12 hrs 9-Sep-02

PLANT & EQUIPMENT BUILD UP 6 working days


4.33 weeks
312.00 hrs / mth with 1 shift
New/Old/Hire Hire/No/Mth/Shft Price/ New Unit
Plant / Equipment (Rs)
Excavator -JCB Hire 80000
Tippers 3 km lead Hire 30000
Water Pump Old 1340
Compressor -400 cfm Old 19490
Crawler Drill Old 4330
Compressor -220 cfm Old 14720
Rock breakers Old 780
Motor grader New 126087 5800000
Vib roller - L&T 1104 New 39130 1800000
Water tanker 10000 ltr @ 6 trip /day Hire 30000
Excavator- EX 200 Hire 240000
Tractor Dozer Hire 21000
Water tanker 10000 ltr @ 6 trip /day Hire 30000
Crawler Drill Old 4330
Jack Hammers Old 779
Compressor 400 cfm Old 19485
Compressor 200 cfm Old 14722
Blasting material
Consumables
Dumper-Transport of spawl Hire 30000
Crushing system 250 TPH Old 275000 27500000
Generator (750KVA) Old 34000 3400000
GSB Blending plant 160 TPH Hire 0
Tractor Dozer Hire 21000
Water tanker 10000 ltr @ 6 trip /day Hire 30000
WMM plant 200TPH New 64706 2200000
Paver with sensor New 58824 4000000
HMM Plant 160 TPH Old 270000 16200000
Generator 500KVA Old 86000 3400000
Generator 65 KVA Hire 10000
Loader Hire 120000
Paver with sensor (9m width) Old 116667 7000000
Vibratory roller - Tandem Old 31667 1900000
Pneumatic tyre roller Old 26667 1600000
Tractor / Trialer Hire 30000
Mobile DG set Hire 7000
Hydraulic Broomer Old 1833 110000
Tractor with Broomer Hire 15000
Water tanker 10000 ltr Hire 24500
Tractor mounted Compressor Hire 14000
Bowser Hire 70000
Apollo Kerb laying Machine with MouNew 37143 780000
Kerb Cutting Machine with Blade New 5238 110000
Batching plant (30 Cum capacity) Old 121200 4280000
JCB Old 70000
Generator -125kVA Hire 20000
Mobile mixer- Gamzen Old 65000
Transit mixer- avg lead 10 km Old 100000
Concrete Pump Old 120000
Concrete Placer Boom New 218182 16000000
Vibrator Old 780
Generator (125KVA) Old 12600 6300000
Generator (60KVA) Old 4300
Generator (24KVA) Old 4300
Welding Generator Old 3800 0
Tyre MountedCrane 320 Old 59800
Tipper Old 30000 0
Weigh bridge Old 32500
Water Pump Old 1300
Tracter with Trolly Hire 50000
Hydra Old 34600
Cube Testing Machine Old 1300
Cutting & Bending Machine Old 400
Levelling instruments Old 1700
Thedolite Old 4300
Distomat/Total station Old 57600 409000
40 T Weigh Bridge New 371000
Crusher-Metso-250 TPH New 36440000
Laboratory Equipment New 337000
Motor Grader New 5750000
Tipper @ 6 cum. Capacity New 853223
Transit Mixer New 1938741
Dumper New 6903241
Vibratory Soil Compactor New 1882767
Tipper @ 8.50 cum. Capacity New 827383
1.8

2010 2010
Hire/No/Mth/Shft Price/ New Unit (Rs)

144000
54000
2412
35082
7794
26496
1404
226957 10440000
70435 3240000
54000
432000
37800
54000
7794
1403
35073
26500
0
0
54000
495000 49500000
61200 6120000
0
37800
54000
116471 3960000
105882 7200000
486000 29160000
154800 6120000
18000
216000
210000 12600000
57000 3420000
48000 2880000
54000
12600
3300 198000
27000
44100
25200
126000
66857 1404000
9429 198000
218160 7704000
126000
36000
117000
180000
216000
392727 28800000
1404
22680 11340000
7740
7740
6840
107640
54000
58500
2340
90000
62280
2340
720
3060
7740
103680 736200
667800
65592000
606600
10350000
1535801
3489735
12425834
3388981
1489289
100

AFTER REBATE
SL. BRIEF DESCRIPTION UNIT RATE
NO. OF ITEMS
Bill No. -1 : Site Clearance
1.01 Clearing and Grubbing Hct 15066
1.02 Co-ordinating with Respective Service Providers / Authorities KM 10230
1.03 Dismantling of Structures & Pavement :
a) Brick and Stone Structures Cum 148.8
b) Plain Cement Concrete Cum 213.9
c) Reinforced Cement Concrete Cum 213.9
d) Flexible Pavement Cum 186
e) Guard Stone & KM Stone Nr. 167
f) Road kerbs , Gutters & Pipes Lm 167
g) Railing and Fencings Lm 111.6
h) Temporary Structures ( Pucca / Semi Pucca ) Sqm 399.99
1.04 Cutting of Trees including Removal of Stumps Complete 0
a) Above 300 mm girth to 600 mm Girths No. 790.5
b) Above 600 mm girth to 900 mm Girths No. 1906.5
c) Above 900 mm girth to 1800 mm Girths No. 3106
d) Above 1800 mm girth No. 3178.71
Total : Bill No.-1

Bill No. -2 : Earth Works


2.01 RoadWay Excavations necessary for Construction
a) In all types of Soil Cum 32.55
b) Ordinary Rock Cum 65
2.02 Embankment with Approved Materials from Borrow Pits Cum 55.8
2.03 Embankment with Materials from Roadway Excav. Cum 48.4
2.04 Subgrade / Shoulder with approved Materials from Roadway & Drainage Excavation ->10% CBR Cum 48.36
2.05 Subgrade / Shoulder with approved Materials from Borrowpit ->10% CBR Cum 62.31
2.06 Loosening and Recompacting Subgrade as per TS 305 Cum 42.8
2.07 Furrow Cutting on Existing Bituminous Surface Sqm 37.2
2.08 Preparation of Road Surface True to Line & Grade as per T.S.305 Sqm 43.7
2.09 Earthwork in Filling of Median and Island with Selected Earth as Per TS 407 Cum 65
2.10 Filling top 300 mm of Median Island with approved material. As per TS 407. Cum 65

5 AA014 / CTC - Rev. 09 dated 01.04.04


2.11 Stripping , Storing and Reapplication of Top Soil as per TS 301. Cum 32.55
2.12 Removal ,Replacement of Unsuitable Materials at Embankment. Cum 32.55
Total : Bill No.-2
Bill No. -3 : Sub-Base and Base Courses
3.01 Constructing Granular Sub-Base -Grading -I of Table 400-1 Cum 381
3.02 Constructing Wet Mix Macadem -as per Table 406 Cum 456
3.03 Constructing Profile Regulating Course-with WMM as per TS-406 Cum 456
Total : Bill No.-3
Bill No. -4 : Bituminous Courses
4.01 Bituminous Prime Coat with MC-30 ( @ 6.0 - 9.0 Kg /10 Sqm ) as per TS 502. Kg 19.5
4.02 Bituminous Tack Coat with Emulsion as per TS 502. 0
a) ( @ 2.5 - 3.0 Kg /10 Sqm )-Over Granular Surface Kg 14
b) ( @ 2.0 - 2.5 Kg /10 Sqm )-Over Bituminous Surface Kg 14
4.03 Profile Corrective Course with DBM as per 501 & 507 Cum 1860
4.04 Provide & Lay DBM Course with 60 / 70 Gr.as per TS 507 Cum 1860
4.05 Provide & Lay BCCourse with 60 / 70 Gr.as per TS 512 Cum 2101.8
4.06 Provide & Lay 20 mm Th. Open Graded Premix Carpet as per TS 509 Sqm 37
4.07 Provide & Lay A-Type Seal Coat .as per TS 513. Sqm 28
Total : Bill No.-4
Bill No. -5A : Widening of Slab Culverts including Service Roads
5A.01 Earthwork in Excav. for Foundations of Str.-All Type of Soil Cum 38.13
5A.02 Ditto 5A.01 above but in Rock Cum 151
5A.03 BackFilling in Abutment & Wing Wall as per TS 305 Cum 98
5A.04 Ditto 5A.03 above but With Selected Excavated Materials Cum 186
5A.05 Filter Medium Behind Abutment as per TS 2504 Cum 177
5A.06 Plain Cement Concrete for Foundation & Sub-StructureM-25 Grade Cum 2120
5A.07 Plain Cement Conc. M-15 in Foundation Levelling Course Cum 1395
5A.08 Structural C.C. for RCC in Sub-Structure / Super Structure Complete. Cum 2948
5A.09 HYSD Reinforcement Bar as per TS 1600 MT 25575
5A.10 Provide & Lay 40 mm Thick AC on top of Deck Slab as per TS 500 Cum 2418
5A.11 Provide & Lay a layer of 25 mm Thick Mastic Asphalt as per TS 500 & 2700 Sqm 288
5A.12 Provide Weep Holes in abutment and Wing Walls Nr. 158
5A.13 Providing and Laying Stone Pitching as per TS 2500 Cum 251
5A.14 Provide and Lay Boulder Appron Complete as per TS 2500 Cum 251
5A.15 Provide and Lay Filter Material Below Stone Pitching as per TS 2500 Cum 233
5A.16 Provide and Lay 20 mm th.Compression Fibre Board Expansion Joint Lm 186

6 AA014 / CTC - Rev. 09 dated 01.04.04


5A.17 Provide and Fix Tar Paper Bearing as per TS 2000 Sqm 19
5A.18 Repair of Cracks : Chip Off, Clean & Grout with Epoxy Mortar Lm 2864
5A.19 Repair of Honey comb , Spalling and Soft /Spongy Conc. Surface
(a) Chipping Out and Cleaning the Surface Complete Sqm 698
(b) Provide and Apply Well Mixed Polymer Cement Slurry Sqm 3069
(c) Provide and Apply C : S Mortar 1 : 3 Sqm 1218
(d) Provide and Apply Polymer Modified C : S Mortar 1 : 2 : 6 Sqm 6557
5A.20 Repair of Corroded Reinforcement & Providing New Kg. 205
5A.21 Dismantling of Concrete Masonry & Cement Concrete Plaster Cum 1395
5A.22 Painting if Culvert No. and Span as per TS 800 Nr. 3488
Total : Bill No.-5A
Bill No. -5B : Widening Of RCC Pipe Culvert including Service Road
5B.01 Earthwork in Excav. for Foundations of Str.-All Type of Soil Cum 38.13
5B.02 Ditto 5A.01 above but in Rock Cum 151
5B.03 BackFilling in Abutment & Wing Wall as per TS 305 Cum 93
5B.04 Ditto 5A.03 above but With Selected Excavated Materials Cum 233
5B.05 Plain Cement Concrete M-15 in Pipe Bedding as per TS 2100 Cum 1683.3
5B.06 Plain Cement Concrete for Foundation & Sub-StructureM-25 Grade Cum 3143.4
5B.07 Plain Cement Conc. M-15 in Foundation Levelling Course Cum 1683.3
5B.08 HYSD Reinforcement Bar as per TS 1600 MT 25575
5B.09 Providing , Laying & Jointing NP4 -Hume Pipes 0
a) Diameter 900 mm Lm 2241
b) Diameter 1000 mm Lm 5580
5B.10 Cleaning and Clearing Fully or Partially Chocked Pipes Lm 251
5B.11 Dismantling of Concrete, Masonry, Damaged Pipes & Cement Concrete Plaster Cum 381
5B.12 Providing and Laying Stone Pitching as per TS 2500 Cum 251
5B.13 Provide and Lay Boulder Appron Complete as per TS 2500 Cum 251
5B.14 Provide and Lay Filter Material Below Stone Pitching as per TS 2500 Cum 233
5B.15 Painting if Culvert No. and Span as per TS 800 Nr. 939
Total : Bill No.-5B
Bill No. -6A : New Bridge
6A.01 Earthwork in Excav. for Foundations of Str.-All Type of Soil Cum 38.13
6A.02 Ditto 6A.01 above but in Soft Disintegrated Rock Cum 100
6A.03 Provide and Lay Coarse Sand Below Open Foundation Cum 158
6A.04 Structural Cement Concrete in Open Foundations Complete 0
(a) M-25 Grade Concrete Cum 2371.5

7 AA014 / CTC - Rev. 09 dated 01.04.04


(b) M-30 Grade Concrete Cum 2445.9
( c) M-35 Grade Concrete Cum 2557.5
6A.05 Carrying Out Load Test on Piles -800mm Dia.incl.Piles 0
(a) Initial Load Test 170 MT x 2.50 = 425 MT Nos. 426870
(b) Lateral Load Test On Piles at Set ( a) Nos. 18879
( c) Routine Load test on Working Piles 255 Tons Nos. 93930
6A.06 Structural Cement Concrete M-35 in Piles Excl.Rebars 0
(a) 0 to 10 M Depth Rm 3069
(b) 10 to 20 M Depth Rm 3069
6A.07 Structural Cement Concrete M-35 in Pile Caps -Grade Separators Cum 3413
6A.08 Provide M.S. Cutting Edge for Well Foundation MT 34596
6A.09 Provide M-35 in Well kerbs Complete Excl. Rebars Cum 3860
6A.10 Provide M-25 in Well Stening Complete Excl. Rebars Cum 3590
6A.11 Sinking of Well Foundations -Complete as per T.S. 0
(i) 6 Mtr. Dia Wells 0
a) 0-10 Mtr. in Soils Rm 23250
b) 10-20 Mtr. in Soils Rm 27063
c) 10-20 Mtr. in Soft Disintegrated Rocks Rm 33294
(ii) 7 Mtr. Dia Wells 0
a) 0-10 Mtr. in Soils Rm 23245
b) 10-20 Mtr. in Disintegrated Rock Rm 26778
(iii) 8 Mtr. Dia Wells 0
a) 0-10 Mtr. in Soils Rm 0
b) 10-20 Mtr. in Disintegrated Rock Rm 0
6A.12 M-25 Grade Concrete in Bottom Plug with 10% Extra Cement Cum 2269
6A.13 Sand Filling in Well- Clean , Seived Sand as per T.S.1209 Cum 130
6A.14 M-25 Grade Concrete inTop / Intermediate Plug Cum 2269
6A.15 M-35 Grade Concrete in Well Cap Complete Cum 2594.7
6A.16 Structural Cement Concrete in Pier, Pier Caps, Pedestal & Abutments Etc. 0
(a) M-25 Grade ( PCC ) Cum 3208.5
(b) M-25 Grade ( RCC ) Cum 3209
(c) M-30 Grade Cum 3292
(d) M-35 Grade Cum 3292
6A.17 Structural Cement Concrete in Super-Structures Etc. 0
(a) M-25 Grade Cum 3525
(b) M-30 Grade Cum 3627
(c) M-35 Grade Cum 3776

8 AA014 / CTC - Rev. 09 dated 01.04.04


6A.18 Controlled RCC M-30 Grade in Kerbs excl.Rebars Cum 2511
6A.19 HYSD Reinforcement Bar as per TS 1600 MT 25436
6A.20 Prestressed Concrete in Box Girders M-45 Grade Complete Cum 4696.5
6A.21 Provide HT Strand in Girders Complete MT 94860
6A.22 Provide & Lay 40 mm Thick AC on top of Deck Slab as per TS 500 Cum 2446
6A.23 Provide & Lay a layer of 25 mm Thick Mastic Asphalt as per TS 500 & 2700 Sqm 279
6A.24 Drainage Spouts Complete as per TS 2705 Nr. 437
6A.25 Provide & lay 150 mm Dia PVC Diwn Take & Runner Pipes Lm 316
6A.26 Providing and Fixing in Position true to Line the followings 0
(a) Elastomeric Bearings CuCm 0.93
(b) Tar Paper Bearings Sqm 19
(c) POT Cum PTFE Bearings 0
(i)a Fixed Bearings-325 T Capacity Nr. 34503
(i)b Fixed Bearings-225 T Capacity Nr. 30783
(i)c Fixed Bearings-275 T Capacity Nr. 0
(ii)a Free Bearings-325 T Capacity Nr. 34503
(ii)b Free Bearings-225 T Capacity Nr. 30783
(ii)c Free Bearings-275 T Capacity Nr. 0
6A.27 Provide and Lay Buried Type Expansion Joint M 856
6A.28 Provide & Lay Elastomeric Strip Seal Type Expansion Joint 0
(i) For a movement of 20 mm M 8184
(ii) For a movement of 40 mm M 8370
6A.29 Reinforced Cement Concrete Railing M-30 Grade M 1386
6A.30 Structural Cement Concrete in Approach Slabs-M30 Cum 3478
6A.31 Reinforced Cement Concrete Crash Barriers M-30 Grade incl Rebars 0
a) For Bridges and Grade Separators M 1386
b) For Approaches of ROB's M 1386
6A.32 PCC M-15 in Levellings Course Below Foundations Cum 1683
6A.33 PCC M-25 in Filling above Deck Slab in Footpaths Cum 2120
6A.34 Provide Weep Holes in Retaining Wall & Abutments Nr. 158
6A.35 Painting Bridge No. and Span Arrangement Etc. Nr. 939
6A.36 BackFilling in Abutment & Wing Wall as per TS 305 Cum 93
6A.37 Filter Medium Behind Abutment as per TS 2500 Cum 177
6A.38 Hand Packed Boulder Pitching on Slopes Cum 241.8
6A.39 Design and Construction of Reinforced Soil Structures 0
(a) Facing Elelments -M35 and Reinforcing Elements Sqm 3343.4
(b) Filling and Compaction of the Backfill Material Cum 130

