LAPORAN MSMA

Hydraulic Design Calculation for Internal Drainage

PERMOHONAN PELAN KERJA TANAH, JALAN DAN PERPARITAN BAGI CADANGAN


PEMBANGUNAN KILANG YANG MENGANDUNGI:
1) 1 BLOK BANGUNAN PENTADBIRAN BESERTA MAKMAL R&D DAN QC 3 - TINGKAT
2) 1 BLOK BANGUNAN KANTIN BESERTA "VISITOR GALLERY" 2 - TINGKAT
3) 1 BLOK BANGUNAN ENGINEERING 1 -TINGKAT
4) 2 BLOK BANGUNAN KILANG 3 - TINGKAT
5) 1 BLOK GUDANG "FINISHED GOODS" 1 1/2 - TINGKAT
6) 1 UNIT KAWASAN REKREASI BERBUMBUNG
7) 1 UNIT TEMPAT LETAK MOTORSIKAL BERBUMBUNG
8) 1 UNIT TEMPAT LETAK KERETA BERBUMBUNG
9) 1 UNIT KEBUK SAMPAH
10) 1 UNIT RUMAH PAM SPRINKLER
11) 1 UNIT "SCRAP YARD" BERBUMBUNG
12) 1 UNIT "QUARANTINE YARD" BERBUMBUNG
13) 1 UNIT RUMAH PAM BESERTA 3 UNIT TANGKI AIR
14) 1 UNIT STESEN METER "NATURAL GAS”(NG)
15) 1 UNIT "WASTE WATER TREATMENT PLANT" (WWTP)
16) 1 UNIT STESEN SUIS UTAMA (SSU)
17) 1 UNIT PEJABAT PENGAWAL
18) 3 UNIT PONDOK PENGAWAL
DI ATAS PT 1402 (DAHULUNYA PT 1163, PT 1164, PT 1165, PT 1166 DAN SEBAHAGIAN
TANAH KERAJAAN), KAWASAN PERINDUSTRIAN TAMAN TEKNOLOGI 2 (TECHPARK 2),
BANDAR ENSTEK, DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.
UNTUK TETUAN AJINOMOTO (MALAYSIA) BERHAD

Owner:
AJINOMOTO (MALAYSIA) BERHAD
(No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama,
58200 Kuala Lumpur
Tel : 03-7890 6958
Fax : 03-7981 7010
E-mail: sato@ajikl.com.my

Consulting Engineers:
KESHMEN CONSULT SDN. BHD.
12A-3 (3rd Floor), Jalan PJS 11/28,
Bandar Sunway,
46150 Petaling Jaya,
Selangor Darul Ehsan.
Tel: 03-5632 3750
Fax: 03-5634 0356
E-mail: info@keshmen.com

December 2019
Contents

1.0 Introduction and Project Description

2.0 Land Information and Site Description

3.0 Drainage System Concept

4.0 Rainfall Intensity and Design Formula

5.0 Internal Drainage Design

6.0 On-site Detention (OSD)

Appendix A – Drawings

Appendix B – Rainfall Intensity Calculation

Appendix C – Catchment Layout Plan

Appendix D – OSD Calculations

Appendix E – Internal Drainage Hydraulic Design Calculations


1.0 INTRODUCTION AND PROJECT DESCRIPTION

1.1 The objective of this report is to present the drainage design concept for the
proposed development.

1.2 The proposal is a new Factory for Ajinomoto Malaysia Berhad.

1.3 The site is located at PT1402 of Kawasan Perindustrian Taman Teknologi 2


(Techpark 2), Bandar Enstek, Daerah Seremban, Negeri Sembilan Darul
Khusus.

2.0 LAND INFORMATION AND SITE DESCRIPTION

2.1 The total land cover by the proposed site is 46.6 acre (18.9 ha).

2.2 The site is generally flat, undeveloped land, with existing ground level
completed by previous earthworks to a platform level of 55.00 O.D.L.
Vegetation is non-existent at the time of writing of this report.

2.3 The access to the proposed site is via existing roads within the Techpark 2
development.

2.4 The Key Plan and Location Plan are as shown in Figure 1 and Figure 2.

3.0 DRAINAGE SYSTEM CONCEPT

3.1 In the existing condition, the site is drained by temporary earth drains which
discharge to the existing sediment basin and subsequently to the existing
roadside drains.

3.2 The permanent drainage system of the proposed development will discharge
directly to the existing external roadside drains, and subsequently to an
existing Kolam Takungan Awam (KTA) centralized retention pond adjacent to
the Techpark 2 development, which caters for the catchment area of our site.

3.3 Please refer to Appendix C for the Catchment Layout Plan and flow direction
plan to the main drains and KTA.

3.4 To provide additional redundancy for the KTA, our drainage system proposal
includes additional OSD capacity.

3.5 The permanent drainage system of the proposed development will flow
through primary and secondary outlets at each discharge point to provide
OSD capacity to control the rate of discharge to the existing external roadside
drains.

3.6 OSD volume is provided by calculating the volume of the drains.


4.0 RAINFALL INTENSITY AND DESIGN FORMULA
4.1 Rainfall intensity is based on empirical equation as follows :-
I = λTK
(d + θ)η
Where,
I = Average rainfall intensity (mm/hr);
T = Average Recurrent Interval – ARI (0.5<T<12 month and
2<T<100 year);
d = Storm Duration (hours), 0.0833<d<72; and
λ, K, θ & η = Fitting constant dependent on the rain gauge location
(Table 2.B1 in Appendix 2.B, MSMA 2nd Edition)
4.2 The formula used to calculate runoff peak discharge is the Rational Method
as follows: -
Q = CIA
360
Where,
Q = Peak Flow (m3/s) ;
C = Runoff Coefficient (Table 2.5, MSMA 2nd Edition);
I = Average Rainfall Intensity (mm/hr); and
A = Drainage Area (ha).
4.3 The formula use to calculate drainage structure capacity is Manning’s formula
as follows: -
Q = (1/n) x A x (R)2/3 x (S)1/2
Where,
Q = Flow, m3/s
n = Manning’s roughness coefficient
R = Hydraulic radius, m
S = Slope (m/m)

5.0 INTERNAL DRAINAGE DESIGN

Reference is made to Manual Saliran Mesra Alam Malaysia 2012, (MSMA 2nd.
Edition), Urban Stormwater Management Manual for Malaysia published by
Department of Irrigation and Drainage Malaysia.

The following main criteria are adopted in the design of Internal Drainage:

5.1 The minimum and maximum average flow velocity for open drain is 0.8 m/s
and 4.0 m/s respectively for lined channel drain.

5.2 The discharge for internal drain is designed for minor system based on
average recurrence interval (ARI) of 10 years and the major system is
checked to a 100-year ARI.

5.3 The total catchment shall be sub divided into sub catchments. Please refer to
the respective appendices for catchment layout plan and internal drainage
hydraulic design calculations.

5.4 Appendix A shows the proposed drainage system alignment on the Road and
Drainage Layout drawing. Appendix C shows the Catchment Layout Plan.
6.0 ON SITE DETENTION (OSD)

Reference is made to Manual Saliran Mesra Alam Malaysia, (MSMA 1st Edition),
Urban Stormwater Management Manual for wMalaysia published by Department of
Irrigation and Drainage Malaysia.

The following criteria are adopted in the design of the OSD systems.

6.1 The primary and secondary outlets are designed for an average recurrence
interval (ARI) of 10 years and 100-year ARI respectively.

6.2 Each catchment area shall be diverted to their respective OSD systems.

6.3 Appendix A shows the proposed drainage system alignment, including the
location of OSD systems, on the Road and Drainage Layout drawing.

6.4 OSD Design Criteria


Pre-Development Condition
Impervious Area : 0%
Pervious Area : 100 %
Post-Development Condition
Impervious Area : 80 %
Pervious Area : 20 %

6.5 Catchment areas for each catchment are shown graphically in Appendix C on
the Catchment Layout Plan.

OSD Site Storage Volume calculation for each catchment is calculated in the
OSD design calculations in Appendix D.

Provided detention volume (drain volume) is calculated in the internal


drainage hydraulic design calculations in Appendix E.

Summary of OSD design:

Catchment Catchment 100% OSD Provided Drain OSD Volume


Area Volume Storage Volume Provided
A1* 57447 m2* 974 m3 470 m3 48%
A2 25011 m2 410 m3 118 m3 29%
B 43308 m2 739 m3 199 m3 27%
C 64309 m2* 1054 m3 333 m3 32%
Total 190075 m2* 3177 m3 1120 m3 35%
* Catchment includes future development area
APPENDIX A

Drawings
3
.35
.52
RL
52.265

5
.47
52.388

.52
RL
52.388

97
2.5
52.51

.5
RL
52.51

S E R E M B A N

2
2.7
52.632

.5
RL

55
2.7
52.632 52.667

.5
RL
52.667

1
2.82
2.842
52.733
52.754

RL.5

RL.52.886
SEREMBAN

RL.5
52.799

RL.52.964
52.733
52.754
SELANGOR 52.799
52.877

TL
TL

TL
TL TL

TL

TL

TL

PT876 PT1107 PT870 TL


30
6
LI LI KTA
17 °08 5.00 ek
.3 '1 28.97 ek
57 0"
18.42

9.108°06'50
"
PT877 LOT LAMA
10.63 ek
SB
343.36

253
LI
PT 871-PT 875 17773 TL
'40"
4

3 5.51 ek
23.96

45
18°27

9.

