SARULLA PROJECT

Preliminary Design for


Warehouse - 12 x 36 m2

HAL-HPM-SOL-14-CALC-003

A 21-Nov-14 Issued for Internal Review

- 16-Nov-14 Issued for Internal Review

PH BP YD

REV DATE DESCRIPTION DYFCO DYFCO DYFCO HAL SOL


REV DATE DESCRIPTION
Prepared by Checked by Approved by

*This document has been prepared for the titled project or named part thereof and shoul not be relief upon or used for any other project without an independent check
being carried out as to its suitability and prior written authority of Dyfco Energy and Halliburton being obtained. Dyfco Energy and Halliburton accepts no responsibility
or liability for the consequences of this document being used for a purpose other than the purposes for which it was commissioned. Any person using or relying on the
document for such other purpose agress, and will by such use or reliance be taken to confirm his agreement, to indemnify Dyfco Energy and Halliburton for all loss or
demage resulting therefrom. Dyfco Energy and Halliburton accepts no responsibility or liability for this document to any party other than the person bu whom it was
commissioned.
of and shoul not be relief upon or used for any other project without an independent check
gy and Halliburton being obtained. Dyfco Energy and Halliburton accepts no responsibility
ther than the purposes for which it was commissioned. Any person using or relying on the
taken to confirm his agreement, to indemnify Dyfco Energy and Halliburton for all loss or
nsibility or liability for this document to any party other than the person bu whom it was
Preliminary Design for Warehouse - HAL-HPM-SOL-14-CALC-003
SARULLA PROJECT 12 x 36 m2 21-Nov-14
NIL-2 Wellpad Page : 2 REV A

REVISION MODIFICATION LOG

REVISION
PAGE DESCRIPTION
A B C

- - Add calculation for footpad foundation


HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 3 REV A

GENERAL
* This document presents calculation of the warehouse Design for Sarulla Project - NIL.2 Production Process.
* Portal frame as steel structure behaviour perform by Structural Analysis Program, SAP2000 advanced 11.0.0

REFERENCE
* "Tata Cara Perencanaan Struktur Baja untuk Bangunan gedung", SNI03-1729-2002. (Ref,.1)
* "Pedoman Perencanaan Pembebanan untuk Rumah dan Gedung", PPURG 1987. (Ref,.2)
* Material Properties - Structural Steel, ex. Gunung Garuda (Ref,.3)
* Typical warehouse drawing, HAL-HPM-SOL

OVERVIEW
* Modelled structure overview below;

3D Object Model
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A

(Ref,.1)
(Ref,.2)
(Ref,.3)
Preliminary Design for Warehouse - HAL-HPM-SOL-14-CALC-003
SARULLA PROJECT 12 x 36 m2 21-Nov-14
NIL-2 Wellpad Page : 4 REV A

A. PURLIN ANALYSIS
A.1 Material Properties

Yield stress, fy = 240.00 MPa


Ultimate stress, fu = 370.00 MPa
Residual stress, fr = 70.00 MPa
Mod. of elasticity, E= 200,000.00 MPa
Poisson's ratio, ʋ= 0.30

CNP 150 x 50 x 20 x 2.3


ht = 150.00 mm
b= 50.00 mm
t= 2.30 mm
a= 20.00 mm
Sectional area A= 601.81 mm2
Moment inertia Ix = 1,925,328.00 mm4
Iy = 195,076.00 mm4
Modulus of section Sx = 25,671.00 mm3
Sy = 5,569.40 mm3
Rad of gyration rx = 56.56 mm
ry = 18.00 mm
Center of grafity c= 21.20 mm
Unit mass w= 4.72 kg/m
Flexure reduction factor, fb 0.90
Shear reduction factor, ff 0.75
Dia. sagrod, d= 12.00 mm
Length each purlin s= 1,440.00 mm
Length each rafter L1 = 6,000.00 mm
Length each sagrod L2 = 2,000.00 mm
Sudut miring atap, α= 15.00 °

G = E / [ 2 * (1 + u) ] = 76,923.08 MPa
h = ht - t = 147.70 mm
J = 2 * 1/3 * b * t3 + 1/3 * (ht - 2 * t) * t3 + 2/3 * ( a - t ) * t3 = 1,138.83 mm4
Iw = Iy * h2 / 4 = 1,063,909,878.01 mm6
X1 = p / Sx * √ [ E * G * J * A / 2 ] = 8,885.76 MPa
X2 = 4 * [ Sx / (G * J) ]2 * Iw / Iy = 0.00 mm2/N2
Zx = 1 / 4 * ht * t2 + a * t * ( ht - a ) + t * ( b - 2 * t ) * ( ht - t ) = 21,601.21 mm3
Zy = ht*t*(c - t / 2) + 2*a*t*(b - c - t / 2) + t * (c - t) + t * (b - t - c) =
2 2
11,897.81 mm3

G = modulus geser, Zx = modulus penampang plastis thd. sb. x,


J = Konstanta puntir torsi, Zy = modulus penampang plastis thd. sb. y,
Iw = konstanta putir lengkung, X1 = koefisien momen tekuk torsi lateral,
h = tinggi bersih badan, X2 = koefisien momen tekuk torsi lateral,

A.2 Load Assessment


* Dead Load (DL)
Width Q
No Material Weight
(m) (N/m)
1.00 Purlin 47.24 N/m 47.24
2.00 roofing (span deck) 0.35mm zinc 30.80 N/m2 1.20 36.96
Σ Dead load, QDL 84.20

* Live Load (LL)


Live Load (LL) due rain will be calculate equal to load of water that flood the area,

thickness or depth 1 inc = 25 mm. qrain = 0.025 * 10 = 0.25 kN/m2 (Ref,.2)


Length each purlin s= 1.44 m
Load due rain qrain * s * 10^3 = 360.00 N/m
Live Load distribution due rain, QLL = 360.00 N/m
Concentrate Load due workers, PLL = 1,000.00 N (Ref,.2)
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A

