S.

NO DESCRIPTION Unit Material Cost Labour Cost Formwork Cost Concrete Mixing Cost Total Cost

1 Excavation Cf 10 10

2 PCC in Foundation (4") Cf 153 36 189

3 Brick Work 18" (1:4) Cf 190 19 209

4 Brick Work 13.5" (1:4) Cf 188 25 213

5 Brick Work 9" (1:4) Cf 185 38 223

6 Brick Work 4.5" (1:4) Cf 183 75 258

7 Foundation 6" (3000 PSI) Cf 210 12 30 34 286