9 AA014 / CTC - Rev. 09 dated 01.04.04


(c) Ground Improvement Measures incl. Soil Stabilisation Cum 456
6A.39 Providing Boulder Pitching in Wire Crates Cum
6A.40 Providing & Fixing Heavy Duty C.I. Man Hole Covers No.
6A.41 Carrying Out Confirmatory Bore Holes RM
Total : Bill No.-6A
Bill No. -6B : Widening of Existing Bridges
6B.01 Dismantling of Masonry and Pitching of Existing Bridge Cum 186
6B.02 Dismantling / Breaking of PCC , RCC Foundations Etc. Cum 251
6B.03 Earthwork in All Type of Soils excluding Rocks Cum 37
6B.04 Earthwork in Disintegrated Rocks Cum 102
6B.05 Backfilling with Selected Granular Material Cum 47
6B.06 Providing and laying Filter Media behind Abutment Etc Cum 177
6B.07 Structural Cement Concrete M-25 in Open Foundation beside Existing Foundations. Cum 3395
6B.08 Structural Cement Concrete in Sub-Structures beside Existing Sub-Structures. 0
(a) Grade M-25 ( PCC )in abutment Wing wall & Piers Cum 3395
(b) Grade M-25 ( RCC )in Piers / Abutments , Dirt Walls Etc. Cum 3395
6B.09 Structural Cement Concrete in Super-Structures beside Existing Super-Structures. 0
(a) M-25 Grade Cum 3682.8
(b) M-30 Grade Cum 3757
6B.10 Providing and Fixing Rebar HYSD as per TS 1600 MT 25575
6B.11 RCC In Crash Barrier M-30 Grade incl.Rebars M 2381
6B.12 100 mm Dia AC Pipes for weep Holes Complete Nr. 158
6B.13 Provide and Fix Tar Paper bearings Complete Sqm 18.6
6B.14 Provide and Fix Buried Type Expansion Joints Complete M 856
6B.15 Provide and lay Asphaltic Plug Type Expansion Joint M 363
6B.16 RCC M30 in Appraoch Slabs Excluding Rebars Cum 3348
6B.17 PCC M-15 in Levellings Course Below Foundations Cum 1683
6B.18 PCC M-25 in Filling above Deck Slab in Footpaths Cum 2120
6B.19 Drainage Spouts Complete as per 2705 Nr. 437
6B.20 Dismantling and Removal of Wearing Coat Sqm 28
6B.21 PCC M-15 Filling above the Existing Deck Slab Cum 1739
6B.22 Provide & Lay 40 mm Thick AC on top of Deck Slab as per TS 500 Cum 2418
6B.23 Provide & Lay a layer of 25 mm Thick Mastic Asphalt as per TS 500 & 2700 Sqm 279
6B.24 Reinforced Cement Concrete railing M-30 Complete M 1786
6B.25 Hand Packed Boulder Pitching on Slopes Cum 242
6B.26 Boulder Pitching in Wire Crates Complete Cum 744
6B.27 PCC M-25 in Curtain Wall for Bed Protection Works Cum 2520
10 AA014 / CTC - Rev. 09 dated 01.04.04
6B.28 PCC M-25 in Bed Protection Works in Flooring Cum 2325
6B.29 Painting Bridge No. and Span Arrangement Etc. Nr. 939
Total : Bill No.-6B
Bill No. -6C : Repair of Existing Bridges
6C.01 Repair of Cracks - Chip Off, Clean & Apply Epoxy Mortar m 2558
6C.02 Guniting of Damaged and Spalled Honeycombed Portion Sqm 1163
6C.03 Repair of Damaged Masonry with CS Mortar 1 : 3 Complete Cum 2455
Total : Bill No.-6C
Bill No. -7 : Toll Plaza
7.01 Construction of Subgrade / Shoulder aith Materials From Borrow Pits as per TS 305 Cum 56
7.02 Construction of Lower Granular Sub-Base as per TS 401 Cum 363
7.03 Construction of Wet Mix Macadem as per TS 406 Cum 419
7.04 Bituminous Prime Coat with MC-30 ( @ 6.0 - 9.0 Kg /10 Sqm ) as per TS 502. Kg 20
7.05 Bituminous Tack Coat with Emulsion as per TS 503. 0
(a) ( @ 2.5 - 3.0 Kg /10 Sqm )-Over Granular Surface Kg 14
(b) ( @ 2.0 - 2.5 Kg /10 Sqm )-Over Bituminous Surface Kg 14
7.06 Dense Bituminous Macadem Course as per 507 Cum 1860
7.07 Provide Bituminous Concrete Wearing Course as per 512 Cum 2102
7.08 Granular Sub-Base Filling With Selected Earth Cum 56
7.09 Supply and lay Concrete Kerb and Channels LM 186
7.10 M-15 Grade Concrete in Median and Island Complete Cum 1414
7.11 Supply and Fix 25 mm Thick Chequered Tiles Complete Sqm 112
7.12 Construction of Dry Lean Concrete Sub-Base M-15 Cum 1581
7.13 Construction of Pavement Quality Concrete M-35 Complete Cum 2604
Total : Bill No.-7
Bill No. -8 : Junctions and Intersections
8.01 Construction of Subgrade / Shoulder aith Materials From Borrow Pits as per TS 305 Cum 56
8.02 Construction of Lower Granular Sub-Base as per TS 401 Cum 363
8.03 Construction of Wet Mix Macadem as per TS 406 Cum 419
8.04 Bituminous Prime Coat with MC-30 ( @ 6.0 - 9.0 Kg /10 Sqm ) as per TS 502. Kg 20
8.05 Bituminous Tack Coat with Emulsion as per TS 502. 0
(a) ( @ 2.5 - 3.0 Kg /10 Sqm )-Over Granular Surface Kg 14
(b) ( @ 2.0 - 2.5 Kg /10 Sqm )-Over Bituminous Surface Kg 14
8.06 Dense Bituminous Macadem Course as per 507 Cum 1860
8.07 Provide Bituminous Concrete Wearing Course as per 512 Cum 2102
Total : Bill No.-8

11 AA014 / CTC - Rev. 09 dated 01.04.04


Bill No. -9 : Road Appurtenances
9.01 Supplying and Fixing of Traffic Sign Board Complete 0
(a) Informatory Signs 0
(i) Parking Sign ( 600 mm X 600 mm ) Nr. 10416
(ii) Advance Direction , Destination Etc ( 1200 X 1500 mm ) Sqm 7998
(iii) Facility Information ( 800 mm X 600 mm ) Nr. 3255
(b) i) Cautionary / Earning -Triangiular 900 mm Side Nr. 2790
( c ) Mandatory / Regulatory Signs 0
(i) Octagon ~ STOP ~ Sign Nr. 4929
(ii) 600 mm Dia Circular Signs Nr. 2790
(ii) GIVE WAY ' Signs -Triangiular 900 mm Side Nr. 4929
9.02 Supply and Fix Overhead and Overhead Gantry Sign 0
(a) Overhead Sign Nr. 102300
(b) Overhead Gantry Sign Nr. 106950
9.03 Pavement Marking with Hot Applied Thermoplastic Paint 0
(a) Lane , Centre Line and Edge Marking Sqm 372
(b) Directional Arrows and Markings Nr. 1023
9.04 Hectometre , KM and 5th KM Stones 0
(a) Hectometre Stone Nr. 270
(b) Kilometre Stone Nr. 270
(c) 5 th KM Stone Nr. 381
9.05 RCC Guard Posts Complete Nr. 1860
9.06 Provide Road Indicators and Hazard Markers 0
(a) Triangilar Red Reflectors Nr. 549
(b) Circular Red Reflectors Nr. 549
(c) One Way Hazard Marker Nr. 549
(d) Two Way Hazard Marker Nr. 549
(e) Object Hazard Marker Nr. 549
9.07 Providing and Erecting Boundary Stones Nr. 270
9.08 Supply and Fix Guard Railing with Rolled Steel Sections 0
(a) For Pedestrians Lm 595
(b) For Antiglare for Pedestrian having 1.20 Mtr Median Lm 502
9.09 Supplying , Fixing and Laying PCC Kerb -M20 LM 139.5
9.10 Supplying , Fixing and Laying PCC Kerb Foundation -M15 LM 93
9.11 Providing and Erecting Steel Beam Guide Rails Complete LM 1962
9.12 M-15 Structural Concrete in FootPaths Complete Cum 1721
9.13 Supplying and Fixing 25 mmTh. Chequered Tiles Complete Sqm 102

12 AA014 / CTC - Rev. 09 dated 01.04.04


9.14 Turfing Side Slopes of Road Embankment Complete Sqm 19
Total : Bill No.-9
Bill No. -10 : Drainage and Protective Works
10.01 Earthwotk in Excavation in All Types of Soils Cum 31
10.02 PCC M-10 in Foundations of Drains Complete Cum 1172
10.03 M-20 RCC for Lined Covered Surface Drains Complete Cum 1999.5
10.04 M-20 Precast Slab Units 1500 x 1000 x 100 mm incl Rebars Nr. 409
10.04 M-20 Precast Slab Units 1500 x 1200 x 100 mm incl Rebars Nr. 493
10.05 Supplying and Fixing Iron Gratings 250 mm x 125 mm Nr. 186
10.06 Constructing Catchpits in Superelevated Sections Nr. 4650
10.07 Supply and Fix 1000 mm Dia NP-4 RCC Pipes M 2139
10.08
23250
Provide and Fix HYSD Rebars as per TS 1600 MT
10.09 Median Cross Drains with M-20 Grade Concrete Cum 2530
10.10 75 mm Dia PVC Pipes for Drains Lm 465
10.11 200 mm Dia PVC Pipes for Drain Entrance Lm 744
10.12 RCC M-15 Grade - Inlet Chambers & Catch Pits 0
(a) Size 600 mm x 600 mm x 1000 mm Nr. 9300
(b) Size 1000 mm x 1000 mm x 1500 mm Nr. 11160
(c) Size 1500 mm x 1500 mm x 1800 mm Nr. 13950
10.13 Construction of 300 mm Dia Semi-circular Drains -M20 Lm 139.5
10.14 Construction of Drainage Chutes on Embankment -M20 Lm 139.5
10.15 Supply and Lay Concrete Kerb and Channel Sections Lm 149
10.16 Energy Dissipation Basins at toe of Chutes -M15 Nr. 1767
10.17 Stone Pitching 300 mm Th. With Grouts M-10 on slopes Cum 791
10.18 Granular Material as Pipe bedding for RCC Pipes Cum 149
Total : Bill No.-10
Bill No. -11 : Service Roads
11.01 Construction of Subgrade / Shoulder aith Materials From Borrow Pits as per TS 305 Cum 60.45
11.02 Construction of Lower Granular Sub-Base as per TS 401 Cum 362.7
11.03 Construction of Wet Mix Macadem as per TS 406 Cum 418.5
11.04 Bituminous Prime Coat with MC-30 ( @ 6.0 - 9.0 Kg /10 Sqm ) as per TS 502. Kg 19.53
11.05 Bituminous Tack Coat with RC-250 as per TS 502. 0
(a) ( @ 2.5 - 3.0 Kg /10 Sqm )-Over Granular Surface Kg 13.95
(b) ( @ 2.0 - 2.5 Kg /10 Sqm )-Over Bituminous Surface Kg 13.95
11.06 Dense Bituminous Macadem Course as per 507 Cum 1860

13 AA014 / CTC - Rev. 09 dated 01.04.04


11.07 Provide Bituminous Concrete Wearing Course as per 512 Cum 2101.8
11.08 Loosening and Recompacting of Subgrade Complete Sqm 40.9
Total : Bill No.-11
Bill No. -12 : Miscellaneous
12.01 Carrying Out Routine Maintenance along the ROW KM -Mnth 2474
12.02 Carrying Out Repair of Pot Holes and Any Patching Up Work Sqm 135
12.03 Bitumminous Tack Coat 2 to 2.50 kg / 10 M2 of Area Kg. 20
12.04 Renewal Coat with Mix Seal Surfacing ( Type -A ) Sqm 37
12.05 Providing, Commissioning and Maintaining of Cellular Phones Inst-Mnth 17298
12.06 Providing and Maintaining Vehicles for the Employer Etc 0
(a) Ambassadar Car A / C V-Mnth 24738
(b) Tata Sumo V-Mnth 29760
12.07 Supply af Coloured Record Photographs-1 Neg+2 Prnts. Print 51
12.08 Planting and Maintenance of Hedges along Median Lm 51
12.09 Planting and Maintenance of Tree Saplings Nr. 223
12.10 Construct RCC Retaining wall with M-25 Grade Concrete Cum 3339
12.11 Providing and Fixing in Position HYSD Rebar as per1600 MT 25575
Total : Bill No.-12
Extra Items

E. 01 Filling of well Cum 130


E. 02 Sinking of Well 6m dia 0-10m depth in soft dis. rock RM 28,603
E. 03 Sinking of Well 7m dia 0-10m depth in soil RM 31,646
E. 04 Sinking of Well 7m dia 10-20 m depth in soil RM 36,836
E. 05 Sinking of Well 7m dia 0-10 m depth in soft dis. Rock. RM 38,932
E. 06 Sinking of Well 7m dia 10-20 m depth in soft dis. Rock. RM 45,317
Earthwork in excavation for foundation of Structure - All types of Soil Cum 38
Bill No. Ditto 13.01 above but in rock Cum 100
13.01 Providing compacted granular fill in soft & loose patches in bearing area Cum 130
13.02 Plain Cement Concrete M15 in foundation levelling course Cum 1683
13.03 Providing & fixing reinforcement as per TS 1600 Mt 25569
13.04 Structural Cement Concrete M25 for Retaining Wall Cum 3339
13.05 Providing Weep Holes in Retaining Wall Nr. 158
13.06 Structural Cement Concrete M30 for Approach Slab Cum 3478
13.07 Structural Cement Concrete M25 for RCC Box Cum 2372
13.08 Structural Cement Concrete M30 for Crash Barrier incl. Rebars m 1386
13.09 PCC M25 for Footpaths Cum 2120
14 AA014 / CTC - Rev. 09 dated 01.04.04
13.10 Providing 20mm Asphaltic Plug Expansion Joint Rm 363
13.11 Tar Paper Bearing Sqm 18.6
13.12 40 mm thick asphaltic concrete Cum 2446
13.13 25 mm thick mastic asphalt over asphaltic concrete sqm 279
13.14 Drainage Spouts complete as per 2705 Nr. 437
13.15 Back Filling Cum 93
13.16 20 mm Filler With Bitumen m 186
13.17 Concrete Wheel Guard Cum 2120
Total : Bill No.-13
E. 07 Filling of well in submerged condition Cum 158
E. 08 Hard Rock in excavation by control blasting Cum 416
E. 09 Overhead Gantry Sign Board No. 870,000

15 AA014 / CTC - Rev. 09 dated 01.04.04


0 BILL NO 2. EARTHWORKS
2.01 Road ways exacavtion necessary for construction
a in all types of soil incl. Marshy soil 255000 cum
Sub contract sc 255000 cum
Lab contract lc 255000 cum
P2 Plant pl 255000 cum
L2 Labour dl 255000 cum
P2 Plant pl 255000 cum
L2 Labour dl 255000 cum

b Rock
i) in soft rock (not requiring blasting) 100000 cum
Subcontract sc 100000 cum
Lab contract lc 100000 cum
P2 Plant pl 100000 cum
L2 Labour dl 100000 cum

ii) in Hard rock (requiring blasting) 759000 cum


Subcontract sc 759000 cum
Lab contract lc 759000 cum
Blasting Material oth 759000 cum
P2 Plant pl 759000 cum
L2 Labour dl 759000 cum

iii) in Hard rock (blasting prohibited) 93000 cum


Subcontract sc 93000 cum
Lab contract lc 93000 cum
P2 Plant pl 93000 cum
L2 Labour dl 93000 cum

2.02 Constn of embankment with approved materials from borrow areas complete as per TSC 305 with all lead
i) Soil as per clause 305 300000 cum
Borrowed earth - Royalty Mu 300000 cum
Borrowed -Land Lease Mu 300000 cum
Lab contract lc 300000 cum
P4 Plant pl 300000 cum
L4 Labour dl 300000 cum

ii) Fly Ash as per IRC-SP:58 27000 cum


Fly Ash Mu 27000 cum
Subcontract sc 27000 cum
Lab contract lc 27000 cum
P4 Plant pl 27000 cum
L4 Labour dl 27000 cum

2.03 Constn of embankment with approved material obtained from road / drain303000 cum

Subcontract sc 303000 cum


Lab contract lc 303000 cum
P4 Plant pl 303000 cum
L4 Labour dl 303000 cum

2.04( i) Constn. of subgrade and earthen shoulder with approved materials with 357000 cum

Borrowed earth - Royalty Mu 357000 cum


Borrowed -Land Lease Mu 357000 cum
Lab contract lc 357000 cum
P4 Plant pl 357000 cum
L4 Labour dl 357000 cum

2.05 Loosening & recompacting ground below subgrade as per TSC 301 & 30 45000 cum

Subcontract sc 45000 cum


Lab contract lc 45000 cum
P3 Plant pl 45000 cum
L3 Labour dl 45000 cum

2.06 Filling in median / island with approved material with all leads and lift 115000 cum

Borrowed earth - Royalty Mu 115000 cum


Borrowed -Land Lease Mu 115000 cum
Lab contract lc 115000 cum
P3 Plant pl 115000 cum
L3 Labour dl 115000 cum

2.07 Scarify existing bituminous surface complete as per TSC501 incl disposa 83000 Sqm

Subcontract sc 83000 Sqm


Lab contract lc 83000 Sqm
P3 Plant pl 83000 Sqm
L3 Labour dl 83000 Sqm

2.08 Turfing with sods of embankment slopes, median and other locations a 108000 Sqm
Subcontract sc 108000 Sqm
2.09 Filling of wells as per TS cl A-9
(i) Mixture of sand and gravel 75 cum
Royalty of stone Mu 75 cum
Sand Mu 75 cum
Lab contract lc 75 cum
P12 Plant pl 75 cum
L12 Labour dl 75 cum

(ii) Selected granular soil 180 cum


Sand Mu 180 cum
Lab contract lc 180 cum

2.1 Rebate towards rock material obtained from excavation 0 0


(i) Ordinary rock 100000 cum
Mining Material Mu 100000 cum

(ii) Hard rock 852000 cum


Mining Material Mu 852000 cum

BILL NO 3. SUB BASE AND BASE COURSES


3.01 Constn. of granular subbase as per TS 401 conforming to Grade-I of tab 165000 cum
Material - GSB
Aggregate 75 mm Mu 165000 cum
Aggregate 40 mm Mu 165000 cum
Lab contract lc 165000 cum
P5 Plant pl 165000 cum
L5 Labour dl 165000 cum

3.02 Constn. of wet mix macadam base complete as per TSC 406. 163000 cum

Material
Aggregate 40 mm Mu 163000 cum
Aggregate 20, 10 mm Mu 163000 cum
Aggregate 10 mm Mu 163000 cum
Aggregate 4.75 mm Mu 163000 cum
Labour contract lc 163000 cum
P6 Plant pl 163000 cum
L6 Labour dl 163000 cum

BILL NO 4. BITUMINOUS COURSES


4.01 Providing bituminous prime coat - TSC 502 697000 Sqm
Bitumen- Basic price b 697000 Sqm
Bitumen- Excise duty ed 697000 Sqm
Bitumen- Sales Tax stax 697000 Sqm
Bitumen- Transport tr 697000 Sqm
Labour contract lc 697000 Sqm

4.02 Providing tack coat with bitumen emulsion all complet Sqm 1394000 3.03425
Bitumen- Basic price b 1394000 Sqm
Bitumen- Excise duty ed 1394000 Sqm
Bitumen- Sales Tax stax 1394000 Sqm
Bitumen- Transport tr 1394000 Sqm
Labour contract lc 1394000 Sqm

4.03 Providing and laying profile corrective course with Dense Bituminous 14000 cum
Material
Bitumen - 4.% by wt of mix b 14000 cum
Bitumen- Excise duty ed 14000 cum
Bitumen- Sales Tax stax 14000 cum
Bitumen- Transport tr 14000 cum
Aggregate 20, 10 mm Mu 14000 cum
Aggregate 10 mm Mu 14000 cum
Aggregate 4.75 mm Mu 14000 cum
Crushed dust Mu 14000 cum
Hydrated Lime filler cem 14000 cum
Labour
Labour contract lc 14000 cum
Plant
P7 Plant pl 14000 Cum
L7 Plant -Labour dl 14000 Cum

4.04 Providing & laying Dense Bituminous Macadam course as per TSC Claus 95000 cum
Material
Bitumen - 4.25% by wt of mix b 95000 cum
Bitumen- Excise duty ed 95000 cum
Bitumen- Sales Tax stax 95000 cum
Bitumen- Transport tr 95000 cum
Aggregate 40 mm Mu 95000 cum
Aggregate 20, 10 mm Mu 95000 cum
Aggregate 10 mm Mu 95000 cum
Dust Mu 95000 cum
Hydraulic lime oth 95000 cum
Labour
Labour contract lc 95000 cum
Plant
P7 Plant pl 95000 Cum
L7 Labour dl 95000 Cum
4.05 Providing & laying Bituminous Concrete wearing course with straigth r 33000 cum
Material
Bitumen - 5% by wt of mix b 33000 cum
Bitumen- Excise duty ed 33000 cum
Bitumen- Sales Tax stax 33000 cum
Bitumen- Transport tr 33000 cum
Aggregate 40 mm Mu 33000 cum
Aggregate 20, 10 mm Mu 33000 cum
Aggregate 10 mm Mu 33000 cum
Dust Mu 33000 cum
Hydraulic lime oth 33000 cum
Labour
Labour contract lc 33000 cum
Plant
P7 Plant pl 33000 Cum
L7 Labour dl 33000 Cum

