St. No. Item Description Unit Rate Remark
A R.S.HIVARE
EXCAVATION WORK
1 EXCAVATION WORK IN HARD ROCK BY NEEDLE & SHIFTING EXCAVATED MATERIAL OUTSIDE PREMISES AROUND 30KM AND MORE CUM 301.75 CASCADA/
2 EXCAVATION WORK IN HARD ROCK BY BLASTING & SHIFTING EXCAVATED MATERIAL OUTSIDE PREMISES AROUND 30KM AND MORE CUM 328.00
HIRING OF MACHINARIES
1 FOR JCB WITH BUCKET HR 650.00
2 FOR JCB WITH BREAKER HR 1,050.00
3 FOR EX70 WITH BUCKET HR 700.00
4 FOR EX70 WITH BREAKER HR 1,200.00
CASCADA/
5 FOR POCKLEN EC-210 WITH BUCKET HR 1,300.00
6 FOR POCKLEN EC-210 WITH BREAKER HR 2,100.00
7 FOR TIPPER (2 BRASS) DAY 1,600.00
8 FOR TIPPER (3 BRASS) DAY 2,400.00
9 FOR TIPPER (5 BRASS) DAY 4,000.00
MURRUM FILLING WITH MATERIAL CUM 193.00
C CONSTROSYS
1 APPLYING CRYSTELLINE BASE W/P FOR RAFT SFT 26.02
2 APPLYING CRYSTELLINE BASE W/P FOR R/W SFT 26.02 CASCADA/
3 APPYING PROTECTION PLASTER COAT FOR R/W SFT 9.30
E DUROCRETE ENGG.SERV.
1 CORE CUTTING & TESTING WORK. EA 2,000.00
2 SOIL TESTING - FIELD TESTING BY DSAND REPLACEMENT METHOD NO. 308.00 CASCADA/
3
F DHARESHWAR EARTHMOVERS
1 CONCRETE PUMP(WITHOUT DIESEL) ON HIRE BASIS WITH OPERATOR & CONCRETE GANG. MONTH 165,000.00
CASCADA/
2 PROVIDING CONCRETE GANG ON MONTHLY BASIS. MONTH 62,000.00
3 FABRICATION OF SITE OFFICE NEAR SALSE OFFICE, METER ROOM SHED, DIESEL GENERATOR SHED SFT 14.00
GI SHEETS BARRICATION REMOVING. SFT 1.25
GI SHEETS BARRICATION FIXING SFT 3.00
CASCADA/42
GI SHEETS DOOR FIXING FOR LABOUR CAMP TOILET IN FABRICATION (WITH ANGLE FIXED AT EDGES - 35X35X5) NOS 200.00
GI SHEETS FIXING FOR ROOF AT LABOUR CAMP TOILET IN FABRICATION(ANGLE FIXED 35X35X5) SFT 3.00
MS CHANNEL FIXING INCLUDING CONCRETING. 20.00 NO. 100.00 2000 NOS 100.00
FABRICATION OF STOOL IN 32MM X 32MM X 2.5MM SQUARE PIPE OF SIZE 10.5" X 10.5" AT TOP AND 13.5" X 13.5" AT BOTTOM AND 24" 150.00
4 HEIGHT. NOS.
M S LADDER IN ISA 35X35X5 OF SIZE 11'-6" LONG AND 20" WIDE. NOS. 300.00
CONCRETE PIPE CHAIR( IN 16MM DIA STEEL OF SIZE - 3'-0" X 3'-O' X 3'-0" NOS. 220.00
FABRICATION OF MISC ITEMS ON KG BASIS.
a FABRICATION OF FRAME FOR SAFETY HORDING
b FABRICATION OF SAFETY SINAGES KG. 8.00
c FABRICATION OF FRAMES FOR FLEX. CASCADA/67
d FABRICATION OF STEEL STACKING STANDS.
