Chart showing Equivalent sizes of Foundation for OHE structures to suit various common Loadings for
different soils and site conditions

Type of Foundation
Direct Bending
Side Bending Side Gravity FDN on Dry BC Soil
FDN Code Load in Moment
Soil Pressure (Kg/m) Soil Pressure (Kg/m) Soil Pressure (Kg/m)
Kg.M in Kg.M
11000 21500 8000 11000 16500 11000
115 700 1500 B01 HB1 BG0 BG01 ANBC1 ANBC3
120 700 2000 B0 HB1 BG1 BG0 ANBC2 ANBC20
125 700 2500 B1 HB1 BG2 BG1 ANBC2 ANBC21
130 700 300 B2 HB1 BG3 BG2 ANBC4 ANBC22
135 700 3500 B3 HB2 BG5 BG3 ANBC4 ANBC23
140 700 4000 B4 HB3 BG6 BG4 ANBC5 ANBC24
147 700 4700 B5 HB4 BG7 BG6 ANBC6 ANBC26
154 700 5400 B6 HB5 BG9 BG6 ANBC7 ANBC27
161 700 6100 B7 HB6 BG9 BG7 ANBC8 ANBC28
168 700 6800 B8 HB6 BG10 BG9 ANBC9 ANBC29
173 700 7300 B9 HB7 BG11 BG9 ANBC9 ANBC30
178 700 7800 B10 HB7 BG12 BG10 ANBC10 ANBC31
185 700 8500 B10 HB7 BG13 BG11 ANBC10 ANBC32
193 700 9300 B11 HB8 BG14 BG12 ANBC11 ANBC32
199 700 10100 B11 HB9 SPL BG13 ANBC12 ANBC33
220 1600 2000 B2 HB1 BG1 BG0 ANBC2 ANBC20
225 1600 2500 B3 HB2 BG3 BG1 ANBC2 ANBC21
234 1600 3400 B4 HB3 BG6 BG3 ANBC4 ANBC23
240 1600 4000 B5 HB4 BG7 BG4 ANBC5 ANBC24
245 1600 4500 B6 HB5 BG8 BG5 ANBC5 ANBC25
250 1600 5000 B7 HB6 BG9 BG6 ANBC6 ANBC27
254 1600 5400 B7 HB6 BG9 BG6 ANBC7 ANBC27
260 1600 6000 B8 HB6 BG10 BG7 ANBC8 ANBC28
265 1600 6500 B9 HB8 BG11 BG9 ANBC8 ANBC29
270 1600 7000 B10 HB9 BG11 BG9 ANBC9 ANBC30
275 1600 7500 B10 HB9 BG12 BG10 ANBC9 ANBC31
325 3000 2500 B4 HB3 BG2 BG1 ANBC3 ANBC23
330 3000 3000 B5 HB4 BG6 BG3 ANBC3 ANBC23
340 3000 4000 B6 HB6 BG8 BG4 ANBC5 ANBC25
347 3000 4700 B7 HB6 BG9 BG6 ANBC6 ANBC27
355 3000 5500 B8 HB7 BG10 BG7 ANBC7 ANBC28
363 3000 6300 B9 HB8 BG11 BG8 ANBC8 ANBC30
374 3000 7400 B10 HB9 BG12 BG9 ANBC9 ANBC31
389 3000 8900 B12 HB9 SPL14 BG11 ANBC10 ANBC33
395 3000 9500 B12 HB10 SPL BG12 ANBC11 ANBC34
399 3000 10500 B13 HB11 SPL BG13 ANBC12 ANBC34

Drg. Ref. No.: ETI/C/0058/ Sh.1 & 3A (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 2 of 26

Volume Chart for Side Bearing Foundation in Normal soil


(Bearing Pressure - 11, 000 Kg/M2)

Foundatio Total Volume of Total Volume of


Dimensions in Mtrs.
n Ref. Concrete with normal Concrete with B W A
Muff of 0.020 cu.m. Muff of 0.080 cu.m.
A B H
B01 0.70 0.70 1.80 0.902 0.962
B0 0.70 0.90 1.80 1.154 1.214
B1 0.80 0.90 1.80 1.316 1.376
B2 0.80 0.90 1.90 1.388 1.448
B3 0.80 1.05 1.90 1.616 1.676
B4 0.80 1.20 1.90 1.844 1.904
B5 0.80 1.40 1.90 2.148 2.208
B6 0.80 1.60 1.90 2.452 2.512
B7 0.80 1.80 1.90 2.756 2.816
B8 0.80 2.00 1.90 3.060 3.120
B9 0.80 2.00 2.0 3.220 3.280
B10 0.80 2.10 2.10 3.548 3.608
B11 0.80 2.30 2.10 3.884 3.944
B12 0.80 2.50 2.10 4.220 4.280
B13 0.80 2.70 2.10 4.556 4.616

