-AP2 as1-as2 100/1 0 .55 120 3.75 UPF +0.332 +5 .71
AP1 -AP 2 as 1-as2 100/1 0 .55 100 3.75 U.P.F +0.329 t'6 ..05
< -
AP1-AP2 as1-as2 100/1 0 .5s 20 3.75 U.P.F +0298 - . - _. - 2 1 I
+8
A P1-AP2 as1-as2 100/1 0.55 5 3.75 UPF +0 .239 - . +1 ~ 95 1
AP 1· AP 2 as 1-as2 100/1 0.5s 1 3.75 UPF +0 .0536 +2079
BP1-BP2 bs1-bs2 100/1 0.5s 120 15 0.8 pr laQ -0.0863 - + 3.34 I
BP1-BP2 bs 1-bs2 100/1 0 .5s 100 15 08pf lag -0 .109
-- - - - -
-- - - + 3'.-97 I
BP1-BP2 bs1-bs2 100/1 0 .55 20 15 0.8pr lag -0.267 +87 1
BP1-BP2
- - - -
bs 1-bs2 100/1 0.55 5 15 0.8pf lag -0.449 + 13.07
BP1-BP2 bs 1-bs2 100/1 0.55 1 15 0.8pf lag -0.909 t-18.99
BP1-BP 2 bs1-bs2 100/1 0.55 120 3.75 U. P.F +0 .362 +6 .2 7
BP1-BP 2 bs 1-bs2 100/1 0.55 100 3.75 UPF +0 .348 +6. 29
BP1-BP 2 bs 1-bs2 100/1 0 .55 20 3.75 U.P. F +0 .343 +9.72
BP1-BP2 bs 1-bs2 100/1 0 .55 5 3.75 +0.267
-
+12.75.
U PF
BP1-BP2 bs1-bs2 100/1 0 .5s 1 3.75 U.P.F +00838 +21.75
CP1-CP2 cs1-cs2 100/1 0.55 120 15 120 -0.0510 +2 .30
CP1 -CP2 cs 1-cs2 100/1 0 .55 100 15 100 -0 .0759 - . +3.25
CP1-CP 2 cs1-cs2 100/1 20
- --
0 .5s 15 20 -0 .240 +9.69
- ..- - -
CP 1-CP2 cs1-cs2 100/1 0 .55 5 15 5 -0.425 +1 5.96
CP1-CP2 cs1-cs2 100/1 0 .55 1 15 1 -0.834 - -+2124
CP 1-CP2 cs1-cs2 100/1 0. 55 120 3.75 120 +0 .356 +6 08
CP1-CP2 cs 1-cs2 100/1 0 .55 100 3.75 100 .0 .345 .5 ~
CP 1-CP2 c:;1 -c:52 10011 05s 20 3.75 20 +0 .356 19 .27
CP 1-CP2 cs 1-cs2 10011 0.55 5 3.75 5 -- I- +0 .264 __ ~~ - +12~8
CP1-CP2 cs 1-cs2 100/1 0.5s 1 3.75 1 -0-~
132 -. _. -+37
- .54
- .,
Observation The percentage ratio and phase angle error were within the limits speci d in the standard .
Sheet 5 of 7
)
»
•
t
CENTRAL POWE R RESEARCH INSTITUTE
(Member of STL)
,
, TEST REPORT
• SCHEDULE OF TESTS
Primary Se~ondary I Ratio Accuracy Test at Burde n Power % Hatio Phase Angle
Connection Connection I class % rated (VA) Factor error Error {Min)
voltage
AP1-BP1 a-b 33000/11 0 0 .5 120 30 08pf lag -0 .294 +5.54 .
AP1-BPl a-b 33000/110 0.5 100 30 08pf lag .0.282 ' +4 .76
AP1-BP1 a-b 33000/1 10 0.5 BO 30 0.8pf lag -0.279 +4.51
AP1-BP1 a-b 33000/110 0.5 120 7 .5 0 .8pf la9. -0 .0999 +4 .80
AP 1-BP1 a-b 33000/110 0 .5 100 7 .5 0 .8pf lag -0.OB71 +4.{}0
AP1 -BPl a-b 33000/ 110 0 .5 80 7.5 O.Bpf lag -0 .OB33 +3.78
BP1 -CP1 b-c 33000/11 0 0.5 120 30 08pf lag -0 .221 + 1.D26
BP1-CP1 b-c 33000/11 0 0 .5 100 30 0 .8pf lag -0 .268 -0 .520
BP1 -CP1 b-c 33000/1 10 0.5 80 30 08pf lag -0266 -0 .893
BP1-CP l b-c 33000/11 0 0 .5 120 7 .5 0.8pf lag -0 .0947 -0.344
BP 1-CPl b-c 33000/110 0 .5 100 7.5 0.8pf lag -0 .0831 -1.~94
BP1 -CPl b-c 33000/110 0.5 80 7.5 D.apf lag -0.0812 -2 .02
CP1-APl c-a 33000/1 10 0.5 120 30 O.Bpf lag -0.1622 +4 .02
CP 1-APl c-a 33000/1 10 0.5 100 30 0 .8pf lag -0.1378 +2.84
CP1-AP1 c-a 33000/110 0.5 80 30 08pf lag -0 .1310 +2.48
CP 1-APl c-a 33000/110 0.5 120 7.5 0.8pf lao +0.0358 +2.71
CP 1-APl c-a 33000/110 05 100 7 .5 0.8pf lag +0.0593 1"1 .585
CP 1-AP1 c-a 33000/110 05 80 7 .5 0.8pf lag +0.0663 + 1.250
Observation : T he percentage ratio and phase angle error were within the limits specified in the standard.
CONCLUSION The test results indicate that the sample tested complies with the requirements of the
CI. 9.2, 9.3.9.4,9.5.2 of IS 2705 (Part-l), 1992 CI. 711 . 7 1. 2 of IS: 2705 (Part-2) ,
CI. 9.2,9.3 .1.1, 9.4 of IS: 3156 (Part-l ),1992 and C1.8 . 1.1 of IS: 3156 (Part-2), 1992 with
deviation as reported on sheet 1 of 7.
I
Sheet 6 of 7
-
TEST REPORT
Test Report
The test report is issued w hen the sample is tested for specific test required by the customer either in accordance
with National/International standards or as per customer's requirement s but no certification on the performance of
the sample tested . The test report will contain the record of the val ues of tes·t parameters as obtained during
testing , the physical condition of the apparatus during testing, the physical condition of the apparatus during/after
the test(s). copy(ies) of Oscillogram(s) , record of supplementary test(s) if any conducted but no certification on
the performance of the apparatus tested.
Test Certificate:
The test certificate is issued on request and payment of the prescribed charges only when the apparatus of
particular type and rating has satisfactorily passed all the specified tests in compliance with condition stipulated in
a published National/International Standards.
h) All Documents constituting this test report/certificate are stitched together with a Cont,inuous silk thread/silk
ribbon, the two ends of which have been brought over the front sheet of this test report/certificate and sealed
with a CPRI logo printed paper sticker/embossed
Sheet 7 of 7