BASIC LABOUR RATES

MARVEL CASCADA
St. No. Item Description Unit Rate Remark
A R.S.HIVARE
EXCAVATION WORK
1 EXCAVATION WORK IN HARD ROCK BY NEEDLE & SHIFTING EXCAVATED MATERIAL OUTSIDE PREMISES AROUND 30KM AND MORE CUM 301.75 CASCADA/
2 EXCAVATION WORK IN HARD ROCK BY BLASTING & SHIFTING EXCAVATED MATERIAL OUTSIDE PREMISES AROUND 30KM AND MORE CUM 328.00
HIRING OF MACHINARIES
1 FOR JCB WITH BUCKET HR 650.00
2 FOR JCB WITH BREAKER HR 1,050.00
3 FOR EX70 WITH BUCKET HR 700.00
4 FOR EX70 WITH BREAKER HR 1,200.00
CASCADA/
5 FOR POCKLEN EC-210 WITH BUCKET HR 1,300.00
6 FOR POCKLEN EC-210 WITH BREAKER HR 2,100.00
7 FOR TIPPER (2 BRASS) DAY 1,600.00
8 FOR TIPPER (3 BRASS) DAY 2,400.00
9 FOR TIPPER (5 BRASS) DAY 4,000.00
MURRUM FILLING WITH MATERIAL CUM 193.00

B A.S.LOKHANDE , LOKHANDE CONSTRUCTION & V.A.LOKHANDE


WITH MATERIAL LABOUR RATE
1 RCC FOR RAFT SFT 87.50
2 RCC FOR R/W SFT 95.00
CASCADA/
3 RCC FOR SLAB SFT 175.00
4 RCC FOR STP &UGWT. LTR. 3.00
5 RCC FOR UPPER PART RAFT & PCC SFT 43.75
LABOUR RATE
1 PROVIDING CONCRETE GANG FOR CONCRETING MONTH 68,000.00
2 DRY RUBBLR SOLLING SFT 3.00
3 MURRUM FILLING CFT 1.28
4 PCC LAYING SFT 2.50
5 RCC WORK INCLUDING STEEL CUTTING,LAYING SHUTTERING ,DESHUTTERING &CONCRETING WITH PROPER CURRING SFT 60.00
CASCADA/
6 BBM WORK-6'' SFT 8.00
7 BBM WORK-9' SFT 10.00
8 BBM WORK-18'' SFT 16.00
9 DOUBLE COAT SAND FACE EXTERNAL PLASTER SFT 11.00
10 SINGLE COAT SAND FACE INTERNAL PLASTER SFT 7.50
11 GHOTAI PLASTER WITH SMOOTH FINISHING

C CONSTROSYS
1 APPLYING CRYSTELLINE BASE W/P FOR RAFT SFT 26.02
2 APPLYING CRYSTELLINE BASE W/P FOR R/W SFT 26.02 CASCADA/
3 APPYING PROTECTION PLASTER COAT FOR R/W SFT 9.30

D SONA ELECTRICALS & ENGG.