Drg. Ref. No.: ETI/C/0058/ Sh.1 Mod-D (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 3 of 26

Volume Chart for Side Bearing Foundation in Hard soil


(Bearing Pressure - 21, 500 Kg/M2)

Foundatio Total Volume of Total Volume of


Dimensions in Mtrs.
n Ref. Concrete with normal Concrete with B W A
Muff of 0.020 cu.m. Muff of 0.080 cu.m.
A B C H
HB1 0.70 0.70 0.60 1.50 0.745 0.805
HB2 0.70 0.80 0.60 1.50 0.848 0.908
HB3 0.70 0.80 0.60 1.60 0.904 0.964
HB4 0.70 0.90 0.60 1.60 1.015 1.075
HB5 0.70 1.00 0.60 1.60 1.125 1.185
HB6 0.70 1.20 0.60 1.60 1.346 1.406
HB7 0.70 1.40 0.60 1.60 1.567 1.627
HB8 0.70 1.60 0.60 1.60 1.788 1.848
HB9 0.70 1.60 0.60 1.70 1.900 1.960
HB10 0.70 1.70 0.60 1.70 2.018 2.078
HB11 0.70 1.90 0.60 1.70 2.253 2.313

Drg. Ref. No.: ETI/C/0058/ Sh.1 Mod-D (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 4 of 26

Volume Chart for Side Gravity Foundation

Dimensions in Mtrs. Total Volume of Total Volume of


Foundatio
Concrete with normal Concrete with B W A
n Ref.
A B C H Muff of 0.020 cu.m. Muff of 0.080 cu.m.

BG01 1.40 0.80 0.80 1.60 1.428 1.488


BG0 1.50 0.80 0.80 1.60 1.492 1.552
BG1 1.70 0.80 0.80 1.60 1.620 1.680
BG2 1.80 0.80 0.80 1.60 1.684 1.744
BG3 1.80 1.00 0.80 1.60 2.100 2.160
BG4 1.90 1.00 0.80 1.60 2.180 2.240
BG5 2.00 1.00 0.80 1.60 2.260 2.320
BG6 2.00 1.20 0.80 1.60 2.708 2.768
BG7 2.00 1.40 0.80 1.60 3.156 3.216
BG8 2.00 1.50 0.80 1.60 3.380 3.440
BG9 2.00 1.70 0.80 1.60 3.828 3.888
BG10 2.00 1.90 0.80 1.60 4.276 4.336
BG11 2.00 2.10 0.80 1.60 4.724 4.784
BG12 2.00 2.30 0.80 1.60 5.172 5.232
BG13 2.00 2.50 0.80 1.60 5.620 5.680
BG14 2.00 2.70 0.80 1.60 6.068 6.128

Drg. Ref. No.: ETI/OHE/C/0058/ Sh.1 Mod-D (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 5 of 26

Volume Chart for Foundation in Dry Black Cotton Soil (ANBC Type)

Total
Total Volume
Dimensions in Mtrs. Volume of
of Concrete
Foundatio Concrete
with B W A
n Ref. with normal
Muff of 0.080
Muff of
A1 A2 B1 B2 H2 H3 cu.m.
0.020 cu.m.