BILL NO 5. - CROSS DRAINAGE WORKS


5.01 Earthwork excavation for foundation for structures in all types of soil ……TSC 304
a In ordinary soil 8400 cum
Subcontract sc 8400 cum
Labour- contract lc 8400 cum
P2 Plant pl 8400 cum
L2 Labour dl 8400 cum

b in ordinary rock 2100 cum


Subcontract sc 2100 cum
Labour- contract lc 2100 cum
P2 Plant pl 2100 cum
L2 Labour dl 2100 cum

c In hard rock (blasting Prohibited) 110 cum


Subcontract sc 110 cum
Labour- contract lc 110 cum
P2 Plant pl 110 cum
L2 Labour dl 110 cum

5.02 Backfilling behind abutments, wing walls, return walls with selected gr 5600 cum
Borrowed earth - Royalty Mu 5600 0
Borrowed -Land Lease Mu 5600 cum
Labour- contract lc 5600 cum
P3 Plant pl 5600 cum
L3 Labour dl 5600 cum

5.03 Provide filter medium behind abutments wing walls and return walls , 3400 cum
Aggregate Mu 3400 cum
Sand Mu 3400 cum
Labour lc 3400 cum
P12 Plant pl 3400 cum
L12 Labour dl 3400 cum

5.04 Cement concrete M-15 grade in levelling course below foundation…15 2300 cum
Aggregate 20, 10 mm Mu 2300 cum
Sand Mu 2300 cum
Cement -Basic price cem 2300 cum
Cement -Excise duty ed 2300 cum
Cement -Sales Tax stax 2300 cum
Cement -Transport tr 2300 cum
Admixture- Basic Price oth 2300 cum
Admixture -Excise duty ed 2300 cum
Admixture -Sales Tax stax 2300 cum
Labour lc 2300 cum
Shuttering tw 2300 cum
Shuttering -Labour lc 2300 cum
P11 Plant pl 2300 cum
L11 Labour dl 2300 cum

5.05 Cement concrete in foundation, abutment, return wall wing wall excl reinf …1500,1700,2100 & 2200
(i) M15 grade 2300 cum
Aggregate 20, 10 mm Mu 2300 cum
Sand Mu 2300 cum
Cement -Basic price cem 2300 cum
Cement -Excise duty ed 2300 cum
Cement -Sales Tax stax 2300 cum
Cement -Transport tr 2300 cum
Admixture- Basic Price oth 2300 cum
Admixture -Excise duty ed 2300 cum
Admixture -Sales Tax stax 2300 cum
Labour lc 2300 cum
Shuttering tw 2300 cum
Shuttering -Labour lc 2300 cum
P11 Plant pl 2300 cum
L11 Labour dl 2300 cum

(ii) M20 grade 2700 cum


Aggregate 20, 10 mm Mu 2700 cum
Sand Mu 2700 cum
Cement -Basic price cem 2700 cum
Cement -Excise duty ed 2700 cum
Cement -Sales Tax stax 2700 cum
Cement -Transport tr 2700 cum
Admixture- Basic Price oth 2700 cum
Admixture -Excise duty ed 2700 cum
Admixture -Sales Tax stax 2700 cum
Labour lc 2700 cum
Shuttering tw 2700 cum
Shuttering -Labour lc 2700 cum
P11 Plant pl 2700 cum
L11 Labour dl 2700 cum

5.06 Cement concrete in foundation, abutment, return wall wing wall ..excl reinf …TSC 1500, 1700, 2100, 2200
0 M20 grade 7300 cum
Aggregate 20, 10 mm Mu 7300 cum
Sand Mu 7300 cum
Cement -Basic price cem 7300 cum
Cement -Excise duty ed 7300 cum
Cement -Sales Tax stax 7300 cum
Cement -Transport tr 7300 cum
Admixture- Basic Price oth 7300 cum
Admixture -Excise duty ed 7300 cum
Admixture -Sales Tax stax 7300 cum
Labour lc 7300 cum
Shuttering tw 7300 cum
Shuttering -Labour lc 7300 cum
P11 Plant pl 7300 cum
L11 Labour dl 7300 cum

5.07 TMT Fe 415 Reinforcement Bar as per TS 1600 450 T


Reinforcement - basic price st 450 T
Reinforcement - Excise ed 450 T
Reinforcement - Sales tax stax 450 T
Reinforcement - Transport tr 450 T
Binding wire oth 450 T
Labour lc 450 T

5.08 Compression fibre board expansion joint 20 mm th as per TS 2600 160 Sqm
Fibre Board - Basic Price oth 160 Sqm
Fibre Board - Excise duty ed 160 Sqm
Fibre Board - Sales Tax stax 160 Sqm
Joint sealant - Basic Price oth 160 Sqm
Joint sealant - Excise Duty ed 160 Sqm
Joint sealant - Sales Tax stax 160 Sqm
Labour lc 160 Sqm
5.09 NP 4 RCC hume pipe for culverts Sec 2900 & IRC 13 0 0 0
i) Dia 1000 mm (ID) 1800 1800 Lm
Hume Pipe NP 4 - 600 MM oth 1800 Lm
Cement -Basic price cem 1800 Lm
Cement -Excise duty ed 1800 Lm
Cement -Sales Tax stax 1800 Lm
Cement -Transport tr 1800 Lm
Sand Mu 1800 Lm
Labour contract lc 1800 Lm

5.1 AC pipe 100 mm dia for weep holes in retaining wall abutment wing retu 4400 Nos
Material _ AC pipe oth 4400 Nos
Labour lc 4400 Nos

5.11 Flexible Stone appron as per TS 2507 1400 cum


Boulder Mu 1400 cum
Labour lc 1400 cum
P13 Plant pl 1400 cum
L13 Labour dl 1400 cum

5.12 Stone pitching on slopes as per TS 2504 540 cum


Boulder Mu 540 cum
Labour lc 540 cum
P13 Plant pl 540 cum
L13 Labour dl 540 cum

5.13 Providing & laying flooring complete - TSC 2505 0 0


I) 300 mm thk PCC in M15 grade 470 cum
Aggregate 20, 10 mm Mu 470 cum
Sand Mu 470 cum
Cement -Basic price cem 470 cum
Cement -Excise duty ed 470 cum
Cement -Sales Tax stax 470 cum
Cement -Transport tr 470 cum
Admixture- Basic Price oth 470 cum
Admixture -Excise duty ed 470 cum
Admixture -Sales Tax stax 470 cum
Labour lc 470 cum
Shuttering tw 470 cum
Shuttering -Labour lc 470 cum
P11 Plant pl 470 cum
L11 Labour dl 470 cum

ii) 150 mm thk flat stone 150 mm th M15 PCC Blocks placed with CM 240 cum
Aggregate 20, 10 mm Mu 240 cum
Sand Mu 240 cum
Cement -Basic price cem 240 cum
Cement -Excise duty ed 240 cum
Cement -Sales Tax stax 240 cum
Cement -Transport tr 240 cum
Admixture- Basic Price oth 240 cum
Admixture -Excise duty ed 240 cum
Admixture -Sales Tax stax 240 cum
Labour lc 240 cum
Shuttering tw 240 cum
Shuttering -Labour lc 240 cum
Laying CM 1;3
Cement -Basic price cem 240 cum
Cement -Excise duty ed 240 cum
Cement -Sales Tax stax 240 cum
Cement -Transport tr 240 cum
Sand Mu 240 cum
Labour lc 240 cum
P11 Plant pl 240 cum
L11 Labour dl 240 cum

5.14 Painting of culvert no. & span… TSC 800 120 Nos
Material - Paints oth 120 Nos
Labour lc 120 Nos

5.15 Apply 2 coats of water based cement paint - 1 lit/2 sqm 290 Sqm
Material - Paints oth 290 Sqm
Labour lc 290 Sqm

BILL NO 6: BRIDGES / ELEVATED STRUCTURE/ UNDER PASS/ GRADE SEPARATOR


6.01 Earthwork excavation for fdn for structures in all types of soil/ marshy 15000 cum
Subcontract sc 15000 cum
Labour-Contract lc 15000 cum
P2 Plant pl 15000 cum
L2 Labour dl 15000 cum
P2 Plant pl 15000 cum
L2 Labour dl 15000 cum

6.02 Earthwork excavation for fdn for structures in ordinary rock TSC 300 3800 cum
Subcontract sc 3800 cum
Labour-Contract lc 3800 cum
P2 Plant pl 3800 cum
L2 Labour dl 3800 cum
6.03 Earthwork excavation for structures in hard rock TSC 300 & A7 0 0
a) With control Blasting 1800 cum
Sub contract sc 1800 cum
Lab contract lc 1800 cum
Blasting Material oth 1800 cum
P2 Plant pl 1800 cum
L2 Labour dl 1800 cum

b) Blasting Prohibited 1800 cum


Sub contract sc 1800 cum
Lab contract lc 1800 cum
P2 Plant pl 1800 cum
L2 Labour dl 1800 cum

6.04 Cement concrete M-15 grade in levelling course below open foundati 1300 cum
Aggregate 20, 10 mm Mu 1300 cum
Sand Mu 1300 cum
Cement -Basic price cem 1300 cum
Cement -Excise duty ed 1300 cum
Cement -Sales Tax stax 1300 cum
Cement -Transport tr 1300 cum
Admixture- Basic Price oth 1300 cum
Admixture -Excise duty ed 1300 cum
Admixture -Sales Tax stax 1300 cum
Labour lc 1300 cum
Shuttering tw 1300 cum
Shuttering -Labour lc 1300 cum
P11 Plant pl 1300 cum
L11 Labour dl 1300 cum

6.05 Cement reinf concrete in open foundation …1500, 1700 & 2100
a M30 grade 490 cum
Aggregate 20, 10 mm Mu 490 cum
Sand Mu 490 cum
Cement -Basic price cem 490 cum
Cement -Excise duty ed 490 cum
Cement -Sales Tax stax 490 cum
Cement -Transport tr 490 cum
Admixture- Basic Price oth 490 cum
Admixture -Excise duty ed 490 cum
Admixture -Sales Tax stax 490 cum
Labour lc 490 cum
Shuttering tw 490 cum
Shuttering -Labour lc 490 cum
P11 Plant pl 490 cum
L11 Labour dl 490 cum

b M35 grade 7600 cum


Aggregate 20, 10 mm Mu 7600 cum
Sand Mu 7600 cum
Cement -Basic price cem 7600 cum
Cement -Excise duty ed 7600 cum
Cement -Sales Tax stax 7600 cum
Cement -Transport tr 7600 cum
Admixture- Basic Price oth 7600 cum
Admixture -Excise duty ed 7600 cum
Admixture -Sales Tax stax 7600 cum
Labour lc 7600 cum
Shuttering tw 7600 cum
Shuttering -Labour lc 7600 cum
P11 Plant pl 7600 cum
L11 Labour dl 7600 cum

6.06 Providing & fixing 28/32mm dia rock anchor bars- excl cost of reinfor 630 Nos
Reinforcement st 630 Nos
Drilling lc 630 Nos
Resin capsules oth 630 Nos
MS plate , washers & nuts oth 630 Nos
Labour- fixing capsules lc 630 Nos

6.07 Cement concrete in RCC grade in piers, pier cap, pedestal, abutment 0 0
I M30 grade 680 cum
Aggregate 20, 10 mm Mu 680 cum
Sand Mu 680 cum
Cement -Basic price cem 680 cum
Cement -Excise duty ed 680 cum
Cement -Sales Tax stax 680 cum
Cement -Transport tr 680 cum
Admixture- Basic Price oth 680 cum
Admixture -Excise duty ed 680 cum
Admixture -Sales Tax stax 680 cum
Labour lc 680 cum
Shuttering tw 680 cum
Shuttering -Labour lc 680 cum
P11 Plant pl 680 cum
L11 Labour dl 680 cum

ii M35 grade 16000 cum


Aggregate 20, 10 mm Mu 16000 cum
Sand Mu 16000 cum
Cement -Basic price cem 16000 cum
Cement -Excise duty ed 16000 cum
Cement -Sales Tax stax 16000 cum
Cement -Transport tr 16000 cum
Admixture- Basic Price oth 16000 cum
Admixture -Excise duty ed 16000 cum
Admixture -Sales Tax stax 16000 cum
Labour lc 16000 cum
Shuttering tw 16000 cum
Shuttering -Labour lc 16000 cum
P11 Plant pl 16000 cum
L11 Labour dl 16000 cum

6.08(I) Cement concrete in RCC in solid slab super structure TS 1500, 1700,2 0 0
a M30 grade 400 cum
Aggregate 20, 10 mm Mu 400 cum
Sand Mu 400 cum
Cement -Basic price cem 400 cum
Cement -Excise duty ed 400 cum
Cement -Sales Tax stax 400 cum
Cement -Transport tr 400 cum
Admixture- Basic Price oth 400 cum
Admixture -Excise duty ed 400 cum
Admixture -Sales Tax stax 400 cum
Labour lc 400 cum
Shuttering tw 400 cum
Shuttering -Labour lc 400 cum
P11 Plant pl 400 cum
L11 Labour dl 400 cum

ii Cement concrete in T -Beam and slab super structure TS 1500, 1700 0 0


a M30 grade 270 cum
Aggregate 20, 10 mm Mu 270 cum
Sand Mu 270 cum
Cement -Basic price cem 270 cum
Cement -Excise duty ed 270 cum
Cement -Sales Tax stax 270 cum
Cement -Transport tr 270 cum
Admixture- Basic Price oth 270 cum
Admixture -Excise duty ed 270 cum
Admixture -Sales Tax stax 270 cum
Labour lc 270 cum
Shuttering tw 270 cum
Shuttering -Labour lc 270 cum
P11 Plant pl 270 cum
L11 Labour dl 270 cum

6.09 Approach slab M 30 incl bituminous joint filler & sealing compound excl 280 cum
Aggregate 20, 10 mm Mu 280 cum
Sand Mu 280 cum
Cement -Basic price cem 280 cum
Cement -Excise duty ed 280 cum
Cement -Sales Tax stax 280 cum
Cement -Transport tr 280 cum
Admixture- Basic Price oth 280 cum
Admixture -Excise duty ed 280 cum
Admixture -Sales Tax stax 280 cum
Labour concreting lc 280 cum
Shuttering tw 280 cum
Shuttering labour lc 280 cum
Reinforcement - basic price st 280 cum
Reinforcement - Excise ed 280 cum
Reinforcement - Sales tax stax 280 cum
Reinforcement - Transport tr 280 cum
Binding wire oth 280 cum
Labour lc 280 cum
Joints -fibre board - Basic oth 280 cum
Joints -fibre board - ED ed 280 cum
Joints -fibre board - S.Tax stax 280 cum
Joints Lab lc 280 cum
Joints sealant - Basic oth 280 cum
Joints sealant - ED ed 280 cum
Joints sealant - S.Tax stax 280 cum
Joints sealant- Lab lc 280 cum
P11 Plant pl 280 cum
L11 Labour dl 280 cum

6.1 Crash barrier M40 incl bituminous joint filler & sealing compound excl c 3200 cum
Aggregate 20, 10 mm Mu 3200 cum
Sand Mu 3200 cum
Cement -Basic price cem 3200 cum
Cement -Excise duty ed 3200 cum
Cement -Sales Tax stax 3200 cum
Cement -Transport tr 3200 cum
Admixture- Basic Price oth 3200 cum
Admixture -Excise duty ed 3200 cum
Admixture -Sales Tax stax 3200 cum
Labour concreting lc 3200 cum
Shuttering tw 3200 cum
Shuttering labour lc 3200 cum
Reinforcement - basic price st 3200 cum
Reinforcement - Excise ed 3200 cum
Reinforcement - Sales tax stax 3200 cum
Reinforcement - Transport tr 3200 cum
Binding wire oth 3200 cum
Labour lc 3200 cum
Joints -fibre board - Basic oth 3200 cum
Joints -fibre board - ED ed 3200 cum
Joints -fibre board - S.Tax stax 3200 cum
Joints Lab lc 3200 cum
Joints sealant - Basic oth 3200 cum
Joints sealant - ED ed 3200 cum
Joints sealant - S.Tax stax 3200 cum
Joints sealant- Lab lc 3200 cum
P11 Plant pl 3200 cum
L11 Labour dl 3200 cum

6.11 RCC M35 in safety kerb incl utility ducts excl cost of reinf TS1700, 270 960 cum
Aggregate 20, 10 mm Mu 960 cum
Sand Mu 960 cum
Cement -Basic price cem 960 cum
Cement -Excise duty ed 960 cum
Cement -Sales Tax stax 960 cum
Cement -Transport tr 960 cum
Admixture- Basic Price oth 960 cum
Admixture -Excise duty ed 960 cum
Admixture -Sales Tax stax 960 cum
Labour concreting lc 960 cum
Shuttering tw 960 cum
Shuttering labour lc 960 cum
Reinforcement - basic price st 960 cum
Reinforcement - Excise ed 960 cum
Reinforcement - Sales tax stax 960 cum
Reinforcement - Transport tr 960 cum
Binding wire oth 960 cum
Labour lc 960 cum
P11 Plant pl 960 cum
L11 Labour dl 960 cum

6.12 Reinforcement Bar TMT in fdn, sub structure, super structure for bridg 4500 MT
Reinforcement - basic price st 4500 MT
Reinforcement - Excise ed 4500 MT
Reinforcement - Sales tax stax 4500 MT
Reinforcement - Transport tr 4500 MT
Binding wire oth 4500 MT
Labour lc 4500 MT

6.13 Cement concrete in M 45 PSC Girder & slab type super structure TS 19000 cum
Aggregate 20, 10 mm Mu 19000 cum
Sand Mu 19000 cum
Cement -Basic price cem 19000 cum
Cement -Excise duty ed 19000 cum
Cement -Sales Tax stax 19000 cum
Cement -Transport tr 19000 cum
Admixture- Basic Price oth 19000 cum
Admixture -Excise duty ed 19000 cum
Admixture -Sales Tax stax 19000 cum
Labour lc 19000 cum
Shuttering tw 19000 cum
Shuttering -Labour lc 19000 cum
Enabling works tw 19000 cum
Enabling - Labour lc 19000 cum
P11 Plant pl 19000 cum
L11 Labour dl 19000 cum

6.14 High tensile steel strands incl tying with anchorage , sheathing, stressing, grouting etc
0 12 T 13 / 19T13 strands 530 MT
HT Strand - Basic Price st 530 MT
HT Strand - Excise duty ed 530 MT
HT Strand - Sales Tax stax 530 MT
HT Strand - Transportation tr 530 MT
Resale of strands st 530 MT
HDPE - Ducts oth 530 MT
12 T 13 Anchors oth 530 MT
Cement -Basic price cem 530 MT
Cement -Excise duty ed 530 MT
Cement -Sales Tax stax 530 MT
Cement -Transport tr 530 MT
Cebex 200 Admix- Basic Price oth 530 MT
Cebex 200 Admix -Excise duty ed 530 MT
Cebex 200 Admix -Sales Tax stax 530 MT
Lab Contract lc 530 MT

6.15 Mastic asphalt 65 mm th under Bituminous conc 50 mm th, 15mm th mast 30000 Sqm
Top Layer
Bitumen - 5% by wt of mix b 30000 Sqm
Bitumen- Excise duty ed 30000 Sqm
Bitumen- Sales Tax stax 30000 Sqm
Bitumen- Transport tr 30000 Sqm
Aggregate 40 mm Mu 30000 Sqm
Aggregate 20, 10 mm Mu 30000 Sqm
Aggregate 10 mm Mu 30000 Sqm
Dust Mu 30000 Sqm
Cement filler cem 30000 Sqm
Hydraulic lime oth Sqm
Labour
Labour contract lc 30000 Sqm
Plant
P7 Plant pl 30000 Cum
L7 Labour dl 30000 Cum
Bottom Layer
Mastic Asphalt oth 30000 Sqm
Tack coat b 30000 Sqm