LT LINESHIFTING WORK ON LABOUR BASIS.
1 REMOVAL OF TL CABLE
a 3.5C X 70 SQ.MM CABLE RMT 16.50
b 3.5C X50 SQ.MM CABLE RMT 16.50
c 3.5C X 35 SQ.MM CABLE RMT 16.50
d 4C X 16 SQ.MM CABLE RMT 9.90
2 REMOVAL OF TL CABLE TERMINATION
a 3.5C X 70 SQ.MM CABLE NO. 27.50
b 3.5C X50 SQ.MM CABLE NO. 27.50
c 3.5C X 35 SQ.MM CABLE NO. 27.50
d 4C X 16 SQ.MM CABLE NO. 19.25
3 REMOVAL OF CT METER 100/5A WITH BOX & MCCB 50 AMPS
a REMOVAL OFLT 4 WAY FEEDER PILLER NO. 750.00
b REMOVAL OF 63/100 AMP. BUSBAR BOX NO. 137.00
c REMOVAL OF 100 AMP. CHANGEOVER SWITCH NO. 137.00
4 INSTALLATION OF G.I. EARTHING STRIP 25X5 MM RMT. 16.50
a INSTALLATION OF G.I. EARTHING 8 SWG TAR RMT.
b INSTALLATION OF 63/100 AMP. BUSBAR BOX
CASCADA/90
5 REMOVAL OF TL CABLE & OTHER
a 3.5C X 95 SQ.MM CABLE NO. 38.50
b 3.5C X 70 SQ.MM CABLE NO. 33.00
c 3.5C X 50 SQ.MM CABLE NO. 33.00
d 3.5C X 35 SQ.MM CABLE NO. 33.00
e 4C X 16 SQ.MM CABLE ALU/CU. NO. 19.80
6 LT 4 WAY FEEDER PILLAR NO. 1,500.00
7 CT METER 100/5A WITH BOX & MCCB 100 AMPS NO. 330.00
8 REMOVAL OF TL CABLE TERMINATION
a 3.5C X 95 SQ.MM CABLE NO. 82.50
b 3.5C X 70 SQ.MM CABLE NO. 55.00
c 3.5C X 50 SQ.MM CABLE NO. 55.00
d 3.5C X 35 SQ.MM CABLE NO. 55.00
e 4C X 16 SQ.MM CABLE ALU/CU. NO. 38.50
9 INSTALL OF LIGHT FITTING
a TUBE LIGHT SET WITH CKOKE & TUBE 4' SET 66.00
b 1.5 SQMM X 3C COPPER FLEX CABLE. RMT 12.00

E DUROCRETE ENGG.SERV.
1 CORE CUTTING & TESTING WORK. EA 2,000.00
2 SOIL TESTING - FIELD TESTING BY DSAND REPLACEMENT METHOD NO. 308.00 CASCADA/
3
F DHARESHWAR EARTHMOVERS
1 CONCRETE PUMP(WITHOUT DIESEL) ON HIRE BASIS WITH OPERATOR & CONCRETE GANG. MONTH 165,000.00
CASCADA/
2 PROVIDING CONCRETE GANG ON MONTHLY BASIS. MONTH 62,000.00

G VILAS PANDIT LONARE


FABRICATION OF LBR. CAMP,OFFC SHED,STORE,QA/QC LAB&SAFETY OFFC.
1 FABRICATION FOR LABOUR CAMP SFT 14.00
2 FABRICATION FOR LABOUR CAMP SFT 14.00 CASCADA/36
3 FOR GREEN NET FIXING WORK WITH PROPERLY FIXING THE CORNER STRETCHED TIGHT TO THE LENGTH. SFT 1.50
4 FOR EMPORARY GREEN NET FIXING WORK SFT 1.00
LABOUR CHARGES FO FABRICATION WORK.
1 FOR GI SHEET FENCING WORK SFT 3.00
2 FOR PIT EXCV.& CONCRETING OF SHEET FENCING POLE. NOS 100.00
CASCADA/55
3 FABRICATION WORK &GI SHEET FIXING FOR MAIN GATE SFT 14.00
4 GI SHEET FENCING WORK. SFT 1.25
5 FOR EMPORARY GREEN NET FIXING WORK SFT 1.00
DEPT LABOUR SUPPLY.
1 WELDER NO. 345.00
CASCADA/72
2 FITTER NO. 345.00
3 HELPER NO. 220.00
H ASHIRWAD FABRICATION
FABRICATION OF STOOL IN 32MM X 32MM X 2.5MM SQUARE PIPE OF SIZE 10.5" X 10.5" AT TOP AND 13.5" X 13.5" AT BOTTOM AND 24"
1 HEIGHT NOS 150.00
M S LADDER IN ISA 35X35X5 OF SIZE 11'-6" LONG AND 20"WIDE. NOS 300.00
CONCRETE PIPE CHAIR( IN 16MM DIA STEEL OF SIZE - 3'-0" X 3'-O' X 3'-0" NOS 220.00
FABRICATION OF MISC ITEMS ON KG BASIS
FABRICATION OF FRAME FOR SAFETY HORDING
FABRICATION OF SAFETY SINAGES KG 8.00
FABRICATION OF FRAMES FOR FLEX. CASCADA/62
FABRICATION OF STEEL STACKING STANDS.
MAKING SECURITY CABINE SHADES OF SIZE 4' X 4' SFT 14.00
FABRICATION OF GATE INCLUDING SHEET FIXING SFT 14.00
MAKING TEMPORARY PARTITION FOR TOILET ON SITE SFT 3.00
MAKING TWO WHEELER PARKING SHED SFT 3.00
GROUTING OF VERTICAL POST FOR TWO WHEELER PARKING SHED NOS 100.00
SUPPLY OF DEPARTMENTAL LABOUR - M/C. DAY 200.00
FAB.ON KG BASIS KG 12.00