MAKING SECURITY CABINE SHADES OF SIZE 4' X 4'. SFT 14.00
FABRICATION OF GATE INCLUDING SHEET FIXING. SFT 14.00
MAKING TEMPORARY PARTITION FOR TOILET ON SITE. SFT 3.00
MAKING TWO WHEELER PARKING SHED SFT 3.00
GROUTING OF VERTICAL POST FOR TWO WHEELER PARKING SHED NOS. 100.00
10 SUPPLY OF DEPARTMENTAL LABOUR - M/C. DAY 200.00
I @ PARYAVARAN SOLUTIONS
1 SEPTIC TANK CLEANING WORK TRIP 600.00 CASACAD/57
2 PROVIDING PORTABLE TOILET CABINS WITH CLEANING SERVICES FOR - INDIAN TOILETS NOS. 3,500.00 CASACAD/59
J NAVANATH DHOTARE
ITEM RATE WORK
1 RUBBLE SOLLING WORK SFT 3.00
2 MURRUM FILLING WORK CFT 1.27
3 PCC (M10) WORK. SFT 2.50
4 BBM WORK - 6'' SFT 8.00
5 BBM WORK - 9'' SFT 10.00
6 DOUBLE COAT PLASTER (EXTERNAL FACE) SFT 11.00
7 SINGLE COAT PLASTER (INTERNAL FACE) SFT 7.50
CASCADA/52
8 GHOTAI PLASTER WITH SMOOTH FINISHING. SFT 10.00
9 PAVINGBLOCK FIXING WIRK (TEMPORARY) SFT 6.00
10 MAKING RCC GUTTER (200 MM DIA) SFT 20.00
DEPT.LABOUR
1 M/C NO. 215.00
2 F/C NO. 135.00
3 PLASTER MASON NO. 310.00
4 BBM MASON NO. 420.00
K MONARCH SURVEYORS & ENGG.
1 CARRIED OUT BLOCK MARL]KING BY TOTAL STATION . L.S 8,000.00
2 COPPER PIPING SUPPLY & INSTALLATION RMT 276.00
3 ELE.CABLE SUPPLY & INSTALLATION RMT 57.00
CASCADA/19
4 DRAIN PIPING SUPPLY & INSTALLATION RMT 60.00
5 SPLIT AC UNIT SUPPLY & INSTALLATION,TESTING COMMISIONING. SET 650.00
6 SUPPORT BRACKET SUPPLY & INSTALLATION. SET 450.00
Q SANTOSH GAIKWAD
1 RCC WEIGH BRIDGE L.S 35,000.00
CASCADA/70&71
2 RCC RAFT SFT 55.00 CASCADA/70&71
3 RCC R/W SFT 95.00
R PRALHAD KONDE
1 REBARING WORK
2 8 MM DIA. NO. 55.00
3 10 MM DIA. NO. 75.00
CASCADA/79
4 12 MM DIA. NO. 85.00
5 16 MM DIA. NO. 105.00
6 CORE CUTTING WORK
S MANSINGH RATHOD
DEPT.LABOUR
1 BBM MASON NO. 310.00
2 PLASTER MASON NO. 420.00
3 M/C NO. 215.00
CASCADA/69
4 F/C NO. 135.00
5 CARENTER - SHUTTERING NO. 310.00
6 FITTER - REINFORCEMENT NO. 275.00
7 HELPER- CARPENTER & SHUTTERING NO. 220.00
T SHREE SADGURU INFRA.
DEPT.LABOUR
WELDER NO. 334.66
CASCADA/73
FITTER NO. 334.66
HELPER NO. 213.40
U SAI ENTERPRISES.
PEST CONTROL WORK
CASCADA/76
1 PEST CONTROL WORK FOR BLDG. SITE OFFC,STORE,LBR CAMP. MONTH 16,000.00
V PARTH ELE.& ENTPS.