ANBC1 1.10 1.00 1.20 1.00 0.10 2.65 3.074 3.134


ANBC2 1.10 1.00 1.50 1.00 0.25 2.50 3.195 3.255
ANBC3 1.20 1.00 1.60 1.00 0.30 2.45 3.286 3.346
ANBC4 1.50 1.00 1.50 1.00 0.50 2.50 3.353 3.413
ANBC5 1.20 1.00 1.90 1.00 0.45 2.30 3.480 3.540
ANBC6 1.40 1.00 1.90 1.00 0.45 2.30 3.613 3.673
ANBC7 1.20 1.00 2.20 1.00 0.60 2.15 3.719 3.779
ANBC8 1.30 1.20 2.20 1.00 0.60 2.15 4.332 4.392
ANBC9 1.50 1.40 2.20 1.00 0.60 2.15 5.035 5.095
ANBC10 1.80 1.60 2.20 1.00 0.60 2.15 5.829 5.889
ANBC20 1.50 1.00 1.70 1.00 0.35 2.40 3.503 3.563
ANBC21 1.60 1.00 1.80 1.00 0.40 2.35 3.646 3.706
ANBC22 1.20 1.00 2.20 1.00 0.60 2.15 3.719 3.779
ANBC23 1.50 1.00 2.20 1.00 0.60 2.15 3.988 4.048
ANBC24 1.70 1.00 2.20 1.00 0.60 2.15 4.166 4.226
ANBC25 1.80 1.00 2.20 1.00 0.60 2.15 4.254 4.314
ANBC26 1.80 1.00 2.20 1.00 0.60 2.15 4.254 4.314
ANBC27 2.10 1.00 2.20 1.00 0.60 2.15 4.517 4.577
ANBC28 2.30 1.10 2.20 1.00 0.60 2.15 4.958 5.018
ANBC29 2.50 1.30 2.20 1.00 0.60 2.15 5.665 5.725
ANBC30 2.70 1.40 2.20 1.00 0.65 2.10 6.206 6.266
ANBC31 3.00 1.40 2.20 1.00 0.80 1.95 6.824 6.884

Drg. Ref. No.: ETI/C/0058/ Sh.3A (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 6 of 26

Volume Chart for Portal Foundation in in Normal Soil


2
(For Pure Gravity Foundation bearing Pressure 11, 000 Kg/M )

Dimensions in Mtrs. Total Volume of


Foundation Ref. Foundation including
Muff of 0.080 cu.m.
A B C H
P1 1.80 1.50 1.00 1.70 3.905
P2 1.80 1.70 1.00 1.70 4.211
P3 1.80 2.00 1.00 1.70 4.670
P4 1.80 2.20 1.00 1.70 4.976
P5 2.00 1.80 1.00 1.70 4.840
P6 2.00 2.00 1.00 1.70 5.180
P7 2.00 2.30 1.00 1.70 5.690
P8 2.00 2.40 1.00 1.70 5.860
P9 2.00 2.60 1.00 1.70 6.200
P10 2.00 3.00 1.00 1.70 6.880
P11 2.00 3.30 1.00 1.70 7.390
P12 2.00 3.60 1.00 1.70 7.900
P13 2.20 3.10 1.00 1.70 7.747
P14 2.20 3.40 1.00 1.70 8.308
P15 2.20 3.70 1.00 1.70 8.869
P16 2.20 3.80 1.00 1.70 9.056
P17 2.20 3.90 1.00 1.70 9.243
P18 2.20 4.10 1.00 1.70 9.617

Drg. Ref. No.: ETI/C/0058/68 (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 7 of 26

Volume Chart for Portal Foundation in in Dry Black Cotton Soil

Dimensions in Mtrs. Total Volume of


Foundatio
Foundation including
n Ref.
Muff of 0.080 cu.m.
A1 A2 B1 B2 H1 H2
PBC1 1.40 1.60 1.00 1.20 2.50 0.30 4.156
PBC2 1.50 1.70 1.00 1.20 2.50 0.30 4.442
PBC3 1.60 1.80 1.00 1.20 2.50 0.30 4.728
PBC4 1.70 1.90 1.00 1.20 2.50 0.30 5.014
PBC5 1.80 2.00 1.00 1.20 2.50 0.30 5.300
PBC6 1.80 2.00 1.10 1.30 2.50 0.30 5.810
PBC7 1.80 2.00 1.20 1.40 2.50 0.30 6.320
PBC8 1.80 2.00 1.40 1.60 2.50 0.30 7.340
PBC9 1.80 2.00 1.60 1.80 2.60 0.30 8.648
PBC10 1.80 2.00 1.70 1.90 2.70 0.30 9.482
PBC11 1.80 2.00 1.80 2.00 2.70 0.30 10.028
PBC12 1.90 2.10 1.80 2.00 2.70 0.30 10.574
PBC13 1.90 2.10 1.90 2.10 2.70 0.30 11.150
PBC14 2.00 2.20 1.90 2.10 2.70 0.30 11.726

Drg. Ref. No.: ETI/C/0063 (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 8 of 26