2 HORDING DISMENTLING - 05 NO LS 6,200.00


FABRICATING MS CLAMP NOS 10.00
MAKING SHADES FOR CEMENT GODOWN, CANTEEN,RO PLANT SFT 14.00
GI SHEET FENCING SFT 3.00
FIXING VERTICAL POST IN LINE & LEVEL INCLUDING EXCAVATION & CONCRETE NOS 100.00 CASCADA/74
FABRICATION OF STAND FOR SINTEX TANKS KG 8.00
SUPPLY OF WELDER NOS 345.00
SUPPLY OF FITTER NOS 345.00
SUPPLY OF HELPER NOS 220.00

3 FABRICATION OF SITE OFFICE NEAR SALSE OFFICE, METER ROOM SHED, DIESEL GENERATOR SHED SFT 14.00
GI SHEETS BARRICATION REMOVING. SFT 1.25
GI SHEETS BARRICATION FIXING SFT 3.00
CASCADA/42
GI SHEETS DOOR FIXING FOR LABOUR CAMP TOILET IN FABRICATION (WITH ANGLE FIXED AT EDGES - 35X35X5) NOS 200.00
GI SHEETS FIXING FOR ROOF AT LABOUR CAMP TOILET IN FABRICATION(ANGLE FIXED 35X35X5) SFT 3.00
MS CHANNEL FIXING INCLUDING CONCRETING. 20.00 NO. 100.00 2000 NOS 100.00

FABRICATION OF STOOL IN 32MM X 32MM X 2.5MM SQUARE PIPE OF SIZE 10.5" X 10.5" AT TOP AND 13.5" X 13.5" AT BOTTOM AND 24" 150.00
4 HEIGHT. NOS.
M S LADDER IN ISA 35X35X5 OF SIZE 11'-6" LONG AND 20" WIDE. NOS. 300.00
CONCRETE PIPE CHAIR( IN 16MM DIA STEEL OF SIZE - 3'-0" X 3'-O' X 3'-0" NOS. 220.00
FABRICATION OF MISC ITEMS ON KG BASIS.
a FABRICATION OF FRAME FOR SAFETY HORDING
b FABRICATION OF SAFETY SINAGES KG. 8.00
c FABRICATION OF FRAMES FOR FLEX. CASCADA/67
d FABRICATION OF STEEL STACKING STANDS.
MAKING SECURITY CABINE SHADES OF SIZE 4' X 4'. SFT 14.00
FABRICATION OF GATE INCLUDING SHEET FIXING. SFT 14.00
MAKING TEMPORARY PARTITION FOR TOILET ON SITE. SFT 3.00
MAKING TWO WHEELER PARKING SHED SFT 3.00
GROUTING OF VERTICAL POST FOR TWO WHEELER PARKING SHED NOS. 100.00
10 SUPPLY OF DEPARTMENTAL LABOUR - M/C. DAY 200.00

5 FAB.OB LABOUR CAMP. IN E'BLDG.UPPER BASEMENT SFT 7.00 CASCADA/78

I @ PARYAVARAN SOLUTIONS
1 SEPTIC TANK CLEANING WORK TRIP 600.00 CASACAD/57
2 PROVIDING PORTABLE TOILET CABINS WITH CLEANING SERVICES FOR - INDIAN TOILETS NOS. 3,500.00 CASACAD/59