(Ref,.2)
(Ref,.2)
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 5 REV A

* Factored Load

Distribution load Qu = 1.2 * QDL + 1.6 * QLL = 677.04 N/m


Concentrate load Pu = 1.6 * PLL = 1,600.00 N
Roof angle a= 0.26 rad
Distribution load, dir,.x, Qux = Qu * cos a *10-3 = 0.65 N/mm
Distribution load, dir,.y, Quy = Qu * sin a *10-3 = 0.18 N/mm
Concentrate load, dir,.x, Pux = Pu * cos a = 1,545.48 N
Concentrate load, dir,.y, Puy = Pu * sin a = 414.11 N

A.3 Moment & Shear Force due Factored Load

Purlin length, dir,.x Lx = L 1 = 6,000.00 mm


Purlin length, dir,.y Ly = L 2 = 2,000.00 mm
Moment due factored load, dir,.x Mux = 1/10 * Qux * Lx + 1/8 * Pux * Lx =
2
3,513,413.21 Nm
Moment at 1/4 of purlin length, dir,.x MA = 2,635,059.91 Nm
Moment at 1/2 of purlin length, dir,.x MB = 3,513,413.21 Nm
Moment at 3/4 of purlin length, dir,.x MC = 2,635,059.91 Nm

Moment due factored load, dir,.y Muy = 1/10 * Quy * Ly2 + 1/8 * Puy * Ly = 173,620.22 Nmm
Shear force due factored load, dir,.x Vux = Qux * Lx + Pux = 5,469.32 N
Shear force due factored load, dir,.y Vuy = Quy * Ly + Puy = 764.57 N

A.4 Moment due Local Buckling


Local buckling influence (flange)
Flange slenderness λ=b/t = 21.74
Max slenderness limits for compact cross section. λp = 170 / √ fy = 10.97
Max slenderness limits for non-compact cross section. λr
= 370 / √ ( fy - fr ) = 28.38

Plastis moment, dir,.x Mpx = fy * Zx = 5,184,290.16 Nmm


Plastis moment, dir,.y Mpy = fy * Zy = 2,855,473.92 Nmm
Bending moment limit, dir,.x Mrx = Sx * ( fy - fr ) = 4,364,070.00 Nmm
Bending moment limit, dir,.y Mry = Sy * ( fy - fr ) = 946,798.00 Nmm

Nominal cross-sectional moment.


a. Compact, λ ≤ λp
→ Mn = M p
b. Non-compact, λp
< λ ≤ λr
→ Mn = Mp - (Mp - Mr) * ( λ - λp) / ( λr - λp)
c. Slim section, λ > λr
→ Mn = Mr * ( λr / λ )^2

λ > λp and λ < λr


Based on the value of the slenderness of flange,: non compact

* Nominal sectional moments of the x-axis is calculated as follows :


compact : Mn = Mp = - Nmm
non-compact : Mn = Mp - (Mp - Mr) * ( λ - λp) / ( λr - λp) = 4,676,929.89 Nmm
Slim section : Mn = Mr * ( λr / λ )^2 = - Nmm
Nominal moment on the x-axis section : non compact Mnx = 4,676,929.89 Nmm

* Nominal cross-sectional moment of the y-axis is calculated as follows :


compact : Mn = Mp = - Nmm
non-compact : Mn = Mp - (Mp - Mr) * ( λ - λp) / ( λr - λp) = 1,674,831.98 Nmm
Slim section : Mn = Mr * ( λr / λ )^ =
2
- Nmm
Nominal moment on the y-axis section : non compact Mny = 1,674,831.98 Nmm
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 6 REV A

A.5 Moment due Lateral Buckling


Nominal cross-sectional moment with lateral buckling :
a. Short spans : L ≤ Lp
→ Mn = Mp = fy * Zx
b. Intermediate spans: L p
≤ L ≤ Lr
→ Mn = Cb * [ M r + ( M p - M r ) * ( L r - L ) / ( L r - L p ) ] ≤ Mp
c. Long spans : L > Lr
→ Mn = Cb * p / L*√ [ E * Iy * G * J + ( p * E / L )2 * Iy * Iw ] ≤ Mp

Max span length of the beam is able to hold the plastic moment,
Lp = 1.76 * ry * √ ( E / fy ) = 914.73 mm
Yield stress - residual stress, fL = fy - fr = 170.00 MPa
Min span length beam which prisoners are determined by the critical buckling moment
lateral torque, Lr = ry * X1 / fL * √ [ 1 + √ ( 1 + X2 * fL2 ) ] = 2,731.59 mm
Coef of torque lateral bending moment,
Cb = 12.5 * Mux / ( 2.5*Mux + 3*MA + 4*MB + 3*MC ) = 1.14
Plastis moment, dir,.x Mpx = fy * Zx = 5,184,290.16 Nmm
Plastis moment, dir,.y Mpy = fy * Zy = 2,855,473.92 Nmm
Bending moment limit, dir,.x Mrx = Sx * ( fy - fr ) = 4,364,070.00 Nmm
Bending moment limit, dir,.y Mry = Sy * ( fy - fr ) = 946,798.00 Nmm
Span length, dir,.y (distance lateral support), L = L2 = 2,000.00 mm

L > Lp dan L < Lr : Intermediate spans

* Nominal sectional moments of the x-axis is calculated as follows :


Mnx = Mpx = fy * Zx = - Nmm
Mnx = Cb * [ Mrx + ( Mpx - Mrx ) * ( Lr - L ) / ( Lr - Lp ) ] = 5,334,481.71 Nmm
Mnx = Cb * π / L*√ [ E * Iy * G * J + ( π * E / L )2 * Iy * Iw ] = - Nmm
Nominal moment on the x-axis section : Intermediate spans Mnx = 5,334,481.71 Nmm
Mnx > Mpx
Min nominal moment on the x-axis section / used : Mnx = 5,184,290.16 Nmm

* Nominal sectional moments of the y-axis is calculated as follows :