Volume Chart for Anchor Block Foundation in Black Cotton Soil

Allocation Chart for Anchor Block Foundation

Type of Dimensions in Mtrs. Volume in Max. Tension


Anchor in Anchored
cu.m. wire in Kg f.
Block
A1 A2 B1 B2 H1 H2

BCA-1 0.90 1.50 0.80 1.20 2.30 0.50 2.556 1400

BCA-2 1.30 1.90 0.80 1.15 2.40 0.50 3.589 2000

BCA-3 1.40 2.00 0.90 1.50 2.60 0.50 4.776 3000

Drg. Ref. No.: ETI/OHE/G/01403 Sh.3 (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 9 of 26

Volume Chart for Dwarf Mast Anchor Foundation


2
(Safe Bearing Capacity - 5, 500 Kg/M )

Type-1:-
These Foundation are suitable for Dwarf masts of all types of Platforms and other locations
Type-2:-
These Foundation are to be used only for Rail level platform which are likely to be raised

Total
Type of Dimensions in Mtrs. Volume
TYPE

Foundatio with Muff Remarks


n of 0.020
A1 A2 B H cu.m.
For Anchorage of Anticreep wire
DF-1 1.00 3.40 1.20 1.50 3.980 maximum Horizontal pull - 1300 Kg
TYPE-1

For Anchorage of Regulated OHE


DF-2 1.00 4.00 1.20 1.50 4.520 maximum Horizontal pull - 2000 Kg

For Anchorage of Unregulated OHE


DF-3 1.50 4.50 1.40 1.50 6.320 maximum Horizontal pull - 3000 Kg

For Anchorage of Anticreep wire


DF-4 1.50 3.80 1.20 1.50 3.944 maximum Horizontal pull - 1500 Kg
TYPE-2

For Anchorage of Regulated OHE


DF-5 2.00 4.40 1.20 1.50 4.736 maximum Horizontal pull - 2000 Kg

For Anchorage of Unregulated OHE


DF-6 2.30 4.60 1.60 1.50 6.752 maximum Horizontal pull - 3000 Kg

Drg. Ref. No.: ETI/C/0014/70 (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 10 of 26

Volume Chart for Dwarf Mast Foundation for Dry Black Cotton Soil
(Soil Pressure - 16, 500 Kg/M2)

Note :-
10 nos of Ø 6 mm rods 500 mm long to be kept vertically inside the concrete around the
core hole such that the reinforcement projects about 400 mm below the bottom of the
mast

Type of Maximum
Dimensions in Mtrs. Volume in Tension in Kg
Foundatio and
cu.m.
n Employment
A1 A2 B1 B2 H1 H2
1500 -
BC-RDF 1 1.50 2.10 0.90 1.50 2.30 0.50 4.344 RC/Feeder/A
C wire

2000 -
BC-RDF 2 1.70 2.30 0.90 1.50 2.40 0.50 5.044 Regulated
OHE

3000 -
BC-RDF 3 2.20 2.80 0.90 1.50 2.40 0.50 6.443 Unregulated
OHE

Drg. Ref. No.: CORE/ALD/OHE/SK/C/02 (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 11 of 26

Volume Chart for Anchor Block in Normal Soil

Total
Dimensions in Mtrs. Volume
Anchor
including Remarks
Block Muff of
A B H 0.012 cu.m.

A1 1.35 0.70 1.00 0.957 For Maximum Horizontal pull of - 800 Kg f.

A2 1.75 0.80 1.00 1.412 For Maximum Horizontal pull of - 1500 Kg f.

A3 1.80 1.00 1.00 1.812 For Maximum Horizontal pull of - 2000 Kg f.

A4 2.20 1.00 1.10 2.432 For Maximum Horizontal pull of - 3000 Kg f.

Drg. Ref. No.: ETI/OHE/G/01403/ Sh.1 (Reproduced)


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 12 of 26

Volume Chart for A.T. Foundation

Total
Dimensions in Mtrs. Volume of
Foundatio Concrete
with Normal
Remarks
n Ref.
Muff of
A B C H 0.020 cu.m.