J NAVANATH DHOTARE
ITEM RATE WORK
1 RUBBLE SOLLING WORK SFT 3.00
2 MURRUM FILLING WORK CFT 1.27
3 PCC (M10) WORK. SFT 2.50
4 BBM WORK - 6'' SFT 8.00
5 BBM WORK - 9'' SFT 10.00
6 DOUBLE COAT PLASTER (EXTERNAL FACE) SFT 11.00
7 SINGLE COAT PLASTER (INTERNAL FACE) SFT 7.50
CASCADA/52
8 GHOTAI PLASTER WITH SMOOTH FINISHING. SFT 10.00
9 PAVINGBLOCK FIXING WIRK (TEMPORARY) SFT 6.00
10 MAKING RCC GUTTER (200 MM DIA) SFT 20.00
DEPT.LABOUR
1 M/C NO. 215.00
2 F/C NO. 135.00
3 PLASTER MASON NO. 310.00
4 BBM MASON NO. 420.00
K MONARCH SURVEYORS & ENGG.
1 CARRIED OUT BLOCK MARL]KING BY TOTAL STATION . L.S 8,000.00
2 COPPER PIPING SUPPLY & INSTALLATION RMT 276.00
3 ELE.CABLE SUPPLY & INSTALLATION RMT 57.00
CASCADA/19
4 DRAIN PIPING SUPPLY & INSTALLATION RMT 60.00
5 SPLIT AC UNIT SUPPLY & INSTALLATION,TESTING COMMISIONING. SET 650.00
6 SUPPORT BRACKET SUPPLY & INSTALLATION. SET 450.00

L DHUMAL ELECTRICALS PVT.LTD.

M DILIP GOVIND GAIKWAD


BBM WORK
1 BRICK WORK & PLASTERING WORK + BONUS. SFT 55.00 CASCADA/93
TILLING WORK
1 L - Toilet Dado/Cladding in Ceramic / Vitrified Tile FT2 17.00
2 L - Toilet Dado/Cladding in Marble FT2 35.00
4 L - Toilet Dado/Cladding in Pearl Mosaic Tile FT2 30.00
6 L - Italian Marble Flooring Fixing FT2 35.00
7 L - Italian Marble Flooring Polishing FT2 16.00
8 L - Italian Marble Skirtting Fixing FT 15.00
9 L - Italian Marble Skirtting Polishing FT 8.50
10 L - Vitrified Tile Flooring Fixing FT2 15.00
11 L - Vitrified Tile Skirtting Fixing FT 10.00
12 L - Ceramic Tile Flooring FT2 9.00
13 L - Ceramic Tile Skirtting FT 8.00
14 L - Mosaic Tile Flooring FT2 7.00
15 L - Mosaic Tile Skirtting FT 7.00
16 L - Marble Flooring FT2 30.00
17 L - Marble Skirtting FT 16.00
18 L - Marble Cladding FT 35.00
19 L - Granite Flooring FT2 32.00
20 L - Granite Skirtting FT 16.00 CASCADA/
22 L - Marble Patti Fixing FT 25.00
23 L - Granite Patti Fixing FT 30.00
24 L - Par wall in Marble (Three Side Patti + Two side champer edge polish) FT 100.00
25 L - Par wall in Granite (Three Side Patti + Two side champer edge polish) FT 114.00
27 L- Granite / Marble Half round Moulding FT 12.00
28 L - Granite / Marble Full round Moulding FT 18.00
29 L - Granite / Marble Double Moulding FT 30.00
30 L - Granite / Marble Champer & Edge Polish FT 12.00
31 L- Granite / Marble Dado Polishing FT2 15.00
34 L - Staircase Trade Fixing in Vitrified Tile FT 20.00
35 L - Staircase Riser Fixing in Vitrified Tile FT 15.00
36 L - Staircase Trade Fixing in Italian Marble FT 20.00
37 L - Staircase Riser Fixing in Italian Marble FT 15.00
38 L - Parking Area Flooring FT2 8.00
39 L - Swimming Pool Tiling ( Pearl mosaic with adhesive by contractor) FT2 32.00
40 L - Granite/ Marble Fixing on Modular Kitchen Platform FT2 30.00
41 L - Under Counter Platform Work FT 350.00
N RAOSAHEB CHAVAN
1 BBM & PLASTER WORK SFT 57.00
CASCADA/
2 BONUS L.S. 3.00
O RAOSAHEB CHAVAN
1 BBM & PLASTER WORK SFT 57.00
CASCADA/75
2 BONUS L.S. 3.00
P SCAFFWORLD.
CONC. PUMP ON HIRE BASIS. WITH OPERATOR
1 HIRING OF CONC.PUMP INCLUDING MAINTAINANCE & OPERATOR MONTH 95,000.00 CASCADA/66
SHUTTERING MATERIAL ON HIRE BASIS
1 2M VERTICAL - 40NB NO. 42.00
2 LEDGER 1.2 M - 40NB NO. 22.00
3 LEDGER 1.8 M - 40NB NO. 28.00 CASCADA/81
4 U-JACK (600MM LONG) NO. 18.00
5 BASE JACK (600MM LONG) NO. 10.00