Mny = Mpy = fy * Zy = - Nmm
Mny = Cb * [ Mry + ( Mpy - Mry ) * ( Lr - L ) / ( Lr - Lp ) ] = 1,949,266.92 Nmm
Mny = Cb * π / L*√ [ E * Iy * G * J + ( π * E / L ) * Iy * Iw ] =
2
- Nmm
Nominal moment on the y-axis section : Intermediate spans Mny = 1,949,266.92 Nmm
Mny > Mpy
Min nominal moment on the y-axis section / used : Mny = 1,949,266.92 Nmm

A.6 Flexural Moment Resistance


Nominal moment, dir,.x :
Moment due Local Buckling Mnx = 4,676,929.89 Nmm
Moment due Lateral Buckling Mnx = 5,334,481.71 Nmm
Min nominal moment, Mnx = 4,676,929.89 Nmm
Flexural moment resistance, dir,.x fb * Mnx = 4,209,236.90 Nmm

Nominal moment, dir,.y :


Moment due Local Buckling Mny = 1,674,831.98 Nmm
Moment due Lateral Buckling Mny = 1,949,266.92 Nmm
Min nominal moment, Mny = 1,674,831.98 Nmm
Flexural moment resistance, dir,.y fb * Mny = 1,507,348.78 Nmm
Moment due factored load, dir,.x Mux = 3,513,413.21 Nmm
Moment due factored load, dir,.y Muy = 173,620.22 Nmm
Mux / ( fb * Mnx ) = 0.83
Muy / ( fb * Mny ) = 0.12
Condition required : Mux / ( fb * Mnx ) + Muy / ( fb * Mny ) ≤ 1.0
Mux / ( fb * Mnx ) + Muy / ( fb * Mny ) = 0.95 < 1.0 (OK)
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 7 REV A

A.7 Shear Resistance


Web thickness condition required,
ht / t ≤ 6.36 * SQRT ( E / fy )
65.22 < 183.60 Web thickness (OK)

Shear force due factored load, dir,.x Vux = 5,469.32 N


Web section area Aw = t * ht = 345.00 mm2
Shear force resistance, dir,.x Vnx = 0.60 * fy * Aw = 49,680.00 N
Reduction shear force resistance, dir,.x ff * Vnx = 37,260.00 N

Shear force due factored load, dir,.y Vuy = 764.57 N


Flange section area Af = 2 * b * t = 230.00 mm2
Shear force resistance, dir,.y Vny = 0.60 * fy * Af = 33,120.00 N
Reduction shear force resistance, dir,.y ff * Vny = 24,840.00 N
Vux / ( ff * Vnx ) = 0.15
Vuy / ( ff * Vny ) = 0.03
Condition required :
Vux / ( ff * Vnx ) + Vuy / ( ff * Vny ) ≤ 1.00
Vux / ( ff * Vnx ) + Vuy / ( ff * Vny ) = 0.18 < 1.0 (OK)

A.8 Shear & Flexural control


Condition required to control the interaction of shear & flexural
Mu / ( fb * Mn ) + 0.625 * Vu / ( ff * Vn ) ≤ 1.375

Mu / ( fb * Mn ) = Mux / ( fb * Mnx ) + Muy / ( fb * Mny ) = 0.95


Vu / ( ff * Vn ) = Vux / ( ff * Vnx ) + Vuy / ( ff * Vny ) = 0.18
Mu / ( fb * Mn ) + 0.625 * Vu / ( ff * Vn ) = 1.06
1.06 < 1.375 (OK)

A.9 Pulled Resistance Sagrod


Distribution load, dir,.y, Quy = 0.18 N/mm
Concentrate load, dir,.y, Puy = 414.11 N/m
Length each sagrod Ly = L 2 = 2,000.00 m

Gaya tarik pada sagrod akibat beban terfaktor, Tu = Quy * Ly + Puy = 764.57 N
Yield stress, fy = 240.00 MPa
Ultimate stress, fu = 370.00 MPa
Diameter sagrod, d= 12.00 mm
Sagrod section area Ag = π / 4 * d2 = 113.10 mm2
Effective sagrod section area Ae = 0.90 * Ag = 101.79 mm2

Pulled force resistance due sagrod area f * Tn = 0.90 * Ag * fy = 21,986.12 N


Pulled force resistance due effective sagrod area f * Tn = 0.75 * Ae * fu = 28,246.06 N

Min pulled force resistance f * Tn = 21,986.12 N

Condition required : Tu ≤ f * T n
764.57 < 21,986.12 (OK)

B PORTAL / FRAME ANALYSIS


B.1 Load Assessment
* Dead Load (DL)

No Material Weight

1.00 Purlin 47.24 N/m = 4.72 Kg/m


2.00 roofing (span deck) 30.80 N/m2 = 3.08 Kg/m2
g.A = g.L (roof weight * 1/2 purlin length A-B) + purlin weight 6.48 Kg
g.B = g.K (roof weight * (1/2 purlin length B-C + 0.302)) + purlin weight 7.87 Kg
g.C = g.D = g.E = g.H = g.I = g.J (roof weight * (1/2 purlin length B-C + 1/2 purlin length C-D)) + purlin weight 9.16 Kg
g.F = g.G (roof weight * (1/2 purlin length E-F + 0.15)) + purlin weight 7.40 Kg

Dead load that applied, will be assume as concentrate load at joint.


HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 8 REV A

* Live Load (LL)


Rain 40 - 0.8*α = 20.00 Kg (Ref,.2)
Concentrate Load due workers, reduction = 1.00 PLL = 100.00 Kg (Ref,.2)

g.A = g.L (rain weight * 1/2 purlin length A-B) + worker weight 111.38 Kg
g.B = g.K (rain weight * (1/2 purlin length B-C + 0.302)) + worker weight 120.44 Kg
g.C = g.D = g.E = g.H = g.I = g.J (rain weight * (1/2 purlin length B-C + 1/2 purlin length C-D)) + worker weight 128.80 Kg
g.F = g.G (rain weight * (1/2 purlin length E-F + 0.15)) + worker weight 117.40 Kg

Live load that applied, will be assume as concentrate load at joint

* Wind Load (Ref,.2)

Wind pressure W= 25.00 kg/m2


Koef. Pressure wind c = (0,02 x a )- 0,4 = (0.10)
Koef. suction wind c' = (0.40)

Wind Pressure, at joint Wind Load Wv Wh


Kg Kg Kg
g.A = g.L (c * w * 1/2 purlin length A-B) (1.42) 1.08 (0.93)
g.B = g.K (c * w * (1/2 purlin length B-C + 0.302)) (2.56) 1.94 (1.66)
g.C = g.D = g.E = g.H = g.I = g.J (c * w * (1/2 purlin length B-C + 1/2 purlin length C-D)) (3.60) 2.73 (2.34)
g.F = g.G (c * w * (1/2 purlin length E-F + 0.15)) (2.18) 1.65 (1.41)

Wind Suction Wind Load Wv Wh


Kg Kg Kg
g.A = g.L (c * w * 1/2 purlin length A-B) (5.69) 4.32 (3.70)
g.B = g.K (c * w * (1/2 purlin length B-C + 0.302)) (10.22) 7.76 (6.65)
g.C = g.D = g.E = g.H = g.I = g.J (c * w * (1/2 purlin length B-C + 1/2 purlin length C-D)) (14.40) 10.94 (9.36)
g.F = g.G (c * w * (1/2 purlin length E-F + 0.15)) (8.70) 6.61 (5.66)

B.2 Structure Model


Portal frame structural analysis will perform with structural analysis program (SAP2000 V11.0.0 advance)
Design in rafter, beam, and column as follow;

- Rafter WF.150.75.5.7
- Beam WF.150.75.5.7
- Column-1 WF.200.100.5,5.8
- Column-2 WF.150.75.5.7
- Brace L. 60.60.6
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A

(Ref,.2)
(Ref,.2)

(Ref,.2)
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 9 REV A

B.2.1 Material Property and Frame Data


Above material using Gunung Garuda manufacture data, that show as follows;

Define frame section input


Wide Flange 200x100x5.5x8
Define material input

Define frame section input Define frame section input


Wide Flange 150x75x5x7 L 60x60x6

B.2.2 Load Combination


Load combination that will perform using Structural Analysis Program describes;

1) 1,4 D
2) 1,4 D + 1,6L
3) 1,2 D + 0,5L + 0.8Wk
4) 1,2 D + 0,5L - 0.8Wk
5) 1,2 D + 0,5L + 0.8Wl
6) 1,2 D + 0,5L - 0.8Wl
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 10 REV A

B.2.3 Load Assignment


Load assessment that perform previously at B.1 will assign to SAP as follows;

Dead Load Input

Live Load Input

Wind Load from Right Side Input


Wind Load from Left Side Input
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 11 REV A

B.2.4 Structure Analysis


- Preferences design of portal frame; AISC-LRFD 99
- Strength ability of structure cause load defined as describes; (check of structure)

Steel Design
Moment release due join plate of structure
will be calculate separately refer to Vu &
Mu.

Structure Analysis
- Deformed shape - deflection check
Actual deflection < 1/3 L
1.00 < 4.00 mm
(OK)

- Structure are safe


HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 12 REV A

C FOUNDATION
C.1 Field Investigation Data
* Field investigation data, refer to Preliminary Geotechnical Recomendation of NIL-2 Wellpad - SOL.

Field Soil Investigation Layout (Conduct)


Refer to Final Report of Soil Investigation NIL-2, allowable bearing capacity shows below;

Allowable bearing Cap.(ton/m2) refer to location for warehouse;


No./Id Terzaghi Meyerhoff Brinch hansen Allowable (average) g (average)
S-2 3.11 3.81 1.75 2.89 16.00 KN/m3
S-4 3.65 4.55 2.05 3.42 16.00 KN/m3
S-5 3.65 4.55 2.05 3.42 16.00 KN/m3
3.24 ton/m2 16.00 KN/m3
32.41 KN/m2

C.2 Foundation Data


* Check of footpad foundation Concrete unit weight gc = 23.54 KN/m3
Tensile strength bars, deform (Ø > 12) fy fy = 390.00 Mpa
Tensile strength bars, plain (Ø < 12) fy fy = 240.00 Mpa
Concrete compressive strength f'c = 250.0 Kg/cm2
20.75 Mpa

K-1 Width of Foundation Bx = 1.20 m


Width of Foundation By = 1.20 m
Thick of Foundation h= 0.30 m
Excavation height df = 1.20 m
Pedestal bx = 0.30 m
by = 0.25 m
Column/pedestal position
(deep = 40, side = 30, edge = 20) as = 20.00

K-2 Width of Foundation Bx = 0.80 m


Width of Foundation By = 0.80 m
Thick of Foundation h= 0.30 m
Excavation height df = 0.85 m
Pedestal bx = 0.25 m
by = 0.20 m
Column/pedestal position
(deep = 40, side = 30, edge = 20) as = 30.00
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A

KN/m3
Mpa
Mpa
Kg/cm2
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 13 REV A

C.3 Load Assessment


Axial force and moment at direction will be determined as output from Structural Analysis Program as follow;

K-1 maximum of id no; 1, 3, 10, 12


Axial force Pu = 15.6646 KN
Momment, x direction Mux = 0.0153 KN-m'
Momment, y direction Muy = 5.124E-18 KN-m'

K-2 id no 8
12 Axial force Pu = 9.8988 KN
K-1 Momment, x direction Mux = 0.0028 KN-m'
Momment, y direction Muy = 1.712E-19 KN-m'
3
K-1

8 10

K-2 K-1

1
K-1

C.4 Soil Pressure Check,

K-1 (Foundation Type)


Footpad area A = Bx * By = 1.44 m2
Moment resistance, x direction, Wx = 1/6 * By * Bx2 = 0.29 m3
Moment resistance, y direction, Wy = 1/6 * Bx * By2 = 0.29 m3
Height of embankment above pad z = Df - h = 0.90 m
Pressure due weight of pad and embankment q = h * gc + z * g = 21.46 KN/m2