PT881
TL
157°

LI 30.48m

TL
156.6

PA 44541 & 44543

3.16 ek
26'20

PT
10 "

TNB

PT878 PT882 PT899


3.75
39

LI LI
2

17

2.54 ek
S 1290.144
5.58 ek (31298)
77

PT883 B 16709.113
(6.179 Ha )
TL
LI
PT884 TL
5

PT885
LI
LI
2.50 ek
2.47 ek
S 1359.471 LOT 60878
B 16986.696
KTA
PT879
LI
2.48 ek

LI 13.3
13.30ek.
ek. PA 810925 SB
5.11 ek
20.12m

LI
S 1428.063
B 16919.489
10.27 ek
TL TL
INDUSTRI BERCAMPUR (31297)
(124.8 Ha)
PT887 PT886
4.40 ek LI
TL
343°09'00"

3.56 ek
44.954

PT880 PT888 TL
5.

LI
343°30'30"

'
LI
41

8.57 ek 99
30.000

LI
2.94 ek
PT889
27.933

ha

6.23 ek 6m

LI LI
FT

30.48m
10.01 ek
343°
32' 30"

4.00 ek
12

PERTANIAN
66

PT890
KP TL TL
(N

22'x75'
6

TNB
LI 82.856 ek
8)

PPU
5.99 ek 0.65 ek
PT
Stesen
IN

89
5
DU

Minyak
TL SB
ST

1.50ek
SB
RI
BE 0'x

LI Plot
(6
R K 132

ZO
N 5.97 ek Komersil
EM ')

PE
NA
1.50ek
BA

MP
AN LI
R

5.00 ek
-2

LI
342°

PT892 17m
TK
58'

5.00 ek TLK/TLL/TLB
00"

RIZAB PERKUBURAN
KL
T
201.185

5.02 ek 3.96 ek
9.22 ek

TNB PUSAT
PENJAJA
TL
3.05m 1.54 ac
SURAU
132'

0.65 ac
30.48m
LI 40.23m
KL
9.08 ek 1.15 ek

INDUSTRI BERCAMPUR
50m

TAKAHIRO SATO (Passport No. TR7184904)


Chief Project Management Officer
LI
9.28 ek
LI
LI 9.81 ek
12.99 ek

17754
PLOT
KOMERSIAL
2
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
(6.12 ek)
TNB
RUMAH PAM &
Cul-de-sac
TANGKI SEDUT
132' (40m)
0.63 ek
KAWASAN PLOT
KOMERSIAL

BANGUN
LAPANG

PMU
11.23 ek

Tangki Air
1
(6.42 ek)
Tel : 03-7890 6958 Fax : 03-7981 7010
80577.8 m²
19.89 ek
0.87 ek

AN
342°
07'
30"

ENGINE
201.152

TL
258°
56'
30"
201.190
273° 58' 00" 261.750

PT896
KL ERING
341°43'30"

273° 57' 00" 221.351

PLOT
273° 56' 30"

KOMERSIAL
200.939
46.136

TT
260° 05'
00" 149.720
PT898
1464 m²
115.512

0.36 ek 3 (PT 17779)


288°

(7.37 ek)
57'

30"

40.233

82.396

289°
00'
00"
182.593

289°00'00"

41.370
335°
29'
00"
162.170

P.A.D BANGUN
AN
TL
(MAKMA PENTADBIRAN
L R&D D
AN QC3)
KAFE FFL 55.45

&
GALERI P.A.D
FFL 55.30

FFL 55.45

PELAWA
T
TL

600.0000

LORRY

LORRY

FORKLIF
TL

T RAM
P
BERI
LALUAN

DOTTE
D LINE
SHOWI
NG CANOP
OV

Y ABOVE
ERHEAD
IDGE ABO BR
VE
TL
P.A.D.
PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:

FIRE LOBB
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL

LORRY

Y
PARK

LIFT
TL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
² PEMBAN 2-TINGKAT

LIFT
GUNAN
AKAN 3) 1BLOKBANGUNANENGINEERING1-TINGKAT

DOTTE
D LINE
DATANG 4) 2BLOKBANGUNANKILANG3-TINGKAT

SHOWI
NG CANOP
Y ABOVE
295 1
54.
348
SB (P.A.D) 5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT
54. TL
388
54.
6) 1UNITKAWASANREKREASIBERBUMBUNG
54.
295 7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
348
54.
54.
388
8) 1UNITTEMPATLETAKKERETABERBUMBUNG
TL 9) 1UNITKEBUKSAMPAH
TL
10) 1UNITRUMAHPAMSPRINKLER
TL
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
54.4
63 54.4
63
TL M2+M3

13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
55.6
23 55.6
23
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
56.3
41
56.3
41
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
57.7
33
57.7
33

18) 3UNITPONDOKPENGAWAL
58.5
54

FINISHE
58.5
54

D DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
LP GOODS
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
60.7
67 (FG)
60.7
67

WAREHO PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
USE BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
62.98
DARULKHUSUS.
62.9

UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
8

64.7
52 64.7 CONTAIN
ER PAR
52 K

65.1
92 65.1
92
FORKLIF
T
RAMP

67.4
05 67.4
05

69.4
9

69.4
9

TA 1
TA 2
TA 3
TL

TL

TL TL

TL

TL TL

TL SB
SB

TAKAHIRO SATO (Passport No. TR7184904)


Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010

BANGUN
AN
TL ENGINE
ERING PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
2-TINGKAT
3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
P.A.D 5) 1BLOKGUDANG"FINISHEDGOODS"1
6) 1UNITKAWASANREKREASIBERBUMBUNG
1
2-TINGKAT

7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
TL 8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
TL 13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
TL
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
18) 3UNITPONDOKPENGAWAL
DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
TL BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
DARULKHUSUS.
UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
600.0000

BERI
LALUAN

TL
< >

>
<
TAKAHIRO SATO (Passport No. TR7184904)
Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010

PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
2-TINGKAT
3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
1
5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT
6) 1UNITKAWASANREKREASIBERBUMBUNG
7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
18) 3UNITPONDOKPENGAWAL
DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
DARULKHUSUS.
UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
< >

TAKAHIRO SATO (Passport No. TR7184904)


Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010

PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
2-TINGKAT
3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
1
5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT
6) 1UNITKAWASANREKREASIBERBUMBUNG
7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
18) 3UNITPONDOKPENGAWAL
DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
DARULKHUSUS.
UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
TAKAHIRO SATO (Passport No. TR7184904)
Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010

PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
2-TINGKAT
3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
1
5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT
6) 1UNITKAWASANREKREASIBERBUMBUNG
7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
18) 3UNITPONDOKPENGAWAL
DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
DARULKHUSUS.
UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
TAKAHIRO SATO (Passport No. TR7184904)
Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010

PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
2-TINGKAT
3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
1
5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT
6) 1UNITKAWASANREKREASIBERBUMBUNG
7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
18) 3UNITPONDOKPENGAWAL
DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
DARULKHUSUS.
UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
TAKAHIRO SATO (Passport No. TR7184904)
Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010

PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
2-TINGKAT
3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
1
5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT
6) 1UNITKAWASANREKREASIBERBUMBUNG
7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
18) 3UNITPONDOKPENGAWAL
DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
DARULKHUSUS.
UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
TAKAHIRO SATO (Passport No. TR7184904)
Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010

PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
2-TINGKAT
3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
1
5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT
6) 1UNITKAWASANREKREASIBERBUMBUNG
7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
18) 3UNITPONDOKPENGAWAL
DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
DARULKHUSUS.
UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
BERI
LALUAN

TAKAHIRO SATO (Passport No. TR7184904)


Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010

PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
2-TINGKAT
3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
1
5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT
6) 1UNITKAWASANREKREASIBERBUMBUNG
7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
18) 3UNITPONDOKPENGAWAL
DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
DARULKHUSUS.
UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
TAKAHIRO SATO (Passport No. TR7184904)
Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010

PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
2-TINGKAT
3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
1
5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT
6) 1UNITKAWASANREKREASIBERBUMBUNG
7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
18) 3UNITPONDOKPENGAWAL
DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
DARULKHUSUS.
UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
TAKAHIRO SATO (Passport No. TR7184904)
Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010

PERMOHONANPELANKERJATANAH,JALANDAN
PERPARITANBAGI
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL
R&DDANQC3-TINGKAT
2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
2-TINGKAT
3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
1
5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT
6) 1UNITKAWASANREKREASIBERBUMBUNG
7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
16) 1UNITSTESENSUISUTAMA(SSU)
17) 1UNITPEJABATPENGAWAL
18) 3UNITPONDOKPENGAWAL
DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
DARULKHUSUS.
UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
17
847

17849

4720

4716

17
47

18
47
4719
4705 15067

06
47
4669

4670

4671
4707

4672

4674
PERTANIAN

4673
SPS PT859
PT866
17 5893
83
1
R
E T
ZA
B PT897
44-C SSU P
A
R
PT867 IT
54-A

RIZAB PERKUBURAN ISLAM


17830
PT860 5892
5894 5895

17829

PERTANIAN
17827 PT861

LI
PT1144
17828

SPS
PT862
17826
TA
LI
A
N
Sa P
l ur E
an N
G
Pa H
ip A
N
Pe TA
lb R
ag A
ai N
LI Ba E
ha LE
PT1145 n K
TR
Pe
tro IK
liu
m

17816
KOLAM TAKUNGAN
KTA 31294

PT863

LI

PT1148

17
81
4
31295
17
LI 81
5
PT1146

TAKAHIRO SATO (Passport No. TR7184904)


Chief Project Management Officer
TETUAN AJINOMOTO (MALAYSIA) BERHAD (No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama, Petaling, 58200 Kuala Lumpur
Tel : 03-7890 6958 Fax : 03-7981 7010
LI
PT1149
LI

17783
PT1147

PT865
PPU
PT868
PT869
PERTANIAN
LI KL TA
PT1202
LI
A
PT1150 N
P
E
N
G
H
TNB A
PT1187
N
TA
R
A
N
m E
18 LE
T K
RI

17
TR
PA

7 82
IK
B
ZA
RE

LI
PT1151

13
2'
KTA

PT870

m
18
T
RI PT876
PA
Z AB
RE

17
7
99'