6.16 Prov & fix as TS sec 2000, IRC 83(Part III) 2002
a Tar Paper Bearing 95 Sqm
Bearing- Basic Price oth 95 Sqm
Bearing- Excise duty ed 95 Sqm
Bearing- Sales Tax stax 95 Sqm
Labour lc 95 Sqm

b Elastomeric Bearing 8945000 CC


Bearing- Basic Price oth 8945000 CC
Bearing- Excise duty ed 8945000 CC
Bearing- Sales Tax stax 8945000 CC
Labour lc 8945000 CC

6.17 Expansion joints TS 2600


i) Fillar Type 120 Lm
Expn jts- Basic price oth 120 Lm
Expn jts- Excise duty ed 120 Lm
Expn jts- Sales tax stax 120 Lm

Labour lc 120 Lm

ii) Asphaltic Plug type 60 Lm


Expn jts- Basic price oth 60 Lm
Expn jts- Excise duty ed 60 Lm
Expn jts- Sales tax stax 60 Lm

Labour lc 60 Lm

iii) Compression seal type capacity- 40mm 1200 Lm


Expn jts- Basic price oth 1200 Lm
Expn jts- Excise duty ed 1200 Lm
Expn jts- Sales tax stax 1200 Lm

Labour lc 1200 Lm

6.18 Drainage spouts TS 2705 1100 Nos


Material _ Drainage spouts oth 1100 Nos
Labour lc 1100 Nos

6.19 Weep holes of PVC pipe 100 mm dia in ROB etc 990 Nos
Material - PVC Pipes oth 990 Nos
Labour lc 990 Nos

6.2 Painting of structure no., span arrangement and flow direction TS 800 15 Nos
Material - Paints oth 15 Nos
Labour lc 15 Nos

6.21 Backfilling behind abutments, wing wall, return walls with selected granular materials
0 (a) C=0, (b) F >=30o ( c ) r= 1.8 t/ m2 3000 cum
Borrowed earth - Royalty Mu 3000 cum
Borrowed -Land Lease Mu 3000 cum
Lab contract lc 3000 cum
P3 Plant pl 3000 cum
L3 Labour dl 3000 cum

6.22 Provde & fiter media behind abutmnet , retaining wall TS 2500 2600 cum
Aggregate Mu 2600 cum
Sand Mu 2600 cum
Labour lc 2600 cum
P12 Plant pl 2600 cum
L12 Labour dl 2600 cum

6.23 Provde grouted (1:3) revetment of river on slopesbehind abutmnet , re 460 cum
Boulder Mu 460 cum
Labour lc 460 cum
Sand Mu 460 cum
P13 Plant pl 460 cum
L13 Labour dl 460 cum

6.24 Carrying confirmatory bore holes at each foundation location. TS 2400


I In soil 260 Lm
Subcontract lc 260 Lm

ii in soft rock 160 Lm


Subcontract lc 160 Lm
iii) In hard rock 210 Lm
Subcontract lc 210 Lm

6.25 Apply 2 coats of water based cement paint - 1 lit/2 sqm 7700 Sqm
Material - Paints oth 7700 Sqm
Labour lc 7700 Sqm

BILL NO 7: REHABILITATION OF EXISTING BRIDGES


7.01 Prov & & intersecting nipples after drilling holes 0 0
a For epoxy grouting 90 Nos
Lab contract - nipple , drilling hole etc lc 90 Nos

b For cement grouting 90 Nos


Lab contract - nipple , drilling hole etc lc 90 Nos

7.02 Sealing cracks in RCC structures & strengthening porous RCC superstrs 0
a For epoxy grouting 180 Kg
Mat - epoxy comp oth 180 Kg
Lab contract lc 180 Kg

b For cement grouting 180 Kg


Mat - cement oth 180 Kg
Lab contract lc 180 Kg

0 BILL NO 8: DRAINAGE AND PROTECTIVE WORK


8.01 Earthwork in excavation for construction unlined ditch drain/covered drain TS 300
(i) In all type of soil incl marshy soil 163000 cum
Subcontract sc 163000 cum
Labour- contract lc 163000 cum
P2 Plant pl 163000 cum
L2 Labour dl 163000 cum

(ii) Ordinary rock 15000 cum


Subcontract sc 15000 cum
Labour- contract lc 15000 cum
P2 Plant pl 15000 cum
L2 Labour dl 15000 cum

(iii) In hard rock (blasting Prohibited) 3700 cum


Subcontract sc 3700 cum
Labour- contract lc 3700 cum
P2 Plant pl 3700 cum
L2 Labour dl 3700 cum
8.02 Construct open/ covered drain as per TS 300,1000,1400,1500, 1600, 1700
a Cement concrete M-15 grade in foundation of drain TS 1700 1300 cum
Aggregate 20, 10 mm Mu 1300 cum
Sand Mu 1300 cum
Cement -Basic price cem 1300 cum
Cement -Excise duty ed 1300 cum
Cement -Sales Tax stax 1300 cum
Cement -Transport tr 1300 cum
Admixture- Basic Price oth 1300 cum
Admixture -Excise duty ed 1300 cum
Admixture -Sales Tax stax 1300 cum
Labour concreting lc 1300 cum
P11 Plant pl 1300 cum
L11 Labour dl 1300 cum

b Cement reinforced concrete M-20 grade in line drain excl cost of reinf 5600 cum
Aggregate 20, 10 mm Mu 5600 cum
Sand Mu 5600 cum
Cement -Basic price cem 5600 cum
Cement -Excise duty ed 5600 cum
Cement -Sales Tax stax 5600 cum
Cement -Transport tr 5600 cum
Admixture- Basic Price oth 5600 cum
Admixture -Excise duty ed 5600 cum
Admixture -Sales Tax stax 5600 cum
Labour lc 5600 cum
Shuttering tw 5600 cum
Shuttering -Labour lc 5600 cum
P11 Plant pl 5600 cum
L11 Labour dl 5600 cum

c Reinforcement Bar TMT in walls and slabs of RCC drain complete as pe 240 MT
Reinforcement - basic price st 240 MT
Reinforcement - Excise ed 240 MT
Reinforcement - Sales tax stax 240 MT
Reinforcement - Transport tr 240 MT
Binding wire oth 240 MT
Labour lc 240 MT

d Supply Iron grating ( 800 mm x 200 mm) at inlet to covered drain - TS 3 120 Nos
Grating 800 mm x 200 mm oth 120 Nos
Grating - ED ed 120 Nos
Grating Stax stax 120 Nos
Grating - transport tr 120 Nos
Labour lc 120 Nos

8.03 Providing & construction of catchpits in superelevated portion incl. Cov 200 Nos
Aggregate 20, 10 mm Mu 200 Nos
Sand Mu 200 Nos
Cement -Basic price cem 200 Nos
Cement -Excise duty ed 200 Nos
Cement -Sales Tax stax 200 Nos
Cement -Transport tr 200 Nos
Admixture- Basic Price oth 200 Nos
Admixture -Excise duty ed 200 Nos
Admixture -Sales Tax stax 200 Nos
Labour lc 200 Nos
Shuttering tw 200 Nos
Shuttering -Labour lc 200 Nos
Reinforcement - basic price st 200 Nos
Reinforcement - Excise ed 200 Nos
Reinforcement - Sales tax stax 200 Nos
Reinforcement - Transport tr 200 Nos
Binding wire oth 200 Nos
Labour lc 200 Nos
Brick Masonry 200 Nos
Sand Mu 200 Nos
Cement -Basic price cem 200 Nos
Cement -Excise duty ed 200 Nos
Cement -Sales Tax stax 200 Nos
Cement -Transport tr 200 Nos
Labour contract lc 200 Nos
Plastering 200 Nos
Sand Mu 200 Nos
Cement -Basic price cem 200 Nos
Cement -Excise duty ed 200 Nos
Cement -Sales Tax stax 200 Nos
Cement -Transport tr 200 Nos
Labour contract lc 200 Nos
Manhole cover 560 mm oth 200 Nos

P11 Plant pl 200 Nos


L11 Labour dl 200 Nos

8.04 NP 4 RCC 450 mm hume pipe connecting catch pits in super elevated sec 3100 Lm
Hume Pipe NP 4 - 450 MM oth 3100 Lm
Cement -Basic price cem 3100 Lm
Cement -Excise duty ed 3100 Lm
Cement -Sales Tax stax 3100 Lm
Cement -Transport tr 3100 Lm
Sand Mu 3100 Lm
Labour contract lc 3100 Lm

8.05 Granular material for bedding of pipes TSC 2904 1600 cum
Stone Aggregate Mu 1600 Nos
Labour lc 1600 Nos
P12 Plant pl 1600 Nos
L13 Labour dl 1600 Nos

8.06 Stone pitching on slopes for erosion protection TS 1400, 2500 3600 cum
Boulder Mu 3600 Nos
Labour lc 3600 Nos
P13 Plant pl 3600 Nos
L13 Labour dl 3600 Nos

8.07 Provde filter media underneath pitching TS 2504 2400 cum


Stone Aggregate Mu 2400 Lm
Labour lc 2400 Lm
P12 Plant pl 2400 Lm
L13 Labour dl 2400 Lm

8.08 Construct retaining wall as per TS 300,1400,1500, 1600, 1700,2100, 2200, 2500.2700
a Earthwork in excavation for retaining wall TS 300 0 0
(i) In all type of soil incl marshy soil 2600 cum
Subcontract sc 2600 cum
Labour- contract lc 2600 cum
P2 Plant pl 2600 cum
L2 Labour dl 2600 cum

(ii) Ordinary rock 510 cum


Subcontract sc 510 cum
Labour- contract lc 510 cum
P2 Plant pl 510 cum
L2 Labour dl 510 cum

(ii) In hard rock (blasting Prohibited) 340 cum


Subcontract sc 340 cum
Labour- contract lc 340 cum
P2 Plant pl 340 cum
L2 Labour dl 340 cum

b Cement concrete M-15 grade in foundation of drain TS 1700 1100 cum


Aggregate 20, 10 mm Mu 1100 cum
Sand Mu 1100 cum
Cement -Basic price cem 1100 cum
Cement -Excise duty ed 1100 cum
Cement -Sales Tax stax 1100 cum
Cement -Transport tr 1100 cum
Admixture- Basic Price oth 1100 cum
Admixture -Excise duty ed 1100 cum
Admixture -Sales Tax stax 1100 cum
Labour concreting lc 1100 cum
P11 Plant pl 1100 cum
L11 Labour dl 1100 cum

c Provde filter media behind retaining wall TS 2504 1500 cum


Aggregate Mu 1500 cum
Sand Mu 1500 cum
Labour lc 1500 cum
P12 Plant pl 1500 cum
L12 Labour dl 1500 cum

d Backfilling behind retaining walls with selected granular material c=0, ( 5100 cum
Borrowed earth - Royalty Mu 5100 cum
Borrowed -Land Lease Mu 5100 cum
Lab contract lc 5100 cum
P3 Plant pl 5100 cum
L3 Labour dl 5100 cum

e Provide RCC M 25 in open fdn and substructure excl cost of reinf 2100 cum
Aggregate 20, 10 mm Mu 2100 cum
Sand Mu 2100 cum
Cement -Basic price cem 2100 cum
Cement -Excise duty ed 2100 cum
Cement -Sales Tax stax 2100 cum
Cement -Transport tr 2100 cum
Admixture- Basic Price oth 2100 cum
Admixture -Excise duty ed 2100 cum
Admixture -Sales Tax stax 2100 cum
Shuttering tw 2100 cum
Shuttering -Labour lc 2100 cum
Labour concreting lc 2100 cum
P11 Plant pl 2100 cum
L11 Labour dl 2100 cum

f Weep holes of PVC pipe 100 mm dia in ROB etc 2500 Nos
Material - PVC Pipes oth 2500 Nos
Labour lc 2500 Nos
BILL NO 9: TRAFFIC SIGN
9.01 Traffic sign boards TS 801
a Octogonal stop sign 900 mm size 20 Nos
Sub contrcat sc 20 Nos

b Octogonal stop sign 600 mm size 40 Nos


Sub contrcat sc 40 Nos

c Triangular sign 900 mm sides 210 Nos


Sub contrcat sc 210 Nos

d Triangular sign 600 mm sides 70 Nos


Sub contrcat sc 70 Nos

e Circular sign 900 mm dis 55 Nos


Sub contrcat sc 55 Nos

f Circular sign 600 mm dis 50 Nos


Sub contrcat sc 50 Nos

g Facility information sign 800 mm x 600 mm 40 Nos


Sub contrcat sc 40 Nos

h Facility information sign 600 mm x 450 mm 40 Nos


Sub contrcat sc 40 Nos

9.02 Identification sign board


a 300 mm x 900 mm 45 Nos
Sub contrcat sc 45 Nos

b 900 mm x 1200 mm 75 Nos


Sub contrcat sc 75 Nos

c 1200 mm x 1800 mm 10 Nos


Sub contrcat sc 10 Nos

d 1500 mm x 2400 mm 5 Nos


Sub contrcat sc 5 Nos

e 1800 mm x 3600 mm 5 Nos


Sub contrcat sc 5 Nos

9.03 Tubular gantry mounted overhead sign - TS 801 & 802


i) Erection of OH gantry Cantilever structure 10 MT
Sub contrcat sc 10 MT
ii) Sign board 2 mm/ 3 mm th al sheet fully cover high intensity 50 Sqm
Sub contrcat sc 50 Sqm

9.04 Pavement Marking with Hot Applied Thermoplastic Paint ASTM D 36/BS 3262(part-I), TS 803
a Lane/ centerline / edge marking 25000 Sqm
Sub contrcat sc 25000 Sqm

b Directional arrows, lettering etc as per Drg no. 61 of MORT&T 1200 Nos
Sub contrcat sc 1200 Nos

9.05 RCC M20 200 m, Km, 5th Km stones. TS 804


a 200 m stone 290 Nos
Aggregate 20, 10 mm Mu 290 Nos
Sand Mu 290 Nos
Cement -Basic price cem 290 Nos
Cement -Excise duty ed 290 Nos
Cement -Sales Tax stax 290 Nos
Cement -Transport tr 290 Nos
Admixture- Basic Price oth 290 Nos
Admixture -Excise duty ed 290 Nos
Admixture -Sales Tax stax 290 Nos
Labour lc 290 Nos
P11 Plant pl 290 Nos
L11 Labour dl 290 Nos

b Km stone 60 Nos
Aggregate 20, 10 mm Mu 60 Nos
Sand Mu 60 Nos
Cement -Basic price cem 60 Nos
Cement -Excise duty ed 60 Nos
Cement -Sales Tax stax 60 Nos
Cement -Transport tr 60 Nos
Admixture- Basic Price oth 60 Nos
Admixture -Excise duty ed 60 Nos
Admixture -Sales Tax stax 60 Nos
Labour lc 60 Nos
P11 Plant pl 60 Nos
L11 Labour dl 60 Nos

c 5th Km stone 15 Nos


Aggregate 20, 10 mm Mu 15 Nos
Sand Mu 15 Nos
Cement -Basic price cem 15 Nos
Cement -Excise duty ed 15 Nos
Cement -Sales Tax stax 15 Nos
Cement -Transport tr 15 Nos
Admixture- Basic Price oth 15 Nos
Admixture -Excise duty ed 15 Nos
Admixture -Sales Tax stax 15 Nos
Labour lc 15 Nos
P11 Plant pl 15 Nos
L11 Labour dl 15 Nos

9.06 Road delineators TS 800


a Triangular objects marker 300 mm sides 150 Nos
Sub contrcat sc 150 Nos

b Rectangular hazard marker 600 mm x 300 mm 30 Nos


Sub contrcat sc 30 Nos

c Roadway indicator - 1000mm high with 80mm dia NB medium pipe 490 Nos
Sub contrcat sc 490 Nos

9.07 Route Marker sign board 600 mm x 450 mm. TS 801 65 Nos
Sub contrcat sc 65 Nos

9.08 RCC boundary stone pillars. TS 806 1400 Nos


Aggregate 20, 10 mm Mu 1400 Nos
Sand Mu 1400 Nos
Cement -Basic price cem 1400 Nos
Cement -Excise duty ed 1400 Nos
Cement -Sales Tax stax 1400 Nos
Cement -Transport tr 1400 Nos
Admixture- Basic Price oth 1400 Nos
Admixture -Excise duty ed 1400 Nos
Admixture -Sales Tax stax 1400 Nos
Labour lc 1400 Nos
P11 Plant pl 1400 Nos
L11 Labour dl 1400 Nos

9.09 Unidirectional reflective pavement. TS 812 1800 Nos


Sub contrcat sc 1800 Nos

9.1 Passenger shelter at Bus bays 10 Nos


Sub contrcat sc 10 Nos

9.11 Concrete kerb and kerb with channel M20. TS 408 9600 cum
Aggregate 20, 10 mm Mu 9600 cum
Sand Mu 9600 cum
Cement -Basic price cem 9600 cum
Cement -Excise duty ed 9600 cum
Cement -Sales Tax stax 9600 cum
Cement -Transport tr 9600 cum
Admixture- Basic Price oth 9600 cum
Admixture -Excise duty ed 9600 cum
Admixture -Sales Tax stax 9600 cum
Labour lc 9600 cum
P8 Plant pl 9600 cum
L8 Labour dl 9600 cum
P11 Plant pl 9600 cum
L11 Labour dl 9600 cum

0 0 0 0
0 9. TOLL PLAZA & REST AREA 0 0
9.01 Toll plaza building incl electric supply, fans, lights etc, fire alarm & f 0 Deleted
a) Administrative block (6.1 x 2.43 m- 2 storied) 0 0
Sub contrcat sc 0 0

b) Change room & pantry (12.2 x 2.43 m) 0 0


Sub contrcat sc 0 0

c) Single toll booths 0 0


Sub contrcat sc 0 0

d) Double toll booths 0 0


Sub contrcat sc 0 0

9.02 Electrically operated barrier gates 0 0


a) 4 m wide toll lane 0 0
Sub contrcat sc 0 0

b) 5.5 m wide toll lane 0 0


Sub contrcat sc 0 0

9.03 Rest area building incl electric supply, fans, lights etc, fire alarm & fi 0 0
a) Traffic aid centre 2392 Sqm
Sub contrcat sc 2392 Sqm

b) Generator room 50 Sqm


Sub contrcat sc 50 Sqm

c) Toilet block 84 Sqm


Sub contrcat sc 84 Sqm
d) Shops / utility 750 Sqm
Sub contrcat sc 750 Sqm

e) Restaurant building 720 Sqm


Sub contrcat sc 720 Sqm

0 Deleted 0 0
0 Canopy for Toll plaza TS Appendix XIX, Vol-II 0 0
Sub contrcat sc 0 0

0 Boundary wall incl earthwork, PCC, brick masonry in CM 1:3, opening & 0 0
Sub contract sc 0 0

0 Barbed wire fencing 0 0


ISA 50x50x6 str 0 0
Barbed wire str 0 0
Concrete pedestal oth 0 0
Consumables oth 0 0
Labour lc 0 0

0 Covered drain under footpath incl earthwork, RCC incl reinforcement, PCC 0 0
Sub contract sc 0 0

0 Covered lateral drain under road, incl earthwork, RCC incl reinforcement 0 0
Sub contract sc 0 0

0 RCC M15 in median incl surface reinforcement 0 0


Aggregate 20, 10 mm Mu 0 0
Sand Mu 0 0
Cement -Basic price cem 0 0
Cement -Excise duty ed 0 0
Cement -Sales Tax stax 0 0
Cement -Transport tr 0 0
Admixture- Basic Price ad 0 0
Admixture -Excise duty ed 0 0
Admixture -Sales Tax stax 0 0
Labour lc 0 0
Shuttering tw 0 0
Shuttering -Labour lc 0 0
P11 Plant pl 0 0
L11 Labour dl 0 0