Excentricity at foundation,
ex = Mux / Pu = 0.00 m < Bx / 6 = 0.20 m (OK)
ey = Muy / Pu = 0.00 m < By / 6 = 0.20 m (OK)

Maximum soil pressure at bottom pad; KN/m2 Minimum soil pressure at bottom pad; KN/m2
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 32.39 qmin = Pu / A - Mux / Wx - Muy / Wy + q = 32.29
qmax > qa → (OK) qmin > 0 → (OK)

K-2 (Foundation Type)


Footpad area A = Bx * By = 0.64 m2
Moment resistance, x direction, Wx = 1/6 * By * Bx2 = 0.09 m3
Moment resistance, y direction, Wy = 1/6 * Bx * By2 = 0.09 m3
Height of embankment above pad z = Df - h = 0.55 m
Pressure due weight of pad and embankment q = h * gc + z * g = 15.86 KN/m2

Excentricity at foundation,
ex = Mux / Pu = 0.00 m < Bx / 6 = 0.13 m (OK)
ey = Muy / Pu = 0.00 m < By / 6 = 0.13 m (OK)

Maximum soil pressure at bottom pad; KN/m2 Minimum soil pressure at bottom pad; KN/m2
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 31.36 qmin = Pu / A - Mux / Wx - Muy / Wy + q = 31.29
qmax > qa → (OK) qmin > 0 → (OK)
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A

KN-m'
KN-m'

KN-m'
KN-m'
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 14 REV A

C.5 Shear Force Check


- Shear at x dir,.

* K-1 (Foundation Type)


Distance center of rebar to concrete cover, d' = 0.075 m
Effective thickness d = h - d' = 0.23 m
Distance of critical area to concrete cover, ax = ( Bx - bx - d ) / 2 = 0.34 m
Soil pressure at critical area, x direction,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 32.36 KN/m2
Shear force, x direction Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 4.42 KN

Width of shear area in x direction, b = By = 1,200.00 mm


Effective thickness d= 225.00 mm
Ratio of pedestal bc = bx / by = 1.20

Shear force resistance equation, x direction (minimum):


Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3 = 546.63 KN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3 = 589.33 KN
Vc = 1 / 3 * √ fc' * b * d * 10 = -3
409.97 KN

Minimum shear force resistance will be taken, → Vc = 409.97 KN


Reduction factor f = 0.75
Shear force resistance f * Vc = 307.48 KN

f * Vc ≥ Vux
307.48 > 4.42 → (OK)

* K-2 (Foundation Type)


Distance center of rebar to concrete cover, d' = 0.075 m
Effective thickness d = h - d' = 0.23 m
Distance of critical area to concrete cover, ax = ( Bx - bx - d ) / 2 = 0.16 m
Soil pressure at critical area, x direction,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 31.35 KN/m2
Shear force, x direction Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 2.01 KN

Width of shear area in x direction, b = By = 800.00 mm


Effective thickness d= 225.00 mm
Ratio of pedestal bc = bx / by = 1.25

Shear force resistance equation, x direction (minimum):


Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3 = 355.31 KN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10 = -3
713.18 KN
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 273.31 KN

Minimum shear force resistance will be taken, → Vc = 273.31 KN


Reduction factor f = 0.75
Shear force resistance f * Vc = 204.98 KN
f * Vc ≥ Vux
204.98 > 2.01 → (OK)
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 15 REV A

- Shear at y dir,.

* K-1 (Foundation Type)


Distance center of rebar to concrete cover, d' = 0.085 m
Effective thickness d = h - d' = 0.22 m
Distance of critical area to concrete cover, ay = ( By - by - d ) / 2 = 0.37 m
Soil pressure at critical area, y direction,
qy = qmin + (By - ay) / By * (qmax - qmin) = 32.36 KN/m2
Shear force, y direction Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 4.81 KN

Width of shear area in y direction, b = Bx = 1,200.00 mm


Effective thickness d= 215.00 mm
Ratio of pedestal bc = bx / by = 1.20 mm

Shear force resistance equation, y direction (minimum):


Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3 = 522.33 KN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3 = 546.82 KN
Vc = 1 / 3 * √ fc' * b * d * 10 = -3
391.75 KN

Minimum shear force resistance will be taken, Vc = 391.75 KN


Reduction factor f = 0.75
Shear force resistance f * Vc = 293.81 KN

f * Vc ≥ Vux
293.81 > 4.81 → (OK)

* K-2 (Foundation Type)


Distance center of rebar to concrete cover, d' = 0.085 m
Effective thickness d = h - d' = 0.22 m
Distance of critical area to concrete cover, ay = ( By - by - d ) / 2 = 0.19 m
Soil pressure at critical area, y direction,
qy = qmin + (By - ay) / By * (qmax - qmin) = 31.34 KN/m2
Shear force, y direction Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 2.39 KN

Width of shear area in x direction, b = Bx = 800.00 mm


Effective thickness d= 215.00 mm
Ratio of pedestal bc = bx / by = 1.25 mm

Shear force resistance equation, y direction (minimum):


Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3 = 339.52 KN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10 = -3
657.00 KN
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 261.17 KN

Minimum shear force resistance will be taken, Vc = 261.17 KN


Reduction factor f = 0.75
Shear force resistance f * Vc = 195.87 KN

f * Vc ≥ Vux
195.87 > 2.39 → (OK)
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 16 REV A

- Shear at x, y (2 direction at pad),.