73
PT877
66'
PT1107

TA
Sa

LI
PT881

AN
lu
ra
PERMOHONANPELANKERJATANAH,JALANDAN

PE
Pa

NG
ip
TNB

Pe

HA
PT899
PT882
PERPARITANBAGI

lb

NT
ag
ai

AR
Ba
PT878

AN
CADANGANPEMBANGUNANKILANGYANGMENGANDUNGI:

ha
n

EL
Pe

EK
tr
1) 1BLOKBANGUNANPENTADBIRANBESERTAMAKMAL

oli

TR
um

IK
PT883

PT884 R&DDANQC3-TINGKAT
PT885
KTA 2) 1BLOKBANGUNANKANTINBESERTA"VISITORGALLERY"
PT891
2-TINGKAT
PT879
PT1152 3) 1BLOKBANGUNANENGINEERING1-TINGKAT
4) 2BLOKBANGUNANKILANG3-TINGKAT
1
INDUSTRI BERCAMPUR
PT886
5) 1BLOKGUDANG"FINISHEDGOODS"1 2-TINGKAT

17
76
6) 1UNITKAWASANREKREASIBERBUMBUNG

3
PT887

7) 1UNITTEMPATLETAKMOTORSIKALBERBUMBUNG
'
66
PT880 PT888
PT1153

99
' 8) 1UNITTEMPATLETAKKERETABERBUMBUNG
9) 1UNITKEBUKSAMPAH
PT889

PT1154
10) 1UNITRUMAHPAMSPRINKLER
11) 1UNIT"SCRAPYARD"BERBUMBUNG
12) 1UNIT"QUARANTINEYARD"BERBUMBUNG
RL.50.165

RL.50.219

TNB 4

13) 1UNITRUMAHPAMBESERTA3UNITTANGKIAIR
RL.50.277

PT1186 RL.50
.49
3
RL.50.333

PL.50.25
RL.50.388

PT1155
RL.50.444
5m

RL.50

7
RL.50.54
14) 1UNITSTESENMETER“"NATURALGAS"”(NG)
.651

PL.50.50
PT
89 ROAD
5 2
3600.0000

15) 1UNIT"WASTEWATERTREATMENTPLANT"(WWTP)
PT1156
PL.51.00
16) 1UNITSTESENSUISUTAMA(SSU)
PT
12
00
17) 1UNITPEJABATPENGAWAL
7.0
18) 3UNITPONDOKPENGAWAL
RL.
51
.53
6.5

DIATASPT1402(DAHULUNYAPT1163,PT1164,PT1165,PT
RL.
51
.55
1166DANSEBAHAGIANTANAHKERAJAAN),KAWASAN
TAL

RL.

PERINDUSTRIANTAMANTEKNOLOGI2(TECHPARK2),
51
.58
IAN

PT11
99
TL

BANDARENSTEK,DAERAHSEREMBAN,NEGERISEMBILAN
TL
PEN
GHA

TL

DARULKHUSUS.
ROAD
NTA

REZ

PT1159
1

UNTUKTETUANAJINOMOTO(MALAYSIA)BERHAD
RAN

AB

TL

PL.53.00 TL

SB
PAR
ELE

TL
IT 1
KTR

SB
8m
IK

PT1160

PL.53.75

TL

TL
.73
RL.52

RL.52
.82 31301

.91
RL.52
20.266

Sa
lur
an
PMU

Pa
PT894

ip
Pe
lba
342°

ga
i B
07'
50"

ah
201.15

an
8

Pe
tro
liu
m
.856
38
273° 56'
" 124.733 20" 221.327
258°55'50 273° 57' 10" 261.728
50"
201.171
PT896

36 '40"
55'

SEREMBAN
258°

31.8 3°09
273°

21
273° 11952.4 m² 55' 50"
56' 20" 2.954 ek 328.453
221.329
341°43

KE
36.029

70
20" 151.0
'50

260° 04' 93° 55' 50"


273°
"

55' 50" 200.923


45.853
KL 31300

00"

09'4 06
03

0"
18°57'
20" 149.7

30.827
T

213° 16.5
260° 04'

288°57
PT898

'40"
24454

'00"
24455

198°54
76.295
24456

24457

1487.9 m²

26.710
24458
APPENDIX B

Rainfall Intensity Calculations


_____________________________________________________________________
Company Name : Keshmen
Job Description :
Designed by : Keshmen
Date and Time : Tuesday, February 12, 2019 4:43:09 PM
File Path : \\kcsb\Dropbox\Engineer\2019\Ajinomoto\500 Calculations\530 Infra Model\532 PondCAD
Model\Ajinomoto 20190212\Ajinomoto 20190212.doc
_____________________________________________________________________

Calculation of 0.2500 hours Duration Rainfalls




Design Criteria:
Storm duration, d = 0.2500 hours
ARI, T = 10 years
Location = Negeri Sembilan - Setor JPS Sikamat
Design Manual = MSMA 2nd Edition

Solution:
1. From Table 2.B1, the fitting constant are:
λ = 52.823
K = 0.167
θ = 0.159
ƞ = 0.811

2. From empirical Equation 2.2,


i = λTK/(d + θ)ƞ

where,
i = Average rainfall intensity (mm/hr)
T = Average recurrence interval - ARI(0.5<=T<=12 month and 2 <= T <= 100 year)
d = Storm duration (hours), 0.0833 <= d <= 72
λ, K, θ, ƞ = Fitting constants dependent on the raingauge location (Table 2.B1)

i = λTK/(d + θ)ƞ
i = 52.823 x 100.167/(0.2500 + 0.159)0.811
= 160.22 mm/hr
_____________________________________________________________________
Company Name : Keshmen
Job Description :
Designed by : Keshmen
Date and Time : Tuesday, February 12, 2019 4:43:48 PM
File Path : \\kcsb\Dropbox\Engineer\2019\Ajinomoto\500 Calculations\530 Infra Model\532 PondCAD
Model\Ajinomoto 20190212\Ajinomoto 20190212.doc
_____________________________________________________________________

Calculation of 0.2500 hours Duration Rainfalls




Design Criteria:
Storm duration, d = 0.2500 hours
ARI, T = 100 years
Location = Negeri Sembilan - Setor JPS Sikamat
Design Manual = MSMA 2nd Edition

Solution:
1. From Table 2.B1, the fitting constant are:
λ = 52.823
K = 0.167
θ = 0.159
ƞ = 0.811

2. From empirical Equation 2.2,


i = λTK/(d + θ)ƞ

where,
i = Average rainfall intensity (mm/hr)
T = Average recurrence interval - ARI(0.5<=T<=12 month and 2 <= T <= 100 year)
d = Storm duration (hours), 0.0833 <= d <= 72
λ, K, θ, ƞ = Fitting constants dependent on the raingauge location (Table 2.B1)

i = λTK/(d + θ)ƞ
i = 52.823 x 1000.167/(0.2500 + 0.159)0.811
= 235.35 mm/hr
APPENDIX C

Catchment Layout Plan


APPENDIX D

OSD Calculations
_____________________________________________________________________

Company Name : Keshmen Consult


Job Description :
Designed by : Project Engineer
Date and Time : 04 December 2019 00:13:21
_____________________________________________________________________

Solution:

Qp for pre development

a) Determine the time concentration for natural catchment, tc


tc = Fc × L / (A1/10 × S1/5)
= 92.5 × 0.44000 / (5.71/10 × 51/5)
= 24.79 min

Hence, tc = 25 min

b) Determine the average rainfall intensity, RIt


ln RIt = a + b(ln t) + c(ln t)² + d(ln t)³
ln 10I25 = 6.1240 + -0.2191(ln 25) + (-0.0820)(ln 25)² + (0.0039)(ln 25)³
= 4.699

tc < 30 min, Pd = P30 - FD(P60 - P30)

ln 10I30 = 6.1240 + -0.2191(ln 30) + (-0.0820)(ln 30)² + (0.0039)(ln 30)³


= 4.584
10I = 97.87 mm/hr
30

ln 10I60 = 6.1240 + -0.2191(ln 60) + (-0.0820)(ln 60)² + (0.0039)(ln 60)³


= 4.120
10I = 61.56 mm/hr
60

PA = (IA × tA) / 60
P30 = (I30 × t30) / 60
= (97.87 × 30) / 60
= 48.94 mm
P60 = (I60 × t60) / 60
= (61.56 × 60) / 60
= 61.56 mm

1/6
FD = 0.24

Pd = P30 - FD(P60 - P30)


= 48.94 - 0.24(61.56 - 48.94)
= 45.97 mm

I = Pd / d
= 45.97 / (25/60)
= 110.33 mm/hr

c) Determine runoff coefficient, C


C = Refer to design chart 14.3,
= 0.64 (Bare Loam, Suburban Residential with Gardens - Type 5)

C = Refer to design chart 14.4,


= 0.79 (Medium Soil, Open Crop - Type B)

d) Determine discharge, Qp (Pre Development)


Qp = C × yIt × A / 360
= [(0.000 × 0.64) + (5.700 × 0.79)] × 110.327 / 360
= 1.380 m³/s

Qa for post development

a) Determine the overland sheet flow travel time, to


to = (107 × n × L1/3) / S0.2
= (107 × 0.011 × 20.001/3) / 1.000.2
= 3.19 min

b) Determine the drain time, td


td = L/V
= 660.00 / (1 × 60)
= 13.75 min

c) Determine time of concentration


tc = to + td
= 16.94 min

d) Determine the average rainfall intensity, RIt


tc < 30 min, Pd = P30 - FD(P60 - P30)

ln 10I30 = 6.1240 + -0.2191(ln 30) + (-0.0820)(ln 30)² + (0.0039)(ln 30)³


= 4.584

2/6
10 I30 = 97.87 mm/hr

ln 10I60 = 6.1240 + -0.2191(ln 60) + (-0.0820)(ln 60)² + (0.0039)(ln 60)³


= 4.120
10I = 61.56 mm/hr
60

PA = (IA × tA) / 60
P30 = (I30 × t30) / 60
= (97.87 × 30) / 60
= 48.94 mm
P60 = (I60 × t60) / 60
= (61.56 × 60) / 60
= 61.56 mm

Take tc as nearest = 15 min, to table 13.3, ²P24h, FD = 0.80

Pd = P30 - FD(P60 - P30)


= 48.94 - 0.80(61.56 - 48.94)
= 38.84 mm

I = Pd / d
= 38.84 / (15/60)
= 155.35 mm/hr

e) Determine runoff coefficient, C


C = Refer to design chart 14.3,
= 0.90 (Impervious Roofs, Concrete; City Areas Fulls and Solidly
Built Up - Type 1)

C = Refer to design chart 14.3,


= 0.73 (Bare Loam, Suburban Residential with Gardens - Type 5)

f) Determine discharge, Qa (Post Development)


Qa = C × yIt × A / 360
= [(4.560 × 0.90) + (1.140 × 0.73)] × 155.350 / 360
= 2.130 m³/s

Hence, Qpost > Qpre, hydraulic structure need to be proposed.