0 150 mm dia PVC pipe in toll booth island 0 0


Material oth 0 0
Labour lc 0 0
0 100 mm dia GI pipe guard rail & support 0 0
GI pipe str 0 0
GI pipe str 0 0
Concrete pedestal oth 0 0
Consumables oth 0 0
Labour lc 0 0

0 Retro-reflectorised type sign boards made of encapsulated lense type of 0 0


0 Cantilever incl gantry 0 0
Sub contrcat sc 0 0

0 Kerb sign 0 0
Sub contrcat sc 0 0

0 Hazard marker incl electrical items 0 0


Sub contrcat sc 0 0

0 0 0 0
0 10. REPAIR & REHABILITATION OF STRUCTURES
10.01(a) Dismantling of stone masonry structure 54 Cum
Subcontract sc 54 Cum

b) Dismantling RCC structures incl separating reinforcement 165 Cum


Subcontract sc 165 Cum

10.02 Excavation of foundation in all types of soil incl rock 240 Cum
Subcontract sc 240 Cum
Labour-Contract lc 240 Cum
P2 Plant pl 240 Cum
L2 Labour dl 240 Cum

10.03 Concrete in RCC open foundation 0 0


i) Deleted 0 0
ii M30 105 Cum
Aggregate 20, 10 mm Mu 105 Cum
Sand Mu 105 Cum
Cement -Basic price cem 105 Cum
Cement -Excise duty ed 105 Cum
Cement -Sales Tax stax 105 Cum
Cement -Transport tr 105 Cum
Admixture- Basic Price ad 105 Cum
Admixture -Excise duty ed 105 Cum
Admixture -Sales Tax stax 105 Cum
Labour lc 105 Cum
Shuttering tw 105 Cum
Shuttering -Labour lc 105 Cum
P11 Plant pl 105 Cum
L11 Labour dl 105 Cum

iii) Deleted 0 0
10.04 Concrete in RCC pier, pier cap, pedestals, abutment wall, dirt wall, wing 0 0
i) Deleted 0 0
ii) M30 1103 Cum
Aggregate 20, 10 mm Mu 1103 Cum
Sand Mu 1103 Cum
Cement -Basic price cem 1103 Cum
Cement -Excise duty ed 1103 Cum
Cement -Sales Tax stax 1103 Cum
Cement -Transport tr 1103 Cum
Admixture- Basic Price ad 1103 Cum
Admixture -Excise duty ed 1103 Cum
Admixture -Sales Tax stax 1103 Cum
Labour lc 1103 Cum
Shuttering tw 1103 Cum
Shuttering -Labour lc 1103 Cum
P11 Plant pl 1103 Cum
L11 Labour dl 1103 Cum

0 Deleted 0 0
10.05 Concrete in superstructure 0 0
(I) Solid slab 0 0
i) M30 152 Cum
Aggregate 20, 10 mm Mu 152 Cum
Sand Mu 152 Cum
Cement -Basic price cem 152 Cum
Cement -Excise duty ed 152 Cum
Cement -Sales Tax stax 152 Cum
Cement -Transport tr 152 Cum
Admixture- Basic Price ad 152 Cum
Admixture -Excise duty ed 152 Cum
Admixture -Sales Tax stax 152 Cum
Labour lc 152 Cum
Shuttering tw 152 Cum
Shuttering -Labour lc 152 Cum
P11 Plant pl 152 Cum
L11 Labour dl 152 Cum

ii) Deleted 0 0
(II) T-beam & slab 0 0
0 Deleted 0 0
0 M35 0 0
Aggregate 20, 10 mm Mu 0 0
Sand Mu 0 0
Cement -Basic price cem 0 0
Cement -Excise duty ed 0 0
Cement -Sales Tax stax 0 0
Cement -Transport tr 0 0
Admixture- Basic Price ad 0 0
Admixture -Excise duty ed 0 0
Admixture -Sales Tax stax 0 0
Labour lc 0 0
Shuttering tw 0 0
Shuttering -Labour lc 0 0
P11 Plant pl 0 0
L11 Labour dl 0 0

10.06(a) Elastomeric bearing IRC 83 (Part II) - 1987..TSC 2000 0 0


Bearing- Basic Price oth 0 0
Bearing- Excise duty ed 0 0
Bearing- Sales Tax stax 0 0
Labour lc 0 0
Labour lc 0 0

10.06(b) Tar paper on abutment / piers as bearing 25 Sqm


Bearing- Basic Price oth 25 Sqm
Bearing- Excise duty ed 25 Sqm
Bearing- Sales Tax stax 25 Sqm
Labour lc 25 Sqm

10.07 TMT reinforcement Fe-415 TSC1600 0 0


i) Foundation 4 MT
Reinforcement - basic price st 4 MT
Reinforcement - Excise ed 4 MT
Reinforcement - Sales tax stax 4 MT
Reinforcement - Transport tr 4 MT
Reinforcement - Resale st 4 MT
Binding wire oth 4 MT
Labour lc 4 MT

ii) Sub structure 65 MT


Reinforcement - basic price st 65 MT
Reinforcement - Excise ed 65 MT
Reinforcement - Sales tax stax 65 MT
Reinforcement - Transport tr 65 MT
Reinforcement - Resale st 65 MT
Binding wire oth 65 MT
Labour lc 65 MT

iii) Super structure 11 Mt


Reinforcement - basic price st 11 Mt
Reinforcement - Excise ed 11 Mt
Reinforcement - Sales tax stax 11 Mt
Reinforcement - Transport tr 11 Mt
Reinforcement - Resale st 11 Mt
Binding wire oth 11 Mt
Labour lc 11 Mt

10.08 Inspection, cleaning & servicing of existing bearing incl removal of all t 124 Nr
Subcontract sc 124 Nr

10.09 Inspection & replacement of existing bearing with Pot PTFE bearings 0 0
0 Fixed bearing 0 0
0 350 T 0 0
Bearing- Basic Price oth 0 0
Bearing- Excise duty ed 0 0
Bearing- Sales Tax stax 0 0
Labour lc 0 0

0 Free bearings 0 0
0 350 T 0 0
Bearing- Basic Price oth 0 0
Bearing- Excise duty ed 0 0
Bearing- Sales Tax stax 0 0
Labour lc 0 0

10.1 Controlled jacking of superstructure for bearing replacement incl all acce 0 0
0 Above 40 m span 0 0
Subcontract sc 0 0

10.11 Dowel bars 4656 Nr


Subcontract sc 4656 Nr

10.12 Neoprene pad glued in seismic restrainer …TS Appendix IV, Vol-II 372000 Cu.Cm.
Bearing- Basic Price oth 372000 Cu.Cm.
Bearing- Excise duty ed 372000 Cu.Cm.
Bearing- Sales Tax stax 372000 Cu.Cm.
Labour lc 372000 Cu.Cm.
Labour lc 372000 Cu.Cm.
10.13 Resetting & grouting with sand cement mortar 1:3 in stone masonry str 30 m
Subcontract sc 30 m

10.14 (a) Dismantling damaged existing expansion joints 2700 m


Subcontract sc 2700 m

b) New expansion joint in existing bridges to be installed under supervisio 0 0


i) Strip seal type 252 m
Expn jts- Basic price oth 252 m
Expn jts- Excise duty ed 252 m
Expn jts- Sales tax stax 252 m

Labour lc 252 m

ii) Filler type 2448 m


Expn jts- Basic price oth 2448 m
Expn jts- Excise duty ed 2448 m
Expn jts- Sales tax stax 2448 m

Labour lc 2448 m

10.15 Sealing of cracks in bridge / culverts by epoxy resin 304 Kg


Lab contract - nipple , drilling hole etc lc 304 Kg
Mat - epoxy comp oth 304 Kg
Lab contract lc 304 Kg

10.16 Replacement of spalled, honeycomb & leached concrete by epoxy mort 26 Sqm
Mat - epoxy comp oth 26 Sqm
Lab contract lc 26 Sqm

10.17 Repair of corroded reinforcement TS Appendix XV, Vol-II 50 Sqm


Lab contract lc 50 Sqm

10.18 Drainage spouts 1378 Nr


Material _ Drainage spouts oth 1378 Nr
Labour lc 1378 Nr

0 0 0 0
0 11. MISCELLANEOUS 0 0
11.01 Vehicles for engineer & employer incl driver, POL etc 0 0
a) Hard top passanger cars, maximum 2 nos 120 Veh-Mth
Car- A/C - 1 no oth 120 Veh-Mth
Running expenses lc 120 Veh-Mth

b) Hard top jeeps 4W drive, max 3 nos 180 Veh-Mth


Hard top jeeps oth 180 Veh-Mth
Running expenses lc 180 Veh-Mth

11.02 Colour record photographs with negatives & 2 colour prints 3000 Nr
Subcontract sc 3000 Nr

11.03 Additional prints 6000 Nr


Subcontract sc 6000 Nr

11.04 Passenger shelter TS Appendix XVI 54 Nr


Sub contrcat sc 54 Nr

11.05 Synthetic enamel paint on crash barrier, kerb at curve location & junctio 17703 Sqm
Sub contrcat sc 17703 Sqm

0 0 0 0
0 12. MAINTENANCE 0 0
12.01 Repairs to potholes & patchingto existing bituminous carriageway 2505.955 Sqm
DBM sc 2505.955 Sqm

12.02 Renewal coat with semi-dense concrete 25 mm thk 1114 Cum


DBM sc 1114 Cum

12.03 Bituminous tack coat 44555 Sqm


Bitumen- Basic price b 44555 Sqm
Bitumen- Excise duty ed 44555 Sqm
Bitumen- Sales Tax stax 44555 Sqm
Bitumen- Transport tr 44555 Sqm
Labour contract lc 44555 Sqm

12.04 Sealing of cracks in bituminous surface with fog seal 40650 Sqm
Bitumen- Basic price b 40650 Sqm
Bitumen- Excise duty ed 40650 Sqm
Bitumen- Sales Tax stax 40650 Sqm
Bitumen- Transport tr 40650 Sqm
Labour contract lc 40650 Sqm

12.05 Sealing of cracks in bituminous surface with slurry seal 27000 Sqm
Tack coat
Bitumen- Basic price b 27000 Sqm
Bitumen- Excise duty ed 27000 Sqm
Bitumen- Sales Tax stax 27000 Sqm
Bitumen- Transport tr 27000 Sqm
Labour contract lc 27000 Sqm
Dust Mu 135 Cum
Bitumen- Basic price b 135 Cum
Bitumen- Excise duty ed 135 Cum
Bitumen- Sales Tax stax 135 Cum
Bitumen- Transport tr 135 Cum
OPC filler oth 135 Cum
Labour contract lc 27000 Cum