* K-1 (Foundation Type)


Distance center of rebar to concrete cover, d' = 0.085 m
Effective thickness d = h - d' = 0.22 m
Width of shear area in x direction, cx = bx + 2 * d = 0.73 m
Width of shear area in y direction, cy = by + 2 * d = 0.68 m

Shear force, Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 10.26 KN


Width of shear area, Ap = 2 * ( cx + cy ) * d = 0.61 m2
Width of shear area, bp = 2 * ( cx + cy ) = 2.82 m
Ratio of pedestal bc = bx / by = 1.20

Shear force resistance equation, (minimum):


fp = [ 1 + 2 / bc ] * √ fc' / 6 = 2.02 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 1.34 MPa
fp = 1 / 3 * √ fc' = 1.52 MPa

Minimum shear force resistance will be taken, fp = 1.34 MPa


Reduction factor f = 0.75
Shear force resistance f * Vnp = f * Ap * fp * 103 = 608.43 kN

f * Vnp ≥ Vup
608.43 > 10.26 → (OK)
f * Vnp ≥ Pu
608.43 > 15.66 → (OK)

* K-2 (Foundation Type)


Distance center of rebar to concrete cover, d' = 0.085 m
Effective thickness d = h - d' = 0.22 m
Width of shear area in x direction, cx = bx + 2 * d = 0.68 m
Width of shear area in y direction, cy = by + 2 * d = 0.63 m

Shear force, Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 3.27 KN


Width of shear area, Ap = 2 * ( cx + cy ) * d = 0.56 m2
Width of shear area, bp = 2 * ( cx + cy ) = 2.62 m
Ratio of pedestal bc = bx / by = 1.25

Shear force resistance equation, (minimum):


fp = [ 1 + 2 / bc ] * √ fc' / 6 = 1.97 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 1.69 MPa
fp = 1 / 3 * √ fc' = 1.52 MPa

Minimum shear force resistance will be taken, fp = 1.52 MPa


Reduction factor f = 0.75
Shear force resistance f * Vnp = f * Ap * fp * 103 = 641.49 kN
f * Vnp ≥ Vup
641.49 > 3.27 → (OK)
f * Vnp ≥ Pu
641.49 > 9.90 → (OK)
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 17 REV A

C.6 Pad Reinforcement

Flexural Bar, x direction. Flexural Bar, y direction.

- Foundation Flexural Reinforcement, x direction


K-1 (Foundation Type)
Distance from pedestal to concrete cover, ax = ( Bx - bx ) / 2 = 0.45 m
Tegangan tanah pada tepi kolom, qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 32.35 KN/m2

Moment due soil pressure,


Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 0.88 KNm
Width of foundation, b = By = 1,200.00 mm
Foot pad thickness h= 300.00 mm
Distance center of rebar to concrete cover, d' = 75.00 mm
Effective thickness d = h - d' = 225.00 mm

Kuat tekan beton, fc' = 20.75 MPa


Kuat leleh baja tulangan, fy = 390.00 MPa
Modulus elastis baja, Es = 200,000.00 MPa
Distribution factor of concrete force, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02
Flexural strength reduction factor, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 5.50
Mn = Mux / f = 1.11 KNm
Rn = Mn * 106 / ( b * d2 ) = 0.02

Rn < Rmax → (OK)

Reinforce ratio, r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.00005


Reinforce ratio, minimum required rmin = 0.00250
Maximum reinforce ratio → r= 0.00250

Reinforcement bar area As = r * b * d = 675.00 mm2


Diameter of bar D 13.00 mm
Spacing bar required s = p / 4 * D2 * b / As = 235.97 mm
smax = 150.00 mm
Reinforcement bar in used → s= 150.00 mm
D 13 - 150.00
Reinforcement bar area in used As = p / 4 * D 2 * b / s = 1,061.86 mm2

K-2 (Foundation Type)


Distance from pedestal to concrete cover, ax = ( Bx - bx ) / 2 = 0.28 m
Tegangan tanah pada tepi kolom, qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 31.34 KN/m2

Moment due soil pressure,


Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 0.47 KNm
Width of foundation, b = By = 800.00 mm
Foot pad thickness h= 300.00 mm
Distance center of rebar to concrete cover, d' = 75.00 mm
Effective thickness d = h - d' = 225.00 mm

Kuat tekan beton, fc' = 20.75 MPa


Kuat leleh baja tulangan, fy = 390.00 MPa
Modulus elastis baja, Es = 200,000.00 MPa
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 18 REV A

Distribution factor of concrete force, b1 = 0.85


rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.04
Flexural strength reduction factor, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 7.52
Mn = Mux / f = 0.59 KNm
Rn = Mn * 106 / ( b * d2 ) = 0.01

Rn < Rmax → (OK)

Reinforce ratio, r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.00004


Reinforce ratio, minimum required rmin = 0.00250
Maximum reinforce ratio → r= 0.00250

Reinforcement bar area As = r * b * d = 450.00 mm2


Diameter of bar D 13.00 mm
Spacing bar required s = p / 4 * D2 * b / As = 235.97 mm
smax = 150.00 mm
Reinforcement bar in used → s= 150.00 mm
D 13 - 150.00
Reinforcement bar area in used As = p / 4 * D 2 * b / s = 707.91 mm2

- Foundation Flexural Reinforcement, y direction


K-1 (Foundation Type)
Distance from pedestal to concrete cover, ay = ( By - by ) / 2 = 0.48 m
Tegangan tanah pada tepi kolom, qy = qmin + (By - ay) / By * (qmax - qmin) = 32.35 KN/m2

Moment due soil pressure,


Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 1.48 KNm
Width of foundation, b = Bx = 1,200.00 mm
Foot pad thickness h= 300.00 mm
Distance center of rebar to concrete cover, d' = 85.00 mm
Effective thickness d = h - d' = 215.00 mm

Kuat tekan beton, fc' = 20.75 MPa


Kuat leleh baja tulangan, fy = 390.00 MPa
Modulus elastis baja, Es = 200,000.00 MPa
Distribution factor of concrete force, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02
Flexural strength reduction factor, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 5.50
Mn = Muy / f = 1.85 KNm
Rn = Mn * 106 / ( b * d2 ) = 0.03

Rn < Rmax → (OK)

Reinforce ratio, r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.00009


Reinforce ratio, minimum required rmin = 0.00250
Maximum reinforce ratio → r= 0.00250