Impervious area Pervious area Total


Development status I (mm/hr) Q (m³/s) Q (l/s)
C A (ha) C A (ha)
C×A
Pre-development, Qp 110.33 0.64 0.000 0.79 5.700 4.50 1.380 1380.34
Post-development, Qa 155.35 0.90 4.560 0.73 1.140 4.93 2.130 2129.52

3/6
From the study of overland flow time including travel time on roof and gutter,
minimum time of concentration adopted:
tcs = 10 minutes

tc = 15 minutes

Permissible Site Discharge (PSD)

For above-ground storage,

a = (4Qa/tc) (0.333tcQp/Qa + 0.75tc + 0.25tcs)


= (4 × 2.130/15) (0.333 × 15 × 1.380 / 2.130 + 0.75 × 15 + 0.25 × 10)
= 9.647

b = 4QaQp
= 4 × 2.130 × 1.380
= 11.758

PSD = [a - √(a² - 4b)] / 2


= [9.647 - √(9.647² - 4 × 11.758)] / 2
= 1.431 m³/s

Site Storage Required (SSR)

For above-ground storage,

c = 0.875 PSD (1 - 0.459(PSD / Qd))


d = 0.214 (PSD² / Qd)
Required SSR,

SSR = 0.06td (Qd - c - d)

I Impervious area Pervious area


td (min) ∑CA Qd (l/s) PSD (l/s) c d SSR (m³)
(mm/hr) C A (ha) C A (ha)
1036.938
5 272.17 0.90 4.56 0.83 1.14 5.0535 3820.51 1431.14 114.725 800.65
4
10 196.67 0.90 4.56 0.79 1.14 5.0059 2734.77 1431.14 951.4571 160.272 973.82
15 155.35 0.90 4.56 0.73 1.14 4.9348 2129.52 1431.14 865.9667 205.824 951.96
20 129.01 0.90 4.56 0.68 1.14 4.8784 1748.23 1431.14 781.7178 250.715 858.95
25 110.33 0.90 4.56 0.64 1.14 4.8345 1481.58 1431.14 697.0352 295.837 733.07
30 97.87 0.90 4.56 0.61 1.14 4.7994 1304.81 1431.14 621.8145 335.917 624.73
35 88.57 0.90 4.56 0.58 1.14 4.7705 1173.66 1431.14 551.3698 373.453 522.56
40 81.10 0.90 4.56 0.56 1.14 4.7461 1069.20 1431.14 482.8930 409.940 423.28
45 74.95 0.90 4.56 0.54 1.14 4.7252 983.79 1431.14 416.0994 445.530 329.83
50 69.79 0.90 4.56 0.53 1.14 4.7063 912.33 1431.14 350.6073 480.426 243.89
55 65.38 0.90 4.56 0.51 1.14 4.6885 851.43 1431.14 286.1179 514.788 166.73

4/6
60 61.56 0.90 4.56 0.50 1.14 4.6714 798.78 1431.14 222.4406 548.718 99.45
Max capacity SSR = 973.82

Note: * indicates the default value of I determined by program has been changed by
user.

From the table, a maximum of SSR for 973.82 m³ occurs at a time of 10 minutes.

Primary Outlet

Primary outlet discharge should not exceed the lesser of pre-development Qp and PSD
flow.

Qp = 1380.34 l/s
PSD = 1431.14 l/s

Provide 4 nos. 400 mm diameter orifice:


Ao = No. of Orifice π × (D/2)2
= 4 × π × (0.400/2)2
= 0.502655 m2

Ho = Depth - Diameter/2 - H
Ho = 1.20 - 0.400/2 - 0.000
Ho = 1.000 m

Q = CdAo(2gHo)0.5
=0.62 × 0.502655(2 × 9.81 × 1)0.5
=1.38042 m3/s
=1380.42 1/s

Secondary Outlet

For ARI = 100 years and tc = 15 minutes.

ln 100I30 = 7.0782 + -0.4277(ln 30) + (-0.0731)(ln 30)² + (0.0051)(ln 30)³


= 4.979
100I = 145.26 mm/hr
30

ln 100I60 = 7.0782 + -0.4277(ln 60) + (-0.0731)(ln 60)² + (0.0051)(ln 60)³


= 4.452
100I = 85.77 mm/hr
60

PA = (IA × tA) / 60

5/6
P30 = (I30 × t30) / 60
= (145.26 × 30) / 60
= 72.63 mm
P60 = (I60 × t60) / 60
= (85.77 × 60) / 60
= 85.77 mm

From table 13.3, 2P24h, FD = 0.80

Pd = P30 - FD(P60 - P30)


= 72.63 - 0.80(85.77 - 72.63)
= 62.12 mm

I = Pd / d
= 62.12 / (15/60)
= 248.48 mm/hr

Using the Rational Method, the pre and post development flows are derived using the
equation:
Q = CIA

Impervious area Pervious area Sum


Development status I (mm/hr) Q (l/s)
C A (m²) C A (m²)
C×A
Post-development 248.48 0.900 45600.00 0.820 11400.00 50393.2 3478.23

Qoverflow = Q100 - Qprimary outlet


= 3478.23 - 1380.42
= 2097.81 l/s

Discharge over board crested weir


Qsecondary outlet capacity = CBCWBH1.5
= 1.7 × 6.00 × 0.5501.5
= 4.16049 m3/s
= 4160.49l/s

Discharge over board crested weir (4160.49 l/s) > Qoverflow(2097.81 l/s), OK

6/6
_____________________________________________________________________

Company Name : Keshmen Consult


Job Description :
Designed by : Project Engineer
Date and Time : 04 December 2019 00:09:39
_____________________________________________________________________

Solution:

Qp for pre development

a) Determine the time concentration for natural catchment, tc


tc = Fc × L / (A1/10 × S1/5)
= 92.5 × 0.44000 / (2.51/10 × 51/5)
= 26.92 min

Hence, tc = 25 min

b) Determine the average rainfall intensity, RIt


ln RIt = a + b(ln t) + c(ln t)² + d(ln t)³
ln 10I25 = 6.1240 + -0.2191(ln 25) + (-0.0820)(ln 25)² + (0.0039)(ln 25)³
= 4.699

tc < 30 min, Pd = P30 - FD(P60 - P30)

ln 10I30 = 6.1240 + -0.2191(ln 30) + (-0.0820)(ln 30)² + (0.0039)(ln 30)³


= 4.584
10I = 97.87 mm/hr
30

ln 10I60 = 6.1240 + -0.2191(ln 60) + (-0.0820)(ln 60)² + (0.0039)(ln 60)³


= 4.120
10I = 61.56 mm/hr
60

PA = (IA × tA) / 60
P30 = (I30 × t30) / 60
= (97.87 × 30) / 60
= 48.94 mm
P60 = (I60 × t60) / 60
= (61.56 × 60) / 60
= 61.56 mm

1/6
FD = 0.24

Pd = P30 - FD(P60 - P30)


= 48.94 - 0.24(61.56 - 48.94)
= 45.97 mm

I = Pd / d
= 45.97 / (25/60)
= 110.33 mm/hr

c) Determine runoff coefficient, C


C = Refer to design chart 14.3,
= 0.64 (Bare Loam, Suburban Residential with Gardens - Type 5)

C = Refer to design chart 14.4,


= 0.79 (Medium Soil, Open Crop - Type B)

d) Determine discharge, Qp (Pre Development)


Qp = C × yIt × A / 360
= [(0.000 × 0.64) + (2.500 × 0.79)] × 110.327 / 360
= 0.605 m³/s

Qa for post development

a) Determine the overland sheet flow travel time, to


to = (107 × n × L1/3) / S0.2
= (107 × 0.011 × 20.001/3) / 1.000.2
= 3.19 min

b) Determine the drain time, td


td = L/V
= 365.00 / (1 × 60)
= 7.60 min

c) Determine time of concentration


tc = to + td
= 10.80 min

d) Determine the average rainfall intensity, RIt


tc < 30 min, Pd = P30 - FD(P60 - P30)

ln 10I30 = 6.1240 + -0.2191(ln 30) + (-0.0820)(ln 30)² + (0.0039)(ln 30)³


= 4.584

2/6
10 I30 = 97.87 mm/hr

ln 10I60 = 6.1240 + -0.2191(ln 60) + (-0.0820)(ln 60)² + (0.0039)(ln 60)³


= 4.120
10I = 61.56 mm/hr
60

PA = (IA × tA) / 60
P30 = (I30 × t30) / 60
= (97.87 × 30) / 60
= 48.94 mm
P60 = (I60 × t60) / 60
= (61.56 × 60) / 60
= 61.56 mm

Take tc as nearest = 10 min, to table 13.3, ²P24h, FD = 1.28

Pd = P30 - FD(P60 - P30)


= 48.94 - 1.28(61.56 - 48.94)
= 32.78 mm

I = Pd / d
= 32.78 / (10/60)
= 196.67 mm/hr

e) Determine runoff coefficient, C


C = Refer to design chart 14.3,
= 0.90 (Impervious Roofs, Concrete; City Areas Fulls and Solidly
Built Up - Type 1)

C = Refer to design chart 14.3,


= 0.79 (Bare Loam, Suburban Residential with Gardens - Type 5)

f) Determine discharge, Qa (Post Development)


Qa = C × yIt × A / 360
= [(2.000 × 0.90) + (0.500 × 0.79)] × 196.672 / 360
= 1.199 m³/s

Hence, Qpost > Qpre, hydraulic structure need to be proposed.