12.06 Maintenance & repair of expansion joints of existing bridges TS Appendi 1350 m
Subcontract sc 1350 m

12.07 Desilting of sludge of existing culverts, bridges 141 Nr


Subcontract sc 141 Nr

0 0 0 0
** Boulder Extractopn from Ujh River top Crusher
GRAND TOTAL
1
1 m3/m3 /m3 0 0
1 m3/m3 5 /m3 1275000 1275000 5.0
0.2 m3/m3 40 /m3 2046995 2046995 8.0 84%
0.2 m3/m3 2 /m3 92570.02 92570.02 0.4
0.8 m3/m3 33 /m3 6802321 6802321 26.7
0.8 m3/m3 2 /m3 307617.3 307617.3 1.2
41 0.0
0.0
0.0
1 m3/m3 /m3 0 0.0
1 m3/m3 12 /m3 1200000 1200000 12.0
1 m3/m3 50 /m3 4998548 4998548 50.0
1 m3/m3 2 /m3 226046.4 226046.4 2.3
64 0 0.0
0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 50 /m3 37950000 37950000 50.0
1 m3/m3 20 /m3 15180000 15180000 20.0
1 m3/m3 76 /m3 57785226 57785226 76.1
1 m3/m3 3 /m3 2613187 2613187 3.4
150 0 0.0
0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 100 /m3 9300000 9300000 100.0
1 m3/m3 76 /m3 7080403 7080403 76.1
1 m3/m3 3 /m3 320192.9 320192.9 3.4
180 0 0.0
per TSC 305 with all leads & lifts 0 0.0
0 0.0
1 m3/m3 17 /m3 5100000 5100000 17.0
1 m3/m3 13 /m3 3896276 3896276 13.0
1 m3/m3 5 /m3 1500000 1500000 5.0
1 m3/m3 62 /m3 18518568 18518568 61.7
1 m3/m3 2 /m3 605493.6 605493.6 2.0
99 0 0.0
0 0.0
1.15 m3/m3 425 /m3 13196250 13196250 488.8
1 m3/m3 /m3 0 0 0.0
1 m3/m3 5 /m3 135000 135000 5.0
1 m3/m3 22 /m3 585563.1 585563.1 21.7
1 m3/m3 1 /m3 19145.9 19145.9 0.7
516 0 0.0
0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 5 /m3 1515000 1515000 5.0
1 m3/m3 22 /m3 6571319 6571319 21.7
1 m3/m3 1 /m3 214859.6 214859.6 0.7
27 0 0.0
0 0.0
0 0.0
1 m3/m3 17 /m3 6069000 6069000 17.0
1 m3/m3 13 /m3 4636569 4636569 13.0
1 m3/m3 8 /m3 2856000 2856000 8.0
1 m3/m3 62 /m3 22037096 22037096 61.7
1 m3/m3 2 /m3 720537.4 720537.4 2.0
102 0 0.0
0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 10 /m3 450000 450000 10.0
1 m3/m3 39 /m3 1748464 1748464 38.9
1 m3/m3 1 /m3 56866.41 56866.41 1.3
50 0 0.0
0 0.0
0 0.0
1 m3/m3 17 /m3 1955000 1955000 17.0
1 m3/m3 13 /m3 1493572 1493572 13.0
1 m3/m3 10 /m3 1150000 1150000 10.0
1 m3/m3 68 /m3 7841815 7841815 68.2
1 m3/m3 2 /m3 255044.3 255044.3 2.2
110 0 0.0
0 0.0
0 0.0
1 m2/m2 /m2 0 0 0.0
1 m2/m2 8 /m2 664000 664000 8.0
0.2 m3/m2 68 /m2 1131949 1131949 13.6
0.2 m3/m2 2 /m2 36815.09 36815.09 0.4
22 0 0.0
0 0.0
1 m2/m2 25 /m2 2700000 2700000 25.0
25 0 0.0
0 0.0
0 0.0
0.65 m3/m3 45 /m3 2193.75 2193.75 29.3
0.6 m3/m3 129 /m3 5822.409 5822.409 77.6
1 m3/m3 50 /m3 3750 3750 50.0
0.5 m3/m2 318 /m3 11930.41 11930.41 159.1 2386083%
0.5 m3/m2 11 /m3 422.5453 422.5453 5.6
322 0 0.0
0 0.0
1.2 m3/m3 129 /m3 27947.57 27947.57 155.3
1 m3/m3 20 /m3 3600 3600 20.0
175 0 0.0
0 0.0
0 0.0
1 m3/m3 5 /m3 -500000 500000 5.0
-5 0 0.0
0 0.0
0 0.0
1 m3/m3 30 /m3 -2.6E+07 25560000 30.0
-30 0 0.0
0 0.0
Sp Gr 2.26 #VALUE! #VALUE!
0 0.0
1.13 mt/m3 28 /mt 5243906 5243906 31.8
1.13 mt/m3 28 /mt 5243906 5243906 31.8
1 m3/m3 5 /m3 825000 825000 5.0
1 m3/m3 384 /m3 63350533 63350533 383.9
1 m3/m3 12 /m3 1956551 1956551 11.9
464 0 0.0
Sp Gr 2.29 #VALUE! #VALUE!
0 0.0
0 0.0
0.5954 mt/m3 28 /mt 2729537 2729537 16.7
0.5496 mt/m3 28 /mt 2519573 2519573 15.5
0.4122 mt/m3 28 /mt 1889679 1889679 11.6
0.7328 mt/m3 28 /mt 3359430 3359430 20.6
1 m3/m3 8 /m3 1304000 1304000 8.0
1 m3/m3 408 /m3 66519788 66519788 408.1
1 m3/m3 15 /m3 2434181 2434181 14.9
495 0 0.0
0 0.0
0 0.0
0.00075 T/m2 9050 /MT 4730888 4730888 6.8
0.00075 T/m2 0 /MT 0 0 0.0
0.00075 T/m2 362 /MT 189235.5 189235.5 0.3
0.00075 T/m2 725 /MT 378993.8 378993.8 0.5
1 m2/m2 1 /m2 348500 348500 0.5
8 0 0.0
0 0.0
0.00025 T/m2 9050 /MT 3153925 3153925 2.3
0.00025 T/m2 0 /MT 0 0 0.0
0.00025 T/m2 362 /MT 126157 126157 0.1
0.00025 T/m2 725 /MT 252662.5 252662.5 0.2
1 m2/m2 1 /m2 697000 697000 0.5
3 0 0.0
Sp Gr 2.41 #VALUE! #VALUE!
1211 0 0.0
0.09158 mt/m3 11160 /mt 14308459 14308459 1022.0
0.102425 mt/m3 0 /mt 0 0 0.0
0.102425 mt/m3 446 /mt 640115.3 640115.3 45.7
0.102425 mt/m3 725 /mt 1039614 1039614 74.3
0.639373 mt/m3 28 /mt 251753.1 251753.1 18.0
0.737701 mt/m3 28 /mt 290469.8 290469.8 20.7
1.032926 mt/m3 28 /mt 406714.6 406714.6 29.1
0.0482 mt/m3 28 /mt 18978.75 18978.75 1.4
mt/m3 /mt 0 0 0.0
0 0.0
1 m3/m3 10 /m3 140000 140000 10.0
0 0.0
1 m3/m3 732 /m3 10241852 10241852 731.6
1 m3/m3 29 /m3 410277.8 410277.8 29.3
1982 0 0.0
Sp Gr 2.41 #VALUE! #VALUE!
1211 0 0.0
0.09158 mt/m3 11160 /mt 97093116 97093116 1022.0 52%
0.102425 mt/m3 0 /mt 0 0 0.0
0.102425 mt/m3 446 /mt 4343639 4343639 45.7
0.102425 mt/m3 725 /mt 7054522 7054522 74.3
0.639373 mt/m3 28 /mt 1708325 1708325 18.0
0.737701 mt/m3 28 /mt 1971045 1971045 20.7
1.032926 mt/m3 28 /mt 2759849 2759849 29.1
0.0482 mt/m3 28 /mt 128784.4 128784.4 1.4
mt/m3 /mt 0 0 0.0
0 0.0
1 m3/m3 10 /m3 950000 950000 10.0
0 0.0
1 m3/m3 732 /m3 69498279 69498279 731.6 37%
1 m3/m3 29 /m3 2784028 2784028 29.3
0 0.0
1982 0 0.0
Sp Gr 2.4 #VALUE! #VALUE!
1415 0 0.0
0.1092 mt/m3 11160 /mt 40216176 40216176 1218.7
0.1092 mt/m3 0 /mt 0 0 0.0
0.1092 mt/m3 446 /mt 1608647 1608647 48.7
0.1092 mt/m3 725 /mt 2612610 2612610 79.2
0.2448 mt/m3 28 /mt 227205 227205 6.9
1.05288 mt/m3 28 /mt 977204.3 977204.3 29.6
1.10232 mt/m3 28 /mt 1023091 1023091 31.0
0.048 mt/m3 28 /mt 44550 44550 1.4
0.048 mt/m3 /mt 0 0 0.0
0 0.0
1 m3/m3 10 /m3 330000 330000 10.0
0 0.0
1 m3/m3 732 /m3 24141507 24141507 731.6
1 m3/m3 29 /m3 967083.5 967083.5 29.3
2186 0 0.0
0 0.0
0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 5 /m3 42000 42000 5.0
1 m3/m3 33 /m3 280095.6 280095.6 33.3 84%
1 m3/m3 2 /m3 12666.59 12666.59 1.5
40 0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 12 /m3 25200 25200 12.0
1 m3/m3 50 /m3 104969.5 104969.5 50.0
1 m3/m3 2 /m3 4746.973 4746.973 2.3
64 0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 100 /m3 11000 11000 100.0
1 m3/m3 76 /m3 8374.67 8374.67 76.1
1 m3/m3 3 /m3 378.7227 378.7227 3.4
180 0 0.0
0 0.0
1 m3/m3 17 /m3 95200 95200 17.0
1 m3/m3 13 /m3 72730.49 72730.49 13.0
1 m3/m3 15 /m3 84000 84000 15.0
1 m3/m3 68 /m3 381862.3 381862.3 68.2
1 m3/m3 2 /m3 12419.55 12419.55 2.2
115 0 0.0
Sp Gr 2.25 #VALUE! #VALUE!
1.575 mt/m3 28 /mt 150609.4 150609.4 44.3
0.675 mt/m3 28 /mt 64546.88 64546.88 19.0
1 m3/m3 80 /m3 272000 272000 80.0
1 m3/m3 318 /m3 1081691 1081691 318.1
1 m3/m3 11 /m3 38310.77 38310.77 11.3
0 0.0
473 0 0.0
Sp Gr 2.4 #VALUE! #VALUE!
1.2636 mt/m3 28 /mt 81739.13 81739.13 35.5
0.816 mt/m3 81 /mt 151770.8 151770.8 66.0
6.464 Bag/m3 113 /Bag 1679250 1679250 730.1
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
1.90688 Kg/m3 30 /Kg 131574.7 131574.7 57.2
1.90688 Bag/m3 0 /Kg 0 0 0.0
1.90688 Bag/m3 1 /Kg 5262.989 5262.989 2.3
1 m3/m3 80 /m3 184000 184000 80.0
1 m3/m3 /m3 0 0 0.0
0 m3/m3 /m2 0 0 0.0
1 m3/m3 662 /m3 1523730 1523730 662.5
1 m3/m3 34 /m3 79349.02 79349.02 34.5
1668 0 0.0
0,1700,2100 & 2200 0 0.0
0 0.0
1.2636 mt/m3 28 /mt 81739.13 81739.13 35.5
0.816 mt/m3 81 /mt 151770.8 151770.8 66.0
6.464 Bag/m3 113 /Bag 1679250 1679250 730.1
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
1.90688 Kg/m3 30 /Kg 131574.7 131574.7 57.2
1.90688 Bag/m3 0 /Kg 0 0 0.0
1.90688 Bag/m3 1 /Kg 5262.989 5262.989 2.3
1 m3/m3 80 /m3 184000 184000 80.0
1 m3/m3 108 /m3 247756 247756 107.7
2 m2/m3 50 /m2 230000 230000 100.0
1 m3/m3 662 /m3 1523730 1523730 662.5
1 m3/m3 34 /m3 79349.02 79349.02 34.5
1876 0 0.0
0 0.0
1.2636 mt/m3 28 /mt 95954.63 95954.63 35.5
0.816 mt/m3 81 /mt 178165.7 178165.7 66.0
6.464 Bag/m3 113 /Bag 1971294 1971294 730.1
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
1.90688 Kg/m3 30 /Kg 154457.3 154457.3 57.2
1.90688 Bag/m3 0 /Kg 0 0 0.0
1.90688 Bag/m3 1 /Kg 6178.291 6178.291 2.3
1 m3/m3 80 /m3 216000 216000 80.0
1 m3/m3 108 /m3 290844 290844 107.7
2 m2/m3 50 /m2 270000 270000 100.0
1 m3/m3 662 /m3 1788726 1788726 662.5
1 m3/m3 34 /m3 93148.85 93148.85 34.5
1876 0 0.0
C 1500, 1700, 2100, 2200 ,2300 0 0.0
0 0.0
1.2636 mt/m3 28 /mt 259432.9 259432.9 35.5
0.816 mt/m3 81 /mt 481707.3 481707.3 66.0
6.464 Bag/m3 113 /Bag 5329794 5329794 730.1
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
1.90688 Kg/m3 30 /Kg 417606.7 417606.7 57.2
1.90688 Bag/m3 0 /Kg 0 0 0.0
1.90688 Bag/m3 1 /Kg 16704.27 16704.27 2.3
1 m3/m3 100 /m3 730000 730000 100.0
1 m3/m3 108 /m3 786356 786356 107.7
2 m2/m3 50 /m2 730000 730000 100.0
1 m3/m3 662 /m3 4836186 4836186 662.5 35%
1 m3/m3 34 /m3 251846.9 251846.9 34.5
1896 0 0.0
0 0.0
1.12 mt/mt 22370 /mt 11274480 11274480 25054.4
1.12 mt/mt 0 /mt 0 0 0.0
1.12 mt/mt 890 /mt 448560 448560 996.8
1.12 mt/mt 550 /mt 277200 277200 616.0
8 kg/mt 40 /kg 144000 144000 320.0
1 mt/mt 1600 /mt 720000 720000 1600.0
28587 0 0.0
0 0.0
1.2 sqm/m 400 /sqm 76800 76800 480.0
1.2 sqm/m 0 /sqm 0 0.0
1.2 sqm/m 16 /sqm 3072 19.2
1 Lit/sqm 210 /lit 33600 33600 210.0
1 Lit/sqm 0 /lit 0 0.0
1 Lit/sqm 8 /lit 1344 8.4
1 sqm/m 80 /sqm 12800 12800 80.0
770 0 0.0
0 0.0
0 0.0
1.05 Lm/Lm 3728 /Lm 7046562 7046562 3914.8
0.04444 Bag/Lm 113 /Bag 9035.096 9035.096 5.0
0.04444 Bag/Lm 0 /Bag 0 0 0.0
0.04444 Bag/Lm 0 /Bag 0 0 0.0
0.04444 Bag/Lm 0 /Bag 0 0 0.0
0.007224 mt/Lm 81 /mt 1051.527 1051.527 0.6
1 Lm/Lm 500 /Lm 900000 900000 500.0
4420 0 0.0
0 0.0
0.77 Lm/nos 33 /Lm 112651 112651 25.6
1 nos/nos 40 /no 176000 176000 40.0
66 0 0.0
Sp Gr 1.6 #VALUE! #VALUE!
1.6 mt/m3 28 /mt 63000 63000 45.0
1 m3/m3 80 /m3 112000 112000 80.0
1 m3/m3 178 /m3 248711.6 248711.6 177.7
1 m3/m3 1 /m3 809.2507 809.2507 0.6
303 0 0.0
0 0.0
1.6 mt/m3 21 /mt 17820 17820 33.0
1 m3/m3 70 /m3 37800 37800 70.0
1 m3/m3 178 /m3 95931.63 95931.63 177.7
1 m3/m3 1 /m3 312.1396 312.1396 0.6
281 0 0.0
0 0.0
0 0.0
0 0.0
1.2636 mt/m3 28 /mt 16703.21 16703.21 35.5
0.816 mt/m3 81 /mt 31014.03 31014.03 66.0
6.464 Bag/m3 113 /Bag 343151.1 343151.1 730.1
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
1.90688 Kg/m3 30 /Kg 26887.01 26887.01 57.2
1.90688 Bag/m3 0 /Kg 0 0 0.0
1.90688 Bag/m3 1 /Kg 1075.48 1075.48 2.3
1 m3/m3 100 /m3 47000 47000 100.0
1 m3/m3 /m3 0 0 0.0
0 m2/m3 /m2 0 0 0.0
1 m3/m3 662 /m3 311370.9 311370.9 662.5
1 m3/m3 34 /m3 16214.8 16214.8 34.5
1688 0 0.0
0 0.0
1.2636 mt/m3 28 /mt 8529.3 8529.3 35.5
0.816 mt/m3 81 /mt 15836.95 15836.95 66.0
6.464 Bag/m3 113 /Bag 175226.1 175226.1 730.1
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
1.90688 Kg/m3 30 /Kg 13729.54 13729.54 57.2
1.90688 Bag/m3 0 /Kg 0 0 0.0
1.90688 Bag/m3 1 /Kg 549.1814 549.1814 2.3
1 m3/m3 100 /m3 24000 24000 100.0
1 m3/m3 /m3 0 0 0.0
0 m2/m3 /m2 0 0 0.0
0 0.0
1.836 Bag/m3 113 /Bag 49770.29 49770.29 207.4
1.836 Bag/m3 0 /Bag 0 0 0.0
1.836 Bag/m3 0 /Bag 0 0 0.0
1.836 Bag/m3 0 /Bag 0 0 0.0
0.18 m3/m3 29 /m3 1249.344 1249.344 5.2
0.15 m3/m3 200 /m3 7200 7200 30.0
1 m3/m3 662 /m3 158997.9 158997.9 662.5
1 m3/m3 34 /m3 8279.898 8279.898 34.5
1931 0 0.0
0 0.0
1 No/No 200 /no 24000 24000 200.0
1 No/No 50 /no 6000 6000 50.0
250 0 0.0
0 0.0
1 m2/m2 25 /m2 7250 7250 25.0
1 m2/m2 10 /m2 2900 2900 10.0
35 0 0.0
0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 5 /m3 75000 75000 5.0
0.8 m3/m3 33 /m3 400136.5 400136.5 26.7
0.8 m3/m3 2 /m3 18095.13 18095.13 1.2
0.2 m3/m3 40 /m3 120411.4 120411.4 8.0
0.2 m3/m3 2 /m3 5445.295 5445.295 0.4
41 0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 12 /m3 45600 45600 12.0
1 m3/m3 50 /m3 189944.8 189944.8 50.0
1 m3/m3 2 /m3 8589.761 8589.761 2.3
64 0 0.0
0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 50 /m3 90000 90000 50.0
1 m3/m3 20 /m3 36000 36000 20.0
1 m3/m3 76 /m3 137040.1 137040.1 76.1
1 m3/m3 3 /m3 6197.281 6197.281 3.4
150 0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 100 /m3 180000 180000 100.0
1 m3/m3 76 /m3 137040.1 137040.1 76.1
1 m3/m3 3 /m3 6197.281 6197.281 3.4
180 0 0.0
0 0.0
1.2636 mt/m3 28 /mt 46200.38 46200.38 35.5
0.816 mt/m3 81 /mt 85783.5 85783.5 66.0
6.464 Bag/m3 113 /Bag 949141.4 949141.4 730.1
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
1.90688 Kg/m3 30 /Kg 74368.32 74368.32 57.2
1.90688 Bag/m3 0 /Kg 0 0 0.0
1.90688 Bag/m3 1 /Kg 2974.733 2974.733 2.3
1 m3/m3 80 /m3 104000 104000 80.0
1 m3/m3 /m3 0 0 0.0
0 m2/m3 /m2 0 0 0.0
1 m3/m3 662 /m3 861238.6 861238.6 662.5
1 m3/m3 34 /m3 44849.45 44849.45 34.5
1668 0 0.0
0 0.0
0 0.0
1.164 mt/m3 28 /mt 16041.38 16041.38 32.7
0.816 mt/m3 81 /mt 32333.78 32333.78 66.0
8.484 Bag/m3 113 /Bag 469551.2 469551.2 958.3
8.484 Bag/m3 0 /Bag 0 0 0.0
8.484 Bag/m3 0 /Bag 0 0 0.0
8.484 Bag/m3 0 /Bag 0 0 0.0
3.253614 Kg/m3 30 /Kg 47828.13 47828.13 97.6
3.253614 Bag/m3 0 /Kg 0 0 0.0
3.253614 Bag/m3 1 /Kg 1913.125 1913.125 3.9
1 m3/m3 100 /m3 49000 49000 100.0
1 m3/m3 107 /m3 52469.2 52469.2 107.1
1.65 m2/m3 50 /m2 40425 40425 82.5
1 m3/m3 662 /m3 324620.7 324620.7 662.5
1 m3/m3 34 /m3 16904.79 16904.79 34.5
2145 0 0.0
0 0.0
1.164 mt/m3 28 /mt 248805 248805 32.7
