Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Selva ganesh Constructions (p) Ltd

Old No 132, New No 88, Flat No F1, II floor Eldams Road,


Teynampet, Ch-18. Phone-044-24355271/72
www.selvaganeshconstructions.com

Project Name: SG SURABHI

Front elevation ;
Project address
Door No 33 kutti naicken street chintadaripet Chennai-2

Project details ;

Ground floor A -988 sq.ft - sold


First floor A- 934 sq.ft
First floor B - 835 sq.ft
Second floor A- 934 sq.ft – SOLD
Second floor B - 835 sq.ft

Special Features

a) Each floor has only two 2BHK Flats.


b) Each 2BHK flat of 825to 988 sq ft as per vasthu.
c) 500 meter away from new secretariat.
d) 1500 meters from LIC.

Location map;
Just 300 Meters Form Loco Railway Station
Speciation

a) RCC column framed structure plinth beam 9” exterior brick walls and
4½” brick partition walls.
b) Designer and aesthetic architectural finish.
c) Covered car park.
d) Staircase with MS handrail.
e) Two Motors – one for metro water and another for bore water.
f) Overhead tank and one large underground sump with capacity to hold
one tanker load water.
g) Compound wall with designer gate.
h) Three phase electric power connection.
i) Vitrified ceramic tile flooring of HR Johnson (or) Kajaria (or) Asian (or)
equivalent.
j) Teak wood door frame for main door and other doors and windows.
k) Polish for main door.
l) Enamel paint for other doors and windows.
m) Paint acrylic emulsion (super coat of ICI or equivalent).
n) Sufficient electrical points of 5 amps / 15 amps modular switch / sockets
of Anchor / MDA or equivalent.
o) Chrome plated ceramic disc sanitary fittings with ISI mark.
p) White / EWC / Parry ware / Hind ware / Johnson etc.
q) Individual water pipeline for ground water and metro water overhead
tank.

Project status;

Under construction
Availability;

Only three Flats

Floor plan;
Typical 1st and 2nd floor
SCHEDULE OF PAYMENTS

confirmation of booking 10%


At the time of registration of land(within 30 days from the date of agreement) 25%
On completion of foundation 15%
On completion of ground floor roof slab 10%
On completion of first floor roof slab 10%
On completion of ground floor brick work 10%
On completion of first floor brick work 5%
on completion of internal plastering 5%
on completion of external plastering 5%
One month before possession 5%

EXTRA EXPENSES;

Registration Charges.
Legal Fees, Documentation Charges & Incidental Expenses.

Service Connection Charges, Fees, Deposits and Incidental Expenses for


Electricity, Water Supply, Drainage Water treatment plant and Sewage
Disposal System
Contribution to Building Maintenance Fund

You might also like