Impervious area Pervious area Total


Development status I (mm/hr) Q (m³/s) Q (l/s)
C A (ha) C A (ha)
C×A
Pre-development, Qp 110.33 0.64 0.000 0.79 2.500 1.98 0.605 605.41
Post-development, Qa 196.67 0.90 2.000 0.79 0.500 2.20 1.199 1199.46

3/6
From the study of overland flow time including travel time on roof and gutter,
minimum time of concentration adopted:
tcs = 5 minutes

tc = 10 minutes

Permissible Site Discharge (PSD)

For above-ground storage,

a = (4Qa/tc) (0.333tcQp/Qa + 0.75tc + 0.25tcs)


= (4 × 1.199/10) (0.333 × 10 × 0.605 / 1.199 + 0.75 × 10 + 0.25 × 5)
= 5.005

b = 4QaQp
= 4 × 1.199 × 0.605
= 2.905

PSD = [a - √(a² - 4b)] / 2


= [5.005 - √(5.005² - 4 × 2.905)] / 2
= 0.670 m³/s

Site Storage Required (SSR)

For above-ground storage,

c = 0.875 PSD (1 - 0.459(PSD / Qd))


d = 0.214 (PSD² / Qd)
Required SSR,

SSR = 0.06td (Qd - c - d)

I Impervious area Pervious area


td (min) ∑CA Qd (l/s) PSD (l/s) c d SSR (m³)
(mm/hr) C A (ha) C A (ha)
5 272.17 0.90 2.00 0.83 0.50 2.2164 1675.66 670.15 478.7390 57.355 341.87
10 196.67 0.90 2.00 0.79 0.50 2.1956 1199.46 670.15 436.0042 80.125 410.00
15 155.35 0.90 2.00 0.73 0.50 2.1644 934.00 670.15 393.2647 102.898 394.05
20 129.01 0.90 2.00 0.68 0.50 2.1397 766.77 670.15 351.1459 125.341 348.34
25 110.33 0.90 2.00 0.64 0.50 2.1204 649.82 670.15 308.8104 147.899 289.66
30 97.87 0.90 2.00 0.61 0.50 2.1050 572.28 670.15 271.2051 167.936 239.66
35 88.57 0.90 2.00 0.58 0.50 2.0923 514.76 670.15 235.9875 186.701 193.36
40 81.10 0.90 2.00 0.56 0.50 2.0816 468.95 670.15 201.7537 204.942 149.40
45 74.95 0.90 2.00 0.54 0.50 2.0725 431.49 670.15 168.3614 222.735 109.05
50 69.79 0.90 2.00 0.53 0.50 2.0642 400.14 670.15 135.6198 240.181 73.03
55 65.38 0.90 2.00 0.51 0.50 2.0564 373.43 670.15 103.3794 257.359 41.90
60 61.56 0.90 2.00 0.50 0.50 2.0488 350.34 670.15 71.5450 274.322 16.12

4/6
Max capacity SSR = 410.00

Note: * indicates the default value of I determined by program has been changed by
user.

From the table, a maximum of SSR for 410.00 m³ occurs at a time of 10 minutes.

Primary Outlet

Primary outlet discharge should not exceed the lesser of pre-development Qp and PSD
flow.

Qp = 605.41 l/s
PSD = 670.15 l/s

Provide 2 nos. 250 mm diameter orifice:


Ao = No. of Orifice π × (D/2)2
= 2 × π × (0.250/2)2
= 0.098175 m2

Ho = Depth - Diameter/2 - H
Ho = 0.62 - 0.250/2 - 0.000
Ho = 0.495 m

Q = CdAo(2gHo)0.5
=0.62 × 0.098175(2 × 9.81 × 0.495)0.5
=0.18969 m3/s
=189.69 1/s

Secondary Outlet

For ARI = 100 years and tc = 10 minutes.

ln 100I30 = 7.0782 + -0.4277(ln 30) + (-0.0731)(ln 30)² + (0.0051)(ln 30)³


= 4.979
100I = 145.26 mm/hr
30

ln 100I60 = 7.0782 + -0.4277(ln 60) + (-0.0731)(ln 60)² + (0.0051)(ln 60)³


= 4.452
100I = 85.77 mm/hr
60

PA = (IA × tA) / 60
P30 = (I30 × t30) / 60

5/6
= (145.26 × 30) / 60
= 72.63 mm
P60 = (I60 × t60) / 60
= (85.77 × 60) / 60
= 85.77 mm

From table 13.3, 2P24h, FD = 1.28

Pd = P30 - FD(P60 - P30)


= 72.63 - 1.28(85.77 - 72.63)
= 55.81 mm

I = Pd / d
= 55.81 / (10/60)
= 334.88 mm/hr

Using the Rational Method, the pre and post development flows are derived using the
equation:
Q = CIA

Impervious area Pervious area Sum


Development status I (mm/hr) Q (l/s)
C A (m²) C A (m²)
C×A
Post-development 334.88 0.900 20000.00 0.866 5000.00 22329.1 2077.08

Qoverflow = Q100 - Qprimary outlet


= 2077.08 - 189.69
= 1887.40 l/s

Discharge over board crested weir


Qsecondary outlet capacity = CBCWBH1.5
= 1.7 × 3.00 × 0.5501.5
= 2.08024 m3/s
= 2080.24l/s

Discharge over board crested weir (2080.24 l/s) > Qoverflow(1887.40 l/s), OK

6/6
_____________________________________________________________________

Company Name : Keshmen Consult


Job Description :
Designed by : Project Engineer
Date and Time : 04 December 2019 00:02:05
_____________________________________________________________________

Solution:

Qp for pre development

a) Determine the time concentration for natural catchment, tc


tc = Fc × L / (A1/10 × S1/5)
= 92.5 × 0.44000 / (4.331/10 × 51/5)
= 25.48 min

Hence, tc = 25 min

b) Determine the average rainfall intensity, RIt


ln RIt = a + b(ln t) + c(ln t)² + d(ln t)³
ln 10I25 = 6.1240 + -0.2191(ln 25) + (-0.0820)(ln 25)² + (0.0039)(ln 25)³
= 4.699

tc < 30 min, Pd = P30 - FD(P60 - P30)

ln 10I30 = 6.1240 + -0.2191(ln 30) + (-0.0820)(ln 30)² + (0.0039)(ln 30)³


= 4.584
10I = 97.87 mm/hr
30

ln 10I60 = 6.1240 + -0.2191(ln 60) + (-0.0820)(ln 60)² + (0.0039)(ln 60)³


= 4.120
10I = 61.56 mm/hr
60

PA = (IA × tA) / 60
P30 = (I30 × t30) / 60
= (97.87 × 30) / 60
= 48.94 mm
P60 = (I60 × t60) / 60
= (61.56 × 60) / 60
= 61.56 mm

1/6
FD = 0.24

Pd = P30 - FD(P60 - P30)


= 48.94 - 0.24(61.56 - 48.94)
= 45.97 mm

I = Pd / d
= 45.97 / (25/60)
= 110.33 mm/hr

c) Determine runoff coefficient, C


C = Refer to design chart 14.3,
= 0.64 (Bare Loam, Suburban Residential with Gardens - Type 5)

C = Refer to design chart 14.4,


= 0.79 (Medium Soil, Open Crop - Type B)

d) Determine discharge, Qp (Pre Development)


Qp = C × yIt × A / 360
= [(0.000 × 0.64) + (4.330 × 0.79)] × 110.327 / 360
= 1.049 m³/s

Qa for post development

a) Determine the overland sheet flow travel time, to


to = (107 × n × L1/3) / S0.2
= (107 × 0.011 × 20.001/3) / 1.000.2
= 3.19 min

b) Determine the drain time, td


td = L/V
= 454.00 / (1 × 60)
= 9.46 min

c) Determine time of concentration


tc = to + td
= 12.65 min

d) Determine the average rainfall intensity, RIt


tc < 30 min, Pd = P30 - FD(P60 - P30)

ln 10I30 = 6.1240 + -0.2191(ln 30) + (-0.0820)(ln 30)² + (0.0039)(ln 30)³


= 4.584

2/6
10 I30 = 97.87 mm/hr

ln 10I60 = 6.1240 + -0.2191(ln 60) + (-0.0820)(ln 60)² + (0.0039)(ln 60)³


= 4.120
10I = 61.56 mm/hr
60

PA = (IA × tA) / 60
P30 = (I30 × t30) / 60
= (97.87 × 30) / 60
= 48.94 mm
P60 = (I60 × t60) / 60
= (61.56 × 60) / 60
= 61.56 mm

Take tc as nearest = 15 min, to table 13.3, ²P24h, FD = 0.80

Pd = P30 - FD(P60 - P30)


= 48.94 - 0.80(61.56 - 48.94)
= 38.84 mm

I = Pd / d
= 38.84 / (15/60)
= 155.35 mm/hr

e) Determine runoff coefficient, C


C = Refer to design chart 14.3,
= 0.90 (Impervious Roofs, Concrete; City Areas Fulls and Solidly
Built Up - Type 1)

C = Refer to design chart 14.3,


= 0.73 (Bare Loam, Suburban Residential with Gardens - Type 5)

f) Determine discharge, Qa (Post Development)


Qa = C × yIt × A / 360
= [(3.460 × 0.90) + (0.870 × 0.73)] × 155.350 / 360
= 1.617 m³/s

Hence, Qpost > Qpre, hydraulic structure need to be proposed.