1 WALL LIGHT POINTS NO. 135.00
2 CEILLING LIGHT POINTS NO. 135.00
3 EXIT SWITHCH POINTS NO. 175.00
4 SENCER FOXING UNIT(SAMS) NO. 135.00
5 CCTV POINT (POWER SUPPLY + COMM. POINT) NO. 250.00 CASCADA/62
6 5A (S/S)HALF POINT NO. 65.00
7 UPS-6A SUPPLY POINT FOR ACCESS CARD READER NO. 200.00
8 5A PLUG POINT FOR HUB NO. 135.00
9 5A PLUG POINT FOR MIXER NO. 200.00
W RAJGAD TECHNO SERVICES
1 MUD PUMPP ON HIRE BASIS (10HP-02 SETS) CWITH CONTRO PANEL + 15 M LONG CABLE. DAY 330.00 CASCADA/63
X TAPAN PANDA
FIXING OF GI LINE -OPEN
FIXING 1/2'' DIA GI PIPE. RFT 12.00
FIXING 3/4'' DIA GI PIPE. RFT 12.00
FIXING 1'' DIA GI PIPE. RFT 16.00
FIXING 11/4'' DIA GI PIPE. RFT 16.00
FIXING GATE VALVE CASCADA/62
FIXING 1/2'' DIA GATE /BALLVALVE /NRV NO. 70.00
FIXING 3/4'' DIA GATE /BALLVALVE /NRV NO. 70.00
FIXING 1'' DIA GATE /BALLVALVE /NRV NO. 80.00
FIXING 1 1/4'' DIA GATE /BALLVALVE /NRV NO. 85.00
FIXING 1 1/2'' DIA GATE /BALLVALVE /NRV NO. 110.00
Y BHALEKAR SWAPNIL SADHU.
SITE T SITE LOCAL TRIP MONTH 20,000.00 CASCADA/43
MARCVEL CASCADA
SR.NO. VENDOR BLGD. DESCRIPTION SES DATE
1 LOKHANDE CONSTRUCTION B'BLDG. AFTER 2'ND SLAB- SCHEDULE 18.12.2012
2 LOKHANDE CONSTRUCTION C'BLDG. AFTER 2'ND SLAB- SCHEDULE 18.12.2012
3 LOKHANDE CONSTRUCTION B'DEV RCC work (with shuttering material & machines) of building. After 2'ND SLAB. 20.12.2012
4 LOKHANDE CONSTRUCTION B'BLDG. RCC Work of R/W pardi on item Rate basis.One side measurement Upto 2'ND SLAB 20.12.2012
5 LOKHANDE CONSTRUCTION B'DEV RCC Work of R/W pardi on item Rate basis.One side measurement Upto 2'ND SLAB 20.12.2012
6 A.S.LOKHANDE C'BLDG. RCC Work of R/W pardi on item Rate basis.One side measurement Upto 2'ND SLAB 20.12.2012
7 A.S.LOKHANDE C'BLDG. Stone Breaking work. 20.12.2012
8 A.S.LOKHANDE C'DEV Rcc Work (UGWT- Excluding Pump Room Water Capacity)- 23054.74 LTR 18.12.2012
9 A.S.LOKHANDE C'DEV Rcc Work (UGWT)- Pump Room Water Capacity - 168849 LTR 18.12.2012
10 A.S.LOKHANDE D'DEV RCC WORK (STP) 18.12.2012
11 A.S.LOKHANDE D'DEV RCC Work of R/W pardi on item Rate basis.One side measurement Upto 1'ST SLAB 19.12.2012
12 A.S.LOKHANDE D'DEV RCC Work of R/W pardi on item Rate basis.One side measurement Upto 2'ND SLAB 19.12.2012
13 A.S.LOKHANDE D'DEV RCC work (with shuttering material & machines) of building. After 2'ND SLAB.(DOUBLE HT.RATE DIFF.) 20.12.2012
14 A.S.LOKHANDE D'DEV Extra For RCC Raft / Graded Slab work After Plinth Completion. 20.12.2012
15 A.S.LOKHANDE D'DEV Extra For Raft/PCC After Murrum Filling Asso.Work For Bldg.@Plinth Lvl. 20.12.2012
16 V.A.LOKHANDE C,D&E PUMP OPERATOR & OPERATING GANG FOR MONTH OF NOV-12 FROM 01/11/12 TO 30/11/12. 20.12.2012
03.01.2013 307958.28
03.01.2013 490,784.69
03.01.2013 350,964.75
03.01.2013 360,815.00
03.01.2013 392,143.02
03.01.2013 160,335.36
03.01.2013 461,889.33
03.01.2013 68,000.00
17.01.2013 534,916.75
17.01.2013 95,070.61
17.01.2013 479,493.13