0.816 mt/m3 81 /mt 501503.5 501503.5 66.0
8.585 Bag/m3 113 /Bag 7369536 7369536 969.7
8.585 Bag/m3 0 /Bag 0 0 0.0
8.585 Bag/m3 0 /Bag 0 0 0.0
8.585 Bag/m3 0 /Bag 0 0 0.0
3.545605 Kg/m3 30 /Kg 808397.9 808397.9 106.4
3.545605 Bag/m3 0 /Kg 0 0 0.0
3.545605 Bag/m3 1 /Kg 32335.92 32335.92 4.3
1 m3/m3 100 /m3 760000 760000 100.0
1 m3/m3 107 /m3 813808 813808 107.1
1.65 m2/m3 50 /m2 627000 627000 82.5
1 m3/m3 662 /m3 5034933 5034933 662.5
1 m3/m3 34 /m3 262196.8 262196.8 34.5
2166 0 0.0
0 0.0
mt/nos /mt 0 0 0.0
1.8 Lm/nos 80 /m 90720 90720 144.0
1 no/no 100 /no 63000 63000 100.0
1 kg/no 32 /Kg 20160 20160 32.0
1 mt/mt 50 /no 31500 31500 50.0
326 0 0.0
0 0.0
0 0.0
1.164 mt/m3 28 /mt 22261.5 22261.5 32.7
0.816 mt/m3 81 /mt 44871.37 44871.37 66.0
8.484 Bag/m3 113 /Bag 651622.1 651622.1 958.3
8.484 Bag/m3 0 /Bag 0 0 0.0
8.484 Bag/m3 0 /Bag 0 0 0.0
8.484 Bag/m3 0 /Bag 0 0 0.0
3.253614 Kg/m3 30 /Kg 66373.73 66373.73 97.6
3.253614 Bag/m3 0 /Kg 0 0 0.0
3.253614 Bag/m3 1 /Kg 2654.949 2654.949 3.9
1 m3/m3 120 /m3 81600 81600 120.0
1 m3/m3 107 /m3 72814.4 72814.4 107.1
2 m2/m3 70 /m2 95200 95200 140.0
1 m3/m3 662 /m3 450494 450494 662.5
1 m3/m3 34 /m3 23459.71 23459.71 34.5
2223 0 0.0
0 0.0
1.1592 mt/m3 28 /mt 521640 521640 32.6
0.816 mt/m3 81 /mt 1055797 1055797 66.0
8.585 Bag/m3 113 /Bag 15514812 15514812 969.7
8.585 Bag/m3 0 /Bag 0 0 0.0
8.585 Bag/m3 0 /Bag 0 0 0.0
8.585 Bag/m3 0 /Bag 0 0 0.0
3.545605 Kg/m3 30 /Kg 1701890 1701890 106.4
3.545605 Bag/m3 0 /Kg 0 0 0.0
3.545605 Bag/m3 1 /Kg 68075.62 68075.62 4.3
1 m3/m3 120 /m3 1920000 1920000 120.0
1 m3/m3 107 /m3 1713280 1713280 107.1
2 m2/m3 70 /m2 2240000 2240000 140.0
1 m3/m3 662 /m3 10599860 10599860 662.5
1 m3/m3 34 /m3 551993.2 551993.2 34.5
2243 0 0.0
0 0.0
0 0.0
1.164 mt/m3 28 /mt 13095 13095 32.7
0.816 mt/m3 81 /mt 26394.92 26394.92 66.0
8.484 Bag/m3 113 /Bag 383307.1 383307.1 958.3
8.484 Bag/m3 0 /Bag 0 0 0.0
8.484 Bag/m3 0 /Bag 0 0 0.0
8.484 Bag/m3 0 /Bag 0 0 0.0
3.253614 Kg/m3 30 /Kg 39043.37 39043.37 97.6
3.253614 Bag/m3 0 /Kg 0 0 0.0
3.253614 Bag/m3 1 /Kg 1561.735 1561.735 3.9
1 m3/m3 120 /m3 48000 48000 120.0
1 m3/m3 276 /m3 110560 110560 276.4
2.5 m2/m3 70 /m2 70000 70000 175.0
1 m3/m3 662 /m3 264996.5 264996.5 662.5
1 m3/m3 34 /m3 13799.83 13799.83 34.5
2427 0 0.0
0 0.0
0 0.0
1.1592 mt/m3 28 /m3 8802.675 8802.675 32.6
0.816 mt/m3 81 /m3 17816.57 17816.57 66.0
8.585 Bag/m3 113 /Bag 261812.5 261812.5 969.7
8.585 Bag/m3 0 /Bag 0 0 0.0
8.585 Bag/m3 0 /Bag 0 0 0.0
8.585 Bag/m3 0 /Bag 0 0 0.0
3.545605 Kg/m3 30 /Kg 28719.4 28719.4 106.4
3.545605 Bag/m3 0 /Kg 0 0 0.0
3.545605 Bag/m3 1 /Kg 1148.776 1148.776 4.3
1 m3/m3 120 /m3 32400 32400 120.0
1 m3/m3 276 /m3 74628 74628 276.4
3.5 m2/m3 70 /m2 66150 66150 245.0
1 m3/m3 662 /m3 178872.6 178872.6 662.5
1 m3/m3 34 /m3 9314.885 9314.885 34.5
2517 0 0.0
Ton/cum -Reinforcement Exclud #VALUE! #VALUE!
1.164 mt/m3 28 /mt 9166.5 9166.5 32.7
0.816 mt/m3 81 /mt 18476.45 18476.45 66.0
8.484 Bag/m3 113 /Bag 268315 268315 958.3
8.484 Bag/m3 0 /Bag 0 0 0.0
8.484 Bag/m3 0 /Bag 0 0 0.0
8.484 Bag/m3 0 /Bag 0 0 0.0
3.253614 Kg/m3 30 /Kg 27330.36 27330.36 97.6
3.253614 Bag/m3 0 /Kg 0 0 0.0
3.253614 Bag/m3 1 /Kg 1093.214 1093.214 3.9
1 m3/m3 100 /m3 28000 28000 100.0
1 m2/m3 276 /m3 77392 77392 276.4
0.5 m2/m3 50 /m2 7000 7000 25.0
0 mt/mt 22370 /mt 0 0 0.0
0 mt/mt 0 /mt 0 0 0.0
0 mt/mt 890 /mt 0 0 0.0
0 mt/mt 550 /mt 0 0 0.0
0 kg/mt 40 /kg 0 0 0.0
0 mt/mt 0 /mt 0 0 0.0
0.25 sqm/m3 400 /sqm 28000 28000 100.0
0.25 sqm/m3 0 /sqm 0 0 0.0
0.25 sqm/m3 16 /sqm 1120 1120 4.0
0.25 sqm/m3 10 /sqm 700 700 2.5
0.010417 lit/ Lm 210 /Lit 612.5 612.5 2.2
0.010417 lit/ Lm 0 /Lit 0 0 0.0
0.010417 lit/ Lm 8 /Lit 24.5 24.5 0.1
0.010417 lit/ Lm 50 /Lit 145.8333 145.8333 0.5
1 m3/m3 662 /m3 185497.5 185497.5 662.5
1 m3/m3 34 /m3 9659.881 9659.881 34.5
2366 0 0.0
Ton/cum -Reinforcement Exclud #VALUE! #VALUE!
1.14432 mt/m3 28 /mt 102988.8 102988.8 32.2
0.816 mt/m3 81 /mt 211159.4 211159.4 66.0
8.888 Bag/m3 113 /Bag 3212479 3212479 1003.9
8.888 Bag/m3 0 /Bag 0 0 0.0
8.888 Bag/m3 0 /Bag 0 0 0.0
8.888 Bag/m3 0 /Bag 0 0 0.0
3.670744 Kg/m3 30 /Kg 352391.4 352391.4 110.1
3.670744 Kg/m3 0 /Kg 0 0 0.0
3.670744 Kg/m3 1 /Kg 14095.66 14095.66 4.4
1 m3/m3 120 /m3 384000 384000 120.0
1 m3/m3 276 /m3 884480 884480 276.4
7 m2/m3 50 /m2 1120000 1120000 350.0
0 mt/m3 22370 /mt 0 0 0.0
0 mt/m3 0 /mt 0 0 0.0
0 mt/m3 890 /mt 0 0 0.0
0 mt/m3 550 /mt 0 0 0.0
0 Kg/m3 40 /kg 0 0 0.0
0 mt/m3 1600 /mt 0 0 0.0
0.05 sqm/m3 400 /sqm 64000 64000 20.0
0.05 sqm/m3 0 /sqm 0 0 0.0
0.05 sqm/m3 16 /sqm 2560 2560 0.8
0.05 sqm/m3 10 /sqm 1600 1600 0.5
0.0025 Lit/m3 210 /Lm 1680 1680 0.5
0.0025 Lit/m3 0 /Lm 0 0 0.0
0.0025 Lit/m3 8 /Lm 67.2 67.2 0.0
0.0025 Lit/m3 50 /Lit 400 400 0.1
1 m3/m3 662 /m3 2119972 2119972 662.5
1 m3/m3 34 /m3 110398.6 110398.6 34.5
2682 0 0.0
0 0.0
1.14432 mt/m3 28 /mt 30896.64 30896.64 32.2
0.816 mt/m3 81 /mt 63347.81 63347.81 66.0
8.888 Bag/m3 113 /Bag 963743.6 963743.6 1003.9
8.888 Bag/m3 0 /Bag 0 0 0.0
8.888 Bag/m3 0 /Bag 0 0 0.0
8.888 Bag/m3 0 /Bag 0 0 0.0
3.670744 Kg/m3 30 /Kg 105717.4 105717.4 110.1
3.670744 Kg/m3 0 /Kg 0 0 0.0
3.670744 Kg/m3 1 /Kg 4228.697 4228.697 4.4
1 Kg/m3 120 /m3 115200 115200 120.0
1 m3/m3 276 /m3 265344 265344 276.4
3 sqm/m3 50 /m2 144000 144000 150.0
0 mt/m3 22370 /mt 0 0 0.0
0 mt/m3 0 /mt 0 0 0.0
0 mt/m3 890 /mt 0 0 0.0
0 mt/m3 550 /mt 0 0 0.0
0 Kg/m3 40 /kg 0 0 0.0
mt/m3 /mt 0 0 0.0
1 m3/m3 662 /m3 635991.6 635991.6 662.5
1 m3/m3 34 /m3 33119.59 33119.59 34.5
2460 0 0.0
0 0.0
1.12 mt/mt 22370 /mt 1.13E+08 1.13E+08 25054.4
1.12 mt/mt 0 /mt 0 0 0.0
1.12 mt/mt 890 /mt 4485600 4485600 996.8
1.12 mt/mt 550 /mt 2772000 2772000 616.0
8 kg/mt 40 /kg 1440000 1440000 320.0
1 mt/mt 1600 /mt 7200000 7200000 1600.0
28587 0 0.0
0 0.0
1.1244 mt/m3 28 /m3 600851.3 600851.3 31.6
0.816 mt/m3 81 /m3 1253759 1253759 66.0
9.292 Bag/m3 113 /Bag 19941097 19941097 1049.5
9.292 Bag/m3 0 /Bag 0 0 0.0
9.292 Bag/m3 0 /Bag 0 0 0.0
9.292 Bag/m3 0 /Bag 0 0 0.0
3.837596 Kg/m3 30 /Kg 2187430 2187430 115.1
3.837596 Bag/m3 0 /Kg 0 0 0.0
3.837596 Bag/m3 1 /Kg 87497.19 87497.19 4.6
1 m3/m3 120 /m3 2280000 2280000 120.0
1 m3/m3 356 /m3 6755450 6755450 355.6
4.5 m2/m3 70 /m2 5985000 5985000 315.0
1 m3/m3 0 /m3 0 0 0.0
1 m2/m3 0 /m2 0 0 0.0
1 m3/m3 662 /m3 12587333 12587333 662.5
1 m3/m3 34 /m3 655491.9 655491.9 34.5
2754 0 0.0
0 0.0
0 0.0
0 0.0
1.08 mt/mt 41000 /mt 23468400 23468400 44280.0
1.08 mt/mt 0 /mt 0 0 0.0
1.08 mt/mt 1640 /mt 938736 938736 1771.2
1.08 mt/mt 1700 /mt 973080 973080 1836.0
0.05 mt/mt 15000 /mt -397500 397500 750.0
77.28 Lm/mt 87 /Lm 3578945 3578945 6752.7
5.866667 no/ mt 1150 /No 3575733 3575733 6746.7
14.35767 Bag/mt 113 /Bag 859500.2 859500.2 1621.7
14.35767 Bag/mt 0 /Bag 0 0 0.0
14.35767 Bag/mt 0 /Bag 0 0 0.0
14.35767 Bag/mt 0 /Bag 0 0 0.0
2.871533 Kg/mt 95 /Kg 144581.7 144581.7 272.8
2.871533 Kg/mt 0 /Kg 0 0 0.0
2.871533 Kg/mt 4 /Kg 5783.268 5783.268 10.9
1 mt/mt 11000 /mt 5830000 5830000 11000.0
73542 0 0.0
Sp.Gr 2.4 0 mm th #VALUE! #VALUE!
0 0.0
0.0054 mt/m3 11160 /mt 1807920 1807920 60.3
0.0054 mt/m3 0 /mt 0 0 0.0
0.0054 mt/m3 446 /mt 72316.8 72316.8 2.4
0.0054 mt/m3 725 /mt 117450 117450 3.9
0.01224 mt/m3 28 /mt 10327.5 10327.5 0.3
0.052644 mt/m3 28 /mt 44418.38 44418.38 1.5
0.055116 mt/m3 28 /mt 46504.13 46504.13 1.6
0.0024 mt/m3 28 /mt 2025 2025 0.1
mt/m3 /mt 0 0 0.0
/mt 0 0 0.0
0 0.0
0.05 m3/m3 10 /m3 15000 15000 0.5
0 0.0
0.05 m3/m3 732 /m3 1097341 1097341 36.6
0.05 m3/m3 29 /m3 43958.34 43958.34 1.5
0 0.0
1 m2/m2 180 /m2 5400000 5400000 180.0
1 m2/m2 3 /m2 91027.5 91027.5 3.0
289 0 0.0
0 0.0
0 0.0
1.05 sqm/sqm 12 /m2 1197 1197 12.6
1.05 sqm/sqm 0 /m2 0 0 0.0
1.05 sqm/sqm 0 /m2 47.88 47.88 0.5
1 sqm/sqm 1 /m2 95 95 1.0
14 0 0.0
0 0.0
1.05 cc/cc 0 /cc 3099443 3099443 0.3
1.05 cc/cc 0 /cc 0 0 0.0
1.05 cc/cc 0 /cc 123977.7 123977.7 0.0
1 cc/cc 0 /cc 536700 536700 0.1
0 0 0.0
0 0.0
0 0.0
1 Lm/Lm 1200 /Lm 144000 144000 1200.0
1 Lm/Lm 0 /Lm 0 0 0.0
1 Lm/Lm 48 /Lm 5760 5760 48.0
0 0.0
1 Lm/Lm 100 /Lm 12000 12000 100.0
1348 0 0.0
0 0.0
1 Lm/Lm 5500 /Lm 330000 330000 5500.0
1 Lm/Lm 0 /Lm 0 0 0.0
1 Lm/Lm 220 /Lm 13200 13200 220.0
0 0.0
1 Lm/Lm 200 /Lm 12000 12000 200.0
5920 0 0.0
0 0.0
1 Lm/Lm 4950 /Lm 5940000 5940000 4950.0
1 Lm/Lm 0 /Lm 0 0 0.0
1 Lm/Lm 198 /Lm 237600 237600 198.0
0 0.0
1 Lm/Lm 200 /Lm 240000 240000 200.0
5348 0 0.0
0 0.0
1 Lm/nos 1250 /Lm 1375000 1375000 1250.0
1 nos/nos 40 /no 44000 44000 40.0
1290 0 0.0
0 0.0
1.15 rm/nos 350 /Lm 398475 398475 402.5
1 nos/nos 50 /Lm 49500 49500 50.0
453 0 0.0
0 0.0
1 m3/Lm 200 /mt 3000 3000 200.0
1 m3/Lm 50 /mt 750 750 50.0
250 0 0.0
0 0.0
0 0.0
1 m3/m3 17 /m3 51000 51000 17.0
1 m3/m3 13 /m3 38962.76 38962.76 13.0
1 m3/m3 15 /m3 45000 45000 15.0
1 m3/m3 68 /m3 204569.1 204569.1 68.2
1 m3/m3 2 /m3 6653.33 6653.33 2.2
115 0 0.0
Sp Gr 2.25 #VALUE! #VALUE!
1.575 mt/m3 28 /mt 115171.9 115171.9 44.3
0.675 mt/m3 28 /mt 49359.38 49359.38 19.0
1 m3/m3 80 /m3 208000 208000 80.0
1 m3/m3 318 /m3 827175.4 827175.4 318.1
1 m3/m3 11 /m3 29296.47 29296.47 11.3
473 0 0.0
Sp Gr 1.6 0 Cement grout #VALUE! #VALUE!
1.6 mt/m3 21 /mt 15180 15180 33.0
1 m3/m3 80 /m3 36800 36800 80.0
0.12 mt/m3 81 /m3 4463.847 4463.847 9.7
1 m3/m3 178 /m3 81719.53 81719.53 177.7
1 m3/m3 1 /m3 265.8967 265.8967 0.6
301 0 0.0
0 0.0
0 0.0
1 Nos/Nos 850 /No 221000 221000 850.0
850 0 0.0
0 0.0
1 Nos/Nos 1500 /No 240000 240000 1500.0
1500 0 0.0
0 0.0
1 Nos/Nos 1700 /No 357000 357000 1700.0
1700 0 0.0
0 0.0
1 m2/m2 25 /m2 192500 192500 25.0
1 m2/m2 10 /m2 77000 77000 10.0
35 0 0.0
0 0.0
0 0.0
0 0.0
1 nos/nos 200 /no 18000 18000 200.0
200 0 0.0
0 0.0
1 nos/nos 200 /no 18000 18000 200.0
200 0 0.0
0 0.0
0 0.0
1.3 kg/kg 350 /kg 81900 81900 455.0
1 kg/kg 50 /kg 9000 9000 50.0
505 0 0.0
0 0.0
1.3 kg/kg 3 /kg 702 702 3.9
1 kg/kg 50 /kg 9000 9000 50.0
54 0 0.0
0 0.0
0 0.0
0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 5 /m3 815000 815000 5.0
1 m3/m3 33 /m3 5435188 5435188 33.3
1 m3/m3 2 /m3 245792.2 245792.2 1.5
40 0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 12 /m3 180000 180000 12.0
1 m3/m3 50 /m3 749782.2 749782.2 50.0
1 m3/m3 2 /m3 33906.95 33906.95 2.3
64 0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 100 /m3 370000 370000 100.0
1 m3/m3 76 /m3 281693.5 281693.5 76.1
1 m3/m3 3 /m3 12738.86 12738.86 3.4
180 0 0.0
0 0.0
0 0 0.0
1.2636 mt/Lm 28 /mt 46200.38 46200.38 35.5
0.816 mt/Lm 81 /mt 85783.5 85783.5 66.0
6.464 Bag/Lm 113 /Bag 949141.4 949141.4 730.1
6.464 Bag/Lm 0 /Bag 0 0 0.0
6.464 Bag/Lm 0 /Bag 0 0 0.0
6.464 Bag/Lm 0 /Bag 0 0 0.0
1.90688 Kg/Lm 30 /Kg 74368.32 74368.32 57.2
1.90688 Kg/Lm 0 /Kg 0 0 0.0
1.90688 Kg/Lm 1 /Kg 2974.733 2974.733 2.3
1 m3/Lm 80 /m3 104000 104000 80.0
1 m3/m3 662 /m3 861238.6 861238.6 662.5
1 m3/m3 34 /m3 44849.45 44849.45 34.5
1668 0 0.0
0 0.0
1.1844 mt/m3 28 /m3 186543 186543 33.3
0.816 mt/m3 81 /m3 369528.9 369528.9 66.0
6.464 Bag/m3 113 /Bag 4088609 4088609 730.1
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
6.464 Bag/m3 0 /Bag 0 0 0.0
1.90688 Kg/m3 30 /Kg 320355.8 320355.8 57.2
1.90688 Bag/m3 0 /Kg 0 0 0.0
1.90688 Bag/m3 1 /Kg 12814.23 12814.23 2.3
1 m3/m3 80 /m3 448000 448000 80.0
1 m3/m3 189 /m3 1055880 1055880 188.6
5.5 m2/m3 50 /m2 1540000 1540000 275.0
1 m3/m3 662 /m3 3709951 3709951 662.5
1 m3/m3 34 /m3 193197.6 193197.6 34.5
2129 0 0.0
0 0.0
1.12 mt/mt 22370 /mt 6013056 6013056 25054.4
1.12 mt/mt 0 /mt 0 0 0.0
1.12 mt/mt 890 /mt 239232 239232 996.8
1.12 mt/mt 550 /mt 147840 147840 616.0
8 kg/mt 40 /kg 76800 76800 320.0
1 mt/mt 1600 /mt 384000 384000 1600.0
28587 0 0.0
0 0 0.0
1 No/No 390 /Nos 46800 46800 390.0
1 No/No 0 /Nos 0 0 0.0
1 No/No 16 /Nos 1872 1872 15.6
1 No/No 5 /Nos 600 600 5.0
1 No/No 30 /Nos 3600 3600 30.0
441 0 0.0
Ton/cum -R 0.578 cum/ No of #VALUE! #VALUE!
0.684583 mt/No 28 /mt 3850.781 3850.781 19.3
0.471648 mt/No 81 /mt 7628.133 7628.133 38.1
4.67024 Bag/no 113 /Bag 105500.7 105500.7 527.5
4.67024 Bag/no 0 /Bag 0 0 0.0
4.67024 Bag/no 0 /Bag 0 0 0.0
4.67024 Bag/no 0 /Bag 0 0 0.0
1.377721 Kg/No 30 /Kg 8266.325 8266.325 41.3
1.377721 Kg/No 0 /Kg 0 0 0.0
1.377721 Kg/No 1 /Kg 330.653 330.653 1.7
0.578 m3/no 80 /m3 9248 9248 46.2
m3/no /m3 0 0 0.0
0 m2/No /m2 0 0 0.0
0 mt/No 22370 /mt 0 0 0.0
0 mt/No 0 /mt 0 0 0.0
0 mt/No 890 /mt 0 0 0.0
0 mt/No 550 /mt 0 0 0.0
0 Kg/No 40 /kg 0 0 0.0
0 mt/No 1600 /mt 0 0 0.0
0.35 Cum / No o 0 0.0
0.14784 mt/No 81 /m3 2391.069 2391.069 12.0
0.591052 Bag/No 113 /Bag 13351.86 13351.86 66.8
0.591052 Bag/No 0 /Bag 0 0 0.0
0.591052 Bag/No 0 /Bag 0 0 0.0
0.591052 Bag/No 0 /Bag 0 0 0.0
0.35 m3/no 200 /m3 14000 14000 70.0
4.46 Sqm / No o 0 0.0
1.027584 mt/No 81 /mt 16619.49 16619.49 83.1
4.929834 Bag/m3 113 /Bag 111365 111365 556.8
4.929834 Bag/m3 0 /Bag 0 0 0.0
4.929834 Bag/m3 0 /Bag 0 0 0.0