Impervious area Pervious area Total


Development status I (mm/hr) Q (m³/s) Q (l/s)
C A (ha) C A (ha)
C×A
Pre-development, Qp 110.33 0.64 0.000 0.79 4.330 3.42 1.049 1048.57
Post-development, Qa 155.35 0.90 3.460 0.73 0.870 3.75 1.617 1617.39

3/6
From the study of overland flow time including travel time on roof and gutter,
minimum time of concentration adopted:
tcs = 10 minutes

tc = 15 minutes

Permissible Site Discharge (PSD)

For above-ground storage,

a = (4Qa/tc) (0.333tcQp/Qa + 0.75tc + 0.25tcs)


= (4 × 1.617/15) (0.333 × 15 × 1.049 / 1.617 + 0.75 × 15 + 0.25 × 10)
= 7.327

b = 4QaQp
= 4 × 1.617 × 1.049
= 6.784

PSD = [a - √(a² - 4b)] / 2


= [7.327 - √(7.327² - 4 × 6.784)] / 2
= 1.087 m³/s

Site Storage Required (SSR)

For above-ground storage,

c = 0.875 PSD (1 - 0.459(PSD / Qd))


d = 0.214 (PSD² / Qd)
Required SSR,

SSR = 0.06td (Qd - c - d)

I Impervious area Pervious area


td (min) ∑CA Qd (l/s) PSD (l/s) c d SSR (m³)
(mm/hr) C A (ha) C A (ha)
5 272.17 0.90 3.46 0.83 0.87 3.8386 2902.05 1087.15 787.6911 87.155 608.16
10 196.67 0.90 3.46 0.79 0.87 3.8023 2077.23 1087.15 722.7420 121.762 739.63
15 155.35 0.90 3.46 0.73 0.87 3.7480 1617.39 1087.15 657.7732 156.379 722.92
20 129.01 0.90 3.46 0.68 0.87 3.7050 1327.72 1087.15 593.7435 190.497 652.18
25 110.33 0.90 3.46 0.64 0.87 3.6715 1125.17 1087.15 529.3819 224.791 556.49
30 97.87 0.90 3.46 0.61 0.87 3.6447 990.88 1087.15 472.2086 255.255 474.15
35 88.57 0.90 3.46 0.58 0.87 3.6227 891.26 1087.15 418.6635 283.786 396.50
40 81.10 0.90 3.46 0.56 0.87 3.6040 811.91 1087.15 366.6132 311.520 321.07
45 74.95 0.90 3.46 0.54 0.87 3.5881 747.04 1087.15 315.8416 338.573 250.09
50 69.79 0.90 3.46 0.53 0.87 3.5737 692.76 1087.15 266.0582 365.099 184.82
55 65.38 0.90 3.46 0.51 0.87 3.5601 646.51 1087.15 217.0356 391.220 126.23
60 61.56 0.90 3.46 0.50 0.87 3.5470 606.52 1087.15 168.6286 417.013 75.16

4/6
Max capacity SSR = 739.63

Note: * indicates the default value of I determined by program has been changed by
user.

From the table, a maximum of SSR for 739.63 m³ occurs at a time of 10 minutes.

Primary Outlet

Primary outlet discharge should not exceed the lesser of pre-development Qp and PSD
flow.

Qp = 1048.57 l/s
PSD = 1087.15 l/s

Provide 3 nos. 300 mm diameter orifice:


Ao = No. of Orifice π × (D/2)2
= 3 × π × (0.300/2)2
= 0.212058 m2

Ho = Depth - Diameter/2 - H
Ho = 1.24 - 0.300/2 - 0.000
Ho = 1.090 m

Q = CdAo(2gHo)0.5
=0.62 × 0.212058(2 × 9.81 × 1.09)0.5
=0.60801 m3/s
=608.01 1/s

Secondary Outlet

For ARI = 100 years and tc = 15 minutes.

ln 100I30 = 7.0782 + -0.4277(ln 30) + (-0.0731)(ln 30)² + (0.0051)(ln 30)³


= 4.979
100I = 145.26 mm/hr
30

ln 100I60 = 7.0782 + -0.4277(ln 60) + (-0.0731)(ln 60)² + (0.0051)(ln 60)³


= 4.452
100I = 85.77 mm/hr
60

PA = (IA × tA) / 60
P30 = (I30 × t30) / 60

5/6
= (145.26 × 30) / 60
= 72.63 mm
P60 = (I60 × t60) / 60
= (85.77 × 60) / 60
= 85.77 mm

From table 13.3, 2P24h, FD = 0.80

Pd = P30 - FD(P60 - P30)


= 72.63 - 0.80(85.77 - 72.63)
= 62.12 mm

I = Pd / d
= 62.12 / (15/60)
= 248.48 mm/hr

Using the Rational Method, the pre and post development flows are derived using the
equation:
Q = CIA

Impervious area Pervious area Sum


Development status I (mm/hr) Q (l/s)
C A (m²) C A (m²)
C×A
Post-development 248.48 0.900 34600.00 0.820 8700.00 38277.9 2642.02

Qoverflow = Q100 - Qprimary outlet


= 2642.02 - 608.01
= 2034.01 l/s

Discharge over board crested weir


Qsecondary outlet capacity = CBCWBH1.5
= 1.7 × 3.50 × 0.5501.5
= 2.42695 m3/s
= 2426.95l/s

Discharge over board crested weir (2426.95 l/s) > Qoverflow(2034.01 l/s), OK

6/6
_____________________________________________________________________

Company Name : Keshmen Consult


Job Description :
Designed by : Project Engineer
Date and Time : 04 December 2019 00:21:19
_____________________________________________________________________

Solution:

Qp for pre development

a) Determine the time concentration for natural catchment, tc


tc = Fc × L / (A1/10 × S1/5)
= 92.5 × 0.44000 / (6.431/10 × 51/5)
= 24.49 min

Hence, tc = 25 min

b) Determine the average rainfall intensity, RIt


ln RIt = a + b(ln t) + c(ln t)² + d(ln t)³
ln 10I25 = 6.1240 + -0.2191(ln 25) + (-0.0820)(ln 25)² + (0.0039)(ln 25)³
= 4.699

tc < 30 min, Pd = P30 - FD(P60 - P30)

ln 10I30 = 6.1240 + -0.2191(ln 30) + (-0.0820)(ln 30)² + (0.0039)(ln 30)³


= 4.584
10I = 97.87 mm/hr
30

ln 10I60 = 6.1240 + -0.2191(ln 60) + (-0.0820)(ln 60)² + (0.0039)(ln 60)³


= 4.120
10I = 61.56 mm/hr
60

PA = (IA × tA) / 60
P30 = (I30 × t30) / 60
= (97.87 × 30) / 60
= 48.94 mm
P60 = (I60 × t60) / 60
= (61.56 × 60) / 60
= 61.56 mm

1/6
FD = 0.24

Pd = P30 - FD(P60 - P30)


= 48.94 - 0.24(61.56 - 48.94)
= 45.97 mm

I = Pd / d
= 45.97 / (25/60)
= 110.33 mm/hr

c) Determine runoff coefficient, C


C = Refer to design chart 14.3,
= 0.64 (Bare Loam, Suburban Residential with Gardens - Type 5)

C = Refer to design chart 14.4,


= 0.79 (Medium Soil, Open Crop - Type B)

d) Determine discharge, Qp (Pre Development)


Qp = C × yIt × A / 360
= [(0.000 × 0.64) + (6.430 × 0.79)] × 110.327 / 360
= 1.557 m³/s

Qa for post development

a) Determine the overland sheet flow travel time, to


to = (107 × n × L1/3) / S0.2
= (107 × 0.011 × 20.001/3) / 1.000.2
= 3.19 min

b) Determine the drain time, td


td = L/V
= 539.00 / (1 × 60)
= 7.49 min

c) Determine time of concentration


tc = to + td
= 10.68 min

d) Determine the average rainfall intensity, RIt


tc < 30 min, Pd = P30 - FD(P60 - P30)

ln 10I30 = 6.1240 + -0.2191(ln 30) + (-0.0820)(ln 30)² + (0.0039)(ln 30)³


= 4.584

2/6
10 I30 = 97.87 mm/hr

ln 10I60 = 6.1240 + -0.2191(ln 60) + (-0.0820)(ln 60)² + (0.0039)(ln 60)³


= 4.120
10I = 61.56 mm/hr
60

PA = (IA × tA) / 60
P30 = (I30 × t30) / 60
= (97.87 × 30) / 60
= 48.94 mm
P60 = (I60 × t60) / 60
= (61.56 × 60) / 60
= 61.56 mm

Take tc as nearest = 10 min, to table 13.3, ²P24h, FD = 1.28

Pd = P30 - FD(P60 - P30)


= 48.94 - 1.28(61.56 - 48.94)
= 32.78 mm

I = Pd / d
= 32.78 / (10/60)
= 196.67 mm/hr

e) Determine runoff coefficient, C


C = Refer to design chart 14.3,
= 0.90 (Impervious Roofs, Concrete; City Areas Fulls and Solidly
Built Up - Type 1)

C = Refer to design chart 14.3,


= 0.79 (Bare Loam, Suburban Residential with Gardens - Type 5)

f) Determine discharge, Qa (Post Development)


Qa = C × yIt × A / 360
= [(5.140 × 0.90) + (1.290 × 0.79)] × 196.672 / 360
= 3.085 m³/s

Hence, Qpost > Qpre, hydraulic structure need to be proposed.