Soil bearing pressure 11, 000 Kg/M2


AT-N1 1.20 1.30 0.80 1.60 2.036
(Normal)

Soil bearing pressure 8, 000 Kg/M2


AT-N2 1.30 1.40 0.80 1.60 2.308
(Loose)

Soil bearing pressure 5, 500 Kg/M2


AT-N3 1.60 1.80 0.80 1.60 3.348
(Loose)

Soil bearing pressure 21, 500 Kg/M2


AT-N4 1.20 1.30 0.80 1.60 2.036
(Hard)

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 13 of 26

Volume Chart for A.T. Foundation

Dimensions in Mtrs. Total


Foundatio
Volume in
n Ref. cu.m.
A1 A2 B1 B2 H1 H2 H3
AT BC-1 0.80 1.70 0.80 1.50 2.350 0.300 0.15 2.333

AT BC-2 0.80 1.50 0.80 1.10 2.450 0.200 0.15 2.036

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 14 of 26

Setting Distance for Anchor Block

Anchor Block setting distance 'L' (Mtrs)


Height of Guy rod fitting from top
Sl. No.
of Anchor block (H+S) in Metre Mast width up to 300 Mast width above 300
mm mm
1 7.56 to 7.30 7.35 7.50

2 7.30 to 7.00 7.65 7.80

3 7.00 to 6.70 7.90 8.05

4 6.70 to 6.40 8.15 8.30

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 15 of 26

Setting Distance for Anchor Block

Anchor Block setting distance 'L' (Mtrs)

Height of Guy rod fitting from top Mast width up to 300 Mast width above 300
Sl. No.
of Anchor block (H+S) in Metre mm mm

BCA-1 BCA-2/3 BCA-1 BCA-2/3

1 6.35 to 6.75 7.60 7.35 7.75 7.50

2 6.80 to 7.15 7.20 7.00 7.40 7.15

3 7.20 to 7.56 6.90 6.60 6.60 6.75

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 16 of 26

Setting Distance for Anchor Block

Height of Anchorage
Anchor Block setting distance 'L' (Mtrs)
from Foundation level
Sl. No.
to Guy rod attachment
8" x 6" RSJ or BFB Fabricated Mast or TTC Portals
on Dwarf mast (M) 'H'

1 5.75 to 6.25 4.80 4.90 5.05

2 6.30 to 6.80 4.40 4.50 4.60

3 6.85 to 7.35 3.90 4.00 4.05

Setting of Mast on Curved Tracks

Outside Curves:
R ≥ 875 m -2.50 m
R < 875 m -2.65 m

Inside Curves:
R ≥ 3500 m -2.90 m
3500 ≥ R > 2350 m -3.05 m
2350 ≥ R > 1150 m -3.25 m
R < 1150 m -3.30 m

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 17 of 26

Volume Chart for Pure Gravity Foundation

Foundatio Total Volume of Total Volume of


Dimensions in Mtrs.
n Ref. Concrete with normal Concrete with B W A
Muff of 0.020 cu.m. Muff of 0.080 cu.m.
MG A1 A2 B H
MG-0 0.80 1.80 0.90 1.50 1.775 1.835
MG-1 0.80 1.80 1.10 1.50 2.165 2.225
MG-2 0.80 2.00 1.10 1.50 2.330 2.390
MG-3 0.80 2.20 1.20 1.50 2.720 2.780
MG-4 0.80 2.20 1.30 1.50 2.945 3.005
MG-5 0.80 2.20 1.45 1.50 3.283 3.343
MG-6 0.80 2.20 1.70 1.50 3.845 3.905
MG-7 0.80 2.20 1.90 1.50 4.295 4.355
MG-8 0.80 2.20 2.20 1.50 4.970 5.030
MG-9 0.80 2.20 2.30 1.50 5.195 5.255
MG-10 0.80 2.20 2.50 1.50 5.645 5.705
MG-11 0.80 2.20 2.40 1.60 5.780 5.840
MG-12 0.80 2.20 2.60 1.60 6.260 6.320
MG-13 0.80 2.20 3.10 1.60 7.460 7.520
MG-14 0.80 2.20 3.40 1.60 8.180 8.240
MG-15 0.80 2.20 3.60 1.60 8.660 8.720
MG-16 0.80 2.20 3.80 1.60 9.140 9.200
MG-17 0.80 2.20 4.40 1.60 10.580 10.640

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 18 of 26

Chart showing Equivalent sizes of Pure Gravity Foundations for OHE structures to suit various
common Loadings for different soils and site conditions