4.929834 Bag/m3 0 /Bag 0 0 0.0
4.46 m2/no 30 /m2 26760 26760 133.8
255 kg/No 30 /kg 1530000 1530000 7650.0
0 0.0
0.578 m3/m3 662 /m3 76583.99 76583.99 382.9
0.578 m3/m3 34 /m3 3988.151 3988.151 19.9
9649 0 0.0
0 0.0
1.05 Lm/Lm 787 /Lm 2561097 2561097 826.2
0.025856 Bag/Lm 113 /Bag 9053.349 9053.349 2.9
0.025856 Bag/Lm 0 /Bag 0 0 0.0
0.025856 Bag/Lm 0 /Bag 0 0 0.0
0.025856 Bag/Lm 0 /Bag 0 0 0.0
0.007224 mt/Lm 81 /mt 1810.963 1810.963 0.6
1 Lm/Lm 150 /Lm 465000 465000 150.0
980 0 0.0
Sp Gr 2.26 #VALUE! #VALUE!
2.26 mt/m3 28 /mt 101700 101700 63.6
1 m3/m3 80 /m3 128000 128000 80.0
1 m3/m3 318 /m3 509031 509031 318.1
1 m3/m3 11 /m3 18028.6 18028.6 11.3
473 0 0.0
Sp Gr 1.6 #VALUE! #VALUE!
1.6 mt/m3 21 /mt 118800 118800 33.0
1 m3/m3 70 /m3 252000 252000 70.0
1 m3/m3 178 /m3 639544.2 639544.2 177.7
1 m3/m3 1 /m3 2080.93 2080.93 0.6
281 0 0.0
Sp Gr 2.26 #VALUE! #VALUE!
2.26 mt/m3 28 /mt 152550 152550 63.6
1 m3/m3 80 /m3 192000 192000 80.0
1 m3/m3 318 /m3 763546.5 763546.5 318.1
1 m3/m3 11 /m3 27042.9 27042.9 11.3
473 0 0.0
0 0.0
0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 5 /m3 13000 13000 5.0
1 m3/m3 33 /m3 86696.24 86696.24 33.3
1 m3/m3 2 /m3 3920.613 3920.613 1.5
40 0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 12 /m3 6120 6120 12.0
1 m3/m3 50 /m3 25492.59 25492.59 50.0
1 m3/m3 2 /m3 1152.836 1152.836 2.3
64 0 0.0
0 0.0
1 m3/m3 /m3 0 0 0.0
1 m3/m3 100 /m3 34000 34000 100.0
1 m3/m3 76 /m3 25885.35 25885.35 76.1
1 m3/m3 3 /m3 1170.598 1170.598 3.4
180 0 0.0
0 0.0
1.2636 mt/Lm 28 /mt 39092.63 39092.63 35.5
0.816 mt/Lm 81 /mt 72586.04 72586.04 66.0
6.464 Bag/Lm 113 /Bag 803119.7 803119.7 730.1
6.464 Bag/Lm 0 /Bag 0 0 0.0
6.464 Bag/Lm 0 /Bag 0 0 0.0
6.464 Bag/Lm 0 /Bag 0 0 0.0
1.90688 Kg/Lm 30 /Kg 62927.04 62927.04 57.2
1.90688 Kg/Lm 0 /Kg 0 0 0.0
1.90688 Kg/Lm 1 /Kg 2517.082 2517.082 2.3
1 m3/Lm 80 /m3 88000 88000 80.0
1 m3/m3 662 /m3 728740.4 728740.4 662.5
1 m3/m3 34 /m3 37949.53 37949.53 34.5
1668 0 0.0
Sp Gr 2.25 #VALUE! #VALUE!
1.575 mt/m3 28 /mt 66445.31 66445.31 44.3
0.675 mt/m3 28 /mt 28476.56 28476.56 19.0
1 m3/m3 80 /m3 120000 120000 80.0
1 m3/m3 318 /m3 477216.6 477216.6 318.1
1 m3/m3 11 /m3 16901.81 16901.81 11.3
473 0 0.0
0 0.0
1 m3/m3 17 /m3 86700 86700 17.0
1 m3/m3 13 /m3 66236.69 66236.69 13.0
1 m3/m3 0 /m3 0 0 0.0
1 m3/m3 68 /m3 347767.5 347767.5 68.2
1 m3/m3 2 /m3 11310.66 11310.66 2.2
100 0 0.0
0 0.0
1.1844 mt/m3 28 /mt 69953.63 69953.63 33.3
0.816 mt/m3 81 /mt 138573.3 138573.3 66.0
8.08 Bag/m3 113 /Bag 1916536 1916536 912.6
8.08 Bag/m3 0 /Bag 0 0 0.0
8.08 Bag/m3 0 /Bag 0 0 0.0
8.08 Bag/m3 0 /Bag 0 0 0.0
2.3836 Kg/m3 30 /Kg 150166.8 150166.8 71.5
2.3836 Kg/m3 0 /Kg 0 0 0.0
2.3836 Kg/m3 1 /Kg 6006.672 6006.672 2.9
1 m3/m3 189 /m3 395955 395955 188.6
5.5 m2/m3 50 /m2 577500 577500 275.0
1 m3/m3 80 /m3 168000 168000 80.0
1 m3/m3 662 /m3 1391232 1391232 662.5
1 m3/m3 34 /m3 72449.11 72449.11 34.5
2327 0 0.0
0 0.0
1.15 rm/nos 350 /Lm 1006250 1006250 402.5
1 nos/nos 50 /Lm 125000 125000 50.0
453 0 0.0
0 0.0
0 0.0
0 0.0
1 No/No 5210 /No 104200 104200 5210.0
5210 0 0.0
0 0.0
1 No/No 3460 /No 138400 138400 3460.0
3460 0 0.0
0 0.0
1 No/No 3845 /No 807450 807450 3845.0
3845 0 0.0
0 0.0
1 No/No 2750 /No 192500 192500 2750.0
2750 0 0.0
0 0.0
1 No/No 5250 /No 288750 288750 5250.0
5250 0 0.0
0 0.0
1 No/No 3400 /No 170000 170000 3400.0
3400 0 0.0
0 0.0
1 No/No 4060 /No 162400 162400 4060.0
4060 0 0.0
0 0.0
1 No/No 3100 /No 124000 124000 3100.0
3100 0 0.0
0 0.0
0 0.0
1 No/No 12000 /No 540000 540000 12000.0
12000 0 0.0
0 0.0
1 No/No 14000 /No 1050000 1050000 14000.0
14000 0 0.0
0 0.0
1 No/No 16435 /No 164350 164350 16435.0
16435 0 0.0
0 0.0
1 No/No 23970 /No 119850 119850 23970.0
23970 0 0.0
0 0.0
1 No/No 39500 /No 197500 197500 39500.0
39500 0 0.0
0 0.0
0 0.0
1 No/No 58000 /Mt 580000 580000 58000.0
58000 0 0.0
0 0.0
1 No/No 2865 /sqm 143250 143250 2865.0
2865 0 0.0
rt-I), TS 803 0 0.0
0 0.0
1 No/No 305 /sqm 7628805 7628805 305.2
305 0 0.0
0 0.0
1 No/No 800 /No 960000 960000 800.0
800 0 0.0
0 0.0
0.05 cum/ No of 0 0.0
0.06318 mt/No 28 /mt 515.3119 515.3119 1.8
0.0408 mt/No 81 /mt 956.8159 956.8159 3.3
0.3232 Bag/No 113 /Bag 10586.58 10586.58 36.5
0.3232 Bag/No 0 /Bag 0 0 0.0
0.3232 Bag/No 0 /Bag 0 0 0.0
0.3232 Bag/No 0 /Bag 0 0 0.0
0.095344 Kg/No 30 /Kg 829.4928 829.4928 2.9
0.095344 Kg/No 0 /Kg 0 0 0.0
0.095344 Kg/No 1 /Kg 33.17971 33.17971 0.1
0.05 m3/No 80 /m3 1160 1160 4.0
0.05 m3/No 662 /m3 9606.123 9606.123 33.1
0.05 m3/No 34 /m3 500.2438 500.2438 1.7
83 0 0.0
0.28 cum/ No o 0 0.0
0.353808 mt/No 28 /mt 597.051 597.051 10.0
0.22848 mt/No 81 /mt 1108.587 1108.587 18.5
1.80992 Bag/No 113 /Bag 12265.83 12265.83 204.4
1.80992 Bag/No 0 /Bag 0 0 0.0
1.80992 Bag/No 0 /Bag 0 0 0.0
1.80992 Bag/No 0 /Bag 0 0 0.0
0.533926 Kg/No 30 /Kg 961.0675 961.0675 16.0
0.533926 Kg/No 0 /Kg 0 0 0.0
0.533926 Kg/No 1 /Kg 38.4427 38.4427 0.6
0.28 m3/No 80 /m3 1344 1344 22.4
0.28 m3/No 662 /m3 11129.85 11129.85 185.5
0.28 m3/No 34 /m3 579.5928 579.5928 9.7
467 0 0.0
0.4 cum/ No of 0 0.0
0.50544 mt/No 28 /mt 213.2325 213.2325 14.2
0.3264 mt/No 81 /mt 395.9238 395.9238 26.4
2.5856 Bag/No 113 /Bag 4380.653 4380.653 292.0
2.5856 Bag/No 0 /Bag 0 0 0.0
2.5856 Bag/No 0 /Bag 0 0 0.0
2.5856 Bag/No 0 /Bag 0 0 0.0
0.762752 Kg/No 30 /Kg 343.2384 343.2384 22.9
0.762752 Kg/No 0 /Kg 0 0 0.0
0.762752 Kg/No 1 /Kg 13.72954 13.72954 0.9
0.4 m3/No 80 /m3 480 480 32.0
0.4 m3/No 662 /m3 3974.947 3974.947 265.0
0.4 m3/No 34 /m3 206.9974 206.9974 13.8
667 0 0.0
0 0.0
0 0.0
1 No/No 1500 /No 225000 225000 1500.0
1500 0 0.0
0 0.0
1 No/No 2450 /No 73500 73500 2450.0
2450 0 0.0
0 0.0
1 No/No 570 /No 279300 279300 570.0
570 0 0.0
0 0.0
1 No/No 3585 /No 233025 233025 3585.0
3585 0 0.0
0.2 cum/ No of 0 0.0
0.25272 mt/No 28 /mt 9950.85 9950.85 7.1
0.1632 mt/No 81 /mt 18476.45 18476.45 13.2
1.2928 Bag/No 113 /Bag 204430.5 204430.5 146.0
1.2928 Bag/No 0 /Bag 0 0 0.0
1.2928 Bag/No 0 /Bag 0 0 0.0
1.2928 Bag/No 0 /Bag 0 0 0.0
0.381376 Kg/No 30 /Kg 16017.79 16017.79 11.4
0.381376 Kg/No 0 /Kg 0 0 0.0
0.381376 Kg/No 1 /Kg 640.7117 640.7117 0.5
0.2 m3/No 80 /m3 22400 22400 16.0
0.2 m3/No 662 /m3 185497.5 185497.5 132.5
0.2 m3/No 34 /m3 9659.881 9659.881 6.9
334 0 0.0
0 0.0
1 No/No 265 /No 477000 477000 265.0
265 0 0.0
0 0.0
1 No/No 197202 /No 1972020 1972020 197202.0
197202 0 0.0
0 0.0
1.2636 mt/cum 28 /mt 341172 341172 35.5
0.816 mt/cum 81 /mt 633478.1 633478.1 66.0
6.464 Bag/cum 113 /Bag 7009044 7009044 730.1
6.464 Bag/cum 0 /Bag 0 0 0.0
6.464 Bag/cum 0 /Bag 0 0 0.0
6.464 Bag/cum 0 /Bag 0 0 0.0
1.90688 Kg/cum, 30 /Kg 549181.4 549181.4 57.2
1.90688 Kg/cum, 0 /Kg 0 0 0.0
1.90688 Kg/cum, 1 /Kg 21967.26 21967.26 2.3
1 m3/m3 80 /m3 768000 768000 80.0
1 m3/m3 185 /m3 1771805 1771805 184.6
1 m3/m3 78 /m3 752114.8 752114.8 78.3
1 m3/m3 662 /m3 6359916 6359916 662.5
1 m3/m3 34 /m3 331195.9 331195.9 34.5
1931
0
0
0
0
35.5752 m2/No 10000 /m2 0 0
#DIV/0! 0
0
35.5752 m2/No 10000 /m2 0 0
#DIV/0! 0
0
23.8788 m2/No 10000 /m2 0 0
#DIV/0! 0
0
31.8384 m2/No 10000 /m2 0 0
#DIV/0! 0
0
0
1 No/No 150000 /No 0 0
#DIV/0! 0
0
1 No/No 250000 /No 0 0
#DIV/0! 0
0
0
1 m2/m2 7000 /m2 16744000 0
7000 0
0
1 m2/m2 5000 /m2 250000 0
5000 0
0
1 m2/m2 7000 /m2 588000 0
7000 0
0
1 m2/m2 5000 /m2 3750000 0
5000 0
0
1 m2/m2 7000 /m2 5040000 0
7000 0
0
0
1 m2/m2 6000 /m2 0 0
#DIV/0! 0
0
1 m/m 1500 /m 0 0
#DIV/0! 0
0
6.138 Kg/m 28 /Lm 0 0
1.035 Kg/m 40 /Lm 0 0
0.015469 m3/m 2000 /m3 0 0
1 m/m 50 /Lm 0 0
6.4557 nos/nos 15 /Kg 0 0
#DIV/0! 0
0
1 m/m 800 /m 0 0
#DIV/0! 0
0
1 m/m 800 /m 0 0
#DIV/0! 0
0
1.34 mt/m3 5 /mt 0 0
0.58 mt/m3 129 /mt 0 0
6.03 Bag/m3 214 /Bag 0 0
6.03 Bag/m3 0 /Bag 0 0
6.03 Bag/m3 0 /Bag 0 0
6.03 Bag/m3 42 /Bag 0 0
2.84616 Kg/m3 35 /Kg 0 0
2.84616 Kg/m3 0 /Kg 0 0
2.84616 Kg/m3 0 /Kg 0 0
1 m3/m3 40 /m3 0 0
1 m3/m3 198 /m3 0 0
1.7 m2/m3 50 /m2 0 0
1 m3/m3 565 /m3 0 0
1 m3/m3 32 /m3 0 0
#DIV/0! 0
0
1 nos/nos 125 /Lm 0 0
1 nos/nos 50 /Lm 0 0
#DIV/0! 0
0
9.9825 Kg/m 38 /Lm 0 0
26.62 Kg/m 38 /Lm 0 0
0.0297 m3/m 2000 /m3 0 0
1 m/m 20 /Lm 0 0
32.94225 nos/nos 15 /Kg 0 0
#DIV/0! 0
0
0
4 T/No 58000 /Mt 0 0
#DIV/0! 0
0
1 nos/nos 3500 /no 0 0
#DIV/0! 0
0
1 nos/nos 15000 /no 0 0
#DIV/0! 0
0
0
0
1 m3/m3 200 /m3 10800 0
200 0
0
1 m3/m3 250 /m3 41250 0
250 0
0
1 m3/m3 /m3 0 0
1 m3/m3 12 /m3 2880 0
1 m3/m3 137 /m3 32824.36 0
1 m3/m3 0 /m3 0 0
149 0
0
0
0
1.21 mt/m3 5 /mt 635.25 0
0.55 mt/m3 129 /mt 7431.214 0
8.04 Bag/m3 214 /Bag 180827.6 0
8.04 Bag/m3 0 /Bag 0 0
8.04 Bag/m3 0 /Bag 0 0
8.04 Bag/m3 42 /Bag 35304.44 0
2.84616 Kg/m3 35 /Kg 10459.64 0
2.84616 Kg/m3 0 /Kg 0 0
2.84616 Kg/m3 0 /Kg 0 0
1 m3/m3 80 /m3 8400 0
1 m3/m3 182 /m3 19065.9 0
1.65 m2/m3 50 /m2 8662.5 0
1 m3/m3 565 /m3 59306.93 0
1 m3/m3 32 /m3 3358.078 0
3176 0
0
0
0
0
1.21 mt/m3 5 /mt 6673.15 0
0.55 mt/m3 129 /mt 78063.13 0
8.04 Bag/m3 214 /Bag 1899551 0
8.04 Bag/m3 0 /Bag 0 0
8.04 Bag/m3 0 /Bag 0 0
8.04 Bag/m3 42 /Bag 370864.8 0
2.84616 Kg/m3 35 /Kg 109876 0
2.84616 Kg/m3 0 /Kg 0 0
2.84616 Kg/m3 0 /Kg 0 0
1 m3/m3 120 /m3 132360 0
1 m3/m3 182 /m3 200282.7 0
2.75 m2/m3 60 /m2 181995 0
1 m3/m3 565 /m3 623005.2 0
1 m3/m3 32 /m3 35275.81 0
3298 0
0
0
0
0
1.21 mt/m3 5 /mt 919.6 0
0.55 mt/m3 129 /mt 10757.57 0
8.04 Bag/m3 214 /Bag 261769.5 0
8.04 Bag/m3 0 /Bag 0 0
8.04 Bag/m3 0 /Bag 0 0
8.04 Bag/m3 42 /Bag 51107.39 0
2.84616 Kg/m3 35 /Kg 15141.57 0
2.84616 Kg/m3 0 /Kg 0 0
2.84616 Kg/m3 0 /Kg 0 0
1 m3/m3 120 /m3 18240 0
1 m3/m3 1068 /m3 162307.1 0
6 m2/m3 70 /m2 63840 0
1 m3/m3 565 /m3 85853.84 0
1 m3/m3 32 /m3 4861.218 0
4439 0
0
0
0
0
1.23 mt/m3 5 /mt 0 0
0.56 mt/m3 129 /mt 0 0
8.2008 Bag/m3 214 /Bag 0 0
8.2008 Bag/m3 0 /Bag 0 0
8.2008 Bag/m3 0 /Bag 0 0
8.2008 Bag/m3 42 /Bag 0 0
3.38693 Kg/m3 35 /Kg 0 0
3.38693 Kg/m3 0 /Kg 0 0
3.38693 Kg/m3 0 /Kg 0 0
1 m3/m3 120 /m3 0 0
1 m3/m3 1068 /m3 0 0
8 m2/m3 70 /m2 0 0
1 m3/m3 565 /m3 0 0
1 m3/m3 32 /m3 0 0
#DIV/0! 0
0
1.05 cc/cc 0 /cc 0 0
1.05 cc/cc 0 /cc 0 0
1.05 cc/cc 0 /cc 0 0
1 cc/cc 0 /cc 0 0
1 cc/cc 0 /cc 0 0
#DIV/0! 0
0
1.05 sqm/sqm 12 /m2 315 0
1.05 sqm/sqm 2 /m2 50.4 0
1.05 sqm/sqm 1 /m2 15.624 0
1 sqm/sqm 1 /m2 25 0
16 0
0
0
1.1 mt/mt 27267 /mt 119973.3 0
1.1 mt/mt 0 /mt 0 0
1.1 mt/mt 0 /mt 0 0
1.1 mt/mt 0 /mt 0 0
-0.04 mt/mt 15000 /mt -2400 0
8 kg/mt 40 /kg 1280 0
1 mt/mt 1247 /mt 4989.579 0
30961 0
0
1.1 mt/mt 27267 /mt 1949567 0
1.1 mt/mt 0 /mt 0 0
1.1 mt/mt 0 /mt 0 0
1.1 mt/mt 0 /mt 0 0
-0.04 mt/mt 15000 /mt -39000 0
8 kg/mt 40 /kg 20800 0
1 mt/mt 1247 /mt 81080.66 0
30961 0
0
1.1 mt/mt 27267 /mt 329926.7 0
1.1 mt/mt 0 /mt 0 0
1.1 mt/mt 0 /mt 0 0
1.1 mt/mt 0 /mt 0 0
-0.04 mt/mt 15000 /mt -6600 0
8 kg/mt 40 /kg 3520 0
1 mt/mt 1247 /mt 13721.34 0
30961 0
0
1 nos/nos 2000 /no 248000 0
2000 0
0
0
0
1 No/no 22000 /no 0 0
1 No/no 3590 /no 0 0
1 No/no 1024 /no 0 0
1 No/no 5000 /no 0 0
#DIV/0! 0
0
0
1 No/no 31500 /no 0 0
1 No/no 3590 /no 0 0
1 No/no 1024 /no 0 0
1 No/no 5000 /no 0 0
#DIV/0! 0
0
0
1 nos/nos 50000 /no 0 0
0
0
1 nos/nos 150 /no 698400 0
150 0
0
1.05 cc/cc 0 /cc 128898 0
1.05 cc/cc 0 /cc 20623.68 0
1.05 cc/cc 0 /cc 6393.341 0
1 cc/cc 0 /cc 22320 0
cc/cc /cc 0 0
0 0
0
1 m/m 3000 /m 90000 0
3000 0
0
1 m/m 500 /m 1350000 0
500 0
0
0
1 Lm/Lm 4950 /Lm 1247400 0
1 Lm/Lm 792 /Lm 199584 0
1 Lm/Lm 246 /Lm 61871.04 0
0
1 Lm/Lm 200 /Lm 50400 0
6188 0
0
1 Lm/Lm 1200 /Lm 2937600 0
1 Lm/Lm 192 /Lm 470016 0
1 Lm/Lm 60 /Lm 145705 0
0
1 Lm/Lm 100 /Lm 244800 0
1552 0
0
0.5 nos/Kg 200 /no 30400 0
1.3 kg/kg 350 /kg 138320 0
1 kg/kg 50 /kg 15200 0
605 0
0
3 kg/m2 350 /kg 27300 0
1 m2/m2 100 /m2 2600 0
1150 0
0
1 m2/m2 1000 /m2 50000 0
1000 0
0
1 Lm/nos 1250 /Lm 1722500 0
1 nos/nos 40 /no 55120 0
1290 0
0
0
0
0
0.016667 No/No 450000 /mth 900000 0
1 Mth/mth 10000 /mth 1200000 0
17500 0
0
0.016667 No/No 500000 /mth 1500000 0
1 Mth/mth 10000 /mth 1800000 0
18333 0
0
1 No/No 500 /No 1500000 0
500 0
0
1 No/No 10 /No 60000 0
10 0
0
35.5 m2/no 3000 /m2 5751000 0
106500 0
0
1 m2/m2 120 /m2 2124360 0
120 0
0
0
0
0.1 cum/sqm 3347 /cum 838752.9 0
335 0
0
1 cum/sqm 3447 /cum 3840002 0
3447 0
0
0.00025 T/m2 11590 /MT 129098.1 0
0.00025 T/m2 1891 /MT 21068.81 0
0.00025 T/m2 539 /MT 6006.677 0
0.00025 T/m2 2200 /MT 24505.25 0
1 m2/m2 1 /m2 22277.5 0
5 0
0
0.0007 T/m2 11590 /MT 329793.5 0
0.00075 T/m2 1891 /MT 57666.74 0
0.00075 T/m2 539 /MT 16440.67 0
0.00075 T/m2 2200 /MT 67072.5 0
1 m2/m2 1 /m2 20325 0
12 0
0
0
0.00025 T/m2 11590 /MT 78232.5 0
0.00025 T/m2 1891 /MT 12767.54 0
0.00025 T/m2 539 /MT 3640.002 0
0.00025 T/m2 2200 /MT 14850 0
1 m2/m2 1 /m2 13500 0
0
1 m3/m3 230 /m3 30988.91 0
0.288 T/m2 11590 /MT 450619.2 0
0.288 T/m2 1891 /MT 73541.05 0
0.288 T/m2 539 /MT 20966.41 0
0.288 T/m2 2200 /MT 85536 0
0.048 mt/m3 5120 /mt 33180.19 0
1 m2/m2 20 /m2 540000 0
50 0
0
1 m/m 1000 /m 1350000 0
1000 0
0
1 No/No 2000 /no 282000 0
2000 0
0