Reinforcement bar area As = r * b * d = 645.00 mm2


Diameter of bar D 13.00 mm
Spacing bar required s = p / 4 * D2 * b / As = 246.94 mm
smax = 150.00 mm
Reinforcement bar in used → s= 150.00 mm
D 13 - 150.00
Reinforcement bar area in used As = p / 4 * D 2 * b / s = 1,061.86 mm2
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Preliminary Design for Warehouse -
SARULLA PROJECT 12 x 36 m2 HAL-HPM-SOL-14-CALC-003
21-Nov-14
NIL-2 Wellpad Page : 19 REV A

K-2 (Foundation Type)


Distance from pedestal to concrete cover, ay = ( By - by ) / 2 = 0.30 m
Tegangan tanah pada tepi kolom, qy = qmin + (By - ay) / By * (qmax - qmin) = 31.34 KN/m2

Moment due soil pressure,


Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 0.56 KNm
Width of foundation, b = Bx = 800.00 mm
Foot pad thickness h= 300.00 mm
Distance center of rebar to concrete cover, d' = 85.00 mm
Effective thickness d = h - d' = 215.00 mm

Kuat tekan beton, fc' = 20.75 MPa


Kuat leleh baja tulangan, fy = 390.00 MPa
Modulus elastis baja, Es = 200,000.00 MPa
Distribution factor of concrete force, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02
Flexural strength reduction factor, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 5.50
Mn = Muy / f = 0.70 KNm
Rn = Mn * 106 / ( b * d2 ) = 0.02

Rn < Rmax → (OK)

Reinforce ratio, r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.00005


Reinforce ratio, minimum required rmin = 0.00250
Maximum reinforce ratio → r= 0.00250

Reinforcement bar area As = r * b * d = 430.00 mm2


Diameter of bar D 13.00 mm
Spacing bar required s = p / 4 * D2 * b / As = 246.94 mm
smax = 150.00 mm
Reinforcement bar in used → s= 150.00 mm
D 13 - 150.00
Reinforcement bar area in used As = p / 4 * D 2 * b / s = 707.91 mm2
HAL-HPM-SOL-14-CALC-003
21-Nov-14
REV A
Standard Sectional Dimension of Wide Flange-steel and Its Sectional
Area, Unit Weight and Sectional Characteristic

Note :
Y

tf
*) Material : JIS G 3101 - SS 400

r
tw
Desain X X
Fy = 2450 kg/cm² if tf £ 16 mm

h2
ht
Fy = 2350 kg/cm² if tf £ 16 mm

h1
bf
Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Informative Reference
S TAN DAR D S E C T I O NAL D I M E N S I O N Sec.of Unit Geometrical Radius of Modulus of
Area Weight Moment of Gyration of Section
Nominal ht x bf tw tf r h1 h2 A Inertia (cm4) Area (cm) (cm3)
Dimensional (mm x mm) (mm) (mm) (mm) (mm) (mm) (cm²) (kg/m) Ix Iy ix iy Sx Sy
WF 100x100x6x8 100 x 100 6.0 8.0 10.0 18.0 64.0 21.90 17.20 383 134 4.18 2.47 76.5 26.7
WF 125x125x6,5x9 125 x 125 6.5 9.0 10.0 19.0 87.0 30.31 23.80 847 293 5.29 3.11 136 47
WF 150x75x5x7 150 x 75 5.0 7.0 8.0 15.0 120.0 17.85 14.00 666 49.5 6.11 1.66 88.8 13.2
WF 148x100x6x9 148 x 100 6.0 9.0 11.0 20.0 108.0 26.84 21.10 1020 151 6.17 2.37 138 30.1
WF 150x150x7x10 150 x 150 7.0 10.0 11.0 21.0 108.0 40.14 31.50 1640 563 6.39 3.75 219 75.1
WF 175x175x7,5x11 175 x 175 7.5 11.0 12.0 23.0 129.0 51.21 40.20 2880 984 7.50 4.38 330 112
WF 198x99x4,5x7 198 x 99 4.5 7.0 11.0 18.0 162.0 23.18 18.20 1580 114 8.26 2.21 160 23
WF 200x100x5,5x8 200 x 100 5.5 8.0 11.0 19.0 162.0 27.16 21.30 1840 134 8.24 2.22 184 26.8
WF 200x200x8x12 200 x 200 8.0 12.0 13.0 25.0 150.0 63.53 49.90 4720 1600 8.62 5.02 472 160
WF 248x124x5x8 248 x 124 5.0 8.0 12.0 20.0 208.0 32.68 25.70 3540 255 10.40 2.79 285 41.1
Standard Sectional Dimension of Wide Flange-steel and Its Sectional
Area, Unit Weight and Sectional Characteristic