Bending Type of Foundation


Direct
FDN Code Moment Soil Pressure 5500 Soil Pressure 8250 Soil Pressure 11000
Load in Kg
in Kg.M 2 2 2
Kg/m Kg/m Kg/m
120 700 2000 MG-2 MG-1 MG-0
125 700 2500 MG-3 MG-2 MG-1
130 700 3000 MG-5 MG-3 MG-2
135 700 3500 MG-6 MG-3 MG-3
140 700 4000 MG-7 MG-5 MG-4
147 700 4700 MG-8 MG-6 MG-5
154 700 5400 MG-9 MG-7 MG-6
161 700 6100 MG-13 MG-8 MG-7
168 700 6800 MG-13 MG-9 MG-8
173 700 7300 MG-14 MG-10 MG-9
178 700 7800 MG-15 MG-12 MG-10
220 1600 2000 MG-3 MG-1 MG-0
225 1600 2500 MG-4 MG-2 MG-1
234 1600 3400 MG-6 MG-4 MG-2
240 1600 4000 MG-7 MG-5 MG-3
245 1600 4500 MG-8 MG-6 MG-4
250 1600 5000 MG-9 MG-6 MG-5
254 1600 5400 MG-10 MG-7 MG-6
260 1600 6000 MG-3 MG-8 MG-7
325 3000 2500 MG-5 MG-3 MG-1
330 3000 3000 MG-6 MG-3 MG-2
340 3000 4000 MG-8 MG-5 MG-3
347 3000 4700 MG-9 MG-6 MG-3
355 3000 5500 MG-13 MG-7 MG-5
363 3000 6300 MG-14 MG-8 MG-6
374 3000 7400 MG-16 MG-10 MG-8
389 3000 8900 MG-18 MG-13 MG-11

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 19 of 26

Volume Chart for Pure Gravity Foundation (Special)

Dimensions in Mtrs. Total Volume of Total Volume of


Foundatio
Concrete with normal Concrete with B W A
n Ref.
Muff of 0.020 cu.m. Muff of 0.080 cu.m.
A B C H
SPL-0 1.70 0.90 0.80 1.60 2.332 2.392
SPL-1 1.80 1.00 0.80 1.60 2.612 2.672
SPL-2 1.80 1.20 0.80 1.60 2.900 2.960
SPL-3 1.80 1.40 0.80 1.60 3.188 3.248
SPL-4 1.90 1.50 0.80 1.60 3.516 3.576
SPL-5 1.90 1.70 0.80 1.60 3.820 3.880
SPL-6 1.90 1.90 0.80 1.60 4.124 4.184
SPL-7 1.90 2.20 0.80 1.60 4.580 4.640
SPL-8 2.00 1.80 0.80 1.60 4.180 4.240
SPL-9 2.00 2.10 0.80 1.60 4.660 4.720
SPL-10 2.00 2.30 0.80 1.60 4.980 5.040
SPL-11 2.00 2.50 0.80 1.60 5.300 5.360
SPL-12 2.00 2.70 0.80 1.60 5.620 5.680
SPL-13 2.00 2.90 0.80 1.60 5.940 6.000
SPL-14 2.00 3.10 0.80 1.60 6.260 6.320
SPL-15 2.20 3.00 0.80 1.60 6.708 6.768
SPL-16 2.20 3.20 0.80 1.60 7.060 7.120
SPL-17 2.20 3.50 0.80 1.60 7.588 7.648
SPL-18 2.20 3.70 0.80 1.60 7.940 8.000
SPL-19 2.20 4.00 0.80 1.60 8.468 8.528
SPL-01 1.50 0.90 0.80 1.60 2.060 2.120

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 20 of 26

Volume Chart for N. G. Type Foundations

Total Total
Dimensions in Mtrs. Volume of Volume of
Foundatio Concrete Concrete
n Ref. with normal with B W A
Muff of Muff of
A1 A2 B1 B2 B3 0.020 cu.m. 0.080 cu.m.

NG-21 1.00 0.70 1.60 1.30 0.70 1.176 1.236


NG-22 1.00 0.70 2.00 1.70 0.80 1.421 1.481
NG-23 1.00 0.70 2.20 1.90 0.95 1.628 1.688
NG-24 1.20 0.70 2.20 1.90 0.95 1.836 1.896
NG-25 1.30 0.70 2.20 1.90 0.95 1.941 2.001
NG-26 1.50 0.80 2.20 1.90 0.95 2.230 2.290
NG-27 1.70 0.80 2.20 1.90 0.95 2.438 2.498
NG-28 1.80 0.90 2.20 1.90 0.95 2.623 2.683
NG-29 2.10 1.00 2.20 1.90 0.95 3.017 3.077
NG-30 2.30 1.10 2.20 1.90 0.95 3.306 3.366
NG-31 2.50 1.30 2.20 1.90 0.95 3.676 3.736
NG-32 2.70 1.50 2.20 1.90 0.95 4.046 4.106
NG-33 2.90 1.70 2.20 1.90 0.95 4.416 4.476
NG-34 3.10 1.90 2.20 1.90 0.95 4.786 4.846
NG-35 3.30 2.10 2.20 1.90 0.95 5.156 5.216
NG-36 3.60 2.40 2.20 1.90 0.95 5.711 5.771
NG-37 4.00 2.80 2.20 1.90 0.95 6.451 6.511
NG-38 4.40 3.20 2.20 1.90 0.95 7.194 7.254

