Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Sheet1

PALEMBANG PORT INFO


1 Name of Port : BOOM BARU PORT *). TPK 2 ( Container Wharf )
2 Port Location : Lat 02 - 58' – 48” South Lat 02 - 58' – 50” South (TPK 2)
Long 104 – 46' – 36” East Long 104 – 46' – 57” East
*). TPK 1 ( Container Wharf )
Lat 02 - 58' – 50” South (TPK 1)
Long 104 – 46' – 59” East
3 Pilot Station : Lat 02 - 19' – 20” South
Long 104 – 54' – 51” East
4 Name of Berth : Boom Baru PORT
From Pilot Station to port is about 55 miles (+/- 108 Km) and
Steaming time about 6 - 7 hours.
5 Length of Berth : Conventional Wharf = A - H (375 mtr) and H & I (130 mtr)
Container Wharf = 266 m
6 Breadth : 30 m
7 Max. LOA : safely below 130 mtr. ( LOA 180 mtr only can STS at Sungai Gerong anchorage)
8 Max. Draft (in/ out Musi River) : 6.0 m (depends on daily water level)
9 the depth of the Port poll : Conventional wharf ( - 6.0 mLWS) and Container wharf ( - 9.0 mLWS).
10 Berthing/Unberthing : Compulsory Pilot ( 24 Hours )
11 Tugage : 6 unit ( 4 unit Cap.1200 HP and 2 unit @ 2400 HP).
12 Fresh Water Supply : Available by shore line with cap. 20 ton / hour which supplied by pelindo II
Also can be supplied by barge which minimum supplied 100 tons
13 Communication : VHF Channel 16 (Tanjung Buyut P/Stn) and VHF Channel 12 (Palembang Harbor pilot)
14 Port Situation : Some time Congestion for breakbulk ships.
15 Port Security : Port Security Level 1 and no Piracy and Thief
16 Discharge/Loading Methode : Bulk Cargo : Load use Ship Crane or Jib Crane + Grabs via Trucking
17 Discharge/Loading Rate : 400 – 700 Ton/day (General Cargo), depend on quantity of truck and storage area
Working Time : 08.00 – 16.00 Wib and 16.00 - 23.00 Wib
18 Weather : November - February = Rain season
March - October = Dry season
19 Port Facility : QCC = 2 unit (SWL Max 30 ton/20' (twinlift) ; Max 35 ton/40' depend on CSC Plate ).
RMGC = 4 Unit
Jib Crane = 4 Unit (SWL @ 35 ton)
Forklift = 11 Unit (@ 3 ton) + 1 unit (@ 15 ton)
Side Loader 2 Unit + Reach Stacker 1 unit.
Head Truck 9 unit (+ chassis 12 Unit)
Pilot boat = 4 unit
Barge for supply FW = 1 unit (@ Cap. 100 Ton).
20 Pelindo II Palembang Branch : PT. Pelindo II Cab Palembang
Jl. Belinyu no 1, Boom Baru, Palembang. 30115. Phone : +62 711-710611.
21 Harbour Master : Administrator Pelabuhan Palembang
Jl. Mayor Memet Sastarawirya no 147 Palembang
Phone : +62711- 713351, Fax : +62711-713551
22 ISPS : Administrator Pelabuhan Palembang
Jl. Mayor Memet Sastarawirya no 147 Palembang
Phone : +62711- 713351, Fax : +62711-713551
23 Pilot / Port Facility : PT. Pelabuhan Indonesia II Palembang
Jl. Belinyu no 1, Boom Baru, Palembang. 30115. Phone : +62 711-710611.
24 Custom : Bea & Cukai Palembang
Jl. Mayor Memet Sastarawirya no 01 Palembang
25 Agent detail : PT. Samudera Agencies Indonesia
Jl. Jend Sudirman No 3528 Palembang
Phone : +62711 - 313616 (hunting), Fax : +62711 – 310175
yudhy.afrianto@samudera.id ( +62 81311107039).
muhammad.iskandar@samudera.id
masmudi@samudera.id
Upd. 26/12/2018 - yudhy

Page 1

You might also like