Impervious area Pervious area Total


Development status I (mm/hr) Q (m³/s) Q (l/s)
C A (ha) C A (ha)
C×A
Pre-development, Qp 110.33 0.64 0.000 0.79 6.430 5.08 1.557 1557.12
Post-development, Qa 196.67 0.90 5.140 0.79 1.290 5.65 3.085 3084.77

3/6
From the study of overland flow time including travel time on roof and gutter,
minimum time of concentration adopted:
tcs = 5 minutes

tc = 10 minutes

Permissible Site Discharge (PSD)

For above-ground storage,

a = (4Qa/tc) (0.333tcQp/Qa + 0.75tc + 0.25tcs)


= (4 × 3.085/10) (0.333 × 10 × 1.557 / 3.085 + 0.75 × 10 + 0.25 × 5)
= 12.871

b = 4QaQp
= 4 × 3.085 × 1.557
= 19.213

PSD = [a - √(a² - 4b)] / 2


= [12.871 - √(12.871² - 4 × 19.213)] / 2
= 1.724 m³/s

Site Storage Required (SSR)

For above-ground storage,

c = 0.875 PSD (1 - 0.459(PSD / Qd))


d = 0.214 (PSD² / Qd)
Required SSR,

SSR = 0.06td (Qd - c - d)

I Impervious area Pervious area


td (min) ∑CA Qd (l/s) PSD (l/s) c d SSR (m³)
(mm/hr) C A (ha) C A (ha)
1231.301
5 272.17 0.90 5.14 0.83 1.29 5.7004 4309.60 1723.62 147.522 879.23
0
1121.370
10 196.67 0.90 5.14 0.79 1.29 5.6465 3084.77 1723.62 206.097 1054.38
7
1011.414
15 155.35 0.90 5.14 0.73 1.29 5.5661 2401.95 1723.62 264.686 1013.27
3
20 129.01 0.90 5.14 0.68 1.29 5.5023 1971.81 1723.62 903.0494 322.426 895.60
25 110.33 0.90 5.14 0.64 1.29 5.4526 1671.01 1723.62 794.1242 380.465 744.63
30 97.87 0.90 5.14 0.61 1.29 5.4130 1471.60 1723.62 697.3661 432.022 615.98
35 88.57 0.90 5.14 0.58 1.29 5.3802 1323.66 1723.62 606.7493 480.305 496.88
40 81.10 0.90 5.14 0.56 1.29 5.3526 1205.83 1723.62 518.6629 527.241 383.82
45 74.95 0.90 5.14 0.54 1.29 5.3289 1109.49 1723.62 432.7407 573.023 280.05
50 69.79 0.90 5.14 0.53 1.29 5.3076 1028.88 1723.62 348.4916 617.914 187.43

4/6
55 65.38 0.90 5.14 0.51 1.29 5.2874 960.19 1723.62 265.5307 662.119 107.39
60 61.56 0.90 5.14 0.50 1.29 5.2680 900.81 1723.62 183.6126 705.768 41.14
Max capacity SSR = 1054.38

Note: * indicates the default value of I determined by program has been changed by
user.

From the table, a maximum of SSR for 1054.38 m³ occurs at a time of 10 minutes.

Primary Outlet

Primary outlet discharge should not exceed the lesser of pre-development Qp and PSD
flow.

Qp = 1557.12 l/s
PSD = 1723.62 l/s

Provide 3 nos. 300 mm diameter orifice:


Ao = No. of Orifice π × (D/2)2
= 3 × π × (0.300/2)2
= 0.212058 m2

Ho = Depth - Diameter/2 - H
Ho = 1.24 - 0.300/2 - 0.000
Ho = 1.090 m

Q = CdAo(2gHo)0.5
=0.62 × 0.212058(2 × 9.81 × 1.09)0.5
=0.60801 m3/s
=608.01 1/s

Secondary Outlet

For ARI = 100 years and tc = 10 minutes.

ln 100I30 = 7.0782 + -0.4277(ln 30) + (-0.0731)(ln 30)² + (0.0051)(ln 30)³


= 4.979
100I = 145.26 mm/hr
30

ln 100I60 = 7.0782 + -0.4277(ln 60) + (-0.0731)(ln 60)² + (0.0051)(ln 60)³


= 4.452
100I = 85.77 mm/hr
60

5/6
PA = (IA × tA) / 60
P30 = (I30 × t30) / 60
= (145.26 × 30) / 60
= 72.63 mm
P60 = (I60 × t60) / 60
= (85.77 × 60) / 60
= 85.77 mm

From table 13.3, 2P24h, FD = 1.28

Pd = P30 - FD(P60 - P30)


= 72.63 - 1.28(85.77 - 72.63)
= 55.81 mm

I = Pd / d
= 55.81 / (10/60)
= 334.88 mm/hr

Using the Rational Method, the pre and post development flows are derived using the
equation:
Q = CIA

Impervious area Pervious area Sum


Development status I (mm/hr) Q (l/s)
C A (m²) C A (m²)
C×A
Post-development 334.88 0.900 51400.00 0.866 12900.00 57429.0 5342.13

Qoverflow = Q100 - Qprimary outlet


= 5342.13 - 608.01
= 4734.13 l/s

Discharge over board crested weir


Qsecondary outlet capacity = CBCWBH1.5
= 1.7 × 7.00 × 0.5501.5
= 4.85390 m3/s
= 4853.90l/s

Discharge over board crested weir (4853.90 l/s) > Qoverflow(4734.13 l/s), OK

6/6
APPENDIX E

Internal Drainage Hydraulic Design Calculations


CALCULATION SHEET - APPENDIX 1

KESHMEN CONSULT SDN BHD CIVIL & STRUCTURAL CONSULTING ENGINEERS SHEET__1__ OF _1__
12A-3 Jalan PJS 11/28, Bandar Sunway, 46150 Petaling Jaya, Selangor Designed by Date
Tel: (03) 56323750, (03) 56341572 Fax: (03) 5634-0356 Kevin 03/12/2019
Ajinomoto R&D Construction 20191021 Checked by Job no.
Wong 1902
Design of Culverts and Open Drains - for internal road side drains DRAINS Version No: 3.01.03
This design is based on JPS Publication - Urban Stormwater Management Manual For Malaysia.
Coeff,n= 0.015 C = 0.9 i10 = 160 mm/hr

OTHER CUMM DRAIN PROPERTIES WET-


LOC CATCHMENT AREA DCHGE DCHGE DCHGE [Pipe: Input D] [Box: Input D and W] [Open: Input W] DRAIN DEPTH X-SECT TED HYD VEL VEL CAP CAP DRAIN REMARK
WIDTH LENGTH AREA Grad Length D W GL Initial IL Final IL Initial Final AREA PERIM RADIUS CHECK CHK TYPE
m m m2 m3/s m3/s m3/s 1 to m mm mm m m m mm mm m2 m m m/s m3/s
Det (m3)

A3a 1 8345.1 8345 0.334 0.334 400 150 900 55.15 54.70 54.33 450 825 0.405 1.80 0.225 1.23 O.K. 0.50 OK Open 0
A3 1 11127 11127 0.445 0.779 400 200 900 55.15 54.33 53.83 825 1325 0.742 2.55 0.291 1.46 O.K. 1.09 OK Open 58
A4 1 7416 7416 0.297 0.297 400 90 900 55.15 54.70 54.48 450 675 0.405 1.80 0.225 1.23 O.K. 0.50 OK Open 0
A5 1 7416 7416 0.297 0.593 400 42 900 55.15 54.48 54.37 675 780 0.607 2.25 0.270 1.39 O.K. 0.85 OK Open 0
A6 1 7487 7487 0.299 0.893 400 213 900 55.15 54.37 53.84 780 1312 0.702 2.46 0.285 1.44 O.K. 1.01 OK Open 57
A7a 1 5049.5 5049 0.202 0.202 250 130 600 55.00 54.70 54.18 300 820 0.180 1.20 0.150 1.19 O.K. 0.21 OK Open 0
A7 1 854.53 854.5 0.034 0.236 250 22 600 55.00 54.18 54.09 820 908 0.492 2.24 0.220 1.53 O.K. 0.76 OK Open 3
A8 1 9752 9752 0.390 2.298 250 321 900 55.15 53.83 52.54 1325 2609 1.193 3.55 0.336 2.04 O.K. 2.43 OK Open 352

Total (m3)
470

Catchmt
(ha)
57447

L
576
CALCULATION SHEET - APPENDIX 1

KESHMEN CONSULT SDN BHD CIVIL & STRUCTURAL CONSULTING ENGINEERS SHEET__1__ OF _1__
12A-3 Jalan PJS 11/28, Bandar Sunway, 46150 Petaling Jaya, Selangor Designed by Date
Tel: (03) 56323750, (03) 56341572 Fax: (03) 5634-0356 Kevin 03/12/2019
Ajinomoto R&D Construction 20191021 Checked by Job no.
Wong 1902
Design of Culverts and Open Drains - for internal road side drains DRAINS Version No: 3.01.03
This design is based on JPS Publication - Urban Stormwater Management Manual For Malaysia.
Coeff,n= 0.015 C = 0.9 i10 = 160 mm/hr