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 21 of 26

Chart showing Equivalent sizes of Foundations for OHE structures to suit various common Loadings
for different soils and site conditions

Type of Foundation
Bending
Direct Pure Gravity
FDN Code Moment
Load in Kg Soil Pressure 5500 Soil Pressure 8000 Soil Pressure 11000
in Kg.M
2 2 2
Kg/m Kg/m Kg/m
115 700 1500 NG-24 NG-22 NG-22
120 700 2000 NG-26 NG-22 NG-22
125 700 2500 NG-28 NG-23 NG-23
130 700 3000 NG-29 NG-26 NG-26
135 700 3500 NG-31 NG-27 NG-27
140 700 4000 NG-33 NG-29 NG-29
147 700 4700 NG-35 NG-30 NG-30
154 700 5400 NG-37 NG-31 NG-31
161 700 6100 NG-38 NG-33 NG-33
168 700 6800 NG-36 NG-34 NG-34
173 700 7300 NG-37 NG-35 NG-35
178 700 7800 NG-38 NG-36 NG-36
185 700 8500 SPL NG-37 NG-37
193 700 9300 SPL NG-38 NG-38
199 700 10100 SPL SPL SPL
220 1600 2000 NG-28 NG-22 NG-22
225 1600 2500 NG-29 NG-23 NG-23
234 1600 3400 NG-32 NG-25 NG-25
240 1600 4000 NG-34 NG-27 NG-27
245 1600 4500 NG-36 NG-29 NG-29
250 1600 5000 NG-37 NG-30 NG-30
254 1600 5400 NG-37 NG-31 NG-31
260 1600 6000 NG-38 NG-32 NG-32
265 1600 6500 SPL NG-33 NG-33
270 1600 7000 SPL NG-34 NG-34
275 1600 7500 SPL NG-35 NG-35
325 3000 2500 NG-32 NG-24 NG-23

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 22 of 26

Chart showing Equivalent sizes of Foundations for OHE structures to suit various common Loadings
for different soils and site conditions

Type of Foundation
Bending Pure Gravity
Direct
FDN Code Moment
Load in Kg Soil Pressure 5500 Soil Pressure 8000 Soil Pressure 11000
in Kg.M 2 2 2
Kg/m Kg/m Kg/m
330 3000 3000 NG-33 NG-25 NG-23
340 3000 4000 NG-36 NG-27 NG-26
347 3000 4700 NG-37 NG-29 NG-29
355 3000 5500 SPL NG-30 NG-30
363 3000 6300 SPL NG-31 NG-31
374 3000 7400 SPL NG-33 NG-33
389 3000 8900 SPL NG-36 NG-36
395 3000 9500 SPL NG-37 NG-37
399 3000 10500 SPL NG-39 NG-39

NOTES:-
The Foundation Concrete should be of M-10 and Core hole Concrete should be of M-15 as
1.
per IS: 456-1978
The Back filling should be well consolidated in layer of not exceeding 200 mm. A special care
2.
should be taken for filling on Track side to avoid formation of water pocket.

3. The Excavation of Bottom pad generally be done by under cutting wherever possible.

4. The Top of Foundation / Muff should be sloped down towards outside Track

5. For details of Muff refer Drawing no. ETI/C/0007/63

Care should be taken to ensure that at least 0.1 m Concrete padding is available below the
6.
bottom end of Mast when grouted.
This New Pure Gravity Foundations (NG Type) supersede the earlier Pure gravity foundation
7.
(G Type)

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 23 of 26

Details of Muff for Structure without Balance Weight Anchor

Dimensions in 'mm' Payable Vol. of Con.


