Coal Hauling
Month
Plan Budget Actual Single Double
Jan 540,000 513,570 10,338 503,232
Feb 490,000 534,494 - 534,494
Mar 560,000 554,805 30,472 524,333
Apr 530,000 653,695 - 653,695
May 530,000 612,371 - 612,371
Jun 500,000 554,371 - 554,371
Jul 540,000 674,892 55,079 619,813
Aug 520,000 636,817 77,757 559,060
Sep 540,000 502,033 18,019 484,014
Oct 570,000 517,522 517,522
Nov 540,000 695,312 695,312
Dec 540,000 158,382 158,382
TOTAL SUSPEND 29 DAY Total 6,400,000 6,608,264 191,666 6,416,599
ESTIMASI VOLUME 598,374 TON
DATA WEIGHTBRIDGE
PT. Karunia Armada Indonesia
TABANG - SENYIUR WEEK 52
Cycle Avg Time Avg Time Avg Time Avg Time Avg Antri Avg Antri
No Type Unit
Time all Loading Tipping Muat Kosong Loading Tipping
1 PMSC R-580 5:28 0:12 0:10 2:07 2:05 0:18 0:36
2 PMVV FH16 4:46 0:14 0:11 2:01 1:58 0:12 0:10
Description 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec Avg All
Total Unit 40 40 40 40 40 40 40 40
Unit efektif 14 15 16 18 15 17 22 16
Avg Trip 4.57 4.33 3.81 3.94 4.60 4.65 4.36 4.56
DATA WEIGHTBRIDGE HAULING
PT. Karunia Armada Indonesia
TABANG - SENYIUR WEEK 52
SCANIA R580 (STD 150 TON) VOLVO FH16-160 (STD 170 TON)
DESC RC CC RC CC
TRIP VOL (TON) TRIP VOL (TON) TRIP VOL (TON) TRIP VOL (TON)
OVER LOAD 11 1,740.25 - - 355 67,719.39 67 11,791.65
UNDER LOAD - - 1 143.30 23 3,717.20 48 7,811.71
STANDARD LOAD - - - - - - - -
TOTAL 11 1,740.25 1 143.30 378 71,436.59 115 19,603.36
PT. Karunia Armada Indonesia FUEL RATIO
Cycle Avg Time Avg Time Avg Time Avg Time Avg Antri Avg Antri
No Type Unit
Time all Loading Tipping Muat Kosong Loading Tipping
1 PMSC R-580 1:40 0:12 0:11 0:14 0:11 0:22 0:30
2 PMVV FH16 1:37 0:11 0:10 0:13 0:11 0:22 0:30
Description 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec Avg All
Total Unit 40 40 40 40 40 40 40 40
Unit efektif 9 6 3 1 4 1 0 3
SCANIA R580 (STD 150 TON) VOLVO FH16-160 (STD 170 TON)
DESC RC CC RC CC
TRIP VOL (TON) TRIP VOL (TON) TRIP VOL (TON) TRIP VOL (TON)
OVER LOAD 24 3,964.00 - - 171 33,861.05 - -
UNDER LOAD - - - - 1 169.85 - -
TOTAL 24 3,964.00 - - 172 34,030.90 - -
PT. Karunia Armada Indonesia FUEL RATIO COAL TRANSFER
R580LA-6X4
COMPONENT FREQ DUR
Cabin 14 336.0
Electrical system 1 0.8
Maintenace/service 1 3.8
Engine 0 0.0
Engine related part 0 0.0
Final Drive 0 0.0
Week
Tyre Problem I II III IV
Total
Bead Crack 1 - - - 1
Matching 8 7 5 14 34
Tread Chipping - - - - 0
Sidewall Cut 1 1 2 3 7
Side Wear - 2 2 2 6
Spot Wear - - - - 0
Tread Bursting - 3 3 4 10
Thread Impact - 1 1 - 2
Tread Penetration 28 29 29 44 130
Tread Separation 2 2 4 7 15
Running Flat 1 - 1 - 2
Worn Out 1 3 5 4 13
Total 42 48 52 78 220
PT. Karunia Armada Indonesia Monitoring Tyre 23 Des – 29 Des 2019
Week
Tyre Size/Type Total
I II III IV
Pemakaian 12.00R24 - GL909A 4 6 6 9 25
Tyre New 325/95R24 - GL690A 5 2 2 - 9
325/95R24 - WD156 - - - - 0
Total 9 8 8 9 34
PT. Karunia Armada Indonesia Monitoring Tyre 23 Des – 29 Des 2019
Week Week
Tyre Size/Type PLAN AVERAGE Tyre Size/Type PLAN AVERAGE
I II III IV Life Time Tyre I II III IV
Life Time Tyre
12.00R24 - GL909A 60000 62306 67821 61865 60548 58991 12.00R24 - GL909A 1200 1246 1356 1237 1211 1180
(KM) (HM)
325/95R24 - GL690A 60000 62037 64438 62976 59765 60967 325/95R24 - GL690A 1200 1240 1288 1259 1195 1219
325/95R24 - WD156 55000 55600 55212 53874 55865 57450 325/95R24 - WD156 1100 1112 1104 1077 1117 1149
Achievement Schedule
PT. Karunia Armada Indonesia 23 Des – 29 Des 2019
Service Greasing
Month Service PM Total
Vessel (PS, & Inpeksi
Plan PS 1 4 25 30
Actual PS 1 4 25 30
Ach PS 100% 100% 100% 100.0%
TERIMA KASIH