Q SANTOSH GAIKWAD
1 RCC WEIGH BRIDGE L.S 35,000.00
CASCADA/70&71
2 RCC RAFT SFT 55.00 CASCADA/70&71
3 RCC R/W SFT 95.00
R PRALHAD KONDE
1 REBARING WORK
2 8 MM DIA. NO. 55.00
3 10 MM DIA. NO. 75.00
CASCADA/79
4 12 MM DIA. NO. 85.00
5 16 MM DIA. NO. 105.00
6 CORE CUTTING WORK
S MANSINGH RATHOD
DEPT.LABOUR
1 BBM MASON NO. 310.00
2 PLASTER MASON NO. 420.00
3 M/C NO. 215.00
CASCADA/69
4 F/C NO. 135.00
5 CARENTER - SHUTTERING NO. 310.00
6 FITTER - REINFORCEMENT NO. 275.00
7 HELPER- CARPENTER & SHUTTERING NO. 220.00
T SHREE SADGURU INFRA.
DEPT.LABOUR
WELDER NO. 334.66
CASCADA/73
FITTER NO. 334.66
HELPER NO. 213.40
U SAI ENTERPRISES.
PEST CONTROL WORK
CASCADA/76
1 PEST CONTROL WORK FOR BLDG. SITE OFFC,STORE,LBR CAMP. MONTH 16,000.00
V PARTH ELE.& ENTPS.
1 WALL LIGHT POINTS NO. 135.00
2 CEILLING LIGHT POINTS NO. 135.00
3 EXIT SWITHCH POINTS NO. 175.00
4 SENCER FOXING UNIT(SAMS) NO. 135.00
5 CCTV POINT (POWER SUPPLY + COMM. POINT) NO. 250.00 CASCADA/62
6 5A (S/S)HALF POINT NO. 65.00
7 UPS-6A SUPPLY POINT FOR ACCESS CARD READER NO. 200.00
8 5A PLUG POINT FOR HUB NO. 135.00
9 5A PLUG POINT FOR MIXER NO. 200.00
W RAJGAD TECHNO SERVICES
1 MUD PUMPP ON HIRE BASIS (10HP-02 SETS) CWITH CONTRO PANEL + 15 M LONG CABLE. DAY 330.00 CASCADA/63
X TAPAN PANDA
FIXING OF GI LINE -OPEN
FIXING 1/2'' DIA GI PIPE. RFT 12.00
FIXING 3/4'' DIA GI PIPE. RFT 12.00
FIXING 1'' DIA GI PIPE. RFT 16.00
FIXING 11/4'' DIA GI PIPE. RFT 16.00
FIXING GATE VALVE CASCADA/62
FIXING 1/2'' DIA GATE /BALLVALVE /NRV NO. 70.00
FIXING 3/4'' DIA GATE /BALLVALVE /NRV NO. 70.00
FIXING 1'' DIA GATE /BALLVALVE /NRV NO. 80.00
FIXING 1 1/4'' DIA GATE /BALLVALVE /NRV NO. 85.00
FIXING 1 1/2'' DIA GATE /BALLVALVE /NRV NO. 110.00
Y BHALEKAR SWAPNIL SADHU.
SITE T SITE LOCAL TRIP MONTH 20,000.00 CASCADA/43
MARCVEL CASCADA
SR.NO. VENDOR BLGD. DESCRIPTION SES DATE
1 LOKHANDE CONSTRUCTION B'BLDG. AFTER 2'ND SLAB- SCHEDULE 18.12.2012
2 LOKHANDE CONSTRUCTION C'BLDG. AFTER 2'ND SLAB- SCHEDULE 18.12.2012
3 LOKHANDE CONSTRUCTION B'DEV RCC work (with shuttering material & machines) of building. After 2'ND SLAB. 20.12.2012
4 LOKHANDE CONSTRUCTION B'BLDG. RCC Work of R/W pardi on item Rate basis.One side measurement Upto 2'ND SLAB 20.12.2012
5 LOKHANDE CONSTRUCTION B'DEV RCC Work of R/W pardi on item Rate basis.One side measurement Upto 2'ND SLAB 20.12.2012
6 A.S.LOKHANDE C'BLDG. RCC Work of R/W pardi on item Rate basis.One side measurement Upto 2'ND SLAB 20.12.2012
7 A.S.LOKHANDE C'BLDG. Stone Breaking work. 20.12.2012
8 A.S.LOKHANDE C'DEV Rcc Work (UGWT- Excluding Pump Room Water Capacity)- 23054.74 LTR 18.12.2012
9 A.S.LOKHANDE C'DEV Rcc Work (UGWT)- Pump Room Water Capacity - 168849 LTR 18.12.2012
10 A.S.LOKHANDE D'DEV RCC WORK (STP) 18.12.2012
11 A.S.LOKHANDE D'DEV RCC Work of R/W pardi on item Rate basis.One side measurement Upto 1'ST SLAB 19.12.2012
12 A.S.LOKHANDE D'DEV RCC Work of R/W pardi on item Rate basis.One side measurement Upto 2'ND SLAB 19.12.2012
13 A.S.LOKHANDE D'DEV RCC work (with shuttering material & machines) of building. After 2'ND SLAB.(DOUBLE HT.RATE DIFF.) 20.12.2012
14 A.S.LOKHANDE D'DEV Extra For RCC Raft / Graded Slab work After Plinth Completion. 20.12.2012
15 A.S.LOKHANDE D'DEV Extra For Raft/PCC After Murrum Filling Asso.Work For Bldg.@Plinth Lvl. 20.12.2012
16 V.A.LOKHANDE C,D&E PUMP OPERATOR & OPERATING GANG FOR MONTH OF NOV-12 FROM 01/11/12 TO 30/11/12. 20.12.2012