Mast Ref. with normal Muff in
A B C D cu.m.
6'x6' BFB 350 175 150 150 0.020
8'x6' RSJ 400 175 200 150 0.020
K/B-100 500 150 300 100 0.020
K/B-125 500 162.5 300 125 0.020
K/B-150 500 175 300 150 0.020
K/B-175 500 187.5 300 175 0.020
K/B-200 500 200 300 200 0.020
K/B-225 500 212.5 300 225 0.080
K/B-250 500 225 300 250 0.080
'G' Portal 450 290 250 380 0.080
'N' Portal 650 325 450 450 0.080
'O' Portal 750 375 550 550 0.080
R' Portal 800 400 600 600 0.080
TTC 500 212.5 300 225 0.080
'BFB' Portal 350 250 150 305 0.080
Double RSJ 8'x6' 400 325 200 450 0.080
'S' Type 505 250 305 300 0.080
BFB 200x200 9.40 400 200 200 200 0.080
Kg/m
8'x8' BFB 400 200 200 200 0.080

Notes:-
1. All Dimensions are in 'mm' unless stated other wise.
2. 1:2:4 Concrete Mixture to be used for all Muffs.
To Prevent the accumulation of water at the bottom of the Structures the muff shown in this
3.
Drawing is to be adopted
In case of the Top of the hole for Rail bonding goes inside muff then the height of the muff is to be
4.
reduced in such a way that the top hole for the Rail bonding is by about 50 mm from the top of muff.
5. Muff for the Masts (Applicable to portals & Two track cantilever masts also)
Drg. Ref. No.:
APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 24 of 26

Details of Muff for Structure with Balance Weight Anchor

Payable Vol.
Dimensions in 'mm' of Con. Muff
Mast Ref. with BWA
termination
A B C D D D in cu.m.

6'x6' BFB 350 175 150 150 465 640 0.080


8'x6' RSJ 400 175 200 150 465 640 0.080
K/B-150 500 175 300 150 535 710 0.080
K/B-175 500 187.5 300 175 547.5 735 0.080
K/B-200 500 200 300 200 560 760 0.080
K/B-225 500 212.5 300 225 572.5 785 0.080
K/B-250 500 225 300 250 585 810 0.080
'G' Portal 450 290 250 380 650 940 0.080
'N' Portal 650 325 450 450 685 1010 0.080
'O' Portal 750 375 550 550 735 1110 0.080
R' Portal 800 400 600 600 760 1160 0.080
TTC 550 212.5 300 225 572.5 785 0.080
'BFB' Portal 350 250 150 305 610 860 0.080
BFB 200x200 9.40 400 200 200 200 465 665 0.080
Kg/m
Notes:-
1. All Dimensions are in 'mm' unless stated other wise.

2. 1:2:4 Concrete Mixture to be used for all Muffs.


To Prevent the accumulation of water at the bottom of the Structures the muff shown in this
3.
Drawing to be adopted
Drg. Ref. No.:
APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 25 of 26

Volume chart for soft rock Foundation

(Bearing Capacity 45, 000 Kg/m2)

Safe Bending Dimensions in Metrs Total Volume


Type of moment at Volume of
Sl. No. Foundatio the top of Concrete
n Foundation in Cu.m. With Normal With BWA
Kg/m A B Muff of Muff of
0.020 cu.m. 0.080 Cu.m.

1 SRB-1 8200 0.70 0.70 0.784 0.804 0.864

2 SRB-2 9300 0.70 0.80 0.896 0.916 0.976

3 SRB-3 10400 0.70 0.90 1.008 1.028 1.088

Notes:-
1. All Dimensions are in 'mm' unless stated other wise.
2. Plain Concrete (with grade M-150/100) shall confirm IS 456-1978
Loose Soil has been assumed for top 0.2 m in case loose soil exceeds the depth of Foundation may
3.
be suitably increased

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)
For KEC International Limited For CPM / RE / UMB
Page 26 of 26

Details of OHE Foundation in Hard Rock


(Bearing Capacity 90, 000 Kg/m2)

Notes:-
1. All Dimensions are in 'mm' unless stated other wise.
2. For Excavation of Foundation approximate size given
3. Plain Concrete (with grade M-150/100) shall confirm IS 456-1978
The Foundation is suitable for 10, 000 Kgm overturning bending moment at the top of the
4.
Foundation
5. Minimum depth of excavation inside hard rock should be 1.20 m
6. Volume of Concrete to be Calculated from actual concreting for each location.

Drg. Ref. No.:


APPROVED Drg No.:

MR.PRAMODE KUMAR
(CPM / RE / UMB)