OTHER CUMM DRAIN PROPERTIES WET-


LOC CATCHMENT AREA DCHGE DCHGE DCHGE [Pipe: Input D] [Box: Input D and W] [Open: Input W] DRAIN DEPTH X-SECT TED HYD VEL VEL CAP CAP DRAIN REMARK
WIDTH LENGTH AREA Grad Length D W GL Initial IL Final IL Initial Final AREA PERIM RADIUS CHECK CHK TYPE
m m m2 m3/s m3/s m3/s 1 to m mm mm m m m mm mm m2 m m m/s m3/s
A9 1 2647.6 2648 0.106 0.106 250 80 600 55.00 54.70 54.080 300 620 0.180 1.20 0.150 1.19 O.K. 0.21 OK Open 0
A9a 1 6056.4 6056 0.242 0.348 250 183 600 55.00 54.38 53.65 620 1352 0.372 1.84 0.202 1.45 O.K. 0.54 OK Open 26
A12 1 3335 3335 0.133 0.133 250 60 600 55.00 54.70 54.46 300 540 0.180 1.20 0.150 1.19 O.K. 0.21 OK Open 0
A12a 1 4089 4089 0.164 0.297 250 164 600 55.00 54.46 53.80 540 1196 0.324 1.68 0.193 1.41 O.K. 0.46 OK Open 12
A12b 0 0.000 0.645 250 30 600 55.00 53.65 53.53 1352 1472 0.811 3.30 0.246 1.65 O.K. 1.34 OK Open 12
A10 1 2164 2164 0.087 0.087 250 100 600 55.00 54.70 54.30 300 700 0.180 1.20 0.150 1.19 O.K. 0.21 OK Open 0
A11 1 2275 2275 0.091 0.091 250 48 600 55.15 54.70 54.51 450 642 0.270 1.50 0.180 1.34 O.K. 0.36 OK Open 0
cvA1 0 0.000 0.091 100 9 600 55.15 54.15 54.06 1000 1090 0.283 1.88 0.150 1.88 O.K. 0.53 OK Pipe 3
A11a 0 0.000 0.091 250 55 600 55.00 54.06 53.84 940 1160 0.564 2.48 0.227 1.57 O.K. 0.89 OK Open 10
cvA2 0 0.000 0.178 100 10 600 55.15 53.84 53.74 1310 1410 0.283 1.88 0.150 1.88 O.K. 0.53 OK Pipe 3
A13 1 4444 4444 0.178 1.000 250 110 600 55.15 53.42 52.98 1730 2170 1.038 4.06 0.256 1.70 O.K. 1.76 OK Open 79
Total (m3)
118

Catchment
25011

L
58
CALCULATION SHEET - APPENDIX 1

KESHMEN CONSULT SDN BHD CIVIL & STRUCTURAL CONSULTING ENGINEERS SHEET__1__ OF _1__
12A-3 Jalan PJS 11/28, Bandar Sunway, 46150 Petaling Jaya, Selangor Designed by Date
Tel: (03) 56323750, (03) 56341572 Fax: (03) 5634-0356 Kevin 03/12/2019
Ajinomoto R&D Construction 20191021 Checked by Job no.
Wong 1902
Design of Culverts and Open Drains - for internal road side drains DRAINS Version No: 3.01.03
This design is based on JPS Publication - Urban Stormwater Management Manual For Malaysia.
Coeff,n= 0.015 C = 0.9 i10 = 160 mm/hr

OTHER CUMM DRAIN PROPERTIES WET-


LOC CATCHMENT AREA DCHGE DCHGE DCHGE [Pipe: Input D] [Box: Input D and W] [Open: Input W] DRAIN DEPTH X-SECT TED HYD VEL VEL CAP CAP DRAIN REMARK
WIDTH LENGTH AREA Grad Length D W GL Initial IL Final IL Initial Final AREA PERIM RADIUS CHECK CHK TYPE
m m m2 m3/s m3/s m3/s 1 to m mm mm m m m mm mm m2 m m m/s m3/s
Det (m3)
B1 1 4702 4702 0.188 0 0.188 300 104 600 55.00 54.70 54.35 300 647 0.180 1.20 0.150 1.09 O.K. 0.20 OK Open 0
B2 1 5784 5784 0.231 0 0.419 300 185 600 55.00 54.35 53.74 647 1263 0.388 1.89 0.205 1.34 O.K. 0.52 OK Open 39
B3 1 3928 3928 0.157 0 0.157 200 109 600 55.00 54.70 54.16 300 845 0.180 1.20 0.150 1.33 O.K. 0.24 OK Open 0
B4 1 4675 4675 0.187 0 0.344 200 56 600 55.00 54.16 53.88 845 1125 0.507 2.29 0.221 1.73 O.K. 0.87 OK Open 13
cvB1 1 0 0 0.000 0 0.764 100 9 750 55.15 53.74 53.65 1413 1503 0.442 2.36 0.188 2.18 O.K. 0.96 OK Pipe 4
B5 1 5195 5195 0.208 0 0.208 200 128 600 55.00 54.60 53.96 400 1040 0.240 1.40 0.171 1.45 O.K. 0.35 OK Open 9
B5a 1 0 0 0.000 0 0.971 300 79 600 55.00 53.65 53.38 1353 1617 0.812 3.31 0.246 1.51 O.K. 1.23 OK Open 42
B6 1 7000 7000 0.280 0 0.280 200 150 600 55.00 54.60 53.85 400 1150 0.240 1.40 0.171 1.45 O.K. 0.35 OK Open 16
cvB2 1 0 0 0.000 0 1.251 100 13 900 55.00 53.38 53.25 1617 1747 0.636 2.83 0.225 2.47 O.K. 1.57 OK Pipe 8
B7 1 5023.5 5024 0.201 0 0.201 200 168 600 55.00 54.70 53.86 300 1140 0.180 1.20 0.150 1.33 O.K. 0.24 OK Open 12
D2 1 0 0 0.000 0 1.653 200 57 750 55.00 53.25 52.97 1747 2032 1.310 4.24 0.309 2.15 O.K. 2.82 OK Open 55
Total (m3)
199

Catchment
43308

L
484
AEP 1 7000 7000 0.280 0 0.280 200 128 600 55.15 54.25 53.61 900 1540 0.283 1.88 0.150 1.33 O.K. 0.38 OK Pipe ajek perim
CALCULATION SHEET - APPENDIX 1

KESHMEN CONSULT SDN BHD CIVIL & STRUCTURAL CONSULTING ENGINEERS SHEET__1__ OF _1__
12A-3 Jalan PJS 11/28, Bandar Sunway, 46150 Petaling Jaya, Selangor Designed by Date
Tel: (03) 56323750, (03) 56341572 Fax: (03) 5634-0356 Kevin 03/12/2019
Ajinomoto R&D Construction 20191021 Checked by Job no.
Wong 1902
Design of Culverts and Open Drains - for internal road side drains DRAINS Version No: 3.01.03
This design is based on JPS Publication - Urban Stormwater Management Manual For Malaysia.
Coeff,n= 0.015 C = 0.9 i10 = 160 mm/hr

OTHER CUMM DRAIN PROPERTIES WET-


LOC CATCHMENT AREA DCHGE DCHGE DCHGE [Pipe: Input D] [Box: Input D and W] [Open: Input W] DRAIN DEPTH X-SECT TED HYD VEL VEL CAP CAP DRAIN REMARK
WIDTH LENGTH AREA Grad Length D W GL Initial IL Final IL Initial Final AREA PERIM RADIUS CHECK CHK TYPE
m m m2 m3/s m3/s m3/s 1 to m mm mm m m m mm mm m2 m m m/s m3/s
Det (m3)
A1 1 5000 5000 0.200 0.200 400 280 900 55.00 54.75 54.05 250 950 0.225 1.40 0.161 0.99 O.K. 0.22 OK Open 0
A2 1 27124 27124 1.085 1.285 400 67 900 55.00 54.05 53.88 950 1118 0.855 2.80 0.305 1.51 O.K. 1.29 OK Open 26
P1a 0 160 0 0.000 0.000 400 160 450 55.15 54.80 54.40 350 750 0.158 1.15 0.137 0.89 O.K. 0.14 OK Open 0
P1b 0 275 0 0.000 0.000 400 215 450 55.15 54.40 53.86 750 1288 0.338 1.95 0.173 1.04 O.K. 0.35 OK Open 26
C4 1 6218 6218 0.249 0.249 200 107 600 55.00 54.50 53.96 500 1036 0.300 1.60 0.188 1.54 O.K. 0.46 OK Open 11
C8 0 0.000 0.249 300 98 600 55.00 53.86 53.54 1138 1464 0.683 2.88 0.237 1.48 O.K. 1.01 OK Open 41
C8b 0 0.000 0.479 300 33 600 55.00 53.54 53.43 1464 1574 0.879 3.53 0.249 1.52 O.K. 1.34 OK Open 18
cvC1 0 0.000 0.479 100 29 750 55.00 53.43 53.14 1574 1864 0.442 2.36 0.188 2.18 O.K. 0.96 OK Pipe 13
C1 1 3750 3750 0.150 0.150 250 105 600 55.25 54.25 53.83 1000 1420 0.283 1.88 0.150 1.19 O.K. 0.34 OK Pipe 30
C2 1 5733 5733 0.229 0.229 200 108 600 55.00 54.60 54.06 400 940 0.240 1.40 0.171 1.45 O.K. 0.35 OK Open 5
C2a 0 0.000 1.514 250 84 750 55.00 53.88 53.55 1118 1454 0.838 2.99 0.281 1.81 O.K. 1.52 OK Open 43
C3 1 7972 7972 0.319 0.469 300 97 600 55.00 53.83 53.51 1170 1493 0.702 2.94 0.239 1.48 O.K. 1.04 OK Open 43
cvC2 0 0.000 1.983 125 21 1050 55.15 53.51 53.34 1643 1811 0.866 3.30 0.263 2.44 O.K. 2.12 OK Pipe 18
C5 1 5761 5761 0.230 0.230 200 108 600 55.00 54.50 53.96 500 1040 0.300 1.60 0.188 1.54 O.K. 0.46 OK Open 11
C6 1 1132 1132 0.045 0.045 200 120 600 55.00 54.60 54.00 400 1000 0.240 1.40 0.171 1.45 O.K. 0.35 OK Open 7
C7 1 1619 1619 0.065 2.572 250 40 900 55.00 53.34 53.18 1661 1821 1.495 4.22 0.354 2.11 O.K. 3.16 OK Open 41
Total (m3)
333

Catchment
64309

L
342