Slides - Presentation To TCIA - FINAL
Slides - Presentation To TCIA - FINAL
Financial Tourism
Serv & Education
Capital Mkt SUSTAIN
Greater Wholesale Continue domestic Oil & Gas
KL & Retail production
Agri Electrical
culture & Electronics
Comms,
Health
Content & DIVERSIFY
Services
Infra Palm Oil Build alternative energy
capabilities
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 3
Downstream Oil & Gas development in Johor is part of
EPP4 and EPP13 under ETP Oil, Gas and Energy (OGE)
NKEA
DIVERSIFY
GROW Build alternative energy capabilities
SUSTAIN
Grow in downstream
Continue domestic Oil & Gas 4. Create a regional oil storage and 9. Reduce energy bill through
production trading hub energy efficiency
10. Build up solar power capacity
1. Enhanced oil recovery 5. Unlock latent gas demand
through LNG import 11. Ensure best practice nuclear
2. Develop small fields deployment
3. Increase exploration activities Make Malaysia #1 Asian hub for oil field 12. Drive industrial growth in
EPPs services Sarawak with big hydro
6. Increase presence of major international
oilfield services players
7. Create regional fabrication champions
8. Encourage JV with world-class
companies
13. Increasing petrochemical output
1. Increased oil & gas production 2. Increase volumes in primary logistics 4. Growth driven power demand
abroad 3. Increase marketing of petroleum 5. Growth driven transmission and
BO products distribution capacity
6. Improve structure of Malaysia
energy supply industry
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 4
EPP4: Malaysia can become a regional oil storage hub with
proximity to Singapore, deep water and land availability
▪ Demand to build storage capacity for the region 2020 total
2020 GNI
impact:
▪ Complementing Singapore, the only major independent terminal and storage new jobs:
facility in South East Asia USD0.5
Senai Airport 800
▪ Potential for oil trading business, development of downstream industry (e.g.: Billion
refinery, oil based petrochemical complex, LNG regasification terminal)
10
mil cbm
Pengerang
• Oil storage
• Developer :
Dialog-Vopak-SSI
Tanjung Langsat • Current storage
• Oil storage, marine capacity :
services, steel, Target Storage Capacity 1.3 mil cbm
Tanjung Bin Oilfield Services
• Oil storage and Equipment, 2 Target Storage Capacity
Singapore
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 5
EPP13 in Johor: Petrochemical Complex will be built in
Pengerang
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 6
Overview of Johor Petroleum Development
Corporation (JPDC)
2 5
To identify and manage funds required Industry To ensure the availability of industry
Sufficient
Fund for financing the downstream oil and gas Ready ready workforce to drive and sustain
development in Johor Workforce PIPC’s development growth
3 6
To coordinate and drive the execution of Local To enhance inclusiveness towards an
Coordination equitable society with more access to
development projects in Johor Participation
economic opportunities in PIPC
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 2
JPDC’s Board of Directors
Co-Chairman Co-Chairman
Johor Chief Minister CEO of PEMANDU
Y.A.B Dato’ Mohamed YBhg Dato’ Sri Idris
Khaled Nordin Jala
SPECIALISED
FEDERAL STATE INDUSTRY
BODY
Secretary General of
Johor State EXCO
Treasury, Ministry of Chief Executive,
Member Petrochemicals
Finance JPDC
Y.B. Datuk Ir. Haji Advisor
Y.Bhg. Tan Sri Dr En. Mohd Yazid
Hasni Haji En. Md Arif Mahmood
Mohd Irwan Serigar Ja’afar
Mohammad
Abdullah
Deputy General
(Sectoral), Johor State Oil Storage &
Economic Planning Secretary Trading Advisor
Unit Y.B. Dato’ Haji Ismail Y.Bhg. Tan Sri Dr.
