Professional Documents
Culture Documents
2018 Diseño de Una Nueva Infraestructura Ferroviaria
2018 Diseño de Una Nueva Infraestructura Ferroviaria
Santos Sánchez-Cambronero
E.T.S.I. de Caminos Canales y Puertos (UCLM)
8000
6000
9356
4000
2000
3823
3446 2793
1762
923
598 345
0
CHINA JAPAN SPAIN FRANCE GERMANY ITALY KOREA TAIWAN
Source: UIC
12
10
0
FRANCE GERMANY ITALY SPAIN CHINA JAPAN TAIWAN KOREA
Source: UIC
0,5
0,4
0,3
0,2
0,1
0
FRANCE GERMANY ITALY SPAIN CHINA JAPAN TAIWAN KOREA
Source: UIC
200
114,4
100 73,7
0
FRANCE GERMANY ITALY SPAIN CHINA JAPAN TAIWAN KOREA
Source: UIC
100000
80000
60000
40000
20000
0
FRANCE GERMANY ITALY SPAIN CHINA JAPAN TAIWAN KOREA
Source: UIC
1,5
0,5
0
FRANCE GERMANY ITALY SPAIN CHINA JAPAN TAIWAN KOREA
Source: UIC
Source: UIC
Source: UIC
Madrid
77,1 23,0
54,1 16,0
10,2 16,0
Toledo
44,0 14,0 Valencia
Puertollano Albacete
9,0
33,9
Alicante
Cordoba
46,7
26,7
Caption
Seville
20,9 AVE Services
AVANT Services
(Alvia, Altaria, Tren Hotel)
Source: FFE
Málaga
Section 4
– Length: 26 710
– Max Speed: 350km/h
– 2 viaduct
– Construction costs: 10,8 /6,5 M€/Km
Section 5
– Length : 21 640m
– Max Speed: 350 km/h
– 1Intersections
– 1 viaduct
– Construction costs: 9,3/ 5,6 M€/Km
Section 3
– Length: 12 780 m
– Max Speed: 350km/h
– 2 viaduct
Section 6
– Construction costs: 12.2/ 7,3 M€/Km
– Length : 8 000m
– Max Speed: 350 km/h
– 1 viaduct
– 1 Tunnel
– Construction costs: 12,2/ 7,3 M€/Km
Section 10
– Length: 16 546 m
– Max Speed: 350km/h
– 1 viaduct
– Construction costs: 13.4/ 8,0 M€/Km
Section 8
– Length : 10 970m
– Max Speed: 350 km/h
– 3 viaduct
– 1 Tunnel
– Construction costs: 22.1/ 11.0 M€/Km
Section 9
– Length: 7 470m
– Max Speed: 350km/h
– 3 Tunnels
– Construction costs: 24.3/ 12,1 M€/Km
Section 7
– Length : 11 170m
– Max Speed: 350 km/h
– 1 Tunnel
– Construction costs: 42.1/ 21.1 M€/Km
Section 11
– Length: 3 000
– Entrance to Málaga
– Construction costs: 204.6 M€
• Operation study
• Infrastructure options
• All sections in double track for the current offer (20 trains each way)
Section Crosses
Málaga
150
11
10 2
9 2
125
8 3
7 0
100 6 1
Antequera
5 7
75
9
4
Puente Genil 50
3 3
4
25 2
Córdoba
1
1
0
• Operation study
• Infrastructure options
• Sections 6, 7,8, 9 and 10 in single track for the current offer (20 trains each way)
Section
Málaga 150 11
10
125
9
8
7
100
6
Antequera
5
75
4
50
Puente Genil
3
25
2
Córdoba 0 1
7.5 10 12.5 15 17.5 20 22.5 25
• Operation study
• Infrastructure options
• Sections 6, 7,8, 9 and 10 in single track for the current offer (20 trains each way)
Section
Málaga 150 11
10
125
9 41
8
40
25
2
1. 1.05 1.1 1.15 1.2 1.25 1.3 1.35 1.4 1.45
Córdoba 0 1
7.5 10 12.5 15 17.5 20 22.5 25
• Operation study
• Infrastructure options
• Sections 6, 7,8, 9 and 10 in single track for the current offer (20 trains each way)
Crosses
Section
Málaga 150 11
10
125
9
8
7
100
6
Antequera
5
75
4
50
Puente Genil
1
3
25 9
2
1
Córdoba 0 1
7.5 10 12.5 15 17.5 20 22.5 25
• Operation study
• Infrastructure options
• Sections 1,3, 6, 7,8, 9 and 10 in single track for the current offer (20 trains each
Section way)
Málaga
150
11
10
9
125
8
7
100 6
Antequera
5
75
Puente Genil 50
3
25 2
Córdoba 1
0
• Operation study
• Infrastructure options
• Sections 1,3, 6, 7,8, 9 and 10 in single track for the current offer (20 trains each
Section way)
Málaga
150
11
10
9
125 41
8 40
7
Trains each way 20
100 6
Antequera 30 Mean Relative Time 1.013
5
Max Relative Time 1.033
75
20
4
Puente Genil 50
10
3
25 2
• Operation study
• Infrastructure options
• Sections 1,3, 6, 7,8, 9 and 10 in single track with 33 trains each way (60% more)
Section
Málaga
150
11
10
9
125
8
7
100 6
Antequera
5
75
Puente Genil 50
3
25 2
Córdoba 1
0
• Operation study
• Infrastructure options
• Sections 1,3, 6, 7,8, 9 and 10 in single track with 33 trains each way (60% more)
Section
Málaga
150
11
10
70
9 66
125
8
60
7
Trains each way 33
100 6 50 Mean Relative Time 1.022
Antequera
Max Relative Time 1.037
5 40
75
30
4
20
Puente Genil 50
3
10
25 2
• Analysis results
• Analysis results
• Analysis results