Note :
Y

tf
*) Material : JIS G 3101 - SS 400

r
tw
Desain X X
Fy = 2450 kg/cm² if tf £ 16 mm

h2
ht
Fy = 2350 kg/cm² if tf £ 16 mm

h1
bf
Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Informative Reference
S TAN DAR D S E C T I O NAL D I M E N S I O N Sec.of Unit Geometrical Radius of Modulus of
Area Weight Moment of Gyration of Section
Nominal ht x bf tw tf r h1 h2 A Inertia (cm4) Area (cm) (cm3)
Dimensional (mm x mm) (mm) (mm) (mm) (mm) (mm) (cm²) (kg/m) Ix Iy ix iy Sx Sy
WF 250x125x6x9 250 x 125 6.0 9.0 12.0 21.0 208.0 37.66 29.60 4050 294 10.40 2.79 324 47
WF 250x250x9x14 250 x 250 9.0 14.0 16.0 30.0 190.0 92.18 72.40 10800 3650 10.80 6.29 867 292
WF 298x149x5,5x8 298 x 149 5.5 8.0 13.0 21.0 256.0 40.80 32.00 6320 442 12.40 3.29 424 59.3
WF 300x150x6,5x9 300 x 150 6.5 9.0 13.0 22.0 256.0 46.78 36.70 7210 508 12.40 3.29 481 67.7
WF 300x300x10x15 300 x 300 10.0 15.0 18.0 33.0 234.0 119.80 94.00 20400 6750 13.10 7.51 1360 450
WF 346x174x6x9 346 x 174 6.0 9.0 14.0 23.0 300.0 52.68 41.40 11100 792 14.50 3.88 641 91
WF 350x175x7x11 350 x 175 7.0 11.0 14.0 25.0 300.0 63.14 49.60 13600 984 14.70 3.95 775 112
WF 350x350x12x19 350 x 350 12.0 19.0 20.0 39.0 272.0 173.90 137.00 40300 13600 15.20 8.84 2300 776
WF 396x199x7x11 396 x 199 7.0 11.0 16.0 27.0 342.0 72.16 56.60 20000 1450 16.70 4.48 1010 145
WF 400x200x8x13 400 x 200 8.0 13.0 16.0 29.0 342.0 84.10 66.00 23700 1740 16.80 4.54 1190 174
WF 400x400x13x21 400 x 400 13.0 21.0 22.0 43.0 314.0 218.70 172.00 66600 22400 17.50 10.10 3330 1120
Standard Sectional Dimension of Wide Flange-steel and Its Sectional
Area, Unit Weight and Sectional Characteristic

Note :
Y

tf
*) Material : JIS G 3101 - SS 400

r
tw
Desain X X
Fy = 2450 kg/cm² if tf £ 16 mm

h2
ht
Fy = 2350 kg/cm² if tf £ 16 mm

h1
bf
Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Informative Reference
S TAN DAR D S E C T I O NAL D I M E N S I O N Sec.of Unit Geometrical Radius of Modulus of
Area Weight Moment of Gyration of Section
Nominal ht x bf tw tf r h1 h2 A Inertia (cm4) Area (cm) (cm3)
Dimensional (mm x mm) (mm) (mm) (mm) (mm) (mm) (cm²) (kg/m) Ix Iy ix iy Sx Sy
WF 450x200x9x14 450 x 200 9.0 14.0 18.0 32.0 386.0 96.80 76.00 33500 1870 18.60 4.40 1490 187
WF 500x200x10x16 500 x 200 10.0 16.0 20.0 36.0 428.0 114.20 89.60 47800 2140 20.50 4.33 1910 214
WF 600x200x11x17 600 x 200 11.0 17.0 22.0 39.0 522.0 134.40 106.00 77600 2280 24.00 4.12 2590 228
WF 588x300x12x20 588 x 300 12.0 20.0 28.0 48.0 492.0 192.50 151.00 118000 9020 24.80 6.85 4020 601
WF 700x300x13x24 700 x 300 13.0 24.0 28.0 52.0 596.0 235.50 185.00 201000 10800 29.30 6.78 5760 722
WF 800x300x14x26 800 x 300 14.0 26.0 28.0 54.0 692.0 267.40 210.00 292000 11700 33.00 6.62 7290 782
Tidak ada 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
F3 M1 M2 F3 - MAX M1 - MAX M2 - MAX
Kgf Kgf-m Kgf-m Kgf Kgf-m Kgf-m

1.00 DL1.4 400.81 (0.00) (1.53) 1,059.88 0.000 1.53


DL1.2 + LL1.6 1,059.88 (0.00) (0.56)
DL1.2 + LL0.5 + WR0.8 563.17 (0.00) (1.07)
DL1.2 + LL0.5 - WR0.8 571.63 (0.00) (1.08)
Dl1.2 + LL0.5 + WL0.8 571.63 (0.00) (1.08)
DL1.2 + LL0.5 - WL0.8 563.17 (0.00) (1.07)

3.00 DL1.4 400.68 (0.00) (1.53) 1,059.76 0.000 1.53


DL1.2 + LL1.6 1,059.76 (0.00) (0.56)
DL1.2 + LL0.5 + WR0.8 590.12 (0.00) (1.06)
DL1.2 + LL0.5 - WR0.8 544.45 (0.00) (1.09)
Dl1.2 + LL0.5 + WL0.8 544.45 (0.00) (1.09)
DL1.2 + LL0.5 - WL0.8 590.12 (0.00) (1.06)

10.00 DL1.4 563.81 0.00 (0.71) 1,566.25 0.000 0.71


DL1.2 + LL1.6 1,566.25 0.00 (0.73)
DL1.2 + LL0.5 + WR0.8 823.62 0.00 (0.64)
DL1.2 + LL0.5 - WR0.8 819.78 0.00 (0.65)
Dl1.2 + LL0.5 + WL0.8 819.78 0.00 (0.65)
DL1.2 + LL0.5 - WL0.8 823.62 0.00 (0.64)

12.00 DL1.4 564.06 0.00 (0.71) 1,566.46 0.000 0.71


DL1.2 + LL1.6 1,566.46 0.00 (0.73)
DL1.2 + LL0.5 + WR0.8 850.91 0.00 (0.65)
DL1.2 + LL0.5 - WR0.8 792.92 0.00 (0.64)
Dl1.2 + LL0.5 + WL0.8 792.92 0.00 (0.64)
DL1.2 + LL0.5 - WL0.8 850.91 0.00 (0.65)

MAXIMUM F3 - MAX 1,566.46 Kgf =


M1 - MAX 0.00 Kgf-m =
M2 - MAX 1.53 Kgf-m =

8.00 DL1.4 298.54 (0.00) (0.28) 989.88 0.00 0.28


DL1.2 + LL1.6 989.88 (0.00) (0.24) 9.899 0.000 0.003
DL1.2 + LL0.5 + WR0.8 497.59 (0.00) (0.24)
DL1.2 + LL0.5 - WR0.8 472.94 (0.00) (0.24)
Dl1.2 + LL0.5 + WL0.8 472.94 (0.00) (0.24)
DL1.2 + LL0.5 - WL0.8 497.59 (0.00) (0.24)
15.665 Kn
0.000 Kn-m
0.015 Kn-m