Y.Bhg. Datuk Allauddin bin Karim Ngau Boon Keat
bin Hj. Anuar
•To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 89
Overview of Pengerang Integrated
Petroleum Complex (PIPC)
Environmentally friendly
• Very few Environmentally
Sensitive Areas (ESAs) which are
easily preserved
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 10
PIPC in numbers
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 5
… and also well connected with existing logistics
infrastructure
To Senai Airport 100 km
MALAYSIA
Johor Bahru
To Johor Port 72 km
To Tg Langsat Port 70 km
SINGAPORE PIPC
Jurong Island
Future Development : High Speed Rail (Singapore-Johor-Kuala Lumpur) & Rapid Transit System (Singapore-JB)
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 14
A comprehensive PIPC Masterplan to ensure
development success
Plastics & Fine Downstream finished Medium & Light
Chemicals Park product zone Industries Hub
ERC
Future
integrated
investor 3
Future
integrated
investor 2
CUF WMC
Future
integrated
investor 1
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 8
In tandem with the commitment from investors, the Government is
heavily investing in infrastructure & public amenities for PIPC
Upgrading of FT92 road
FT92
(27.0 km) Main Drainage in PIPC
Stage: Construction
Commencement: 3 August 2015 New Sebana Fire Station
Completion: 30 July 2017
Drainage R1 (7.3 km)
New Ring Road (15.0 km) Stage: Design
Stage: Construction P4 Commencement: April 2017
New P4 Road (7.0 km)
Commencement: 18 Mac 2015 Completion: April 2019
Stage: Design
Completion: January 2017
Commencement: December 2016
Completion: December 2018
Drainage R2 (6.4 km)
NRR
Stage: Tendering
New Punggai Fire Commencement: April 2016
Station Completion: April 2019
New Police
New P1 Road (7.0 km) P1
R3 Station
Stage: Tendering
Commencement: May 2016 R2a New Schools Drainage R2a (1.5 km)
Completion: May 2019 Stage: Tendering
P2 New Sg. Rengit Fire Commencement: April 2016
New P2 Road (5.6 km) Station Completion: April 2019
Stage: Tendering
Commencement: May 2016 Upgrading of Medical
Completion: May 2019 Clinic
Drainage R3 (4.9 km)
R2
• Overall Development Progress as at 29th Stage: Tendering
R1
P3 Commencement: April 2016
August 2016 : 17.81% (vs plan 18.87%) with a New P3 Road (4.2 km)
total of 25 packages Completion: April 2019
Stage: Design
• Completed: 7 packages
• Construction: 13 packages Commencement: December 2016
• Planning Stage, Design & Procurement: 5 Completion: December 2018
packages
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Overview of DIALOG Pengerang Deepwater
Terminal (PDT)
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
DIALOG Pengerang Deepwater Terminal in illustration and
progress in pictures
LNG
Source: DIALOG
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
DIALOG Pengerang Deepwater Terminal in illustration and
progress in pictures
Source: DIALOG
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
DIALOG Pengerang Deepwater Terminal in illustration and
progress in pictures
Source: DIALOG
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
DIALOG Pengerang Deepwater Terminal in illustration and
progress in pictures
Source: DIALOG
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Overview of PETRONAS Pengerang
Integrated Complex (PIC)
PIC
Refinery and Petrochemical • Refinery (300k bbl/d refining capacity)
Integrated Development • Naphtha cracker
(RAPID) • Petrochemical plants
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
PETRONAS Refinery and Petrochemical Integrated
Development (RAPID) Configuration
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
PETRONAS Pengerang Integrated Complex (PIC) Project
Progress
Construction of Refineries
Source: PETRONAS
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
PETRONAS Pengerang Integrated Complex (PIC) Project
Progress
Source: PETRONAS
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
PETRONAS Pengerang Integrated Complex (PIC) Project
Progress
Source: PETRONAS
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
PETRONAS Pengerang Integrated Complex (PIC) Project
Progress
Source: PETRONAS
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Investment Opportunities by PETRONAS Chemicals Group
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
.. and with other milestones achieved according to
plan, the dream will soon become a reality..
PETRONAS
Cogen Plant 1st PETRONAS
Commercial Refinery Ready
PETRONAS For Start-Up
Operation
FID – 3 April TODAY June 2017 Q1 2019
2014 2015 2016 2017 2018 2019
Q1 2015
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 13
Industrial Park Development in PIPC
The Overview
• The only large scale industrial park in
Pengerang for SME’s.
• Accessibility to RAPID, Highways,
Roads and Haulage Road.
• PIP is within PIPC project area and the
project consist of :
o 1,231 acres of SME’s Industrial
Park (phase1 : 786 acres ; phase 2
: 445 acres).
o 243 acres of Commercial &
Residential development.
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Pengerang Industrial Park (PIP) by JCorp
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
PIPC Industrial Park Development by :
The Overview
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Sg. Rengit Industrial Estate by DIALOG
Commercial 1 1.12
Zone
Detached 67 194.06
Industry
Twin Industry 62 35.19
(929 m2)
Cluster 36 8.80
Industry
(2090 m2)
Terrace 95 6.75
Industry
(279 m2)
Future N/A 14.87
Development
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Sg. Rengit Industrial Estate by DIALOG
Development
EIA Order Expected
Approved To Be
Approved
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Conclusion
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 14
Main Office
Suite 17.03A, Level 17,
Menara MSC Cyberport,
No. 5, Jalan Bukit Meldrum,
80300 Johor Bahru,
Johor, Malaysia.
Tel : +607 – 267 2900
Fax : +607 – 267 2999
enquiries@jpdc.gov.my
www.jpdc.gov.my
facebook.com/johorpetroleumdevelopmentcorporationberhad
Thank you