• Speed=250 km/h
• Curves: R≥3550 m , clothoids L ≥470 m
• Straight : L ≥S/1.5=133 m; in practice L ≥200 m
Section 3
– Length: 17 800m
– Max Speed: 300km/h
– 7 Intersections (316,5m)
– Construction costs: 5.1/3.2M€/Km
Section 2
– Length: 17 700m
– Max Speed: 300km/h
– 8 Intersections (605.5 m)
– Construction costs 5.4/3.4M€/Km
Section 1
– Length: 20 200 m
– Max Speed: 250 km/h
– 5 Intersections (85m)
– Construction
Diseño de una infraestructura ferroviaria atendiendocosts:a 4.7/2.8M€/Km
criterios de eficiencia. I Gallego y S.Sánchez-Cambronero
Palencia-Santander
Description of the sections
Section 12
– Length: 12 200 m
– Max Speed:250
– 5 Intersections (108,5)
– Construction costs: 7.3/5.1M€/Km
Section 7
– Length: 11 222m
– Max Speed: 300km/h
– 8 Intersections (365,5m)
– 1 viaduct (150m)
– Construction costs: 7.0/4.7 M€/Km
Section 6
– Length : 17 180m
– Max Speed: 250 km/h
– 7 Intersections (247 m)
– 1 Tunnel (2250m)
– Construction costs: 12.8/8.0 M€/Km
Section 9
– Length: 10 410m
– Max Speed: 250 km/h
– L viaducts (9270 m)
– 1 Tunnel (500m)
– Construction costs: 27.2/17.4 M€/Km
Section 5
– Length : 12 100m
– Max Speed: 300 km/h
– 2 viaducts (4250m, 1850m)
– 1 Tunnel (3300 m)
– Construction costs: 21.5/13.7 M€/Km
Section 8
– Length : 20 790 m
– Max Speed: 300 km/h
– 1 viaducts (350 m)
– L Tunnel (19 550 m)
– Construction costs: 50,7/ 30.5 M€/Km
• Operation study
• Expected demand: 1.6 mill pas/ year
• Pesimistic assumption: 9 trains each way
• Normal assumption: 15 trains each way
• Optimistic assumption: 20 trains each way
• Operation study
• Expected demand: 1.6 mill pas/ year
• Pesimistic assumption: 9 trains each way
• Normal assumption: 15 trains each way
• Optimistic assumption: 20 trains each way
• Assumption for the preferred timetable
0.12 0.12
0.12
0.1 0.1
0.1
0.08 0.08
0.08
0.06 0.06
0.06
0.04 0.04
0.04
0.02 0.02
0.02
0 00
0 5 10 15 20 00 55 10
10 15
15 20
20
• Operation study
• Infrastructure options
• All sections in double track for 9 trains each way
Section Crosses
Santander
12 0
175
11 2
150 10 0
9 0
125 8 0
7 0
100
6 2
5 4
75
4 0
50
3 2
2 0
25
1 2
Palencia
0
8 10 12 14 16 18 20 22
• Operation study
• Infrastructure options
Sections 3 and 6 double tracked. Rest single tracked (9 trains each way)
Section
Santander
12
175
11
150 10
9
125 8
7
100
6
5
75
4
50
3
2
25
1
Palencia
0
8 10 12 14 16 18 20
• Operation study
• Infrastructure options
Sections 3 and 6 double tracked. Rest single tracked (9 trains each way)
Section
Santander
12
175
11
150 10 20
9 18
125 8
15
Trains each way 9
7
100 Mean Relative Time 1.
6
10 Max Relative Time 1.
5
75
4
5
50
3
2
25
1. 1.05 1.1 1.15 1.2 1.25 1.3 1.35 1.4 1.45 1.5 1.55 1.6
1
Palencia
0
8 10 12 14 16 18 20
• Operation study
• Infrastructure options
Sections 3 and 6 double tracked. Rest single tracked (15 trains each way)
Section
Santander
12
175
11
150 10
9
125 8
7
100
6
5
75
4
50
3
2
25
1
Palencia
0
8 10 12 14 16 18 20 22
• Operation study
• Infrastructure options
Sections 3 and 6 double tracked. Rest single tracked (15 trains each way)
Section
Santander
12
175
11
150 10 35
9
30
125 8
25
7
100
6 20 19
5
75 15
Trains each way 15
4 11 Mean Relative Time 1.035
10
50 Max Relative Time 1.079
3
5
2
25
1. 1.05 1.1 1.15 1.2 1.25 1.3 1.35 1.4 1.45 1.5 1.55 1.6
1
Palencia
0
8 10 12 14 16 18 20 22
• Operation study
• Infrastructure options
Sections 3 and 6 double tracked. Rest single tracked (20 trains each way)
Section
Santander
12
175
11
150 10
9
125 8
7
100
6
5
75
4
50
3
2
25
1
Palencia
0
• Operation study
• Infrastructure options
Sections 3 and 6 double tracked. Rest single tracked (20 trains each way)
Section
Santander
12
175
11
150 10
40
9
125 8 30
7 25
100
6 20 Trains each way 20
5
75 Mean Relative Time 1.083
4 11 Max Relative Time 1.11
10
50
3
4
2
25
1. 1.05 1.1 1.15 1.2 1.25 1.3 1.35 1.4 1.45 1.5 1.55 1.6
1
Palencia
0
150 10
9
125 8
7
100
6
5
75
50
3
2
25
1
Palencia
0
7
100
6
5
75
50
3
2
25
1
Palencia
0
7
100
6
5
75
Double composed
4 trains
50
3
2 Double composed
25
trains
1
Palencia
0
• Analysis results