1 LOKHANDE CONSTRUCTION B'BLDG. AFTER 2'ND SLAB- SCHEDULE 02.01.2013


2 LOKHANDE CONSTRUCTION A'BLDG AFTER 10'TH SLAB- SCHEDULE 02.01.2013
3 LOKHANDE CONSTRUCTION B'DEV RCC SLAB WORK AFTER 2'ND SLAB 03.01.2013
4 A.S.LOKHANDE C'DEV RCC SLAB WORK AFTER 2'ND SLAB 03.01.2013
5 A.S.LOKHANDE C'BLDG. SCHEDULE BILL (AFTER 2'ND SLAB) 02.01.2013
5 A.S.LOKHANDE C'BLDG. EXTRA FOR RAFT & PCC 03.01.2013
6 A.S.LOKHANDE C'DEV Rcc Work (UGWT- Excluding Pump Room Water Capacity)- 179217.90 LTR 02.01.2013
7 V.A.LOKHANDE C,D&E PUMP OPERATOR & OPERATING GANG FOR MONTH OF NOV-12 FROM 01/11/12 TO 30/11/12. 03.01.2013

1 LOKHANDE CONSTRUCTION A'BLDG AFTER 11'TH RCC SLAB 16.01.2013


2 LOKHANDE CONSTRUCTION B'BLDG UPPER PART RCC RAFT &PCC WORK 17.01.2013
3 A.S.LOKHANDE D'BLDG AFTER 03'RD RCC SLAB 15.01.2013
RCVEL CASCADA
BILL SUBM. DATE AMT.
20.12.2012 433,892.82
20.12.2012 372,766.22
20.12.2012 860,042.60
20.12.2012 65,178.03
20.12.2012 29,380.65
20.12.2012 32,850.50
20.12.2012 4,767.91
20.12.2012 71,301.39
20.12.2012 435,166.09
20.12.2012 105,701.87
20.12.2012 55,872.79
20.12.2012 50,587.52
20.12.2012 27,597.82
20.12.2012 21,684.00
20.12.2012 34,497.52
20.12.2012 68,000.00

03.01.2013 307958.28
03.01.2013 490,784.69
03.01.2013 350,964.75
03.01.2013 360,815.00
03.01.2013 392,143.02
03.01.2013 160,335.36
03.01.2013 461,889.33
03.01.2013 68,000.00

17.01.2013 534,916.75
17.01.2013 95,070.61
17.01.2013 479,493.13